1 GROUNDWATER REDUCTION PLAN MONTHLY OPERATIONS REPORT GRP REVIEW COMMITTEE MEETING MAY 22, 2017 SJRA BOARD MEETING MAY 25, 2017

2 TABLE OF CONTENTS Table of Contents 1 Acronyms and Defini ons Reporter Water Usage Reported Groundwater Usage Reported Alterna ve Water Source Usage Historical Date Reported by Par cipants Division Updates Drought Con ngency Plan Triggers/Status Public Rela ons Ac vi es Upcoming Events Surface Water Withdrawal Surface Water Withdrawal Compliance Lone Star Groundwater Conserva on District (LSGCD) 6 Requirement Status 2.2 Par cipants Projected Data Versus Actual Data for Groundwater 6 Usage 2.4 Projected Data Versus Actual Data for Surface Water 7 Delivery 3.0 Financial Schedule of Revenues and Expenses Clarifica on of Actual and Budget Variances 9 1

3 ACRONYMS AND DEFINITIONS ACRONYMS DEFINITIONS AWS AWWA CIP Alternative Water Source American Water Works Association Capital Improvement Project Groundwater Reduc on Plan (GRP) The document developed and filed with the LSGCD indica ng SJRA s plan to reduce the permited 2009 groundwater pumpage of its GRP Par cipants by 30%. The GRP is administered by the SJRA, including any supplements, revisions, or amendments. ECC GIS Early Conversion Credits Geographic Information System GRP Administrator The SJRA General Manager s designee who administers the SJRA Groundwater Reduc on Plan and GRP Contract with GRP Par cipants. GRP GPY GST HSPS ICO LSGCD LVGU MSL ORS RWI / RWPS SCADA SJRA SWF SWRF SWTP TCEQ TQD TWDB Groundwater Reduction Plan Gallons Per Year Groundwater Storage Tank High Service Pump Station Initial Conversion Obligation Lone Star Groundwater Conservation District Large Volume Groundwater User Mean Sea Level Online Reporting System Raw Water Intake / Raw Water Pump Station Supervisory Control And Data Acquisition San Jacinto River Authority Surface Water Facilities (SWTP, HSPS and RWI) Surface Water Receiving Facilities Surface Water Treatment Plant Texas Commission on Environmental Quality Total Qualifying Demand Texas Water Development Board GRP Contract Contract between the SJRA and a Par cipant to be included in the SJRA s efforts to meet the surface water conversion requirements mandated by the LSGCD. ICO Adjusted TQD The ICO Adjusted TQD is the total amount of groundwater that can be produced by all Joint GRP Par cipants. Joint GRP Large Volume Groundwater User(s) (LVGU) Par cipant(s) GRP which is prepared to include (takes into account) LVGUs who have executed a GRP Contract with the SJRA to join the SJRA s GRP. Contracted LVGUs obtain LSGCD groundwater reduc on regula on compliance through the SJRA s Joint GRP without preparing and submi ng a GRP. Any person or en ty that, through a single well or a combina on of wells, actually produces or is authorized by permit(s) issued by the LSGCD to produce 10 million gallons or more of groundwater annually on or a er January 1, Regulated User(s) that enters into and remains subject to a writen agreement with the SJRA to be included in the SJRA s GRP and includes the legal successors or assigns of Par cipant(s). Regulated User(s) Any public or private en ty or person that is or becomes subject to the District Regulatory Plan established by the LSGCD and includes any amendments, revisions or supplements thereto as may be adopted by the LSGCD. SJRA GRP Division Division of the SJRA responsible for GRP compliance, and the management, administra on, opera on and maintenance of the surface water facili es and surface water transmission system. 2

4 1.0 REPORTED WATER USAGE For the purpose of the GRP Monthly Operations Report, water usage is separated into two (2) categories; groundwater and alternative water source (AWS), and is tracked on a monthly basis. Pursuant to the GRP Rate Order, Participant water usage must be reported no later than ten (10) days from the end of the month. Water usage is self-reported by Participants through an online reporting system (ORS), TrueBill. The water usage data in Sections is as of May 11, 2017 and is self-reported by the GRP Participants. 1.1 REPORTED GROUNDWATER USAGE The amount of groundwater usage reported by GRP Participants for the month of April is 898,258,919 gallons. 1.2 REPORTED ALTERNATIVE WATER SOURCE USAGE For the purpose of this report, reported AWS usage is separated into three (3) categories; surface water, Catahoula Aquifer usage, and reuse. The amount of AWS usage reported for the month of April is 655,371,800 gallons. The AWS data reflected in the tables below are reported by source and Participant for the month of April REPORTED CATAHOULA AQUIFER USAGE Reported Catahoula Aquifer Usage in Gallons - April 2017 City of Conroe 156,000 City of Willis 10,273,000 Corinthian Point MUD No. 2 2,901,000 Point Aquarius MUD 9,181,000 Total Gallons 22,511, REPORTED REUSE WATER Reported Reuse Water Usage in Gallons - April 2017 Sequoia - Panther Trails 4,411,000 Southern Montgomery County MUD 17,056,800 Total Gallons 21,467, REPORTED SURFACE WATER USAGE Reported Surface Water Usage in Gallons - April 2017 City of Conroe 147,907,000 City of Oak Ridge North 6,501,000 Montgomery County MUD 99 8,686,000 MSEC - Montgomery Trace/Crown Oaks 33,329,000 Rayford Road MUD 31,620,000 SJRA - The Woodlands 354,459,000 Southern Montgomery County MUD 28,891,000 Total Gallons 611,393,000 3

5 1.3 HISTORICAL DATA REPORTED BY PARTICIPANTS The table and chart below reflect the historical usage of groundwater and AWS for all Joint GRP Participants. For representational purposes, historical surface water usage has been presented independently from other AWS usage. Reported Surface Water Usage In Gallons Reported Groundwater Usage in Gallons Reported Catahoula Aquifer and Reuse in Gallons Jan - 402,401, ,901,000 1,081,148, ,423, ,197,847 12,875,000 47,191,800 37,167,900 Feb - 464,506, ,905, ,403, ,566, ,070,362 11,616,332 33,625,100 34,156,700 Mar - 472,880, ,385,000 1,106,284, ,213, ,008,037 17,476,258 24,575,500 44,316,700 Apr - 497,328, ,393,000 1,615,439, ,291, ,258,919 14,505,905 29,447,300 43,978,800 May - 492,059,000-1,864,139, ,707,323-12,331,000 25,023,500 - Jun - 520,498,000-1,660,110,972 1,002,279,881-17,789,706 45,254,000 - Jul - 692,602,000-1,860,403,649 1,920,006,040-30,200,834 74,973,700 - Aug - 658,102,000-2,287,169,292 1,383,063,438-29,510,064 66,639,800 - Sep 94,555, ,490,000-1,763,157,393 1,105,338,253-29,794,419 37,561,100 - Oct 226,715, ,901,000-1,584,949,550 1,373,942,265-29,198,500 49,025,400 - Nov 353,189, ,919,000-1,215,827, ,129,030-13,166,800 40,077,200 - Dec 408,797, ,440,000-1,089,683, ,036,280-13,202,100 35,005,700 - Total 1,083,256,000 6,443,126,000 2,023,584,000 18,055,718,378 12,577,996,285 3,139,535, ,666, ,400, ,620,100 SJRA Joint GRP Water Usage 2.5 Billion Gallons Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 Groundwater Surface Water Catahoula and Reuse 4

6 1.3 HISTORICAL DATA REPORTED BY PARTICIPANTS (CONTINUED) The chart below reflects historical usage of groundwater pumped by all Joint GRP Participants, since August, 2010 through the month of April, SJRA Joint GRP Groundwater Pumpage Billion Gallons Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

7 2.0 COMPLIANCE The following information is related to the Joint GRP s compliance with Lone Star Groundwater Conservation District s (LSGCD) rules and regulations, along with Participant compliance with the GRP Contract. 2.1 LONE STAR GROUNDWATER CONSERVATION DISTRICT REQUIREMENT STATUS Per LSGCD rules and regulations, the Joint GRP was required to reduce its overall groundwater pumpage in 2016 to below its Initial Conversion Obligation (ICO) Adjusted Total Qualifying Demand (TQD). The GRP successfully achieved this goal and now must meet compliance with LSGCD by reducing groundwater to below its ICO Adjusted TQD, on average, for the next thirty years. 2.2 PARTICIPANTS Following are recently received, new Joint GRP Contracts and/or amendments to existing Joint GRP Contract s exhibits for consideration: None at this time. 2.3 PROJECTED DATA VERSUS ACTUAL DATA FOR GROUNDWATER USAGE In an effort to comply with LSGCD s rules for groundwater reduction, GRP Division staff tracks groundwater pumpage monthly. Conversion status will be evaluated monthly by comparing projected demands with actual groundwater pumpage and surface water delivery. Projected groundwater demands come from the 2017 Production Schedule. 2,000,000, Projected vs. Actual Groundwater Usage 1,500,000,000 Gallons 1,000,000, ,000,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Projected Groundwater (By Month) Actual Groundwater (By Month) 6

8 2.4 PROJECTED VERSUS ACTUAL DATA FOR SURFACE WATER DELIVERY The GRP projects to deliver 8,041,191,000 gallons of surface water in calendar year The surface water delivery estimate is based the GRP s 2017 Production Schedule. The surface water delivery data for this report comes from SJRA s SCADA system, while groundwater data is self-reported by the GRP Participants through the ORS. 900,000, Projected vs. Actual Surface Water Delivered 800,000, ,000, ,000,000 Gallons 500,000, ,000, ,000, ,000, ,000,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Projected Surface Water (By Month) Actual Surface Water (By Month) 7

9 3.0 FINANCIAL 3.1 SCHEDULE OF REVENUES AND EXPENSES Schedule of Revenues and Expenses Actual and Budget For Eight Months Ending in April 30, 2017 (Unaudited) Apr Actual Actual Budget Variance % Variance OPERATING REVENUES GRP pumping fees $ 2,291,931 $ 17,871,743 $ 20,877,028 $ (3,005,285) (14%) $ 36,527,375 49% GRP Surface Water Sales 1,644,647 11,476,438 10,608, ,634 8% 18,704,243 61% LSGCD revenue - 581, ,384 69,947 14% 1,022,767 57% Compliance fee revenue % - 0% TOTAL OPERATING REVENUES $ 3,936,578 $ 29,930,012 $ 31,997,216 $ (2,067,204) (6%) $ 56,254,385 53% OPERATING EXPENSES Payroll & employee benefit expenses $ 362,725 $ 3,271,452 $ 3,269,978 $ (1,475) (0%) $ 4,980,346 66% Professional fees 83,119 1,305,192 1,866, ,888 30% 2,731,170 48% Purchased & contracted services 44, , , ,219 11% 1,577,668 49% Supplies, materials & utilities 1,443,748 7,266,751 8,170, ,709 11% 12,205,469 60% Maintenance repairs, parts & rentals 24,004 1,333,965 1,882, ,968 29% 2,069,400 64% General & administration 36, , , ,599 35% 711,855 43% TOTAL OPERATING EXPENSES $ 1,994,707 $ 14,260,398 $ 16,534,306 $ 2,273,908 14% $ 24,275,908 59% NON-OPERATING REVENUES & EXPENSES Interest on investments $ 32,726 $ 195,070 $ 12,008 $ 183,062 1,524% $ 18,000 1,084% Other revenues 1,474 14,638 11,792 2,846 24% 17,688 83% Interest expense (1,766,718) (14,159,198) (14,161,869) 2,671 (0%) (21,230,477) 67% Capital contributions % - 0% TOTAL NON-OPERATING (EXCLUDING ITEMS NOT BUDGETED) $ (1,732,518) $ (13,949,490) $ (14,138,069) $ 188,579 (1%) $ (21,194,789) 66% NET INCOME (LOSS) (EXCLUDING ITEMS NOT BUDGETED) $ 209,352 $ 1,720,124 $ 1,324,841 $ 395,283 30% $ 10,783,688 16% NON-OPERATING REVENUES & EXPENSES (NOT BUDGETED) Depreciation $ (1,237,075) $ (9,899,774) $ - $ (9,899,774) 100% $ - 0% Amortized debt issuance expense 584 3,851-3, % - 0% TOTAL NON-OPERATING (NOT BUDGETED) $ (1,236,491) $ (9,895,923) $ - $ (9,895,923) 100% $ - 0% NET INCOME (LOSS) (BUDGETED AND NOT BUDGETED) $ (1,027,138) $ (8,175,799) $ 1,324,841 $ (9,500,639) (717%) $ 10,783,688 (76%) *FY 2017 budget was amended by Board approval 03/23/17. Fiscal Year To Date Total Year Budget Fiscal Budget Actual YTD % of Total Year Budget 8

10 3.2 CLARIFICATION OF ACTUAL AND BUDGETED VARIANCES Following is a schedule with an explanation of budget variances related to the SJRA GRP Division s Fiscal Year 2017 operating budget (revenue and expenditures) for the month of March. For Eight Months Ending April 30, 2017 (Unaudited) (in thousands) FYTD Category YTD - Driver April GRP Pumping Fees Groundwater pumpage significantly less than forecasted. (620) (3,005) GRP Surface Water Sales Surface water delivery more than anticipated LSGCD Revenue Budgeted at rate of.07; Rate increased to Compliance Fee Revenue Fees not budgeted as we expect compliance from all participants. - 1 Payroll and related expenses Professional Fees Group Insurance increase of 25% vs 10% budgeted. This affects both direct and allocated personnel. Professional fees showing below budget due to timing of Legal and Engineering/Consultant fees. 27 (1) Purchased & Contracted Services Purchased and contracted services below budgeted spending levels Supplies, Materials, Utilities, Maintenance, Repairs, Parts & Rentals Fuel, office supplies, phones, recruiting and misc. expenses less than budgeted Chemicals-Aggregate usage of Chemicals lower than expected GAC Replacement budgeted in February/March occurred in April/May (917) 323 Utilities-Electricity & Sewer costs more than expected due to weather and increased surface water treatment. 11 (10) COH Reservation Fee below expected - 56 SJRA Reservation Fee below expected 5 54 SJRA Supply Use Fee more than budgeted (21) (162) TRA-Reservation Fee less than budgeted - 13 Maintenance repairs, parts & rentals expense less than budgeted due to timing of receipt of Invoices for Line Break Response and Restoration General & Administration Allocation portion of G&A expenses less than budgeted Non-Operating Interes t/inves tment Income Other Revenues - 3 Bond interest expense - 2 Depreciation expense (1,237) (9,900) Bond Issuance Cost Amort expense 1 4 (1,882) (9,501) 9

11 4.0 DIVISION UPDATES 4.1 DROUGHT CONTINGENCY PLAN TRIGGERS/STATUS The GRP has not implemented any stages if it s Drought Contingency Plan, 4.2 PUBLIC RELATIONS ACTIVITIES Event Type Location Date Participants MSEC Enterprises Operator GRP Surface Water Tour May 10, 2017 Utility Operators Tour Treatment Plant 4.3 UPCOMING ACTIVITIES None at this time. 5.0 SURFACE WATER WITHDRAWAL 5.1 SURFACE WATER WITHDRAWAL Surface water withdrawal is the amount of surface water that is metered through the Raw Water Intake. For the purpose of the GRP, the amount of surface water withdrawal for the month of April was 619,420,000 gallons. For further detail on lake level impacts, please refer to the Lake Conroe Division Monthly Update. 10