1 Power industry, fuel industry INVESTMENT PROJECT 1 Name of the project: The assembly of autonomous power supply using solar panels. Aim of the project: The development and introduction of alternative sources of energy Brief project description: Based on the lack of production of analogs in the region of the republic exists a large market demand for independent power systems. The project provides introduction of system of power supply with use of solar panels. Total value of the project: (mln. USD) including: - 800,000 USD Term of repayment (year) - 2 years Type of Investment project: Creation of joint venture INVESTMENT PROJECT 2 Name of the project:building of substation 220 кv "shahrinav" Title of firm: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street Telegraph: Dushanbe " Barki Tojik " the teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki tojik@tajnet.com Field of activity: manufacture, transmission and distribution of thermal and electrical energy The purpose of the project: improvement of electrical power supply of Gissar Region. The brief description of the project: For liquidation of a deficit in power junctions of Dushanbe, Shahrinav and Gissar regions it is necessary to build the new supporting PC 220 кv with two autotransformers on 125 thousand кvа each and one autotransformer 125 кvа Overall costs of the project: (million. US dollars) - 8,854 from them:own means the external investments -8,854 The proposal to the investors Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: The technical - economical substantiation. Business - plan INVESTMENT PROJECT 3 Name of the project:modernization of kayrakum hydroelectric power station Title of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street Telegraph: Dushanbe " Barki Tojik " the teletype: "Plamya" Tel.: (992-37) , fax: (992-37)

2 barki Field of activity: manufacture, transmission and distribution of thermal and electrical energy The purpose of the project: increase of reliability of effecting, transmission and distribution of the electric power by modernization of the existing equipment of a hydropower plant. The brief description of the project: To execute an estimation of residual resource of the hydraulic turbines which have fulfilled the normative service life. The replacement of power equipment, taking in to account the design features of the hydrounit, replacement of the runner, modernization of hydrogenerators with usage of new technology ОРУ, drainage pompes and compressors, replacement of oil and air circuit breakers is indispensable. Overall costs of the project: (million. US dollars) - 26,8 from them: own means the external investments -26,8 Proposal to investors Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: The technical - economical substantiation. Business - plan INVESTMENT PROJECT 4 Name of the project: Modernization of the fall casting hydroelectric power station Title of enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street Telegraph: Dushanbe " Barki Tojik " the Teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki tojik@tajnet.com Field of activity: Manufacture, transmission and distribution of thermal and electrical energy The purpose of the project: improvement of manufacture of the electric power by the modernization of the existing equipment. The brief description of the project: modernization of hydraulic units No: 1, No: 2, No: 3. Replacement of accumulator batteries, compressors, rehabilitation of a piezometrian network on hydraulic engineering facilities, realization of shore strengthening activities on derivational channel. Overall costs of the project: (million. US dollars) - 16,2 from them: own means the external investments -16,2 Proposal to the investors Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: The technical - economical substantiation. Business - plan INVESTMENT PROJECT 5 Name of the project: Reconstruction of distributive electrical networks.

3 Title of enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street Telegraph: Dushanbe " Barki Tojik " the Teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki tojik@tajnet.com Field of activity: manufacture, transmission and distribution of thermal and electrical energy The purpose of the project: an improvement of the quality, reliability of transmission and distribution of the electric power. The brief description of the project: the replacement of existing transformers on more powerful is indispensable in order to decrease the load of existing distributive electrical circuits networks. A rewiring (on the greater cross-section), bearings, disconnecting switches, disconnectors, single-switches, automatic control units, safety devices. Building of additional substations / 0,4 sq. Overall costs of the project: (million. US dollars) - 70,0 from them: own means the external investments -70,0 The proposal to the investors Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: The technical - economical substantiation. Business - plan INVESTMENT PROJECT 6 Name of the project:reconstruction of a park of the count in a power system Open Holding Joint - Stock Company " Barki Tojik " Title of firm: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street Telegraph: Dushanbe " Barki Tojik " the Teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki tojik@tajnet.com Field of activity: manufacture, transmission and distribution of thermal and electrical energy The purpose of the project: achievement of the qualitative calculation of the consumed electric power in a power system Open Holding Joint - Stock Company " Barki Tojik " The brief description of the project: used devices for calculation of the electric power morally and physically have become outdated, as have a poor nonsufficient accuracy, create disculculation of consumed electric power, do not have the possibility of operating control of routine-limit discipline. It is indispensable the full replacement of an existing park of devices of the calculation on modern electronic meters with absolute consistency for: 1. Intergovernmental crossflow of the electric power in quantity 66 pieces with an absolute consistency 0,2. 2. Development of diverging lines in quantity 135 pieces with an absolute consistency 0,5 3. Head count in quantity 300 pieces with an absolute consistency 0,5. 4. Interregional counting in quantity 280 pieces with an absolute consistency 1,0 5. Technical count in quantity 4500 pieces with an absolute consistency 1,0 Total 5281 pcs. of electric meters. The application of electric meters demands partial replacement of measuring transformers of a

4 current and voltage. Simultaneously with it the conforming metrology equipment, computer means and communication facilities, and also replacement of electric meters for the household users which are most power-intensive are required. Overall costs of the project: (million. US dollars) - 15,04 from them: own means the external investments -15,04 The proposal to the investors Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: The technical - economical substantiation. Business - plan. ============================================================= INVESTMENT PROJECT 7 Name of the project: Construction of superconductive high voltage line- 765 Kw "Rogun- Khorog-Vakhan-Peshavar" Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street Telegraph: Dushanbe " Barki Tojik " Teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki tojik@tajnet.com Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations. The purpose of the project: Provide direct transmission of power energy from Rogunskaya HPS to Afghanistan and Pakistan. The brief description of the project: Construction of superconductive HL-765 Kw., section 3*5 sq.mm, length-650 km; Rogunskaya HPS-Khorog-Vakhan- Peshavar will provide transmission of thousand Kw. or 4.0 billion kw. to Afghanistan and Pakistan. The length from Rogunskaya HPS till Afghanistan-Pakistan frontier is 550 km. Total costs of the project: (million. US dollars) - 240,0 from them: own means the external investments - 240,0 term of repayment (year) - 10 The proposal to the investors Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: Investment project. Business - plan INVESTMENT PROJECT 8 Name of the project: Construction of superconductive high voltage line- 500 Kw "Rogun- Kunduz-Puli Khumri-Kabul-Jalalabad-Peshavar"

5 Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street Telegraph: Dushanbe " Barki Tojik " Teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki tojik@tajnet.com Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations. The purpose of the project: Provide direct transmission of power energy from Rogunskaya HPS to Afghanistan and Pakistan. The brief description of the project: Construction of superconductive HL-500 Kw., section 3*400 sq.mm, length-1100 km: Rogunskaya HPS-Sangtudinskaya HPS - Kunduz, Puli Khumri - Kabul - Jalalabad (Afghanistan)-Peshavar (Pakistan) will provide transmission of thousand Kw. or 4.0 billion kw. to Afghanistan and Pakistan. The length of the line from Rogunskaya HPS till Afghanistan-Pakistan frontier is 1000 km. Total costs of the project: (million. US dollars) - 295,5 from them: own means the external investments - 295,5 term of repayment (year) - 10 The proposal to the investors Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: Investment project. Business - plan INVESTMENT PROJECT 9 Name of the project: Construction of superconductive high voltage line- 500 Kw "Rogunskaya HPS- Sangtudinskaya HPS -Kunduz-Puli Khumri-Kabul" Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street Telegraph: Dushanbe " Barki Tojik " Teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki tojik@tajnet.com Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations. The purpose of the project: Provide direct transmission of power energy to large population areas of Afghanistan The brief description of the project: Construction of superconductive HL-500 Kw, section 3*400 sq.mm, length- 585 km: Rogunskaya HPS-Sangtudinskaya HPS - Kunduz, Puli Khumri -Kabul will provide transmission of thousand Kw or 4.0 billion kw. of energy from the Republic of Tajikistan to large population areas of Afghanistan. Total costs of the project: (million. US dollars) - 157,65 from them: own means the external investments - 157,65 term of repayment (year) - 10 The proposal to the investors

6 Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: Investment project. Business - plan INVESTMENT PROJECT 10 Name of the project: Construction of superconductive high voltage line- 500 Kw "Rogun - Sangtuda -Kunduz-Puli Khumri-Kabul-Gerat- Meshed (Iran). Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street Telegraph: Dushanbe " Barki Tojik " Teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki tojik@tajnet.com Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations. The purpose of the project: Provide direct transmission of power energy to large population areas of Afghanistan and Iran. The brief description of the project: Construction of superconductive HL-500 Kw, section 3*400 sq.mm, length km: from Rogunskaya and Sangtudinskaya HPS till Kunduz, Puli Khumri - Kabul - Gerat - Meshed (Iran) will provide transmission of power energy from the Republic of Tajikistan to large population areas of Afghanistan and Iran. Total costs of the project: (million. US dollars) - 544,4 from them: own means the external investments - 544,4 term of repayment (year) - 10 The proposal to the investors Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: Investment project. Business - plan INVESTMENT PROJECT 11 Name of the project: Construction of high voltage line- 500 Kw "Rogun - Regar-Guzar -Karakul (Uzbekistan) - Charjou- Mari (Turkmenistan)- Meshed (Iran). Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street Telegraph: Dushanbe " Barki Tojik " Teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki tojik@tajnet.com Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations. The purpose of the project: Provide transmission of power energy from Republic of Tajikistan to the Islamic Republic of Iran. The brief description of the project: Construction of HL-500 Kw, section 3*400 sq.mm, length km, including Rogun-Regar-160 km; Regar-Guzar-Karakul-Charjou- Mari-900 km; existing HL-500 kw, Mari- Meshed-250 km is for transmission of power energy from the

7 Republic of Tajikistan to Islamic Republic of Iran. Total costs of the project: (million. US dollars) - 166,55 from them: own means the external investments - 166,55 term of repayment (year) - 10 The proposal to the investors Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: Investment project. Business - plan INVESTMENT PROJECT 12 Name of the project: Construction of superconductive high voltage line- 500 Kw "Rogunskaya HPS-Jirgital- Kyrgyzstan- China. Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street Telegraph: Dushanbe " Barki Tojik " Teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki tojik@tajnet.com Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations. The purpose of the project: Provide transmission of power energy from the Republic of Tajikistan to China and other countries. The brief description of the project: Construction of HL-500 Kw, section 3*400 sq.mm, length- 550 km. Rogunskaya HPS-Jirgital- Sari Tash (Kyrgyzstan) - Ulugchan (Chinese People's Republic) is for transmission of power energy from the Republic of Tajikistan to China and other countries. Total costs of the project: (million. US dollars) - 159,5 from them: own means the external investments - 159,5 term of repayment (year) - 10 The proposal to the investors Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: Investment project. Business - plan INVESTMENT PROJECT 13 Name of the project: Construction of superconductive high voltage line- 500 Kw " Khujand- Datka- Osh (Kyrgyzstan) - Ulugchat (China). Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

8 Telegraph: Dushanbe " Barki Tojik " Teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations. The purpose of the project: Provide transmission of power energy from the Republic of Tajikistan to China and other countries The brief description of the project: Construction of HL-500 Kw, section 3*400 sq.mm, length- 510 km. Khujand-Datka- Osh (Kyrgyzstan) - Ulugchan (CPR) is for transmission of power energy from the Republic of Tajikistan to China and other countries. Total costs of the project: (million. US dollars) - 193,51 from them: own means the external investments - 193,51 term of repayment (year) - 7 The proposal to the investors Possible forms of co-operation: Engaging of the investments by the way of credit Document ground of the project: Investment project. Business - plan INVESTMENT PROJECT 14 Name of the project: Construction of Shurobskaya HPS with capacity of 850 МW. Title of enterprise: OPEN HOLDING JOINT STOCK COMPANY " BARKI TOJIK " Address: , Republic of Tajikistan, Dushanbe city, 64 Ismoili Somoni street. Telegraph: Dushanbe " Barki Tojik ", Teletype: "Plamya" Tel.: (992-37) , fax: (992-37) barki tojik@tajnet.com Field of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of Hydroelectric Power Stations, power transmission lines, substations. The purpose of the project: Manufacture of electric power for further export to other countries. The brief description of the project: Working out of technical project of Rogunskiy hydrocontrol structure proved the necessity to construct Shurobskaya HPS to optimize work schedule of Vahshskaya HPS cascade and in particular Pogunskaya HPS. Overall costs of the project: (Million. US dollars) ,0-900, 0 From them: Own means: The external investments ,0-900,0 The Proposal to investors: Possible forms of co-operation: Investments attraction in the form of credit Document ground of the project: INVESTMENT PROJECT 15 Name of the project: Construction of 72 small Hydroelectric Power Stations.

9 Title of enterprise: Ministry of energy and industry of the Republic of Tajikistan. Address: , Republic of Tajikistan, Dushanbe city, 22 Rudaki avn. Tel.: (992-37) , fax: (992-37) Field of activity: Working out and implementation of unique state policy in the sphere of energy and industry of RT. Foreign economic activity, foreign investments attraction. The purpose of the project: Provide removed mountainous regions of the republic with electric power, electric power manufacturing for further export to other countries. The brief description of the project: Construction of small fast-payback HPS for internal and external use. Overall costs of the project: (Million. US dollars) ,0-1400,0 From them: Own means: The external investments ,0-1400,0 Capacity MW The Proposal to investors: Possible forms of co-operation: Investments attraction in the form of credit Document ground of the project: Investment project Business plan INVESTMENT PROJECT 16 Name of the project: Restoration of production in Joint Stock Open Company "TRANSFORMATOR". Name of the enterprise: OPEN JOINT STOCK COMPANY "TRANSFORMATOR". Address: , Republic of Tajikistan, Khatlon Region,. Kurgan - Tyube town, 1 Gafurova street Tel.:( ) , , fax: ( ) aoot@khatlon.com Type of activity: The manufacture of power transformers and measurement aparatus. The purpose of the project: The recovery of the manufacture and expansion of output, full loading of existing powers for fulfillment of demand inside the republic, and also export to other countries. The brief description of the project: Realization of maintenance-rehabilitation activities, replacement of the obsolete equipment, realization of starting-up and adjustment works, acquisition of spares parts, furnishing components, raw and materials which are indispensable for operation of the manufacture. Total costs of the project: (million. US dollars) - 10,0 from them: own means - the external investments -10,0 payback time (year) - 3 The proposal to the investors Possible forms of co-operation: Creation of joint venture including of foreign investors Documentary ground of the project: Investment project.

10 Business - plan INVESTMENT PROJECT 17 Name of the project: Completion of the second line of Kurgan-Tube JSC "Transformer" Characteristic of the enterprise Name of the enterprise: OPEN JOINT STOCK COMPANY "TRANSFORMATOR". Address: , Republic of Tajikistan, Khatlon Region,. Kurgan - Tyube town, 1 Gafurova street Tel.:( ) , , fax: ( ) aoot@khatlon.com Type of activity: Production of power transformers and measure apparatus Aim of the project: Assimilation of the new transformer production TM-630, TM Brief project description: Completion of construction, installation of new equipment and provide inside market of republic with of power transformers. Main component of the project: Construction-assembling work, acquisition of equipment, raw and materials, Assembly and launch adjusting work Preparing of personnel Total value of the project: (min. USD) - 7,29 including: internal funds foreign investment - 7,29 Term of repayment (year) - 3 Proposals to investors: Possible form of cooperation: Creation of joint venture, credit Documentary expediency of the project: Business plan is on the stage of elaborating INVESTMENT PROJECT 18 Name of the project: Building of oil-refining factory in Hissar urban settlement of the Republic of Tajikistan. Name of the enterprise: Limited Enterprise "KNOW - HOW" Address: 77, Mushfiki str., Dushanbe city, RT, Теl.: (992-37) saijafav@mail.ru Type of activity: Oil products treatment. Project goal: Building of oil-refining factory. Brief description of the project: Erection woks, purchasing of equipment. Annual productivity of the factory will make: - petrole t; - diesel fuel t; - black oil (furnace) t. Total costs of the project: (million US dollars) - 1,32 of which: own contributions - foreign investments - 1,32 recoupment time (year) - 1

11 Proposal to investors Possible forms of cooperation: Attracting investments in the form of a credit: Documental justification of the project: Investment project Business - plan INVESTMENT PROJECT 19 Name of the project: Development of gas deposits and creation of gas pipeline systems in the south of Tajikistan Name of the enterprise: The Ministry of energy end industry of the Republic of Tajikistan. Address: , Republic of Tajikistan., Dushanbe city, 22 Rudaki avn. Tel.: (992-37) , , , fax: , minenergoprom@mail.tj Type of activity: Development and implementation of unique state policy in the sphere of energy of RT, coordination of enterprises activity on development, transference and distribution of power energy of RT. Foreign economic activity, foreign investments attraction. Purpose of the project: Construction of gas pipe-line on the territory of the Gas deposit "Khoja- Sartez-Sarband". Brief description of project: It is necessary to purchase and assemble the following equipments: steel fastener, steel pipe of 325, 159 mm of diameter and other material recourses and equipments due to the project for gas pipe line construction Total costs of the project: (million. US dollars) - 9,0 from them: own means the external investments - 0 term of repayment (year) - 4,7 Proposal to the investors Possible forms of cooperation low interest credit INVESTMENT PROJECT 20 Name of the project: Research-prospecting operations in Rengan area, situated in Lenin region of the Republic of Tajikistan Name of the enterprise: The Ministry of energy end industry of the Republic of Tajikistan. Address: , Republic of Tajikistan., Dushanbe city, 22 Rudaki avn. Tel.: (992-37) , , , fax: , minenergoprom@mail.tj Type of activity: Development and implementation of unique state policy in the sphere of energy of RT, coordination of enterprises activity on development, transference and distribution of power energy of RT. Foreign economic activity, foreign investments attraction Brief description of project: The presence of oil and gas structure in Rengan located in Lenin region is confirmed by the complex geological-geophysical documents on Jurassic deposits. Seismic - research operations in volume of 55 linear km. are being conducted. Three deep chinks were drilled with metric area of m. The structure dimension is: 9x3 km. Perspective resources of free gas is 35 bl. m3. The tentative depth of bedding is 6700 m. It is necessary to provide the supplementary seismic-research measures in volume of 150 linear km to and drill three chinks in depth of 6900 m each ones (one is research, two are prospecting). Annual

12 extraction of gas is 1400 bl. m3 Total costs of the project: (million. US dollars) - 82,0 from them: own means - 80,4 the external investments - 1,6 term of repayment (year) - 10 Proposals to the investors: Possible forms of cooperation: creation of joint-ventures, share participation, issue of licenses to conduct operations, low interest credit. List of required equipment: Drilling technology, drilling pipes, chemical reagents and other material resources due project. ================================================================ INVESTMENT PROJECT 21 Project Name: Rehabilitation of production of technological shop on deeper conversion of oil. Enterprise Name: Joint-Stock Public Society "Petroleum-bitumen factory". Adress: , RТ, Khatlon oblast, Kolhozabad region. Теl.: ( ) Type of activity: Treatment of oil products. Production of bitumen of model МF 40/70, MF 70/130, БИД 60/90, gasoline, diesel oil. Project Objective: Rehabilitating and increasing production, full usage of the existing power (100 thousand) for satisfaction of demand of the local market of the Republic, as well as export to Afghanistan. Brief Description of the Project: Running repair-recovery works, replacement of the dated equipment, running testing and commissioning works, purchasing spare parts, constituent parts, raw and materials necessary for the production functioning. Personnel training. Overall Project Cost: (million US dollars) - 1,2 of which: own funds - 0,2 foreign investment - 1,0 payback time - 2 years Proposal for Investors: Creation of a joint enterprise with participation of foreign investors. Document Background: Investment Project Business-plan INVESTMENT PROJECT 22 Name of Project "Aini HPP on the river Zarafshan" The purpose of the project Construction of HPP on the river Zarafshan to provide electricity Aini and surrounding areas (north) Brief Description of the Project Stvor Aini waterworks is located 5 km below the village of Aini, between the villages and Hushikat Iskatar. Domestic water horizons rise to 35-40m to 1350m mark at 20m below the tailrace Fandarinskoy Fandarya HPS on the river.

13 Pressurized tunnel 600 meters long along the left bank of the water fed to the building of a hydroelectric station and dumped into the river at the 1240m mark in the upstream hydropower Javanese. Possible options Aini HPP: pressure, flow rate 100m settlement, the average annual 140m3 / s consumption, the estimated m3 hydro / s installed capacity of MVt Average annual generation of electricity billion kw / h The total project cost is required to develop a feasibility study project INVESTMENT PROJECT 23 Name of the Project "Construction of thermal power plant" The purpose of the Project Construction of thermal power capacity of 300 MW based on coal deposit Shurab A brief description of the project is proposed to implement the project in three phases: The first phase - Construction of two power units of 150 MW. The total capacity of 300 MW units. Construction took 36 months The second phase - Construction of 74 km transmission line with a capacity of 220 kilovolts and development of coal mines. Construction took 14 months Third stage - construction of additional units of 2 and 15 km transmission line with a capacity of 220 kilovolts, which connects the thermal power plant with a power line Kanibadam, creating a ring transmission system. The total capacity of two units of 300 MW. According to preliminary calculations, while working 20 hours a day, 300 days a year, the thermal power plant will produce 1.8 billion kilowatt hours of electrical energy The total project cost is million U.S. dollars Payback period - Type of investment or preferential loan HERE INVESTMENT PROJECT 24 Name of the Project "Construction Iskanderkulskoy HPS on the river Zarafshan"

14 The purpose of the Project Ensuring the northern regions of Tajikistan's electricity through the construction of hydropower plants on the river Iskanderkulskoy Zeravshan Brief description of Project Possible options Iskanderkulskoy HPS: pressure, flow rate 560m settlement, the average annual 18.5m3 / s consumption, the estimated 25-42m3 HPS / s installed capacity of MW Average annual generation of electricity billion kw / h INVESTMENT PROJECT 25 Name of the Project "Construction Fandarinskoy HPS on the river Zarafshan" The purpose of the Project Ensuring the northern regions of Tajikistan's electricity through the construction of hydropower plants on the river Fandarinskoy Zeravshan Brief description of Project Possible options Fandarinskoy HPS: pressure, settlement - 200m flow rate, average annual m3 / s, consumption, estimated HPP - 180m3 / s, installed capacity MW Average annual generation of electricity billion kw / h INVESTMENT PROJECT 26 Name of the Project "Construction of Aini HPP on the river Zarafshan" The purpose of the project Providing electricity through the northern regions of Tajikistan, Aini HPP construction on the river Zarafshan Brief description of Project Possible options Aini HPP:

15 pressure, settlement - 100m flow rate, average annual - 140m3 / s, consumption, estimated HPP m3 / s, installed capacity MVt, Average annual generation of electricity billion kw / h INVESTMENT PROJECT 27 Name of the Project "Construction of Javanese HPS on the river Zarafshan" The purpose of the Project Ensuring the northern regions of Tajikistan's electricity through the construction of hydropower plants on the river Javanese Zeravshan Brief description of Project Possible options Javanese HPS: pressure, current - 80m, flow rate, average annual - 140m3 / s, consumption, the estimated hydropower - 25m3 / s, installed capacity - 160MVt, Average annual generation of electricity billion kw / h INVESTMENT PROJECT 28 Name of the Project "Construction of Penjikent GES-1 on the river Zarafshan" The purpose of the Project Ensuring the northern regions of Tajikistan's electricity by building Penjikent GES-1 on the river Zarafshan Brief description of Project Possible options Penjikent GES-1: pressure, current - 49m,

16 flow rate, average annual - 115m3 / s, consumption, estimated HPP m3 / s, installed capacity - 50 mw, Average annual generation of electricity billion kw / h INVESTMENT PROJECT 29 Name of the Project "Construction of Penjikent HPP-2 on the river Zarafshan" The purpose of the Project Ensuring the northern regions of Tajikistan's electricity by building Penjikent HPP-2 on the river Zarafshan Brief description of Project Possible options Penjikent GES-2: pressure, current - 46m, flow rate, average annual - 115m3 / s, consumption, estimated HPP m3 / s, installed capacity - 45MVt, Average annual generation of electricity billion kw / h INVESTMENT PROJECT 30 Name of the Project "Construction of Penjikent HPP-3 on the river Zarafshan" The purpose of the Project Ensuring the northern regions of Tajikistan's electricity by building Penjikent HPP-3 on the river Zarafshan Brief description of Project Possible options Penjikent GES-3:

17 pressure, settlement - 100m flow rate, average annual - 115m3 / s, consumption, estimated HPP - 110m3 / s, installed capacity - 60MVt, Average annual generation of electricity billion kw / h INVESTMENT PROJECT 31 Name of the Project "Basic indicators Zarafshan river hydropower plant on the Zarafshan" The purpose of the Project Construction Zarafshan river hydropower plant on the Zarafshan A brief description of the project is located between the HPP Zeravshan Panjakent and the village of Aini. The distance from the alignment of a future power plant to Panjakent - 51km to the village of Aini, 50 km. - Design pressure of m -The average annual water consumption - 145m3/sek -Design flow hydro-250 m3/sec -MW installed capacity of Average long-term power generation-0, 96 billion kwh -NEC m -TMA m Is the height of the dam - 75 m, The number of units - 2 pcs. Is the total estimated investment million U.S. dollars, The volume of the reservoir at NEC million m3, -Adjusting the volume of million m3 Dead-volume million m3

18 , The installed capacity of one unit MW -Type unit - HLA551E-LJ410 The diameter of the impeller m -Speed rev / min The length of the penstock pressure m The mean diameter of the tunnel, 10 m The number of hours of use hours INVESTMENT PROJECT 32 Name of the Project "Basic indicators Oburdonskoy HPS on the river Match" The purpose of the Project Construction Oburdonskoy HPS on the river Match Brief Description of the Project Power MW, Annual electricity production billion kwh The volume of the reservoir km3. The height of the dam to 190 meters, is located 2.5 km upstream tributary Oburdon. Mark NEC m Tunneling derivation, length km, laid on the right bank. The station building is located above the village Oburdon INVESTMENT PROJECT 33 Name of the Project "Basic indicators Dupulinskoy HPS on the river Zarafshan" The purpose of the Project Construction Dupulinskoy HPS on the river Zarafshan Brief description of Project Possible options GES:

19 current head, m - 85, average annual flow m3 / s - 155, flow rate, the estimated hydroelectric m3 / s - 280, installed capacity of hydropower, MW - 200, sr.mnogolet.vyrabotka electric power. billion kwh INVESTMENT PROJECT 34 Name of the Project "Basic indicators Nurobadskoy GES-1 on the River Ob-Hingou" The purpose of the Project Construction Nurobadskoy GES-1 on the River Ob-Hingou Brief Description of the Project Nurobadsky HPP -1 is located in the lower reaches of the river Obihingou 13 km above the confluence Obihingou and Surkhob Project-pressure-107m -The average annual water consumption m3/sec Design-flow hydro-373, 2 m3/sec -Installed power -350 MW -Average annual generation of electricity-1, 44 billion kwh -NEC m -TMA m -The height of the dam meters -Number of units - 4 units -The total estimated investment million dollars U.S.. - Average annual temperature C -The volume of the reservoir in the NBL million m3, -Adjusting the volume of million m3 Low-volume million m3

20 The installed capacity of one-unit MW -Type unit - HLA497-LJ-335, -Impeller - 3,35 m -Speed r / min, -Number of hours of use hours. The total project cost per unit investment in 1kVt/dollarov U.S INVESTMENT PROJECT 35 Name of the Project "Basic indicators Nurobadskoy GES-2 on the River Ob-Hingou" The purpose of the Project Construction Nurobadskoy GES-2 on the River Ob-Hingou Brief Description of the Project Nurobadsky HPP -2 is located in the lower reaches of the river Obihingou in 23km above the confluence of the rivers and Obihingou Surkhob, a distance of 1 km below the village Damob. At GES provides for the application schema derivation of water. -Design pressure - 105m, -The average annual water consumption 183m3/sek Design-flow hydropower m3/sec -Installed capacity MW; -Average annual generation of electricity-0, 862 billion kwh, -NEC m -TMA m -Height of the dam - 38 m, -Number of units - 4 units, -The total investment estimated 2 billion 734 million yuan (400 million dollars. USA) -The volume of the reservoir at NEC million m3 -Adjusting the volume of -4.5 million m3 Low-volume million m3,

21 The installed capacity of one-unit - 50 mw, -Type unit - HLD333V, -Impeller m -Speed r / min, Derivational-length 6.4 km route, including the diversion tunnel km -Pressure penstock length m -The average diameter of the tunnel, nine meters, -Number of hours of use hour. The total project cost per unit investment in 1kVt/dollarov U.S INVESTMENT PROJECT 36 Name of the Project "Basic indicators Shurabad hydropower plant on the Vakhsh River" The purpose of the Project Construction Shurabad hydropower plant on the Vakhsh River A brief description of the project is located in the Shurabad HPP 12.5 km below the dam Rogun NEC 977m mark The volume of the dam in 2600 m3 The height of the dam 83 m The installed capacity of 850 MW Average annual production of 3100 GWh The volume of the reservoir: Full - 27 million m3 useful - 5 million m3 INVESTMENT PROJECT 37

22 Name of the Project "Basic indicators Shtienskoy HPS on the river Ob-Hingou" The purpose of the Project Construction Shtienskoy HPS on the river Ob-Hingou Brief Description of the Project term average water consumption - 140m3/sek, net capacity of the reservoir km3 Installed capacity MW Electricity production billion kwh The total project cost per unit investment in 1kVt/dollarov U.S INVESTMENT PROJECT 38 Name of the Project "Basic indicators Sangvorskoy HPS on the river Ob-Hingou" The purpose of the Project Construction Sangvorskoy HPS on the river Ob-Hingou Brief Description of the Project term average water consumption m3/sec Net capacity of the reservoir km3, installed capacity MW Electricity production billion kwh INVESTMENT PROJECT 39 Name of the Project "Basic indicators Vistanskoy HPS on the river Kafernigan" The purpose of the Project Construction Vistanskoy HPS on the river Kafernigan Brief Description of the Project Vistanskaya HPS: Installed capacity - 54 MW, Electricity generation billion kwh, Calculation of pressure m,

23 INVESTMENT PROJECT 40 Name of the Project "Basic indicators Sarvozskoy HPS on the river Kafernigan" The purpose of the Project Construction Sarvozskoy HPS on the river Kafernigan Brief Description of the Project Sarvozskaya HPS: Installed capacity - 42 MW, Electricity generation billion kwh, Calculation of pressure - 55 pm INVESTMENT PROJECT 41 Name of the Project "Basic indicators Yavrozskoy HPS on the river Kafernigan" The purpose of the Project Construction Yavrozskoy HPS on the river Kafernigan Brief Description of the Project Yavrozskaya HPS: Installed capacity - 90 MW, Electricity production billion kwh, Calculation of pressure - 77 pm INVESTMENT PROJECT 42 Name of Project "Key figures of the Lower-Kafirniganskoy y / y on the river Kafernigan" The purpose of the Project Construction of the Lower River-Kafirniganskoy Kafernigan Brief description of Project Bottom-Kafirnigansky y / y: Installed capacity - 72 MW,

24 Power Generation billion kwh, Calculation of pressure - 70 pm INVESTMENT PROJECT 43 Name of the Project "Basic indicators Bagzhigdinskoy y / y on the river Kafernigan" The purpose of the Project Construction Bagzhigdinskoy y / y on the river Kafernigan Brief Description of the Project Bagzhigdinskaya g / y: Installed capacity MW, Electricity production billion kwh, Calculation of pressure - 64 pm INVESTMENT PROJECT 44 Name of the Project "Basic indicators Dargskoy HPS on the river Match" The purpose of the Project Construction Dargskoy HPS on the river Match Brief Description of the Project Dargskaya HPS: pressure, current meters flow rate, average annual, m3 / s - 65, consumption, the estimated hydroelectric capacity, m3 / s , installed capacity of hydropower, MW , Average annual generation billion kwh of electricity - 0,75-0,78.

25 INVESTMENT PROJECT 45 Name of the Project "Basic indicators Sangistanskoy HPS on the river Match" The purpose of the Project Construction Sangistanskoy HPS on the river Match Brief Description of the Project Sangistanskaya HPS: pressure, current meters - 150, flow rate, average annual, m3 / s - 80, consumption, the estimated hydroelectric capacity, m3 / s , installed capacity of hydropower, MW , Average annual generation billion kwh of electricity INVESTMENT PROJECT 46 Name of the Project "Basic indicators Shurabad hydropower plant on the Vakhsh River" The purpose of the Project Construction Shurabad hydropower plant on the Vakhsh River Brief Description of the Project Shurabad HPS: flow rate, average annual, m3 / s - 628, useful volume of the reservoir CMH , installed capacity of hydropower, MW - 850, billion kwh of electricity The total project cost per unit investment in 1kVt/dollarov U.S

26 INVESTMENT PROJECT 47 Name of the Project "Basic indicators Baipazinskaya hydropower plant on the Vakhsh River" The purpose of the Project Construction Baipazinskaya hydropower plant on the Vakhsh River Brief Description of the Project Baipaza HPS: flow rate, average annual, m3 / s - 647, useful volume of the reservoir CMH , installed capacity of hydropower, MW - 600, billion kwh of electricity The total project cost per unit investment in the U.S. 1kVt/dollarov INVESTMENT PROJECT 48 Name of the Project "Basic indicators Urfatinskoy HPS on the river Ob-Hingou" The purpose of the Project Construction Urfatinskoy HPS on the river Ob-Hingou Brief Description of the Project Urfatinskaya HPS: flow rate, average annual, m3 / s - 100, useful volume of the reservoir CMH , installed capacity of hydropower, MW - 200, billion kwh of electricity The total project cost per unit investment in 1kVt/dollarov U.S INVESTMENT PROJECT 49 Name of the Project "Basic indicators Dzhalbulakskoy HPS on the river Surkhob" The purpose of the Project Construction Dzhalbulakskoy HPS on the river Surkhob Brief Description of the Project Dzhalbulakskaya HPS:

27 flow rate, average annual, m3 / s - 200, useful volume of the reservoir CMH installed capacity of hydropower, MW - 600, billion kwh of electricity The total project cost per unit investment in 1kVt/dollarov U.S INVESTMENT PROJECT 50 Name of the Project "Basic indicators Sayronskoy HPS on the river Surkhob" The purpose of the Project Construction Sayronskoy HPS on the river Surkhob Brief Description of the Project Sayronskaya HPS: flow rate, average annual, m3 / s - 250, useful volume of the reservoir CMH , installed capacity of hydropower, MW - 500, billion kwh of electricity The total project cost per unit investment in 1kVt/dollarov U.S INVESTMENT PROJECT 51 Name of the Project "Basic indicators Gorgenskoy HPS on the river Surkhob" The purpose of the Project Construction Gorgenskoy HPS on the river Surkhob Brief Description of the Project Gorgenskaya HPS: flow rate, average annual, m3 / s - 303, useful volume of the reservoir CMH , installed capacity of hydropower, MW - 600, billion kwh of electricity

28 The total project cost per unit investment in 1kVt/dollarov U.S INVESTMENT PROJECT 52 Name of the Project "Basic indicators Garm HPS on the river Surkhob" The purpose of the Project Construction Garm HPS on the river Surkhob Brief Description of the Project Garm HPS: flow rate, average annual, m3 / s - 324, useful volume of the reservoir CMH , installed capacity of hydropower, MW - 400, billion kwh of electricity - 1.8, The total project cost per unit investment in 1kVt/dollarov U.S INVESTMENT PROJECT 53 Name of the Project "Basic indicators Barshorskoy GES Panj River" The purpose of the Project Construction Barshorskoy GES Panj River Brief Description of the Project Barshorskaya HPS: installed capacity of hydropower, MW - 300, billion kwh of electricity - 1.6, possible pressure meters - 100, NEC mark m The total project cost is required to develop a feasibility study INVESTMENT PROJECT 54

29 Name of the Project "Basic indicators Anderobskoy GES Panj River" The purpose of the Project Construction Anderobskoy GES Panj River Brief Description of the Project nderobskaya HPS: installed capacity of hydropower, MW - 650, electricity, billion kwh - 3.3, possible pressure, m - 200, NEC mark, m The total project cost is required to develop a feasibility study INVESTMENT PROJECT 55 Name of the Project "Basic indicators Pishskoy GES Panj River" The purpose of the Project Construction Pishskoy GES Panj River Brief Description of the Project Pishskaya HPS: installed capacity of hydropower, MW - 320, billion kwh of electricity - 1.7, possible pressure, m - 150, NEC m mark The total project cost is required to develop a feasibility study INVESTMENT PROJECT 56 Name of Project "Key figures in the Khorog GES Panj" The purpose of the Project Construction Khorog HPP on the river Panj Brief Description of the Project Khorog HPP: installed capacity of hydropower, MW - 250,

30 billion kwh of electricity - 1.3, possible pressure meters - 100, NEC m mark The total project cost is required to develop a feasibility study INVESTMENT PROJECT 57 Name of Project "Key figures in the Rushan GES Panj" The purpose of the Project Construction Rushan GES Panj River Brief Description of the Project Rushan HPS: installed capacity of hydropower, MW billion kwh of electricity , possible pressure meters - 150, NEC mark m The total project cost is required to develop a feasibility study INVESTMENT PROJECT 58 Name of the Project "Basic indicators Yazgulem GES Panj River" The purpose of the Project Construction Yazgulem GES Panj River Brief Description of the Project Yazgulem HPS: installed capacity of hydropower, MW - 850, billion kwh of electricity - 4.2, possible pressure meters - 100, NEC mark m The total project cost is required to develop a feasibility study

31 INVESTMENT PROJECT 59 Name of the Project "Basic indicators HPS Granite Gate on the River Panj" The purpose of the Project Construction HPS Granite Gate on the River Panj Brief Description of the Project HPP Granite Gate: installed capacity of hydropower, MW billion kwh of electricity possible pressure meters NEC mark m The total project cost is required to develop a feasibility study INVESTMENT PROJECT 60 Name of the Project "Basic indicators Shirgovatskoy GES Panj River" The purpose of the Project Construction Shirgovatskoy GES Panj River Brief Description of the Project Shirgovatskaya HPS: installed capacity of hydropower, MW billion kwh of electricity - 9.7, possible pressure meters NEC mark, m The total project cost is required to develop a feasibility study INVESTMENT PROJECT 61 Name of the Project "Basic indicators Hostavskoy GES Panj River"