Study on Private-Initiative Infrastructure Projects. in Developing Countries in FY2007. Management System in Rajasthan, India SUMMARY.

Size: px
Start display at page:

Download "Study on Private-Initiative Infrastructure Projects. in Developing Countries in FY2007. Management System in Rajasthan, India SUMMARY."

Transcription

1 Study on Private-Initiative Infrastructure Projects in Developing Countries in FY2007 Study on the development of an Industrial area Environment Management System in Rajasthan, India SUMMARY March 2008 EX Corporation Toyota Tsusho Corporation

2 Summary 1. Background of the Project Japanese companies investing in India put environmental considerations as a high priority. However, the lack of environmental infrastructure in India is acting as a barrier for proper environmental management for these companies. In December 2006 agreement was made between the Japanese and the Indian government on the development of the DMIC (Delhi Mumbai Industrial Corridor) that includes the development of various economical and social infrastructures including port development, development of industrial parks etc. At present, both the countries are in the process of developing master plans for the implementation of the DMIC scheme. It can be expected that investment in this region from Japan will increase in the future. In this background, this study focuses on the feasibility of the formation of an Environmental Management Service Company, (EMSC, hereinafter) that provides integrated environmental services. 2. Project Content This study focuses on the establishment of an EMSC, which provides an integrated solution to various environmental services. EMSC will help pre-existing industrial parks to transform into EIP (Eco-Industrial Parks) while help establish new EIPs. EMSC will provide the following services. a. Water Supply, sewage treatment, and water reclamation business b. Treatment of hazardous waste c. Treatment and recycling of other wastes d. Establishment of air and water monitoring system e. Establishment of a regional environmental management center f. Solar Energy Services g. Lease of pollution abatement equipments h. Environmental analysis Services i. Outsourcing of Environmental management of factories 3. Project outline 3.1 target area The following areas will be chosen as the target sites for the study. Area around National Highway 8 (NH) between Delhi and Mumbai,mainly in

3 Rajasthan State(A) Bidadi area near Bangalore in Southern India(B) Regarding area A mentioned above, it is expected that the number of companies including Japanese ones will increase due to the development of the DMIC concept and during the course of this study, possibility of establishing a partnership with RIICO (Rajasthan State Industrial Development and Investment Corporation limited), a body responsible for development of industrial areas in Rajasthan state, will be studied. EMSC will provide a large variety of services but in the initial phase the services will be divided into core services and sub-services with the initial business being started from the core portions only. The services will later be expanded into sub-portions at the appropriate timing. Hence, to establish the core portion in India, a pilot project will be started in area B indicated above. The area B is an area where Toyota Tsusho Corporation has various interests. To be specific, the Bidadi industrial area in southern India near Bangalore where the factory of Toyota Kirloskar Motors (TKM) is located will be the target area. Hence, the business will start in area B and expanded to area A at the appropriate timing in the future. 3.2 business expansion Establishment and preparation Stage 1: Setting up in Bidadi Stage 2: Expansion to Bangalore Stage 3: Expansion to Northern States Construction Operation Marketing Expansion Survey Construction Operation 3 stages to be considered. The first stage will be the formation of the business foundation. The second stage will be the expansion stage and the third stage will be the expansion in the northern states including Rajasthan.

4 figure 0-1 Bidadi Industrial Area(1:10000)

5 3.3 Financial and economic analysis Investment cost and operation cost The initial investment cost is as follows. table 0-1 Initial investment cost Classification Price (million Rs) Construction 4.5 Equipment and machinery 193 Equipment 190 Heavy machinery (repair fee included) 2.9 Engineering and contingency fee 38 Total The annual O &M cost is as follows table 0-2 Annual O & M cost Type Cost (million Rs) Facility operation cost 19.4 Labor cost 10.3 Depreciation cost 11.6 Total Calculation of the FIRR For estimating FIRR in this chapter, Net Cash Flow is estimated based upon the following preconditions. Income Treatment charge obtained at the proposed facility Expenditure -Initial investment cost (Building construction, engineering service, contingency etc) -O&M Cost(Facility operation cost, Labour, ash disposal etc) Net Present Value of this project is 121 million Rs based upon 14% Discount Rate. The outcome of Financial Internal Rate of Return is 15.07%(before tax, 11.2%(after tax)on 25 th year after the operation starts and implies the project is financially sound project.

6 table 0-3 outcome of the FIRR Years from 2009 (Business operation start) 10years 15years 25years Tax Estimation outcome Before tax 6.19% After tax 1.44% Before tax 11.90% After tax 7.52% Before tax 15.07% After tax 11.2% Calculation of the EIRR Economic Internal Rate of Return (EIRR) is estimated as 15.47% based upon the above-mentioned condition. The estimation outcome is the same level as FIRR and thus this implies social benefit of the project is significant 3.4 Analysis of Environmental and social impact The implementation of this project is expected to have the following environmental improvement effects. 1. The waste matter that was temporarily stored will be treated permanently and safely 2. The hazardous waste will be treated properly 3. The environmental effects of the companies will be analyzed by a third party and improvements can be made 4. New companies expanding in India can start their business with the best possible environmental considerations 5. Water savings 6. Energy saving by the usage of solar energy and prevention of global warming 7. Establishment of an environment management system and the betterment of the image of the company Hazardous waste will be properly incinerated (or co processed in cement kiln) and be stabilized. This will lead to the elimination of environmental impact during the storage stage and the treatment stage. The hazardous waste being stored at present poses a potential for contamination and it is desirable to treat the waste immediately after its production. The flue gas and effluent from the treatment facility will be treated according to the stringent levels demanded by Japan.

7 The ash will be taken to the landfill and landfilled only after a proper pre-treatment. Further, in the long run, the facility will also help to lessen the burden by small companies who at present are dumping their waste in an in appropriate manner due to the lack of proper facilities present in the area. The EMSC will help the Japanese companies understand the laws and regulations of India regarding waste management better and hence help their environmental improvement goals. 3.5 Financial procurement Toyota Tsusho Corporation will be the major stakeholder with other partners as shown below. The capital fund will be about 30 to 50 million yen. Toyota Tsusho Corporation Sanyu Service Plant EX Corporation TKM invest fee suppliers EMSC invest Finance company TTPI companies related Corporate finance Construction capital JBIC loan Export Figure 0-2 Business scheme in Bidadi The capital will be procured using the following sources. Increase in capital stock Corporate finance or load from finance companies

8 3.6 Technological Advantages of Japanese Companies Japanese companies are competitive in the sectors of water treatment, waste treatment and laboratory analysis. However, as the project proponent is a private company, cost will play a big role in determining the exact stakeholders to be involved in the project. 3.7 Action Plan and issues This projects aims to provide environmental management services to the companies that will be present in the Northern states due to the development of the DMIC in the long run. As a first step towards achieving the ultimate goal, a model plant will be built in Bidadi with the initiatives of Toyota Tsusho Corporation. Expansion to the northern states will be the second stage. Regarding Bidadi, the business is dependent on the accumulation of suppliers due to the expected expansion of TKM. Hence it becomes necessary to receive the acceptance of TKM and TMC. Regarding the expansion to the northern states, it will be a prerequisite for the EMSC to gain experience first in Bidadi. During this time, EMSC will also propose the concept of Eco-industrial Park for incorporation in the DMIC master plan. During implementation in Rajasthan, it is desirable to receive the development rights of industrial rights from RIICO. Hence a consortium of business development companies and construction companies becomes necessary.

Form 3R Portfolio - Good Practices to Promote the 3Rs - Country: Thailand

Form 3R Portfolio - Good Practices to Promote the 3Rs - Country: Thailand Form 3R Portfolio - Good Practices to Promote the 3Rs - Country: Thailand Major Activities 1. National Policy and Plan 1.1 Thai Government policies - On 23 March 2005, the Prime Minister has presented

More information

3R Portfolio - Good Practices to Promote the 3Rs - Country: Thailand

3R Portfolio - Good Practices to Promote the 3Rs - Country: Thailand 3R Portfolio - Good Practices to Promote the 3Rs - Country: Thailand Major Activities 1. National Policy and Plan 1.1 Thai Government policies - On 23 March 2004, the Prime Minister has presented the policies

More information

Ex-ante Evaluation 1. Name of the Project 2. Background and Necessity of the Project

Ex-ante Evaluation 1. Name of the Project 2. Background and Necessity of the Project Ex-ante Evaluation 1. Name of the Project Country: India Project Title: Hyderabad Outer Ring Road Project (Phase 2) Loan Agreement: November 21, 2008 Loan Amount: 42,027 million Yen Borrower: The President

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: India Project: Madhya Pradesh Transmission System Modernisation Project Loan Agreement: June 16, 2011 Loan Amount:

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Ex-Ante Evaluation (for Japanese ODA Loan) Country: India Project: Dedicated Freight Corridor Project (Procurement of Electric Locomotives) Loan Agreement: September 15, 2017 Loan

More information

Ex-ante Project Evaluation

Ex-ante Project Evaluation Ex-ante Project Evaluation 1. Name of project Country: Socialist Republic of Vietnam Name of project: Hai Phong City Environmental Improvement Project (II) L/A signing date: March 31, 2009 Loan amount:

More information

Waste Management and Recycling in Japan Opportunities for EU SMEs. Christine Yolin, MINERVA Visiting Fellow Tokyo, 29 September 2015

Waste Management and Recycling in Japan Opportunities for EU SMEs. Christine Yolin, MINERVA Visiting Fellow Tokyo, 29 September 2015 Waste Management and Recycling in Japan Opportunities for EU SMEs Christine Yolin, MINERVA Visiting Fellow Tokyo, 29 September 2015 Outline Targets: EU SMEs, support organisations Objectives: Give an overview

More information

MOEJ/GEC BOCM Feasibility Study (FS) 2014 Summary of the Final Report. Waste Heat Recovery and Utilization in Textile and Garment Factories

MOEJ/GEC BOCM Feasibility Study (FS) 2014 Summary of the Final Report. Waste Heat Recovery and Utilization in Textile and Garment Factories MOEJ/GEC BOCM Feasibility Study (FS) 2014 Summary of the Final Report Waste Heat Recovery and Utilization in Textile and Garment Factories (Implementing Entity: PEAR Carbon Offset Initiative, Ltd.) 1.Overview

More information

Country Questionnaire Prior to the Senior Officials Meeting On the 3R Initiative -THAILAND

Country Questionnaire Prior to the Senior Officials Meeting On the 3R Initiative -THAILAND Country Questionnaire Prior to the Senior Officials Meeting On the 3R Initiative -THAILAND [Country Questionnaire Survey] 1. Major developments regarding the strategies, policies and activities on the

More information

Study on Economic Partnership Projects. in Developing Countries in FY2007. Construction Project in Bandung, Republic of Indonesia SUMMARY.

Study on Economic Partnership Projects. in Developing Countries in FY2007. Construction Project in Bandung, Republic of Indonesia SUMMARY. Study on Economic Partnership Projects in Developing Countries in FY200 Study on Integrated Intermediate Waste Treatment Facilities Construction Project in Bandung, Republic of Indonesia SUMMARY March

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan 1. Name of the Project Ex-Ante Evaluation (for Japanese ODA Loan) Country: Arab Republic of Egypt Project: Hurghada Photovoltaic Power Plant Project Loan Agreement: February 29, 2016

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People's Republic of Bangladesh Project: Kanchpur, Meghna and Gumti 2 nd Bridges Construction and Existing

More information

Table 1 Concept of the Project Stage Objectives Remarks First step This project (Aerobic fermentation. - Reduce in emission of methane gas.

Table 1 Concept of the Project Stage Objectives Remarks First step This project (Aerobic fermentation. - Reduce in emission of methane gas. Executive Summary Chapter 1 Overview of Malaysia and the Background of the Project Malaysia is one of the countries whose social and economic conditions are most stable in Asia. Since the country is also

More information

Japan s New Action Plan towards a Global Zero Waste Society 1. Introduction

Japan s New Action Plan towards a Global Zero Waste Society 1. Introduction Japan s New Action Plan towards a Global Zero Waste Society Japan s New Action Plan for Accelerating the Establishment of Sound Material-Cycle Societies Internationally through the 3Rs (tentative translation)

More information

Japanese ODA. Ex-ante Evaluation

Japanese ODA. Ex-ante Evaluation Japanese ODA Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: Second Ho Chi Minh City Water Environment Improvement Project (I) (II) (III) L/A signed on: March

More information

Roles and functions of government for promoting MFA application and resource management - (A-2) Case Studies for Japan- Yuichi Moriguchi,, Dr. Eng.

Roles and functions of government for promoting MFA application and resource management - (A-2) Case Studies for Japan- Yuichi Moriguchi,, Dr. Eng. Sustainable Resource Management Workshop hosted by CTCI, 5-6 October 2009 Yen Tjing Ling Industrial Research Institute, National Taiwan University, Taipei Course A (for Governmental Agencies) Roles and

More information

1. Name of the Project

1. Name of the Project Japan ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: India Project: Mumbai Metro Line III Project Loan Agreement: September 17, 2013 Loan Amount: 71,000 million yen

More information

for the Industrial Clusters in Maharashtra Province, the Republic of India

for the Industrial Clusters in Maharashtra Province, the Republic of India Study on Economic Partnership Projects in Developing Countries in FY2013 Study on the Water Recycling and Sludge Reduction Project for the Industrial Clusters in Maharashtra Province, the Republic of India

More information

Study on Economic Partnership Projects in Developing Countries in FY2013. Final Report SUMMARY. February 2014

Study on Economic Partnership Projects in Developing Countries in FY2013. Final Report SUMMARY. February 2014 Study on Economic Partnership Projects in Developing Countries in FY2013 Study on the small hydro power project in the province of Lam Dong in Socialist Republic of Vietnam Final Report SUMMARY February

More information

Survey on Rice Husk Power Generation Project in Cambodia (Small and Medium-Sized Enterprise Partnership Promotion Survey) Final Report (Summary)

Survey on Rice Husk Power Generation Project in Cambodia (Small and Medium-Sized Enterprise Partnership Promotion Survey) Final Report (Summary) Kingdom of Cambodia Survey on Rice Husk Power Generation Project in Cambodia (Small and Medium-Sized Enterprise Partnership Promotion Survey) Final Report (Summary) May 2013 Japan International Cooperation

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives Ex-ante Evaluation 1. Name of the Project Country: The Democratic Socialist Republic of Sri Lanka Project: The Galle Port Development Project (I) Loan Agreement: March 28, 2006 Loan Amount: 14,495 million

More information

STUDY ON THE COAL GASIFICATION AND POWER GENERATION PROJECT IN MAE MOH, THE KINGDOM OF THAILAND

STUDY ON THE COAL GASIFICATION AND POWER GENERATION PROJECT IN MAE MOH, THE KINGDOM OF THAILAND STUDY ON PRIVATE-INITIATIVE INFRASTRUCTURE PROJECTS IN DEVELOPING COUNTRIES IN FY2011 STUDY ON THE COAL GASIFICATION AND POWER GENERATION PROJECT IN MAE MOH, THE KINGDOM OF THAILAND SUMMARY February 2012

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) 1. Basic Information Ex-Ante Evaluation (for Japanese ODA Loan) South Asia Division 1, South Asia Department, JICA Country: India Project Name: Project for the Construction of Turga Pumped Storage (I)

More information

Cost Analysis Study of Mango Fruit Processing Industry in Southern India

Cost Analysis Study of Mango Fruit Processing Industry in Southern India Serials Publications Cost Analysis Study of Mango Fruit Processing Industry in Southern India National Academy of Agricultural Science (NAAS) Rating : 3. 03 Cost Analysis Study of Mango Fruit Processing

More information

Study on Waste-to-Energy Project. in Almaty, the Republic of Kazakhstan

Study on Waste-to-Energy Project. in Almaty, the Republic of Kazakhstan Study on Economic Partnership Projects in Developing Countries in FY2013 Study on Waste-to-Energy Project in Almaty, the Republic of Kazakhstan Final Report SUMMARY February 2014 Prepared for: The Ministry

More information

Study on Private-Initiative Infrastructure Projects. in Developing Countries in FY2007. Vietnam SUMMARY. March 2008

Study on Private-Initiative Infrastructure Projects. in Developing Countries in FY2007. Vietnam SUMMARY. March 2008 Study on Private-Initiative Infrastructure Projects in Developing Countries in FY2007 Study on Coal-fired Thermal Power Projects in Southern Vietnam SUMMARY March 2008 Electric Power Development Co.,Ltd.

More information

Japanese ODA. Ex-ante Evaluation

Japanese ODA. Ex-ante Evaluation Japanese ODA Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: North-South Expressway Construction Project (Da Nang Quang Ngai Section) (I) (II) (III) L/A signed

More information

Discussion points for the internationally-harmonized EPR systems

Discussion points for the internationally-harmonized EPR systems Discussion points for the internationally-harmonized EPR systems United Nations Economic and Social Commission for Asia and the Pacific Institute of Global Environmental Strategies, Japan of Extended Producer

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People's Republic of Bangladesh Project: Dhaka Urban Transport Development Project (I) Loan Agreement: February

More information

Environment and Economy Division Ministry of the Environment February 1, 2017

Environment and Economy Division Ministry of the Environment February 1, 2017 Environment and Economy Division Ministry of the Environment February 1, 2017 Promoting Low Carbon Investment The Central Environment Council estimated in 2012 that the additional investment would be 135

More information

Ex-ante Evaluation - 1 -

Ex-ante Evaluation - 1 - Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: Hue City Water Environment Improvement Project (Loan Agreement: March 31, 2008; Loan Amount: 20,883 million

More information

Low Carbon City Design by AIM. Intercity Cooperation between Pasir Gudang City and Kitakyushu City for the Development of Law Carbon Society

Low Carbon City Design by AIM. Intercity Cooperation between Pasir Gudang City and Kitakyushu City for the Development of Law Carbon Society 1 Low Carbon City Design by AIM Intercity Cooperation between Pasir Gudang City and Kitakyushu City for the Development of Law Carbon Society Kitakyushu Asian Center for Low Carbon Society Development

More information

Towards a Circular Economy in NL

Towards a Circular Economy in NL Towards a Circular Economy in NL Herman Huisman RWS Environement Herman.huisman@rws.nl Upscaling of waste management, both in policies and waste markets Scale of government Global National regional Municipal

More information

Overseas Environmental Measures of Japanese Companies (Philippines)

Overseas Environmental Measures of Japanese Companies (Philippines) A Project Consigned of the Environment Agency in 1996 Overseas Environmental Measures of Japanese Companies (Philippines) - Research Report on Trends in Environmental Considerations related to Overseas

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of the Union of Myanmar Project: Yangon-Mandalay Railway Improvement Project Phase I (II) Loan

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Ex-Ante Evaluation (for Japanese ODA Loan) Country: India Project: Project for the Construction of Training Institute for Mumbai-Ahmedabad High Speed Rail Loan Agreement: September

More information

Promotion of the 3R Initiative

Promotion of the 3R Initiative Promotion of the 3R Initiative - Challenge to Establish a Sound Material-Cycle Society - Kazuyoshi OKAZAWA Ministry of the Environment Government of Japan Background The 3R Initiative was endorsed at the

More information

JICA s Approach on Waste Management

JICA s Approach on Waste Management JICA s Approach on Waste Management Sep. 2009 Environmental Management Group, Global Environment Department, JICA Waste problem covers several issues/sectors (1)Clear division of roles & responsibilities

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: The Kanchpur, Meghna and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation

More information

Japanese ODA Loan. Ex-Ante evaluation

Japanese ODA Loan. Ex-Ante evaluation Japanese ODA Loan Ex-Ante evaluation 1. Project Country: Ukraine Name of the Project: Bortnychi Sewage Treatment Plant Modernization Project Loan Agreement: June 15, 2015 Loan Amount: 108.193 billion yen

More information

The Law on Promoting Green Purchasing and the Green Contract Law

The Law on Promoting Green Purchasing and the Green Contract Law The Law on Promoting Green Purchasing and the Green Contract Law Environment and Economy Division Environmental Policy Bureau Ministry of the Environment, Japan Takashi Minemura Outline of the Law on Promoting

More information

1. Name of the Project 2. Necessity and Relevance of JBIC Assistance 1. Situation and issues of the road sector in Sri Lanka

1. Name of the Project 2. Necessity and Relevance of JBIC Assistance 1. Situation and issues of the road sector in Sri Lanka Ex-ante Evaluation 1. Name of the Project Country: The Democratic Socialist Republic of Sri Lanka Project: Southern Highway Construction Project II Loan Agreement: July 29, 2008 Loan Amount: 17,499 million

More information

PAPAIN 1.0 PRODUCT AND ITS APPLICATIONS 2.0 MARKET POTENTIAL 3.0 BASIS AND PRESUMPTIONS 4.0 IMPLEMENTATION SCHEDULE

PAPAIN 1.0 PRODUCT AND ITS APPLICATIONS 2.0 MARKET POTENTIAL 3.0 BASIS AND PRESUMPTIONS 4.0 IMPLEMENTATION SCHEDULE PAPAIN QUALITY AND STANDARDS : As per BPC/ IP specifications PRODUCTION CAPACITY : 4.2MT BPC grade or 6.3 MT IP grade Papain 1.0 PRODUCT AND ITS APPLICATIONS Papain is a proteolytic enzymes produced from

More information

DISCUSSION PURPOSE ONLY. JCM Project Development by JFE

DISCUSSION PURPOSE ONLY. JCM Project Development by JFE JCM Project Development by JFE July 2018 JFE Group Structure Est. 1912 Est. 1951 JFE Holdings, Inc. (est. 2002) Equity-method affiliate JFE Engineering Net Sales(million $) Employees JFE Steel Net Sales(million

More information

Co-Benefit Approach in JICA

Co-Benefit Approach in JICA Co-Benefit Approach in JICA The 18 th Asia-Pacific Seminar on Climate Change Ha Noi, 3th March 2009 by Akiko URAKAMI, Office for Climate Change Japan International Cooperation Agency (JICA) Table of Contents

More information

Japan s International Cooperation for Resource Efficiency and the 3Rs

Japan s International Cooperation for Resource Efficiency and the 3Rs 22/2/2016 (Mon) Japan s International Cooperation for Resource Efficiency and the 3Rs Kazuhisa MATSUDA Director Office of Sound Material-Cycle Society, Waste Management and Recycling Department Ministry

More information

Launch of CCAC MSWI Asian Component

Launch of CCAC MSWI Asian Component CCAC Municipal Solid Waste Initiative Workshop Surabaya, Indonesia, 23 February 2014 Launch of CCAC MSWI Asian Component Jun Daito Waste Management and Recycling Department Ministry of the Environment,

More information

The JCM project development in Bangkok making effective use of city to city collaboration. 6 th September, 2016 Jun Watanabe, OECC

The JCM project development in Bangkok making effective use of city to city collaboration. 6 th September, 2016 Jun Watanabe, OECC The JCM project development in Bangkok making effective use of city to city collaboration 6 th September, 2016 Jun Watanabe, OECC 1 Table of contents 1. Climate policy and Japan s cooperation in Bangkok

More information

Centre of Excellence for Skills for Green Jobs. Skill development Government of Gujarat

Centre of Excellence for Skills for Green Jobs. Skill development Government of Gujarat Centre of Excellence for Skills for Green Jobs Skill development Government of Gujarat Contents Project Concept 3 Market Potential 6 Growth Drivers 6 Gujarat Competitive Advantage 7 Project Information

More information

Possibility of Co-generation and Energy conservation in Energy Sector

Possibility of Co-generation and Energy conservation in Energy Sector ISAP2013 Possibility of Co-generation and Energy conservation in Energy Sector July 24 th, 2013 NTT Data Institute of Management Consulting, Inc. Socio & Eco Strategic Consulting Sector 1. Outline of Project

More information

Feasibility study guidelines to implement innovative land-based farm concepts

Feasibility study guidelines to implement innovative land-based farm concepts Feasibility study guidelines to implement innovative land-based Peder Nielsen (NC Consulting ApS), Otso Järvisalo (FGFRI) and Alfred Jokumsen (DTU Aqua) Finnish Game and Fisheries Research Institute, Helsinki

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Kingdom of Morocco Project: Sewerage System Development Project (III) Loan Agreement: March 26, 2013 Loan

More information

Mr. Coby Skye. Los Angeles County Department of Public Works

Mr. Coby Skye. Los Angeles County Department of Public Works Mr. Coby Skye Los Angeles County Department of Public Works Overview What are Conversion Technologies? Conversion Technology Benefits The Southern California Conversion Technology Demonstration Project

More information

An Environmental Management System (EMS) Designed for Global Deployment

An Environmental Management System (EMS) Designed for Global Deployment Activities Activities An System (EMS) Designed for Global Deployment The Yokogawa Group is deploying its EMS globally with the aim of building a sustainable society. EMS Activities for Deployment Throughout

More information

Dear students, Please attempt all the questions and submit it to the D.E.office on.

Dear students, Please attempt all the questions and submit it to the D.E.office on. Assignment Paper (Semester -1 st ) Course Code: MS- Course Title : Accounting and Finance for Managers Coverage: All Blocks Q.1 What are the Generally Accepted Accounting Principles? Explain Any Five of

More information

ECONOMIC AND FINANCIAL ANALYSES I. ECONOMIC ANALYSIS

ECONOMIC AND FINANCIAL ANALYSES I. ECONOMIC ANALYSIS A. Background SASEC Bangladesh India Electrical Grid Interconnection Project Additional Financing (BAN RRP 44192-14) ECONOMIC AND FINANCIAL ANALYSES I. ECONOMIC ANALYSIS 1. The Bangladesh India Electrical

More information

Japanese ODA loan. Ex-ante Evaluation

Japanese ODA loan. Ex-ante Evaluation Japanese ODA loan Ex-ante Evaluation 1.Name of the Project Country: The Socialist Republic of Vietnam Project: North-South Expressway Construction Project (Da Nang Quang Ngai Section)(I) L/A signed on:

More information

JICA s support for Development of Andhra Pradesh

JICA s support for Development of Andhra Pradesh JICA s support for Development of Andhra Pradesh 23 rd May, 2016 Takema Sakamoto, Chief Representative, Japan International Cooperation Agency (JICA) India Office 2 Fastest growing large economy in the

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Indonesia Project: Patimban Port Development Project (I) Loan Agreement: November 15, 2017 Loan

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of the Union of Myanmar Project: National Power Transmission Network Development Project Phase

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1.Name of the Project Country: Socialist Republic of Viet Nam Project: O Mon Thermal Power Plant Unit No.2 Construction Project (II) Loan Agreement:

More information

Waste Management in Thailand

Waste Management in Thailand Waste Management in Thailand Solid and Hazardous Substances Management Bureau Pollution Control Department Ministry of Natural Resources and Environment Thailand Municipal Solid Waste Management : Generation,

More information

Urban, Climate change and Finance - JICA s Approach-

Urban, Climate change and Finance - JICA s Approach- COP20 Side Event on Urban, Climate change and Finance Urban, Climate change and Finance - JICA s Approach- Tomonori Sudo. Ph.D., Senior Rersearch Fellow, JICA Research Institute 5 th December, 2014, Japan

More information

Partnership to Advance Clean Energy - Deployment (PACE-D) TA Program

Partnership to Advance Clean Energy - Deployment (PACE-D) TA Program Partnership to Advance Clean Energy - Deployment (PACE-D) TA Program A Programmatic Approach to Incentivizing Large-scale Rooftop Solar In India 19 th June, 2015 Presented at The Asia Clean Energy Forum,

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Indonesia Project: Construction of Jakarta Mass Rapid Transit Project (II) Loan Agreement: December

More information

FICCI ENVIRONMENT CONCLAVE "Sustainable waste management: harnessing the. potential for business and technology"

FICCI ENVIRONMENT CONCLAVE Sustainable waste management: harnessing the. potential for business and technology Check against delivery FICCI ENVIRONMENT CONCLAVE 2010 "Sustainable waste management: harnessing the potential for business and technology" Address by H.E. Ms Danièle Smadja Ambassador and Head of the

More information

3Rs and resource efficiency policy towards sound material cycle society

3Rs and resource efficiency policy towards sound material cycle society The Second Meeting of High-Level Political Forum on Sustainable Development New York, 7 July 2014 3Rs and resource efficiency policy towards sound material cycle society Mr. Shinji Inoue Parliamentary

More information

Chapter #2: Cost Concepts and Design Economics

Chapter #2: Cost Concepts and Design Economics ENGINEERING ECONOMY Chapter #2: Cost Concepts and Design Economics By: Eng. Ahmed Y Manama Outline Fixed, Variable, and Incremental Cost Recurring and Nonrecurring Costs Direct, Indirect and Overhead Costs

More information

M. Özgür Şakı, Senior Waste Expert M. Özgür Şakı, Kıdemli Atık Uzmanı 22 May 2018, Ankara

M. Özgür Şakı, Senior Waste Expert M. Özgür Şakı, Kıdemli Atık Uzmanı 22 May 2018, Ankara Dissemination Workshop Yayım Toplantısı M. Özgür Şakı, Senior Waste Expert M. Özgür Şakı, Kıdemli Atık Uzmanı 22 May 2018, Ankara GHGs caused by Waste Sector Turkey s total GHG emissions in 2016 was 496

More information

The demand for the bricks will increase in line with the demand for construction.

The demand for the bricks will increase in line with the demand for construction. CONVENTIONAL BRICKS A. INTRODUCTION The construction activity is one of the vital sectors of the economy. There is hardly any sector in the economy where there is no construction involved. There has been

More information

Envisioning Corporate Mission. To make the world a better place to live by helping people and goods get where they need to go.

Envisioning Corporate Mission. To make the world a better place to live by helping people and goods get where they need to go. 0/19 Envisioning 2025 Corporate Mission To make the world a better place to live by helping people and goods get where they need to go. October 30, 2018 Hino Motors, Ltd. Yoshio Shimo President & CEO,

More information

Solid Waste Management in South Asia

Solid Waste Management in South Asia Solid Waste Management in South Asia 18 September 2013 Ron Slangen Urban Development Specialist, SAUW Outline 1. SWM in SAUW operations 2. Overview of 3. Projects in Bangladesh 4. Summary of key issues

More information

ENVIRONMENTAL ACCOUNTING AND REPORTING IN BALRAMPUR CHINI MILLS LIMITED GONDA (U.P), INDIA

ENVIRONMENTAL ACCOUNTING AND REPORTING IN BALRAMPUR CHINI MILLS LIMITED GONDA (U.P), INDIA ENVIRONMENTAL ACCOUNTING AND REPORTING IN BALRAMPUR CHINI MILLS LIMITED GONDA (U.P), INDIA Dr. Gunjan Gupta Assistant Professor, Department of Commerce, Daulat Ram College, Delhi University, Delhi, India

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Dhaka Mass Rapid Transit Development Project (Line 1) (E/S) Loan Agreement: June

More information

NIMZ Guidelines :- From : CA Ratan Moondra. Presentation on National Investment & Manufacturing Zone

NIMZ Guidelines :- From : CA Ratan Moondra. Presentation on National Investment & Manufacturing Zone NIMZ Guidelines :- From : CA Ratan Moondra Presentation on National Investment & Manufacturing Zone GUIDELINES FOR ESTABLISHMENT OF NATIONAL INVESTMENT & MANUFACTURING ZONES (NIMZS) o Background o Application

More information

THE STUDY ON REGIONAL SOLID WASTE MANAGEMENT FOR ADANA-MERSIN IN THE REPUBLIC OF TURKEY

THE STUDY ON REGIONAL SOLID WASTE MANAGEMENT FOR ADANA-MERSIN IN THE REPUBLIC OF TURKEY JAPAN INTERNATIONAL COOPERATION AGENCY () THE MINISTRY OF ENVIRONMENT THE REPUBLIC OF TURKEY THE STUDY ON REGIONAL SOLID WASTE MANAGEMENT FOR ADANA-MERSIN IN THE REPUBLIC OF TURKEY FINAL REPORT VOLUME

More information

Fiscal 2016 Business Results. May 17, 2017

Fiscal 2016 Business Results. May 17, 2017 Fiscal 2016 Business Results May 17, 2017 Overview of Operating Results 2 Consolidated Income Statements FY2015 Results FY2016 Results Changes Billion yen H1 H2 Full Year H1 H2 Full Year H1 H2 Full Year

More information

Financial Viability and Barriers for Implementing AFR Project An Industry Perspective

Financial Viability and Barriers for Implementing AFR Project An Industry Perspective Financial Viability and Barriers for Implementing AFR Project An Industry Perspective Ulhas Parlikar Dy Head, Geocycle India ACC Limited 2014 Holcim Technology 2014 Ltd About Geocycle For a zero-waste

More information

STUDY ON THE WASTE TREATMENT FACILITY BOT PROJECT IN DKI JAKARTA, THE REPUBLIC OF INDONESIA

STUDY ON THE WASTE TREATMENT FACILITY BOT PROJECT IN DKI JAKARTA, THE REPUBLIC OF INDONESIA STUDY ON PRIVATE-INITIATIVE INFRASTRUCTURE PROJECTS IN DEVELOPING COUNTRIES IN FY2011 STUDY ON THE WASTE TREATMENT FACILITY BOT PROJECT IN DKI JAKARTA, THE REPUBLIC OF INDONESIA SUMMARY February 2012 Prepared

More information

Due Diligence Checklist

Due Diligence Checklist Due Diligence Checklist Company Registration Number Date Established Legal Status of Business Principal Bankers Auditors Attorneys Insurers OWNERSHIP Names and Holdings of Shareholders, Partners, Members

More information

Waste Generation and Waste Disposal CHAPTER 16

Waste Generation and Waste Disposal CHAPTER 16 Waste Generation and Waste Disposal CHAPTER 16 Paper or Plastic? Polystyrene plastic polymer with high insulation value Aka styrofoam Is harmful to environment In response to public sentiment Switch to

More information

Ex-Ante evaluation 1. Name of the Project 2. Background and Necessity of the Project

Ex-Ante evaluation 1. Name of the Project 2. Background and Necessity of the Project Ex-Ante evaluation 1. Name of the Project Country: Democratic Socialist Republic of Sri Lanka Name of the Project: National Transmission and Distribution Network Development and Efficiency Improvement

More information

Jawaharlal Nehru National Solar Mission Building Solar India Ministry of New and Renewable Energy Government of India

Jawaharlal Nehru National Solar Mission Building Solar India Ministry of New and Renewable Energy Government of India Jawaharlal Nehru National Solar Mission Building Solar India Ministry of New and Renewable Energy Government of India 1 st Concentrated Solar Thermal Power Summit New Delhi, September 2010 Under the National

More information

Environmental Activities and Green Procurement Program in Nissan

Environmental Activities and Green Procurement Program in Nissan Environmental Activities and Green Procurement Program in Nissan Shogo SAEGUSA Environmental and Safety Engineering Department NISSAN Motor Co., Ltd. 1 Nissan plans locally-based production in India? On

More information

Japan s s International Cooperation for the 3Rs in Asia

Japan s s International Cooperation for the 3Rs in Asia Japan s s International Cooperation for the 3Rs in Asia Hidetoshi Kimura Director, Policy Planning Division, Waste Management and Recycling Department Ministry of the Environment, Japan Development of

More information

The PPP System: Korean Case

The PPP System: Korean Case Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development Bank (ADB), its Board of Directors, or the governments

More information

Country Report on Waste management in Sri Lanka Status, Achievements and Challenges

Country Report on Waste management in Sri Lanka Status, Achievements and Challenges Asia Pacific Workshop on Global Partnership on Waste Management Country Report on Waste management in Sri Lanka Status, Achievements and Challenges Eng V R SenaPeiris Director National Cleaner Production

More information

3R Ministerial Conference on the 3R Initiative Tokyo, Japan, April THE ROLE OF THE BASEL CONVENTION IN PROMOTING 3Rs

3R Ministerial Conference on the 3R Initiative Tokyo, Japan, April THE ROLE OF THE BASEL CONVENTION IN PROMOTING 3Rs 3R Ministerial Conference on the 3R Initiative Tokyo, Japan, 29-30 April 2005 THE ROLE OF THE BASEL CONVENTION IN PROMOTING 3Rs Ms Sachiko Kuwabara-Yamamoto Executive Secretary Secretariat of the Basel

More information

Review of the current Good Practice Document (Good Practices for Management of Mercury Releases from Wastes)

Review of the current Good Practice Document (Good Practices for Management of Mercury Releases from Wastes) S3_01 Review of the current Good Practice Document (Good Practices for Management of Mercury Releases from Wastes) UNEP Global Mercury Partnership Waste Management Partnership Area Meeting Manila, The

More information

Technology- Transfer for Sustainable Industrial Development. Dr. Heinz Leuenberger 25 September 2009, Geneva, Switzerland

Technology- Transfer for Sustainable Industrial Development. Dr. Heinz Leuenberger 25 September 2009, Geneva, Switzerland Technology- Transfer for Sustainable Industrial Development Dr. Heinz Leuenberger 25 September 2009, Geneva, Switzerland Context Many industries use more materials and energy than their production processes

More information

Study on Economic Partnership Projects. in Developing Countries in FY2009. Da Nang City in Socialist Republic of Viet Nam SUMMARY.

Study on Economic Partnership Projects. in Developing Countries in FY2009. Da Nang City in Socialist Republic of Viet Nam SUMMARY. Study on Economic Partnership Projects in Developing Countries in FY2009 Study on the Water Environment Improvement Project for Da Nang City in Socialist Republic of Viet Nam SUMMARY March 2010 NIHON SUIDO

More information

Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA -

Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA - Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA - [Country Questionnaire Survey] 1. Major developments regarding the strategies, policies and activities on the

More information

MARINE LITTER: What role for Extended Producer Responsibility (EPR)?

MARINE LITTER: What role for Extended Producer Responsibility (EPR)? MARINE LITTER: What role for Extended Producer Responsibility (EPR)? Brussels, November 22, 2018 Maria Spyraki MEP Plastic packaging waste Plastics are widely used in our economy: in packaging, buildings,

More information

Government Plan to Reduce Dioxin Levels Resulting from Business Activities in Japan

Government Plan to Reduce Dioxin Levels Resulting from Business Activities in Japan Government Plan to Reduce Dioxin Levels Resulting from Business Activities in Japan Pursuant to Paragraph 3 of Article 33 (Law No.105 of 1999), a government plan to reduce dioxins released as a result

More information

Ramsey/Washington Recycling and Energy Board: Facility Committee. June 23, 2016 Meeting

Ramsey/Washington Recycling and Energy Board: Facility Committee. June 23, 2016 Meeting Ramsey/Washington Recycling and Energy Board: Facility Committee June 23, 2016 Meeting Item IV. a. R&E Center Operations Update Item IV. b. Odor Mitigation Study Update 2017 Facility Budget Recommendations

More information

JICA s Experiences towards Better Air

JICA s Experiences towards Better Air JICA s Experiences towards Better Air February, 2017 Takema Sakamoto Chief Representative Japan International Cooperation Agency (JICA) India Office Contents 1. About JICA 2. JICA s Approaches to Air Pollution

More information

Mid-Term Review Report of Japanese ODA Loan Project for FY2012

Mid-Term Review Report of Japanese ODA Loan Project for FY2012 Mid-Term Review Report of Japanese ODA Loan Project for FY2012 External Evaluator: Hiroshi Oita (OPMAC Corporation) Field Study: October, 2012 Project Name: Indonesia PLN Operation Improvement System Project

More information

Ex-Ante Evaluation Africa Division 4, Africa Department, JICA 1. Basic Project Information 2. Background and Necessity of the Project

Ex-Ante Evaluation Africa Division 4, Africa Department, JICA 1. Basic Project Information 2. Background and Necessity of the Project Ex-Ante Evaluation Africa Division 4, Africa Department, JICA 1. Basic Project Information Country: Republic of Côte d Ivoire Project: Abidjan Port Cereal Berth Construction Project Loan Agreement: March

More information

Towards a recycling-oriented society Waste Report

Towards a recycling-oriented society Waste Report Towards a recycling-oriented society Waste Report 2018 Contents Flow of waste and resources in the 23 cities 1 Ⅰ Overview of the Clean Authority of TOKYO 1. Background and purpose of establishment 2. FY

More information

Huge-scale illegal dumping of waste Accumulation of hazardous waste such as PCB

Huge-scale illegal dumping of waste Accumulation of hazardous waste such as PCB Promotion of Sound Material-Cycle Society in Japan and 3R Initiative i i Masayoshi Namiki Vice Minister of the Environment, Ministry of the Environment of Japan April 2008 1. Japan s Experience Outline

More information