1 Page 1 of 17 Capital Planning & Development Request for Qualifications for Architectural Services University of Washington Request for Qualifications ARCHITECTURAL PREDESIGN SERVICES FOR Health Sciences (HS) Education Phase I - T-Wing Renovation/Addition Project Number: Submittal Deadline: Friday, December 4, 2015 at 3:00 p.m. The University of Washington is soliciting Statements of Qualifications (SOQ) from planning and design firms/teams to provide pre-design services for instructional and instructional support spaces that will replace, expand and/or modernize those currently provided in the T-Wing of the Magnuson Health Sciences facility on UW Seattle s South Campus. In order to identify program, site, phasing, and budget that will define the T-Wing project the selected firm/team will define and analyze options by which the UW s established long-term vision for the redevelopment of South Campus could accommodate the T-Wing project, and ways in which the T-Wing project goals can be accomplished while also serving as the first steps in the implementation of the South Campus vision. The study goals envision the creation of a new inter-professional education facility or IPE, characterized by 120K GSF of new education space and renovation of 400K GSF existing space in the T-Wing. The actual size, preferred location and configuration of the T-Wing renovation/addition project is to be determined in the course of this study through a programming phase that defines the building program, identifies siting requirements, analyzes site options and recommends a site or sites, with phasing, and project costs. This project is also the potential first step in achieving the vision of an improved South Campus setting for health sciences education and healthcare delivery at UW. As such it would set the stage for additional steps, including providing parking to facilitate the long term redevelopment of South Campus
2 Page 2 of 17 parking needs, by replacing the existing S1 facility, and preparing for public realm enhancements, in addition to defining the IPE and classroom future. This effort must produce a pre-design study, to be submitted by July 1, 2016, as required by the Washington State Office of Financial Management in order that funding for design and construction can be requested. The State has provided funding of $623,000 for the pre-design. The pre-design study will be formatted in order to meet state requirements and to serve the UW s decision-making processes. Should the project move forward into design, this study s selected firm/team will be eligible to submit qualifications to provide full design services for the project, regardless of whether a traditional or alternate delivery method is utilized. BACKGROUND The T-Wing, built in 1948, houses UW s Health Sciences Administration (HSA), a centralized resource that coordinates and supports space planning and management and oversees 150,000 of approximately 235,000 assignable square feet of instruction and instructional support spaces in the Magnuson Health Sciences T-Wing. Other space is occupied by the School of Public Health, UW Libraries and the School of Nursing. These spaces, utilized by both students and faculty, are outdated with limited technological capacity and lack the flexibility and technologies required for educating future Health Science professionals. This project will establish the academic heart of the UW Health Sciences complex, provide a shared (renovated and/or new) inter-professional education instructional facility that serves the six schools of Health Sciences (Dentistry, Medicine, Nursing, Pharmacy, Public Health and Social Work) as well as other UW academic disciplines in the Colleges of Engineering, Environment and Arts & Sciences. This effort will define a pre-design with options to meet the immediate need for new and expanded classrooms in the South Campus area. The integration of recent and ongoing planning studies concepts is key to maximizing the outcomes in this complex physical environment for Health Sciences and the campus as a whole. Pre-design options will be explored and tested for program options, site options, phasing and other implementation options including enabling projects and infrastructure (parking, MEP, structural, public realm, etc.).
3 Page 3 of 17 The University of Washington's Seattle campus reflects over 150 years of thoughtful campus planning, growth and development. UW develops pre-design plans to maximize the limited resource of land, space and funding. The UW continues to expand enrollment, launch new programs and grow new research. Continual change is essential for the university s vitality, and sustaining the university over the long term requires strategic planning and effective fiscal management. Given financial realities it is critical that, in addition to assessing the potential need for greater density in the future, the university makes the best use of existing space and capital investments. This is particularly critical for the South Campus, the most densely-built sub-area, most lacking in public realm investments in spite of its long waterfront which is lacking in identity and expandability. This pre-design study is an opportunity to begin the long process of incremental improvements strategically defined and phased to achieve a particular vision over many years, to best serve the academic and research functions while also providing an attractive waterfront setting, and individual identities for each of the health sciences schools within a well-integrated and navigable building complex. The consultant selected for this project will be familiar with the following in order to make recommendations that are informed by and support the planning goals and recommendations: 2003 Campus Master Plan (CMP) The ongoing 2018 Campus Master Plan (2018 CMP) The 2015 West Campus Development Framework (WCDF) 23%20West%20Campus%20Development%20Framework.pdf 2014 Campus Landscape Framework (CLF) under Meeting Presentations 2015 South Campus Study (SCS) 30/UWAC% %20South%20Campus%20Study%20Phase%20II.pdf 2014 UW Learning Spaces Assessment (LSA) %20Space%20Assessment.pdf,
4 Page 4 of 17 UW s One Capital Plan These studies will provide the institutional context for the T-Wing s future new shared instructional space, and will inform and facilitate the phased development strategy, in this region. The mission and academic purposes of the T-Wing renovation/addition will be explored through interviews with academic and administrative leaders. SCOPE OF SERVICES The scope of services involves preparing a predesign study for the project in accordance with the WA State Office of Financial Management (OFM) Predesign Manual. This Manual can be found at: Working within the parameters of the State pre-design process, and the UW planning studies identified above, this project s scope of services shall include, but is not limited to, the following: 1.Establish Work Plan & Schedule Provide a proposed work plan and schedule for the following actions: a. Consensus goals statement for this project. b. Existing conditions analysis physical, facilities and site, planning principles c. Building program for new instructional and instructional support space plan. Indicate the anticipated deliverables and methodology. Include specific tasks, with milestones, to provide services and generate products, and note expected roles of Capital Planning and Development, Health Sciences Administration and other UW staff. d. Site requirements and options for satisfying the building program and enabling actions (such as the replacement of S1parking) e. Key issues/variables to be addressed by any option/scenario f. Three scenarios, at a minimum, strategically constructed to achieve project goals, program needs, address key issues and variables, initiate long-term redevelopment of South Campus g. Scenarios analysis, costs and benefits h. Recommendations including program, site, enabling projects, phasing, etc.
5 Page 5 of 17 i. Fulfill State pre-design study submittal requirements and support UW decision- making processes for submitting the final Predesign to the state by July 1, Clarify roles and responsibilities of the consultant, Executive Committee, Project Committee and Health Sciences Board of Deans. Identify the process for informationgathering and communication such as surveys, interviews, focus groups, data validation, and/or public forums. All should foster transparency, and include opportunities for input from constituencies. Describe how the plan will incorporate relevant existing plans and other, concurrent, planning efforts in a way that fosters continuity and minimizes overlap of tasks. 2. Articulate Vision and Guiding Principles for Instructional Space Development Review and validate the Guiding and Planning Principles from the recent WCDF, SCS and LSA. Facilitate, guide and support the articulation of the College s long-term vision and strategic plan as it relates to space planning, learning spaces and the overall campus masterplan. This may include new directions in teaching and learning, research or service. This vision should reflect programmatic, academic and architectural aspirations, and will reflect what is known about specific facility/infrastructure needs, as well as potential phasing options. Identify and address projected changes in faculty, staff and student FTE, and projected program changes as illustrated in the SCS. Examine, at a minimum, five peer institutions for insights and lessons learned regarding challenges facing parking infrastructure and University instructional spaces. The report will reflect the interplay of functions, program locations, support of HS and other UW units, existing facilities and the need for expanded, or possible reduced, capacity of parking infrastructure in this this region of campus. The final report will include highly illustrated narratives describing the vision and guiding planning principles, important factors in their development, and paths to their realization as identified through this study.
6 Page 6 of Integration and Analysis of Instructional Space Inventory and Functional Use The consultant will use the verified instructional space program and inventory and graphically integrate them into the analysis and narrative regarding the functional use, adjacencies and utilization of space, also identifying efficiencies, restacking and fit to function recommendations. Identify spaces that are under or over-used and suggest how to right-size use. Apply benchmark data of past consultant projects (Odegaard Library, South Campus Center - Active Learning Classrooms and the LSA, etc.). Identify pedagogical and technological trends that will create demand for new kinds of instructional space. This will assist with the key issues that will be addressed in scenario development. Deliverables include verified and integrated inventory (in a format approved by OUA for university data consistency), updated floor plans, and a narrative outlining the qualitative observations and analysis of current and recommended use of instructional and instructional support space. The final report will include summary data in tabular form, in addition to any other tables, marked up floor plans, stacking plans and other graphical reports. 4. Integration and Analysis of Existing Parking Facilities/Site Conditions Consultant will develop a parking infrastructure facilities/site condition report, utilizing information from the recently complete SCS as well as information from UW Transportation and Facilities Services. Information will be analyzed and graphically integrated into the report with a narrative that describes the overall structural/seismic quality, functional suitability and the alignment of assigned parking space needs. In addition, a facilities condition analysis will need to be created for the S1 Parking garage as well as a Geotechnical analysis of lots 45S and E12 that in turn will be integrated into the overall planning study. 5. Identify Issues to Address in Scenario Development Analyze space needs based on programmatic/space needs, and facilities/site conditions outlined in 3 and 4 above. Assess current space versus projected needs
7 Page 7 of 17 based on instructional trends. Review facilities, infrastructure, open spaces, view corridors and landscape character of site vicinity study area (utilizing the SCS and WCDF) for strengths and weaknesses to the Health Sciences and to the university as a whole. Identify needs for interior and exterior program elements to support the academic enterprise. Project program needs for near-term, mid-term (10 years) and long-term (20 years) in three physical and capital environments: steady-state, modest growth, and significant growth. 6. Create Scenarios for Future Development, Highlighting and Developing Detailed Project Costs, Tradeoffs and Choices and describing how these scenarios will be implemented Create scenarios that develop detailed project costs for each scenario, including site development and schedules, constructability and phasing, demolition, renovations, enabling projects, F&E, escalation, and fees. Identify key cost considerations that will help build and/or differentiate among the scenarios. The executive committee and project committee may advise the consultant on additional solutions to explore. Study scenarios: Scenarios will be constructed to test a full range of possible options for addressing the needs of the Health Sciences and the surrounding facilities and site vicinity. Key variables should be identified and expressed in the scenarios. Analysis of the scenarios should include comparative assessments of their benefits and costs. A hybrid scenario may be developed and recommended to illustrate a recommended course of action that maximizes the benefits and minimizes the costs. Describe a sequence for scenario implementation based on realistic funding and growth/phasing expectations, including near, mid- and longer-term plans. Describe enabling projects, decanting, site considerations such as infrastructure and circulation projects, and related costs. Provide detailed project costs.
8 Page 8 of 17 Summarize in narratives, graphics and tabular forms. Study scenarios requirements above will address, at a minimum: Alignment of existing space to optimize utilization and meet functional needs. Provide examples of right-sized space and relevant design solutions. Changes to existing space to support greater use efficiency, create flexible room types, eliminate deferred maintenance or improve physical and functional conditions. Construction of new space or major renovation for needs that cannot be addressed in existing space with consideration to building renewal projects to solve facility needs. Factor existing facilities conditions into concepts regarding extent of renovation, decision-making regarding renovation v. replacement (example: T-Wing), and test a range of approaches using the scenarios and phasing to do so. Requirements for both building and parking replacement and the relocation of current occupants should be part of the criteria for constructing and analyzing scenarios. Take site development challenges and opportunities into consideration in constructing and analyzing scenarios. Description of the development capacity for areas where new construction is proposed, and how the scenario makes strategic use of this capacity. (Utilize 2003 CMP, SCS and WCDF) Factor site development considerations into the plan, including architectural and landscape character; height, density, setback and other Campus Master Plan requirements; landscape development; campus connectivity and any regulatory issues and restrictions. Address competing construction needs in this area. Massing studies and longitudinal sections for proposed new construction. Sustainability impact of recommendations, particularly impacts on energy, utilities, parking infrastructure and transportation. Historic preservation impacts of scenarios. Environmental and other regulatory impacts or issues of scenarios.
9 Page 9 of 17 SUBMITTAL REQUIREMENTS AND EVALUATION CRITERIA The SOQ must include and will be evaluated based on the following criteria. Each firm s SOQ must include an index and be organized by discrete sections corresponding to the criteria and in the same order as listed below: 1. Cover Letter A cover letter 1-2 pages, addressing, at a minimum, the following: a. Expression of interest in this project. b. A summary of the firm s/team s relevant qualifications. c. The size of the firm/team and its capability to manage a project of this size and scope within the identified time frame. d. Acknowledgement of receipt of any addenda issued to the RFQ, as posted on the University s website. e. The name and contact information of the individual the University should contact with questions about the SOQ and to schedule an interview. The contact information should include the person s name and title (Mr., Ms., etc.), firm name, mailing address, telephone number, and address. 2. Team Qualifications a. Team expertise and availability The project is expected to take approximately 6 months from the initiation of the work to its conclusion. This work will require an extremely well-coordinated, strategic, and interdisciplinary team. Identify essential team members by their role on the team, discipline and expertise, availability, and their experience and qualifications relevant to this scope, including projects and the roles they played on relevant projects, and whether they have worked on these or other projects with other key staff/firms. Include resumes for the team s key staff. Narrate a staffing plan for each phase of the project, exploring the rationale for these team members and roles as they address the scope.
10 Page 10 of 17 In addition to providing the information in the above paragraph, please provide your assessment of any additional disciplinary expertise that could bring value to developing this complex pre-design. b. Experience facilitating, shaping, and defining the development of an academic vision for inter-professional educational instructional space in Health Sciences at a research university. Give examples of your firm s/team s approach to comprehending programmatic and academic needs for growth on geographically restricted sites. Indicate how you have helped users articulate their vision and planning guidelines, with the outcome being an implementation plan that is responsive to the client s and the campus needs. c. Communications and engagement Give examples of your firm s/team s experience in providing strategic communications and engagement services with upper administration, faculty and Deans. Give examples of planning documents you have produced that were strategically developed for strategic results that were achieved. Describe the firm s/team s philosophy regarding communications and engagement in a consensus-based higher education environment. d. Project management Show your firm s/team s successful completion of 3 to 5 relevant projects, in the supervision, coordination, communication, and management of schedule and budget throughout the project phases. Explain key issues the team or key staff successfully addressed to enable each project to address critical schedule, budget and design challenges. e. Coordination with other efforts: The 2003 Campus Master Plan, SCS, WCDF and CLF, will inform this study. Please describe relevant projects that demonstrate the firm s/team s ability to work with parameters established through prior planning efforts. Outline your approach to
11 Page 11 of 17 fostering collaboration and minimizing overlap of tasks or making contradictory recommendations. f. Components of scenario planning. Provide relevant examples of work that the firm/team has been responsible for that used a scenario-based planning process in the pre-design phase, and familiarity with handling the following components: Planning Goals Statement Existing Conditions - physical and functional characteristics of existing facilities and sites, projected functional and space needs, Building program, site vicinity conditions and capacity, siting options Identification of enabling projects and phasing plans that will allow for the phased implementation of building renovation and/or replacement and growth Costs associated with scenarios for future development, implications and trade-offs, including financing of parking scenarios The character of the campus and the relationship of the Health Sciences and its facilities to the campus character and implications for the campus. Historic preservation planning Sustainability and environmental design Implementation Strategies and Next Steps 3. Past Performance in the Utilization of sbe, dbe and MWBE Provide a summary of your firm s/team s performance in the state of Washington over the last five (5) years on projects of similar size and scope in utilization of small business entities (sbe), disadvantaged business enterprises (dbe), and minority and women-owned enterprises (MWBE). For each project, include the following: Name of the project Date of substantial completion Name of the owner and contact person with and phone
12 Page 12 of 17 Final contract value Owner s utilization goals for the project (if any) The overall percentage of the final contract value paid to sbe, dbe, and MWBE. See the Business Equity section near the end of this RFQ for the definitions of sbe, dbe and MWBE. 4. References Provide at least three (3) client references for work completed by the firm/team and by members of the key staff for this project. References should be selected from projects prominent in the SOQ with relevance to this scope of work. Cited references should include project name, reference name, title, project role, and current contact telephone number, and address. Refer to the Selection Process section of this RFQ for information about how reference checks will be used in the evaluation process. 5. Acceptance of University s Standard Contract The University intends to enter into an agreement with one firm as a result of this RFQ process and to use its standard Agreement for Professional Services for the work. A copy of this Agreement is included as Attachment I to this RFQ. Each firm must affirm in this section of the SOQ that the terms and conditions of the agreement is acceptable, or if the firm takes exception to any of the proposed language in the agreement, the firm must specifically describe the reasons for the exceptions and propose in this section of the SOQ alternative language for review and consideration by the University. The University makes no commitment that it will modify any of the terms of the standard agreement based on the firm s suggestions. Firms should not comment on the terms of Attachment A to the Agreements that include compensation provisions. Failure to respond to this item may result in the University eliminating the firm s SOQ from consideration.
13 Page 13 of 17 SELECTION PROCESS 1. SOQ Evaluation - Criteria for selecting firms/teams to be interviewed. The SOQ s will be evaluated by a UW staff selection committee. The most qualified firms will be invited by letter to a debrief meeting on December 11, 2015 and then an interview on January 6, The evaluation process for the SOQ will be based on the following criteria and point values. Points will be awarded based on the Proposer s demonstrated ability to meet the requirements of this RFQ. SOQ EVALUATION CRITERIA Max. Points Available 2. a. Team expertise and availability b. Experience facilitating, shaping and defining the development of a Health Sciences instructional space vision based on updated conditions assessments and guiding a scenario based, phased, strategic implementation plan. c. Communications and engagement. 2. d. Project management e. Coordination with other planning f. Experience with complex scenario based planning process Past Performance in Utilization of sbe, dbe and MWBE 10 Other Documentation References No points GSA Form 330 Part II No points Acceptance of University s Standard Contract No points Total: 100
14 Page 14 of 17 Submittal Deadline One (1) unbound original, five (5) copies organized in removable, recyclable covers, and one (1) CD/DVD in PDF format of the Statement of Qualifications containing the above-listed information must be received at the University Facilities Building no later than the submittal deadline stated on the first page of this RFQ, or as modified by any subsequent addenda. Submittals sent by mail or courier shall be sent to the address below (use box number for U.S. Postal Service (USPS) delivery only). Faxed or ed submittals will not be accepted. Consultants are responsible for ensuring receipt of the SOQ at the University Facilities Building by the deadline stated above, and should take into account internal UW delivery times once USPS delivers a submittal to the box number indicated, and other delays that may occur when using a delivery service. Submittals received after the deadline will not be considered. University of Washington Capital Projects Office Attention: Lyndsey Cameron University Facilities Building Box Seattle, WA Any addenda issued for this RFQ will be published at the following website address: within the Current Advertisements box. Consultants are responsible for checking the website for any addenda prior to submission of qualifications. If you are unable to download the addenda, you may contact the individual noted at the end of this RFQ. 2. Interview process Key team members are expected to lead the interview, describing their approach to this study. A fifty-minute interview period will be allocated to each firm/team, as follows: 25 minutes to present, 20 minutes for question and answer, 5 minutes for consultant questions and closing statement. Firms/teams will have five minutes to set up before the interview and five minutes to take down and remove presentation material after the interview. Interviews will be evaluated
15 Page 15 of 17 based on the criteria below for a total of 43 points, which will be added to the points scored for the SOQ, for a maximum total of 143 points: Max Points INTERVIEW EVALUATION CRITERIA Available Project approach. The team s understanding of and approach to 10 the project Personnel. Demonstrated experience and knowledge relevant to 5 the project. Suitability of project team, including sub-contractors. Communication. Interpersonal communication among team 10 members and with the interview committee; strategically valuable use of communication tools and techniques throughout the planning process and its products and deliverables. Presentation and questions. Clarity of expression and 10 organization in the firm s presentation, and in providing insightful answers to questions asked by the interview committee. Quality of questions asked by the firm. Outreach Plan and approach to the inclusion of sbe, dbe and 8 MWBE. Total 43 The most qualified firms will be invited by to submit, prior to the interview on January 6, an Outreach Plan for inclusion of sbe, dbe, and MWBE. The letter will inform the firms as to the submittal date for the Outreach Plan. The plan should address the following areas: Discuss the opportunities and challenges you have identified relative to engaging sbe, dbe, and MWBE on this project. Discuss the strategy(ies) you will employ and the approach(es) you will take to optimize those opportunities and mitigate those challenges relative to sbe, dbe, and MWBE engagement;
16 Page 16 of 17 The most highly qualified firm/team, based on the total points from the evaluation of the SOQs and interviews, will be invited to enter into negotiation with the university. Only one firm (the prime consultant) will be designated as the contracting entity. If the university and that firm cannot agree on fair and reasonable terms, the university may enter into negotiations with the next most highly qualified firm s/team s contracting entity. All sub-consultant team members will be finalized prior to awarding the contract. SCHEDULE SELECTION PROCESS First publication of the RFQ - November 23, 2015 Statement of Qualifications due - 3:00 pm on Friday, December 4, 2015 Notification of firms to be interviewed - December 9, 2015 Shortlisted Consultants Informational Meeting 3:30 pm, December 11, 2015, at UW Tower Magnolia Room Interviews with the Selection Committee - January 6, 2016 Only one pre-design firm/team will be selected at this time. The University expects to work with the selected firm to finalize the sub-consultant team prior to consultant contract award. The university reserves the right to conduct reference checks for the highest scoring firm(s)/team(s) either after qualifications have been evaluated, and/or after interviews have been held. Should information obtained during reference checks reveal concerns about the firm s/team s past performance or its ability to successfully perform he contract to be executed based on the is RFQ the university may, at is sole discretion, determine that the firm/team is not qualified to move forward in the selection process and/or enter into negotiations with the university. In reference checks, the university may include itself as a reference if the firm/team has performed work for the university, even if the firm/team did not identify the university as a reference. Likewise, the university reserves the right to check references for the firm/team from other owners and designers not identified as a reference in the Statement of Qualifications submitted.
17 Page 17 of 17 BUSINESS EQUITY The University of Washington is committed to providing the maximum practicable opportunity for participation in contracting by sbe, dbe, and MWBE through direct contracts with the University, and sub-consulting or supplier participation. The University has determined that 10% combined sbe/dbe/mwbe participation is practicable and attainable for this project; however no minimum level of sbe/dbe/mwbe participation shall be required as a condition for receiving an award. The University is also an affirmative action-equal opportunity employer. The definitions which follow apply throughout this selection process. 1. Small business entity means an in-state business, including a sole proprietorship, corporation or other legal entity, that: a. certifies, under penalty of perjury that it is owned and operated independently from all other businesses and has either: i. Fifty or fewer employees; or ii. A gross revenue of less than seven million dollars annually as reported on its state and federal tax returns over the previous three consecutive years; or b. is certified with the Office of Minority and Women s Business Enterprises (OMWBE). 2. Disadvantaged business enterprise means any business entity certified with the OMWBE. 3. MWBE means businesses that are more than 50% owned and controlled by minorities or women, including those businesses certified by the OMWBE as women-owned or minorityowned. The term minorities includes persons of Asian, Black, Hispanic and Native American racial or ethnic heritage. QUESTIONS All questions regarding this RFQ should be addressed to Lyndsey Cameron, at , or Lyndsey2@uw.edu Publication date(s) in the Seattle Daily Journal of Commerce: November 23, 2015
Request for Qualifications for Master Agreement
Page 1 of 10 Request for Qualifications for Master Agreement ON-CALL CIVIL AND STRUCTURAL ENGINEERING SERVICES Submittal Deadline: June 2, 2017 at 3:00 p.m. The University of Washington is soliciting Statements
More informationRequest for Qualifications for Master Agreement
Page 1 of 10 Request for Qualifications for Master Agreement ON-CALL ARCHITECTURAL SERVICES Submittal Deadline: April 28, 2017 at 3:00 p.m. The University of Washington is soliciting Statements of Qualifications
More informationRequest for Qualifications For Master Agreement
Page 1 of 11 Capital Planning & Development Request for Qualifications For Master Agreement University of Washington Request for Qualifications ON-CALL COMMISSIONING AUTHORITY SERVICES Submittal Date:
More informationRequest for Qualifications for Historic Resources Services
Page 1 of 6 Request for Qualifications for Historic Resources Services On-Call Roster for Historic Resources Services Submittal Deadline: December 22, 2017 at 3:00 p.m. The University of Washington is
More informationRequest for Qualifications for Architectural Services
Page 1 of 11 Capital Projects Office Request for Qualifications for Architectural Services University of Washington Request for Qualifications ARCHITECTURAL SERVICES FOR Computer Science & Engineering
More informationUniversity of Washington. Request for Qualifications ARCHITECTURAL DESIGN SERVICES FOR. UW Fluke Hall Labs and Building Renewal Project Number:
Capital Projects Office Request For Qualifications for Architectural Design Services University of Washington Request for Qualifications ARCHITECTURAL DESIGN SERVICES FOR UW Fluke Hall Labs and Building
More informationUniversity of Washington. Request for Qualifications. Commissioning Authority Services for
University of Washington Request for Qualifications Commissioning Authority Services for University of Washington Fluke Hall Renovation Project Project Number: 203880 Submittal Date: July 18, 2013 at 3:00
More informationREQUEST FOR QUALIFICATIONS FOR Design-Build Services for the University of Washington Seismic Improvements
Page 1 of 16 University of Washington REQUEST FOR QUALIFICATIONS FOR Design-Build Services for the University of Washington Seismic Improvements Project No. 205729 Submittal Deadline Date: No later than
More informationREQUEST FOR QUALIFICATIONS FOR Design-Build Services For the HMC 2MB Cart Washers & Sterilizers Project No
Page 1 of 17 University of Washington REQUEST FOR QUALIFICATIONS FOR Design-Build Services For the Project No. 206269 Submittal Deadline Date: No later than 3:00 PM, September 20, 2017 1.1 INTRODUCTION:
More informationREQUEST FOR QUALIFICATIONS FOR Design-Build Services for the
Page 1 of 16 University of Washington REQUEST FOR QUALIFICATIONS FOR Design-Build Services for the Project No. 205037 Submittal Deadline Date: No later than 3:00 PM, May 15, 2018. 1.1 INTRODUCTION: The
More informationNew York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together
The New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together This document printed Friday, 04/15/2016 Contracting Opportunity Title:
More informationRENEWAL/MODERNIZATION FACILITIES REYNOLDS BUILDING #1 COLLEGE OF DESIGN
Prime DESIGN PHASE SERVICES FOR RENEWAL/MODERNIZATION FACILITIES REYNOLDS BUILDING #1 COLLEGE OF DESIGN Project Scope: $34,000,000 INTRODUCTION The is requesting the services of an ARCHITECTURAL FIRM to
More informationREQUEST FOR QUALIFICATIONS
1.0. Invitation Capital Region Water (CRW) owns and operates the drinking water, wastewater and stormwater facilities and infrastructure for the city of Harrisburg, PA and portions of surrounding communities
More informationThe Lothian Residence Hall Building System Infrastructure Analysis project will develop a phased strategy that will include the following elements:
UNIVERSITY OF CALIFORNIA, RIVERSIDE REQUEST FOR PROPOSAL PRE-DESIGN AND PRE-ENGINEERING PROGRAMMING LOTHIAN RESIDENCE HALL BUILDING SYSTEM INFRASTRUCTURE AND SEISMIC ANALYSIS Introduction The University
More informationRequest for Proposals Strategic Planning Facilitation
Request for Proposals Strategic Planning Facilitation Deadline for Submission: March 6, 2019 1 Section 1: Terms and Conditions 1.1 Issuing Department or Division Department of Operations 1.2 Synopsis or
More informationAPPLICATION INFORMATION: 1. All five sections of the application must be completed.
HELP ME GROW SUSTAINABILITY PLANNING CONSULTANT REQUEST FOR QUALIFICATIONS Application Deadline: 5:00 pm on MONDAY, SEPTEMBER 25, 2017 APPLICATION INFORMATION: 1. All five sections of the application must
More informationRequest for Qualifications (RFQ) #CEZ
Request for Qualifications (RFQ) #CEZ20160407 Strategic Planning Consultant The Columbia Empowerment Zone, Inc. (CEZ, Inc.), Board of Directors, request qualification responses from individuals or firms
More informationREQUEST FOR QUALIFICATIONS FOR DESIGN-BUILD TEAMS. Washington State University Tri-Cities Academic Building
FOR DESIGN-BUILD TEAMS September 25th, 2018 For Washington State University Tri-Cities Academic Building By Facilities Services, Capital Statement of Qualifications Deadline: October 11th, 2018, 3:00 pm
More informationRequest for Qualifications Information (RFQI) No C146. Mechanical, Electrical, Plumbing and Fire Protection Engineering Design Services
Request for Qualifications Information (RFQI) No. Mechanical, Electrical, Plumbing and Fire Protection Engineering Design Services At Ronald Reagan Washington National Airport and Washington Dulles International
More informationCONSTRUCTION MANAGEMENT SERVICES
DrAFTDRAFTdd EXHIBIT 1 CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS () SELECTION PROCESS School District of Lee County, Florida TABLE OF CONTENTS 1. INTRODUCTION 1 Lobbying 2 2. REQUEST
More informationMARYLAND STADIUM AUTHORITY
MARYLAND STADIUM AUTHORITY REQUEST FOR QUALIFICATIONS Warehouse at Camden Yards Construction Manager for Warehouse Improvements Project MSA Project No. 18-070 ISSUE DATE: April 13, 2018 Contents A. Instructions...
More information11/20/15 SUBMISSIONS DUE: WEDNESDAY, JANUARY 13, 2016, 5:00 P.M. CDT
Request for Proposals DOWNTOWN AUSTIN PARKING SUPPLY AND DEMAND ANALYSIS AND PARKING MANAGEMENT STRATEGY For Austin DMO, Inc. d/b/a DOWNTOWN AUSTIN ALLIANCE SUBMISSIONS DUE: WEDNESDAY, JANUARY 13, 2016,
More informationScience Building Advance Planning/Design Services Code Item 301
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0615 PROJECT: UNC Charlotte Science Building Advance
More informationPosition Status: Position Status: Management; Level M; Full-time; Exempt
Associate Dean, Student Development - Rock Creek Portland Community College Requisition Number: 09248 Location: Rock Creek Campus Address: 17705 NW Springville Road, Portland, OR Hours of Work: 8 a.m.
More informationREQUEST FOR QUALIFICATIONS
REQUEST FOR QUALIFICATIONS CONSULTING & ARCHITECTURAL SERVICES FOR NEW PUBLIC SAFETY FACILITY Date Issued: June 1, 2017 1. Request for Qualifications (RFQ) Instructions and General Scope of Services 1.1.
More informationRequest for Proposals for Marketing Services
Request for Proposals for Marketing Services Proposal Deadline: 3:00pm CST, Friday, December 8 th, 2017 Engineers Geoscientists Manitoba, an Association requesting marketing plan development proposals
More informationScience Technology Engineering and Mathematics (STEM) Initiative
DEPARTMENT of FACILITIES DESIGN December 17, 2013 and CONSTRUCTION REQUEST for PROPOSAL Science Technology Engineering and Mathematics (STEM) Initiative PRE-CONSTRUCTION SERVICES Facilities Design and
More informationRFQ. Request for Qualifications Phase One. Renovation of City Owned Homes CITY OF BEREA, OHIO. Mayor Cyril Kleem
RFQ Request for Qualifications Phase One Renovation of City Owned Homes CITY OF BEREA, OHIO Mayor Cyril Kleem City of Berea, Ohio Project: Renovation of City Owned Homes Criteria Engineer: Antonio C. Armagno,
More informationMARYLAND STADIUM AUTHORITY
MARYLAND STADIUM AUTHORITY REQUEST FOR QUALIFICATIONS Warehouse at Camden Yards General Contractor for Warehouse Elevator Modernization Project MSA Project No. 18-061 ISSUE DATE: March 7, 2018 Contents
More informationREQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING SERVICES RUNWAY 16R-34L IMPROVEMENTS PROGRAM RENO-TAHOE INTERNATIONAL AIRPORT
REQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING SERVICES RUNWAY 16R-34L IMPROVEMENTS PROGRAM RENO-TAHOE INTERNATIONAL AIRPORT The Reno-Tahoe Airport Authority (RTAA) Reno, Nevada, is seeking
More informationSubject: Statement of Qualifications for Public Safety Building Design
March 5, 2010 Subject: Statement of Qualifications for Public Safety Building Design The City of Porterville seeks Statements of Qualification (SOQ) from qualified architectural and engineering firms for
More informationPROFESSIONAL SERVICES PREQUALIFICATION APPLICATION INSTRUCTIONS FOR FORM 48A Revised January 2009
STATE OF NEW JERSEY DEPARTMENT OF THE TREASURY DIVISION OF PROPERTY MANAGEMENT AND CONSTRUCTION INSTRUCTIONS FOR FORM 48A Revised January 2009 INTRODUCTION: N.J.A.C. 17:19-5.4 requires that firms wanting
More informationPIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) for ON-CALL ENVIRONMENTAL CONSULTANT SERVICES at the PIEDMONT TRIAD INTERNATIONAL AIRPORT (GSO) The Piedmont Triad Airport Authority (PTAA)
More informationJanuary 22, Table of Contents
January 22, 2014 PROCEDURES SINGLE SELECTION PROCUREMENT OF DESIGN AND CONSTRUCTION MANAGEMENT SERVICES (Section 30 of Chapter 193 of the Acts of 2004) Table of Contents 1.0 Introduction...3 1.1 Purpose
More informationCITY OF CHICAGO DEPARTMENT OF BUILDINGS
CITY OF CHICAGO DEPARTMENT OF BUILDINGS GUIDELINES FOR THE PREPARATION OF REQUESTS FOR QUALIFICATIONS FOR THE SELECTION OF CONSULTING FIRMS TO PERFORM LIFE SAFETY EVALUATIONS The Chicago Department of
More informationMott Community College Job Description
Title: Department: Office of Physical Plant Reports To: Chief Financial Officer Date Written/Revised: September 22, 2006; Revised July 3, 2017, March 13, 2018 Purpose, Scope and Dimension of Job: Purpose:
More informationREQUEST FOR PROPOSALS FOR STRATEGIC VISIONING AND PLANNING
PURPOSE The Rural Community Assistance Partnership (RCAP) has initiated a Request for Proposal (RFP) process to identify a vendor qualified to design and execute a strategic visioning and comprehensive
More informationMetropolitan Washington Airports Authority. Request for Qualifications Information (RFQI) RFQI No C084. for
Request for Qualifications Information (RFQI) RFQI No. for Project Controls Task Contract for Project Support & Management at Washington Dulles International Airport and Ronald Reagan Washington National
More informationPUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD
PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE TO ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD REQUEST FOR PROFESSIONAL SERVICES The Secretary of the Maryland
More informationKing County Library System 960 Newport Way NW Issaquah, WA February 15, 2011 REQUEST FOR QUALIFICATIONS FOR
King County Library System 960 Newport Way NW Issaquah, WA 98027 February 15, 2011 REQUEST FOR QUALIFICATIONS FOR SUPPLEMENTAL EVERGREEN SYSTEM DEVELOPMENT Responses Due: March 14, 2011 by 5pm PST TABLE
More informationRequest for Qualifications Statements
Request for Qualifications Statements BND WATER DISTRIBUTION AND WASTEWATER TREATMENT ENGINEERING STATEMENTS ENGINEERING DESIGN SERVICES FOR BND WATER DISTRIBUTION AND WASTEWATER TREATMENT The Brownsville
More informationADDITIONAL TYPES OF WORK REQUIRING PRE-QUALIFICATION:
CENTRAL FLORIDA EXPRESSWAY AUTHORITY NOTICE TO PROFESSIONAL ENGINEERING CONSULTANTS REQUEST FOR LETTERS OF INTEREST FOR GENERAL ENGINEERING CONSULTANT SERVICES CONTRACT NO. 001145 The Central Florida Expressway
More informationCONSTRUCTION MANAGEMENT SERVICES
DrAFTDRAFTdd EXHIBIT 1 CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) SELECTION PROCESS School District of Lee County, Florida TABLE OF CONTENTS 1. INTRODUCTION 1 Lobbying 2 2. 3 A.
More informationSEARCH, SCREENING AND HIRING PROCEDURES For Full-time Faculty, Administrative and Professional/Technical Positions
SEARCH, SCREENING AND HIRING PROCEDURES For Full-time Faculty, Administrative and Professional/Technical Positions Philosophy and Strategic Framework Santa Fe College's mission, values, goals and priority
More informationREQUEST FOR QUALIFICATIONS (RFQ) EMPOWERMENT EVALUATION CONTRACTOR FOR COMMUNITY PARTNERSHIPS FOR HEALTH EQUITY Release date: Jan.
REQUEST FOR QUALIFICATIONS (RFQ) EMPOWERMENT EVALUATION CONTRACTOR FOR COMMUNITY PARTNERSHIPS FOR HEALTH EQUITY Release date: Jan. 16, 2018 DEADLINE AND SUBMISSION INSTRUCTIONS: Letters of qualifications
More informationPRELIMINARY SCOPE OF SERVICES
PRELIMINARY SCOPE OF SERVICES (Owner) (Project) The, through its, is (owner) (governing body if applicable - i.e. Board of Directors) in the process of selecting professional services for. This project
More informationDates/Times: p.m. Pacific Time.
Notice - Request for Qualifications (RFQ) For Corrosion Engineering and Investigations For The "E" Street Reservoir Cover Repainting For The City of Port Angeles 06-12-12 The City of Port Angeles, Washington,
More informationREQUEST FOR PROPOSALS: AUDIT AND TAX SERVICES
GOODWILL INDUSTRIES OF CENTRAL EAST TEXAS, INC. REQUEST FOR PROPOSALS: AUDIT AND TAX SERVICES Issue Date: April 4, 2018 Due Date: April 20, 2018 Goodwill Industries of Central East Texas, Inc. 1 Index
More informationSellwood Bridge Replacement Slayden Sundt JV. Diversity Plan
Sellwood Bridge Replacement Slayden Sundt JV Diversity Plan A. Diversity Plan Objectives Slayden-Sundt shares in the County s commitment to diversity in all aspects of the Sellwood Bridge Replacement project.
More informationQuad Cities Chamber of Commerce. Request for Proposals for HUMAN RESOURCES MANAGED SERVICES
Quad Cities Chamber of Commerce Request for Proposals for HUMAN RESOURCES MANAGED SERVICES Project Manager: Leslie Anderson, Vice President Finance landerson@quadcitieschamber.com 1601 River Dr., Suite
More informationTown of York, Maine Request for Qualifications
Town of York, Maine Request for Qualifications Historic Restoration Contractor The Town of York is accepting Statement of Qualifications from General contractors experienced in historic restoration, for
More informationCareer Center Advance Planning/Design Services Code Item 321
The University of North Carolina at Charlotte Temporary Office Space Facilities Management - Capital Projects Hickory Building (Building #536 on Campus Map) 9316 Mary Alexander Road Charlotte, NC 28223
More informationRequest for Proposal Strategic Planning Consultant. Proposals will be received until: August 6, :00 PM CST
Request for Proposal Strategic Planning Consultant Proposals will be received until: August 6, 2018 5:00 PM CST 1 Request for Proposal I. General Information Project Objective: To develop 3 year Strategic
More informationTRIO Talent Search Director - Rock Creek Campus. Portland Community College. Requisition Number: Location: Rock Creek Campus
TRIO Talent Search Director - Rock Creek Campus Portland Community College Requisition Number: 09400 Location: Rock Creek Campus Address: 17705 NW Springville Road, Portland, OR Hours of Work: 8 a.m. to
More informationAddendum No. 2 February 19, 2014 City University Construction Fund Engineering Design Services Requirements Contracts RFQ Project No.
Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 16 th Floor New York, NY 10019 Tel: 646-664-2700 Addendum No. 2 February 19,
More informationRequest for Consultant Statements of Interest and Qualifications POINT DEFIANCE ZOO & AQUARIUM
Request for Consultant Statements of Interest and Qualifications POINT DEFIANCE ZOO & AQUARIUM Capital Bond Program Implementation Planning Services 5/20/14 The Point Defiance Zoo & Aquarium (PDZA) will
More informationHouse Doctor Consulting Services Application Package
Public Facilities Department House Doctor Consulting Services Application Package For FY2013 FY2015 House Doctor Consulting Services Project #7005 City of Boston Thomas M. Menino, Mayor Michael Galvin
More informationRequest for Qualifications. Career Pathways for English Language Learners. April 21, 2014
Request for Qualifications Career Pathways for English Language Learners April 21, 2014 To organizations, businesses, and community colleges in the Seattle area working with English language learner populations:
More informationREQUEST FOR QUALIFICATIONS (RFQ):
REQUEST FOR QUALIFICATIONS (RFQ): Planning/Engineering/Architectural Services SENECA NATION OIL SPRING DEVELOPMENT MASTER PLAN Release Date: August 15, 2013 Responses Due: by 4:00 PM Eastern time on August
More informationNortheast Ohio Areawide Coordinating Agency NOACA 1299 Superior Avenue Cleveland, Ohio (216)
Northeast Ohio Areawide Coordinating Agency NOACA 1299 Superior Avenue Cleveland, Ohio 44114-3204 (216) 241-2414 www.noaca.org Request for Proposals (RFP) for Consultant for Air Quality Public Education
More informationREQUEST FOR PROPOSALS FOR STRATEGIC VISIONING AND PLANNING
REQUEST FOR PROPOSALS FOR STRATEGIC VISIONING AND PLANNING PURPOSE The National Association of Development Organizations (NADO) and the NADO Research Foundation have initiated a Request for Proposal (RFP)
More informationMARYLAND STADIUM AUTHORITY
MARYLAND STADIUM AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) GENERAL CONTRACTOR RENOVATIONS TO OPERATIONS OFFICE M&T BANK STADIUM MSA Project No. 19-013 ISSUE DATE: October 9, 2018 MARYLAND STADIUM AUTHORITY
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Title Organizational Review LRFP Number 2100.17.01 Project Manager Alan Sorum Submittal Deadline June 17, 2016 Award Announcement July 15, 2016 Submit Proposals to: or Alan Sorum,
More informationSUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY
SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional
More informationCITY OF PORTLAND, TEXAS
CITY OF PORTLAND, TEXAS REQUEST FOR QUALIFICATIONS FOR PLANNING SERVICES OLDE TOWN MIXED USE DISTRICT REDEVELOPMENT PLAN CITY OF PORTLAND, TEXAS 1900 Billy G. Webb Drive Due Date: Portland, Texas 78374
More informationCHAPTER 3: DESIGN. TN Higher Education Designers Manual October 2018 Page 1 of 12
3.01 GENERAL A. Design the project to meet the authorized scope, budget, and schedule. B. Upon initiation of the project, arrange to review with the Owner the service and administrative requirements as
More informationREQUEST FOR QUALIFICATIONS
MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS AND ENVIRONMENTAL AFFAIRS DEPARTMENT SUITE 209S LOGAN OFFICE CENTER SUITE 209S ONE HARBOR SIDE DRIVE EAST BOSTON MA 02128-2909 REQUEST FOR QUALIFICATIONS L1557-S1,
More information2018 ARCHITECTURAL, ENGINEERING AND PLANNING OUTREACH. August 9, 2018
2018 ARCHITECTURAL, ENGINEERING AND PLANNING OUTREACH August 9, 2018 Schedule 8:30 a.m. Check-in & Network 9:00 a.m. Pre-Qualification Program 9:30 a.m. Network Break 10:00 a.m. Terminal and Landside/Land
More informationREQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES For The University of Colorado at Boulder
STATE OF COLORADO STATE BUILDINGS AND REAL ESTATE PROGRAMS REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES For The University of Colorado at Boulder Project: CM-M07013, ECME,
More informationREQUEST FOR QUALIFICATIONS DESIGN BUILD SERVICES FACILITY IMPROVEMENTS AT MUSIC HALL, AFRICAN AMERICAN MUSEUM & AQUARIUM ANNEX FAIR PARK DALLAS, TEXAS
REQUEST FOR QUALIFICATIONS for DESIGN BUILD SERVICES for FACILITY IMPROVEMENTS AT MUSIC HALL, AFRICAN AMERICAN MUSEUM & AQUARIUM ANNE at FAIR PARK DALLAS, TEAS ISSUED: MARCH 8, 2018 DUE: APRIL 6, 2018
More informationContact: Rebecca Hanson, , Date of Issue: October 16, 2017 Deadline: November 13, 2017, 5pm
REQUEST FOR QUALIFICATIONS (RFQ) FOR TECHNICAL SERVICES to Conduct a Build-out Analysis for the SQUAM LAKES WATERSHED PLAN DEVELOPMENT PHASE 1 FOR THE SQUAM LAKES ASSOCIATION Contact: Rebecca Hanson, 603-968-7336,
More informationPROJECT SPECIFIC QUALIFICATION STATEMENT REQUIREMENTS for CONSTRUCTION MANAGEMENT SERVICES
PROJECT SPECIFIC QUALIFICATION STATEMENT REQUIREMENTS for CONSTRUCTION MANAGEMENT SERVICES Kraus Edward Henry Building Renovation and Addition U-M Project Number P00011092 Submittal Deadline: April 12,
More informationQUALIFICATION PACKET For Consultants: Civil Engineer Landscape Architect Geotechnical Engineer Acoustical Engineer SEPTEMBER, 2018 I.
QUALIFICATION PACKET For Consultants: Civil Engineer Landscape Architect Geotechnical Engineer Acoustical Engineer SEPTEMBER, 2018 I. INTRODUCTION The Boldt Company and Skidmore, Owings & Merrill, LLP
More informationResolution No Resolution No. 3737, Diversity in Contracting Policy Directive Page 1 of 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Resolution No. 3737 A RESOLUTION of the Port of Seattle Commission establishing a
More informationAssociate Vice President of Facilities Management
Associate Vice President of Facilities Management Review: Open Until Filled (Job #17-107) Administrator IV, Associate Vice President of Facilities Management. Salary is commensurate with qualifications
More informationREQUEST FOR PROPOSAL. For: Tourism Advertising and/or Public Relations Agency(ies)
REQUEST FOR PROPOSAL For: Tourism Advertising and/or Public Relations Agency(ies) The Rhode Island Commerce Corporation is soliciting a Request for Proposal (RFP) from a qualified firm or firms to retain
More informationREQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS
OLYMPIA, WASHINGTON REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS REQUEST FOR QUALIFICATIONS AND QUOTES (RFQQ) RELEASE DATE: April 13, 2017 PRE-PROPOSAL MEETING: Date: April 24, 2017
More informationThe University of Texas at San Antonio Request for Qualifications for University Center Update Common Lounge. RFQ No.
The University of Texas at San Antonio Request for Qualifications for University Center Update Common Lounge RFQ No. 743-15-110315SC RFQ Deadline Date: November 25, 2015 1.1. OBJECTIVE AND OVERVIEW SECTION
More informationCity and County of San Francisco City Hall Events Office (CHEO)
Background San Francisco City Hall, seat of government for the City and County of San Francisco, is also a historic landmark and popular event venue hosting approximately five-hundred events annually,
More informationBELLOWS FALLS HISTORICAL SOCIETY, INC. Post Office Box 466 Bellows Falls, VT I fax
BELLOWS FALLS HISTORICAL SOCIETY, INC. Post Office Box 466 Bellows Falls, VT 05101 802-376-6789 I fax 802-463-9415 Request for Qualifications Design and Build Services for Nature Observation Platforms
More informationThe deadline for submittal of proposals is 4:00 PM, Pacific Time, January 8, 2014.
CITY OF BAINBRIDGE ISLAND, WASHINGTON REQUEST FOR PROPOSALS CLASSIFICATION AND COMPENSATION STUDY INTRODUCTION The City of Bainbridge Island, Washington invites proposals from qualified consulting firms
More informationADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION)
ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION) Subject to conditions prescribed by the University of California, San Francisco (the University or UCSF ), bids for a Construction Manager at Risk Agreement
More informationREQUEST FOR QUALIFICATIONS
Issue Date: August 11, 2013 Title: Issuing Agency & Address Location of Work: RFQ#: SWaM-2013-15 Pre-Qualified Contractors Term Small, Women, and Minority Owned (SWaM) Contractors for Renovation, Replacement
More informationREQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE
MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS DEPARTMENT SUITE 209S - LOGAN OFFICE CENTER ONE HARBORSIDE DRIVE EAST BOSTON, MASSACHUSETTS 02128-2909 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT
More informationPage 1 of 2 AMENDMENT - REQUEST FOR QUALIFICATIONS (RFQ)
Page 1 of 2 Page 1 of 2 AMENDMENT - REQUEST FOR QUALIFICATIONS (RFQ) Amendment No. 2 RFQ No. 4018000166 COMPANY NAME AND ADDRESS (To be completed by Bidder) Project Name Construction Management Services
More informationREQUEST FOR QUALIFICATIONS FOR DESIGN-BUILD TEAMS. Washington State University Baseball Clubhouse
FOR DESIGN-BUILD TEAMS November 20, 2018 For Washington State University Baseball Clubhouse By Facilities Services, Capital Statement of Qualifications Deadline: December 7, 2018, 3:00 pm TABLE OF CONTENTS
More informationConsultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III
Terms of Reference Consultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III UNICEF Cambodia 1. Background The Capacity Development Partnership
More informationContracting for Architectural and Engineering (A/E) Services Webinar. August 30, AM to 11:30 AM
Contracting for Architectural and Engineering (A/E) Services Webinar August 30, 2011 10 AM to 11:30 AM 1 Where We're Going Today Webinar Operation - Fred Ward 5 minutes (+/-) Topic Introduction - John
More informationUSD 497. Request for Qualifications Commissioning Engineers Building Commissioning Services. August 11, 2017
USD 497 Request for Qualifications Commissioning Engineers Building Commissioning Services August 11, 2017 1 INTRODUCTION Lawrence Public Schools, in accordance with the policies of the Board of Education,
More informationRequest for Qualifications Architects CENTRAL UTILITY PLANT SHOP AND POWER CENTER
Request for Qualifications Architects CENTRAL UTILITY PLANT SHOP AND POWER CENTER The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses
More informationSTATEMENTS OF QUALIFICATIONS ARE DUE NO LATER THAN 5:00 P.M. FRIDAY, JUNE 23, 2017
RFQ 13-2017-01 REQUEST FOR QUALIFICATIONS FOR A CRITERIA ENGINEER TO PERFORM CERTAIN PROFESSIONAL SERVICES IN THE REPAIR AND/OR REPLACEMENT OF THE LOWER LAKE DAM AND POTENTIAL REPAIRS TO THE UPPER LAKE
More informationWELCOME LOS ANGELES CONVENTION CENTER (LACC) EXPANSION AND RENOVATION PLAN B PROJECT
WELCOME LOS ANGELES CONVENTION CENTER (LACC) EXPANSION AND RENOVATION PLAN B PROJECT JUNE 23, 2014 9:30 A.M SITE MAP SOUTH HALL STAPLES CENTER COMMITMENT TO PLAN-A Presently, there is a Implementation
More informationNew York City Transit (NYCT) DATE: July 19, 2018 CONSTRUCTION/ARCHITECTURAL & ENGINEERING CONTRACT SOLICITATION NOTICE/PROJECT OVERVIEW MTA-NYCT IS NOW ADVERTISING FOR THE FOLLOWING: SSE #: 0000226381
More informationAVIATION AUTHORITY POLICY
PURPOSE: To establish a policy for the selection of development related professional services firms, including design-build firms for professional services and the Consulting Engineer, pursuant to the
More informationOffice of Physical Plant
Office of Physical Plant The Pennsylvania State University Physical Plant Building University Park, PA 16802-1118 DATE: August 21 th, 2014 SUBJECT: TO: Integrated Project Delivery (IPD) Engagement RFP
More informationCITY OF COLUMBIA DEPARTMENT OF UTILITIES & ENGINEERING MENTOR-PROTÉGÉ PROGRAM GUIDELINES STANDARDS (Effective January 1, 2014)
CITY OF COLUMBIA DEPARTMENT OF UTILITIES & ENGINEERING MENTOR-PROTÉGÉ PROGRAM GUIDELINES 2014 STANDARDS (Effective January 1, 2014) TABLE OF CONTENTS INTRODUCTION 3 BENEFITS TO THE CITY OF COLUMBIA 4 DEFINITIONS
More informationUniversity of Washington Business Diversity Program Operational Performance Dashboard Report
University of Washington Business Diversity Program Operational Performance Dashboard Report As of April 11, 2011 FY 2011 2nd Quarter (October - December 2010) Mission We proactively engage with and support
More informationCity of Sultan Request for Proposals City Attorney Services
The City Council of the ( City ) invites interested law firms and individuals with a minimum of seven (7) years of municipal experience to submit a written proposal to provide City Attorney services. As
More informationMarch 10, 2016 by 4:00 p.m. February 11, 2016 by 4:00 p.m. RFP-16104
Request for Pro posals t o provide Emplo yee Co mpensatio n Assessment Due Date Proposal Submissions March 10, 2016 by 4:00 p.m. Questions Due by February 11, 2016 by 4:00 p.m. RFP-16104 Solicited by:
More informationIf you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal
If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal may cause your submittal to be considered non-responsive.
More information