1 National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: , Fax: Web: Director Commercial, Huaneng Shandong Ruyi HSR (Pakistan) Energy (Private) Limited (HSR) House No 105, Street 10, Block H, Phase 5, DHA, Lahore No. NEPRAffRF-308/HSRPEL-2015/ 1-95' December 14, 2017 Subject: Decision of the Authority in the matter of Fuel Price Adjustment for Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited (HSR) [Case No. NEPRA/TRF-308/HSRPEL Enclosed please find herewith the subject decision of the Authority along with Schedule of Fuel Cost Part of Energy Charge (Annex-I), Details of Shipments (Annex-II) and Marine Freight (Annex-III) (04 pages) regarding the fuel price adjustment on account of Coal price variation for the month of November 2017 in respect of Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited. Enclosure: As above %. t z C") ( Syed Safeer Ilussain ) CC: 1. Secretary Ministry of Energy, 'A' Block, Pak Secretariat, Islamabad 2. Secretary, Cabinet Division, Cabinet Secretariat, Islamabad 3. Secretary, Ministry of Finance, 'Q' Block, Pak Secretariat, Islamabad. 4. Chief Executive Officer, Central Power Purchasing Agency Guarantee Limited ENERCON Building, Sector G-5/2, Islamabad.

2 Fuel Price Adjustment Case No. NETRATRF-308,115RPEL-2015 DECISION OF THE AUTHORITY IN THE MATTER OF FUEL PRICE ADJUSTMNET FOR HUANENG SHANDONG RUYI (PAKISTAN) ENERGY PRIVATE LIMITED. Pursuant to the Decision of the Authority dated 31st March 2015 in the matter of approval of upfront coal tariff for 2x660 MW coal power plant of Huaneng Shandong Ruyi (Pakistan) Energy Private Limited (hereafter "HSR"), based on information submitted by HSR, the fuel portion of the energy charge part of HSR's tariff has been adjusted for variation in coal prices. The requested weighted average coal price US$ /ton was found on higher side. In accordance with the prescribed mechanism, the revised coal prices have been worked out and are attached as Annex-II. The revised fuel cost component of energy charge part of HSR's tariff indicated hereunder shall be immediately applicable to the units delivered during the month. Period Revised Fuel Cost Component Rs./kWh November The above referred revised fuel cost component along with revised coal prices and revised marine freight charges attached as Annex-I, Annex-11 & Annex-Ill respectively are to be notified in the official gazette, in accordance with the provisions of Section 31(4) of the Regulation of Generation. Transmission and Distribution of Electric Power Act AUTHORITY Himayat Ullah Khan Member Syed Masoo -Hassan Naqvi-7>f Member 11, Saif Ullah Chatt Brig (R) Tariq Saddozai Vice Chairman - /2..,2_,(_5-17 Chairman ti 12_ 1-7

3 Schedule of Fuel Cost Part of Energy Charge Adjustment on Account of Coal Price Variation for the Month of November 2017 Annex-I Quantity Net CV Price Description kcal/kg. Rs/ Consumption from Shipment No. HSR ,232 6,079 13,970 Consumption from Shipment No. HSR ,666 6,010 13,437 Consumption from Shipment No. HSR ,735 5,994 13,927 Consumption from Shipment No. HSR ,251 5,824 13,267 Consumption from Shipment No. HSR ,695 6,082 14,613 Consumption from Shipment No. HSR ,061 6,117 14,596 Consumption from Shipment No. HSR ,436 5,908 13,624 Consumption from Shipment No. HSR ,438 5,906 13,626 Consumption from Shipment No. HSR ,906 5,989 14,350 Total consumption 273,420 5,984 13,884 Description Unit Revised Avg. Price of stock consumed during the month Rs./ton 13,884 Avg. net calorific value of stock consumed during the month kcal/kg 5,984 Avg. net calorific value of stock consumed during the month BTU/kg 23,745 Net Heat Rates BTU/kWh 8,749 Revised Fuel cost component for November 2017 Rs./kWh Note: The above adjustment of fuel cost component on coal shall be subject to verification by a consultant/independent third party to be appointed for the purpose by the Authority. In case the verified delivered coal price is different, the fuel cost component shall be revised accordingly.

4 Am,..' 11 Details of Shipmnets HSR HSR 34-2 HSR HSR HSR HSR HSR HSR SINAR KUTAI SBI POSE( ' NAUTICAL IENIFER PORTI1OS Shipment Number YASA GULTEN SENORITA CURIA BEKS CENK 12-Aug Aug 6-Aug-17 7-Aug-17 Vessel Name 4-Aug-17 3-Aug Jul Jul-17 LC28803B LC2880:1137,. LC LC Bill of Lading (B/L) Date 1.C LC LC LC L/C Number API-4 Index for the month of B/L Date kca UKg , Base Calorific Value 5,824 6,082, ,994 kcal/kg 42,203 41, ,995 Actual Calorific Value 43,999 42,771 41,751 MT Quantity US$/ (630) (6.30) FOB Coal Price API-4 Index as per B/L month Adjusted for CV (8.72) US$/ (3 90) Discount US$/ Marine Freight Charges US$/ Marine Insurance US$/ CIF Coal Price US$/ Handling Loss 1% or actual whichever is minimum US$/ CIF Coal Price with losses at Karachi US$/ Other Charges US$/ (t) Port Handling Charges : US$/ (u) Customs Duties & Cess US$/ (iii) L/C Charges US$/ Inland Freight Charges US$/ io Delivered Coal Price before adjustment of handling loss :',14 US$/ Handling Loss 1% or actual whichever is minimum ,- 48 US$/ Delivered Coal Price with losses at Power Plant , ,37,i '11 Rs./USS 14, , Exchange Rate 13, , , Rs./ Delivered Coal Price with losses at Power Plant 3

5 Annex I. Marine Freight Unit SENORITA CURIA YASA CUMIN PORTHOS Delivery Days: Voyage At Port Total Average Time Charter Rate Time Charter Cost Bunker Consumption' Bunker dunng Voyage Bunker dunng Port Day MGO Consumption Total Bunker Price MGO Price Bunker Cost Total Voyage Expense Quantity Minimum Marine Freight $/ S/ US$ US$ s , , ,096 43, , , , , , , , ,877 41, , , , ,667 8,655 8, , , , ,718 41, ,