1 CONSOLIDATED STATEMENT ON VARIOUS ENVIRONEMNTAL ASPECTS FOR INDUSTRIAL PROJECTS: Important Note before filling the form: 1. Fill the form in the same format (i.e. Font: Times New Roman and font size: 12) 2. Do not edit / delete the columns if it s not applicable 3. Send soft copy to the mahaseac@gmail.com and seiaa.mah@gmail.com in the Word format (doc file). Sr. No. Particulars Commitment On 1 Name of the project M/S Shivsamarth Stone Crusher Name : M/S Shivsamarth Stone Crusher Address : Village- Vajrachounde 2 Taluka: Tasgaon Name, address, & contact District : Sangli number of proponent State : Maharashtra Tel No. : Name, address, & contact number of Consultant Accreditation of Consultant (NABET accreditation) New Project/Expansion in existing project /Diversification in existing project Name : Hubert Enviro care systems Pvt. Ltd. Accredited by QCI NABET: - Sectors 1 & 38 Lab. Recognized by MoEF, Govt. of India NABL Accredited Certificate ISO 17025:2005 Certified by ISO 9001:2008 Certified by BS OHSAS 18001:2007 Approved Environmental Monitoring Laboratory # 18, 92 nd Street, 18 th Avenue, Ashok Nagar, Chennai Tel No. : /55, / Mobile No: / / consultancy@hecs.in/ marketing@hecs.in/ moses.hecs@gmail.com Website:- NABET Accreditation. Accreditation for sectors 1(a) and 5 (f) New project Page 1

2 6 7 8 If expansion/ Diversification, whether environmental clearance has been obtained for existing project (If yes, enclose a copy with compliance table) Activity schedule in the EIA notification Area Details Not Applicable Category 1 (a), B Total plot Area : 1.00 Ha 9 Name of Notified Industrial area/ MIDC 10 TOR given by SEAC? Not Applicable No. Estimated cost of the project : 11 (Including cost for land, building, 90.0 lacks plant and machinery separately) ` Location details of the project Latitude 17 3'52.87"N to 17 3'55.51"N Longitude 74 44'28.93"E to "E 13 Distance from protected area/ critically polluted area/ Eco sensitive area/ Inter state boundary 14 Raw materials (including process chemicals, catalysts & additives). Page 2 Location Elevation above Mean Sea Level (metres) Not Ap plicable List of raw mater ials to be used Physical and chemical nature of raw material Quanti ty (tones / month ) full produc tion capacit y Stone (Minor mineral) Basalt is dense with micro prophyritic texture. The rock is grayish black colored Vajrachounde m Source of material s Local Means of transportati on (Source to storage site) with justification By Road

3 medium fine grained. Basalt occurring in the area is hard and compact in nature 15 Production profile (tones / year): Name of Products, By products and Intermediate Products Existing Propos ed activity (new) Total Main Products Stone Metal (3,000 Brass/Annu m) - - By- Products Intermediate Products Crushed Powder Process Details/Manufacturing Details 17 Rain Water Harvesting (RWH) Process details is given in Pre-feasibility report. In monsoon the rain water get collected in quarry pit which is used for spraying. Ground Water Survey will be carried out in the during the course of the time. 18 Total Water Requirement Size and no of RWH tank(s) & Quantity Location of the RWH tank(s) referred to the conceptual plan Size, nos of recharge boreholes and Quantity- there will be one major pit in the area and 2 recharge bore hole in the pit. Total water requirement: Fresh water (CMD):2.5 & Source:Borewell Recycled water (CMD):0 CMD Use of the water: Process (CMD): Cooling water (CMD):0 CMD DM Water (CMD):0 CMD Dust Suppression (CMD): 1.5 Drinking (CMD):0.5 Green belt (CMD):0.5 Page 3

4 19 Strom water drainage Fire service (CMD):0 CMD Others (CMD):0 CMD Natural water drainage pattern quantity of storm water Size of SWD 20 Sewage generation and Treatment Not Applicable Amount of Sewage generation: CMD Proposed treatment for sewage: Septic tank provided. 21 Characters of effluent Parameter s (ph,bod, COD, etc) ph S.S B.O.D C.O.D O & G Inlet effluent Character istic Outlet effluent Character istic Not Applicable. Effluent Dischar ge Standar ds (CPCB/ MPCB) 22 ETP Details Amount of effluent generation (CMD) Capacity of the ETP (CMD) Amount of treated effluent recycled (CMD): Amount of water send to the CETP (CMD): Membership of the CETP (If require): If yes then attach the letter submit the letter Not Applicable 23 Note on ETP technology to be used Not Applicable 24 Disposal of the ETP sludge (if applicable) Not Applicable 25 Solid Waste Management Sr. No Source Qty (TPM) Form (Sludge / Dry / slurry Composition Page 4

5 . etc.) 1 Raw Water Treatment Plant ETP Process Spent Carbon Oily Sludge (Others like Battery waste etc) Spent Oil Method of disposal of solid waste: Not Applicable 26 Atmospheric Emissions: Flue gas characteristics (SPM, Pollutant SO 2, NO X, CO) SPM RPM SO 2 NO X CO 27 Stack emission Details: Not Applicable. Plant section & Unit Stac k No. Source of Emission Process, product transportation, blasting (if done) Height ground level (m) Emissio n Rate (Kg/hr) Internal Diameter (Top) (m ) Concentratio n in flue gas (g/m3) Only SPM and RSPM will be generated Emissio n rate Temp. of Exhaust Gases. 28 Emission Standard: 29 Ambient Air Quality Data Sr. NO Pollutant Source of Emission SPM SO 2 NO X Process, product transportati 4 CO on, blasting (if done) Emission rate (kg/hr) Concen tration in flue gas (g/m 3 ) Monitoring will be done Copies of Analysis reports attached with the EIA report 30 Details of fuel to be used :- Not Applicable Page 5

6 Sr. No. Fuel Daily Consumption (TPD/KLD) % Ash % Sulphur 1 Gas Naphtha HSD 150 liter LDO F.O Coal Lignite Other (pl. Specify) Source of fuel : Diesel for D. G Set if Available Mode of transportation of fuel to site: By Road 31 Energy Power supply: Existing power requirement:20 HP DG sets:125 KVA Number and capacity DG sets to be used (existing and proposed) Details of the non-conventional renewable energy proposed to be used : NA Green Belt Development (in Ha) Existing nos. of trees, Proposed nos. of trees with plant species Number trees being cut/ replanted or compensated. Details of Pollution Control System: Green Belt area: hectare. Number and species of trees to be planted Number, size, age and species of trees to be cut, trees to be Transplanted Ashoka, Guava, Coconut, Lemon, Casurina, Mango,Neem, Hibiscus, Decorative trees, Sal, Nilgiri, Palm Also plant species like Bamboo, ficus, aloe vera, spider plant, and elephant ear philodendron, Banana trees etc shall be planted in the premises. Sr. Existing Proposed No Page 6

7 1 Air Water Sprinklers, Dust Collection Bag, Covered Product Storage Water No adverse impact 3 Noise Enclosure for noise generating equipments, Vibration pads for the specific instrument. 4 Solid Disposed to Waste authorized Vendor by MPCB Environmental Management plan Budgetary Allocation Capital cost (With break up):5,10,000 O&M cost (With break up): 40,000 Page 7

8 Sr. No. Recurring Cost per annum (Rs.) Capital Cost (Rs.) 1 Air Pollution Control 5,000 2,00,000 2 Water Pollution Control Noise Pollution Control 5,000 1,25, Environment Monitoring and Management Reclamation borrow / mined area 10,000 50, Occupational Health 5,000 35,000 7 Green Belt 10,000 50,000 8 Solid Waste Management 5,000/- 50,000/- 9 Others (Pl. Specify) Total 40,000/- 5,10,000/- Page 8

9 EIA Submitted (if yes then submit the salient Features) Public hearing Report Air Pollution waste water issue in the project area, if any Period of data collected Details of the primary data collection (i.e. location of the sample collection, number of visit, etc) Details of the secondary data collection (i.e. Source and year of data) Potential hazard and mitigation measures Conclusion of the Cumulative Impact study EIA report is submitted along with the consolidated statement (Refer Cumulative Impact Study) Date of the public hearing Name of the news paper in which the advertisement appeared (Please attach the copy) Location of the public hearing Number of people attended the hearing Objection(s) / Suggestion(s) if any Not Applicable No there is no issue on air & water pollution in the respective project area. Page 9

10 Declaration I hereby declare that no work has been initiated for the said project. Date: Place: Name & Signature Of the project proponent Name & Signature of the consultant M/S Shivsamarth Stone Crusher Village Vajrachounde Tal: - Tasgaon District-Sangli State-Maharashtra Tel. No. : (Vivek P Navare) EIA Coordinator For Hubert Enviro Care Syatems Pvt.Ltd Page 10