Capacity Market Topics Resource Targets, Qualifications, Performance Standards, Must Offer. Jacqueline DeRosa, Senior Market and Product Economist

Size: px
Start display at page:

Download "Capacity Market Topics Resource Targets, Qualifications, Performance Standards, Must Offer. Jacqueline DeRosa, Senior Market and Product Economist"

Transcription

1 Capacity Market Topics Resource Targets, Qualifications, Performance Standards, Must Offer Jacqueline DeRosa, Senior Market and Product Economist Capacity Market Stakeholder Meeting September 19, 2007

2 Agenda Resource Targets RA Qualifications Existing, Planned Generation, Demand Response Imports Performance Standards Must Offer 2

3 Resource Adequacy Targets - Proposals Summary: Four proposals include forward assessment and determination RA Targets Four proposals include continuation (in some form) of the collaborative RA Target development process that is in place today 3

4 RA Target - Proposals CFCM Five years prior to delivery year Requirements for local areas with transfer limitation and level of internal generation, and installed MWs Max amount of imports (by path and total) Cal CIM Three to Four Year Planning Elements Include Load Forecasting and Establishing Reserve Margin Definition of Load Pockets 4

5 RA Target - Proposals Mirant Retain existing procurement timelines Do not move to multi-year forward procurement requirement Move from monthly peak to annual peak demand PGE Six Years Ahead Comprehensive Forward Assessment Conducted Every Three Years Reliability, Competitiveness, Environmental and Performance Needs of System Local Area Prescriptive determination 5

6 RA Targets CAISO Assessment Build off RA procurement targets System Peak load plus PRM Annual Peak approach warrants consideration Locational Capacity Requirements Multi year forward assessment based on established RA targets Can inform investment decisions Supports bilateral procurement Could support integration with transmission planning Details? Could include other reliability requirements 6

7 Operational Attributes - Proposals CFCMA, Mirant, Constellation Include local price signals and encourages development of AS markets to inform investment decisions CFCM - Could add a price adder to meet more targeted operational goals PG&E - Comprehensive Assessment and CRFO to procure operational characteristics Mirant - Annual product to provide more operational certainty 7

8 Operational Attributes - CAISO Assessment Multi year forward obligation for system and local could direct investment What is the most effective and efficient way to attract investment in needed operational attributes? (1) Rely on combination of CCM and locational and spot AS markets (2) Use price adders in CCM for attributes (3) Target CRFO to procure attributes CAISO supports identification and development of spot markets but is this enough to encourage investment? 8

9 Resource Qualification - Proposals All proposals Support definition of product and clear rules to qualify CFCM All capacity must be offered into auction New Generation and repowerings -- with development criteria to be established Delisting Demand response Imports 9

10 Resource Qualification - Proposals Constellation Forced outages used to adjust QC on an annual basis (combined with testing to compute average) Forced outage data will impact subsequent periods Scheduled outages are already in PRM Mirant Demand response should be based on rolling average availability at peak Import capacity - Derating Net QC based on testing, and forced outages 10

11 Resource Qualification Proposals, Continued and CAISO Assessment Proposals Continued PG&E Qualification rules under CAM - undefined CAISO Assessment Existing RA program s resource qualification requirements are sound framework Carefully consider what resources qualify and should be uniform to all participants 11

12 Resource Qualification - CAISO Assessment Continued Once qualified, capacity may be traded bilaterally or through CCM, or other procurement mechanism Supports Listing and Delisting concept All internal capacity must offer into auction unless it formally delists New and Repowerings should meet milestones Demand Response Currently being discussed in multiagency process 12

13 Resource Qualification - Imports All Four There is a Need to Accommodate Imports in CA CFCM - CAISO recommends max amount of imports from external control areas; can be self supplied and bid in CalCim - Don t revisit; Supports maximum use of imports Mirant Qualifying criteria needs to be made more stringent, less reliance on financial penalties PG&E secured in bilateral, included in RA Registry, and can participate in CAM 13

14 Resource Qualification Imports CAISO Assessment RAR Tariff: Imports limited by total system and path import capability as determined by CAISO Imports have DA MOO, no RT obligation unless selected in RUC (except for dynamically scheduled) Standardized product All QC should be treated the same with respect to availability and performance requirements 14

15 Resource Qualification Imports CAISO Assessment Imports May be warranted to re-examine qualifying criteria; but don t want to discourage Accommodate limited amount of seasonal capacity swaps? Would forward obligation inhibit imports? 15

16 Must Offer - Proposals CFCM Must Offer to DA, RUC, RT and AS; If not selected, no obligation. Supply obligation is transferable External cannot be selected to meet local and must offer obligation Mirant Consistent with CAISO Tariff Control area certification process for imports or mechanism to discount Constellation - DA Must Offer Obligation and RUC 16

17 Must Offer Obligation - CAISO Assessment Continuation of must offer requirements for RA resources from DA, RUC, and into RT Must offer for Energy and AS Imports not qualified to meet local capacity requirements 17

18 Performance Standards - Proposals CFCM Availability metric: EFORd as all hours availability metric and EFORp to provide additional incentive during peak hours Penalty to units not available Only in year of underperformance Does not adjust QC of resource, except if chronic 18

19 Performance Standards - Proposals Mirant Net Qualifying Metric, based on UCAP, QC based on past performance and adjusted QC Penalties for non-compliance Constellation Net Qualifying Metric like Mirant Strong performance incentive where current year forced outages impact QC in subsequent period 19

20 Performance Standards CAISO Assessment Clear rules for compliance, performance requirements, capacity targets, and qualifying capacity CAISO has provisions in Tariff that provide for determination of Net QC: Deliverability, Performance, Testing Specific performance metrics should address overall and peak availability Impacts on current year capacity payments provides incentives to perform 20

Briefing on How Resource Adequacy Works in ISO s Current Balancing Authority Area

Briefing on How Resource Adequacy Works in ISO s Current Balancing Authority Area Briefing on How Resource Adequacy Works in ISO s Current Balancing Authority Area Regional Resource Adequacy Meeting December 16, 2015 Salt Lake City, Utah Keith Johnson Manager, Infrastructure Policy

More information

Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2. Working Group Meeting. Karl Meeusen, Ph.D. June 18, 2018

Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2. Working Group Meeting. Karl Meeusen, Ph.D. June 18, 2018 Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2 Working Group Meeting Karl Meeusen, Ph.D. June 18, 2018 FRACMOO 2 Working Group Meeting Agenda 6/18/2018 Time Topic Presenter 10:00

More information

Reliability Pricing Model (RPM) DRAFT Business Rules

Reliability Pricing Model (RPM) DRAFT Business Rules Definition and Purpose of Reliability Pricing Model (RPM) 1. The purpose of the RPM is to develop a long term pricing signal for capacity resources and LSE obligations that is consistent with the PJM Regional

More information

Resource Adequacy Enhancements Straw Proposal - Part 1. Stakeholder Call January 23, 2019

Resource Adequacy Enhancements Straw Proposal - Part 1. Stakeholder Call January 23, 2019 Resource Adequacy Enhancements Straw Proposal - Part 1 Stakeholder Call January 23, 2019 Agenda Time Topic Presenter 1:00 1:10PM Welcome and introduction Jody Cross 1:10 1:40PM Rules for Import RA Chris

More information

Day Ahead Market Enhancements: Issue Paper/Straw Proposal

Day Ahead Market Enhancements: Issue Paper/Straw Proposal Day Ahead Market Enhancements: Issue Paper/Straw Proposal Don Tretheway Senior Advisor, Market Design Policy Megan Poage Senior Market Design & Regulatory Policy Developer March 7, 2018 Agenda Time Topic

More information

BPM Change Management Meeting

BPM Change Management Meeting BPM Change Management Meeting September 26, 2017 Julia Payton BPM Change Management Process BPM_CM@caiso.com Agenda BPM Change Management Meeting, September 26, 2017 Topic Introduction/meeting overview

More information

Reliability Pricing Model (RPM) Overview. April 11, 2005

Reliability Pricing Model (RPM) Overview. April 11, 2005 Reliability Pricing Model (RPM) Overview April 11, 2005 Drivers for Capacity Market Reform Generation Net Revenue Shortfall Inconsistency between capacity pricing and reliability requirements Result has

More information

Expanding Capacity Eligibility

Expanding Capacity Eligibility Expanding Capacity Eligibility Zachary T. Smith Manager, Capacity Market Design ICAPWG/MIWG March 7 th, 2019 Agenda Background Installed Capacity Supplier Payment Structure Peak Load Windows Counting MWs

More information

Resource Adequacy Enhancements Stakeholder Work Group

Resource Adequacy Enhancements Stakeholder Work Group Resource Adequacy Enhancements Stakeholder Work Group April 8 & 9, 2019 Agenda Day 1 Day 1 April 8 Time Topic Presenter 10:00 10:05AM Welcome Jody Cross 10:05 10:30AM Introduction Objectives and principles

More information

Business Practice Manual for Reliability Requirements. Version 34

Business Practice Manual for Reliability Requirements. Version 34 Business Practice Manual for Reliability Requirements Version 34 Last Revised: January 1, 2009July 28, 2010 Approval History Approval Date: 3/27/09 Effective Date: 3/31/09 BPM Owner: Chetty Mamandur BPM

More information

Reliability Demand Response Product

Reliability Demand Response Product Reliability Demand Response Product CAISO Response to Stakeholder Comments on the RDRP Straw Proposal Prepared for The Reliability Demand Response Product Stakeholder Initiative September 1, 2010 Comments

More information

RDRP Stakeholder Initiative

RDRP Stakeholder Initiative Reliability Demand Response Product RDRP Stakeholder Initiative Draft Final Proposal Review Stakeholder Conference Call September 13, 2010 Reliability Demand Response Product (RDRP) 1 2 3 We are here Project

More information

2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017

2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017 2018 Draft Policy Initiatives Roadmap Market and Infrastructure Policy December 7, 2017 Primary drivers of proposed three-year roadmap Recent grid operations challenges pointing to need for day-ahead market

More information

Temporary Shutdown of Resource Operations BBB Straw Proposal

Temporary Shutdown of Resource Operations BBB Straw Proposal Temporary Shutdown of Resource Operations BBB Straw Proposal Stakeholder Conference Call June 28, 2017 3:00 5:00 p.m. Pacific Time Keith Johnson Infrastructure and Regulatory Policy Manager Agenda Time

More information

California ISO. Standard Resource Adequacy Capacity Product. Straw Proposal. ISO Straw Proposal November 11, Your Link to Power

California ISO. Standard Resource Adequacy Capacity Product. Straw Proposal. ISO Straw Proposal November 11, Your Link to Power California ISO Your Link to Power Straw Proposal Standard Resource Adequacy Capacity Product ISO Straw Proposal November 11, 2008 MD&RP/CRH Page 1 of 32 TABLE OF CONTENTS 1 Executive Summary 3 2 Introduction

More information

Resource Adequacy Enhancements. Straw Proposal Part 1

Resource Adequacy Enhancements. Straw Proposal Part 1 Resource Adequacy Enhancements Straw Proposal Part 1 December 20, 2018 Table of Contents 1. Executive Summary... 3 2. Introduction and Background... 4 3. Stakeholder Engagement Plan... 6 4. Straw Proposal

More information

Regional Resource Adequacy Stakeholder Meeting on Straw Proposal

Regional Resource Adequacy Stakeholder Meeting on Straw Proposal Regional Resource Adequacy Stakeholder Meeting on Straw Proposal Folsom, CA March 2, 2016 Chris Devon Senior Infrastructure Policy Developer Acronyms BAA Balancing Authority Area CEC California Energy

More information

Regional Resource Adequacy Draft Regional Framework Proposal. Stakeholder Meeting December 8, 2016

Regional Resource Adequacy Draft Regional Framework Proposal. Stakeholder Meeting December 8, 2016 Regional Resource Adequacy Draft Regional Framework Proposal Stakeholder Meeting December 8, 2016 Acronyms ADR Alternative Dispute Resolution BAA Balancing Authority Area BPM Business Practice Manual CEC

More information

Reliability Services Initiative Phase 2: Revised Draft Final Proposal

Reliability Services Initiative Phase 2: Revised Draft Final Proposal Reliability Services Initiative Phase 2: Revised Draft Final Proposal July 7, 2016 CAISO/M&IP/IP/EKim/KMeeusen 1 Table of Contents 1. Executive summary... 3 2. Changes to proposal and stakeholder comments...

More information

Subject: Regional Resource Adequacy Initiative

Subject: Regional Resource Adequacy Initiative Subject: Regional Resource Adequacy Initiative Submitted by Company Date Submitted Simone Brant, 415-703-5239 Jaime Rose Gannon Candace Morey CPUC October 27, 2016 The CPUC Staff appreciate the opportunity

More information

CAPACITY MARKETS 5. Overview. RPM Capacity Market Market Design. Market Structure

CAPACITY MARKETS 5. Overview. RPM Capacity Market Market Design. Market Structure 2009 Quarterly State of the Market Report for PJM: January through September Section 5 - Capacity Markets Each organization serving PJM load must meet its capacity obligations by acquiring capacity resources

More information

Capacity Performance FAQ Response

Capacity Performance FAQ Response PJM Interconnection September 15, 2014 This page is intentionally left blank. PJM 2014 www.pjm.com 2 P age Contents FAQ Response Introduction... 4 Capacity Products... 4 Methodology for Establishing Maximum

More information

Capacity Performance Proposal. Summary of Key Design Elements

Capacity Performance Proposal. Summary of Key Design Elements December 3, 2014 This page is intentionally left blank. PJM 2014 1 P a g e Capacity Product Synopsis PJM Interconnection is proposing a single capacity product called Capacity Performance, similar to the

More information

Extended Short-Term Unit Commitment. Draft Final Proposal

Extended Short-Term Unit Commitment. Draft Final Proposal Extended Short-Term Unit Commitment June 13, 2018 Intentionally left blank CAISO/MDP/M.Poage & B.Dean Page 2 June 13, 2018 Extended STUC Table of Contents 1. Purpose... 4 1.1. Changes to Proposal... 4

More information

Potential Effectiveness of the Demand Curve Approach for Mitigation of Local Market Power in Capacity Markets

Potential Effectiveness of the Demand Curve Approach for Mitigation of Local Market Power in Capacity Markets I. Background Potential Effectiveness of the Demand Curve Approach for Mitigation of Local Market Power in Capacity Markets Department of Market Monitoring October 11, 2007 If California moves forward

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Udi Helman, Principal Market Economist Anjali Sheffrin, Chief Economist / Director, Market and Product Development

More information

Stakeholder Comments Template. RA Enhancements

Stakeholder Comments Template. RA Enhancements Stakeholder Comments Template RA Enhancements This template has been created for submission of stakeholder comments on the RA Enhancements Issue Paper that was published on October 22, 2018. The Issue

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 40. Resource Adequacy Demonstration for all SCs in the CAISO BAA... 3 40.1 Applicability... 3 40.1.1 [Not Used]... 3 40.2 Information Requirements for Resource Adequacy Programs... 3

More information

Day Ahead Market Enhancements

Day Ahead Market Enhancements Day Ahead Market Enhancements Don Tretheway Senior Advisor, Market Design Policy Regional Issues Forum March 9, 2018 Day-ahead market enhancements address net load curve and uncertainty previously left

More information

PJM Manual 18: PJM Capacity Market. Revision: 14 Effective Date: February 23, Prepared by PJM Capacity Market Operations PJM 2012

PJM Manual 18: PJM Capacity Market. Revision: 14 Effective Date: February 23, Prepared by PJM Capacity Market Operations PJM 2012 PJM Manual 18: PJM Capacity Market Revision: 14 Effective Date: February 23, 2012 Prepared by PJM Capacity Market Operations PJM 2012 PJM 2012 i Table of Contents PJM Manual 18: PJM Capacity Market Table

More information

Infrastructure and Market Issues. Jeffrey Nelson Southern California Edison

Infrastructure and Market Issues. Jeffrey Nelson Southern California Edison CPM Payments and Related OTC/VER Infrastructure and Market Issues Jeffrey Nelson Southern California Edison October 8, 2010 CPM Payment Questions is Part of Much Larger Set of Infrastructure and Market

More information

Concepts for Behind-the- Meter Net Generation

Concepts for Behind-the- Meter Net Generation Concepts for Behind-the- Meter Net Generation Pradip Ganesan Donna Pratt New York Independent System Operator Joint Meeting of Installed Capacity, Market Issues and Price Responsive Load Working Groups

More information

Resource Adequacy Availability Incentive Mechanism Modification White Paper

Resource Adequacy Availability Incentive Mechanism Modification White Paper Resource Adequacy Availability Incentive Mechanism Modification White Paper August 31, 2017 Table of Contents 1. Executive summary... 3 2. Background... 4 3. Schedule... 5 4. Review of RAAIM Implementation

More information

Extended Short-Term Unit Commitment. Issue Paper/Straw Proposal

Extended Short-Term Unit Commitment. Issue Paper/Straw Proposal Extended Short-Term Unit Commitment May 15, 2018 Intentionally left blank CAISO/MDP/M.Poage & B.Dean Page 2 May 15, 2018 Extended STUC Issue Paper & Straw Proposal Table of Contents 1. Purpose... 4 1.1.

More information

Capacity Resource Performance in NYISO Markets

Capacity Resource Performance in NYISO Markets Capacity Resource Performance in NYISO Markets An Assessment of Wholesale Market Options Paul Hibbard Todd Schatzki Sarah Bolthrunis Analysis Group Inc. October 2017 Acknowledgments This report reviews

More information

Resource Adequacy Compliance Overview. Candace Morey, CPUC-Legal Division Meredith Younghein, Jaime Gannon CPUC-Energy Division

Resource Adequacy Compliance Overview. Candace Morey, CPUC-Legal Division Meredith Younghein, Jaime Gannon CPUC-Energy Division Resource Adequacy Compliance Overview 1 Candace Morey, CPUC-Legal Division Meredith Younghein, Jaime Gannon CPUC-Energy Division Purpose of Presentation Provide an overview of the mechanics of CPUC administered

More information

PJM Manual 18: PJM Capacity Market

PJM Manual 18: PJM Capacity Market PJM Manual 18: PJM Capacity Market Revision: 23 Effective Date: June 1, 2014 Prepared by PJM Capacity Market Operations PJM 2014 PJM 2014 i PJM Manual 18: PJM Capacity Market Manual 18: PJM Capacity Market

More information

PJM Capacity Market. October 5, 2011 OPSI Seventh Annual Meeting Andrew L. Ott, Senior Vice President, Market Services

PJM Capacity Market. October 5, 2011 OPSI Seventh Annual Meeting Andrew L. Ott, Senior Vice President, Market Services PJM Capacity Market October 5, 2011 OPSI Seventh Annual Meeting Andrew L. Ott, Senior Vice President, Market Services Capacity vs. Energy Capacity A commitment of a resource to provide energy during PJM

More information

Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead

Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead Harvard Electricity Policy Group 68 th Plenary Session Paul M. Sotkiewicz, Ph.D. Chief Economist PJM Interconnection October

More information

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The 1 2 3 4 LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The Transmission Provider will calculate and post the Planning

More information

ISO-NE FCM Capacity Market Design Scott M. Harvey. October 9, 2007

ISO-NE FCM Capacity Market Design Scott M. Harvey. October 9, 2007 ISO-NE FCM Capacity Market Design Scott M. Harvey October 9, 2007 Summary The ISO-NE FCM capacity market design embodies many improvements over the prior ISO-NE capacity market. Five of these improvements

More information

GADS and LOLE Considerations in Gas- Electric Coordination. ENGCTF June 13, 2013

GADS and LOLE Considerations in Gas- Electric Coordination. ENGCTF June 13, 2013 GADS and LOLE Considerations in Gas- Electric Coordination ENGCTF June 13, 2013 Generating Availability Data System (GADS) National database of electric generator performance, produced by the North American

More information

Demand Response, Use Limitations and Exemption from RAAIM in CCE3. Barbara Barkovich & Nora Sheriff, CLECA June 15, 2016

Demand Response, Use Limitations and Exemption from RAAIM in CCE3. Barbara Barkovich & Nora Sheriff, CLECA June 15, 2016 Demand Response, Use Limitations and Exemption from RAAIM in CCE3 Barbara Barkovich & Nora Sheriff, June 15, 2016 June 15 Workshop Goal Critical Context Four Types of Supply Side DR How Some Supply Side

More information

Frequency Response Service and BAL December 14, 2015

Frequency Response Service and BAL December 14, 2015 Frequency Response Service and BAL-003-1 December 14, 2015 Two Key Objectives 1. Reliability: CAISO must have sufficient frequency response service to meet NERC BAL-003-1, effective Dec 2016 Will actions

More information

PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations

PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, 2017 Prepared by Capacity Market Operations PJM 2017 Table of Contents Table of Contents Table of Exhibits...9 Approval...10 Current

More information

Midwest ISO Resource Adequacy Overview ATC Network Customer Meeting. Kevin Larson Sr. Manager Resource Adequacy October 20, 2010

Midwest ISO Resource Adequacy Overview ATC Network Customer Meeting. Kevin Larson Sr. Manager Resource Adequacy October 20, 2010 Midwest ISO Resource Adequacy Overview ATC Network Customer Meeting Kevin Larson Sr. Manager Resource Adequacy October 20, 2010 Agenda Role of Resource Adequacy Planning Reserve Margin Requirements LSE

More information

2018 CAISO Policy Initiatives Roadmap

2018 CAISO Policy Initiatives Roadmap 2018 CAISO Policy Initiatives Roadmap Jim Price Senior Advisor, Market Quality and Renewable Integration California ISO Briefing to WECC Market Interface & Operating Committees March 20, 2018 California

More information

ATTACHMENT DD. Reliability Pricing Model

ATTACHMENT DD. Reliability Pricing Model OF NEW SERVICE REQUESTS; R - OATT ATTACHMENT DD ATTACHMENT DD Reliability Pricing Model References to section numbers in this Attachment DD refer to sections of this Attachment DD, unless otherwise specified.

More information

Demand Response Update

Demand Response Update Demand Response Update Bruce Kaneshiro & David Hungerford California Public Utilities Commission & California Energy Commission November 2, 2006 1 Demand Response in the Energy Action Plan The Energy Action

More information

Market Settlements - Advanced

Market Settlements - Advanced Market Settlements - Advanced RPM Module PJM State & Member Training Dept. PJM 2017 Capacity vs. Energy Capacity A commitment of a resource to provide energy during PJM emergency under the capped energy

More information

Capacity Market. Overview RPM Capacity Market. Market Design

Capacity Market. Overview RPM Capacity Market. Market Design Section 4 Capacity Capacity Market Each organization serving PJM load must meet its capacity obligations through the PJM Capacity Market, where load serving entities (LSEs) must pay the locational capacity

More information

PJM Manual 18: PJM Capacity Market. Revision: 287 Effective Date: January 22, Prepared by PJM Capacity Market Operations

PJM Manual 18: PJM Capacity Market. Revision: 287 Effective Date: January 22, Prepared by PJM Capacity Market Operations Style Definition: PJM_Normal PJM Manual 18: PJM Capacity Market Revision: 287 Effective Date: January 22, 2015 Prepared by PJM Capacity Market Operations PJM 2015 PJM 2015 i PJM Manual 18: PJM Capacity

More information

March 18, Docket Nos. ER and EL Exceptional Dispatch Informational Report Covering Period up to February 2019

March 18, Docket Nos. ER and EL Exceptional Dispatch Informational Report Covering Period up to February 2019 California Independent System Operator Corporation March 18, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

September 29, Docket No. ER

September 29, Docket No. ER California Independent System Operator Corporation September 29, 2017 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Alberta Capacity Market

Alberta Capacity Market Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Proposal Document Section 1: Overview of the Alberta Capacity Market Prepared by: Alberta Electric System Operator Date: January 26, 2018

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Oversee ) the Resource Adequacy Program, Consider ) Program Refinements, and Establish Annual ) Rulemaking

More information

WSPP Spring Meeting. California Energy Markets and Regional Expansion Policy Update. March 8, 2018

WSPP Spring Meeting. California Energy Markets and Regional Expansion Policy Update. March 8, 2018 WSPP Spring Meeting California Energy Markets and Regional Expansion Policy Update March 8, 2018 1 CES Core Service Offerings We maximize value of existing and emerging electric infrastructure through

More information

What is a Capacity Market?

What is a Capacity Market? What is a Capacity Market? Mechanism that ensures sufficient generation to meet reliability and peak load needs. Additional potential benefit of capacity markets is the incentive to build new generation.

More information

NEW YORK INDEPENDENT SYSTEM OPERATOR

NEW YORK INDEPENDENT SYSTEM OPERATOR Rate Schedule 1 Study Status Update Review of Other ISO/RTO s March 2011 TABLE OF CONTENTS 1.0 RATE STRUCTURES AT OTHER ISO S/RTO S...1 1.1 PJM...1 1.2 ISO-New England...3 1.3 California ISO...6 1.4 Midwest

More information

Congestion Revenue Rights Auction Efficiency Track 1A Draft Final Proposal Addendum

Congestion Revenue Rights Auction Efficiency Track 1A Draft Final Proposal Addendum Congestion Revenue Rights Auction Efficiency March 8, 2018 Prepared by: M&IP California Independent System Operator Table of Contents 1 Executive Summary... 3 2 Initiative organization and scope... 5 2.1

More information

ACKNOWLEDGEMENT. The following staff members of the Department of Market Monitoring contributed to this report:

ACKNOWLEDGEMENT. The following staff members of the Department of Market Monitoring contributed to this report: ACKNOWLEDGEMENT The following staff members of the Department of Market Monitoring contributed to this report: Eric Hildebrandt Jeffrey McDonald Brad Cooper Bryan Swann Dan Yang David Robinson Douglas

More information

Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2. Revised Draft Framework Proposal

Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2. Revised Draft Framework Proposal Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2 Revised Draft Framework Proposal Karl Meeusen, Ph.D. Stakeholder Meeting February 7, 2018 FRACMOO 2 Stakeholder Meeting Agenda 2/7/2018

More information

Potential Methodology to Account for OFO Penalties Incurred due to Real-time Energy Dispatches

Potential Methodology to Account for OFO Penalties Incurred due to Real-time Energy Dispatches Potential Methodology to Account for OFO Penalties Incurred due to Real-time Energy Dispatches Department of Market Monitoring White Paper February 2012 Copyright 2012 California ISO Contents Introduction...

More information

Capacity Market Technical Design Stakeholder Update Session

Capacity Market Technical Design Stakeholder Update Session Capacity Market Technical Design Stakeholder Update Session Straw Alberta Market (SAM 3.0) Dec. 11, 2017 Session outline Time Agenda Item 1:30 1:35 p.m. Welcome and session overview: Matt Gray, AESO 1:35

More information

State of the Market Report 2006

State of the Market Report 2006 State of the Market Report 2006 PIEOUG March 12, 2007 Joseph Bowring Market Monitor www.pjm.com PJM Market Monitoring Unit Independent Internal Market Monitoring Independent System Operator ISO/RTO has

More information

California ISO. Q Report on Market Issues and Performance. November 1, Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. November 1, Department of Market Monitoring California Independent System Operator Corporation California ISO Q3 2018 Report on Market Issues and Performance November 1, 2018 Department of Market Monitoring TABLE OF CONTENTS Executive summary...

More information

Stakeholder Process: Commitment Cost Bidding Improvements. Summary of Submitted Comments

Stakeholder Process: Commitment Cost Bidding Improvements. Summary of Submitted Comments Stakeholder Process: Commitment Cost Bidding Improvements Attachment A Summary of Submitted Comments Two stakeholder initiatives are consolidated into one memo as both propose market improvements to ISO

More information

Advancing Renewable Alternatives

Advancing Renewable Alternatives Advancing Renewable Alternatives FERC/RTO Training Session Institute for Policy Integrity New York University School of Law June 15, 2011 Abigail Krich President, Boreas Renewables About Boreas Renewables

More information

Ethan D. Avallone Senior Market Design Specialist, Energy Market Design ICAPWG/TPAS February 21, 2018 Rensselaer, NY

Ethan D. Avallone Senior Market Design Specialist, Energy Market Design ICAPWG/TPAS February 21, 2018 Rensselaer, NY Performance Assurance Management Response to Analysis Group s Capacity Resource Performance in NYISO Markets: An Assessment of Wholesale Market Options Ethan D. Avallone Senior Market Design Specialist,

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Oversee the Resource Adequacy Program, Consider Program Refinements, and Establish Annual Local and Flexible

More information

Comparison Matrix of Existing Capacity Market Attributes: RPM & FCM

Comparison Matrix of Existing Capacity Market Attributes: RPM & FCM Comparison Matrix of Existing Capacity Market Attributes: RPM & FCM RPM / PJM FCM / ISO-NE Qualification for Existing Resources Qualification for New Resources Procurement cycle Commitment Term Base Auction

More information

Virtual Bidding and Scheduling Requirements in MRTU

Virtual Bidding and Scheduling Requirements in MRTU Virtual Bidding and Scheduling Requirements in MRTU Gary A. Stern, Ph.D. Director of Market Southern California Edison Virtual Bidding SCE s Position Virtual bidding (VB) should not be implemented in California

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination of Ancillary Service Standards... 4 8.2.2 Time-Frame for Revising Ancillary Service

More information

Convergence Bidding Monitoring Process Walkthrough. January 13, 2011

Convergence Bidding Monitoring Process Walkthrough. January 13, 2011 Convergence Bidding Monitoring Process Walkthrough January 13, 2011 Agenda Overview Convergence Bidding Monitoring Scenarios Market Impact Reporting and Analysis Operational Monitoring Settlements Proactive

More information

Price Formation Education 4: Shortage Pricing and Operating Reserve Demand Curve

Price Formation Education 4: Shortage Pricing and Operating Reserve Demand Curve Price Formation Education 4: Shortage Pricing and Operating Reserve Demand Curve Patricio Rocha Garrido Lisa Morelli Laura Walter Disclaimer This is not a committee meeting. This session is for educational

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION TRACK 2 TESTIMONY

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION TRACK 2 TESTIMONY BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Oversee the Resource Adequacy Program, Consider Program Refinements, and Establish Annual Local and Flexible

More information

Congestion Revenue Rights Auction Efficiency Track 1B Straw Proposal

Congestion Revenue Rights Auction Efficiency Track 1B Straw Proposal Congestion Revenue Rights Auction Efficiency April 19, 2018 Prepared by: M&IP California Independent System Operator Table of Contents 1 Executive Summary... 3 2 Scope of this proposal... 5 3 Initiative

More information

Flexible Resource Adequacy Criteria and Must Offer Obligation Working Group Meeting

Flexible Resource Adequacy Criteria and Must Offer Obligation Working Group Meeting Flexible Resource Adequacy Criteria and Must Offer Obligation Working Group Meeting Karl Meeusen, Ph.D. September 26, 2017 2017 CAISO - Public Page 1 FRACMOO 2 Working Group Meeting Agenda 9/26/2017 Time

More information

Department of Market Monitoring California ISO April 2008

Department of Market Monitoring California ISO April 2008 6 Reliability Costs Observable reliability costs Minimum Load Cost Compensation (MLCC), Reliability Must Run (RMR) costs, and Out-of-Sequence (OOS) redispatch costs were dramatically lower in 2007 than

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

Reliability Services Initiative Phase 2: Draft Final Proposal

Reliability Services Initiative Phase 2: Draft Final Proposal Reliability Services Initiative Phase 2: Draft Final Proposal January 26, 2016 CAISO/M&IP/IP/KMeeusen 1 Table of Contents 1. Executive summary... 4 2. Changes to proposal and stakeholder comments... 5

More information

Load Serving Entity Definition Refinement Draft Final Proposal

Load Serving Entity Definition Refinement Draft Final Proposal Updated: September 21, 2016 Table of Contents 1. Executive Summary... 4 2. Scope of Initiative... 6 3. Changes to this proposal... 6 4. Stakeholder Engagement... 7 5. Background... 8 Allocation of Congestion

More information

Comments of Pacific Gas & Electric Company Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2 Revised Straw Proposal

Comments of Pacific Gas & Electric Company Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2 Revised Straw Proposal Comments of Pacific Gas & Electric Company Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2 Revised Straw Proposal Submitted by Company Date Submitted Kristin Charipar (415-973-6177)

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA COMMENTS OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA COMMENTS OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Pacific Gas and Electric Company (U39E) for Approval of Demand Response Programs, Pilots and Budgets for Program Years 2018-2022.

More information

Stakeholder Comments Template

Stakeholder Comments Template Stakeholder Comments Template Submitted by Company Date Submitted Melanie Gillette Senior Director, Policy 916-671-2456 CA Efficiency + Demand Management Council 5/17/2018 Please use this template to provide

More information

Generation Capacity Mechanisms and Resource Adequacy Planning

Generation Capacity Mechanisms and Resource Adequacy Planning Generation Capacity Mechanisms and Resource Adequacy Planning Jennifer Heintz Public Service Commission of the State of Missouri February 7, 2013 Abu Dhabi, UAE Electricity Markets in the U.S. and Canada

More information

Load Shift Working Group. https://gridworks.org/initiatives/load-shift-working-group/

Load Shift Working Group. https://gridworks.org/initiatives/load-shift-working-group/ Load Shift Working Group APRIL 18 10AM 2PM PST CPUC GOLDEN GATE ROOM https://gridworks.org/initiatives/load-shift-working-group/ Agenda 10:00 10:20am: Intro and Purpose (Gridworks) 10:20 12:00pm: Grid

More information

California ISO 2009 Annual Report on Market Issues and Performance

California ISO 2009 Annual Report on Market Issues and Performance California Independent System Operator Corporation California ISO 2009 Annual Report on Market Issues and Performance Special Revised Executive Summary June 30, 2010 Prepared by: Department of Market Monitoring

More information

ACKNOWLEDGEMENT. The following members of the Department of Market Monitoring contributed to this report:

ACKNOWLEDGEMENT. The following members of the Department of Market Monitoring contributed to this report: ACKNOWLEDGEMENT The following members of the Department of Market Monitoring contributed to this report: Eric Hildebrandt Keith Collins Jeffrey McDonald Brad Cooper Amol Deshmukh Erdal Kara Serhiy Kotsan

More information

Conceptual Design for Convergence Bidding

Conceptual Design for Convergence Bidding Conceptual Design for Convergence Bidding Margaret Miller Senior Market and Product Economist Market Surveillance Committee Meeting/ Stakeholder Meeting June 6, 2007 Agenda - Convergence Bidding Additionally,

More information

Outage Management System Revised Straw Proposal Overview. October 31, 2013

Outage Management System Revised Straw Proposal Overview. October 31, 2013 Outage Management System Revised Straw Proposal Overview October 31, 2013 Agenda Time Topic Speaker 1:00 1:10 Introduction, Stakeholder Process Kristina Osborne 1:10 3:45 OMS Revised Straw Proposal Review

More information

Energy Efficiency in RPM. Adam Keech Director, Market Operations PJM January 13, 2015

Energy Efficiency in RPM. Adam Keech Director, Market Operations PJM January 13, 2015 Energy Efficiency in RPM Adam Keech Director, Market Operations PJM January 13, 2015 PJM Capacity Market PJM Capacity Market Reliability Pricing Model (RPM) PJM secures capacity on behalf of LSEs to satisfy

More information

Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper

Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper Stakeholder Conference Call October 12, 2017 3:00 p.m. 5:00 p.m. (Pacific Time) Agenda Time Item Speaker 3:00-3:10 Stakeholder

More information

PJM ARR and FTR Market

PJM ARR and FTR Market PJM ARR and FTR Market PJM State & Member Training Dept. PJM 2016 Objectives Explain the concepts and principles of Auction Revenue Rights and Financial Transmission Rights Describe how to participate

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA 1 2 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA 3 4 5 6 Order Instituting Rulemaking to Oversee the Resource Adequacy Program, Consider Program Refinements, and Establish Annual Local

More information

Straw Proposal. Post-Release 1 MRTU Functionality for Demand Response

Straw Proposal. Post-Release 1 MRTU Functionality for Demand Response California Independent System Operator Corporation Executive Summary Straw Proposal Post-Release 1 MRTU Functionality for Demand Response The (CAISO) has a goal of helping to develop demand response resources

More information

BPM Change Management Meeting

BPM Change Management Meeting BPM Change Management Meeting Julia Payton BPM Change Management Process Administrator BPM_CM@caiso.com April 3, 2018 The information contained in these materials is provided for general information only

More information

Reliability Services Phase 2 Straw Proposal

Reliability Services Phase 2 Straw Proposal Reliability Services Phase 2 Straw Proposal August 26, 2015 Karl Meeusen, Ph.D. Market Design and Regulatory Policy Lead Eric Kim Market and Infrastructure Policy Developer Stakeholder Meeting Agenda 8/26/15

More information

6.1.9 IFM Initial Conditions

6.1.9 IFM Initial Conditions 6.1.9 IFM Initial Conditions A Generating Unit that was committed in the previous day s Day-Ahead Market (IFM or RUC) run (TD-2 for TD-1) but was de-committed before HE24 would normally be considered initially

More information

Design Alternatives Sheet (DAS) 18 Physical Bilateral Procurement

Design Alternatives Sheet (DAS) 18 Physical Bilateral Procurement Design Alternatives Sheet (DAS) 18 Physical Bilateral Procurement Introduction The subject matter discussed within this document forms part of the process for developing a Capacity Market design for Alberta.

More information