1 3 PART THREE: WORK PLAN AND IV&V METHODOLOGY (SECTION 5.3.3) Emagine IT s approach to Independent Verification and Validation (IV&V) has been shaped over the years by hands-on experience and contributions as thought leaders in the cybersecurity arena. Simply put, we address the objectives, challenges, transformation, and ultimately the critical success factors necessary for mission success. We incorporate Project Management Body of Knowledge (PMBoK) best practices, Capability Maturity Model Integration (CMMI) Level 3 appraised methodologies, and our International Organization of Standardization (ISO) , 27001:2013, and 17020:2012 certified frameworks to design and develop our most comprehensive IV&V solution. The key IV&V objectives of the Emagine IT methodology include: Provide continuous assessment of software, system products, and processes throughout the life cycle Facilitate early detection and correction of errors Reduce the effort required to remove faults, via early detection Demonstrate hardware, software, system requirements are complete, accurate, consistent, and testable Enhance management insight into process and product risk Support the life cycle processes to ensure compliance with program performance, schedule, and cost requirements Enhance operational correctness and product maintainability As shown in Figure 1 below, Emagine IT developed a 12-step IV&V methodology by taking the best of breed from industry standards (National Institute of Standards and Technology (NIST), CMMI, ISO, PMBoK) and combining them with years of Subject Matter Expert (SME) experience. Figure 1. Emagine IT s IV&V Methodology Air Force Medical Services (AFMS) Contract IV&V Efficiencies On the AFMS contract we successfully processed more Authority to Operate/Interim Authority to Operate (ATO/IATO) packages in the first six months after contract award than the combined 18 months under the previous contract; a more than 300% increase in complete package efficiency. Our approach enabled Emagine IT to reduce the number of staff required from that of the previous vendor s contract. Under that contract, 14.5 Full Time Equivalents (FTE) were required and Emagine IT is doing the same work with only 6 FTEs, while increasing staff productivity and the quality of deliverables by nearly 600%. 3.1 IV&V ENGAGEMENT OVERVIEW The first and most important step in the IV&V process is the Planning Phase. As part of the Planning Phase, Emagine IT begins by conducting an analysis of the scope of the project, application, or system in relation to: cost, size, schedule, complexity, criticality, security, Page 1

2 safety, risk, team complexity, organizational complexity, and requirements maturity. IV&V factors need to be analyzed, resulting in a costeffective IV&V effort that is tailored to the scope of the application. During the planning phase, we conduct independent verification against program planning to measure readiness and prepare a baseline to work from. These independent variables include: Development Schedules Software Development Plans Security Assessment Plan System Engineering Plans Project Management Plans Test Plan Quality Assurance Plans Hardware Development/Acquisition Plans Configuration Management (CM) Plans Commercial of the Shelf (COTS) Plans Risk Management Plans Emagine IT then prepares a tailored Work Plan to address the IV&V activities for each project under review. This follows the Emagine IT IV&V Methodology and/or any other applicable customer-specific guidance documents or policies. This plan is fairly brief and contains an introduction and a list of activities to be performed for each development stage. The Work Plan is structured by phase and includes key activities for each phase with target due dates. At a minimum, the Emagine IT Work Plan describes the following: System profile Points of contact IV&V schedule Key activities by phase IV&V Team organization Key deliverable due dates Scope of the IV&V effort (Approach, Activities, Tailoring) Tailoring of IV&V tasks and/or checklists based on project and/or scope The IV&V schedule is coordinated with the customers project master schedule so that IV&V schedules can be consolidated across all contractors and staff. The Work Plan is generally the first major deliverable produced by Emagine IT and it is updated regularly throughout the project as we respond to the specific needs of the project. Upon completion of the IV&V assessment (documentation review, interviews, vulnerability and penetration tests, analysis, and reporting), Emagine IT conducts a lessons learned session. The lessons learned session incorporates feedback from the project team members in addition to the IV&V team internal evaluation. We evaluate feedback to determine opportunities for improvements to processes, people, policies, and deliverables. We provide the results from the lessons learned to the customer as a final deliverable with recommendations and an action plan. 3.2 TOOLS, RECOMMENDATIONS, DELIVERABLES Table 1 outlines a baseline of standard checklists and tools maintained by Emagine IT for use during evaluations. They may be used as is, or tailored as necessary. Table 1. Emagine IT IV&V Baseline s Name Project WBS and This checklist is used to determine if critical activities have been planned for in a project s Work Breakdown Schedule Structure (WBS) and schedule. This checklist is applied to the Integrated Master schedule for the project. Readiness Review This checklist specifies review of all system documentation, raw scan results, configuration checklists, and interviews with system and process owners. Document Review Requirements Review Preliminary Design Detailed Design This checklist forms the basis for documentation reviews and is tailored to match the type of document under review. It serves as an aid to determining the overall quality of a document as to readability, utility, correctness, and completeness. This checklist is used to determine whether a given concept, set of requirements, design, test, etc., demonstrates that the requirements documentation or system satisfies its specified acceptance requirements. This checklist is used to aid in assessing the top-level design, as well as the allocation of requirements to software components, and to determine whether the Preliminary Design Review resolved open issues concerning the handling of high-level design requirements. This checklist is used to aid in determining if all the software requirements have been translated into a viable software design, and whether the Critical Design Review resolved open issues concerning the handling of critical requirements. Page 2

3 Name Process Review CM Code Review Unit Testing Review Software Development Files Review Test Readiness Review Section 508 Review This is a sample process review checklist with an emphasis on CM practices. This checklist is used to determine whether CM Procedures document and plans for performing configuration control; providing access to documentation and code under configuration control; and controlling the preparation and dissemination of changes to master copies of software and documentation so they reflect only approved changes. This checklist identifies evaluation criteria that can be used to determine whether the software design has been correctly implemented using code that adheres to programming standards and conventions. This checklist is used to determine if adequate test procedures to test each Computer Software Unit were developed and documented. Each unit was coded and tested ensuring that the algorithm(s) and logic employed are correct and satisfy the specified requirements; all necessary revisions to the design documentation and code were made; all necessary retesting was performed; and test results were recorded. This checklist is used to determine whether software development files contain material pertinent to the development or support of the software including: requirements, design considerations, constraints, documentation, program design language and source code, test data; status information; and test requirements, cases, procedures, and their results. This checklist is for evaluating the Test Readiness Review to ensure that adequate preparations were made prior to performing System Integration Test, and System Acceptance Testing. This checklist is for performing a Section 508 assessment, as required. These requirements are described in section 508 of the Rehabilitation Act, which requires access for both members of the public and federal employees to such technologies when developed, procured, maintained, or used by Federal Agencies. It is included here to provide guidance to the IV&V Team as to the Section 508 requirements. The goal of conducting IV&V assessments is to get an unbiased review of a project or system against the agreed upon requirements. On many engagements, we have identified situations where significant or major defects/vulnerabilities have been discovered, that cannot and should not, wait to be addressed until later in the project lifecycle. In the Planning Phase, Emagine IT defines major risks and the escalation procedures to address the risks. In addition, we rely heavily on constant communication throughout the entire IV&V assessment process. Table 2 below outlines the typical documentation, deliverables, and reports that Emagine IT s IV&V Team provides on any IV&V assessment. We include additional deliverables to address customer-specific requirements, as specified in a Statement of Work (SOW). Table 2. Representative Documentation and Deliverables Documents, Deliverables, IV&V Work Plan The IV&V Team prepares a tailored plan to address the IV&V activities for each development project under review. Review Plan Typically, the IV&V Team provides the Review Plan within 10 days of the scheduled review. Reviews are performed when scheduled by the IV&V Team or when directed by DMS Customer. Completed s The IV&V Team completes the appropriate checklist for each IV&V task. Completed checklists may be included as part of a Technical submitted for the specific IV&V task. The IV&V Team reports on the individual IV&V phase tasks in a letter of findings (technical report), Technical s which is issued as necessary. The technical reports may document interim results and status. The reports may be in a format appropriate for technical disclosure (for example, technical reports or memos). We generate reports for each technical task performed during the course of the IV&V program. Document Review Comments Memorandum of Record (MOR) Feasibility Assessment Pen Testing Letter of Authorization The IV&V Team prepares and submit document review comments in a letter of findings. For each document that requires review, the IV&V Team submits a letter of findings within 30 days of document receipt. A formal memo format that can be used for meeting minutes, comments, and status reports, or to highlight a significant issue or milestone. This report contains a detailed analysis of the IV&V Team s assessment of the alternatives including: Assessment methodology Alternatives with accompanying analysis Ranking of alternatives Recommendations with rationale Any risks that accompany the recommendations and alternatives Also known as the Rules of Engagement for penetration testing that may be performed for a DMS customer. Page 3

4 Documents, Deliverables, Requirements Verification Matrix (RVM) Anomaly Risk Assessment and IV&V Risk Register Security Assessment Plan Plan of Actions and Milestones Test Plan IV&V Test Procedures and Use Cases IV&V Test Special Studies s IV&V End of Phase Summary s Stage Gate/Production Readiness Review Recommendation IV&V Final (Security Assessment ) Progress s Meeting Minutes Trip s IV&V Metrics s Contractor Team/Security Roster Executive Level Project A tool to verify that system requirements are in accordance with the IV&V standards. An Anomaly is prepared and for submission to the DMS Customer Program Manager when anomalies detected by the IV&V team. Emagine IT will provide Anomaly s to the DMS customer no later than 3 days after anomaly detection. A formal report documenting the results of the risk assessment described in the IV&V Standards and Procedures. The detailed technical test plan that outlines the tools, dates, scope, and level of effort to conduct the security assessment for any engagement. Record of all identified vulnerabilities that tracks the status of the vulnerability and mitigation plan. All of the activities of the testing cycle to include environmental variables, users, timeframes of testing, results, formal build procedures, what types of tests, etc. These procedures and use cases will be provided sequentially throughout the Build and Test and Integration Test Phases in preparation for Acceptance Testing. These reports will be used to document the IV&V Team s witnessing of test activities, including software installation, test setup, test execution, problem reporting, data recording, and data analysis. As required, the IV&V Team will conduct and report on technical, cost, and schedule trade-off analyses related to system development (for example, changes in standards or technology) For large system development efforts, the IV&V Team may prepare and submit an IV&V End of Phase Summary for each lifecycle phase to include the following information: of IV&V tasks performed Assessment of overall system/software quality Recommendations to proceed to next phase Lessons learned An End of Phase Summary when provided comes at the conclusion of each of the following phases: Vision Phase, Definition Phase, Construction Phase, Deployment Phase, Support Phase When applicable, IV&V will encourage a pre-stage Gate meeting where all outstanding issues can be addressed prior to the Stage Gate or Program Readiness Review (PRR). The report includes: List of outstanding issues Risks relevant to Stage Gate/PRR Recommendation for Stage Gate/PRR All contingencies that impact the recommendation The IV&V Project Manager or team lead may be asked to sign the Stage Gate/PRR recommendation. The IV&V Final is issued at the end of the System Deployment Phase or at the conclusion of the IV&V effort. The report includes the following items: Summary of all lifecycle IV&V tasks Assessment of overall system quality Recommendations Lessons learned Provide a summary of all IV&V activities performed for the program. Provides a detailed description of the attendees, action items, and discussions of all meetings. The IV&V Team may prepare (as needed) and submit formal trip reports to the DMS customer for each trip in support of the project. This report is used in reporting metrics performance on a monthly basis. This is delivered at the project inception and includes a list of the complete project staff including name, labor category, task, title, whether they have a badge, and whether they are on- or off-site. This report provides DMS customer leadership insight into the key issues facing a particular development project. This report provides the IV&V Team s formal assessment of the issues and provides a forum for IV&V to convey information to senior management. Page 4

5 Documents, Deliverables, IV&V Lessons Learned Vulnerability Scans Penetration Testing At the conclusion of each In Process Review (IPR), the IV&V Team provides lessons learned for the quarter under review. Raw results from the scans, and reports resulting from any vulnerability scans performed during the IV&V assessment. of all vulnerabilities, risks, and findings discovered during the penetration testing phase of an assessment. Page 5

Work Plan and IV&V Methodology

Work Plan and IV&V Methodology Work Plan and IV&V Methodology Technology initiatives and programs should engage with an IV&V process at the project planning phase in order to receive an unbiased, impartial view into the project planning,

More information

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B 1. Work Plan & IV&V Methodology 1.1 Compass Solutions IV&V Approach The Compass Solutions Independent Verification and Validation approach is based on the Enterprise Performance Life Cycle (EPLC) framework

More information

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes

More information

Independent Verification and Validation (IV&V)

Independent Verification and Validation (IV&V) Independent Verification and Validation (IV&V) 12 th Annual NDIA CMMI Conference November 2012 - Denver, CO The MITRE Corporation The author s affiliation with The MITRE Corporation is provided for identification

More information

1.0 PART THREE: Work Plan and IV&V Methodology

1.0 PART THREE: Work Plan and IV&V Methodology 1.0 PART THREE: Work Plan and IV&V Methodology 1.1 Multi-Faceted IV&V Methodology Large, complex projects demand attentive and experienced IV&V and project management support to meet expectations. Monitoring

More information

7. Model based software architecture

7. Model based software architecture UNIT - III Model based software architectures: A Management perspective and technical perspective. Work Flows of the process: Software process workflows, Iteration workflows. Check Points of The process

More information

Information Technology Independent Verification and Validation

Information Technology Independent Verification and Validation Florida Department of Management Services Information Technology Independent Verification and Validation RFP No. Work Plan and Methodology ; 2:30 PM EST 2150 River Plaza Drive Suite 380 Sacramento California

More information

CMMI Project Management Refresher Training

CMMI Project Management Refresher Training CMMI Project Management Refresher Training Classifica(on 2: Foxhole Technology Employees Only RMD 032 Project Management Refresher Training Course September 21, 2017 Version 1.0 The Process Approach The

More information

PART THREE - WORK PLAN AND IV&V METHODOLOGY WORK PLAN. FL IT IV&V Work Plan

PART THREE - WORK PLAN AND IV&V METHODOLOGY WORK PLAN. FL IT IV&V Work Plan WORK PLAN FL IT IV&V Work Plan PART THREE - WORK PLAN AND IV&V METHODOLOGY ID Task Name Duration 1 FL IT IV&V Project Work Plan 261 days 2 DDI / SI Contract Award 0 days 3 Project Initiation and Planning

More information

Project Planning and Management (PPM) V2.0. WBS Dictionary

Project Planning and Management (PPM) V2.0. WBS Dictionary Project Planning and Management (PPM) V2.0 WBS Dictionary Software as a Service (SaaS) Version 1.0 August 2014 1 Table of Contents PPM V2.0 Work Breakdown Structure (WBS) Dictionary 1 Project Type: Software

More information

M3 Playbook Guidance. 1.1 Establish Initial Customer PMO and Processes. Human Resources (HR)/Staffing Plan

M3 Playbook Guidance. 1.1 Establish Initial Customer PMO and Processes. Human Resources (HR)/Staffing Plan M3 Playbook Guidance Phase 1: Readiness This guidance is intended for use by organizations to confirm and validate that their plans are comprehensive and have adequate level of detail for proper migration

More information

Continuous Diagnostic and Mitigation and Continuous Monitoring as a Service. CMaaS TASK AREAS

Continuous Diagnostic and Mitigation and Continuous Monitoring as a Service. CMaaS TASK AREAS Continuous Diagnostic and Mitigation and Continuous Monitoring as a Service CMaaS TASK AREAS CMaaS TASK AREAS The contractor shall provide functional, strategic, and managerial business consulting and

More information

Program Lifecycle Methodology Version 1.7

Program Lifecycle Methodology Version 1.7 Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated

More information

TECHNICAL REVIEWS AND AUDITS

TECHNICAL REVIEWS AND AUDITS Chapter 11 Technical Reviews and Audits CHAPTER 11 TECHNICAL REVIEWS AND AUDITS 11.1 PROGRESS MEASUREMENT The Systems Engineer measures design progress and maturity by assessing its development at key

More information

Software Project & Risk Management Courses Offered by The Westfall Team

Software Project & Risk Management Courses Offered by The Westfall Team Software Project & Risk Management is a 5-day course designed to provide a knowledge base and practical skills for anyone interested in implementing or improving Software Project and Risk Management techniques

More information

Child Welfare Services New System Project. Requirements Management Plan

Child Welfare Services New System Project. Requirements Management Plan Child Welfare Services New System Project Requirements Management Plan September 2017 Revision History REVISION HISTORY REVISION/VERSION # DATE OF RELEASE AUTHOR SUMMARY OF CHANGES Version 1.0 October

More information

Aerospace Advanced Product Quality Planning (Aerospace APQP) Introduction. Date: April Section 7.2

Aerospace Advanced Product Quality Planning (Aerospace APQP) Introduction. Date: April Section 7.2 Aerospace Advanced Product Quality Planning (Aerospace APQP) Introduction Date: April 2014 www.iaqg.org/scmh Section 7.2 Purpose of this document The purpose of this document is to provide the key messages

More information

STATEMENT OF WORK SMALL SPACECRAFT PROTOTYPING ENGINEERING DEVELOPMENT & INTEGRATION (SSPEDI) Space Solutions (SpS)

STATEMENT OF WORK SMALL SPACECRAFT PROTOTYPING ENGINEERING DEVELOPMENT & INTEGRATION (SSPEDI) Space Solutions (SpS) SSPEDI SpS J.1(a), Attachment 1 80ARC018R0007 National Aeronautics and Space Administration Ames Research Center Moffett Field, CA 94035-0001 STATEMENT OF WORK SMALL SPACECRAFT PROTOTYPING ENGINEERING

More information

This resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study

This resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study RESOURCE: MATURITY LEVELS OF THE CUSTOMIZED CMMI-SVC FOR TESTING SERVICES AND THEIR PROCESS AREAS This resource is associated with the following paper: Assessing the maturity of software testing services

More information

FLORIDA DEPARTMENT OF JUVENILE JUSTICE PROCEDURE. Title: Information Technology (IT) Project Management and Governance Procedures

FLORIDA DEPARTMENT OF JUVENILE JUSTICE PROCEDURE. Title: Information Technology (IT) Project Management and Governance Procedures PROCEDURE Title: Information Technology (IT) Project Management and Governance Procedures Related Policy: FDJJ 1270 I. DEFINITIONS Agency for State Technology (AST) Rule Rules 74-1.001 through 74-1.009,

More information

Large Federal Agency Leverages IV&V to Achieve Quality Delivery for Critical Modernization Initiative

Large Federal Agency Leverages IV&V to Achieve Quality Delivery for Critical Modernization Initiative Large Federal Agency Leverages IV&V to Achieve Quality Delivery for Critical Modernization Initiative Capgemini Government Solutions provides Independent Verification and Validation (IV&V) services to

More information

Project Plan. Executive Summary. Project Name: Prepared By: Date: Business Need/Problem Identify business need/problem that needs to be solved.

Project Plan. Executive Summary. Project Name: Prepared By: Date: Business Need/Problem Identify business need/problem that needs to be solved. Project Plan Project Name: Prepared By: Date: A Executive Summary Information in the project summary areas was started during the project concept phase and should be included here. Information includes

More information

Sample Reliability Language for DoD Acquisition Contracts

Sample Reliability Language for DoD Acquisition Contracts Sample Reliability Language for DoD Acquisition Contracts The single most important step necessary to correct high suitability failure rates is to ensure programs are formulated to execute a viable systems

More information

Project Execution Plan For

Project Execution Plan For Project Execution Plan For [Insert Name Here] Project Document Revision History Revision Date Project Manager Project Sponsor Page 1 of 24 About This Project Execution Plan Template: This template is intended

More information

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not

More information

USING PILOTS TO ASSESS THE VALUE AND APPROACH OF CMMI IMPLEMENTATION. Goddard Space Flight Center (GSFC)

USING PILOTS TO ASSESS THE VALUE AND APPROACH OF CMMI IMPLEMENTATION. Goddard Space Flight Center (GSFC) USING PILOTS TO ASSESS THE VALUE AND APPROACH OF CMMI IMPLEMENTATION Goddard Space Flight Center (GSFC) Sally Godfrey, James Andary, Linda Rosenberg SEPG 2003 2/03 Slide 1 Agenda! Background " NASA Improvement

More information

Quality Assurance / Quality Control Plan

Quality Assurance / Quality Control Plan Quality Assurance / Quality Control Plan Table of Contents MANAGEMENT APPROACH... 3 SUBCONTRACT MANAGEMENT... 3 QUALITY MANAGEMENT APPROACH... 3 METHODOLOGY... 4 CONCEPT OF OPERATIONS... 5 QUALITY MANAGEMENT

More information

PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY "A"

PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY A PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY "A" 1. SOFTWARE QUALITY PROGRAM. This attachment establishes the software quality requirements

More information

IT PROJECT ANALYST/MANAGER

IT PROJECT ANALYST/MANAGER IT PROJECT ANALYST/MANAGER I. DESCRIPTION OF WORK Positions in this banded class are responsible for project management work involving planning and coordination of information technology projects. To ensure

More information

Using Pilots to Assess the Value and Approach of CMMI Implementation

Using Pilots to Assess the Value and Approach of CMMI Implementation Using Pilots to Assess the Value and Approach of CMMI Implementation Godfrey, S., Andary, J., Rosenberg, L. NASA Goddard Space Flight Center, Greenbelt, Maryland, USA, 20771 Sara.H.Godfrey.1@gsfc.nasa.gov

More information

Program/Project Management

Program/Project Management PROCEDURE OVERVIEW PROGRAM/PROJECT MANAGEMENT PROCEDURE defines the project management infrastructure, reporting relationships and project management activities within SDLC.com. Project Managers, Program

More information

ATK Ordnance and Ground Systems Company

ATK Ordnance and Ground Systems Company ATK Ordnance and Ground Systems Company Multi-Option Fuze for Artillery (MOFA) Using Risk Mitigation Process to Develop and Implement Automation Presented at 48 th Annual NDIA Fuze Conference Charlotte,

More information

Project Manager s Roadmap We re all smarter together

Project Manager s Roadmap We re all smarter together Version 7.0a Project Manager s Roadmap We re all smarter together Think Top Down! Methodology Checklists Define Plan Execute Close Conflict Resolution Modes Contract Outsource Management Mentoring References

More information

NYSITS. Overview of Project Management

NYSITS. Overview of Project Management NYSITS Overview of Management SMART objectives SPECIFIC MEASURABLE ACHIEVABLE REALISTIC TIME-SPECIFIC Initiation WBS Network Diagram Gantt Chart Kick-off Meeting Introduction Objectives Planning Risks

More information

Project Management Professionals

Project Management Professionals A COLLECTION OF INTERVIEW QUESTIONS FOR Project Management Professionals When interviewing a Project Manager, it s important to set up the discussion for the first couple of minutes in an open dialogue.

More information

CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide

CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide processlabs CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide CMMI-DEV V1.3 Process Areas Alphabetically by Process Area Acronym processlabs CAR - Causal Analysis and Resolution...

More information

Project Management Session 6.2. Project Initiation Phase Integration Management

Project Management Session 6.2. Project Initiation Phase Integration Management Project Management Session 6.2 Project Initiation Phase Integration Management 1 Project Phases & Knowledge Areas 1. Integration 2. Scope Management 3. Time Management 4. Cost Management 5. Quality Management

More information

2012 Medicaid Enterprise System Conference

2012 Medicaid Enterprise System Conference 2012 Medicaid Enterprise System Conference O3: Leveraging Independent Verification and Validation (IV&V) to improve project success Introduction of Panel Agenda PCG North Highland, CSG, Washington Role

More information

Attachment J-4 Milestone Acceptance Criteria and Payment Schedule

Attachment J-4 Milestone Acceptance Criteria and Payment Schedule Attachment J-4 Milestone Acceptance Criteria and Payment Schedule Page 1 of 7 For Base, CLIN 001: Milestone Payment Event Integrated System Baseline Review (ISBR) Milestone Objective: At a NASA and Contractor

More information

Reference B Project Management Requirements

Reference B Project Management Requirements Reference B State of Alaska TABLE OF CONTENTS 1... 2 1.1 Project Life Cycle Methodology... 2 1.2 Preliminary Project Management Narrative and Work Plan... 2 2 Master Project Management Plan and Master

More information

Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013)

Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Integration Management: processes & activities needed to properly coordinate all aspects of the project to meet stakeholder

More information

Chapter 6. Software Quality Management & Estimation

Chapter 6. Software Quality Management & Estimation Chapter 6 Software Quality Management & Estimation What is Quality Management Also called software quality assurance (SQA) s/w quality:- It is defined as the degree to which a system, components, or process

More information

QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT)

QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) MOSAIC Quality Assurance Plan v04.02 Prepared by: Approved by: QUALITY ASSURANCE PLAN APPROVALS QA/QC Program

More information

AGENCY FOR STATE TECHNOLOGY

AGENCY FOR STATE TECHNOLOGY AGENCY FOR STATE TECHNOLOGY PROJECT RISK & COMPLEXITY ASSESSMENT TOOL Risk & Complexity Assessment Model for State Information Technology Projects Purpose: In order to determine the level of risk associated

More information

Project+ Examination Blueprint Version June 1, 2003

Project+ Examination Blueprint Version June 1, 2003 Introduction The Project + examination is designed for business professionals involved with projects with a technology component. The examination is designed for candidates possessing at least 12 months

More information

ADM The Architecture Development Method

ADM The Architecture Development Method ADM The Development Method P Preliminary Phase Preliminary Phase Determine the Capability desired by the organization: Review the organizational context for conducting enterprise architecture Identify

More information

Integrated Class C Process Appraisals (ICPA)

Integrated Class C Process Appraisals (ICPA) Integrated Class C Process Appraisals (ICPA) Kent S. McClurg Raytheon Company Garland, TX 972 205-7415 Kent_S_McClurg@raytheon.com Suzanne N. Delcambre Raytheon Company Garland, TX 972 205-7967 Suzanne_N_Delcambre@raytheon.com

More information

NASA Procedural Requirements

NASA Procedural Requirements NASA Procedural Requirements NPR 7150.2 Effective Date: September 27, 2004 Expiration Date: September 27, 2009 NASA Software Engineering Requirements Responsible Office: Office of the Chief Engineer 0

More information

CMMI for Acquisition Quick Reference

CMMI for Acquisition Quick Reference AGREEMENT MANAGEMENT PROJECT MANAGEMENT (ML2) The purpose of Agreement Management (AM) is to ensure that the supplier and the acquirer perform according to the terms of the supplier agreement. SG 1 The

More information

Information Technology Services Project Management Office Operations Guide

Information Technology Services Project Management Office Operations Guide Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...

More information

PROJECT MANAGEMENT PLAN FOR: PROJECT NAME HERE

PROJECT MANAGEMENT PLAN FOR: PROJECT NAME HERE Tip for using the PMM allinone template: To develop your Project Charter, complete all nonyellow sections, and save a copy. Next, remove all the yellow sections, reformat, PROJECT CHARTER or PROJECT MAGEMENT

More information

LVC-IA EC WBS/Dictionary Dictionary

LVC-IA EC WBS/Dictionary Dictionary WBS 1.0 LVC-IA EC 1.1 LVC-IA Products 1.1.1 Live Integration Products 1.1.2 Virtual Integration Products 1.1.3 Constructive Integration Products 1.1.4 Gaming Integration Products 1.1.5 Integrated Architecture

More information

Project Management Framework with reference to PMBOK (PMI) July 01, 2009

Project Management Framework with reference to PMBOK (PMI) July 01, 2009 Project Management Framework with reference to PMBOK (PMI) July 01, 2009 Introduction Context Agenda Introduction to Methodologies What is a Methodology? Benefits of an Effective Methodology Methodology

More information

LVC-IA EC WBS/Dictionary Dictionary

LVC-IA EC WBS/Dictionary Dictionary WBS 1.0 LVC-IA EC 1.1 LVC-IA Products 1.1.1 Live Integration Products 1.1.2 Virtual Integration Products 1.1.3 Constructive Integration Products 1.1.4 Gaming Integration Products 1.1.5 Integrated Architecture

More information

Part Work plan and IV&V methodology

Part Work plan and IV&V methodology Part 3 4.4.3 Work plan IV&V methodology EY s IV&V methodology is an explicit risk quantitative process that proactively identifies the interrelationship of factors conditions that could impede the success

More information

Project Scope Management

Project Scope Management Project Scope Management Understand the importance of good project scope management. Discuss methods for collecting and documenting requirements in order to meet stakeholder needs and expectations. Explain

More information

Project Management. Risk Management

Project Management. Risk Management Brandt s History of IV&V Success Using over 30 years of experience supporting local, state, and federal agencies, Brandt provides IV&V services using proven, strategic methodologies to ensure project success

More information

CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS

CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS Objectives Introduction The objectives are: Describe the purpose of the phase planning activity, preconditions, and deliverables in the implementation methodology.

More information

Work Plan and IV&V Methodology

Work Plan and IV&V Methodology Work Plan and IV&V Methodology ISG Public Sector has been helping public sector organizations acquire and implement (from a project oversight and organizational change management perspective) new, enterprise-wide

More information

CMMI-SVC V1.3 CMMI for Services Version 1.3 Quick Reference Guide

CMMI-SVC V1.3 CMMI for Services Version 1.3 Quick Reference Guide processlabs CMMI-SVC V1.3 CMMI for Services Version 1.3 Quick Reference Guide CMMI-SVC V1.3 Process Areas Alphabetically by Process Area Acronym processlabs CAM - Capacity and Availability Management...

More information

DORNERWORKS QUALITY SYSTEM

DORNERWORKS QUALITY SYSTEM DORNERWORKS QUALITY SYSTEM ALIGNMENT WITH CMMI INTRODUCTION Since its beginning, DornerWorks has had quality as one of our main goals. We have delivered solutions for over a dozen aircraft, including several

More information

2015 Program Excellence Award

2015 Program Excellence Award 2015 Program Excellence Award Phase I Submission Name of Program: F-22 Raptor Vapor Cycle Controller Partnering Service Depot Stand-Up Name of Program Leader: Peter Anderson Phone Number: 647-444-9136

More information

Number: DI-IPSC-81427B Approval Date:

Number: DI-IPSC-81427B Approval Date: DATA ITEM DESCRIPTION Title: Software Development Plan (SDP) Number: Approval Date: 20170313 AMSC Number: N9775 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: EC Project Number:

More information

Number: DI-IPSC-81427B Approval Date:

Number: DI-IPSC-81427B Approval Date: DATA ITEM DESCRIPTION Title: Software Development Plan (SDP) Number: DI-IPSC-81427B Approval Date: 20170313 AMSC Number: N9775 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity:

More information

REQUIREMENTS DOCUMENTATION

REQUIREMENTS DOCUMENTATION REQUIREMENTS DOCUMENTATION Project Title: Date Prepared: Stakeholder Requirement Category Priority Acceptance Criteria REQUIREMENTS DOCUMENTATION Project Title: Date Prepared: Stakeholder Requirement Category

More information

APPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS

APPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS APPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS Shared denotes whether a Contractor Resource may be responsible for that in addition to another identified. Contractor Required

More information

What We Know Now: Lessons Learned Implementing Federal Financial Systems Projects

What We Know Now: Lessons Learned Implementing Federal Financial Systems Projects Forum: Driving Performance Strategies for More Effective Government What We Know Now: Lessons Learned Implementing Federal Financial Systems Projects By Debra Cammer Hines and Angela Carrington This contribution

More information

Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.

Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room. APM Project Fundamentals Qualification Examination paper Candidate Number Date Location Examination Paper Sample Paper v1.4 General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use

More information

ServiceNow Custom Training and Adoption

ServiceNow Custom Training and Adoption ServiceNow Custom Training and Adoption Overview... 3 Adoption Toolkit Deliverables... 3 Change Enablement Deliverables... 4 Custom Training Deliverables... 5 Custom Training Applications by Business Function...

More information

Introduction to Cost Estimation - Part I

Introduction to Cost Estimation - Part I Introduction to Cost Estimation - Part I Best Practice Checklists Best Practice 1: Estimate Purpose and Scope The estimate s purpose is clearly defined The estimate s scope is clearly defined The level

More information

Managing a Project and Keeping Sane While Wrestling Elegantly With PMBOK, Scrum and CMMI (Together or Any Combination)

Managing a Project and Keeping Sane While Wrestling Elegantly With PMBOK, Scrum and CMMI (Together or Any Combination) Managing a Project and Keeping Sane While Wrestling Elegantly With PMBOK, Scrum and CMMI (Together or Any Combination) Neil Potter The Process Group neil@processgroup.com 1 Agenda Summary of PMBOK, CMMI

More information

Project Integration Management

Project Integration Management Project Integration Management Presented by Project Masters Inc. *Throughout this presentation, we reference and recognize the following trademarks, service marks, and copyrights of the Project Management

More information

2015 Program Excellence Award. Sub-System Sustainment

2015 Program Excellence Award. Sub-System Sustainment 2015 Program Excellence Award I. Program Overview Organization Name/Program Name: Honeywell / F-22 Raptor Vapor Cycle Controller Partnering Service Depot Stand-Up Program Leader Name/ Position/Contact

More information

Project Management Training Brochure

Project Management Training Brochure Project Management Training Brochure We develop project management training sessions by integrating our 40 years of combined practitioner experience with the most current project management knowledgebase

More information

System Development Life Cycle New Development Process For the Natural Resource Sector

System Development Life Cycle New Development Process For the Natural Resource Sector Corporate Services for the Natural Resource Sector System Development Life Cycle New Development Process For the Natural Resource Sector Last Updated: December 1, 2014 Version: 1.0.0 Document: NRS_IMIT_SDLC_NewDevelopment_Process

More information

Rational Software White Paper TP 174

Rational Software White Paper TP 174 Reaching CMM Levels 2 and 3 with the Rational Unified Process Rational Software White Paper TP 174 Table of Contents Abstract... 1 Introduction... 1 Level 2, Repeatable... 2 Requirements Management...

More information

Passit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2

Passit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2 Passit4Sure.OG0-093.221Questions Number: OG0-093 Passing Score: 800 Time Limit: 120 min File Version: 7.1 TOGAF 9 Combined Part 1 and Part 2 One of the great thing about pass4sure is that is saves our

More information

CMMI for Services Quick Reference

CMMI for Services Quick Reference CAPACITY AND AVAILABILITY MANAGEMENT PROJECT & WORK MGMT (ML3) The purpose of Capacity and Availability Management (CAM) is to ensure effective service system performance and ensure that resources are

More information

PMP Exam Preparation Course Project Scope Management

PMP Exam Preparation Course Project Scope Management Project Scope Management 1 Product Scope Product scope The features and functions that are to be included in your products or service or result of the project. Completion is measured against the product

More information

Intermediate Systems Acquisition Course. Lesson 3.15 Full Rate Production ADE-3. Supporting ADE-3

Intermediate Systems Acquisition Course. Lesson 3.15 Full Rate Production ADE-3. Supporting ADE-3 Supporting ADE-3 At the end of the Obtain Phase, the program office prepares for Acquisition Decision Event 3 (ADE-3). ADE-3 is the production decision to advance to the Produce/Deploy/Support/Dispose

More information

Define and Initiate SubPhase

Define and Initiate SubPhase Project Management Methodology Project Management Methodology Training Define and Initiate SubPhase Course Purpose Familiarize team members with the Start Project Sub-Phase processes. Understand process

More information

Commercial Planning Manager. Supply Planning Manager Heslerton Road, Dunsandel, Canterbury

Commercial Planning Manager. Supply Planning Manager Heslerton Road, Dunsandel, Canterbury Position Reports to Commercial Planning Manager Supply Planning Manager Company Synlait Milk Limited Date: March 2016 Location 1028 Heslerton Road, Dunsandel, Canterbury Purpose This is a key role to support

More information

Buy:

Buy: Chapter-1.0 CONTENTS OF CMMI MATURITY LEVEL 3 DOCUMENT KIT (More than 160 document files) A. The Total Editable Document kit has 8 main directories as below in word/excel. CMMI-V1.3 Maturity Level 3 (Dev)

More information

CHAPTER 1 Introduction

CHAPTER 1 Introduction CHAPTER 1 Introduction The Standard for Program Management provides guidelines for managing programs within an organization. It defines program management and related concepts, describes the program management

More information

Report of the Reliability Improvement Working Group (RIWG) Volume II - Appendices

Report of the Reliability Improvement Working Group (RIWG) Volume II - Appendices Report of the Reliability Improvement Working Group (RIWG) Volume II - Appendices Appendix 1 Formulate Programs with a RAM Growth Program II-1 1.1 Reliability Improvement Policy II-3 1.2 Sample Reliability

More information

How mature is my test organization: STDM, an assessment tool

How mature is my test organization: STDM, an assessment tool How mature is my test organization: STDM, an assessment tool Bonney Joseph, (Bonney.joseph@wipro.com) Nikhil Gupta, (Nikhil.gupta@wipro.com) Abstract Software ing thought of as a support function until

More information

Florida Cleanroom Systems

Florida Cleanroom Systems Florida Cleanroom Systems Design Build Projects / Project Quality Control Plan (PQCP) Quality Control / Quality Assurance Manual May 2010 1 TABLE OF CONTENTS Section 1: Introduction 3 1.1 Defining Plan

More information

Project Origination: Item Description (Origination) Comments (or reasons for NOT completing)

Project Origination: Item Description (Origination) Comments (or reasons for NOT completing) Project Origination: (Origination) Develop Project Proposal: 24 Formulate business need/problem and 24 anticipated benefits to all parties Review project s fit with organization s mission 24 Identify project

More information

Scope Management 3/11/2015. Chapter 5 Learning Objectives. Project Scope. 1) Conceptual development. Problem Statements. Statement of Work (SOW)

Scope Management 3/11/2015. Chapter 5 Learning Objectives. Project Scope. 1) Conceptual development. Problem Statements. Statement of Work (SOW) Chapter 5 Learning Objectives Scope Management 05-01 Project Scope 05-02 Conceptual Development The process that addresses project objectives by finding the best ways to meet them. Project scope is everything

More information

CERT Resilience Management Model, Version 1.2

CERT Resilience Management Model, Version 1.2 CERT Resilience Management Model, Organizational Process Focus (OPF) Richard A. Caralli Julia H. Allen David W. White Lisa R. Young Nader Mehravari Pamela D. Curtis February 2016 CERT Program Unlimited

More information

2018 CMMI Institute 1

2018 CMMI Institute 1 2018 CMMI Institute 1 Copyright 2018 CMMI Institute THIS CMMI INSTITUTE MATERIAL IS FURNISHED ON AN AS-IS BASIS. TO THE MAXIMUM EXTENT ALLOWED BY LAW, THE CMMI INSTITUTE SPECIFICALLY DISCLAIMS ALL WARRANTIES,

More information

Overview: Status Reports/Dashboards provide program leadership and governance with updates on program progress, and strategic program risks/issues.

Overview: Status Reports/Dashboards provide program leadership and governance with updates on program progress, and strategic program risks/issues. M3 Playbook Guidance Phase 4: Migration This guidance is intended for use by organizations to confirm and validate that their plans are comprehensive and have adequate level of detail for proper migration

More information

Project Management CSC 310 Spring 2018 Howard Rosenthal

Project Management CSC 310 Spring 2018 Howard Rosenthal Project Management CSC 310 Spring 2018 Howard Rosenthal 1 Notice This course is based on and includes material from the text: A User s Manual To the PMBOK Guide Authors: Cynthia Stackpole Snyder Publisher:

More information

CMMI Version 1.2. Model Changes

CMMI Version 1.2. Model Changes Pittsburgh, PA 15213-3890 CMMI Version 1.2 Model Changes SM CMM Integration, IDEAL, and SCAMPI are service marks of Carnegie Mellon University. Capability Maturity Model, Capability Maturity Modeling,

More information

WDVA EMR Project Readiness Assessment Report

WDVA EMR Project Readiness Assessment Report WDVA EMR Project Readiness Assessment Report 1 Prepared by: Marcus Bailey Project QA Assurance Consultant New Compass Consulting, LLC marcus@newcompassconsulting.com Tele: 360-239-4607 Transformation Leadership

More information

ADNET LEAN SIX SIGMA WHITE PAPER

ADNET LEAN SIX SIGMA WHITE PAPER ADNET LEAN SIX SIGMA WHITE PAPER Adnet's Lean Six Sigma program enables your organization to increase performance, eliminate waste and satisfy customers by streamlining operations, improving quality and

More information

Best Practices for Enterprise Agile Transformation

Best Practices for Enterprise Agile Transformation Best Practices for Enterprise Agile Transformation A White Paper for the Software Development Project Community Date: May 2017 Select Computing, Inc. 9841 Broken Land Parkway Suite 209 Columbia, MD 21046

More information

Principles of Information Security, Fourth Edition. Chapter 10 Implementing Information Security

Principles of Information Security, Fourth Edition. Chapter 10 Implementing Information Security Principles of Information Security, Fourth Edition Chapter 10 Implementing Information Security Learning Objectives Upon completion of this material, you should be able to: Explain how an organization

More information

Highlights of CMMI and SCAMPI 1.2 Changes

Highlights of CMMI and SCAMPI 1.2 Changes Highlights of CMMI and SCAMPI 1.2 Changes Presented By: Sandra Cepeda March 2007 Material adapted from CMMI Version 1.2 and Beyond by Mike Phillips, SEI and from Sampling Update to the CMMI Steering Group

More information

Biometrics Enterprise Architecture Systems Engineering Management Plan (BMEA SEMP)

Biometrics Enterprise Architecture Systems Engineering Management Plan (BMEA SEMP) Biometrics Enterprise Architecture Systems Engineering Management Plan (BMEA SEMP) Version 1.0 Prepared by: Date: November 24, 2009 Revision History Purpose Revision Date Level 11/17/2009 First Draft 1.0

More information