1 Company Portfolio 2015 On/off-site fabrication and site installation of pipework and process systems Project management of refurbishment upgrades Modular built packages Bespoke engineering solutions Off-site testing of pumping systems

2 Awards and Accreditations Quality Management System 9001:2008 Environmental Management System 14001:2004 Occupational H&S Management System 18001:2007 SAFEContractor Scheme Utilities Verification & Assessment Scheme

3 Customers

4 Fabrication & Main Office Facilities - 30,000 ft 2 total capacity with a 10t overhead crane facility. - Large outdoor area currently used for site simulation testing.

5 BAE Systems Steam Barge New and refurbished equipment in the boiler room - 2 million refurbishment of the steam barge Steamhammer. Boiler room deck before refurbishment

6 Lube Oil Flushing Rig - Design and manufacture of a 2000 litre lube oil flushing rig. - Stainless Steel tank, skid mounted design with various instrumentation.

7 Nuclear Submarine Test Loop - Fabrication of a 60 Bar seawater test loop % Radiography. - Supply of high performance butterfly valves.

8 Seawater Pump Replacement Existing Pump New Pump installed New Pump delivery The Problem - High concentration of sandy seawater. - Long periods of redundancy. - Operating parameters of 43,000 l/min. - History of problematic operation and maintenance. New Motor The Solution - Modified vertical upgrade split-case centrifugal pumps. - Superior efficiency, easier maintenance. - Design, supply and installation by NW Total. - Ongoing data monitoring system. - Six split case pumps providing seawater for the Astute class nuclear submarine

9 Degasser System - Used in the Steel industry. - One of many Degasser units built each year at our premises.

10 Simon Carves Dual Pump Package - Dual liquid ring pump system, all pipework vessels and frame fabricated in house. - Used in the Petrochemical industry.

11 Deaeration Pump Skids - 1, 2, or 3 pump skids, with baseframes fabricated in house to offshore specifications. - Pipework generally GRP, Stainless Steel, Cupro-Nickel, or Super Duplex.

12 Ramsden Square Pipe Installation - We are experienced in both small and large scale site work. - We regularly work on site for the Utilities, Nuclear and Pharmaceutical industries. - A large amount of our site work is carried out on a local MoD site.

13 Condensate Recovery System - Bespoke condensate recovery system with integrated level control. - Complete removal of exiting system on site. - Designed, manufactured, and commissioned by NW Total.

14 Industrial Water Booster Set - Design and build of an Industrial Water Booster Set to rigid Sellafield standards.

15 Off-site Simulation Testing - We have a large test facility capable of simulating on-site conditions. - This is becoming increasingly popular in the Nuclear industry.

16 Product Development Test Rigs - Test rig manufactured to bespoke customer requirements. - PLC controlled with clean-in-place (CIP) function.

17 HAST Unblocking Rig - Stainless steel pipework requiring radiography and NDT. - Sellafield quality level 02 build. - Fully function tested at NW premises.

18 Particle Test Rig - A joint design with the customer to develop a test rig for monitoring particles. - Stainless steel welding and machined components. - Borosilicate glass viewing window and infra red camera.

19 Summary NW Total Engineered Solutions are a multi-disciplined company specialising in the following areas Modular built packages Bespoke engineering solutions Fabricated Pipework Systems On-site installation and final commission Off-site testing of pumping systems PCN Qualified Weld Inspection Engineers