Pomme de Terre One Watershed, One Plan Request for Proposal Responses DUE: May 19 th, 2017

Size: px
Start display at page:

Download "Pomme de Terre One Watershed, One Plan Request for Proposal Responses DUE: May 19 th, 2017"

Transcription

1 Pomme de Terre One Watershed, One Plan Request for Proposal Responses DUE: May 19 th, 20 The Pomme de Terre watershed planning area has begun planning in the One Watershed, One Plan (1W1P) program. With this program, the Pomme de Terre watershed will transition from the use of six different county water management plans (Big Stone, Swift, Stevens, Grant, Douglas, and West Otter Tail County) and other collective planning documents (WRAPS, TDML) into one comprehensive watershed plan that will provide increased collaboration, project prioritization based on a watershed scale, and create opportunities for funding for the projects that are most needed based on the defined goals of the watershed. Currently, LGU s within the Pomme de Terre watershed are collaborating through the Pomme de Terre River Association (PDTRA) which was formed through a Joint Powers Agreement between six Soil and Water Conservation Districts (SWCDs) and six County Commissioners in This collaboration has created an excellent model for communication, and a comprehensive watershed plan would further allow us to pinpoint projects by prioritizing, targeting, and measuring goals. Each of the six SWCDs and counties have given their support to the 1W1P project and have entered a Memorandum of Agreement. As proposed for the 1W1P program, a Policy Committee, composed of the PDTRA s Joint Power Board (including one County Commissioner and one SWCD Supervisor appointed from each county), serves as a decision-making authority for the 1W1P process. A 1W1P Planning Committee made up of local, state and federal agency staff will serve as an advisory committee that will make recommendations to the Policy Committee. The PDTRA will also be implementing a Citizens Advisory Committee for both the North and South portions of the watershed due to stark differences between the two areas as well as encourage more diverse input on the plan. Committees will include representatives from: County, Lake Organizations, Agricultural, Sportsmen Clubs, City, and citizens atlarge. This group will help to circulate local information regarding the watershed. The PDTRA Project Coordinator will also serve as a facilitator and organizer for each of these committees as well as the dayto-day contact for this project. A consultant will act as official facilitator in specific meetings detailed below. 1

2 A request for Proposals is being issued to consultants to select one consultant to fill these areas of need in cooperation with the committees listed above: 1. Aggregating, analyzing, and mapping watershed data, including the results from watershed models that have been completed 2. Participate in meetings as requested a. Public meetings(s) b. Citizen Advisory Committee meeting(s) c. Planning Committee meeting(s) d. Workgroup meeting(s) Estimated number of meetings in which consultant will be requested to attend: including meetings that will need professional facilitation from consultant (number May be higher or lower once tasks are evaluated). Please use your best estimate of the number of meetings to include in your costs. 3. After prioritization of resources and issues, the analysis of data is expected to be completed in coordination with piloting and use of the Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMApp). 4. Writing the plan (Link to the One Watershed, One Plan Content Requirements: The plan will be developed within the parameters outlined in these documents. Request for Proposals Submittal Format 1. Scope of Services a. How services will be provided, detailed listing and description of tasks b. Assigned staff and deliverables i. See attached Scope of Services which RFP should address. Please add tasks that may be necessary based on your experience with similar planning. 2. Role of Staff a. Identify assigned staff, their background and experience, roles, and responsibilities (This section should be limited to 10pages maximum and should highlight major points) 3. Experience and Capacity a. Demonstrate firm s ability to provide required services i. Utilize outputs from PTMApp ii. Including previous experience in the One Watershed, One Plan planning process b. Submit a sample of similar planning process and completed document (electronic or link) c. Demonstrate familiarity with the Pomme de Terre watershed in terms of hydrology, geomorphology, land practice, watershed issues, and LGU involvement. d. Include experience and style as a facilitator for large and small public groups. 4. Costs a. Indicate proposed cost of services tabulated by Scope of Services Task. Include how cost is determined, hourly rates, and total per employee. b. Pomme de Terre River Association will cover costs of renting meeting facilities, meeting materials, organization, and stakeholder notification through grant agreement with BWSR. c. Consultant will provide electronic format of drafts and final plan. 2

3 Proposal Submittal Please submit your proposal (electronic) by Friday May 19 th, 20, 4:00 PM to: Stephanie Adams, Watershed Project Coordinator Pomme de Terre River Association 12 MN-28, Suite 2 Morris, MN (320) ext. 109 stephanie.adams@pdtriver.org Timeline for Review and Selection Friday, May 19 th, 20 Wednesday, May 24 th, 20 Wednesday, June 7 th, 20 Friday, June 9 th, 20 Friday June 30 th, 20 July 14 th, 20 Submission deadline for proposal Selection of up to top three proposals by Pomme de Terre 1W1P Consultant subcommittee Presentation by up to the top three proposals to members of the Pomme de Terre 1W1P Planning Committee. Presentations will be 45min with 15minutes for questions Presentation Time Slots: 11:00AM, 1:00PM, and 2:15PM Chosen Project Consultant will be notified Consultant Contract due for review Pomme de Terre 1W1P Policy Committee meeting to approve and sign contract with consultant Selection of Consultant The Pomme de Terre River Association intends to negotiate a final scope, schedule, and budget with the highest rated Consultant. The Pomme de Terre River Association reserves the right to negotiate a final scope, schedule, and budget with the next highest rated firm if we are unable to reach agreement with the first firm. Disclaimer The Pomme de Terre River Association retains the right to modify or cancel this solicitation at its own discretion. This RFP in no way obligates the Pomme de Terre River Association into entering a contract. Proposers are responsible for all their own costs for preparing a response to this RFP document as well as any materials/travel for June 7 th interview if chosen. If there are any questions regarding this RFP, please direct them to Stephanie Adams, PDTRA Watershed Projects Coordinator (Contact information above) 3

4 Pomme de Terre One Watershed, One Plan Scope of Services for Developing a Comprehensive Watershed Management Plan General Information for Prospective Respondents The estimated number of meetings which the consultant will attend is within the range of These include meetings that will require facilitation from a member of the consultant team that is most qualified to do so. These Facilitated meetings include Public Hearings, Citizen Advisory meetings, and Plan review meetings. All meetings are preferred to be completed in person. Please use your best estimate to include in costs. Include any additional information, tasks, or actions that you feel would be necessary to accomplish of parts of this document in detail to be included in your proposal. Part 1: Preparation for Plan Writing Task 1: Aggregate Existing Watershed physical / Spatial Data Anticipated Time Frame: July November 20 Task 1A: Create useable, presentation quality map projects Watershed Scale: Land use, Drainage, Relief, Public Waters, Sub-watersheds, Pollutant Loading (from models), Impaired Waters etc. Resource Concerns: Impaired Waters, Floodplain, High-valued resources (named creeks, recreational lakes, critical habitats, etc.), areas of special concern/natural resource value, incorporation of the PTMApp. Special interest: Census/demographic, recreation, natural areas, regulated land use, public water suppliers, MDNR Permitted Water Appropriators, etc. (Planning Committee may obtain zonation information from another source) Incorporation of existing monitoring data and identify gaps Task 1B: Participate in meeting with committees, workgroups, and the public that are needed to accomplish Task 1A 1-2 meetings with the Planning Committee (or Workgroup, TBD) to determine purpose, presentation, and use of data Participation in kick-off watershed bus-tour (Date TBD) Facilitate two Public informational meeting (One each for the North and South portion of the watershed) One Meeting with Planning Committee to review / discuss data following notifications and informational meeting. 4

5 Task 2: Prioritization, Modeling, and Targeting Mapping Anticipated Time Frame: November January 20 Task 2A: Bring together all new and existing plan data and information to create a cohesive watershed priority scheme Analysis of existing priorities in current plans (affinity mapping) Stressors identified in WRAPS document Use of additional mapping, GIS, and other physical/spatial data and methods Identify gaps Task 2B: Use outputs from modeling tools and/or programs that have been completed for the watershed, such as those listed below to map and target areas identified through prioritization. GIS analysis tools Hydro DEM HSPF PTMApp (must incorporate with plan) Task 2C: Participation in meeting with committees & workgroups to accomplish Tasks 2A and 2B One meeting with Workgroup to review information prior to presentation to Policy, Planning, and Advisory committees One Meeting with Planning Committee to refine the priorities/ categories o Discuss watershed-wide vs. sub-watershed specific priorities o consider splitting watershed into logical management areas Facilitate two meetings with Citizen Advisory Committees (North and South) to identify, discuss, and prioritize local issues. Part 2: Development of Draft Plan Task 3: Set Initial Measurable Goals Anticipated Time Frame: December 20 April 20 Task 3A: Organize goals into categories based on priorities identified in Task 2, present and gain group consensus Task 3B: Participate in meetings with committees & workgroup needed to accomplish Task 3A One Meeting with Planning Committee to review information prior to presentation to Policy and Advisory Committees two-three meetings with Planning Committee / Workgroup to discuss and refine goals Facilitate two meetings with Citizen Advisory Committees (North and South) to discuss and prioritize goals for the watershed over the 10-year life of the plan. Facilitate two meetings with Citizen Advisory Committees (North and South) to identify and discuss programs and outreach opportunities (how will we carry out these items) 5

6 Task 4: Develop Targeted and Measurable Implementation Plan and Schedule Anticipated Time Frame: March 20 July 20 Task 4A: Create a 10-year implementation plan that contains the following elements: 1. Targeted Implementation Schedule o A brief description of each action; o Location targeting where the action will occur; o Identification of roles and the responsible government unit for the action; o An estimate of cost and potential sources of funding for implementing the action; o An estimate of when the implementation will occur within the ten-year timeframe of the plan; how the outcomes of the action will be measured. 2. Implementation Programs o Plan Administration and Coordination i. Decision-making and staffing; collaboration with other Units of Government; funding; work plan; assessment and evaluation; plan amendments; formal agreements. o Plan Implementation Programs i. Incentive programs; capital improvements; operation and maintenance; regulation and enforcement; data collection and monitoring; information, outreach and education programs. Task 4B: Participation in meeting with committees, workgroups and the public that are needed to accomplish Task 4A One meeting with Workgroup to review information prior to presentation to Policy and planning Committee Part 3: Completed Draft Plan Document Task 5: Complete the Draft Pomme de Terre Watershed Management Plan and Submit for Local and Public Review Anticipated Time Frame: May October 20 Task 5A: The plan document will contain the following required elements, (Refer to BWSR s online document dated 9/23/2016, One Watershed, One Plan, Plan Content Requirements ) 1. Executive Summary- Provide a condensed and concise plain language summary of the contents of the plan. a. Must be suitable for use in public relations 2. Identification and Prioritization of Resources and Issues - summarize the process that the planning partners used to reach agreement on the watershed resource issues that will be addressed within the lifespan of the plan. a. Clearly articulated priority issue statements 3. Establishment of Measurable Goals - Each priority issue must have associated measurable goals 6

7 4. Targeted Implementation Schedule - The plan will have a targeted implementation schedule for achieving the goals that: describes each action, the location, roles and responsibilities, estimated costs and timelines and how the actions will be measured. 5. Implementation Programs - support the targeted implementation schedule by describing the overarching program(s) that will be used to implement actions identified in the schedule and how these programs will be coordinated between the local water management responsibilities. a. List of programs and projects and their outcomes 6. Plan Appendix - Account of water resources and physical factors affecting watershed resources. a. Majority of highly technical information should be here and referred to when necessary 7. Plan will be accessible and easy to communicate to a variety of viewers. Task 5B: Complete the internal and formal review process and revise plan accordingly Internal review among all committees, counties, and SWCD s Formal review process with stakeholders Public hearings(s) Task 5C: Participation in meetings with committees, workgroups, and the public that are needed to accomplish Task 5B One meeting with Workgroup to review information prior to presentation to Policy and Planning Committees Facilitate one-two meetings with Planning Committee to review summary of comments, prepare a formal response and to plan and prepare for public hearings Facilitate two Public Hearing(s) Task 6: Complete Final Pomme de Terre, One Watershed, One Plan Management Plan Anticipated Time Frame: October - November 20 Task 6A: Summarize and incorporate all comments from Public Hearing(s) into final plan 1 meeting with Workgroup to develop responses to comments from Public Hearing(s) Anticipated Schedule to Accomplish Required Services July Aug Sep Oct Nov Dec Activity Aggregate Info X X X X X Public Info Mtg. X X Prioritize & Target X X X Measurable Goals X X X X X X Implement Schedule X X X X X Draft Plan X X X Formal Reviews X X Public Hearings Jan X Final Plan X X Feb Mar Apr May Jun Jul Aug Sep Oct Nov 7

Root River One Watershed, One Plan Request for Proposals Proposals DUE: Wednesday, December 3, 2014, 4:00 PM

Root River One Watershed, One Plan Request for Proposals Proposals DUE: Wednesday, December 3, 2014, 4:00 PM Root River One Watershed, One Plan Request for Proposals Proposals DUE: Wednesday, December 3, 2014, 4:00 PM The Root River Planning Area (which includes the Minnesota portion of the Upper Iowa River Watershed

More information

Thief River Watershed Plan Development: Work Plan

Thief River Watershed Plan Development: Work Plan Thief River Watershed Plan Development: Work Plan This Work Plan outlines tasks and a budget for the development of a watershed-based plan consistent with the One Watershed, One Plan vision and program

More information

Cannon River Watershed Plan Development: Work Plan

Cannon River Watershed Plan Development: Work Plan Cannon River Watershed Plan Development: Work Plan This Work Plan outlines tasks and a budget for the development of a watershed-based plan consistent with the One Watershed, One Plan vision and program

More information

Cannon River One Watershed, One Plan. POLICY COMMITTEE MEETING April 4, 2018 Rice County Government Center Faribault, MN

Cannon River One Watershed, One Plan. POLICY COMMITTEE MEETING April 4, 2018 Rice County Government Center Faribault, MN Cannon River One Watershed, One Plan POLICY COMMITTEE MEETING April 4, 2018 Rice County Government Center Faribault, MN Work Plan Progress TASK Task 1. Aggregate Existing Watershed Physical & Spatial Data

More information

One Watershed, One Plan Plan Content Requirements

One Watershed, One Plan Plan Content Requirements One Watershed, One Plan Plan Content Requirements From the Board of Water and Soil Resources, State of Minnesota Version: 2.00 Effective Date: 03/28/2018 Approval: Board Decision #18-14 Policy Statement

More information

One Watershed, One Plan

One Watershed, One Plan One Watershed, One Plan An evolution of water planning in Minnesota 2014 The Vision The One Watershed, One Plan vision is to align local water planning on major watershed boundaries with state strategies

More information

Public Participation. Public Participation Plan and Schedule for the 10th Year Comprehensive Plan Update

Public Participation. Public Participation Plan and Schedule for the 10th Year Comprehensive Plan Update Public Participation and Schedule for the 10th Year Update prepared for. CHEROKEE COUNTY, GA prepared by. McBRIDE DALE CLARION revised on. AUGUST 17, 2005 PUBLIC PARTICIPATION PLAN OVERVIEW Effective citizen

More information

One Watershed, One Plan Operating Procedures

One Watershed, One Plan Operating Procedures One Watershed, One Plan Operating Procedures From the Board of Water and Soil Resources, State of Minnesota Version: 2.00 Effective Date: 03/28/2018 Approval: Board Decision #18-14 Policy Statement These

More information

Cannon River One Watershed, One Plan. POLICY COMMITTEE MEETING January 10, 2018 Rice County Government Center Faribault, MN

Cannon River One Watershed, One Plan. POLICY COMMITTEE MEETING January 10, 2018 Rice County Government Center Faribault, MN Cannon River One, One Plan POLICY COMMITTEE MEETING January 10, 2018 Rice County Government Center Faribault, MN TASK Task 1. Aggregate Existing Physical & Spatial Data 1A. Create project maps 1B. Meeting

More information

Traffic Department Anchorage: Performance. Value. Results.

Traffic Department Anchorage: Performance. Value. Results. Traffic Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements.

More information

Flood Control District of Maricopa County Recommendations from the Ad Hoc Task Force convened April 29, 2014

Flood Control District of Maricopa County Recommendations from the Ad Hoc Task Force convened April 29, 2014 Process and Communication Subcommittee 1. To promote the Lean Management Philosophy throughout the department by conducting several facilitated Kaizen process events with customers, staff and management

More information

Minnesota District Freight Plans - Work Plan

Minnesota District Freight Plans - Work Plan Minnesota District Freight Plans - Work Plan Overview of Tasks and Deliverables The work will be completed in six tasks. Each of these tasks is described in detail in the following section. The District

More information

APPLICATION INFORMATION: 1. All five sections of the application must be completed.

APPLICATION INFORMATION: 1. All five sections of the application must be completed. HELP ME GROW SUSTAINABILITY PLANNING CONSULTANT REQUEST FOR QUALIFICATIONS Application Deadline: 5:00 pm on MONDAY, SEPTEMBER 25, 2017 APPLICATION INFORMATION: 1. All five sections of the application must

More information

Business Practice Manual for The Transmission Planning Process

Business Practice Manual for The Transmission Planning Process Business Practice Manual for The Transmission Planning Process Posted: June 2, 2015 Intentionally left blank TABLE OF CONTENTS 1. Introduction... 9 1.1. Purpose of California ISO Business Practice Manuals...

More information

Lampasas River Watershed Partnership. Ground Rules

Lampasas River Watershed Partnership. Ground Rules Lampasas River Watershed Partnership Ground Rules The signatories to these Ground Rules agree as follows: The following are the Ground Rules for the Lampasas River Watershed Partnership agreed to and signed

More information

Design Division Project Management & Engineering Department Anchorage: Performance. Value. Results.

Design Division Project Management & Engineering Department Anchorage: Performance. Value. Results. Design Division Anchorage: Performance. Value. Results. Mission Design and prepare construction documents that produce safe, functional and costeffective capital infrastructure projects, i.e., roads, drainage,

More information

Cannon River One Watershed, One Plan. POLICY COMMITTEE MEETING August 2, 2017 Rice County Government Center Faribault, MN

Cannon River One Watershed, One Plan. POLICY COMMITTEE MEETING August 2, 2017 Rice County Government Center Faribault, MN Cannon River One Watershed, One Plan POLICY COMMITTEE MEETING August 2, 2017 Rice County Government Center Faribault, MN Work Plan Progress 2017 Task M J J A S O N D Task 1. Aggregate Existing Watershed

More information

HOUSE OF REPRESENTATIVES KNOTT COMMITTEE ROOM 116 NOVEMBER 28, 2018

HOUSE OF REPRESENTATIVES KNOTT COMMITTEE ROOM 116 NOVEMBER 28, 2018 HOUSE OF REPRESENTATIVES KNOTT COMMITTEE ROOM 116 NOVEMBER 28, 2018 3 FACILITATOR: RYAN WEST, CHAIR 4 FACILITATOR: MELISSA TURNER 5 FACILITATORS: CAROLYN HICKS, ANGIE ROBERTSON, MELISSA TURNER Florida

More information

Minnesota Airports Conference. April 15, 2015

Minnesota Airports Conference. April 15, 2015 Minnesota Airports Conference April 15, 2015 What is airport zoning and what is its purpose? What are the issues with current zoning? What is being proposed to address these issues? What can you do to

More information

Air quality sensing in europe

Air quality sensing in europe Air quality sensing in europe Round Table: New opportunities for air quality sensing lower cost sensors for public authorities and citizen science initiatives Frankfurt, 24 October 2018 European Commission

More information

School Modernization Overview

School Modernization Overview Bond Work Session November 17, 2016 School Modernization Overview 1 Architectural/Engineering Diligence Created Pre-Design Diligence RFPs / Interview Questions Advertised RFPs / Short-List for Interviews

More information

CI User Engagement Activities and Schedule Nov Apr 2013

CI User Engagement Activities and Schedule Nov Apr 2013 OCEAN OBSERVATORIES INITIATIVE Activities and Schedule Nov 2012 - Apr 2013 Julie Thomas, Operations Director Susanne Jul, User Experience Lead 1 Overview Review engagement points in the iterative release

More information

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017 REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES Issuance Date November 27, 2017 Submittal Deadline January 8, 2018 Page Is Blank For Photocopying MARIN LAFCO 2 TABLE OF CONTENTS Section Page Number I.

More information

Racial Equity Work Plan. Equity Advisory Committee June 20, 2017

Racial Equity Work Plan. Equity Advisory Committee June 20, 2017 Racial Equity Work Plan Equity Advisory Committee June 20, 2017 Today s Objectives Reviewing: what is this plan and why are we doing it (briefly) Discussing: what the plan says, what changes are needed,

More information

MEMORANDUM OF UNDERSTANDING to establish the DULUTH URBAN WATERSHED ADVISORY COMMITTEE

MEMORANDUM OF UNDERSTANDING to establish the DULUTH URBAN WATERSHED ADVISORY COMMITTEE MEMORANDUM OF UNDERSTANDING to establish the DULUTH URBAN WATERSHED ADVISORY COMMITTEE A. Introduction This Memorandum of Understanding (MOU) formalizes formation of the Duluth Urban Watershed Advisory

More information

Ground Transportation Management Services

Ground Transportation Management Services ONE (1) HARDCOPY ORIGINAL AND ONE (1) ELECTRONIC COPY FLASH DRIVE MUST BE SUBMITTED REQUEST FOR INFORMATION - RFI #PGT-2018-002 Ground Transportation Management Services Department of Ground Transportation

More information

5/21/2012. Welcome and Introductions Introduction to the IRWM Program Statewide Program Merced Region IRWM Plan. Regional Advisory Committee

5/21/2012. Welcome and Introductions Introduction to the IRWM Program Statewide Program Merced Region IRWM Plan. Regional Advisory Committee Presenters: Hicham ElTal Charles Gardiner Alyson Watson Regional Advisory Committee Meeting #1 May 23, 2012 1 Nearly Ten Years Ago, California Embarked on a New Adventure In November 2004, the IRWM Program

More information

Minnesota River Basin Turbidity TMDL

Minnesota River Basin Turbidity TMDL Minnesota River Basin Turbidity TMDL Hydrological Simulation Program/FORTRAN Modeling Results: Scenario 4 Chuck Regan Barr Engineering Scenario 4: Key Elements Perennial Vegetation Increase in the Chippewa

More information

Solid Waste Master Plan County Board Workshop

Solid Waste Master Plan County Board Workshop Solid Waste Master Plan County Board Workshop 8/1/2017 Agenda Master Planning Background and Update Proposed Approaches: Review and Discussion Policy Plan strategy selection Additional strategies toward

More information

Walnut Creek Watershed Management Authority

Walnut Creek Watershed Management Authority Walnut Creek Watershed Management Authority Respond by November, 21, 2014 Notice for Request for Qualifications The newly formed Walnut Creek Watershed Management Authority seeks qualified professionals

More information

Southwest LRT Management Committee. April 27, 2011

Southwest LRT Management Committee. April 27, 2011 Southwest LRT Management Committee April 27, 2011 Today s Topics PE/DEIS Status Update Engineering Services Contract Park & Ride Guidelines Cash Flow Needs for Project Office Startup 2 PE/DEIS Status Update

More information

DS3 System Services Project Plan Detailed Design and Implementation Phase

DS3 System Services Project Plan Detailed Design and Implementation Phase DS3 System Services Project Plan Detailed Design and Implementation Phase Dated: 20/5/2015 Executive Summary The System Services work stream within the DS3 Programme relates to the procurement of services

More information

Request for Proposals

Request for Proposals Request for Proposals Comprehensive Parks, Trails, & Recreation Master Plan Services Section 1 Proposal Guidelines PURPOSE This RFP is soliciting proposals for a Professional Planning Consultant Service

More information

CFWI 2013 CALENDAR - Rev. August 11, 2013

CFWI 2013 CALENDAR - Rev. August 11, 2013 CFWI 2013 CALENDAR - Rev. August 11, 2013 CFWI Critical Path Management December 6 2012 December 20 2012 January 3 January 17 & 18 GAT 1. EMT Measuring Sticks 2. Other lines of evidence example 3. SJRWMD

More information

Okaloosa RESTORE Advisory Committee (ORAC) October 3, :00 PM 8:00 PM Northwest Florida State College

Okaloosa RESTORE Advisory Committee (ORAC) October 3, :00 PM 8:00 PM Northwest Florida State College Okaloosa RESTORE Advisory Committee (ORAC) October 3, 2013 6:00 PM 8:00 PM Northwest Florida State College Agenda Minutes Approval Consultant s Administrative Report Scheduled Presentations - None Regional

More information

Gail Melgren, Executive Director, Tri-State Water Resources Coalition. Southwest Missouri Water Resource Study: Summary of Phases

Gail Melgren, Executive Director, Tri-State Water Resources Coalition. Southwest Missouri Water Resource Study: Summary of Phases Memorandum To: From: Gail Melgren, Executive Director, Tri-State Water Resources Coalition Donie Grimsley, CDM Smith Date: (Current as of July 13, 2016) Subject: Southwest Missouri Water Resource Study:

More information

11/20/15 SUBMISSIONS DUE: WEDNESDAY, JANUARY 13, 2016, 5:00 P.M. CDT

11/20/15 SUBMISSIONS DUE: WEDNESDAY, JANUARY 13, 2016, 5:00 P.M. CDT Request for Proposals DOWNTOWN AUSTIN PARKING SUPPLY AND DEMAND ANALYSIS AND PARKING MANAGEMENT STRATEGY For Austin DMO, Inc. d/b/a DOWNTOWN AUSTIN ALLIANCE SUBMISSIONS DUE: WEDNESDAY, JANUARY 13, 2016,

More information

Otter Creek Watershed TMDL Project. Stakeholder Meeting June 6, 2013

Otter Creek Watershed TMDL Project. Stakeholder Meeting June 6, 2013 Otter Creek Watershed TMDL Project Stakeholder Meeting June 6, 2013 1 Meeting Purpose Meet with watershed & technical advisory group members and watershed landowners to provide basic Otter Creek TMDL project

More information

Project Scope and Timetable

Project Scope and Timetable 2 PROPOSED SCOPE OF WORK The timetable enclosed in this proposal presents the schedule for completing all of the work items identified within a six-month timeframe from receipt of a signed professional

More information

Proposal to Provide Professional Planning Services for the Root River Watershed District

Proposal to Provide Professional Planning Services for the Root River Watershed District December 8, 2014 engineering planning environmental construction 1648 Third Avenue SE Rochester, MN 55904 Phone (507) 289-3919 Fax (507) 289-7333 Jennifer Ronnenberg Water Management Coordinator Fillmore

More information

Source Water Protection Integrating with Existing Watershed and Water Management Frameworks

Source Water Protection Integrating with Existing Watershed and Water Management Frameworks Source Water Protection Integrating with Existing Watershed and Water Management Frameworks Steph Neufeld, M.Sc. Watershed Specialist 1 Overview There are multiple, competing land and water planning and

More information

Port of Whitman County Request for Proposal for Washington State Grain Train Strategic Plan

Port of Whitman County Request for Proposal for Washington State Grain Train Strategic Plan Port of Whitman County Request for Proposal for Washington State Grain Train Strategic Plan The Port of Whitman County is hereby announcing an RFP for firms interested in providing professional services

More information

Release of RFP February 9, 2017 RFP Questions and Clarifications Deadline February 16, 2017 at 4 p.m.

Release of RFP February 9, 2017 RFP Questions and Clarifications Deadline February 16, 2017 at 4 p.m. Request for Proposals Temporary Staffing Services North St. Louis Soil and Water Conservation District 307 First St S Ste 114 Virginia MN 55792 I. Introduction The North St. Louis Soil and Water Conservation

More information

Soil & Water Conservation District

Soil & Water Conservation District Soil & Water Conservation District 215 1 st Avenue South, Long Prairie, MN 56347 Phone: 320-732-2644 Fax: 320-732-4803 TODD COUNTY SWCD BOARD WORK SESSION AGENDA Todd Soil and Water Conservation District

More information

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation Ohio Water Environment Association 2016 Technical Conference & Expo June 29, 2016 Objective To create a Stormwater

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS Requests for Proposals Page 1 REQUEST FOR PROPOSALS CONSULTANT SERVICES DEVELOPMENT OF A DIVERSITY, EQUITY AND INCLUSION STRATEGY AND IMPLEMENTATION OF PHASE I OF THE RESULTING PLAN SECTION I - INTRODUCTION

More information

Salinas River Watershed Management Coordinator

Salinas River Watershed Management Coordinator Request For Qualifications Salinas River Watershed Management Coordinator Response Due: February 27, 2018 at 5:00pm Contact: Devin Best, Executive Director 65 South Main Street, Suite 107 Templeton, CA

More information

Northeast Georgia Plan 2035

Northeast Georgia Plan 2035 Northeast Georgia Plan 2035 Stakeholder Involvement Program June The Stakeholder Involvement Program is the second major part of the Regional Plan, as per the Georgia Department of Community Affairs (DCA)

More information

RISK AND VULNERABILITY ASSESSMENT WITH CLIMATE CHANGE: MANCHESTER-BY-THE-SEA HAZARD MITIGATION PLAN ENHANCEMENT

RISK AND VULNERABILITY ASSESSMENT WITH CLIMATE CHANGE: MANCHESTER-BY-THE-SEA HAZARD MITIGATION PLAN ENHANCEMENT RISK AND VULNERABILITY ASSESSMENT WITH CLIMATE CHANGE: MANCHESTER-BY-THE-SEA HAZARD MITIGATION PLAN ENHANCEMENT Description Manchester-by-the Sea has a current Hazard Mitigation Plan (HMP) that was approved

More information

Newark & Sherwood Local Development Framework Local Development Scheme

Newark & Sherwood Local Development Framework Local Development Scheme Newark & Sherwood Local Development Framework Local Development Scheme SEPTEMBER 2018 CONTENTS 1 Introduction 2 LDF Proposed Documents 3 Delivery & Review Appendix Appendix A Local Development Scheme Timetable

More information

The City of Oregon City Oregon City Tourism Strategic Plan - Scope of Work. May 30, 2017 Submitted by Coraggio Group coraggiogroup.

The City of Oregon City Oregon City Tourism Strategic Plan - Scope of Work. May 30, 2017 Submitted by Coraggio Group coraggiogroup. The City of Oregon City Oregon City Tourism Strategic Plan - Scope of Work May 30, 2017 Submitted by Coraggio Group 503.493.1452 coraggiogroup.com Coraggio proposes a straightforward, three-phase framework

More information

Surface Water Improvement and Management (SWIM) Plan Development

Surface Water Improvement and Management (SWIM) Plan Development Surface Water Improvement and Management (SWIM) Plan Development Bay Area Resource Council TAC Paul Thorpe Chief, Bureau of Environmental May 17, 2017 and Resource Planning May 17, 2017 Surface Water Improvement

More information

Project Risk Management Bootcamp. Contents are subject to change. For the latest updates visit

Project Risk Management Bootcamp. Contents are subject to change. For the latest updates visit Bootcamp Page 1 of 7 Why Attend The overall aim of this program is to enable participants to plan, manage and control project risks. Moreover, participants will be able to develop project risk management

More information

Technical Memorandum Task 12: Implementation Schedules

Technical Memorandum Task 12: Implementation Schedules A Technical Memorandum Task 12: Implementation Schedules To: From: Carolina Hernandez, County of Los Angeles Watershed Division Melinda McCoy, CDM Cody Belcher, CDM Date: August 22, 2006 1.0 Introduction

More information

Portland General Electric Company First Revision of Sheet No P.U.C. Oregon No. E-18 Canceling Original Sheet No. 26-1

Portland General Electric Company First Revision of Sheet No P.U.C. Oregon No. E-18 Canceling Original Sheet No. 26-1 First Revision of Sheet No. 26-1 P.U.C. Oregon No. E-18 Canceling Original Sheet No. 26-1 PURPOSE SCHEDULE 26 NONRESIDENTIAL DEMAND RESPONSE PILOT PROGRAM This schedule is an optional supplemental service

More information

Salinity TMDL Development and Modeling in the Otter Creek Watershed. Erik Makus DEQ Hydrologist June 6, 2013

Salinity TMDL Development and Modeling in the Otter Creek Watershed. Erik Makus DEQ Hydrologist June 6, 2013 Salinity TMDL Development and Modeling in the Otter Creek Watershed 1 Erik Makus DEQ Hydrologist June 6, 2013 Outline for Today: Otter Creek and the Tongue River Previous salinity modeling efforts Existing

More information

Developing a Salt Management Strategy (SaMS) for Northern Virginia

Developing a Salt Management Strategy (SaMS) for Northern Virginia Developing a Salt Management Strategy (SaMS) for Northern Virginia 2018 National Capital Region Water Resources Symposium April 6, 2018 Will Isenberg Virginia Department of Environmental Quality Photo

More information

CITY OF SIMI VALLEY MEMORANDUM SUBJECT: UPDATE REPORT AND DISCUSSION REGARDING THE SHORT RANGE TRANSIT PLAN AND TRANSIT FLEET ASSESSMENT

CITY OF SIMI VALLEY MEMORANDUM SUBJECT: UPDATE REPORT AND DISCUSSION REGARDING THE SHORT RANGE TRANSIT PLAN AND TRANSIT FLEET ASSESSMENT CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. 7B May 15, 2017 TO: FROM: City Council Department of Community Services SUBJECT: UPDATE REPORT AND DISCUSSION REGARDING THE SHORT RANGE TRANSIT PLAN AND TRANSIT

More information

REQUEST FOR PROPOSALS:

REQUEST FOR PROPOSALS: REQUEST FOR PROPOSALS: Public Behavioral Health System Gap Analysis Release Date: June 12, 2018 Proposal Due: July 13, 2018 Anticipated Award Notification: July 31, 2018 Anticipated Contract Start: August

More information

Maintaining and Improving the Health of All Minnesotans

Maintaining and Improving the Health of All Minnesotans Protecting, Maintaining and Improving the Health of All Minnesotans 7/10/17 Stephanie Adams 12 Hwy 28 E St 2 Morris, MN 56267 Dear Stephanie: Subject: Initial Comment Letter, One Watershed One Plan Thank

More information

Cannon River One Watershed, One Plan

Cannon River One Watershed, One Plan Cannon River One Watershed, One Plan Aligning local water planning on major watershed boundaries with state strategies towards prioritized, targeted and measurable implementation plans AGENDA Cannon River

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS 1.0. Invitation Capital Region Water (CRW) owns and operates the drinking water, wastewater and stormwater facilities and infrastructure for the city of Harrisburg, PA and portions of surrounding communities

More information

REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT. Proposals will be received until. FRIDAY, January 5, :00 p.m. ET

REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT. Proposals will be received until. FRIDAY, January 5, :00 p.m. ET REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT Proposals will be received until FRIDAY, January 5, 2018 5:00 p.m. ET This RFP is also available at our website: www.canadian-fairs.ca I. General Information

More information

Cuyahoga Soil and Water Conservation District Cuyahoga County Request for Qualifications/Request for Proposal

Cuyahoga Soil and Water Conservation District Cuyahoga County Request for Qualifications/Request for Proposal Cuyahoga Soil and Water Conservation District Cuyahoga County Request for Qualifications/Request for Proposal Issue Date: June 22, 2006 RFQ/RFP Title: Environmental Assessment Work to be conducted under

More information

Using PTMApp Products to Develop a Targeted Implementation Schedule

Using PTMApp Products to Develop a Targeted Implementation Schedule Using PTMApp Products to Develop a Targeted Implementation Schedule Charles Fritz, Director, International Water Institute Mark R. Deutschman, Ph.D., P.E. Houston Engineering Drew Kessler, Houston Engineering

More information

2018 Performance Review and Assistance Program

2018 Performance Review and Assistance Program This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 2018 Performance Review

More information

Manitoba Hydro - Power Plants and SWOT Analysis, 2011 Update

Manitoba Hydro - Power Plants and SWOT Analysis, 2011 Update Manitoba Hydro - Power Plants and SWOT Analysis, 2011 Update #43357 $1000 53 pages In Stock Report Description The report contains the profile of the company that is involved in the field of power generation

More information

One Watershed, One Plan

One Watershed, One Plan One Watershed, One Plan Evolution of water planning in Minnesota Water Planning Timeline 1937: MN Soil Conservation Law 1938: MN s 1st Soil & Water Conservation District formed 1955: MN Watershed Act 1957:

More information

SCRLC April Supply Chain Risk Leadership Council

SCRLC April Supply Chain Risk Leadership Council SCRLC April Supply Chain Risk Leadership Council April 2009 Meeting Supply Chain Risk Leadership Council 1 Contents Founding Members Council Objectives Council Structure CISCO SCRM Team The ISO System

More information

Research Administrators Forum. November 10, 2011

Research Administrators Forum. November 10, 2011 Research Administrators Forum November 10, 2011 1 Christine Lavoie Director, Research Administration Office of Research 213-821-5537 clavoie@usc.edu 2 Session Objectives Communicate goals for USC systems

More information

APPENDIX C: PUBLIC PARTICIPATION PLAN

APPENDIX C: PUBLIC PARTICIPATION PLAN Appendix APPENDIX C: PUBLIC PARTICIPATION PLAN 131 Space Coast 2035 Long Range Transportation Plan I. The Technical Memorandum #1 June 30, 2008 Prepared by: Renaissance Planning Group Table of Contents

More information

Request for Proposals: Tax Increment Financing District Application Services Response Date: December 11, 2009, 2:00 PM

Request for Proposals: Tax Increment Financing District Application Services Response Date: December 11, 2009, 2:00 PM Website: www.cedoburlington.org Request for Proposals: Tax Increment Financing District Application Services Response Date: December 11, 2009, 2:00 PM I. PURPOSE The city of Burlington's Community and

More information

Schedule Guidance Document

Schedule Guidance Document Schedule Guidance Document Version: 1.2 Effective Date: August 20, 2013 Contents 1. Purpose... 1 2. Applicability and Basic Requirements... 2 3. Baseline Schedule... 3 3.1. General... 3 3.2. Schedule Work

More information

Phase 1 - Technical Assessment Kettle River Watershed Management Plan. Request for Proposals

Phase 1 - Technical Assessment Kettle River Watershed Management Plan. Request for Proposals Phase 1 - Technical Assessment Kettle River Watershed Management Plan Request for Proposals Closing date and time: 4:00 PM, January 28, 2011 Pacific Standard Time Location of proposal closing: Regional

More information

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

Traffic Division Public Works Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the

More information

REQUEST FOR PROPOSALS. Size of Site Approximately 5 acres in size with no permanent structures presently located on the site.

REQUEST FOR PROPOSALS. Size of Site Approximately 5 acres in size with no permanent structures presently located on the site. REQUEST FOR PROPOSALS The Village of Bedford Park is issuing this Request For Proposals (RFP) for the selection of an architectural firm for architectural services in connection with the design of a multi-purpose

More information

STATEMENTS OF QUALIFICATIONS ARE DUE NO LATER THAN 5:00 P.M. FRIDAY, JUNE 23, 2017

STATEMENTS OF QUALIFICATIONS ARE DUE NO LATER THAN 5:00 P.M. FRIDAY, JUNE 23, 2017 RFQ 13-2017-01 REQUEST FOR QUALIFICATIONS FOR A CRITERIA ENGINEER TO PERFORM CERTAIN PROFESSIONAL SERVICES IN THE REPAIR AND/OR REPLACEMENT OF THE LOWER LAKE DAM AND POTENTIAL REPAIRS TO THE UPPER LAKE

More information

Okaloosa RESTORE Advisory Committee (ORAC) January 8, :30 PM 4:30 PM Emerald Coast Convention Center

Okaloosa RESTORE Advisory Committee (ORAC) January 8, :30 PM 4:30 PM Emerald Coast Convention Center Okaloosa RESTORE Advisory Committee (ORAC) January 8, 2014 2:30 PM 4:30 PM Emerald Coast Convention Center Agenda Minutes Approval Consultant s Administrative Report Scheduled Presentations - None Regional

More information

Public Involvement Plan for the Montgomery 2030 Long Range Transportation Plan (LRTP)

Public Involvement Plan for the Montgomery 2030 Long Range Transportation Plan (LRTP) This Public Involvement Plan (PIP) outlines the overall approach to involve MPO Committees and the general public during the Montgomery 2030 LRTP update. The range of outreach techniques to provide information,

More information

The 2007 Comprehensive Plan

The 2007 Comprehensive Plan The 2007 Comprehensive Plan for Lexington - Fayette County, Kentucky Public Participation Public Participation Public Input 20 Eagle Creek Public Input 2006 - Beaumont Central, Main Street MPO Public Input

More information

June 20, 2016 REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT

June 20, 2016 REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT ADULT EDUCATION BLOCK GRANT DESERT REGIONAL CONSORTIUM June 20, 2016 REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT Proposals will be received until MONDAY, JULY 25TH 2:00 p.m. PST Return Proposal

More information

Regional Habitat Indicators Project. Workshop #1. Nov 9, 2016

Regional Habitat Indicators Project. Workshop #1. Nov 9, 2016 Regional Habitat Indicators Project Workshop #1 Nov 9, 2016 Workshop Objectives Vet recommendations for management questions with Fist-to-Five Review and identify missing indicators Identify criteria for

More information

2017 Draft Policy Initiatives Roadmap

2017 Draft Policy Initiatives Roadmap 2017 Draft Policy Initiatives Roadmap Prepared by and Infrastructure Development November 4, 2016 CA/M&ID Table of Contents 1 Introduction... 2 2 2017 Roadmap Initiative Ranking Process... 2 3 Draft High

More information

Whatcom County Request for Proposals #17-18

Whatcom County Request for Proposals #17-18 Request for Proposals #17-18 Notice is hereby given that sealed proposals will be received by Purchasing located in the Administrative Services-Finance Office on the fifth floor of the Courthouse, 311

More information

Project Overview- Feasibility Report

Project Overview- Feasibility Report OVERVIEW OF STORMWATER CAPTURE AND USE FEASIBILITY STUDY TAC MEETING #1, JULY 18, 2017 PRESENTED TO SAN DIEGO IRWM RAC AUGUST 2, 2017 2 Project Overview- Feasibility Report 1. Existing Conditions 2. Feasibility

More information

Impacts of Permit-Exempt Wells

Impacts of Permit-Exempt Wells Impacts of Permit-Exempt Wells Dave Nazy, LHG August 24, 2018 1 Impacts of Permit-Exempt Wells Introduction ESSB 6091 Example Impacts Calculation Basin Estimate & 20-year Projections Offsetting Impacts

More information

Stevens County Request for Proposal. Employee Classification and Compensation Study

Stevens County Request for Proposal. Employee Classification and Compensation Study Stevens County Request for Proposal Employee Classification and Compensation Study Due: April 17, 2014 I. Purpose Stevens County is currently soliciting proposals from qualified consulting firms for an

More information

Advanced Practice Registered Technologist (Therapy) Certification Handbook

Advanced Practice Registered Technologist (Therapy) Certification Handbook Advanced Practice Registered Technologist (Therapy) Certification Handbook June 2017 Table of Contents Purpose of the handbook... 1 Disclaimers... 1 Candidate enquiries... 1 Advanced Practice Registered

More information

WINCHESTER FREDERICK COUNTY (WIN-FRED) METROPOLITAN PLANNING ORGANIZATION (MPO) PUBLIC INVOLVEMENT PLAN (PIP)

WINCHESTER FREDERICK COUNTY (WIN-FRED) METROPOLITAN PLANNING ORGANIZATION (MPO) PUBLIC INVOLVEMENT PLAN (PIP) WINCHESTER FREDERICK COUNTY (WIN-FRED) METROPOLITAN PLANNING ORGANIZATION (MPO) PUBLIC INVOLVEMENT PLAN (PIP) Adopted June 28, 2005 PAGE INTENTIONALY LEFT BLANK 2 TABLE OF CONTENTS SECTION PAGE NO. Table

More information

ADDENDUM NUMBER 1. DATED 19 January 2017

ADDENDUM NUMBER 1. DATED 19 January 2017 Request for Proposals for Designer Selection Project 18-01 MnDOT Safety Rest Area Building Replacement and Site Rehabilitation at Clear Lake SRA and Des Moines River SRA ADDENDUM NUMBER 1 DATED 19 January

More information

Project Manager for Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals:

Project Manager for Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals: Project Manager for Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals: The King County Flood District (District) is seeking proposals from firms

More information

Surface Water Improvement and Management (SWIM) Plan Development

Surface Water Improvement and Management (SWIM) Plan Development Surface Water Improvement and Management (SWIM) Plan Development Bay Area Resource Council TAC Paul Thorpe Chief, Bureau of Environmental May 17, 2017 and Resource Planning May 17, 2017 Surface Water Improvement

More information

Overview of the New Zealand Natural Capital Assessment May 2014

Overview of the New Zealand Natural Capital Assessment May 2014 Overview of the New Zealand Natural Capital Assessment May 2014 TEEB on Natural Capital Our ecosystems, biodiversity and natural resources underpins economies, societies and individual well-being. In addition

More information

Project Management & Engineering

Project Management & Engineering Project Management & Engineering Municipal Manager Project Management & Engineering Design Geotechnical Services Project Management Survey Watershed Management PME - 1 Project Management & Engineering

More information

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/ Connecting South Dakota and the Nation Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD 57709-1970 Phone: 605/394-2244 FAX: 605/394-1904 July 9, 2014

More information

Implementing the Leapfrog Hospital Rewards Program

Implementing the Leapfrog Hospital Rewards Program Implementing the Leapfrog Hospital Rewards Program Review program questions for administrators Discuss customizable program features: Eligibility Performance categories Performance benchmarks Rewards options

More information

REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT. Proposals will be received until Friday, November 24, :00 p.m. MDT

REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT. Proposals will be received until Friday, November 24, :00 p.m. MDT REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT Proposals will be received until Friday, November 24, 2017 5:00 p.m. MDT This RFP is also available at our website: http://cal.unac.org/ REQUEST FOR PROPOSAL

More information

CITY OF JONESBORO. 2015:28 Request for Proposals (RFP) Geographic Information Systems (GIS) Strategic Plan

CITY OF JONESBORO. 2015:28 Request for Proposals (RFP) Geographic Information Systems (GIS) Strategic Plan CITY OF JONESBORO Project Description 2015:28 Request for Proposals (RFP) Geographic Information Systems (GIS) Strategic Plan The City of Jonesboro ( City ) needs an experienced Geographic Information

More information

Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals:

Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals: Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals: The King County Flood District (District) is seeking proposals from firms to prepare a programmatic

More information

Draft Refined Incremental Proposal GAC WS 2

Draft Refined Incremental Proposal GAC WS 2 Draft Refined Incremental Proposal GAC WS 2 Brussels 22 September 2014 What is the incremental proposal? The process by which capacity demand beyond the offer of existing capacity can be satisfied in a

More information