1 FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR MANUFACTURING MAN MADE FIBER (PARTIALLY ORIENTED YARN (POY), FULLY DRAWN YARM (FDY), TEXUTURISED YARN, TWISTED YARN - OTHER THAN RAYON THROUGH CONTINUOUS POLYMERIZATION PROCESS OF Located at: Survey. 171/1/1/4/1,193,196/1,197/1,197/1/1, 197/1/2,197/2/1,153P, 154, 155/1, 155/2, 156/1,201/1/1, 201/3, 202/1 & 202/2, Village: Surangi, Silvassa, Industrial zone, Dadra & Nagar Haveli

2 UPDATED FORM-1 (I) BASIC INFORMATION. Item Details 1. Name of the project/s : M/s. DNH Spinners Pvt. Ltd. 2. S.. in the schedule : 5 (d) Manmade fiber other than rayon 3. Proposed capacity / area / length/ tonnage to be handled / command area / lease area / number of wells to be drilled : Proposed capacity 1. Polyester Textured Yarn (PTY) MT/Annum 2. Partially Oriented Yarn (POY) / Fully Drawn Yarn (FDY) through Continuous Polymerization Process MT/Annum Power Generation 6 MW (Dual Fired Power Engine) Existing Total plot area is m 2 and m 2 additional land is procured from private owner for proposed expansion project. Only existing bore well will be utilized for expansion project (permission from central ground water authorities will be obtained) 4. New / Expansion / Modernization : Expansion 5. Existing Capacity / Area etc. : 1. Partially Oriented Yarn (POY) / Fully Drawn Yarn (FDY) MT/Annum 2. Polyester Textured Yarn (PTY) 270 MT/Annum 6. Category of Project i.e. A or B : B category of project 7. Does it attract the general condition? If yes, please specify. 8. Does it attract the specific condition? If yes, please specify. 9. Location : Plot/ Survey/ Khasra. : (iv) Inter-State boundaries : Survey.171/1/1/4/1,193,196/1,197/1,197/1/1, 197/1/2, 197/2/1,153P, 154, 155/1, 155/2,156/1, 201/3, 201/1/1, 202/1 & 202/2, Industrial Zone declared by Administration U.T. of D & NH. Surangi Village Tehsil -- District Silvassa State UT of D & NH 10. Nearest railway station/airport along with : Bhilad 21 kms distance in kms. 11. Nearest Town, City, District Headquarters : Silvassa 12.6 kms along with distance in kms. 12. Village Panchayats, Zilla Parishad, : Gram Panchayat, Village-Surangi, Silvassa Municipal corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the Applicant : Mr. Mahesh Lakhwani 14. Registered Address : , Business Classic, Chincholi Bundae Road, Near Junction of S.V. Road, Malad (West) Mumbai Address for Correspondence : : Survey. 171/1/1/4/1, 193, 196/1, 197/1, 197/1/1, 197/1/2, 197/2/1, 153P, 154, 155/1, 155/2, 156/1, 201/1/1, 201/3, 202/1 & 202/2, Industrial Zone, Village-Surangi, Village-Surangi, Silvassa, U.T. Name Mr. Mahesh Lakhwani

3 Designation (Owner/Partner/CEO) Technical Director Address Survey. 171/1/1/4/1, 193, 196/1, 197/1, 197/1/1, 197/1/2, 197/2/1, 153P, 154, 155/1, 155/2, 156/1, 201/1/1, 201/3, 202/1 & 202/2, Industrial Zone, Village-Surangi, Village-Surangi, Silvassa, U.T. Pin Code Telephone , Fax Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. : As the proposed expansion activity will be carried out in the existing set-up, there are no alternative sites examined. 17. Interlinked Projects. : Whether separate application of : interlinked project has been submitted? 19. If yes, date of submission : If no, reason : NA Whether the proposal involves : approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z tification, 1991? 22. Whether there is any Government : - Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) : Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) Name of the court (b) Case. (c) Orders/directions of the Court, if any & its relevance with the proposed project. : -

4 (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.). Information/Checklist confirmation / 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? 1.3 Creation of new land uses? 1.4 Pre-construction investigations e.g. bore quantities /rates, wherever possible) with source of information data The company has acquired additional plots for the proposed expansion project. houses, soil testing? 1.5 Construction works? There will construction activity undertaken for the proposed expansion project. 1.6 Demolition works? There will be no demolition, underground, 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations reclamation or dredging work. temporary sites for construction work or housing of construction workers will be developed as local labour will be employed. 1.9 Underground works including mining or tunneling? 1.10 Reclamation works? 1.11 Dredging? 1.12 Offshore structures? 1.13 Production and manufacturing processes? Enclosed as Annexure- 5 of Salient Features of the project uploaded under Additional Information Facilities for storage of goods or materials? The raw materials will be stored in a earmarked raw material storage area within the premises Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes Domestic Effluent will be treated through soak pit. New ETP will be installed. Final treated effluent will be used for cooling tower make up and cooling tower blow down will be utilized for gardening/plantation purpose. Hazardous/n-hazardous wastes will be sold off to actual users / disposed off to TSDF site of GEPIL, Silvassa Workers from the local/near-by areas will be employed

5 in traffic movements? 1.20 New or diverted transmission lines or pipelines? Impoundment, damming, culverting, -- realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? Abstraction or transfers of water form ground or surface waters? Water requirement will be met through Bore well/ canal water Changes in water bodies or the land surface -- affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning -- which could have an impact on the environment? 1.28 Influx of people to an area in either -- temporarily or permanently? 1.29 Introduction of alien species? Loss of native species or genetic diversity? Any other actions? -- We shall hire personnel from local / nearby area only and the construction material will be obtained preferably from local traders and will be transported via roads. The sources of raw materials and machinery for operation will vary based on market driven forces, which will be transported via roads. --

6 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Information/Checklist confirmation /. quantities /rates, wherever possible) with 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KL/D 2.3 Minerals (MT) Construction material stone, aggregates, sand / soil (expected source MT) The proposed expansion project will be accommodated in the additional plots acquired. Bore well/canal water Enclosed as Annexure- 6 of Salient Features of the project uploaded under Additional Information. Construction material will be obtained from local traders. 2.5 Forests and timber (source MT) Energy including electricity and fuels (source, Enclosed as Annexure- 1 of Salient competing users) Unit: fuel (MT), energy (MW) Features of the project uploaded under 2.7 Any other natural resources (use appropriate standard units) Additional Information Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.. Information/Checklist confirmation / 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes -- Enclosed as Annexure- 1 of Salient Features of the project uploaded under Additional Information. The project site is located in an industrial zone which is surrounded by cluster of industries, thus there will be no change in the living condition of the people in the nearby vicinity. --

7 4. Production of solid wastes during construction or operation or decommissioning (MT/month). Information/Checklist confirmation / 4.1 Spoil, overburden or mine wastes Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) The commercial waste generated during construction activity will be sold to scrap vendors. Enclosed as Annexure- 7 of Salient Features of the project uploaded under Additional Information. 4.4 Other industrial process wastes Same as above 4.5 Surplus product 4.6 Sewage sludge or other sludge from effluent treatment Same as above 4.7 Construction or demolition wastes Waste will be generated only during construction phase. 4.8 Redundant machinery or equipment Contaminated soils or other materials Agricultural wastes Other solid wastes Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr). Information/Checklist confirmation / 5.1 Emissions from combustion of fossil fuels from Enclosed as Annexure- 8 of Salient stationary or mobile sources Features of the project uploaded under Additional Information. 5.2 Emissions from production processes There will be no generation of process gas 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odors from handling of materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste Emissions from burning of waste in open air (e.g. -- slash materials, construction debris) 5.8 Emissions from any other sources -- emissions. generation of emissions from material handling including storage or transport. Only construction activity for the shed will be carried out. Dusting will be generated during the construction phase, transportation of goods and materials. Dusting will subsided by spraying of water.

8 6. Generation of ise and Vibration, and Emissions of Light and Heat:. Information/Checklist confirmation / 6.1 From operation of equipment e.g. engines, -- ventilation plant, crushers 6.2 From industrial or similar processes The noise level will not exceed than 75 db. 6.3 From construction or demolition Negligible 6.4 From blasting or piling From construction or operational traffic Negligible noise due to transportation of vehicles. 6.6 From lighting or cooling systems From any other sources Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:. Information/Checklist confirmation / 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water 7.4 From any other sources Is there a risk of long term build up of pollutants -- in the environment from these sources? Hazardous materials will be stored in an isolated area and all proper steps will be followed to prevent accidents. Treated effluent will be utilized for cooling tower make-up and the cooling tower blow down will be utilized for gardening/plantation purpose as per the industry specific norms hence there will be no discharge of effluent outside the company premises. However, the emissions from utility section will be controlled with help of adequate chimney height. Moreover, there will be no process gas emissions.

9 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment. Information/Checklist confirmation / 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances 8.2 From any other causes Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? -- However, Hazardous materials will be stored in an isolated area and all proper steps will be followed to prevent accidents. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. Information/Checklist confirmation / 9.1 Lead to development of supporting, cities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or wastewater treatment, etc.) Housing development Extractive industries Supply industries Other 9.2 Lead to after-use of the site, which could have an impact on the environment Set a precedent for later developments Have cumulative effects due to proximity to other existing or planned projects with similar effects. Supporting infrastructure like roads, power grids already exist. New waste water treatment plant proposed. Local labour will be utilized. The unit belongs to an area where other industries are in operation in a close proximity. Pollution load of this industrial cluster may lead to cumulative negative impacts on surrounding.

10 (III) ENVIRONMENTAL SENSITIVITY Areas Name/ Identity Aerial distance. (within 15 km.) Proposed project location boundary 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value ne NA 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Damanganga Reservoir Patches of Reserved forests 6.15 km 1.52 km 3 Areas used by protected, important or Deer Park and Vasona Lion Safari 2.52 km sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground River Darotha 1.41 km waters 5 State, National boundaries Gujarat State 4.96 km 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas SH185A NH 8B 0.25 km km 7 Defense installations ne NA 8 Densely populated or built-up area Silvassa 12.6 km 9 Areas occupied by sensitive man-made Primary, Secondary schools 0.50 km land uses (hospitals, schools, places of Hospitals Km worship, community facilities) Worship and community facilities 5.00 Km 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Groundwater resources: ne Surface resources: River Darotha Forestry: Patches of Reserves forests Agriculture: agricultural activities in nearby villages Tourism: Gardens & monuments NA 1.41 km km 1-3 km 2-10 km ne -- The project site falls under Zone 3 as per the Seismic zone map of India, which is a moderate risk zone. subsidence, landslides, erosion or extreme climatic conditions observed in the past. --

11 (IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES t applicable, because our request is for EC amendment in terms of exemption of specific condition no. i of the referred granted Environmental Clearance due to its non applicability for the proposed project. I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Date: 11/02/2016 Signature of applicant: (Project Proponent / Authorized Signatory) Mr. Mahesh Lakhwani Place: Silvassa Designation (Owner/Partner / CEO) : Address: Technical Director M/s. DNH Spinners. Survey. 171/1/1/4/1, 193, 196/1, 197/1, 197/1/1, 197/1/2, 197/2/1, 153P, 154, 155/1, 155/2, 156/1, 201/1/1, 201/3, 202/1 & 202/2, Industrial Zone, Village-Surangi, Village-Surangi, Silvassa, U.T.) NOTE: 1. The projects involving clearance under Coastal Regulation Zone tification, 1991 shall submit with theh application a CRZ map duly demarcated by one of the authorize agencies, showing the project activities, w.r.t. CRZ (at the stage of TOR) and the recommendations of the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the CRZ tification, 1991 for the activities to be located in the CRX. 2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticate by Chief Wildlife Warden showing these features vis-à-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the stage of EC). 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/EC, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project.