1 Austrian Gas Infrastructure Development Day 2018 TRANS AUSTRIA GASLEITUNG GmbH KNEP Vienna,

2 Content 1. The TAG System Transit and Supply 2. Commercial activity 3. Capacity scenario and capacity projects 4. Re-investment projects

3 The TAG System The TAG-System - 3 Pipelines of 380 km each:1140 km - 5 compressor stations: 480 MW Maximal technical transportation capacity Netzkopplungspunkte - 2 cross border interconnection points with metering stations (BGT, ARNO) - 10 to the domestic Austrian distribution system - 4 national internal (TAG<>GCA) 3 in Baumgarten with WAG and PVS 1 1 in Weitendorf wiht the SOL pipeline Entry-Exit System: relevant points and Y-tarifs 2 Entry Baumgarten (FZK) 0,77 EUR/kWh/h Exit Arnoldstein (FZK) 4,63 EUR/kWh/h Entry Arnoldstein (DZK) 0,62 EUR/kWh/h Exit Baumgarten (UK) 1,12 EUR/kWh/h Sourcing of Fuel gas / Electricity - via tenders 13,6 Bcm/y DE IT 39,2 Bcm/y CS/MS BAUMGARTEN CS EGGENDORF CS GRAFENDORF CS WEITENDORF CS RUDEN MS ARNOLDSTEIN VHP SL SK 46,8 Bcm/y HU PVS: Primäres Verteilungssystem / Austrian Distribution System (High pressure) 2 Tariff decree

4 The TAG System Situation in central Europe NG Bcm/y RU NS II: +55 Bcm/y RU NS: 55 Bcm/y RU: 33 Bcm/y Projects with main relevance for TAGG 1 TAP/TANAP: 2019 RU: 100 Bcm/y Nord Stream II++: 2019 Black Sea Gas: Black sea Bcm/y LNG Bcm/y DZ Bcm/y ITA Demand Bcm/y LY 4-10 Bcm/y AZ Bcm/y Reverse Flow project NW Support ITA 2018 TAG RF: 2019 (Not represented here - See slide 16) Existing supply / route Planned new supply / route FID / advanced projects Source: TYNDP 2018 TAGG from ENTSOG 2 Range mainly depending on the supply potential.

5 The TAG System EU Transit What is the TAG system? A stable and reliable Gas Transit System About 40% of gas demand ITA 1 About 55% of gas demand SLO + HR (over the SOL System of GCA) 2 Energie data in Baumgarten: 353,566 GWh - in Arnoldstein: GWh - to SOL: GWh - To Distribution Syst.: GWh - Fuel gas: GWh Key values: - Rund 40% ITA gas demand - Rund 55% SLO+HR gas demand - Rund 5-10% AT gas demand Security of transit for Security of Supply of Italia, Slovenia and Croatia indicative yearly estimation TAG load / ITA gas demand; source: TAGG, Italian TYNDP, ENTSOG 2 indicative yearly estimation TAG load to SOL / SLO+HR gas demand; source: TAGG, Italian TYNDP, ENTSOG

6 The TAG System National supply An Austrian supply gas System About 5-10% of gas demand Austria 1 Energie data in Baumg arten: 353,566 GWh - in Arnoldstein: GWh - to SOL: GWh - To Distribution Syst.: GWh - Fuel gas: GWh What is the TAG system? Backbone of the supply of South & South-East AT (Burgendland, Styria, Carintia) together with the Südschiene Versorgungssicherheit Österreichs Industrie/KWK; SoS; Versorgungsinsel Key values: - About 40% of ITA gas demand - About 55% of SLO+HR gas demand - About 10% of AT gas demand indicative yearly estimation TAG load to distribution system / AT gas demand ; Source: TAGG, ECA Betriebsstatistik 2017

7 Content 1. The TAG System Transit and Supply 2. Commercial activity 3. Capacity scenario and capacity projects 4. Re-investment projects

8 Commercial offer & Portfolios Markets TAGGs is in full conformity with the requirements of the NC CAM 1 through its portofolio of standard capacity products Founding member and shareholder of the PRISMA European Capacity Platform founded in Leipzig on December 4th, Exclusive marketing of primary transportation capacities via PRISMA online auction platform since 1 st April 2013 PRISMA PLATTFORM Primary capacity market Primary capacity market (2014) Capacity products (NC CAM) Yearly products Quarterly products Monthly products Day-Ahead products Within-Day products Implemented CMP 2 measures UIOLI 3 Capacity Surrender NC CAM: Regulation (EU) No 2017/459 2 CMP: Congestion Management Procedures 3 UIOLI: Use-It-Or-Lose-IT

9 Commercial offer: LAST Key Points : Conversion service for FZK-unbundled capacity : Reduction of lead-time for Transfer of Use form 2 Days to 4 hours (PRISMA) : Reduction of lead-time for Assignment from 10 to 5 days (PRISMA) : Service Quality Assessment measures in preparation/ implementation 2019 Preparation to certification - ISO 14001:2015 (environment Mngt.system) - ISO 45001:2018 (Safety@work Mngt. system) Begin 2019: Fall-Back procedure for sells of capacity XXX

10 Capacity sells TAG GmbH Q/M capacity-market segment Securing of capacity fromn the side of the system user Arbitrage based on the time multiplicators and potential premium TENP Situation DA/WD capacity-market segment Cold spell Dynamic of the gas storages withdrawal/ -usage

11 Content 1. The TAG System Transit and Supply 2. Commercial activity 3. Capacity scenario and capacity projects 4. Re-investment projects

12 KNEP - legal project background EU Gas directive 2009/73 EU SoS Regulation 2017/ Gas Directive (EU) 2009/73 Art.13 (2) Tasks of TSOs [Auszug] Each TSO shall build sufficient XB capacity to integrate EU transmission infrastructure accommodating all economically reasonable and technically feasible demands for capacity and taking into account security of gas supply. Project for additional capacity GWG 2011 (Fassung 2017) 2 Gas Directive (EU) 2009/73 Art.13 (1) Tasks of TSOs [Auszug] operate, maintain and develop under economic conditions secure, reliable and efficient transmission ; Re-investment projects ,2 National transposition in gas Act GWG, in particular 62 for FNB tasks, 62 and 63 CNDP / NDP

13 Gas demand and project survey 2018 Relevant Points - TAG GmbH High booked transportation capacity till 2023 Significant increase of available capacity from 2023 Capacity demand survey 2018: no demand Infrastructural project survey 2018: no demand Feedback to TSOs possible the whole year

14 KNEP 2018: capacity scenario & TAG projects PCI-projects (3 rd list EC: ) GCA: Murfeld (PCI ) (KrK Term.) GCA: Moson (PCI ) (RO-HU-AT) GCA: BACI (PCI 6.4) (AT<>CZ) Oberkappel TAG 2016/05 GCA BACI: Nm³/h TAG 2015/01 TAG 2016/02 BGT no project required GCA: Nm³/h Flexibilisation BGT btw. TAG und GCA BREGENZ GCA: Further Optimization SALZBU RG Überackern LI N Z GCA/VGM - Distribution system WIEN Mosonmag Nm³/h ST. PÖLTEN TAG 2016/04 GCA: Nm³/h EI SEN STADT GCA: Nm³/h TAG 2017/01 I N N SBRUCK GRAZ TAG 2016/01 TAG: min Nm³/h DZK to FZK quality KLAGEN FURT ARNO Murfeld TAG 2016/01 GCA Nm³/h GCA: Nm³/h TAG 2018/ Completed In planning /completion Planning

15 5 projects for additional capacity Completed Baumgarten Flexibilität TAG 2015/01: GCA>TAG Reinforced connection - MS TAG 2016/02: GCA>TAG Reinforced connection - AZ1/BOP In Planning or In completion (Project with or without amendments) TAGG Projects mainly complementary to GCA-PCI projects TAG 2016/04: Mosonmagyorovar I (niedrigere Variante) 4,5 years TAG 2017/01: Mosonmagyorovar II (höhere Variante) 4,5 years TAG 2016/05: BACI 4,5 years Implementation of project under condition of positive economic viability TAGG projecte für weitere Flexibilsierung / SoS TAG 2016/01: TAG Reverse Flow Weitendorf/Eggendorf Q (also complementary to Entry Murfeld from GCA) New TAGG Projects mainly complementary to GCA-PCI projects TAG 2018/01: Exit Murfeld 4,5 years Implementation of project under condition of positive economic viability

16 Focus: TAG reverse Flow project I 3 main targets Contribution to European SoS 1. Physical transport possibility in Reverse Flow in the South-North-East direction Incresase of the local / national Security of Supply through the diversification of routes and sources Upgrades of existing DZK capacity in FZK capaiyt in Entry Arnoldstein Reinforcement of the Austrian VTP DE SK BGT VHP HU VS Eggendorf Project Full reverse flow of the TAG system Crossing-out 2 compressor stations ARNO TAG 2016/01 TAG: min Nm³/h DZK to FZK quality VS Weitendorf Murfeld TAG 2016/01 GCA Nm³/h Reg. (EU) 347/2013: Trans-European energy infrastructure;

17 Focus: TAG reverse Flow project II Ínteraction btw. South-North projects: TAG Reverse Flow End 2019 (SNAM) Support to the North West market & bidirectional cross-border flows Q SNAM project: Exit Tarvisio FZK 1 : 0,72 Mio.Nm³/h TAG project: Entry Arnoldstein FZK: mind. 1,0 Mio.Nm³/h with GCA project: Entry Murfeld FZK: 0,6 Mio. Nm³/h VHP SoS & Reliability Market Integration Competition & Diversification Sustainability Reg. (EU) 347/2013: Trans-European energy infrastructure SNAM-project : Support to the North West market and bidirectional cross-border flows (TYNDP 2018 TRA-F-214); ITA TYNDP 1 in Competition with Exit Passo Gries von ITA to CH

18 Content 1. The TAG System Transit and Supply 2. Commercial activity 3. Capacity scenario and capacity projects 4. Re-investment projects

19 30 Re-investment projects 5 Other projects Overhaul metering lines Station Control Systems (*2) Corrosion revamp 48 valve in BGT 1 NOxER II project Installation of 4 electricity-driven compressors Dismantling of 10 gas compressors 30 projects 3 Exchange of actuators Exchange of gas-hydraulic actuators (TUCO, CS) Exchange of electric actuators (Filter, MS) 17 Major Overhaul Station projects Overhaul of section valve station Exchange of lealking valves 4 Upgrade gas generator Upgrade of gas generators Upgrade of turbines Security Innovation Environment Digitalisation Technology

20 KNEP 2018 Re-investment projects 30 re-investment projects have been represented in current KNEP Investment outlook amounts to min. 3 years: Projects with high investments (Over 500 keur) Infrastructure of the 30 projects concerns: 12 re-investment projects in Compressor stations 18 re-investment projects along the pipeline and in the section valve station

21 Focus: NOxER II project (I) Main drivers Compliance with the EG-K 2013 (Austrian act on emissions) NOx, CO 10 concerned old gas compressors (for some, part of the original system 1975) Replacement through 4 new electric-driven untis Compressor park TAGG Compressor Station Before NOxER II After NOxER II Baumgarten (Upper-Austria) 8 TUCO 1 4 TUCO + 1 ELCO Eggendorf (Upper-Austria) 3 TUCO 3 TUCO + 1 ELCO Grafendorf (Styria) 6 TUCO 3 TUCO + 2 ELCO Weitendorf (Styria) 3 TUCO 3 TUCO Ruden (Carintia) 6 TUCO 3 TUCO TUCO: Gas driven Compressors; ELCO: Electric driven Compressors

22 Focus: NOxER II project (II) Benefits Emissions reduction - Legal requirement - Greenhouse effect CO2 CH4, - CO, NOx Flexibility / Operability - Wider range of outputs power - Faster compressor time reaction - Increased flexibility - Better Operability CO2 Emission Allowances - Savings in procurement of CO2 allowances Strong reduction of noise emission Reduction of maintenance works and immobilisation time - Less mecanical stress - Thus, less spare parts required Cost optimization - Diversification of compressor energy - Operation btw. Gas- and electric-driven compressors possible

23 Thank you for your attention! Commercial Department TAG GmbH Dr. Roberto Tebaldi Dipl. Ing. Jean-Yves Beaudeau Head of Department Senior - Capacity & Energy Market r.tebaldi@taggmbh.at j.beaudeau@taggmbh.at (0) (0) tag@taggmbh.at