1 International Subawards Alternatives to Cost Reimbursable Subrecipient Agreements Presentation for the Federal Demonstration Partnership International Subawards Subcommittee 11 January 2008 David Brady, Director Office of Export and Secure Research Compliance
2 Alternatives to Cost Reimbursable International Subrecipient Agreements Financial assistance or procurement? Procurement alternatives Choosing a procurement instrument Payment structure issues Audit issues Other risk containment issues Pros and cons by contract type
3 Financial Assistance or Procurement? Is my international subrecipient eligible for financial assistance? Key questions International subrecipients authorized/eligible for financial assistance? For profit or not for profit? Subrecipient materially participating in research/activity or providing goods and services?
4 Financial Assistance or Procurement? Is my international subrecipient eligible for financial assistance? Check your sponsoring agency s s guidelines first
5 Financial Assistance or Procurement? Is my international subrecipient eligible for financial assistance? The term [Recipient] may include commercial organizations, foreign or international organizations (such as agencies of the United Nations) which are recipients, subrecipients, or contractors or subcontractors of recipients or subrecipients at the discretion of the Federal awarding agency [emphasis added] (OMB Circular A-110 A SUBPART A.2.cc Definitions)
6 Financial Assistance or Procurement? For profit or not for profit? Relevant Cost Principles Colleges and Universities OMB Circular A-21, A Cost Principles for Educational Institutions (48 CFR 31.4) Non-Profit Organizations OMB Circular A-122, A Cost Principles for Non-Profit Organizations (48 CFR 31.7) Hospitals DHHS Regulation 45 CFR 74, App E For Profit Organizations 48 CFR 31 (FAR Subpart , 203, 204ff)
7 Financial Assistance or Procurement? Subrecipient materially participating in the research/activity? A A grant or cooperative agreement shall be used only when the principal purpose of a transaction is to accomplish a public purpose of support or stimulation authorized by Federal statute... Contracts shall be used when the principal purpose is acquisition of property or services for the direct benefit or use of the Federal Government. (OMB Circular A-110 A SUBPART B.11.c Pre-award Policies)
8 Financial Assistance or Procurement? Subrecipient materially participating in the research/activity? Is subrecipient participation success evaluated by the success of the overall project? Is subrecipient providing goods and services? Services are not defined in OMB Circulars, FAR definitions of Advisory and assistance services is useful, includes studies, analyses and evaluations in support of R&D (2 CFR 2.101)
9 Procurement Alternatives (OMB OMB Circular A-110 A SUBPART C.44.c Procurement Standards and 48 CFR 16.2) Fixed price costs and rates are not negotiated, only total price Fixed price with economic adjustment* Adjustments based on established prices Adjustments based on actual costs of labor or materials Adjustments based on cost indexes of labor or material * Not explicitly enumerated in OMB Circular A-110A
10 Procurement Alternatives (OMB Circular A-110 A SUBPART C.44.c Procurement Standards and 48CFR 16.4) Fixed price incentive* required supplies or services can be acquired at lower costs and, in certain instances, with improved delivery or technical performance, by relating the amount of profit or fee payable under the contract to the contractor s s performance. Incentive contracts are designed to obtain specific acquisition objectives by (1) Establishing reasonable and attainable targets that are clearly communicated to the contractor; and (2) Including appropriate incentive arrangements designed to (i) motivate contractor efforts that might not otherwise be emphasized; and (ii) discourage contractor inefficiency and waste. * Not enumerated in OMB Circular A-110A
11 Procurement Alternatives (OMB Circular A-110 A SUBPART C.44.c Procurement Standards and 48 CFR 16.4) Fixed price incentive* Incentive Types Cost incentive- profit or fee adjustment-n/a for not for profits Performance incentive Delivery incentive Multiple incentives Target types Specifies target cost, price ceiling and profit adjustment formula Firm target Successive targets * Not enumerated in OMB Circular A-110A
12 Procurement Alternatives (OMB Circular A-110 A SUBPART C.44.c Procurement Standards and 48 CFR 16.4) Fixed price with award fees when Gov t wants to motivate contractor and other incentives cannot be used because contractor performance cannot be measured objectively * Not enumerated in OMB Circular A-110A
13 Procurement Alternatives (OMB Circular A-110 A SUBPART C.44.c Procurement Standards and 48 CFR 16.5 ) Purchase Orders Not a contract type, generally fixed price procurement instrument for purchase of well cost defined goods and services Indefinite Delivery Contracts* A master agreement laying out most terms and conditions, but the actual procurement instrument requires task orders or suborders * Not enumerated in OMB Circular A-110A
14 Procurement Alternatives (OMB Circular A-110 A SUBPART C.44.c Procurement Standards) Time and Materials, Labor Hour, and Letter Contracts* T&M and Labor hour negotiated cost based contracts Letter contract last resort only * Not enumerated in OMB Circular A-110A
15 Procurement Alternatives (OMB Circular A-110 A SUBPART C.44.c Procurement Standards) Cost Reimbursable alternatives Cost plus a percentage of cost* Cost plus incentive** Cost plus award fee** Cost plus fixed fee** * Expressly prohibited for educational institutions by OMB Circular A ** Implicitly prohibited for educational institutions by OMB Circular A - 110
16 Choosing a Procuring Instrument Which procurement instrument an appropriate contract mechanism for my subrecipient? The type of procuring instruments used (e.g., fixed price contracts, cost reimbursable contracts, purchase orders, and incentive contracts) shall be determined by the recipient but shall be appropriate for the particular procurement and for promoting the best interest of the program or project involved. The "cost- plus-a-percentage percentage-of-cost" or "percentage of construction cost" methods of contracting shall not be used. [emphasis added] (A-110 SUBPART C.44.c Procurement procedures) 110 SUBPART C.44.c Procurement procedures)
17 Choosing a Procuring Instrument Is my international recipient subject to OMB Circular A-21? A Federal agencies may apply the provisions of this Circular to commercial organizations, foreign governments, organizations under the jurisdiction of foreign governments, and international organizations. (A-110 SUBPART 3 Policy)
18 Choosing a Procurement Instrument (2 CFR ) Fixed Price Agreements OMB Circular A-21. A 3. Applicability a. All Federal agencies that sponsor research and development, training, and other work at educational institutions shall apply the provisions of this Circular in determining the costs incurred for such work. The principles shall also be used as a guide in the pricing of fixed price or lump sum agreements. [emphasis added] These principles do not apply to: c. Other awards under which the institution is not required to account to the Federal Government for actual costs incurred.
19 Choosing a Procurement Instrument (2 CFR & 48 CFR h) Incentive Agreements A Cost Principles for Educational Institutions Provision for profit or other increment above costs is outside of the scope of this Circular. Limits cost based incentive procurement instruments (fee), but not price based incentive procurement instruments (profit)
20 Fixed Price Payment Structure Suggestions Limited or no prepayment Payment tied to deliverables Scheduled progress payments Repayment of residuals More flexible payment terms with long term subrecipients In fixed price subrecipient agreements, possession is 9/10ths of the law
21 Other risk containment issues Currency fluctuation issues Termination issues (residuals) Buy America Act Program income
22 A-133 Audit Issues Fixed price agreements generally are not subject to allowable costs determination (A-133 annual audit), but are subject to sponsor review of Pre-award documents (proposals, budgets) for determination of fair and reasonable pricing. (see 48 CFR 15.4 Contract Pricing) Pricing analysis documentation must be retained for inspection
23 A-133 Audit Issues (48 CFR ) Application of cost principles to fixed price contracts and subcontracts & mods is required whenever: Determination or negotiation of costs is required; or price revisions are made to fixed price-incentive incentive contracts Notwithstanding the mandatory use of cost principles, the objective will continue to be to negotiate prices that are fair and reasonable, cost and other factors considered.
24 Pros and Cons: Fixed Price Pros: Cost and performance risk borne by international subrecipient Better suited to contracts in countries with limited infrastructure/ first time contracts International recipients generally comfortable with fixed price agreements
25 Pros and Cons: Fixed Price Pros: Administrative burden shifted No F&A, indirect rates justification, cost analysis required Procurement procedure (e.g., bids, sole source justification) required Audit risk reduced Total Price is only negotiated (auditable) value A-21 cost principles is a guide not a requirement Fair and reasonable standard vs. allowable cost
26 Pros and Cons: Fixed Price Cons: Procurement procedures must be followed Price analysis required Competitive bids required; or Sole source justification
27 Pros and Cons: Fixed Price with Economic Adjustment Pros: Same as fixed price Contains mechanism to contain currency fluctuation risk Cons: Admin burden Cost analysis required
28 Pros and Cons: Fixed Price Incentive Pros: Same as Fixed Price Suitable in rare instances in which purchase of foreign technology/ technical services is needed with accelerated performance/delivery schedule Cons: Cost analysis required
29 Pros and Cons: Purchase Order Pros: Satisfies procurement procedure requirement Cons: Usually not a very flexible instrument Sometimes more rigorous terms than required for circumstances
30 Pros and Cons: Cost Plus Contracts Pros: Incentives may enhance performance Cons: Not applicable to A-21 A governed educational institutions Admin burden Requires cost analysis Cost plus percentage of cost contracts prohibited
31 Pros and Cons: Time and Materials, Pros: Labor Hour Contracts Reduced overhead recovery by subrecipient Cons: Substantial Admin burden Requires cost analysis Subrecipient cost accounting system must be able to accommodate time sheet record keeping
32 Questions? David Brady
33 Advisory and assistance services (48 CFR 2.101) Advisory and assistance services means those services provided under contract by nongovernmental sources to support or improve: organizational policy development; decision-making; management and administration; program and/or project management and administration; or R&D activities. It can also mean the furnishing ng of professional advice or assistance rendered to improve the effectiveness of Federal management processes or procedures (including those of an engineering and technical nature). In rendering the foregoing services, outputs may take the form of information, advice, opinions, alternatives, analyses, evaluations, recommendations, training and the day-to to-day aid of support personnel needed for the successful performance of ongoing Federal operations. All advisory and assistance services are classified in one of the following definitional subdivisions:
34 Advisory and assistance services (48 CFR 2.101) (1) Management and professional support services, i.e., contractual services that provide assistance, advice or training for the efficient and effective management and operation of organizations, activities (including management and support services for R&D activities), or systems. These services are normally closely related to the basic responsibilities and mission of the agency originating the requirement for the acquisition of services by contract. Included are efforts that support or contribute to improved organization of program management, logistics management, project monitoring and reporting, data collection, budgeting, accounting, performance auditing, and administrative technical support for conferences and training programs.
35 Advisory and assistance services (48 CFR 2.101) (2) Studies, analyses and evaluations, i.e., contracted services that provide organized, analytical assessments/evaluations in support of policy development, decision-making, management, or administration. Included are studies in support of R&D activities. Also included are acquisitions of models, methodologies, and related software supporting studies, analyses or evaluations. (3) Engineering and technical services, i.e., contractual services used to support the program office during the acquisition cycle by providing such services as systems engineering and technical direction (see (b)) to ensure the effective operation and maintenance of a weapon system or major system as defined in OMB Circular No. A-109 or to provide direct support of a weapon system that is essential to research, development, production, operation or maintenance of the system.
36 Fixed-price subcontracts (31 CFR (31 CFR 102, 203, 204ff) The applicable subparts of part 31 shall be used in the pricing of fixed-price contracts, subcontracts, and modifications to contracts and subcontracts whenever (a) cost analysis is performed, or
37 Fixed-price subcontracts (31 CFR (31 CFR 102, 203, 204ff) (b) a fixed-price contract clause requires the determination or negotiation of costs. However, application of cost principles to fixed-price contracts and subcontracts shall not be construed as a requirement to negotiate agreements on individual elements of cost in arriving at agreement on the total price. The final price accepted by the parties reflects agreement only on the total price. Further, notwithstanding the mandatory use of cost principles, the objective will continue to be to negotiate prices that are fair and reasonable, cost and other factors considered. [emphasis added]
Procurement Under the New Requirements 1
Requirements 1 Procurement under the New Requirements 1 Why This Session Is Needed New provisions in Uniform Guidance Changes to conflict of interest requirements in Uniform Guidance Distinctions between
More informationPROCUREMENT POLICY. 1 P age
PROCUREMENT POLICY PURPOSE: Procurement Standards: 20 CFR requires non-profits to establish procedures for: I. The procurement of supplies and other expendable property, equipment, and real property. II.
More informationSOUTHERN METHODIST UNIVERSITY
SOUTHERN METHODIST UNIVERSITY SPONSORED RESEARCH ADMINISTRATION SPONSORED PROJECT PROCUREMENT POLICY AND PROCEDURE May 1, 2015 TABLE OF CONTENTS DESCRIPTION PAGE Introduction...1 Acronyms and Definitions...1
More informationRequest for Proposals Professional Audit Services. January 17, 2019
Request for Proposals Professional Audit Services January 17, 2019 TABLE OF CONTENTS I. INTRODUCTION A. General Information 4 B. Term of Engagement 5 II. NATURE OF SERVICES REQUIRED A. Scope of Work 5
More informationAppropriate Role of Contractors Supporting the Government Working Group: Presentation of Recommendations 12/16/2005
PRELIMINARY WORKING GROUP DRAFT For Discussion Purposes Only Not Reviewed or Approved by the Acquisition Advisory Panel Appropriate Role of Contractors Supporting the Government Working Group: Presentation
More informationSTUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 4, Lesson 1 Differences between Cost & Price Analysis
STUDENT GUIDE CON 170 Fundamentals of Cost & Price Analysis Unit 4, Lesson 1 Differences between Cost & Price Analysis April 2018 STUDENT PREPARATION Required Student Preparation Read FAR subpart 15.4,
More informationSTUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 4, Lesson 1 Differences between Cost & Price Analysis
STUDENT GUIDE CON 170 Fundamentals of Cost & Price Analysis Unit 4, Lesson 1 Differences between Cost & Price Analysis July 2018 STUDENT PREPARATION Required Student Preparation Read FAR subpart 15.4,
More informationDeveloping a Compliant Procurement Policy. Bag Lunch Webinar August 29, 2017
Developing a Compliant Procurement Policy Bag Lunch Webinar August 29, 2017 Co-Presenter: Presenter: Jenny E. Herrera, CPA CGMA Rubino & Company, CPAs & Consultants Shareholder Tel: 301-214-4179 jherrera@rubino.com
More informationSUBRECIPIENT MONITORING GUIDE
SUBRECIPIENT MONITORING GUIDE Introduction The following Roles and Responsibilities Chart serves as a reference for University of Arizona Principal Investigators and designated department personnel (Business/Finance
More informationSubrecipients vs. Vendors
Subrecipients vs. Vendors U.S. Office of Management and Budget (OMB) Circular A-133 requires us, as recipients of Federal funds, to determine whether a subagreement which we provide to another agency creates
More informationProcurement Requirements under the Uniform Administrative Guidance
Procurement Requirements under the Uniform Administrative Guidance Purpose: This Technical Assistance Guide has been developed to assist Local Workforce Development Areas (LWDAs) in making informed decisions
More informationProcurement Standards Expectations Document
Procurement Standards Expectations Document Certain of the procurement requirements of 2 CFR 200 are explicit statements of what the University would consider as general expectations of any University
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS International Republican Institute 1225 Eye St. NW, Suite 700 Washington, DC 20005 (202) 408-9450 (202) 408-9462 fax www.iri.org @IRIGlobal Procurement Number: GOV2017HDP02o Open
More informationPOLICY AND PROCEDURES FOR THE DOD PILOT MENTOR-PROTEGE PROGRAM (Revised August 12, 2008)
POLICY AND PROCEDURES FOR THE DOD PILOT MENTOR-PROTEGE PROGRAM (Revised August 12, 2008) I-100 Purpose. (a) This Appendix I to 48 CFR Chapter 2 implements the Pilot Mentor-Protege Program (hereafter referred
More informationSection M: Evaluation Factors for Award HQ R LRDR Section M: Evaluation Factors for Award For HQ R-0002
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 LRDR Section M: Evaluation Factors for Award For 1 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Table of
More informationPRICING GUIDE FOR RECIPIENTS AND SUBRECIPIENTS UNDER THE UNIFORM RULES (2 C.F.R. PT. 200) PFLD-FISCAL PDAT FEMA OFFICE OF CHIEF COUNSEL
PRICING GUIDE FOR RECIPIENTS AND SUBRECIPIENTS UNDER THE UNIFORM RULES (2 C.F.R. PT. 200) PFLD-FISCAL PDAT FEMA OFFICE OF CHIEF COUNSEL MAY 1, 2016 1 Table of Contents Introduction and Purpose... 3 Policy...
More informationDFARS Appendix I. Appendix I Policy and Procedures for the DoD Pilot Mentor- Protégé Program TABLE OF CONTENTS. I-100 Purpose. I-101 Definitions.
DFARS Appendix I Appendix I Policy and Procedures for the DoD Pilot Mentor- Protégé Program I-100 Purpose. I-101 Definitions. I-102 Participant eligibility. I-103 Program duration. I-104 Selection of protege
More informationVersion 1.0. The Contract Management Standard Final Edition. Version 1.0
The Management Standard Final Edition 1 Purpose of the Management Standard The purpose of the Management Standard is to describe the nature of contract management in terms of the contract management processes
More informationTEAMING, SUBCONTRACTING, AND JOINT VENTURES
888 17 th Street, NW, 11 th Floor Washington, DC 20006 Tel: (202) 857-1000 Fax: (202) 857-0200 TEAMING, SUBCONTRACTING, AND JOINT VENTURES 2013 NATIONAL HUBZONE CONFERENCE SEPTEMBER 10, 2013 Presented
More informationVersion 1.0. The Contract Management Standard Final Edition. Version 1.0
The Management Standard Final Edition 1 Purpose of the Management Standard The purpose of the Management Standard is to describe the nature of contract management in terms of the contract management processes
More informationUniform Guidance 2 CFR 200
Uniform Guidance 2 CFR 200 What Researchers Need to Know (and Organizing your UG Implementation) Susan Sedwick, University of Texas at Austin Dan Evon, Michigan State Pamela A. Webb, University of Minnesota
More informationMEMORANDUM FOR CHIEF ACQUISITION OFFICERS SENIOR PROCUREMENT EXECUTIVES. Improving the Management and Use of Interagency Acquisitions
EXECUTIVE OFFICE OF THE PRESIDENT OFFICE OF MANAGEMENT AND BUDGET WASHINGTON, D.C. 20503 OFFICE OF FEDERAL PROCUREMENT POLICY June 6, 2008 MEMORANDUM FOR CHIEF ACQUISITION OFFICERS SENIOR PROCUREMENT EXECUTIVES
More informationPurchasing Policies and Procedures
Purchasing Policies and Procedures A. General As set forth in statutes of the State of California, the Board of Trustees of the Yosemite Community College District has the sole authority to purchase materials
More informationSubawards, Consultants, Vendors & Collaborator Who Are You?
Subawards, Consultants, Vendors & Collaborator Who Are You? NCURA 2012 Region IV / V Spring Meeting Gateway to Innovation St. Louis, MO April 17, 2012 Jamie Young Interim Director, Office for Sponsored
More informationTitle 2: Grants and Agreements PART 225 COST PRINCIPLES FOR STATE, LOCAL, AND INDIAN TRIBAL GOVERNMENTS (OMB A 87)
GHSA and NHTSA examine 2 CFR 225 May June 2010 Discussion of time keeping requirements in support of salaries, wages and related costs 8/5/2010rev Title 2: Grants and Agreements PART 225 COST PRINCIPLES
More informationProcurement Policies and Procedures
Center for Economic and Social Development Procurement Policies and Procedures 1. Purpose of procurement standards. The purpose of these standards is to establish procedures for the Center for Economic
More informationJuly 29, 2009 MEMORANDUM FOR THE HEADS OF DEPARTMENTS AND AGENCIES
EXECUTIVE OFFICE OF THE PRESIDENT OFFICE OF MANAGEMENT AND BUDGET WASHINGTON, D.C. 20503 THE DIRECTOR July 29, 2009 M-09-25 MEMORANDUM FOR THE HEADS OF DEPARTMENTS AND AGENCIES FROM: SUBJECT: Peter R.
More informationProcurement Under Uniform Guidance
Procurement Under Uniform Guidance September 21, 2018 Presenters Manju Patnaik, CPA Professional Standards Technical Manager Manju is a technical audit manager with 13 years of experience serving our public
More informationFEDERAL AWARD PROGRAMS INTERNAL CONTROL EVALUATION. Cross-cutting characteristics (generally applicable to all fourteen requirements)
NAME OF ENTITY YEAR END prep by FEDERAL AWARD PROGRAMS INTERNAL CONTROL EVALUATION The Single Audit Act requires the auditor to determine and report on whether an entity has internal controls that provide
More informationREQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services
REQUEST FOR PROPOSALS Construction Manager CM Services Pre-Construction and Construction Services Big Sky Fire Department Station 1 Project Big Sky Fire District OWNER Big Sky, Montana November 2016 Request
More informationRFP 3512R09 Strategic Consultant Services for the Office of Policy and Public Private Partnerships Addendum 3 Appendix H Questions & Answers
1. Question Is pre-registration required for the pre-proposal conference on May 3? Answer Pre-registration is not required. Please refer to Section I-8 of the RFP for further information. 2. Question Please
More informationFISCAL: PROFICIENCY IN PROCUREMENT
FISCAL: PROFICIENCY IN PROCUREMENT CAPLAW 2009 National Training Conference June 25, 2009 9:00 a.m. 11:00 a.m. Seattle, WA Kay Sohl 3343 NE 18th Ave Portland, OR 97212 P: (503) 314-8265 kay@kaysohlconsulting.net
More informationExhibit 5 Page 1 of 12 TRANSIT VEHICLE INVENTORY MANAGEMENT PROCEDURES
Page 1 of 12 TRANSIT VEHICLE INVENTORY MANAGEMENT PROCEDURES 725-030-025 114 Page 2 of 12 115 Page 3 of 12 Approved: Department of Transportation Secretary PURPOSE:
More informationIntermediate Systems Acquisitions Course. Planning the Acquisition
Planning the Acquisition The effort to move from recognizing a new mission requirement to fielding a new capability requires careful and comprehensive planning by the acquisition team. This planning process
More informationSubcontract Management Certification Program (ScMCP ) SUBCONTRACT MANAGEMENT TECHNICAL COMPETENCIES. SUBCONTRACT MANAGER (ScM)
Competency 1. Determination of How Best to Satisfy Requirements for the Mission Area a. Provide proactive business advice on requirements documentation based on analysis of requirements and performance-based
More informationConnoisseur Solutions Project Procurement Management
Project Procurement Management Project Procurement Management Processes necessary to purchase or acquire products, services or results needed from outside the project team. Procurement Management Processes
More informationRWA GSA Schedule Contract Prices Contract Number GS 35F-0112J With IFF
RWA GSA Schedule Contract Prices Contract Number GS 35F-0112J With IFF Effective Effective Effective Effective Effective Job Title 1-Dec-13 1-Dec-14 1-Dec-15 1-Dec-16 1-Dec-17 through through through through
More informationPUBLIC CONTRACT CODE SECTION
PUBLIC CONTRACT CODE SECTION 22160 22169 22160. (a) The Legislature finds and declares that the design build method of project delivery, using a best value procurement methodology, has been authorized
More informationCompliance from a Departmental Perspective
Compliance from a Departmental Perspective Vernon Ferrell, University of Cincinnati Jeffrey Ritchie, Aurora Health Care Jaynee Tolle, University of Cincinnati Objectives To become familiar with the range
More informationCOAA EPCM CONTRACT PHILOSOPHY. COAA EPCM Contract Committee
COAA EPCM CONTRACT PHILOSOPHY COAA EPCM Contract Committee 1. Introduction The COAA EPCM Contract Committee, consisting of owner, contractor and affiliate members, has developed a standard form EPCM Contract
More informationUnit 3: The Traditional Procurement Route
Unit 3: The Traditional Procurement Route 3.1 Introduction This Unit briefly introduces the main features of the traditional procurement route as a widely used route that provides a good basis for examining
More informationSeattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices
Seattle Public Schools Office of Internal Audit Issue Date: December 5, 2017 Introduction and Background In accordance with the fiscal year 2018 capital audit plan, we have completed an audit of the district
More information700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION
700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION Section 14.01: Definitions 14.02: Application for Prequalification of Contractors 14.03: Aggregate Bonding Capacity and Single
More informationSTUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems
STUDENT GUIDE CON 170 Fundamentals of Cost & Price Analysis Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems January 2017 CON170, Unit 5 Lesson 1 Cost Analysis Process and Players
More informationPromoting social and economic objectives through procurement
Promoting social and economic objectives through procurement The Standard for Infrastructure Procurement and Delivery Management (SIPDM) establishes developmental or secondary procurement policy relating
More informationPricing - Proprietary Products
Pricing - Proprietary Products Constraints None. Authoritative Guidance Summary 1. Proprietary products are ones designed and developed by a company at their own cost and risk. 2. Companies are sometimes
More informationTEXAS BOARD OF NURSING CONTRACT PROCUREMENT AND MANAGEMENT HANDBOOK JULY 2018
TEXAS BOARD OF NURSING CONTRACT PROCUREMENT AND MANAGEMENT HANDBOOK JULY 2018 I. Introduction a. Purpose i. All staff involved with procuring goods and services for the agency must comply with proper purchasing
More informationProcurement Policy NORTH AMERICA
NORTH AMERICA October 2, 2017 Table of Contents 1. OVERVIEW...1 2. OVERALL PROCUREMENT PROCESS...3 3. SUPPLIER SELECTION PROCESS...4 4. CONTRACTING AND LEGAL REQUIREMENTS...8 5. PROCUREMENT CARDS...8 6.
More informationCharges to sponsored projects are classified as either non-salary or salary.
EXPENDITURE APPROVAL AND CONTROL INITIATING CHARGES TO SPONSORED PROJECTS Charges to sponsored projects are classified as either non-salary or salary. Non-salary charges are initiated via: 1. Pcard; 2.
More informationLockheed Martin Comments and Recommendations
Lockheed Martin Comments and Recommendations Defense Acquisition Regulations System Public Meeting On Weapon Systems Acquisition Reform Act Organizational Conflicts of Interest Requirements December 8,
More informationDEFENSE ACQUISITION UNIVERSITY FE Intermediate Facilities Engineering
1 Describe the relationship that exists between weapons systems acquisition and facilities requirements. Identify the milestones within the systems acquisition framework that may require the application
More information19A NCAC 02E.0702 Solicitation and Award of Contract 19A NCAC 02E.0703 Prequalifying to Award - Professional Services Firms
FISCAL NOTE Rule Citation: Rule Topic: NCDOT Division: 19A NCAC 02E.0702 Solicitation and Award of Contract 19A NCAC 02E.0703 Prequalifying to Award - Professional Services Firms Revision of the Requirements
More informationCarnegie Mellon University Sponsored Projects Accounting (PA11) Subcontract Invoice & Consultant Payment Procedures Updated: June 30, 2017
(PA11) Subcontract Invoice & Consultant Payment Procedures Updated: June 30, 2017 Frequency: Varies Responsible Staff: SPA Rep Approval Required: Manager / Assistant Manager, Post Award Accounting Summary:
More informationSubrecipient Management
August 3, 2017 Subrecipient Management UNC Symposium for Research Administrators Session Presenters Stacy Barca Assistant Director of Research Administration Interim Subaward Team Manager Office of Sponsored
More informationSAM Supplement Representations, Certifications and Other Statements of Offerors for Government Related Orders
PRIME Contractor/Offeror System Studies and Simulation Inc, 615 Discovery Drive, Huntsville, AL 35806 (256) 539-1700 SAM Supplement Representations, Certifications and Other Statements of Offerors for
More informationSub awards. Property Management
AURA Central Administrative Services (CAS) provides AURA Operating Centers funded by NSF with the business services defined herein. These services will be performed in accordance with federal and state
More informationAuthorized Federal Supply Schedule Price List Professional Services Schedule (PSS)
Authorized Federal Supply Schedule Price List Government Contract Solutions, Inc. (GCS), a wholly-owned subsidiary of Preferred Systems Solutions, Inc. (PSS) 7925 Jones Branch Drive, Suite 6200 McLean,
More informationLB 889 The Political Subdivisions Construction Alternatives Act
1 LB 889 The Political Subdivisions Construction Alternatives Act What cities, villages, counties, state colleges, community colleges, and school districts need to know about their construction options.
More informationCo m m o n l y Fa c e d CSBG Mo n i t o r i n g Fi n d i n g s a n d Po t e n t i a l Ap p r o a c h e s
Co m m o n l y Fa c e d CSBG Mo n i t o r i n g Fi n d i n g s a n d Po t e n t i a l Ap p r o a c h e s for Addressing Them An Exerpt from the CAPLAW and Community Action Partnership publication, Monitoring
More informationProject Management Professional (PMP) Exam Review
Project Management Professional (PMP) Exam Review Unauthorized distribution is strictly prohibited. These resources are for 3FOLD Education Centre students. PMI, PMP, PMBOK and the PMI Registered Education
More informationSub awards. Property Management
AURA Central Administrative Services (CAS) provides AURA Operating Centers funded by NSF with the business services defined herein. These services will be performed in accordance with federal and state
More informationDocument Synopses by Series
Document Synopses by Series AIA Contract Documents are divided into six alphanumeric series by document use or purpose: A Series: Owner/Contractor Agreements B Series: Owner/Architect Agreements (p. 13)
More informationMaterials Management and Accounting System Compliance Statement
Compliance Statement Materials Management and Accounting System Compliance Statement Infor LN Materials Management and Accounting System Compliance Statement The Defense Federal Acquisition Regulation
More informationSECTION 6.2: CONTRACT MANAGER
: Section 287.057(15), Florida Statutes, requires the department, for each contractual service contract, to designate an employee to be responsible for enforcing the performance of the contract terms and
More informationFISCAL MONITORING PROCEDURES MANUAL
FISCAL MONITORING PROCEDURES MANUAL F Y 2016-17 I. MONITORING OVERSIGHT PROCEDURES PURPOSE: This manual contains the San Francisco Office of Economic and Workforce Development (OEWD) standards for monitoring
More informationGlobal Supplier Code of Business Conduct & Ethics
Global Supplier Code of Business Conduct & Ethics Version 2.0 2/15/2017 Contents Document Statement... 3 Scope... 3 1.0 Related or Referenced Policies... 3 2.0 Compliance with Laws, Regulations and the
More informationFederal Education Programs Financial Management Practices
Federal Education Programs Financial Management Practices Legal Structures for Federal Programs Statutes / Legislation Program Statues (NCLB, IDEA, Perkins) General Education Provisions Act (GEPA) Regulations
More informationModule 2 Contract Planning in the FAR. Preview
Module 2 Contract Planning in the FAR Preview Some of the FAR s Guiding Principles All members of the Team are required to employ planning as an integral part of the overall process of acquiring products
More informationRyan White Part A/MAI Program OVERVIEW OF THE NEW SITE VISIT MONITORING INSTRUMENT
October 25, 2016 Ryan White Part A/MAI Program OVERVIEW OF THE NEW SITE VISIT MONITORING INSTRUMENT Nicolette Solan-Pegler Compliance Officer OMB-GC/RW What is our objective? To familiarize ourselves with
More informationPURCHASING AND PROCUREMENT OVERVIEW
Purchasing and Procurement Overview AASBO Certificate Program September 2018 David Smith Executive Director david@aasbo.com 256 585 1511 PURCHASING AND PROCUREMENT OVERVIEW Contract Procurement Law Understanding
More informationSUBPART ACQUISITION PLANS (Revised January 10, 2008)
SUBPART 207.1--ACQUISITION PLANS (Revised January 10, 2008) 207.103 Agency-head responsibilities. (d)(i) Prepare written acquisition plans for (A) Acquisitions for development, as defined in FAR 35.001,
More informationCommercial Software Licensing
Commercial Software Licensing CHAPTER 5: Prepared by DoD ESI January 2013 Chapter Overview Software pricing to end users is usually based on several models: Users. Computer assignment. Company application
More informationCoastal Zone Management Act Section 309 Program Guidance to 2020 Enhancement Cycle
Coastal Zone Management Act Section 309 Program Guidance 2016 to 2020 Enhancement Cycle National Oceanic and Atmospheric Administration National Ocean Service Office of Ocean and Coastal Resource Management
More informationLincoln City Visitor and Convention Bureau. City of Lincoln City REQUEST FOR QUALIFICATIONS
Lincoln City Visitor and Convention Bureau City of Lincoln City REQUEST FOR QUALIFICATIONS Visitor Center Concept Development and Designs Architectural Services Lincoln City, Oregon April 20, 2018 RFQ
More informationThe North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement
The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison NAFTA Chapter 10: Government Procurement Chapter Ten: Government Procurement Chapter Fifteen: Government
More informationRequest for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County
Request for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County April 09, 2018 Responses Due Date/Time April 30, 2018 before 4:00 PM Pacific
More informationGeneral Session 2 Procurement Update. #AirportsTechnical
General Session 2 Procurement Update #AirportsTechnical Procurement Update Moderator: Jeff Kirby, Parish & Partners Mike Rottinghaus, FAA, Office of Airport Planning and Programming Jim Harris, Coffman
More informationAudit of Executive Compensation
5-803.1 Audit of Executive Compensation a. The contractor's executive compensation system should be evaluated separately, even if the contractor does not have a separate pay structure for executives. FAR
More informationPreparing for a CPSR Audit
Preparing for a CPSR Audit Presented by Phil Bail Phil Bail & Associates 3/18/2015 1 What is your experience with CPSR s? I have no real idea what a CPSR audit is. My company has a government approved
More informationOhio Department of Transportation. Conflict of Interest Waiver Process Guidance Concerning Review of Conflict of Interest Waiver Requests
June 26, 2017 (rev. 9/29/2017) Ohio Department of Transportation Conflict of Interest Waiver Process Guidance Concerning Review of Conflict of Interest Waiver Requests Purpose The purpose of this document
More information6. KLH Industries, Inc. performs inspection activities to ensure that purchased product meets purchase requirements.
General: As a supplier to KLH Industries, Inc., it is understood that when accepting our purchase orders, your organization agrees to meet the following stipulations / AS9100 requirements whenever KLH
More informationUNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ
SPECIAL CONDITIONS Definitions: a) OWNER: Union County Vocational-Technical Schools UCVTS b) CITY or TOWN: Scotch Plains, New Jersey c) ARCHITECT: Netta Architects 1084 Route 22 West Mountainside, New
More informationPHASE 4 - Post-Award. Type of Feedback Type of Contract Feedback Category Feedback
PHASE 4 - Post-Award Type of Feedback Type of Feedback Category Feedback Commodity (Competitive) Use of the Bid Evaluation Model (BEM), when validated, is a best practice approach to evaluating competitive,
More informationARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)
More informationGSA Schedule Services Contracting and the Cost-build Approach to Pricing
GSA Schedule Services Contracting and the Cost-build Approach to Pricing Breakout Session #: D09 Presented by: Bill Bressette, Principal, Baker Tilly Rob Austin, Director, Baker Tilly Date: 7/23/2013 Time:
More informationREALOGY HOLDINGS CORP. CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS. As Amended on January 25, 2017
REALOGY HOLDINGS CORP. CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS As Amended on January 25, 2017 I. Purpose of the Compensation Committee The Compensation Committee, which is a Committee
More informationPersons Policy and Model Monitoring Plan
Innovations for Poverty Action Owner: General Counsel/ Chief Compliance Officer Combating Trafficking in Persons Policy and Model Monitoring Plan Revision Date: 03/28/17 Revision No.: V1 Purpose This policy
More informationThe Ravens Group, Inc.
GSA FEDERAL SUPPLY SCHEDULE WORLDWIDE FEDERAL SUPPLY SCHEDULE CONTRACT FINANCIAL AND BUSINESS SOLUTIONS (FABS) GENERAL SERVICES ADMINISTRATION SPECIAL ITEM NUMBER SERVICES 520-11 Accounting 520-12 Budgeting
More informationAPPENDIX 2: COMPLIANCE WITH REVISED PUBLIC HEALTH SERVICE REGULATIONS
APPENDIX 2: COMPLIANCE WITH REVISED PUBLIC HEALTH SERVICE REGULATIONS This Appendix to the Columbia University Policy on Financial Conflicts of Interest and Research (the Policy ) documents the policies
More informationDefinitions. Group Purchasing Services Private for-profit or not-for-profit organizations that purchase goods and services on behalf of members.
Definitions Competitive Proposal* - i.e., a Request for Proposal (RFP), means a method of procurement whereby a technical proposal is solicited that explains how the prospective contractor will meet the
More informationGeneral Services Administration Federal Supply Service Authorized Federal Supply Schedule Price List
General Services Administration Federal Supply Service Authorized Federal Supply Schedule Price List FSC Schedule: 70 General Purpose Commercial Information Technology Equipment, Software, and Services
More informationAccounting and Auditing for Government Contractors
Accounting and Auditing for Government Contractors Presented By: C. P. Krishnan Newport Beach (CA) Dallas (TX) Washington (D.C) New Delhi (India) For more info - www.sba.gov Who is DCAA? The Defense Contract
More informationPurchasing System (Including Counterfeit Parts)
Purchasing System (Including Counterfeit Parts) Steven M. Masiello Joseph G. Martinez April 26, 2016 McKenna Government Contracts, continuing excellence at Dentons Agenda Purchasing system overview Contractor
More informationAudit and Timekeeping Requirements
Audit and Timekeeping Requirements Department of Health & Human Services National Institutes of Health / OD / OALM / OAMP Division of Financial Advisory Services Hruta Virkar, Director Dan Milstead, Branch
More informationInternational Republican Institute 1225 Eye St. NW, Suite 700 Washington, DC (202) (202) fax
REQUEST FOR QUOTES International Republican Institute 1225 Eye St. NW, Suite 700 Washington, DC 20005 (202) 408-9450 (202) 408-9462 fax www.iri.org @IRIGlobal Procurement Number: IRI2016ALL01o Open Date:
More informationBASIC HOST COUNTRY CONSTRUCTION CONTRACTING FOR DEVELOPMENT PROFESSIONALS: A PRIMER
BASIC HOST COUNTRY CONSTRUCTION CONTRACTING FOR DEVELOPMENT PROFESSIONALS: A PRIMER January 2012 This Primer was produced for the United States Agency for International Development (USAID). It was prepared
More informationREQUEST FOR QUOTES. Period of Performance: March 1, 2017 to June 30, Statement of Work:
International Republican Institute 1225 Eye St. NW, Suite 700 REQUEST FOR QUOTES Washington, DC 20005 (202) 408-9450 Procurement Number: GOV2017SC01o Open Date: January 23, 2017 Questions Deadline: January
More informationREQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 11, DUE DATE: December 28, 2017
REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF LEGAL SERVICES General Counsel ISSUE DATE: December 11, 2017 DUE DATE: December 28, 2017 Issued by: Rahway Parking Authority NOTE: In the event an interested
More informationCONSTRUCTION MANAGEMENT SERVICES
DrAFTDRAFTdd EXHIBIT 1 CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS () SELECTION PROCESS School District of Lee County, Florida TABLE OF CONTENTS 1. INTRODUCTION 1 Lobbying 2 2. REQUEST
More informationExport-Import Bank of the United States
Export-Import Bank of the United States Guidelines for Ensuring and Maximizing the Quality, Objectivity, Utility, and Integrity of Information Disseminated to the Public by the Export-Import Bank of the
More information