1 Advanced Diploma in Purchasing and Supply Contracting in the Public Sector L5-14 LEVEL 5 MARKING SCHEME November 2007
2 SECTION A BGA Q1 (a) The question requires the candidate to do two things: outline the concerns and make recommendations. Syllabus Reference(s): Syllabus References All Answer content might include: The following list of issues is as a guide only; candidates may have other valid concerns; (2 marks each) Widespread delegated authority which leads to local decision making and potential disaggregation of supplies and services with potential legal challenges Inconsistent management and control of purchasing by senior management Possible incorrect or non-application of EU procurement directives, either knowingly to avoid them or unwittingly, because of low level of procurement expertise Low level of procurement expertise amongst PCA staff Poor or no MI on suppliers or costs No evidence of electronic or use of GPC card (or any other e-initiative) Question of ethics regarding brother-in-law No evidence of competitive tendering in Temps or Consultancy contracts and price seems only criteria for VFM Little or no contract management in some large contracts (temp and consultants) No regime of proper levels of approval nor authority to proceed No Gateway reviews considered No commercial relationship with Main Department or OGC Q1 (b) Syllabus Reference(s): 12 marks Syllabus References All L5-14/Nov07/BT/FV 2/13
3 Answer content might include: Recommendations could include; Centralising the PCA as a professional unit and taking away authority to ad hoc purchase in the field to gain control of all procurement and contract management across the agency Identify common services, goods and supplies across the agency to rationalise the number of suppliers, aggregate requirements and start to think about partnering with suppliers Increase Procurement and Contract management (CM) resources and start a training programme looking at developing staff in the PCA Appoint a professionally qualified procurement manager in accordance with NAO (1999) recommendations Recruit better qualified procurement and contract management staff to immediately raise the level of Procurement and CM staff Introduce frameworks, use OGCbs frameworks as soon as possible and set new rules that prevent staff using local purchased goods, supplies etc unless they are on frameworks Specific and immediate training for all staff in agency to raise awareness of EU directives Develop a Procurement and CM strategy for the Agency linked to its goals. Introduction of active contract management including incentives Aggregation of spend to improve leverage with supplier The introduction of compulsory use of GPC card which, amongst other things, will improve MI, purchasing authority, introduce limits on spend, reduce admin time by reconciling purchases made automatically to requisitions and orders therefore releasing admin resources to the front line The list of issues and recommendations is not exhaustive and candidates will have many other ideas for which credit (if relevant) will be given. 13 marks Q2 (a) Syllabus Reference(s): Syllabus References 2.6,4.3,4.4 L5-14/Nov07/BT/FV 3/13
4 Answer content might include: The issue of having good management information was a key area of the NAO report Improving Procurement Any organisation public or private runs many risks if it does not know its business. Public sector organisations require reliable information on procurement and contract spend and supplier performance. Reliable management information used strategically is an important tool that can identify inappropriate buying arrangements that are unlikely to secure value for money. If MI is ignored authorities could face the following risks (not exhaustive); By not monitoring and benchmarking prices paid for key items and services it is impossible to gauge VFM They risk losing leverage (if they have any) and handing over power to the supplier due to not reviewing the volume of procurement. They will have no idea what constitutes maverick spend Frameworks are unlikely to be utilised as volumes not known. They will be open to fraud as monitoring will be poor Strategy will be unreliable as it will not be backed up by reliable financial information Often MI is used for control of particular functions and activities (for example, volume discounts) and this will prove difficult Legal challenges could be made (such as EU aggregation rules) 11 marks Q2 (b) Syllabus Reference(s): Syllabus References 2.6,4.3,4.4 Answer content might include: The issue of having good management information was a key area of the NAO report Improving Procurement To mitigate risks BGA could look at the following (list not exclusive); Areas to be included (with short explanation why) - 2 marks each. How much is spent, with whom and on what goods and services The number of suppliers and the profile of expenditure with them Information up and down the supply chain Transaction costs for different types and size of item or service Estimates of maverick spend that fall outside organised arrangements The potential value for money options of OGCbs, GPC and so on The likely future demand for products and services in particular markets and how much will be spent Number and nature of contracts let with individual suppliers Contract end dates 14 marks L5-14/Nov07/BT/FV 4/13
5 Q3 (a) Syllabus Reference(s): Syllabus References 2.3,2.4 Answer content might include: Examples identified could include but not limited to; Contracts too large for SMEs Penalties Access to public sector market Feeling of safety with known or large suppliers Political pressure Location Delivery point Suppliers unaware of opportunities Capacity of the market Impact on competition Range of products/services included Scope for enhancing access of SMEs, Women owned, ethnic owned (1 mark each max 5 marks-identification only required) 5 marks Q3 (b) Syllabus Reference(s): Syllabus References 2.3,2.4 L5-14/Nov07/BT/FV 5/13
6 Answer content might include, but please note this is a wide ranging question and many other areas will be valid: This is a question relating to risk of dependency on too few suppliers Public sector organisations information regarding dependency is patchy too say the least (especially in central government) and this increases the risk that they can become reliant on a small number of firms (often large multinationals). This can be dangerous as leverage is reduced and prices/service levels may be adversely affected. The NAO (2004) identified 3 key areas where enhancement was needed to reduce the risk of dependency. (4 marks) Competition Authorities should actively seek opportunities to promote competition between suppliers. Obviously this will take place on OJEU cases where tendering (incl frameworks) are required but by breaking requirements down in a legal way may encourage greater competition by suppliers (4 marks) Sources of Supply Opportunities to have a wider range of sources of supply for key goods and services should be realised, innovative methods of sourcing the market (for example, electronic means) could be used. (4 marks) Active promotion including SME use Departments can actively promote the use of small and medium enterprises (SMEs), although care should be taken that EU rules are not breached. The small business service has recently launched the supply2gov online portal, giving SMEs direct contact with sub-ojeu public sector business opportunities. SMEs find it difficult to compete for public sector contracts which can mean that authorities lose the benefits that can be gained from SMEs, including better levels of service, more innovative solutions and increased competitiveness. (6 marks) Other examples; Procurement staff should be aware of initiatives in the market (examples not exclusive and credit given for others) OGC Better regulation task force/sbs report Government: supporter and customer? (2 marks) Supply2gov initiative (see above) Haringey pilot on better access for SMEs and women/ethnically owned firms (2 marks) West Midlands pilot working with 500 SMEs and so on (other examples will be given credit also (2 marks each) 20 marks Q4 Syllabus Reference(s): Syllabus References 3.2,3.3 L5-14/Nov07/BT/FV 6/13
7 Answer content might include: Candidates will need to build a case which could include the points below, although credit will be given for other relevant areas. There are many benefits deriving from actively managing suppliers. The main areas are (not exclusive); The quality of goods and services purchased and their fitness for purpose depends partly on the clarity with which requirements are specified. Proactive management of suppliers helps grow good communication and trust between the supplier and the authority and will ultimately improve VFM down the value chain to the end user. It will also improve the stifling of competition (NAO 2004). Competition is a reliable means of ensuring VFM. Clearer communication arises between the authorities procurement staff, suppliers and possibly, most important, the end user of the goods or services required Bureaucratic perceptions of procurement practices in the public sector (EU/Legal and so on) can be explained or dispelled and this could eventually lead to more small firms bidding. More consistent performance across the authorities in reducing the time it takes to tender for goods and services so as to minimise the burden on suppliers and encourage them to bid, increasing the chance of better quality competitions. By proactive management of suppliers a single source of access to all invitations to tender, for example, an online portal could be developed. Without proactive management this process would be difficult Perceptions that contracts are awarded solely on price could be improved by close communication with suppliers that weighting given to other criteria, such as quality of service, ranks equal or above when procurement decisions are made It ensures that earlier engagement with suppliers is made before and during the earliest stages of procurement It allows an easier mechanism for the effective provision of feedback as a relationship exists Overarching agreements are possible (especially for larger suppliers) giving the procurement staff the opportunity to build in volume discounts, locality discounts, secondees at cost, contract rate as opposed to daily rate and so on (although care must be given that evaluation staff are not influenced by these type of arrangements) (4 marks each bullet point) An excellent example of proactive management of suppliers was the Capability Assessment tool developed by the Highways Agency where validated CAT information is used to ensure that the best suppliers receive the most tendering opportunities. The CAT will help to improve the consistency, transparency and robustness of the selection of tenderers and will be used to take forward a programme of proactive supplier management. (6 marks) 25 marks L5-14/Nov07/BT/FV 7/13
8 Q5 Syllabus Reference(s): Syllabus References 2.2 L5-14/Nov07/BT/FV 8/13
9 Answer content might include: The following scheme is a guide only and many other examples will be relevant. Many public sector organisations purchase a range of similar goods and services. This commonality provides opportunities to purchase goods and services collectively. Public sector organisations are attractive to suppliers as they offer certainty (and prestige) and minimum levels of business this provides authorities with the opportunity to secure improved deals To ensure best deals authorities must work together as the sheer size of joint deals mean that greater discounts, improved service levels and so on can be negotiated. Co-ordination should take place between departments and their agencies and NDPBs who may be purchasing similar goods and services, providing considerable opportunities for increased VFM. Where OGCbs have negotiated framework agreements authorities need to ensure that they make full use of them to achieve price and process savings. Further examples (NAO 2004) include; Sharing of information on supplier performance Better communication between authorities to identify opportunities for collaborative purchasing Increasing the use of pan-government initiatives such as S-Cat, Catalist, joint agreements between police, fire authorities, regional purchasing consortia and so on. Gershon (2004) proposed (this is a summary only) that departments consider shared services in areas such as print, utilities and back office functions such as IT, HR, finance and procurement. He proposed that; The potential to make savings for the market segments relevant to them; The potential for departments to be change agents and promulgate successful examples and encourage use of shared procurement models (for example, frame works) To look at possible incentive structures for encouraging devolved bodies to participate in shared procurement models where they can provide superior VFM over existing arrangements; and The scope to make use of scarce in-house professional commissioning and procurement models, for example, regional purchasing consortia, piggy backing of contracts and so on. Other things to consider are geographical (local, regional, national, European, even global) and sectoral scope of the contract, EU and UK rules on aggregation and joining previously let frameworks or contracts, and how to cope with specific levels of tailoring which the end user may require. L5-14/Nov07/BT/FV 9/13
10 25 marks Q6 (a) Question 6 clearly asked for details of these concepts in terms of the public sector, for example, size, thresholds, political pressures, regulations and so on and marks will be allowed for candidates who remember this. Syllabus Reference(s): Syllabus References 1.5 L5-14/Nov07/BT/FV 10/13
11 Answer content might include: Whole Life Costing Candidates should demonstrate an understanding of the following key points but this is a wide topic and the narrative is not exhaustive. Any relevant examples (for example inclusion of whole life in ITTs, Discounting and so on) will be rewarded. Whole life costing (WLC) aims to determine the full cost of a solution to a requirement over the full period that the requirement will exist. Some costs are clear from the outset; however many of the costs of goods and services only arise after purchase, such as running costs, staff training, disposal costs and so on. Also as part of a whole life costing environmental issues must be taken into consideration in the business case and specification. This is particularly important in the public sector where strict policy and objectives on environmental issues exist (for example, sustainability, timber purchases and so on). WLC principles, however, are broadly the same however for the public and private sectors. WLC can be applied to leased assets as well as owned assets and can be used in the public sector to compare the cost of leasing and outright purchase. WLC is a means of costing different methods of achieving an objective. The specification should be clear in terms of operating costs and disposal to give the full cost over a lifetime. The cost of using an item can be broadly divided into three categories: acquisition, running and disposal costs Although WLC deals with the cost of a requirement over its life candidates should remember that different solutions have different life spans and a form of annualisation may be required at the business case stage. WLC should form the element in purchasing decisions which should also reflect quality, environmental, social and price considerations. In taking these factors into consideration, public sector organisations must also act within a clear policy framework and comply with the law and regulations. WLC must be used in the context of the need to obtain VFM in the public sector purchasing decisions. Cost alone, even WLC does not capture all of the information relevant to a purchasing decision. In the public sector especially VFM does not simply mean choosing the cheapest option which meets the minimum requirements but is defined as the optimum combination of whole life costs and quality (and fitness for purpose) to meet the customer s requirement. 13 marks Q6 (b) Syllabus Reference(s): Syllabus References 1.5 L5-14/Nov07/BT/FV 11/13
12 Answer content might include: An investment appraisal is a technique whereby the need for the decision is outlined and set in the context of the Public Sector organisations strategy, where all realistic options are identified and the relative merits and drawbacks of each option are analysed, culminating in the identification of a preferred course of action. It is used to evaluate proposals to invest in a project to ascertain the benefit of making the expenditure. A public sector investment appraisal can be broken down into the following basic steps: a. Identify the need or problem, set in the context of the authority s strategies and define the objectives of the project b. Identify the options c. Assess the cost and benefits, financial and otherwise, of each option i. Analysis of non-financial benefit ii. Financial Analysis - Calculation of Net Present Value over an appropriate time period d. Consider risk and uncertainty e. Presentation of results and assessment of affordability A private sector organisation may concentrate more on the financial elements whereas a public authority must demonstrate all of the above. Therefore, in public sector cases, there are likely to be several proposals on the table at any one time. There are three main financial methods of investment appraisal, varying in degrees of accuracy and sophistication and candidates are required to give a short explanation of each; Payback, that is, which project has the shortest payback Average rate of return, that is, the yearly return on an investment Net Present Value (NPV) that is, the discounted value of money in the future 12 marks END OF MARKING SCHEME L5-14/Nov07/BT/FV 12/13
13 Question Develop The Business Case 1.1 x x 1.4 x 1.5 x 2 Analyse the Scope and Nature of the Contract x 2.3 x 2.4 x x 2.5 x 2.6 x 3 Manage the Supplier Selection Process Through the Application of Appropriate Rules and Procedures 3.1 x 3.2 x x 3.3 x 4 Develop and Maintain Positive Relationships With Suppliers to Realise Benefits from the Contract 4.1 x 4.2 x 4.3 x 4.4 x x L5-14/Nov07/BT/FV 13/13
Graduate Diploma in Purchasing and Supply. Public Sector Stakeholders and Governance L6-14 LEVEL 6. Senior Assessor s Examination Report
Graduate Diploma in Purchasing and Supply Public Sector Stakeholders and Governance L6-14 LEVEL 6 Senior Assessor s Examination Report November 2009 SECTION A Taking the role of the head of procurement
More informationContract Management arrangements - Procurement Policy update
Agenda item: 13 Report title: Report by: Action: Contract Management arrangements - Procurement Policy update Gordon Duffus, Head of Procurement, Resources and Quality Assurance, gordon.duffus@gmc-uk.org,
More informationPROCUREMENT STRATEGY. October 2016
PROCUREMENT STRATEGY October 2016 1 Contents Foreword... 3 1.0 Introduction... 3 2.0 Objectives... 4 3.0 Principles... 4 4.1 Governance and Organisation... 5 4.2 Roles and Responsibilities... 5 4.2.1 Board...
More informationAnnual Procurement Report 2016/17
Annual Procurement Report 2016/17 Publication date: 12 September 2017 Publication code (leave blank Comms will complete this) Page 1 of 15 Annual Procurement Report 2016/17 Prepared by: Gillian Berry,
More informationProcurement Policy & Procedures
Procurement Policy & Procedures 1 Introduction 2 Objectives 3 Organisation 4 Authority 5 Procurement Procedures 6 EU Procurement Regulations 7 General Principles of Procurement 8 Reporting & Information
More informationProcurement Policy Approved May 2017
Procurement Policy Approved May 2017 Contents 1. Background 3 2. Aim 3 3. Scope 4 4. Objectives 4 5. Policy Responsibility 4 6. Review 5 7. Linkages (to other Policies) 5 8. Procurement Approach 5 9. Procurement
More informationProcurement Strategy Version 08 October Reference Version 08
Strategy 2016-2020 Version 08 October 2016 Reference Version 08 Issue date October 2016 Review date October 2018 Introduction At Red Kite, achieving value for money in delivering our corporate vision is
More informationJOB DESCRIPTION. Job title. Senior Procurement Manager. 2-year fixed term contract. Band 2. 52,312-64,208 per annum. Main purpose of the job:
JOB DESCRIPTION Job title Senior Procurement Manager 2-year fixed term contract Band 2 52,312-64,208 per annum Main purpose of the job: The Finance and Procurement Team provides a full range of finance
More informationCorporate Procurement Policy
Corporate Procurement Policy Director Responsible Author Gordon Laidlaw (Finance & IT) Roy Aitken (Procurement Manager) Date October 2015 Version Number 2 Approved by Board Dec 2015 Review Date Nov 2018
More informationCentral Procurement Directorate. removing the barriers to SMEs
Central Procurement Directorate removing the barriers to SMEs A GUIDE TO PURCHASERS FOREWORD Public procurement policy recognises the importance of SMEs both for the vital contribution they make to the
More informationZSIC GROUP OF COMPANIES PROCUREMENT PLAN EXCEL VERSION
ZSIC GROUP OF COMPANIES PROCUREMENT PLAN 2015 EXCEL VERSION 1 P a g e 2 P a g e ZSIC Group Procurement Plan 2015 Contents Page 1. Background 3 2. Introduction 4 3. Executive Summary 5 4. Overall Expenditure
More informationScotland Excel Executive Sub Committee
Scotland Excel Executive Sub Committee To: Executive Sub Committee On: 17 June 2016 Report by Director Tender: Street lighting bulk renewal of luminaires Schedule: 10/13 Period: 1 July 2016 until 30 June
More informationGLOSSARY C O N T E N T S PAGE. Group Procurement Strategy
C O N T E N T S PAGE 1 Executive Summary 3 2 Scope of this Strategy 3 3 Procurement Principles 4 4 Route To Market 6 5 Procurement Governance 8 6 Procurement Plan 2018/19 8 GLOSSARY EU European Union ICT
More informationCorporate Strategy for Commissioning and Procurement
Corporate Strategy for Commissioning and Procurement 2012-2015 Page 1 of 19 C ontents 1 I n t r o d u c t i o n... 3 Introduction to Durham County Council... 3 Introduction to the Corporate Strategy for
More informationPROCUREMENT STRATEGY & ACTION PLAN. April 2012 March 2015
PROCUREMENT STRATEGY & ACTION PLAN CONTENTS Page 1 Executive Summary 2 2 Strategic Context 2 3 Scope 3 4 Values 3 5 Structure and Responsibilities 5 6 Aims, Objectives and Initiatives 6.1 Sustainability
More informationThe impact and progress achieved against each of the principles of the 2015 WPPS is summarised below:
Y Pwyllgor Cyfrifon Cyhoeddus / Public Accounts Committee PAC(5)-07-18 P2 National Assembly for Wales Public Accounts Committee: Public Procurement Evidence from Welsh Government Welsh Government Leadership
More informationProcurement Strategy
Procurement Strategy 2017-2020 POLICY AND PROCEDURE Procurement Strategy DATE OF FIRST ISSUE December 2014 ISSUE NUMBER 2 APPROVING BODY Board of Management DATE OF APPROVAL March 2017 RESPONSIBLE PERSON
More informationSUSTAINABLE PROCUREMENT POLICY & STRATEGY
SUSTAINABLE PROCUREMENT POLICY & STRATEGY Sustainable procurement is a process whereby organisations meet their needs for goods, services, works and utilities in a way that achieves value for money on
More informationBusiness Planning and Business Cases. The development and approval of Programmes and Projects
HM TREASURY Business Planning and Business Cases The development and approval of Programmes and Projects Joseph Lowe Head of Economics Branch Public Services and Growth Directorate HM Treasury Green Book
More informationPROGRESS REPORT ON THE BEST VALUE IMPROVEMENT PLAN FOR PROCUREMENT
PAPER B RESOURCES SELECT COMMITTEE - 1 NOVEMBER 2004 PROGRESS REPORT ON THE BEST VALUE IMPROVEMENT PLAN FOR PROCUREMENT REPORT OF THE PORTFOLIO HOLDER FOR RESOURCES REASON FOR SELECT COMMITTEE CONSIDERATION
More informationA simple Procurement Process Flow diagram is shown in Appendix 1 and should be considered when carrying out spend.
Scottish Canals Procurement Policy Introduction The Scottish Canals Procurement Policy supports the Scottish Canals Procurement Strategy and sets out the method of delivery of the day-to-day procurement
More informationThe Forward Plan for e-auctions
Procurement The Forward Plan for e-auctions www.ogc.gov.uk The Forward Plan for e-auctions E-auctions are a procurement tool with a proven track record of delivering significant savings during the purchase
More information1.3 If further guidance is required staff should contact the Head of Strategic Procurement.
Procurement Policy 1. Introduction 1.1 The University has a devolved procurement structure and this document is intended to give clear guidance to staff in teaching and central service departments who
More informationProcurement of Specialist Professional Services
Meeting: Executive Date: 22 April 2014 Subject: Report of: Summary: Procurement of Specialist Professional Services Cllr Maurice Jones Deputy Leader and Executive Member for Corporate Resources The report
More informationLCFT High Value Orders (Including Breach and Waiver) Procedure. Issued: November 2011
LCFT High Value Orders (Including Breach and Waiver) Procedure Issued: November 2011 Document revision control LCFT High Value Orders (Including Breach and Waiver) Procedure Version Author/editor Notes
More informationProcurement Strategy and Action Plan
Strategy and Action Plan 2016-2021 1. Context The University of Aberdeen s Strategic Plan contains a vision to transform the world with greater knowledge and learning and to be one of the world s top seats
More informationClinical Commissioning Group Governing Body Paper Summary Sheet Date of Meeting: 19 May 2015
Clinical Commissioning Group Governing Body Paper Summary Sheet Date of Meeting: 19 May 2015 For: PUBLIC session PRIVATE Session For: Decision Discussion Noting Agenda Item and title: Author: GOV/15/05/10
More informationProcurement Policy. Policy Objectives
Procurement Policy Policy Type: Council Policy Policy Owner: Director Corporate Services Policy No. CP- 023 Last Review Date: 20 November 2018 Policy Objectives The objectives of this Policy are to ensure
More informationAnnual Procurement Report 2017/18. Prepared by: Gillian Berry, Senior Accountant Contact:
Annual Procurement Report 2017/18 Prepared by: Gillian Berry, Senior Accountant Contact: 01382 207140 Approved by: Board: 18 December 2018 1 Contents 1.0 Introduction 1.1 About the Care Inspectorate 2.0
More informationReport by the Comptroller and. SesSIon October Central government s use of consultants and interims
Report by the Comptroller and Auditor General HC 488 SesSIon 2010 2011 14 October 2010 Central government s use of consultants and interims 4 Summary Central government s use of consultants and interims
More informationPLEASURES AND PI OF PROCUREMENT
Brick Workshop 28 29/06/2017 Brymbo Ironworks PLEASURES AND PI OF PROCUREMENT PROCUREMENT The purchase of work, services, goods and assets PROCUREMENT PROCESS The actions taken in purchasing work, services,
More informationProcurement Policy. November Also available in large print (16pt) and electronic format. Ask Student Services for details.
Procurement Policy November 2016 Also available in large print (16pt) and electronic format. Ask Student Services for details. www.perth.uhi.ac.uk Perth College is a registered Scottish charity, number
More informationHigher Education Procurement Association. Procurement Benefits Reporting Guidance 2016/17 Onwards
Higher Education Procurement Association Procurement Benefits Reporting Guidance 2016/17 Onwards January 2017 1 Contents Section Subject Page Section 1 Background & Introduction 3 Section 2 Reporting 4
More informationLevel 5 NVQ Diploma in Management and Leadership Complete
Learner Achievement Portfolio Level 5 NVQ Diploma in Management and Leadership Complete Qualification Accreditation Number: 601/3550/5 Version AIQ004461 Active IQ wishes to emphasise that whilst every
More informationHOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS
HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS Produced by Bangor University s Corporate Procurement Team July 2016 Version 1.0 CONTENT About this Guide.. 3 Background.. 4 The Procurement
More informationQuestions and answers
The Engagement Gateway Pre qualification questionnaire Questions and answers Q1. At launch events, there were a specific number of participants mentioned at the three levels. Have these numbers changed?
More informationMedical Category Tower Providers Contract Awards. Questions and Answers
Medical Category Tower Providers Contract Awards Questions and Answers 1. What is the Future Operating Model (FOM)? The National Health Service (NHS) has the potential, through greater collaboration, to
More informationISLE OF MAN GOVERNMENT PROCUREMENT POLICY GD 2017/0026
ISLE OF MAN GOVERNMENT PROCUREMENT POLICY GD 2017/0026 INCLUSIVE TOLERANT SUSTAINABLE INTRODUCTION This Document sets out the Council of Ministers Procurement Policy for Government Ministerial Forward
More informationCIPS POSITIONS ON PRACTICE PURCHASING AND SUPPLY MANAGEMENT: BUYING ALLIANCES
CIPS POSITIONS ON PRACTICE PURCHASING AND SUPPLY MANAGEMENT: BUYING ALLIANCES INTRODUCTION The CIPS' practice documents are written as a statement in time. They are a collection of views on good practice
More informationProcurement Strategy
Procurement Strategy Contents Introduction... 2 Objectives... 2 Our Key Procurement Principles... 3 The Procurement Process... 4 Sustainable Procurement... 5 1 P a g e Introduction Procurement is defined
More informationThe Gym Group plc. (the Company ) Audit and Risk Committee - Terms of Reference. Adopted by the board on 14 October 2015 (conditional on Admission)
The Gym Group plc (the Company ) Audit and Risk Committee - Terms of Reference Adopted by the board on 14 October 2015 (conditional on Admission) 1. BACKGROUND The board of directors of the Company (the
More information48.2 Follow OJEU guidelines for procurement tenders and incorporate sustainable procurement where possible and compliant with the OJEU guidelines
UCLH Actions Optimising Policy Aims (source: UCLH Carbon Reduction and Sustainability Management Plan, 2010) Policy 48.1 Produce updated sustainable procurement policy. Refer to NHS/ DH sustainability
More informationPROCUREMENT POLICY. Director of Finance Head of Financial Services. The Intranet version of this document is the only version that is maintained.
PROCUREMENT POLICY Document Summary To ensure the Trust s approach to Purchasing, Supply and Distribution provides the maximum benefit in both cost and service to the Trust. DOCUMENT NUMBER POL/002/043
More information1.1 This document details Edinburgh College s Procurement Policy and will support the values adopted by the College by:
Policy Finance 1 Issue No 1 Issue Date 01/01/13 Review Date 01/01/16 EIA Prepared by L Dunlop PROCUREMENT POLICY 1. INTRODUCTION 1.1 This document details Edinburgh College s Procurement Policy and will
More informationProcurement Policy. Education is for improving lives and for leaving your community and world better than you found it.
Procurement Policy Education is for improving lives and for leaving your community and world better than you found it. Review date: April 2020 Page 1 of 13 Contents 1. Introduction... 3 2. Principles...
More informationCIPS Exam Report for Learner Community:
CIPS Exam Report for Learner Community: Qualification: Advanced diploma in procurement and supply Unit: AD4 - Category management in P&S Exam series: Nov 2016 Each element of a question carries equal weighting
More informationCIPS Exam Report for Learner Community:
CIPS Exam Report for Learner Community: Qualification: Diploma in Procurement and Supply Unit: D1 Contexts of Procurement and Supply Exam series: July 2017 Each element of a question carries equal weighting
More informationEnvironmental and Sustainable Procurement Policy
Environmental and Sustainable Procurement Policy Graham Beck FlnstLM, MCIPS February 2015 Contents 1. General Policy Statement 2. Aims of the Policy 3. Strategic Objectives 4. Trust Responsibility 5. Delegated
More informationPROCUREMENT AND TENDERING PROCEDURES POLICY 2018
PROCUREMENT AND TENDERING PROCEDURES POLICY 2018 1. Purpose of Document This document has been produced to help define and explain each individual s responsibilities in relation to Weymouth BID s procurement
More informationLANCASHIRE COMBINED FIRE AUTHORITY PROCUREMENT STRATEGY
LANCASHIRE COMBINED FIRE AUTHORITY PROCUREMENT STRATEGY 2018-21 CONTENTS 1. INTRODUCTION... 3 2. BACKGROUND... 3 3. WHAT IS PROCUREMENT... 3 4. APPLICABILITY... 4 5. PROCUREMENT PRINCIPLES... 4 6. CONTROLS,
More informationProcurement Strategy period September 2012 September 2014
National Library of Scotland Procurement Strategy period September 2012 September 2014 Aims This document aims to identify NLS strategy for the development and continued improvement of procurement systems,
More information239 Purchasing V4 Current
239 Purchasing V4 Current 1 PURPOSE This policy provides a best practice approach to purchasing for the City of Busselton (the City ). It also ensures compliance with the Local Government Act 1995 ( the
More informationDecision-making Exercises and Tools
Decision-making Exercises and Tools This Section presents four decision making exercises for use by advisors to help groups decide which organisational structure is most appropriate for their needs. The
More informationQuantitative Benefit Methodology. July 2012
Quantitative Benefit Methodology July 2012 SCOTTISH FUTURES TRUST QUANTITATIVE BENEFIT METHODOLOGY SFT s Quantitative Benefit Methodology Introduction In order to recognise SFTs benefits, a methodology
More informationP2 Performance Management
Performance Pillar P2 Performance Management Examiner s Answers SECTION A Answer to Question One (a) Flexed Actual Budget Output (batches) 50 50 Variance Direct labour hours 68 91 93 65 24 74 adverse Direct
More informationCIPS Exam Report for Learner Community:
CIPS Exam Report for Learner Community: Qualification: Diploma in Procurement and Supply Unit: Contexts of Procurement and Supply Exam series: November 2016 Each element of a question carries equal weighting
More informationILM Level 5 NVQ Diploma in Management and Leadership (QCF) 601/3254/1
ILM Level 5 NVQ Diploma in Management and Leadership (QCF) 601/3254/1 Contents Page Qualification Overview: ILM Level 5 NVQ Diploma in Management 3 and Leadership Mandatory Units Group A Specifications
More informationProject: Replacement provision for the Highway Term Service Contract (HTSC)
BUSINESS JUSTIFICATION CASE (BJC) Project: Replacement provision for the Highway Term Service Contract (HTSC) Purpose: To support the Councils Highways Service in the management of highways infrastructure,
More informationGLASGOW WEST HOUSING ASSOCIATION PROCUREMENT STRATEGY
GLASGOW WEST HOUSING ASSOCIATION PROCUREMENT STRATEGY 2016-2020 Glasgow West Housing Association Limited Registered with The Scottish Housing Regulator HEP126 Registered under the Co-operative and Community
More informationADVANCED PROCUREMENT FOR UNIVERSITIES AND COLLEGES WRITTEN SUBMISSION
ADVANCED PROCUREMENT FOR UNIVERSITIES AND COLLEGES Introduction WRITTEN SUBMISSION APUC is the Procurement Centre of (procurement) expertise and representative body for procurement matters for all of Scotland
More informationBenefits and issues of managed services. Executive summary
Benefits and issues of managed services Benefits and issues of managed services Executive summary March 2008 http://www.becta.org.uk page 1 of 7 Executive summary Introduction A managed service is any
More informationPROCUREMENT POLICY. Revision Revision Date Owner Reference Comment 00 September Procurement
PROCUREMENT POLICY Revision Revision Date Owner Reference Comment 00 September 2011 Procurement FIN-POL-003 Format Revised / Bribery Act 01 January 2012 Procurement FIN-POL-003 OJEU / DCMS amends / change
More informationAudit services outline procurement strategy
Audit services outline procurement strategy November 2016 High quality independent audit is one of the cornerstones of public accountability. It gives assurance that taxpayers money has been well managed
More informationInternational Advanced Certificate in Purchasing and Supply ANALYSING THE SUPPLY MARKET. A6/Nov10 LEVEL 4 MARKING SCHEME. November 2010.
International Advanced Certificate in Purchasing and Supply ANALYSING THE SUPPLY MARKET A6/Nov10 LEVEL 4 MARKING SCHEME November 2010 SuperShave SECTION A Questions 1-10 are multiple choice questions.
More informationPoint of View. Capability Optimization & Doing more with Sourcing and Procurement BPO : Strategic end to end Category Management.
Infosys BPO Point of View Capability Optimization & Doing more with Sourcing and Procurement BPO : Strategic end to end Category Sue Woodall End-to-End (E2E) Category is a continuum of identifying and
More informationCIPS Exam Report for Learner Community:
CIPS Exam Report for Learner Community: Qualification: Professional diploma in procurement and supply Unit: PD5 - Programme and project management Exam series: Nov 2016 Each element of a question carries
More informationProcurement Strategy
Financial and Commercial Services Procurement Strategy 2017-2025 Report author: James Platts, Associate Director of Procurement Date: 23 June 2017 Version Control Sheet Version Date Reviewed By Revision
More informationSTRATEGIC CASE STUDY FEBRUARY 2018 EXAM ANSWERS. Variant 5. The February 2018 exam can be viewed at
STRATEGIC CASE STUDY FEBRUARY 2018 EXAM ANSWERS Variant 5 The February 2018 exam can be viewed at These answers have been provided by CIMA for information purposes only. The answers created are indicative
More informationResource Efficiency Framework Agreement Advice, Support and Delivery Service for Energy Efficiency Advice and Environmental Consultancy
Y Pwyllgor Cyfrifon Cyhoeddus / Public Accounts Committee PAC(4)-24-15 P3B Resource Efficiency Framework Agreement Advice, Support and Delivery Service for Energy Efficiency Advice and Environmental Consultancy
More informationProcurement Department PROCUREMENT STRATEGY
Procurement Department PROCUREMENT STRATEGY 2012-2014 CONTENTS Section Page Introduction 3 The University s Mission Statement 3 Aim of the Procurement Department Considerations by the Procurement Department
More informationOptions Appraisal for Repairs and Maintenance Services for Babergh and Mid Suffolk District Councils (MSDC)
Appendix 1 Options Appraisal for Repairs and Maintenance Services for Babergh and Mid Suffolk District Councils (MSDC) Executive Summary This report presents the options available for providing repairs
More informationYHN s Corporate Procurement Strategy
YHN s Corporate Strategy 2014-2018 YHN s Corporate Strategy 2014-2018 - 1 - - 2 - Version control table Version number: 1 Date original version produced November 2014 Date current version produced: November
More informationApproach to Value for Money. Ginny Warr Head of Procurement
Approach to Value for Money Ginny Warr Head of Procurement Background to Sovereign Pre 2011 Sovereign Housing Group Ltd Sovereign Housing Association Ltd Twynham Housing Association Ltd The Vale Housing
More informationFollow-Up on VFM Section 3.13, 2016 Annual Report RECOMMENDATION STATUS OVERVIEW
Chapter 1 Section 1.13 Supply Chain Ontario and Procurement Practices Follow-Up on VFM Section 3.13, 2016 Annual Report RECOMMENDATION STATUS OVERVIEW # of Status of Actions Recommended Actions Fully In
More informationAPUC Strategy 2015 to 2018
APUC Strategy 2015 to 2018 The Core Vision and Mission of APUC is To maximise the value of Scotland s investment in further and higher education by working in partnership with institutions to support and
More informationWhite paper. Portland. Do More With Bpo End-To-End Category Management Delivers Sustainable Value. Sue Woodall
White paper Do More With Bpo End-To-End Category Management Delivers Sustainable Value Sue Woodall Portland Capability optimisation means expanding spend under management and procurement capability to
More informationRole Type Pay Band Location Duration Reports to:
Role Title Finance Manager Zambia Accountability Programme (ZAP) Role Information Role Type Pay Band Location Duration Reports to: Advisory, Policy and Expertise 8/E (Locally engaged) Lusaka, Zambia 14
More informationSUSTAINABLE PROCUREMENT POLICY
Ref No: SPP/1b SUSTAINABLE PROCUREMENT POLICY Version: Ratified by: Title of originator/author: Title of responsible committee/individual: SECTION 1 PROCEDURAL INFORMATION Date issued: May 2017 Review
More informationSimplifying Supplier Selection. Sue Hurrell, Value Wales
Simplifying Supplier Selection Sue Hurrell, Value Wales What am I covering? Background Supplier Selection what we set out to achieve SQuID what is it? The risk-based approach Summary of content The project
More informationTransforming the UK Government Estate
Transforming the UK Government Estate The role of the Office of Government Commerce Mike Burt Director, Government Estate Transformation Office of Government Commerce The context Government procurement,
More informationCompetitive Tendering Policy. Pate s Grammar School
Competitive Tendering Policy Pate s Grammar School Approved by: Finance & Facilities Committee Date: May 2018 Last reviewed: May 2018 Next review due by: May 2020 Contents 1. Aims... 1 2. Legislation and
More informationProcurement Policy and Procedures
Procurement Policy and Procedures Document Ref: PP001 version 2 Publication Date: February 2018 Review Date: 12 months (January 2019) Author: F Ward, Head of Procurement Part 1: Purpose and Scope of Activity
More informationSRUC Procurement Strategy and Action Plan
SRUC Procurement Strategy and ction Plan In accordance with the Procurement Reform (Scotland) ct 2014 (the ct), Sections 8 and 15, this strategy aligns with SRUC s Strategic Plan 2018-2023 and describes
More informationPublic Private Partnerships: Airwave
Public Private Partnerships: Airwave REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 730 Session 2001-2002: 11 April 2002 LONDON: The Stationery Office 0.00 Ordered by the House of Commons to be printed
More informationEUROCITIES position on the European Commission legislative proposal on public procurement
EUROCITIES position on the European Commission legislative proposal on public procurement EUROCITIES EUROCITIES is the political platform for major European cities towards the EU institutions. We network
More informationMANAGEMENT CASE STUDY NOVEMBER 2018 EXAM ANSWERS. Variant 5
MANAGEMENT CASE STUDY NOVEMBER 2018 EXAM ANSWERS Variant 5 These answers have been provided by CIMA for information purposes only. The answers created are indicative of a response that could be given by
More informationMILITARY OUTSOURCING: UK EXPERIENCE. Professor Keith Hartley Director Centre for Defence Economics University of York
MILITARY OUTSOURCING: UK EXPERIENCE Professor Keith Hartley Director Centre for Defence Economics University of York Introduction The UK Ministry of Defence (MoD) and the Armed Forces have considerable
More informationReduce the cost of trading. with your suppliers
trade simple provides comprehensive purchasing control and ensures all the process and pain of online ordering is handled for you. We would recommend it to anyone in the hospitality industry. Colin Simpson,
More informationProcurement Strategy and Action Plan. Financial Year
Procurement Strategy and Action Plan Financial Year 2018-2019 Status Final Owner Procurement Source location Procurement website Consultation APUC Endorsed Audit Committee 11 June 2018 Publication 1 August
More informationPLEASE ASK A MEMBER OF STAFF IF YOU WOULD LIKE A VERSION IN A DIFFERENT FORMAT
Procurement Policy AS WITH ALL OF THE ASSOCIATION S POLICIES & PROCEDURES, THIS DOCUMENT, IN FULL AND IN PART, IS AVAILABLE IN SUMMARY, ON TAPE, IN BRAILLE, AND IN TRANSLATION INTO MOST OTHER LANGUAGES.
More informationTrends in NHS Procurement and their impact
Trends in NHS Procurement and their impact HFMA Procurement Forum 24 th May 2018 Beth Loudon Head of Sourcing and Procurement NHS Shared Business Services What are we going to talk about? Explore the concept
More informationISEB Certificate in Project Management for Information Systems
ISEB Certificate in Project Management for Information Systems Sample Paper A Rationale, Specimen Answers and Page 1 of 13 Rationale This paper includes a scenario, three questions for the candidate and
More informationSUSTAINABLE PROCUREMENT POLICY- BP017
SUSTAINABLE PROCUREMENT POLICY- BP017 1 of 8 Issue log Version 2.2 Originator (job title) Senior Procurement Manager Date ratified 02/01/2014 Document Manager Senior Procurement Manager Date issued 02/01/2015
More informationDesigning and implementing a comprehensive framework for people management
For the Public Sector Designing and implementing a comprehensive framework for people management Presented by: Transforming people management Introduction Every organisation needs to organise and describe
More informationProcurement Policy 4P/ Institutional Chief Director: Finance. Financial Administration. Approved by Council. Council
Procurement Policy Reference number Accountable executive manager Policy owner Responsible division Status Approved by 4P/4.2.1 Executive Director: Finance and Facilitities Institutional Chief Director:
More informationBCS, The Chartered Institute for IT. Consultation Response: HM Government Making Public Sector Procurement More Accessible to SMEs
BCS, The Chartered Institute for IT Consultation Response: HM Government Making Public Sector Procurement More Accessible to SMEs Dated: 17 October 2013 BCS The Chartered Institute for IT First Floor,
More informationProcurement Policy. Version: 1.0 Bodies consulted: Date Approved: 25 September 2018 Director of Financial Operations
Procurement Policy Version: 1.0 Bodies consulted: EMT Approved by: Board of Directors Date Approved: 25 September 2018 Lead Manager: Director of Financial Operations Responsible Director: Director of Finance
More informationINSTITUTION OF CIVIL ENGINEERS (ICE) SCOTLAND WRITTEN SUBMISSION
INSTITUTION OF CIVIL ENGINEERS (ICE) SCOTLAND WRITTEN SUBMISSION Introduction and background The Institution of Civil Engineers is a global membership organisation which qualifies civil engineers, exchanges
More informationPROMOTING THE INCLUSION OF SMALLER PRACTICES IN THE MARKETS FOR PUBLIC CONTRACTS. Submission from the CIC to the Department of Finance
PROMOTING THE INCLUSION OF SMALLER PRACTICES IN THE MARKETS FOR PUBLIC CONTRACTS Submission from the CIC to the Department of Finance October 2009 Submission to the Department of Finance by Construction