This is the third and final article in a series on developing

Size: px
Start display at page:

Download "This is the third and final article in a series on developing"

Transcription

1 Performance measurement in Canadian government informatics Bryan Shane and Gary Callaghan A balanced performance measurement system requires that certain principles be followed to define the scope and provide a philosophy of operations. This is the third and final article in a series on developing and implementing a performance measurement system (PMS) for an informatics function in a public service environment. 1 The first article presented a conceptual approach to performance measurement based upon the Balanced Scorecard 2 approach, while the second article described the steps to developing and implementing a PMS. This third article describes the realization of a PMS in a Canadian government informatics organization, the Application Management Service (AMS) of Public Works and Government Services Canada (PWGSC). Specifically, this article describes the mission, services and clients of AMS; the rationale for embarking on the performance measurement project; and the development and implementation process. Finally, it provides an assessment of the benefits and risks associated with implementing such an endeavour. Bryan Shane is a senior partner with BPC Management Consultants. For more than 20 years, he has provided consulting services in the areas of strategic management, information technology and performance consulting, to a wide variety of public and private sector organizations. Mr. Shane has a BA in Political Science from Carleton University and a BEd and MEd from the University of Ottawa. He has also completed graduate studies in statistics and evaluation. AMS description AMS is a sector within the Government Telecommunications and Informatics Services (GTIS) branch of PWGSC. Its vision is to develop information management and information technology (IM/IT) partnerships with the department s other business lines and with Special Operating Agencies (SOAs) to maximize PWGSC s value as a Common Services Organization. As one of the department s eight major business lines, GTIS is recognized by the federal government community as the principal agent for the management of common IM/IT infrastructure and services. GTIS provides a wide range of IM/IT services to PWGSC and other departments of the Canadian government. AMS has 418 employees and is augmented by a similar number of consultants. It has an annual budget allocation Gary Callaghan is the Manager of the Application Management Service (AMS) Program Office for the Government Telecommunications and Informatics Services Branch of Public Works and Government Services Canada. He has over 20 years of experience in the information management and information technology field, all with the Canadian federal government. Mr. Callaghan has been a project manager for the past seven years and has spent the last two years developing and implementing the AMS performance measurement framework. 16 Optimum, The Journal of Public Sector Management Vol. 29, No. 1 (16-24)

2 of $42 million and an in-house supported technology inventory valued at approximately $300 million. Its mission is to provide development and support services in respect of administrative processes and education to government IM/IT professionals. It delivers value by working closely with clients to reduce business risk, while increasing flexibility and performance. To achieve its mission, AMS provides a number of services to its clients, including: Application support includes operational-support and functional-enhancement services primarily for PWGSC applications. 27% officers and/or line managers 43% middle managers FIGURE 1 AMS s client base 7% clerical employees 23% senior managers and/or directors Application development includes major functional enhancements, architectural re-engineering services and IT project management. Application environment includes architecture and environment services, such as standard development tools and techniques and quality management, primarily for AMS. Other AMS services include business process re-engineering, Internet support, data warehousing and software exchange. Figure 1 illustrates the client base of AMS. The majority of AMS clients (87 percent) work within PWGSC, with the remainder coming from outside the department. Most clients are using more than one AMS service, with 71 percent using at least three services. The most widely used services include: application support (84 percent), application development (75 percent), application environment (41 percent), Internet (39 percent), data warehousing (26 percent), and software exchange (24 percent). 3 Rationale PWGSC and GTIS are committed to the review and renewal of federal programs and services to ensure that they are affordable, accessible and responsive to the needs of Canadians. This new environment created a number of challenges and opportunities in the delivery of these programs and services. There is a need to deliver high-quality programs and services across the country in an environment of ongoing fiscal restraint. Staff reductions and costsaving initiatives have created an environment in which employees often have difficulty managing their workloads, with a resulting negative effect on morale. There are opportunities for more effective leadership and simplified management structures that permit long-term, viable alternative approaches to delivering programs and services at reduced costs, based upon new forms of collaboration across branch and department lines. There is a need for a means to facilitate the sharing of best practices in the delivery of programs and services. These challenges and opportunities, which are directly related to the effective delivery of programs and services to the Canadian public, were further compounded by the need for effective performance measurement practices in AMS. Until the Balanced Scorecard approach was implemented, the performance of programs and services was not measured in a holistic way. At present, the established standard in the federal government for reporting performance is solely based on a financial perspective. This one-dimensional approach fails Optimum, The Journal of Public Sector Management Vol. 29, No. 1 17

3 to provide performance information related to client and employee satisfaction, quality of service or continuous improvement. Many performance measurement systems do not provide the information needed to determine whether objectives and strategies are being effectively implemented. Much performance information is reactive rather than proactive. Moreover, it fails to recognize outstanding group or individual performance, which tends to undermine motivation and morale within the organization. This situation is further compounded by the fact that while approximately 10 percent of all informatics organizations have formal performance measurement programs, only one organization in six that starts such a program achieves a successful implementation. Development and implementation approach To address these problems, AMS undertook a holistic approach to the development and implementation of a PMS. The objective was to develop and implement a balanced and systematic PMS to assess the effectiveness of AMS s operations from various points of view: financial quality of programs and services client satisfaction employee satisfaction Performance measurement requires time, effort, skills, expertise and, perhaps most importantly, the active support of senior management. Performance measurement must be organized around the department s planning and budgeting cycles. Performance measurement business processes for finances, quality of service, employee satisfaction, client satisfaction and continuous improvement must be created or adapted to collect and analyze the data. An Office of Performance Measurement (OPM), in this case the AMS Program Office, must be established and held responsible for the planning, implementation and ongoing operation of the PMS. The OPM must report directly to, and be supported by, senior management. The PMS should be developed and implemented in phases. Simple and existing information sources should be used. There is no need to pursue new, expensive and/or time-consuming approaches to data generation. The PMS must be designed so that multiple lines of evidence are generated for each perspective at different organizational levels and at different times. The information generated from one perspective must be confirmed by another so that there is a convergence of information to support the diagnosis and action on any issue. continuous improvement. The PMS was designed to provide feedback at all three levels: strategic, tactical and operational. It was also designed to evaluate the effectiveness of strategies and plans, to improve decision making, enable proactive problem correction and promote continuous improvement within the organization. Principles Developing and implementing a balanced PMS requires that a number of principles be followed to define the scope of the project and provide a philosophy of operations. AMS was no different. These principles indicate: Steps in developing and implementing a performance measurement system As noted above, the PMS for AMS was implemented in phases. Phase 1 was a pilot project used in three core divisions, two offering development services and one providing support services. In Phase 2, the project was extended to include all high-profile projects, those directly involving clients and some internal to AMS. This expansion covered most directorates within the sector. Phase 3, now underway, will extend the project to the two remaining directorates. The steps used in developing and implementing each phase of the PMS are briefly described below. 18 Optimum, The Journal of Public Sector Management Vol. 29, No. 1

4 Step 1: Project orientation The first step was to provide an orientation to management and staff on the balanced approach to performance measurement. This orientation covered the roles and responsibilities of participants, the stages of development and implementation, the time frames or milestones, the key principles of performance measurement, and anticipated and unforeseen issues. Step 2: Readiness assessment The second step was to assess the readiness of the AMS directorates and/or divisions to accept the balanced approach to performance measurement. This assessment would demonstrate how the organization s mandate and functions supported or reinforced the business plans of AMS, GTIS and the department. Those responsible for developing the PMS were looking for evidence of management and staff commitment, as well as an assurance that the necessary resources to carry out the project would be made available. Following a positive analysis of the organization s readiness, it was necessary to select core functional areas in which to begin a pilot. Step 3: Performance Measurement Architecture (PMA) The third step was the development of the Performance Measurement Architecture (PMA) to provide the design, content and structure of the PMS. In developing the PMA, business objectives were developed first, then informatics objectives were designed to support the business directions. Performance measures and performance indicators were then derived for the informatics function. These measures and associated indicators are objective, qualitative, quantitative and output oriented, but are also quantifiable in nature (see Information quality below for details). The PMA was an evolving document, changing as measures were implemented and feedback was received. Once the PMA was approved, it became the sanctioned PMS architecture for AMS (see Table 1) and it was important to place it under change control, i.e., proposed changes were scrutinized and approvals were required. Step 4: Implementation As noted above, Phase 1 began on a pilot basis in three core areas. This approach was used to demonstrate the value of performance measurement and to build the competencies of the performance measurement team. After a successful three-month pilot, Phase 2 was started. The second phase lasted six months and concentrated on high-priority informatics projects involving AMS. Phase 3, currently underway, is addressing the remaining parts of the AMS organization. The activities required to implement the AMS Performance Measurement System included: Performance Measurement Profile (PMP) A PMP was developed from the PMA to assess the degree to which existing operational processes needed to be developed or adapted in order to implement the PMS. The profile also identified areas where information and processes concerning the performance measures and related performance indicators existed, and where information and processes needed to be adapted or created (see Appendix). Further, it identified the availability of baseline and benchmark information. Implementation Strategy An implementation strategy was developed for each of the performance measurement perspectives: financial quality of service client satisfaction employee satisfaction continuous improvement. These strategies provide the direction to guide the implementation effort by defining the roles and responsibilities of participants, the frequency of reporting and the data collection methods. They also outline the methods for analyzing, reporting and interpreting the information, as well as for identifying any issues that could impede progress for each measurement perspective. Business Processes Various day-to-day, month-tomonth business processes were developed or adapted to support data gathering for each of the performance measurement perspectives. Optimum, The Journal of Public Sector Management Vol. 29, No. 1 19

5 TABLE 1 AMS Performance Measurement Architecture VISION To be the supplier of choice to government departments for developing, supporting and integrating common administrative applications and infrastructure, and to be acknowledged by partners and clients as an employer of competent professionals who deliver measurable efficiencies through the management of information and technology. Financial Perspective Quality Service Perspective Customer Satisfaction Perspective Innovation and Learning Perspective Objectives Ensure cost effectiveness of application services On time delivery of quality application management services at lowest cost to client Achieve high level of customer satisfaction with application management services Create an organization of highly competent and dedicated staff Establish a corporate culture of continuous learning Performance Measures Revenues Expenditures IT investment Contracting Funding ratios Project Management Index Client Satisfaction Index Employee Satisfaction Index Continuous Improvement Index Performance Indicators Actual vs. planned revenues Actual vs. planned expenditures Variance between revenues and expenditures IT investment % of revenue IT investment per employee Competitive vs. noncompetitive contracts Ratio of O&M to FTE * expenditures Ratio of salaries to overtime Project Management Index: projects on time projects on budget projects within scope functional quality technical quality issue management Client Satisfaction Index client opinions on: products/services staff/consultants communication overall satisfaction Employee Satisfaction Index employee opinions on: goals/objectives role clarity decision making/ communication team building staff utilization rewards/recognition overall evaluation Continuous Improvement Index: staffing professional development suggestions for improvement staff rewards/ recognition * FTE: Full-time equivalent. 20 Optimum, The Journal of Public Sector Management Vol. 29, No. 1

6 Information Capture Once business processes were adapted or created for each measurement perspective, the information generated from these processes was captured according to established reporting formats for each of the performance measurement perspectives (e.g., monthly status reports, procurement activity reports and action logs). the methodology for developing performance measurement architectures; the means to establish baseline information to compare future performance; methods for collecting, analyzing and interpreting information; Interpretation This performance measurement information was interpreted to ensure internal validity and to provide an comparative external view. The interpretation of the information was accomplished in several ways: rating systems, baseline information, benchmarks, experience within the organization and the use of multiple lines of evidence. Reporting The monthly performance information relates to financial performance and the quality of services. A full performance measurement report, the Dashboard, is published quarterly. Both monthly and quarterly reports discuss the organizational mission from various points of view. Cumulatively, this information provides a causal link between the goals of the mission and any strategic, tactical and operational issues interferring with their attainment. When issues are raised, a briefing note is prepared and presented to management in advance for discussion at the monthly review (see Appendix). Communication Communicating results to senior management and staff is imperative so that changes can be made to keep the organization on course towards its mission, to recognize and reward the efforts of individuals and teams, and to encourage continued positive results. Benefits The benefits of the AMS performance measurement project must be assessed from several points of view. A discussion of the salient perspectives appears below. Knowledge transfer There was a considerable transfer of knowledge from the subject matter experts to AMS staff. Some key areas of knowledge transfer included: ways of developing or adapting business processes to generate performance information related to all measurement perspectives; and the use of facilitation techniques and Straw Dog Models to increase individual and organizational support for the PMS. As a result, AMS is relatively self-sufficient in knowledge and is self-sustaining in its ability to operate and update the PMS. Organizational culture AMS was successful in developing an organizational culture that values and supports balanced and comprehensive feedback as an essential element in examining issues and providing the information necessary for effective decision making. By improving communication, a common language and understanding developed in AMS concerning priorities, constraints and opportunities, as well as problems related to finances, quality of programs and services, client and employee satisfaction and continuous improvement. The PMS fostered a higher level of motivation and morale among staff through a greater appreciation of the issues and a greater involvement in formulating strategies and plans to resolve them. It is now viewed as a necessary and valued component of the management regime in AMS and has brought discipline to many of the sector s business processes. Decision making By providing AMS managers with multi-dimensional sources of information, the PMS provides a framework for decision making on cost effectiveness; improving, modifying or continuing programs or services; and improving client and employee satisfaction. It also provides information on program and service enhancements arising from Optimum, The Journal of Public Sector Management Vol. 29, No. 1 21

7 changing client, employee or technology needs or innovations. Moreover, it provides a means of translating the AMS mission into concrete objectives, strategies and plans, which can be monitored and adjusted in response to ongoing environmental changes. Lastly, it provides a frame of reference for management and staff, working together, to sustain and enhance excellence in program and service delivery to their clients. Information quality The use of indices magnifies the complexity of information generated about any of the measurement perspectives in the PMS. The PMA for AMS includes four indices: Project Management Client Satisfaction Employee Satisfaction Continuous Improvement. The use of these indices allows qualitative and quantitative information to be combined, yet provides the ability to quantify both so that all measures become output oriented. For example, the Project Management Index provides an assessment of qualitative and quantitative measures of high-priority projects used to deliver services to clients. Quantitative measures used include whether the project is on time, within budget, within scope, and whether it meets all functional and technical quality requirements. Qualitative measures include the effective use of estimation, risk management, methodologies and tools, the quality of user involvement, and the effective use of staff and consultants. These dimensions of project management were expanded or decreased in response to changing conditions or experience. By using an index, these diverse measures were reduced to a common overall score representing all dimensions of project management. The use of indices in AMS provides a powerful and flexible tool to provide comprehensive information on the areas mentioned. Interpretation of the information Several techniques are used to increase the rigour with which the information provided by the AMS Performance Measurement System is interpreted. Rating systems, baseline information, benchmarks, and organizational knowledge and information from multiple lines of evidence are used to ensure that the issues revealed by the PMS are interpreted to ensure internal validity with a comparative external perspective. Identification of best practices The use of the PMS has also resulted in the identification of a number of best practices at both the project and sector level. By sharing these best practices, AMS has given employees the knowledge and skills necessary to deliver programs and services in a constantly changing IM/IT environment. Risks/Threats There were a number of risks inherent in the development and implementation of a PMS in AMS. Leadership Performance measurement requires the active support of management in communicating the rationale and benefits of the system, to help breakdown individual and organizational resistance to what may be perceived as a threatening project. Without the active and ongoing support of management in promoting the PMS and using the information to improve the functioning of the organization, the exercise would have been viewed as another form of unnecessary overhead. Even though there is strong support by the AMS executive for ongoing performance measurement, there is always the risk that insufficient time will be devoted to discussing and reviewing information at monthly and quarterly presentations. Resources Developing and implementing a successful PMS requires time, effort and money. It took just over a year to build the processes and framework for AMS. For most of that time, the assistance of consulting expertise was 22 Optimum, The Journal of Public Sector Management Vol. 29, No. 1

8 needed until the process became self-sustaining. In particular, the process required the support of an already overburdened staff. Organizational context The PMS was built at the sector level but fits within the planning and reporting framework (Performance Reporting and Accountability Structure) for GTIS and PWGSC. Many of the financial, human resource and other information systems did not produce the type of information required at the proper time or to the required level of quality. There was also a reliance on staff members outside the sector, operating in a virtual organization, to produce certain types of performance information. Together, these elements tended to restrict the ability of those implementing the PMS to produce reports with the frequency and quality desired to meet departmental business and financial cycles. Exposure By publishing monthly and quarterly performance measurement reports, AMS provides a complete picture of the financial, quality-of-service, client/employee-satisfaction and continuous-improvement issues that it has dealt with during that period. By providing greater exposure to the organization s strengths and weaknesses, AMS is identifying the issues and actions required to resolve them. While such exposure is beneficial to a proactive organization such as AMS, it could be detrimental when no action is taken, or when issues can only be resolved at the branch or departmental level. continues to provide insights into issues needed to steer AMS towards its mission. It also provides insights that can be applied to other organizations to assist in the smooth development and implementation of a balanced PMS, which is portable and highly applicable to other informatics organizations. To date, the insights and lessons learned indicate: The development of a balanced PMS must be tailored to fit the unique requirements of each organization in terms of specific measures, timing, sequence of activities and knowledge transfer. The use of pilots is necessary to provide evidence of the utility of performance measurement, to build acceptance and support, and to provide the experience needed to mould the PMS to the needs of the organization and its sub-organizations. The implementation of a balanced PMS requires the full support of management in terms of providing the leadership to communicate the necessity and importance of the approach and to supply adequate resources. The development of a PMA must begin at the top of the organization and be implemented downwards. The development and implementation of a PMS must avoid expensive data gathering and implementation approaches. Use a Just Do It mentality with existing sources of information, work around strategies, and available methods for interpreting and maintaining progress. Once established, the performance measurement process tends to be self-correcting and self-sustaining. Conclusion The AMS performance measurement system is now well launched and is developing at an acceptable pace. It Most importantly, the performance information, along with the associated analysis, must be used to take corrective actions in the form of strategies and plans to deal with issues interfering with the achievement of an organization s mission. Endnotes 1. The first article in this series, Improved performance measurement: a prerequisite for better service delivery, appeared in Optimum, Vol. 27, No. 4, pp The second article, Implementing a performance measurement system in a public service informatics function, appeared in Optimum, Vol. 28, No. 3, pp R.S. Kaplan and D.P. Norton. The Balanced Scorecard: Translating Strategy into Action (Boston: Harvard Business School Press, 1996). 3. These numbers represent the total where multiple selections were available and are not intended to be a cumulative total. Optimum, The Journal of Public Sector Management Vol. 29, No. 1 23

9 Appendix: AMS Performance Measurement Profile and AMS Issue Briefing Note 24 Optimum, The Journal of Public Sector Management Vol. 29, No. 1

In October 1997, the Trade Commissioner Service (TCS) Performance measurement in the Canadian Trade Commissioner Service THE MANAGER S CORNER

In October 1997, the Trade Commissioner Service (TCS) Performance measurement in the Canadian Trade Commissioner Service THE MANAGER S CORNER Performance measurement in the Canadian Trade Commissioner Service Pierre Sabourin Ten lessons to ponder before embarking on a performance measurement initiative to improve your way of working. In October

More information

Audit of Human Resources Planning

Audit of Human Resources Planning Health Canada Santé Canada Final Audit Report Audit of Human Resources Planning March 2012 Table of Contents Executive summary... i 1. Introduction... 1 1.1 Background... 1 1.2 Audit objective... 2 1.3

More information

The Balanced Scorecard: Translating Strategy into Results

The Balanced Scorecard: Translating Strategy into Results The Balanced Scorecard: Translating Strategy into Results By Becky Roberts, President, Catoctin Consulting, LLC (540) 882 3593, broberts@catoctin.com Abstract The balanced scorecard provides managers and

More information

Main points Background Our audit objective and conclusions Managing for results key findings...243

Main points Background Our audit objective and conclusions Managing for results key findings...243 Managing for results Main points...240 Background...241 Our audit objective and conclusions...242 Managing for results key findings...243 Committed leaders show the way...244 Clear expectations include

More information

Organizational capacity Assessment tool 1

Organizational capacity Assessment tool 1 Organizational capacity Assessment tool 1 Purpose This assessment tool is intended to guide HI staff and members of local structures to assess organisational capacity. The questions highlight three key

More information

Final Report Evaluation of Translation Bureau Programs Volume 2: Translation and Other Linguistic Services Program

Final Report Evaluation of Translation Bureau Programs Volume 2: Translation and Other Linguistic Services Program 2012-603 Evaluation of Translation Bureau Programs Office of Audit and Evaluation January 21, 2014 Table of Contents MAIN POINTS... i INTRODUCTION... 1 PROFILE... 1 Background... 1 Authority... 2 Roles

More information

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes

More information

IPMA-CANADA INTERNATIONAL CERTIFICATION PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE

IPMA-CANADA INTERNATIONAL CERTIFICATION PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE IPMA- Canada INTERNATIONAL PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE INTERNATIONAL PROGRAM is a national human resource management association whose mission is to promote excellence

More information

ITServices Strategic Plan

ITServices Strategic Plan ITServices Strategic Plan 2013 2017 The Queen s ITServices Strategic Plan 2013 2017 serves as a document to focus and guide ITServices efforts to support the university s academic mission through information

More information

Competency Framework FOR CHARTERED PROFESSIONALS IN HUMAN RESOURCES

Competency Framework FOR CHARTERED PROFESSIONALS IN HUMAN RESOURCES Competency Framework FOR CHARTERED PROFESSIONALS IN HUMAN RESOURCES Chartered Professionals in Human Resources Alberta Suite 990, 105 12 Ave SE Calgary, AB T2G 1A1 Tel. 800-668-6125 Email. info@cphrab.ca

More information

IT PROJECT ANALYST/MANAGER

IT PROJECT ANALYST/MANAGER IT PROJECT ANALYST/MANAGER I. DESCRIPTION OF WORK Positions in this banded class are responsible for project management work involving planning and coordination of information technology projects. To ensure

More information

Sponsor/CRO Partnership Optimization

Sponsor/CRO Partnership Optimization Insight Brief Sponsor/CRO Partnership Optimization Developing a CRO Governance Model Geoff Garabedian, Vice President and Managing Director, Consulting at Quintiles Josh Samon, Principal Life Sciences

More information

2017 Law Firm Marketing Operations Index

2017 Law Firm Marketing Operations Index 2017 Law Firm Marketing Operations Index Executive Summary The rapidly growing discipline of Marketing Operations seeks to increase marketing efficiency and organizational agility, and to measure, in a

More information

Evaluating and Building Portfolio Management Maturity

Evaluating and Building Portfolio Management Maturity Evaluating and Building Portfolio Management Maturity Hostetter and Norris, UMD PM Symposium 2016 Evaluating and Building Portfolio Management Maturity Susan Hostetter and Sherri Norris U.S. Census Bureau,

More information

Assessment of the Capability Review programme

Assessment of the Capability Review programme CABINET OFFICE Assessment of the Capability Review programme LONDON: The Stationery Office 14.35 Ordered by the House of Commons to be printed on 2 February 2009 REPORT BY THE COMPTROLLER AND AUDITOR GENERAL

More information

A Model for Implementing HR S Strategic Role

A Model for Implementing HR S Strategic Role Expert Journal of Business a nd Management (2 0 1 3 ) 1, 36-41 2013 Th e Au thor. Publish ed by Sp rint In v estify. Business.Exp ertjou rn als.c om A Model for Implementing HR S Strategic Role Anca ȘERBAN

More information

POSSE System Review. January 30, Office of the City Auditor 1200, Scotia Place, Tower Jasper Avenue Edmonton, Alberta T5J 3R8

POSSE System Review. January 30, Office of the City Auditor 1200, Scotia Place, Tower Jasper Avenue Edmonton, Alberta T5J 3R8 1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor POSSE System Review January 30, 2017 The conducted this project in accordance with the International Standards

More information

3Z0Z 0? W7? TOTAL QUALITY MANAGEMENT MASTER PLAN* (S)l\f> v^n. 0 Department of Defense. AUG 2 ego, August O/ A./ \o V* TECHNICAL LIBRARY

3Z0Z 0? W7? TOTAL QUALITY MANAGEMENT MASTER PLAN* (S)l\f> v^n. 0 Department of Defense. AUG 2 ego, August O/ A./ \o V* TECHNICAL LIBRARY 3Z0Z O/ A./ \o V* ^V TIME y>- v^n 0? W7? TOTAL QUALITY MANAGEMENT MASTER PLAN* 0 Department of Defense August 1988 (S)l\f> TECHNICAL LIBRARY AUG 2 ego, u i ACCESSION NO AD DoD TOTAL QUALITY MANAGEMENT

More information

Arizona DCYF Final Project Report Executive Summary

Arizona DCYF Final Project Report Executive Summary July 12, 2011 The Annie E. Casey Foundation Center for Effective Family Services and Systems Arizona DCYF Final Project Report Executive Summary SUBMITTED BY: CONNIE CHAMPNOISE Project Director MIKE MASTERNAK

More information

An Integrated Approach to Research and Academic Quality Management in Engineering Education

An Integrated Approach to Research and Academic Quality Management in Engineering Education An Integrated Approach to Research and Academic Quality Management in Engineering Education M.A. El-Kady, A.M. Al-Ahmari, R.M. Alhamali, A.A. Al-Karni, B.A. Al-Omar, S.S. AlQahtani, and M.A. Alshehri Members

More information

Program Management Professional (PgMP)

Program Management Professional (PgMP) Program Management Professional (PgMP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published

More information

Self-Assessment for the CoSN Certified Education Technology Leader (CETL ) Certification Exam

Self-Assessment for the CoSN Certified Education Technology Leader (CETL ) Certification Exam Self-Assessment for the CoSN Certified Education Technology Leader (CETL ) Certification Exam COSN s Self-Assessment will help you determine your readiness for the CETL certification exam. It can also

More information

Management Systems. Linkage. 26 March Text #ICANN49

Management Systems. Linkage. 26 March Text #ICANN49 Management Systems Linkage 26 March 2014 Agenda Introduction /Overview Strategy Strategic & Financial Planning Implementation Operating Plan Budget / Cost Mgmt. Project Portfolio Mgmt. People Performance

More information

I. POLICY FOR INTERNAL ALIGNMENT

I. POLICY FOR INTERNAL ALIGNMENT 1 TABLE OF CONTENTS PHASE I Summary.... 3 I. Internal Alignment.....3 II. Job Structure Evaluation..3 Appendix I. Compensable Families...6 Appendix II. Compensable levels...7 Appendix III Defining Compensable

More information

OA PERFORMANCE ASSESSMENT QUESTIONS

OA PERFORMANCE ASSESSMENT QUESTIONS OA PERFORMANCE ASSESSMENT QUESTIONS Effectiveness How effective is the organization in moving towards its mission and goals? What are the performance components that are identified in the material from

More information

The ROI of training: Strategies and evaluation methods

The ROI of training: Strategies and evaluation methods The ROI of training: Strategies and evaluation methods As global organizations seek to gain a competitive advantage through employee development, more pressure has been placed on HR and learning professionals

More information

Project performance management using balanced score card (BSC) approach

Project performance management using balanced score card (BSC) approach Project performance management using balanced score card (BSC) approach Published in PMI global network Prepared by Ilango Vasudevan, Consulting Director, SaraS Project Performance Management Scorecard

More information

HRM. Human Resource Management Rapid Assessment Tool. A Guide for Strengthening HRM Systems. for Health Organizations. 2nd edition

HRM. Human Resource Management Rapid Assessment Tool. A Guide for Strengthening HRM Systems. for Health Organizations. 2nd edition HRM Human Resource Management Rapid Assessment Tool for Health Organizations A Guide for Strengthening HRM Systems 2nd edition Copyright 2005, 2009 Management Sciences for Health, Inc. All rights reserved.

More information

Achieving Organizational Change:

Achieving Organizational Change: Achieving Organizational Change: The Importance of Organizational Culture Presented by: Ken Desson Pentor Communications Inc. Ottawa, Canada 1 This presentation discusses how organizational culture impedes

More information

DECISION-MAKING STRATEGIES REGARDING LOGISTICS ORGANIZATION

DECISION-MAKING STRATEGIES REGARDING LOGISTICS ORGANIZATION DECISION-MAKING STRATEGIES REGARDING LOGISTICS ORGANIZATION Ioana Olariu Vasile Alecsandri University of Bacau ioana_barin_olariu@yahoo.com Abstract In the face of higher costs of operation and increasing

More information

Quadrant I. Module 25: Balanced Scorecard

Quadrant I. Module 25: Balanced Scorecard Quadrant I Module 25: Balanced Scorecard 1. Learning Outcomes 2. Introduction 3. Balanced Scorecard Framework 4. Balanced Scorecard 5. Organisational Effectiveness 6. Balanced Scorecard & Organisational

More information

A Value Management Approach to Business Transformation

A Value Management Approach to Business Transformation A Value Management Approach to Business Transformation Chris Carter, KPMG LLP Nov 17-18, 2014 Canadian Value Symposium Toronto, Ontario A Value Management Approach to Business Transformation Understanding

More information

PORTLAND PUBLIC SCHOOLS HUMAN RESOURCE SERVICES AND DELIVERY

PORTLAND PUBLIC SCHOOLS HUMAN RESOURCE SERVICES AND DELIVERY PORTLAND PUBLIC SCHOOLS HUMAN RESOURCE SERVICES AND DELIVERY January 2013 Overview Portland Public School District (the District or PPS) contracted with AKT to create a new vision and values for their

More information

Internal Audit of Compensation and Benefits

Internal Audit of Compensation and Benefits Internal Audit of Compensation and Benefits Office of the Chief Audit and Evaluation Executive Audit and Assurance Services Directorate June 2010 Cette publication est également disponible en français.

More information

Public Service Secretariat Business Plan

Public Service Secretariat Business Plan Public Service Secretariat 2008-11 Business Plan Message from the Minister The Public Service Secretariat is a Category 2 entity that provides leadership in the area of strategic human resource management.

More information

PERFORMANCE MANAGEMENT ROADMAP

PERFORMANCE MANAGEMENT ROADMAP PERFORMANCE MANAGEMENT ROADMAP Building a high-performance culture PERFORMANCE MANAGEMENT ROADMAP a The Partnership for Public Service is a nonpartisan, nonprofit organization that works to revitalize

More information

The EFQM 2013 Model Changes. Implications for Organizations

The EFQM 2013 Model Changes. Implications for Organizations 1-June-13 The EFQM 2013 Model Changes Implications for Organizations by Sunil Thawani EFQM reviews the EFQM Excellence model every three years to ensure it continues to reflect reality and relevance to

More information

CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide

CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide processlabs CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide CMMI-DEV V1.3 Process Areas Alphabetically by Process Area Acronym processlabs CAR - Causal Analysis and Resolution...

More information

TOTAL PERFORMANCE SCORECARD

TOTAL PERFORMANCE SCORECARD Anca ȘERBAN Oana DUMITRAȘCU Department of Management, Marketing and Business Administration Faculty of Economics, "Lucian Blaga" University Sibiu, Romania TOTAL PERFORMANCE SCORECARD Keywords Balanced

More information

Requirements Analysis and Design Definition. Chapter Study Group Learning Materials

Requirements Analysis and Design Definition. Chapter Study Group Learning Materials Requirements Analysis and Design Definition Chapter Study Group Learning Materials 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters to use and modify this

More information

Extending Enterprise Architecture to a Business Discipline. William Sheleg Senior Manager Deloitte Consulting July 20, 2009

Extending Enterprise Architecture to a Business Discipline. William Sheleg Senior Manager Deloitte Consulting July 20, 2009 Extending Architecture to a Business Discipline William Sheleg Senior Manager Deloitte Consulting July 20, 2009 Agenda The Strategy Disconnect What s Needed to Make Strategy Work EA s Support for Business

More information

PUTTING Taking Strides Towards OUR BEST Effective Practices FOOT and Accountability FORWARD

PUTTING Taking Strides Towards OUR BEST Effective Practices FOOT and Accountability FORWARD PUTTING Taking Strides Towards OUR BEST Effective Practices FOOT and Accountability FORWARD THE BROADBENT IMPERATIVE A call to accountability Accountability is the requirement to explain and accept responsibility

More information

Certified Human Resources Professional (CHRP) Competency Framework

Certified Human Resources Professional (CHRP) Competency Framework Certified Human Resources Professional (CHRP) Competency Framework 11.15 Table of Contents About the CHRP... 3 Application of the Competency Framework... 3 Path to Obtain the CHRP... 4 Maintaining the

More information

Strategy Mapping During Fiscally Challenging Times

Strategy Mapping During Fiscally Challenging Times Strategy Mapping During Fiscally Challenging Times Robyn E. Scott EXECUTIVE SUMMARY It is important for managers to focus on improved performance measurement systems to motivate staff and develop resources.

More information

DIRECTOR TRAINING AND QUALIFICATIONS: SAMPLE SELF-ASSESSMENT TOOL February 2015

DIRECTOR TRAINING AND QUALIFICATIONS: SAMPLE SELF-ASSESSMENT TOOL February 2015 DIRECTOR TRAINING AND QUALIFICATIONS: SAMPLE SELF-ASSESSMENT TOOL February 2015 DIRECTOR TRAINING AND QUALIFICATIONS SAMPLE SELF-ASSESSMENT TOOL INTRODUCTION The purpose of this tool is to help determine

More information

Optimization: The Next Frontier

Optimization: The Next Frontier Optimization: The Next Frontier A White Paper Impact Advisors LLC January 2015 400 E. Diehl Road Suite 190 Naperville IL 60563 1 800 680 7570 Impact Advisors.com Table of Contents Introduction... 3 Optimization

More information

Management, Motivation, and Leadership: Bringing Business to Life

Management, Motivation, and Leadership: Bringing Business to Life 14 14-1 14-2 14-3 14-4 14-5 14-6 Management, Motivation, and Leadership: Bringing Business to Life Discuss the role of management and its importance to organizational success Explain key theories and current

More information

McKinsey BPR Approach

McKinsey BPR Approach McKinsey BPR Approach Kai A. Simon Viktora Institute 1General aspects Also McKinsey uses a set of basic guiding principles, or prerequisites, which must be satisfied in order to achieve reengineering success.

More information

BC Public Service Agency and BC Leadership Centre SERVICE PLAN 2004/ /07

BC Public Service Agency and BC Leadership Centre SERVICE PLAN 2004/ /07 BC Public Service Agency and BC Leadership Centre SERVICE PLAN 2004/05 2006/07 National Library of Canada Cataloguing in Publication Data BC Public Service Agency. Service Plan (electronic resource). 2004/2005/2006/2007

More information

First Strategic Thinking

First Strategic Thinking Board Leadership March 4, 2017 8:45am 12:00pm First Strategic Thinking then Strategic Planning Presented by: Scott Vaughan & Marci Scharle Community Development Unit Community Development Unit Planning:

More information

IT Services Management

IT Services Management RL Information Consulting LLC IT Services Management INFRASTRUCTURE ARCHITECTURE PLANNING Service Brief Prepared by: Rick Leopoldi August 4, 2009 Copyright 2009 RL Information Consulting LLC. All rights

More information

Manager, Supervisor & CEMA Skill Set Model County of Santa Clara

Manager, Supervisor & CEMA Skill Set Model County of Santa Clara Leads Innovation Leadership Styles Manages Change Models Integrity, Trust & Transparency Strategic Thinking and Planning Manager, Supervisor & CEMA Skill Set Model County of Santa Clara Conflict Management

More information

Illinois State Board of Education

Illinois State Board of Education Illinois State Board of Education February 2010 Guidance Document 10-01 Illinois Induction Program Continuum This document is intended to provide non-regulatory guidance on the subject matter listed above.

More information

High Performance Organization

High Performance Organization Kai Laamanen HPO description 1 (6) 15.10.2007 High Performance Organization Leaders of today face ever-increasing complexity in private business and public sector. Innotiimi meets the growing need for

More information

Human Resources FTE s

Human Resources FTE s 401 Human Resources Human Resources 220.2 FTE s General Manager Human Resources 4 FTE's Director Labour Relations 2 FTE's Organizational Effectiveness 2 FTE's Director Compensation Payroll & Benefits 2

More information

ROCKY MOUNTAIN PERFORMANCE EXCELLENCE POSITION DESCRIPTION FOR THE EXECUTIVE/MANAGING DIRECTOR

ROCKY MOUNTAIN PERFORMANCE EXCELLENCE POSITION DESCRIPTION FOR THE EXECUTIVE/MANAGING DIRECTOR ROCKY MOUNTAIN PERFORMANCE EXCELLENCE POSITION DESCRIPTION FOR THE EXECUTIVE/MANAGING DIRECTOR ABOUT THE ORGANIZATION: Rocky Mountain Performance Excellence (RMPEx) is a Colorado nonprofit corporation

More information

Organisational review of UNICEF

Organisational review of UNICEF Organisational review of UNICEF Request for proposals 1. Introduction While many gains have been made for the world s children, their situation remains grave in many countries. Making progress towards

More information

IS&T Leadership Job Description

IS&T Leadership Job Description IS&T Leadership Job Description December 1, 2015 IT Leadership Job Description December 1, 2015 Page i Table of Contents General Characteristics... 1 Job Path... 2 Explanation of Proficiency Level Definitions...

More information

Workplace Essential Skills Program

Workplace Essential Skills Program Workplace Essential Skills Program Strategic Plan 2011-2014 Prepared by: Community Adult Learning Services Branch Department of Post-Secondary Education, Training and Labour Education is not the filling

More information

Assessment of Your Knowledge of Principles in Organizational Consulting

Assessment of Your Knowledge of Principles in Organizational Consulting Assessment of Your Knowledge of Principles in Organizational Consulting Description A consultant is anyone in a role to help a person, process, team or organization to change, but who has no direct authority

More information

<Project Name> Business Case

<Project Name> Business Case Business Case Author(s) Contributors Department Campus DOCUMENT HISTORY Version Date Person Notes 1.0 ITS Portfolio Management Office Business Case Page 1 TABLE OF CONTENTS

More information

PROCUREMENT - FOLLOW-UP

PROCUREMENT - FOLLOW-UP PROCUREMENT - FOLLOW-UP 25. PROCUREMENT - FOLLOW-UP BACKGROUND.1 The Government Purchases Act controls the acquisition of goods in government. The Act assigns responsibility for acquisition of goods to

More information

Executive Director: Annual Evaluation

Executive Director: Annual Evaluation Please rate the Executive Director on the following attributes. Executive Director: Annual Evaluation 1 1.1 1.2 1.3 Vision, Mission, and Strategies The Executive Director maintains a clear vision for the

More information

Energy Trust of Oregon Strategic Plan

Energy Trust of Oregon Strategic Plan Energy Trust of Oregon 2015-2019 Strategic Plan October 1, 2014 Introduction Who We Are Energy Trust of Oregon is an independent nonprofit organization dedicated to helping 1.5 million customers of four

More information

RESEARCH REPORT. Includes complete survey data. Project Management Maturity & Value Benchmark

RESEARCH REPORT. Includes complete survey data. Project Management Maturity & Value Benchmark RESEARCH REPORT Includes complete survey data Project Management Maturity & Value Benchmark 2014 2 Project Management Maturity & Value Benchmark 2014 Introduction PM Solutions Research first surveyed organizations

More information

Ministry of Finance Comptroller General Victoria, BC

Ministry of Finance Comptroller General Victoria, BC Ministry of Finance Comptroller General Victoria, BC Provide your strong leadership, financial aptitude, and communication skills to this integral role in the executive team The Ministry of Finance plays

More information

Audit and Advisory Services Integrity, Innovation and Quality

Audit and Advisory Services Integrity, Innovation and Quality Audit and Advisory Services Integrity, Innovation and Quality Follow-up Progress Assessment of the Audit of IM/IT Project Life Cycle Controls 1577-13/14-101 Table of Contents EXECUTIVE SUMMARY 1 1. Introduction

More information

ARCHIVED - Evaluation Function in the Government of. Archived Content. Centre of Excellence for Evaluation Treasury Board of Canada Secretariat

ARCHIVED - Evaluation Function in the Government of. Archived Content. Centre of Excellence for Evaluation Treasury Board of Canada Secretariat Home > Expenditure Management > Centre of Excellence for Evaluation ARCHIVED - Evaluation Function in the Government of Canada This page has been archived. Archived Content Information identified as archived

More information

Unleashing the Enormous Power of Call Center KPI s. Call Center Best Practices Series

Unleashing the Enormous Power of Call Center KPI s. Call Center Best Practices Series Unleashing the Enormous Power of Call Center KPI s Call Center Best Practices Series 27 Years of Call Center Benchmarking Data Global Database More than 3,700 Call Center Benchmarks 30 Key Performance

More information

MAKE IT STICK! A Change Management Journey

MAKE IT STICK! A Change Management Journey MAKE IT STICK! A Change Management Journey A story of covert organizational transformation and overt project management interventions. Stacey Ferguson, Mark Alt, Paul Burke, Dan Olson 04.12.11: PMI-MN

More information

EXECUTIVE SUMMARY 9. Executive summary

EXECUTIVE SUMMARY 9. Executive summary EXECUTIVE SUMMARY 9 Executive summary The global financial and economic crisis is keeping several countries in the spiral of low growth, high unemployment and lower potential output, putting public finances

More information

Measuring Impact of Patient- and Family- Centered Care

Measuring Impact of Patient- and Family- Centered Care FACT SHEET Measuring Impact of Patient- and Family- Centered Care JUNE 2014 Why Measure Impact? Taking a patient- and family-centered approach to care has consistently been shown to improve the quality,

More information

Contents An Introductory Overview of ITIL Service Lifecycle: concept and overview...3 I. Service strategy...6 The 4 P's of ITIL Service

Contents An Introductory Overview of ITIL Service Lifecycle: concept and overview...3 I. Service strategy...6 The 4 P's of ITIL Service ITIL 2011 Notes Contents An Introductory Overview of ITIL 2011...3 Service Lifecycle: concept and overview...3 I. Service strategy...6 II. The 4 P's of ITIL Service Strategy...6 Key processes and activities...7

More information

Strategic Thinking for the New Reality: Creating and Executing a Blueprint for Your Custom Building Business

Strategic Thinking for the New Reality: Creating and Executing a Blueprint for Your Custom Building Business Strategic Thinking for the New Reality: Creating and Executing a Blueprint for Your Custom Building Business International Home Builders Show January 13, 2011 An outline of the talk given by Charles C.

More information

Quality Assessments of Statistical Production Processes in Eurostat Pierre Ecochard and Małgorzata Szczęsna, Eurostat

Quality Assessments of Statistical Production Processes in Eurostat Pierre Ecochard and Małgorzata Szczęsna, Eurostat Quality Assessments of Statistical Production Processes in Eurostat Pierre Ecochard and Małgorzata Szczęsna, Eurostat Since 1994, Eurostat has developed its own approach for the measurement of the quality

More information

ASPIRE Guideline. ASPIRE Guideline Achieving Greatness. Together

ASPIRE Guideline. ASPIRE Guideline Achieving Greatness. Together ASPIRE Guideline Achieving Greatness. Together 2 Together, we strive for performance excellence. Welcome AGCO has committed itself to provide high-tech solutions for professional farmers feeding the world

More information

STaR Recruitment Pack Head of Strategic Procurement People Category

STaR Recruitment Pack Head of Strategic Procurement People Category STaR Recruitment Pack Head of Strategic Procurement People Category 1 Contents Introduction 3 Background and context 5 Governance 6 Structure 6 Job Description and Person Specification 7 How is STaR Performing

More information

Supply Management Three-Year Strategic Plan

Supply Management Three-Year Strategic Plan Supply Management Three-Year Strategic Plan 2010-2012 Message From the Vice President, Supply Management I am pleased to present our new three-year strategic plan for fiscal years 2010 2012. The plan

More information

Accenture Federal Services. From Measurement to Improvement. Transforming Performance Management in Federal Agencies to Drive High Performance

Accenture Federal Services. From Measurement to Improvement. Transforming Performance Management in Federal Agencies to Drive High Performance Accenture Federal Services From Measurement to Improvement Transforming Performance Management in Federal Agencies to Drive High Performance Executive Summary The question we ask today is not whether our

More information

Conseil scolaire Viamonde (Conseil scolaire de district du Centre Sud-Ouest)

Conseil scolaire Viamonde (Conseil scolaire de district du Centre Sud-Ouest) Ministry of Education (Conseil scolaire de district du Centre Sud-Ouest) Follow-up Report to the Operational Review October 2011 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. STATUS AND IMPLEMENTATION UPDATE...

More information

IPAA Public Sector Excellence Model SUSTAINABLE EXCELLENCE IN PUBLIC SECTOR MANAGEMENT

IPAA Public Sector Excellence Model SUSTAINABLE EXCELLENCE IN PUBLIC SECTOR MANAGEMENT IPAA Public Sector Excellence Model SUSTAINABLE EXCELLENCE IN PUBLIC SECTOR MANAGEMENT Table of Contents The Prime Minister s Awards for Excellence in Public Sector Management...3 The IPAA Public Sector

More information

Precision Engineering Master Craftsman Certification (PeMC) Evaluation Form

Precision Engineering Master Craftsman Certification (PeMC) Evaluation Form Master Craftsman is the highest professional qualification accorded to highly skilled craftsmen in Singapore and is a representation of superior technical expertise and exceptional craftsmanship. The Master

More information

BALLOT MEASURE ASSISTANCE APPLICATION

BALLOT MEASURE ASSISTANCE APPLICATION BALLOT MEASURE ASSISTANCE APPLICATION Guidelines for the NEA Ballot Measures/Legislative Crises Fund require that affiliate requests for assistance be drafted in consultation with the NEA Campaigns and

More information

A Primer for the Project Management Process by David W. Larsen 1. Table of Contents

A Primer for the Project Management Process by David W. Larsen 1. Table of Contents A Primer for the Project Management Process by David W. Larsen 1 Table of Contents Description... 2 STAGE/STEP/TASK SUMMARY LIST... 3 Project Initiation 3 Project Control 4 Project Closure 6 Project Initiation...

More information

Balanced Scorecard Briefing for NAPA BaSIG

Balanced Scorecard Briefing for NAPA BaSIG Balanced Scorecard Briefing for NAPA BaSIG Ed Kufeldt Director, Corporate Planning ed.kufeldt@dfas.mil February 2004 Your Financial Partner @ Work Presentation Outline What is DFAS? DFAS approach to the

More information

Justice Canada. Audit of Cost Recovery Process Improvement (CRPI) Initiative Phase 1. Audit Report. Internal Audit Services.

Justice Canada. Audit of Cost Recovery Process Improvement (CRPI) Initiative Phase 1. Audit Report. Internal Audit Services. IA S AI Justice Canada Audit of Cost Recovery Process Improvement (CRPI) Initiative Phase 1 Audit Report Internal Audit Services March 2015 Information contained in this publication or product may be reproduced,

More information

4/26. Analytics Strategy

4/26. Analytics Strategy 1/26 Qlik Advisory As a part of Qlik Consulting, Qlik Advisory works with Customers to assist in shaping strategic elements related to analytics to ensure adoption and success throughout their analytics

More information

Action Planning Workbook

Action Planning Workbook Action Planning Workbook Building Your Organization s Capacity for Primary Prevention: Developing an Action Plan These materials were developed for the CDC Foundation by the Work Group for Community Health

More information

Audit of Cultural Industries Branch

Audit of Cultural Industries Branch REVISED October 11, 2012 Audit of Cultural Industries Branch Office of the Chief Audit and Evaluation Executive Audit and Assurance Services Directorate March 2012 Cette publication est également offerte

More information

PHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008)

PHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008) PHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008) PREPARED BY: Government Audit Services Branch Government of Yukon APPROVED BY: Audit Committee Table of Contents Page PREFACE 3 EXECUTIVE SUMMARY

More information

Internal Construction Management at Michigan State University

Internal Construction Management at Michigan State University Internal Construction Management at Michigan State University MSU Construction Industry Research and Education Center Sp Funding Provided by MSU office of Vice President of Finance and Operations Grant

More information

Goal-Driven Performance Measurement

Goal-Driven Performance Measurement Goal-Driven Performance Measurement Terry Vogt, CFPS ISMA Washington, DC September 2008 0 Agenda What is Performance Measurement Difficulties of Measurement Goal-Question-Indicator-Measurement (GQIM) Framework

More information

The Evolution of the HR Business Partner

The Evolution of the HR Business Partner The Evolution of the HR Business Partner A Discussion of the Changing Role of the HR Business Partner in a Shared Services Model June 2015 Copyright 2015 ScottMadden, Inc. All rights reserved. Agenda About

More information

CMMI-SVC V1.3 CMMI for Services Version 1.3 Quick Reference Guide

CMMI-SVC V1.3 CMMI for Services Version 1.3 Quick Reference Guide processlabs CMMI-SVC V1.3 CMMI for Services Version 1.3 Quick Reference Guide CMMI-SVC V1.3 Process Areas Alphabetically by Process Area Acronym processlabs CAM - Capacity and Availability Management...

More information

DEVELOPING KEY PERFORMANCE INDICATORS. - The Balanced Scorecard Framework -

DEVELOPING KEY PERFORMANCE INDICATORS. - The Balanced Scorecard Framework - DEVELOPING KEY PERFORMANCE INDICATORS - The Balanced Scorecard Framework - The purpose of this presentation is to identify and address the key questions necessary to design an effective framework for performance

More information

Supplier Relationship Management Study: Summary of Findings

Supplier Relationship Management Study: Summary of Findings Supplier Relationship Management Study: Summary of Findings Copyright 2016 by Vantage Partners, llc. All rights reserved. Supplier Relationship Management Study: Summary of Findings By Ashley Hatcher and

More information

Modern Management Practices Assessment. FINAL--September 2000

Modern Management Practices Assessment. FINAL--September 2000 Modern Management Practices Assessment FINAL--September 2000 Contents Background 5 Overview of modern management practices capacity check assessment 7 Objectives of the modern management practices capacity

More information

Understanding and Mitigating IT Project Risks BY MIKE BAILEY AND MIKE RIFFEL

Understanding and Mitigating IT Project Risks BY MIKE BAILEY AND MIKE RIFFEL Understanding and Mitigating IT Project Risks BY MIKE BAILEY AND MIKE RIFFEL Technology projects can present organizational challenges, and the associated risk is one of the finance officer s primary concerns

More information

The Concepts: Team Management Systems

The Concepts: Team Management Systems The Concepts: Team Management Systems The Concepts: Work Preferences Understanding work preferences is a critical component in developing individual, team and organizational performance. The Team Management

More information