1 Proceedings of the 2007 IEEE International Symposium on Assembly and Manufacturing Ann Arbor, Michigan, USA, July 22-25, 2007 MoB2.1 Bottleneck Detection of Manufacturing Systems Using Data Driven Method Lin Li, Qing Chang, Jun Ni, Guoxian Xiao, and Stephan Biller Abstract Bottlenecks in a production line have been shown to be one of the main reasons that impede productivity. Correctly and efficiently identifying bottleneck locations can improve the utilization of finite manufacturing resources, increase the system throughput, and minimize the total cost of production. Current bottleneck detection schemes can be separated into two categories: analytical and simulation-based. For the analytical method, the system performance is assumed to be described by a statistical distribution. Although an analytical model is good at long term prediction, this type of model is not adequate for solving the bottleneck detection problem in the short term. On the other hand, the simulation-based method has disadvantages, such as long development time and decreased flexibility for different production scenarios, which greatly impede its wide implementation. Because of all these problems, a data driven bottleneck detection method has been constructed based on the real-time data from manufacturing systems. Using this new method, bottleneck locations can be identified in both the short term and long term. Furthermore, the proposed data driven bottleneck detection method has been verified using the results from both the analytical and simulation methods. T I. INTRODUCTION HROUGHPUT is an important parameter to evaluate a production performance. Throughput analysis is also critical for the design, control, and management of production systems. Bottleneck is a machine that impedes the system performance in the strongest manner. Generally, the performance improvement on bottleneck machines results in a significantly higher overall system throughput than the performance improvement on non-bottleneck machines. Much research effort has been made in the area of throughput analysis and bottleneck detection. Generally, previous research can be categorized into two groups: L. Li is with the Department of Mechanical Engineer, University of Michigan, Ann Arbor, MI 48109, USA (phone: ; lilz@umich.edu). Q. Chang is with Manufacturing Systems Research lab, General Motors Research and Development Center, Warren, MI 48090, USA (phone: , cindy.chang@gm.com). J. Ni is with the Department of Mechanical Engineer, University of Michigan, Ann Arbor, MI 48109, USA (phone: ; junni@umich.edu). G. Xiao is with Manufacturing Systems Research lab, General Motors Research and Development Center, Warren, MI 48090, USA ( guoxian.xiao@gm.com). S. Biller is with Manufacturing Systems Research lab, General Motors Research and Development Center, Warren, MI 48090, USA ( stephan.biller@gm.com). detection using an analytical model [1] [4] and detection using a simulation model [5] [6]. For the analytical method, the machine performance metrics such as machine-up-down and processing time are assumed to be exponentially distributed. No closed form expressions have been found for the throughput analysis of serial production lines with more than two workstations. The accepted method for analyzing the longer lines is following the heuristic rule of decomposition. This decomposition approach analyzes the station-buffer-station case iteratively as the building block for longer production lines [7]. Using this heuristic rule, the fundamental challenge is how to model the two-station problem. For the two-station problem, two basic models considering the reliability are often discussed in the literature to establish the closed form expression: the Bernoulli model [8] [10] and the Markovian model [11] [12]. Reference [13] proposed an indirect method to identify the bottleneck. This method described a way of comparison between two neighboring machines: if the blockage time of upstream machine was higher than the starvation time of the downstream machine, bottleneck was downstream; otherwise bottleneck was upstream. By assuming reliability performance follow the Markovian model, analytical verification result was obtained for a scenario with two machines and one buffer. Another widely used method for analyzing system throughput and detecting bottleneck is simulation method, which has been adopted in industry [14] [15]. In the simulation method, discrete event simulation models are often created for a production line. Once these models have been constructed, throughput analysis must be carried out within the simulation model to detect any bottlenecks. The accuracy of the simulation results depends on many factors such as how closely the discrete event models appropriate the actual system and the skill level of the programmer. Good simulation models can significantly improve the design, analysis and management of the production systems. Many corporations have their own tools for analysis. For example, General Motors Corporation created an internal throughput-analysis tool called C-MORE, which is the combination of decomposition-based analytical methods and customized discrete-event-simulation solvers [16]. Although the simulation method is good at analyzing the throughput and detecting the bottleneck locations, it has some disadvantages such as long development time, decreased /07/$ IEEE. 76

2 flexibility for different production scenarios, and high cost greatly impede its wide application. To solve the problems of current bottleneck detection methods, a new data driven bottleneck detection method is developed. The method utilizes production line blockage and starvation probabilities to identify production constraints. The rest of this paper is organized as follows: section 2 gives the definition of a bottleneck and turning point, and then verifies the turning point corresponds to a bottleneck; section 3 explains the data driven bottleneck detection procedures; section 4 discusses the conclusions and future work of this research. B. Definition of Turning Point Based on definition (c), it is difficult to calculate the sensitivity value directly. Therefore, an indirect method is needed to identify the bottlenecks based on the information obtained in the plant floor. Before developing the method, we first introduce a definition of turning point. This definition is the foundation of the proposed data driven bottleneck detection method. Presently, more data are becoming available in modern factories. Fig. 1 shows the blockage and starvation times from a real (serial) production line. II. BOTTLENECK DETECTION FORMULATION A. Bottleneck Detection The notion of a bottleneck does not seem to have a uniformed accepted interpretation [17] [18]. Specifically, the following definitions are often found in the literature: (a) If a machine has the smallest isolation production rate (PR), this machine is the bottleneck. The production rate is defined as the average number of parts produced by a machine per cycle of time. (b) If the work-in-process (WIP) inventory in a buffer is the largest, then the machine right after this buffer is the bottleneck. (c) If the sensitivity value of the system production rate to a machine s production rate is the largest, then this machine Fig. 1. Trend of blockage and starvation times in a production line Usually, bottleneck machines in a production line have many distinct characteristics. For example, a bottleneck machine will often make the upstream machines blocked and downstream machines starved. A bottleneck machine will also have a lower overall sum of blockage and starvation time. Based on these characteristics, the turning point can be defined. DEFINITION: Machine j is the turning point in a n- machine segment with finite buffers if is the bottleneck. It is formulated as if, and then machine i is the bottleneck [18]. In this paper, a bottleneck is defined as the machine which has the maximum ratio of overall system throughput increment to its own standalone throughput increment during a certain period [15]. This definition can be formulated as If, and then machine k is the bottleneck in an n-machine production line. In this definition, is the system throughput increment caused by machine i due to a performance change (e.g., reduction of cycle time or downtime) and is the standalone throughput increment of machine i. Each of these definitions has its advantages and disadvantages [18]. The main advantage of definitions (a) and (b) is that they are based on on-line data, which can be measured during real-time system operation. However, these two definitions are local in nature, and they may not identify the critical bottlenecks from the total system point of view. On the other hand, definition (c) considers both local and global properties, because it defines how each local machine affects the system performance. However, it is not formulated in terms of on-line data, and quantities involved in the definition cannot be measured directly during realtime system operation. This greatly impedes applying definition (c) to detect bottlenecks in a real system. where is the blockage time for machine j; is the starvation time for machine j; j-1 is the nearest upstream machine and j+1 is the nearest downstream machine. We define the turning point to be a machine where the trend of blockage and starvation changes from blockage being higher than starvation to starvation being higher than blockage. Furthermore, the sum of a turning point machine s blockage and starvation is smaller than its neighboring machines. In this way, the turning point machine has the highest percentage of the sum of operating time and downtime compared to the other machines in the segment. This definition of turning point can be further illustrated in Fig. 2, which plots the same actual data as in Fig. 1. In Fig 2, within the segment from machine M8 to machine M17 (a ten-machine segment), blockage is initially higher than starvation (M8). Then, starvation becomes higher than blockage (from M9 to M17). Furthermore, because the relations can be obtained as: 77

3 M9 must be the turning point by definition. Following the same procedure, M2, M4 and M6 are the other turning points in this example. Because each machine only has four statuses (blocked, starved, down, and operating), the equations based on time summation for each machine can be expressed as: Fig. 2. Case to show how turning points are determined The on-line information of blockage and starvation reflects production line performance during a projected time periods. For short time periods, the turning points reflect short-term dynamic bottlenecks. For long time periods, the turning points reflect long-term statistic bottlenecks C. Analytical Verification for Three-Machine-No-Buffer Segment After introducing the definitions of a bottleneck and turning point, two kinds of verification methods analytical verification and simulation verification are performed to prove the conclusion that turning points correspond to bottlenecks. The analytical verification is on a simple three-machineno-buffer line. We give a pictorial representation of this segment in Fig. 3. By analyzing the relationship between these three machines; we see that is mainly caused by, and is mainly caused by. Furthermore, is mainly caused by and, and is mainly caused by and. Therefore, four additional equations according to these conditions can be obtained as where. When both machines and are failed, if there is a part on machine, then machine is blocked during the failure; else if there is no part on machine when both machine and machine are failed, then machine is starved. Therefore, parameter is the random value between 0 and 1 to describe this kind of uncertainty in (4) and (5). By solving these seven equations, the expressions for can be calculated as Fig. 3. Selected segment for analytical verification The assumptions and simplifications in the verification include: (1) The first machine is never starved, and the last machine is never blocked. (2) Reasonably assume the cycle time for each machine to be same, because the cycle time for each machine in the actual system of different types of machine is quite close. (3) Machine is the turning point. We define the parameters as follows: - Blockage time for machine j, j = i-1, i - Starvation time for machine j, j = i, i+1 - Down time for machine j, j = i-1, i, i+1 - Working time for machine j, j = i-1, i, i+1 T- Sampling time (e.g., one shift) TC - Cycle time of machines - Overall system throughput - Standalone throughput for individual machine j, j = i-1, i, i+1 - Intersection of sets which means the working time of each machine during the segment is the same. Since machine is the turning point, the additional relations can be obtained as and. Therefore, from (1), (2) and (3), we see that and. The system throughput of the three-machine segment can be obtained: According to the definition of standalone throughput, three more equations can be obtained as Now, change each machine s parameter to calculate the sensitivity value. We reduce the total downtime of each machine by a certain small value respectively to calculate the throughput increment by each machine and the standalone throughput increment of each machine. Then the sensitivity values and can be 78

4 obtained. Finally, the bottleneck location can be identified by comparing the sensitivity values. When is reduced by, according to (8) and (9) As a result, D. Simulation Verification Besides the analytical verification on a three-machine-nobuffer serial line, simulation-based verification is utilized to verify the turning point is a bottleneck in complex production lines More than five hundred cases have been studied, and over 95% of cases show good agreement that the data driven bottleneck detection method works well and finds the actual bottleneck. The simulation models studied include twomachine-one-buffer model (2M1B), three-machine-twobuffer model (3M2B), four-machine-three-buffer model (4M3B), five-machine-four-buffer model (5M4B), sixmachine-five-buffer model (6M5B), several-machine-nobuffer models, and models of real production lines from two automotive plants. One case of a 6M5B production line is shown to not only illustrate the simulation verification but also highlight the main advantage of data driven method over the traditional simulation-based bottleneck detection method. The 6M5B production line is drawn schematically in Fig. 4. Therefore, Following the same procedures, we calculate sensitivity values when reducing downtime by one at a time for other two machines and as Fig. 4. A 6M5B production line The simulation running conditions include: buffer capacity =10, initial buffer content = 0, part inter-arrival time = 0.1 sec, running period = 8 hours, and machine running parameters are listed in TABLE І. TABLE I SIMULATION PARAMETERS IN A 6M5B LINE Cycle time MTTR (min) MTBF (min) M1 10 sec 2 31 M2 10 sec 3 25 M3 10 sec 2 28 M4 10 sec 2 26 M5 10 sec 3 21 M6 10 sec 2 29 Therefore, which verifies that the turning point (machine bottleneck. ) is the Fig. 5. A simulation result for verification on 6M5B line By running the simulation, the blockage and starvation results are shown in the histogram in Fig. 5. By applying the data driven bottleneck detection method, we find that M2 and M5 are the two turning points in this case. For comparison, we run the simulation for sensitivity analysis. Under normal conditions, system throughput is 2,362 parts. Two approaches are adopted to perform sensitivity analysis for simulation-based bottleneck detection. The first approach is to eliminate the downtime of each machine respectively to check which elimination results in the highest new throughput. The bigger the new throughput (or throughput increment) is, the higher the importance of a potential bottleneck becomes. A second approach, similar to the first, includes a reduction of the total downtime of each machine by a certain small value (5 minutes in this case). This reduction of downtime is used for each machine individually, instead of eliminating the downtime altogether. The results for these two kinds of 79

5 sensitivity analysis approaches are listed in TABLE II. TABLE II RESULTS OF SENSITIVITY ANALYSIS OF A 6M5B LINE when MTTR=0 when downtime decreased by 5 minutes M1 2,363 2,363 M2 2,403 2,371 M3 2,408 2,376 M4 2,431 2,384 M5 2,461 2,388 M6 2,378 2,378 Both approaches show M5 and M4 are the most important bottleneck. In fact, M5 is definitely the primary bottleneck with highest throughout increment, and M2 (not M4) is the actual secondary important bottleneck. To verify this conclusion, we eliminated the down time of the primary bottleneck (M5) and performed the sensitivity analysis on the other five machines again. The results are shown in TABLE III. TABLE III SENSITIVITY ANALYSIS OF A 6M5B LINE WHEN M5 IS PERFECT when MTTR=0 when downtime decreased by 5 minutes M1 2,480 2,480 M2 2,622 2,487 M3 2,500 2,486 M4 2,474 2,473 M6 2,461 2,461 In TABLE III, both sensitivity analysis methods show that M2 is the primary bottleneck in the new condition, which verifies that M2 is the actual secondary bottleneck in the original system (not M4). In fact, in the original condition, the higher throughput increment of M4 comes from the effect of the primary bottleneck M5. In this way, the primary bottleneck dominates the throughput change: on one hand, the function and influence of M2 has been concealed and abated by the primary bottleneck M5; on the other hand, M4 is the dependent machine of the primary bottleneck M5 and achieves high throughput with M5. Therefore, M4 is the dependent bottleneck (not the independent one). These dependencies cause actual independent bottlenecks to be missed. Furthermore, some unimportant, dependent bottlenecks are treated as independent bottlenecks. In summary, this case study verifies an important advantage of data driven bottleneck detection method over the simulation based bottleneck detection method: the data driven method can identify independent local bottlenecks, while the simulation based method sometimes reflects dependencies. E. Verification Discussion In fact, the most important task for bottleneck detection is to identify all the independent local bottlenecks, which are often located in independent segments and divided by the effective buffer locations. Buffer locations in the production line are used to receive and store the finished parts from the upstream machines and provide parts to the downstream machines to be processed. Buffer content level is an important factor which strongly affects system performance. If a buffer content is seldom zero or full and often close to a certain level (e.g., half of the total capacity), then the machines ahead of this buffer are independent of the machines after this buffer because the buffer can provide or store enough parts and the production is not affected no matter how good or bad the performance is upstream or downstream. This kind of buffer is defined as an effective buffer, and segments divided by an effective buffer can be studied independently. On the other hand, if the content of a buffer is often zero or full, this kind of buffer is defined as non-effective buffer and machines ahead of this buffer are dependently related to machines after this buffer because the blockage and starvation times of upstream machines affect the blockage and starvation times of downstream machines (and vice versa). However, the effective buffer and non-effective buffer can only be defined qualitatively not quantitatively because there is no unified standard accepted to determine the boundary between effective and non-effective buffers. It is obvious that a buffer in which the content is never zero or full can be considered an ideally effective buffer. However, it is less straightforward to define whether a buffer is effective or non-effective when the buffer is full or empty 10 percent of the time. Fortunately, buffer dynamic movement (including both effective and non-effective buffers) can be considered as a blockage/starvation change, and the global trend of blockage/starvation automatically decouples long production lines into many independent segments. The turning point is defined in both a local and a global sense; in this way, it can identify independent local bottlenecks in each independent segment of the production line. Under the ideal condition, for the segment between two effective buffers, if only one turning point exists, the segment possibly can be aggregated into a three-machineno-buffer segment. As shown in Fig. 6, if machine is the turning point, by definition, for each machine from to, blockage is higher than its own starvation. However, for each machine from to, blockage is smaller than its own starvation. Therefore, the machines in the small segment before are blocked while the machines after are starved. Because of these characteristics, the m-machine segment (including buffers) can be simplified and aggregated into a three-machine-no-buffer segment including, and. Because the analytical 80

6 verification solution has been obtained in three-machine segment, analytical verification on m-machine segment is also solved. However, the conditions, under which a long segment can be aggregated into three-virtual-machine segment, are still unknown. It will be our further work. Fig. 6. Long line aggregation into three-machine segment III. CONCLUSIONS AND FUTURE WORK This research proposed a new data-driven methodology to detect serial production line bottlenecks. It is shown that manufacturing blockage and starvation measurements play crucial roles in bottleneck identification. The method is verified to be compatible with the bottleneck definition for simple three-machine-no-buffer serial line. The analytical verification uses the actual cumulative values instead of traditional statistical values. For complex production line, simulation-based verification is utilized. It is convinced that the data driven method can provide quick bottleneck identification. This offers a possibility for a unified approach to bottleneck analysis. It is noticed that the new method can apply for most cases in our studies, however a few exceptions exist. To learn the limitation of the method and to gain deep understandings of production performance from on-line production measurements such as blockage and starvation are subjects of future work [9] D. Jacobs, and S. M. Meerkov, A system-theoretic property of serial production lines: Improvability, Int. J. System Science, 1995, Vol. 26, No. 4, pp [10] J. Li, and S. M. Meerkov, Bottlenecks with respect to due-time performance in pull serial production lines, Mathematical Problem in Engineering, 2000, Vol. 5, pp [11] J. A. Buzacott, and J. G. Shanthikumar, Stochastic Models of Manufacturing Systems, Englewood Cliffs, NJ: Prentice Hall, [12] S. Y. Chiang, C. T. Kuo, and S. M. Meerkov (2000), DT-bottlenecks in serial production lines: theory and application, IEEE Transactions on Robotics and Automation, 2000, Vol. 16, No. 5, pp [13] S. Y. Chiang, C. T. Kuo, and S. M. Meerkov, c-bottlenecks in serial production lines: identification and application, Mathematical Problem in Engineering, 2001, Vol. 7, pp [14] C. Roser, M. Nakano, and M. Tanaka, Comparison of bottleneck detection methods for AGV systems, Proceedings of the 2003 Winter Simulation Conference, 2003, pp [15] Q. Chang, and J. Ni, Supervisory factor control based on real-time production feedback, Ph.D dissertation, Program in Manufacturing in the University of Michigan, [16] J. M. Alden, L. D. Burns, T. Costy, R. D. Hutton, C. A. Jackson, D. S. Kim, K. A. Kohls, J. H. Owen, M. A. Turnquist, and D. J. Vander Veen, General Motors Increases Its Production Throughput, Interfaces, 2006, Vol. 36, No. 1, pp [17] S. R. Lawrence, and A. H., Buss, Economic Analysis of Production Bottlenecks, Mathematical Problems in Engineering, 1995, Vol. 1, No. 4. [18] C. T. Kuo, J. T. Lim and S. M. Meerkov, Bottlenecks in serial production lines: a system-theoretic approach, Mathematical Problem in Engineering, 1996, Vol. 2, pp Reference [1] S. B. Gershwin, Manufacturing Systems Engineering, Englewood Cliffs, NJ: Prentice Hall, 1994, pp [2] S. Y. Chiang, C. T. Kuo, and S. M. Meerkov, (1998), Bottlenecks in Markovian production lines: a systems approach, IEEE Transactions on Robotics and Automation, 1998, Vol. 14, No. 2, pp [3] J. C. Wang, M. C. Zhou, and Y. Deng, Throughput analysis of discrete event systems based on stochastic Petri nets, International Journal of Intelligent Control and Systems, 1999, Vol. 99. [4] D. E. Blumenfeld, and J. Li, An analytical formula for throughput of a production line with identical stations and random failures, Mathematical Problems in Engineering, 2005, Vol. 3, [5] A. M. Law, and M. G. McComas, Simulation of manufacturing systems, Proceedings of the 1998 Winter Simulation Conference, 1998, pp [6] D. A. Bonder, and L. F. McGinnis, A structured approach to simulation modeling of manufacturing systems, Proceedings of the 2002 Industrial Engineering Research Conference. [7] S. B. Gershwin, An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking, Operations Research, 1987, Vol. 35, No. 2, pp [8] J. T. Lim, S. M. Meerkov, and F. Top (1990), Homogeneous, asymptotically reliable serial production lines: theory and a case study, IEEE Transactions on Automatic Control, 1990, Vol. 35, No. 5, pp. 81

A Quantitative Comparison of Bottleneck Detection Methods in Manufacturing Systems with Particular Consideration for Shifting Bottlenecks

A Quantitative Comparison of Bottleneck Detection Methods in Manufacturing Systems with Particular Consideration for Shifting Bottlenecks A Quantitative Comparison of Bottleneck Detection Methods in Manufacturing Systems with Particular Consideration for Shifting Bottlenecks Christoph Roser 1, Masaru Nakano 2 1 Karlsruhe University of Applied

More information

COMPARISON OF BOTTLENECK DETECTION METHODS FOR AGV SYSTEMS. Christoph Roser Masaru Nakano Minoru Tanaka

COMPARISON OF BOTTLENECK DETECTION METHODS FOR AGV SYSTEMS. Christoph Roser Masaru Nakano Minoru Tanaka Roser, Christoph, Masaru Nakano, and Minoru Tanaka. Comparison of Bottleneck Detection Methods for AGV Systems. In Winter Simulation Conference, edited by S. Chick, Paul J Sanchez, David Ferrin, and Douglas

More information

BOTTLENECK SHIFTING IN PRODUCTION LINES IMPACT OF VARIABILITY, NEW DETECTION METHOD AND CONTROL STRATEGIES. A Thesis by. Prasannavenkatesh Tamilselvan

BOTTLENECK SHIFTING IN PRODUCTION LINES IMPACT OF VARIABILITY, NEW DETECTION METHOD AND CONTROL STRATEGIES. A Thesis by. Prasannavenkatesh Tamilselvan BOTTLENECK SHIFTING IN PRODUCTION LINES IMPACT OF VARIABILITY, NEW DETECTION METHOD AND CONTROL STRATEGIES A Thesis by Prasannavenkatesh Tamilselvan Bachelor of Engineering, Anna University, India, 2007

More information

DESIGN AND OPERATION OF MANUFACTURING SYSTEMS is the name and focus of the research

DESIGN AND OPERATION OF MANUFACTURING SYSTEMS is the name and focus of the research Design and Operation of Manufacturing Systems Stanley B. Gershwin Department of Mechanical Engineering Massachusetts Institute of Technology Cambridge, Massachusetts 02139-4307 USA web.mit.edu/manuf-sys

More information

Bottleneck Prediction Using the Active Period Method in. Combination with Buffer Inventories

Bottleneck Prediction Using the Active Period Method in. Combination with Buffer Inventories Bottleneck Prediction Using the Active Period Method in Combination with Buffer Inventories Christoph Roser 1, Kai Lorentzen 2, David Lenze 3 Jochen Deuse 3, Ferdinand Klenner 4, Ralph Richter 5, Jacqueline

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds Proceedings of the 0 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds OPTIMAL BATCH PROCESS ADMISSION CONTROL IN TANDEM QUEUEING SYSTEMS WITH QUEUE

More information

A DECISION TOOL FOR ASSEMBLY LINE BREAKDOWN ACTION. Roland Menassa

A DECISION TOOL FOR ASSEMBLY LINE BREAKDOWN ACTION. Roland Menassa Proceedings of the 2004 Winter Simulation Conference R.G. Ingalls, M. D. Rossetti, J. S. Smith, and. A. Peters, eds. A DECISION TOOL FOR ASSEMLY LINE REAKDOWN ACTION Frank Shin ala Ram Aman Gupta Xuefeng

More information

EasyChair Preprint. Economic Investigation in Variable Transfer Batch Size, in CONWIP Controlled Transfer Line

EasyChair Preprint. Economic Investigation in Variable Transfer Batch Size, in CONWIP Controlled Transfer Line EasyChair Preprint 57 Economic Investigation in Variable Transfer Batch Size, in CONWIP Controlled Transfer Line Guy Kashi, Gad Rabinowitz and Gavriel David Pinto EasyChair preprints are intended for rapid

More information

OPTIMAL ALLOCATION OF WORK IN A TWO-STEP PRODUCTION PROCESS USING CIRCULATING PALLETS. Arne Thesen

OPTIMAL ALLOCATION OF WORK IN A TWO-STEP PRODUCTION PROCESS USING CIRCULATING PALLETS. Arne Thesen Arne Thesen: Optimal allocation of work... /3/98 :5 PM Page OPTIMAL ALLOCATION OF WORK IN A TWO-STEP PRODUCTION PROCESS USING CIRCULATING PALLETS. Arne Thesen Department of Industrial Engineering, University

More information

Dynamic Lead Time Based Control Point Policy for Multi Stage Manufacturing Systems

Dynamic Lead Time Based Control Point Policy for Multi Stage Manufacturing Systems Dynamic Lead Time ased Control Point Policy for Multi Stage Manufacturing Systems Marcello Colledani (1), Stanley. Gershwin (2) 11 th Conference on Stochastic Models of Manufacturing and Service Operations,

More information

PERFORMANCE MODELING OF AUTOMATED MANUFACTURING SYSTEMS

PERFORMANCE MODELING OF AUTOMATED MANUFACTURING SYSTEMS PERFORMANCE MODELING OF AUTOMATED MANUFACTURING SYSTEMS N. VISWANADHAM Department of Computer Science and Automation Indian Institute of Science Y NARAHARI Department of Computer Science and Automation

More information

Utilization vs. Throughput: Bottleneck Detection in AGV Systems

Utilization vs. Throughput: Bottleneck Detection in AGV Systems Utilization vs. Throughput: Bottleneck Detection in AGV Systems Christoph Roser Masaru Nakano Minoru Tanaka Toyota Central Research and Development Laboratories Nagakute, Aichi 480-1192, JAPAN ABSTRACT

More information

SIMULATING TEST PROGRAM METHODS IN SEMICONDUCTOR ASSEMBLY TEST FACTORIES. Chad D. DeJong

SIMULATING TEST PROGRAM METHODS IN SEMICONDUCTOR ASSEMBLY TEST FACTORIES. Chad D. DeJong Proceedings of the 2001 Winter Simulation Conference B. A. Peters, J. S. Smith, D. J. Medeiros, and M. W. Rohrer, eds. SIMULATING TEST PROGRAM METHODS IN SEMICONDUCTOR ASSEMBLY TEST FACTORIES Chad D. Intel

More information

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Atanu Mukherjee, President, Dastur Business and Technology Consulting,

More information

2012 MPS Qualify Exam

2012 MPS Qualify Exam 2012 MPS Qualify Exam The examination will be four hours long. There will be eight questions in all. Students must select 7 out of 8 questions to answer. The exam is open book and open notes. The students

More information

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 2/30 People Philosophy Basic Issues Industry Needs Uncertainty, Variability, and Randomness

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 2/30 People Philosophy Basic Issues Industry Needs Uncertainty, Variability, and Randomness Copyright c 2009 Stanley B. Gershwin. All rights reserved. 1/30 Uncertainty, Variability, Randomness, and Manufacturing Systems Engineering Stanley B. Gershwin gershwin@mit.edu http://web.mit.edu/manuf-sys

More information

ASSESSING THE TRADEOFF BETWEEN COST AND AVAILABILITY USING SIMULATION

ASSESSING THE TRADEOFF BETWEEN COST AND AVAILABILITY USING SIMULATION 2017 NDIA GROUND VEHICLE SYSTEMS ENGINEERING AND TECHNOLOGY SYMPOSIUM SYSTEMS ENGINEERING (SE) TECHNICAL SESSION AUGUST 8-10, 2017 NOVI, MICHIGAN ASSESSING THE TRADEOFF BETWEEN COST AND AVAILABILITY USING

More information

Unreliable Production Lines with Simultaneously Unbalanced Operation Time Means, Breakdown, and Repair Rates

Unreliable Production Lines with Simultaneously Unbalanced Operation Time Means, Breakdown, and Repair Rates Unreliable Production Lines with Simultaneously Unbalanced Operation Time Means, Breakdown, and Repair Rates S. Shaaban, T. McNamara, S. Hudson Abstract This paper investigates the benefits of deliberately

More information

Simulation Analytics

Simulation Analytics Simulation Analytics Powerful Techniques for Generating Additional Insights Mark Peco, CBIP mark.peco@gmail.com Objectives Basic capabilities of computer simulation Categories of simulation techniques

More information

Line Balancing in the Hard Disk Drive Process Using Simulation Techniques

Line Balancing in the Hard Disk Drive Process Using Simulation Techniques Line Balancing in the Hard Disk Drive Process Using Simulation Techniques Teerapun Saeheaw, Nivit Charoenchai, and Wichai Chattinnawat Abstract Simulation model is an easy way to build up models to represent

More information

Line Balancing in the Hard Disk Drive Process Using Simulation Techniques

Line Balancing in the Hard Disk Drive Process Using Simulation Techniques Line Balancing in the Hard Disk Drive Process Using Simulation Techniques Teerapun Saeheaw, Nivit Charoenchai, and Wichai Chattinnawat Abstract Simulation model is an easy way to build up models to represent

More information

PETRI NET VERSUS QUEUING THEORY FOR EVALUATION OF FLEXIBLE MANUFACTURING SYSTEMS

PETRI NET VERSUS QUEUING THEORY FOR EVALUATION OF FLEXIBLE MANUFACTURING SYSTEMS Advances in Production Engineering & Management 5 (2010) 2, 93-100 ISSN 1854-6250 Scientific paper PETRI NET VERSUS QUEUING THEORY FOR EVALUATION OF FLEXIBLE MANUFACTURING SYSTEMS Hamid, U. NWFP University

More information

A TUTORIAL ON ERGONOMIC AND PROCESS MODELING USING QUEST AND IGRIP. Deidra L. Donald

A TUTORIAL ON ERGONOMIC AND PROCESS MODELING USING QUEST AND IGRIP. Deidra L. Donald Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. A TUTORIAL ON ERGONOMIC AND PROCESS MODELING USING QUEST AND IGRIP Deidra L. Donald

More information

Inventory and Variability

Inventory and Variability Inventory and Variability 1/29 Copyright c 21 Stanley B. Gershwin. All rights reserved. Inventory and Variability Stanley B. Gershwin gershwin@mit.edu http://web.mit.edu/manuf-sys Massachusetts Institute

More information

OPERATING SYSTEMS. Systems and Models. CS 3502 Spring Chapter 03

OPERATING SYSTEMS. Systems and Models. CS 3502 Spring Chapter 03 OPERATING SYSTEMS CS 3502 Spring 2018 Systems and Models Chapter 03 Systems and Models A system is the part of the real world under study. It is composed of a set of entities interacting among themselves

More information

MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM

MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM Tan Hauw Sen Rimo 1, Engr. Mohd Soufhwee bin Abd Rahman 2, 1 tanhauwsr@utem.edu.my, 2 soufhwee@utem.edu.my LESSON OUTCOMES At the end

More information

Numerical investigation of tradeoffs in production-inventory control policies with advance demand information

Numerical investigation of tradeoffs in production-inventory control policies with advance demand information Numerical investigation of tradeoffs in production-inventory control policies with advance demand information George Liberopoulos and telios oukoumialos University of Thessaly, Department of Mechanical

More information

Analysis and Modelling of Flexible Manufacturing System

Analysis and Modelling of Flexible Manufacturing System Analysis and Modelling of Flexible Manufacturing System Swetapadma Mishra 1, Biswabihari Rath 2, Aravind Tripathy 3 1,2,3Gandhi Institute For Technology,Bhubaneswar, Odisha, India --------------------------------------------------------------------***----------------------------------------------------------------------

More information

IMPROVING MANUFACTURING PROCESSES USING SIMULATION METHODS

IMPROVING MANUFACTURING PROCESSES USING SIMULATION METHODS Applied Computer Science, vol. 12, no. 4, pp. 7 17 Submitted: 2016-07-27 Revised: 2016-09-05 Accepted: 2016-09-09 computer simulation, production line, buffer allocation, throughput Sławomir KŁOS *, Justyna

More information

AN ABSTRACT OF THE DISSERTATION OF

AN ABSTRACT OF THE DISSERTATION OF AN ABSTRACT OF THE DISSERTATION OF SeJoon Park for the degree of Doctor of Philosophy in Industrial Engineering presented on December 6, 2011. Title: Container Fleet-Sizing for Part Transportation and

More information

REAL-TIME DISPATCHING SYSTEM OF GIGA-FAB

REAL-TIME DISPATCHING SYSTEM OF GIGA-FAB REAL-TIME DISPATCHING SYSTEM OF GIGA-FAB YING-MEI TU Department of Industrial Management, Chung-Hua University, Taiwan, R.O.C. E-mail: amytu@chu.edu.tw Abstract Semiconductor manufacturing companies have

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 MANUFACTURING SYSTEM Manufacturing, a branch of industry, is the application of tools and processes for the transformation of raw materials into finished products. The manufacturing

More information

RE-EXAMINING THE PERFORMANCE OF MRP AND KANBAN MATERIAL CONTROL STRATEGIES FOR MULTI-PRODUCT FLEXIBLE MANUFACTURING SYSTEMS

RE-EXAMINING THE PERFORMANCE OF MRP AND KANBAN MATERIAL CONTROL STRATEGIES FOR MULTI-PRODUCT FLEXIBLE MANUFACTURING SYSTEMS RE-EXAMINING THE PERFORMANCE OF MRP AND KANBAN MATERIAL CONTROL STRATEGIES FOR MULTI-PRODUCT FLEXIBLE MANUFACTURING SYSTEMS Ananth Krishnamurthy Department of Decision Sciences and Engineering Systems,

More information

Design and Operational Analysis of Tandem AGV Systems

Design and Operational Analysis of Tandem AGV Systems Proceedings of the 2008 Industrial Engineering Research Conference J. Fowler and S. Mason. eds. Design and Operational Analysis of Tandem AGV Systems Sijie Liu, Tarek Y. ELMekkawy, Sherif A. Fahmy Department

More information

Modeling and Analysis of a Manufacturing Plant Using Discrete Event Simulation

Modeling and Analysis of a Manufacturing Plant Using Discrete Event Simulation ISSN : 48-9, Vol. 7, Issue, ( Part -3) February 07, pp.49-54 RESEARCH ARTICLE OPEN ACCESS Modeling and Analysis of a Manufacturing Plant Using Discrete Event Simulation Radha Krishna R., Siva Krishna S,

More information

Determining the Effectiveness of Specialized Bank Tellers

Determining the Effectiveness of Specialized Bank Tellers Proceedings of the 2009 Industrial Engineering Research Conference I. Dhillon, D. Hamilton, and B. Rumao, eds. Determining the Effectiveness of Specialized Bank Tellers Inder S. Dhillon, David C. Hamilton,

More information

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds.

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds. Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds. SIMULATION-BASED CONTROL FOR GREEN TRANSPORTATION WITH HIGH DELIVERY SERVICE

More information

CHAPTER 2 LITERATURE REVIEW

CHAPTER 2 LITERATURE REVIEW CHAPTER 2 LITERATURE REVIEW A manufacturing system is a combination of human, machinery and equipment bounded by material and instruction. A detailed literature review is carried out in the areas of manufacturing

More information

Production error analysis for a line of manufacturing machines, variable structure control approach Starkov, K.; Pogromskiy, A.Y.; Rooda, J.E.

Production error analysis for a line of manufacturing machines, variable structure control approach Starkov, K.; Pogromskiy, A.Y.; Rooda, J.E. Production error analysis for a line of manufacturing machines, variable structure control approach Starkov, K.; Pogromskiy, A.Y.; Rooda, J.E. Published in: Proceedings of the APMS International Conference

More information

Dynamic Buffering of a Capacity Constrained Resource via the Theory of Constraints

Dynamic Buffering of a Capacity Constrained Resource via the Theory of Constraints Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, January 22 24, 2011 Dynamic Buffering of a Capacity Constrained Resource via

More information

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations Why use simulation? Accurate Depiction of Reality Anyone can perform a simple analysis manually. However, as the complexity of the analysis increases, so does the need to employ computer-based tools. While

More information

Maintenance Priority Assignment Utilizing On-line Production Information

Maintenance Priority Assignment Utilizing On-line Production Information Zimin Yang Center for Intelligent Maintenance s (IMS), Department of Mechanical Engineering, University of Michigan, 2350 Hayward Street, Ann Arbor, MI 48109-2125 Qing Chang General Motors Research and

More information

PRODUCTIVITY IMPROVEMENT IN APPLIANCE MANUFACTURING

PRODUCTIVITY IMPROVEMENT IN APPLIANCE MANUFACTURING Proceedings of the 2007 Winter Simulation Conference S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, eds. PRODUCTIVITY IMPROVEMENT IN APPLIANCE MANUFACTURING Charles Harrell

More information

IDENTIFICATION AND MITIGATION OF BOTTLENECKS IN COMPLEX PRODUCTION SYSTEM. A Thesis by. Pradeesh Narayanasamy

IDENTIFICATION AND MITIGATION OF BOTTLENECKS IN COMPLEX PRODUCTION SYSTEM. A Thesis by. Pradeesh Narayanasamy IDENTIFICATION AND MITIGATION OF BOTTLENECKS IN COMPLEX PRODUCTION SYSTEM A Thesis by Pradeesh Narayanasamy Bachelor of Engineering, Anna University, India, 2007 Submitted to the Department of Industrial

More information

PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES

PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES Chakkaphan

More information

LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS

LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS Advances in Production Engineering & Management 4 (2009) 3, 127-138 ISSN 1854-6250 Scientific paper LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS Ahmad, I. * & Al-aney, K.I.M. ** *Department

More information

THE IMPACT OF THE AVAILABILITY OF RESOURCES, THE ALLOCATION OF BUFFERS AND NUMBER OF WORKERS ON THE EFFECTIVENESS OF AN ASSEMBLY MANUFACTURING SYSTEM

THE IMPACT OF THE AVAILABILITY OF RESOURCES, THE ALLOCATION OF BUFFERS AND NUMBER OF WORKERS ON THE EFFECTIVENESS OF AN ASSEMBLY MANUFACTURING SYSTEM Volume8 Number3 September2017 pp.40 49 DOI: 10.1515/mper-2017-0027 THE IMPACT OF THE AVAILABILITY OF RESOURCES, THE ALLOCATION OF BUFFERS AND NUMBER OF WORKERS ON THE EFFECTIVENESS OF AN ASSEMBLY MANUFACTURING

More information

Statistics, Data Analysis, and Decision Modeling

Statistics, Data Analysis, and Decision Modeling - ' 'li* Statistics, Data Analysis, and Decision Modeling T H I R D E D I T I O N James R. Evans University of Cincinnati PEARSON Prentice Hall Upper Saddle River, New Jersey 07458 CONTENTS Preface xv

More information

Understanding Manufacturing Execution Systems (MES)

Understanding Manufacturing Execution Systems (MES) Understanding Manufacturing Execution Systems (MES) What is a Manufacturing Execution System (MES)? AMR Research, a Boston-based industry and market analysis firm, defines a Manufacturing Executing System

More information

A Machine Setup Model for TFT-LCD Cell Back-End Process

A Machine Setup Model for TFT-LCD Cell Back-End Process A Machine Setup Model for TFT-LCD Cell Back-End Process Y.-C. Chang 1, P.-S. Chen 2, P.-C. Chen 1 1 Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan

More information

1. For s, a, initialize Q ( s,

1. For s, a, initialize Q ( s, Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. A REINFORCEMENT LEARNING ALGORITHM TO MINIMIZE THE MEAN TARDINESS

More information

Allocating work in process in a multiple-product CONWIP system with lost sales

Allocating work in process in a multiple-product CONWIP system with lost sales Allocating work in process in a multiple-product CONWIP system with lost sales S. M. Ryan* and J. Vorasayan Department of Industrial & Manufacturing Systems Engineering Iowa State University *Corresponding

More information

LIFE CYCLE AND COST ANALYSIS FOR MODULAR RE-CONFIGURABLE FINAL ASSEMBLY SYSTEMS

LIFE CYCLE AND COST ANALYSIS FOR MODULAR RE-CONFIGURABLE FINAL ASSEMBLY SYSTEMS LIFE CYCLE AND COST ANALYSIS FOR MODULAR RE-CONFIGURABLE FINAL ASSEMBLY SYSTEMS Juhani Heilala, Kaj Helin, Jari Montonen, Otso Vaatainen VTT Industrial Systems, P.O.Box 1702, FIN-02044 VTT, Finland Abstract:

More information

A Simulation Study of Lot Flow Control in Wafer Fabrication Facilities

A Simulation Study of Lot Flow Control in Wafer Fabrication Facilities Proceedings of the 2012 International Conference on Industrial Engineering and Operations Management Istanbul, Turkey, July 3 6, 2012 A Simulation Study of Lot Flow Control in Wafer Fabrication Facilities

More information

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING International Journal of Mechanical Engineering and Technology (IJMET) Volume 8, Issue 9, September 2017, pp. 274 280, Article ID: IJMET_08_09_029 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=8&itype=9

More information

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING International Journal of Mechanical Engineering and Technology (IJMET) Volume 8, Issue 9, September 2017, pp. 274 280, Article ID: IJMET_08_09_029 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=8&itype=9

More information

Influence of Worker Variability and Number of Workstations in. The effect on cycle time and in the work-in-process

Influence of Worker Variability and Number of Workstations in. The effect on cycle time and in the work-in-process Influence of Worker Variability and Number of Workstations in Assembly Line Performance The effect on cycle time and in the work-in-process Instituto Superior Técnico Departamento de Engenharia Mecânica

More information

MFS605/EE605 Systems for Factory Information and Control

MFS605/EE605 Systems for Factory Information and Control MFS605/EE605 Systems for Factory Information and Control Fall 2004 Larry Holloway Dept. of Electrical Engineering and Center for Robotics and Manufacturing Systems 1 Collect info on name, major, MS/PhD,

More information

Simulation and Modeling - Introduction

Simulation and Modeling - Introduction Simulation and Modeling November 2, 2015 Vandana Srivastava Simulation imitation of the operation of a real-world process or system over time first requires that a model be developed model represents the

More information

A Hit-Rate Based Dispatching Rule For Semiconductor Manufacturing

A Hit-Rate Based Dispatching Rule For Semiconductor Manufacturing International Journal of Industrial Engineering, 15(1), 73-82, 2008. A Hit-Rate Based Dispatching Rule For Semiconductor Manufacturing Muh-Cherng Wu and Ting-Uao Hung Department of Industrial Engineering

More information

Re-Examining the Performance of MRP and Kanban Material Control Strategies for Multi-Product Flexible Manufacturing Systems

Re-Examining the Performance of MRP and Kanban Material Control Strategies for Multi-Product Flexible Manufacturing Systems The International Journal of Flexible Manufacturing Systems, 16, 123 150, 2004 c 2004 Kluwer Academic Publishers. Manufactured in The Netherlands. Re-Examining the Performance of MRP and Kanban Material

More information

Mass Customized Large Scale Production System with Learning Curve Consideration

Mass Customized Large Scale Production System with Learning Curve Consideration Mass Customized Large Scale Production System with Learning Curve Consideration KuoWei Chen and Richard Lee Storch Industrial & Systems Engineering, University of Washington, Seattle, U.S.A {kwc206,rlstorch}@uw.edu

More information

Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process

Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process Journal of Mechanical Engineering Vol SI 4 (1), 47-60, 2017 Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process Seha Saffar * Centre

More information

Center for Intelligent Maintenance Systems. IMS Researcher Profiles

Center for Intelligent Maintenance Systems. IMS Researcher Profiles Center for Intelligent Maintenance Systems IMS Researcher Profiles Ahmad Almuhtady almuhtad@umich.edu 734 272 7362 HVAC Equipment Screw and Scroll Compressor Health Monitoring Enhancement of the Lifetime

More information

MIT Manufacturing Systems Analysis Lecture 1: Overview

MIT Manufacturing Systems Analysis Lecture 1: Overview 2.852 Manufacturing Systems Analysis 1/44 Copyright 2010 c Stanley B. Gershwin. MIT 2.852 Manufacturing Systems Analysis Lecture 1: Overview Stanley B. Gershwin http://web.mit.edu/manuf-sys Massachusetts

More information

Applied Mathematical Modelling

Applied Mathematical Modelling Applied Mathematical Modelling 34 (2010) 2129 2135 Contents lists available at ScienceDirect Applied Mathematical Modelling journal homepage: www.elsevier.com/locate/apm Study on intelligent monitoring

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION This chapter is explaining the background of this research, which is determining I- Trolley fleet sizing in a production floor in order to change manual material handling. The problem

More information

PERFORMANCE ANALYSES OF CONWIP CONTROLLED PRODUCTION SYSTEM USING SIMULATION

PERFORMANCE ANALYSES OF CONWIP CONTROLLED PRODUCTION SYSTEM USING SIMULATION PERFORMANCE ANALYSES OF CONWIP CONTROLLED PRODUCTION SYSTEM USING SIMULATION ROTARU Ana University of Pitesti, Faculty of Mechanics and Technology, Department of Management and Technology e-mail: ana_c_rotaru@yahoo.com

More information

Bottleneck detection in manufacturing

Bottleneck detection in manufacturing Bottleneck detection in manufacturing A throughput case study at SCANIA CV Master s thesis in Production engineering AXEL ERICSON Department of Production systems, Industrial and Materials Science CHALMERS

More information

Axiomatic Design of Manufacturing Systems

Axiomatic Design of Manufacturing Systems Axiomatic Design of Manufacturing Systems Introduction to Manufacturing System "What is a manufacturing system?" "What is an ideal manufacturing system?" "How should we design a manufacturing system?"

More information

Why Small Companies Exist. Organizational Entropy Effects on Business Efficiency

Why Small Companies Exist. Organizational Entropy Effects on Business Efficiency Why Small Companies Exist Organizational Entropy Effects on Business Efficiency The Question We are all familiar with economies of scale. Large operations are more efficient than small ones, big factories

More information

Case on Manufacturing Cell Formation Using Production Flow Analysis

Case on Manufacturing Cell Formation Using Production Flow Analysis Case on Manufacturing Cell Formation Using Production Flow Analysis Vladimír Modrák Abstract This paper offers a case study, in which methodological aspects of cell design for transformation the production

More information

Production/Inventory Control with Correlated Demand

Production/Inventory Control with Correlated Demand Production/Inventory Control with Correlated Demand Nima Manafzadeh Dizbin with Barış Tan ndizbin14@ku.edu.tr June 6, 2017 How to match supply and demand in an uncertain environment in manufacturing systems?

More information

USING SIMULATION TO SUPPORT IMPLEMENTATION OF FLEXIBLE MANUFACTURING CELL. Kambiz Farahmand

USING SIMULATION TO SUPPORT IMPLEMENTATION OF FLEXIBLE MANUFACTURING CELL. Kambiz Farahmand Proceedings of the Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. USING SIMULATION TO SUPPORT IMPLEMENTATION OF FLEXIBLE MANUFACTURING CELL Kambiz Texas A&M

More information

EXPLORING THE POSSIBILITIES OF CONJOINT MEASUREMENT AS A DECISION-MAKING TOOL FOR VIRTUAL WAYFINDING ENVIRONMENTS

EXPLORING THE POSSIBILITIES OF CONJOINT MEASUREMENT AS A DECISION-MAKING TOOL FOR VIRTUAL WAYFINDING ENVIRONMENTS EXPLORING THE POSSIBILITIES OF CONJOINT MEASUREMENT AS A DECISION-MAKING TOOL FOR VIRTUAL WAYFINDING ENVIRONMENTS Eindhoven University of Technology, Faculty of Architecture, Building and Planning P.O.

More information

A Combined Analytical and Simulation Based Approach to WIP Improvement

A Combined Analytical and Simulation Based Approach to WIP Improvement A Combined Analytical and Simulation Based Approach to WIP Improvement Shortt D. A. Webasto Roof Systems, Inc., 1757 Northfield Drive, Rochester Hills, MI 48309 USA duane.shortt@gmail.com Abstract Discrete-event

More information

Simulation Using. ProModel. Dr. Charles Harrell. Professor, Brigham Young University, Provo, Utah. Dr. Biman K. Ghosh, Project Leader

Simulation Using. ProModel. Dr. Charles Harrell. Professor, Brigham Young University, Provo, Utah. Dr. Biman K. Ghosh, Project Leader T H R D E D T 0 N Simulation Using ProModel Dr. Charles Harrell Professor, Brigham Young University, Provo, Utah Director, PROMODEL Corporation, Oram, Utah Dr. Biman K. Ghosh, Project Leader Professor,

More information

PRODUCTION PLANNING IN CONDITIONS OF MASS CUSTOMIZATION BASED ONTHEORY OF CONSTRAINTS

PRODUCTION PLANNING IN CONDITIONS OF MASS CUSTOMIZATION BASED ONTHEORY OF CONSTRAINTS Applied Computer Science, vol. 13, no. 4, pp. 35 44 doi: 10.23743/acs-2017-27 Submitted: 2017-10-25 Revised: 2017-11-13 Accepted: 2017-12-06 mass customization, computer aided planning, TOC Janusz MLECZKO

More information

International Conference on Energy and Environmental Protection (ICEEP 2016)

International Conference on Energy and Environmental Protection (ICEEP 2016) International Conference on Energy and Environmental Protection (ICEEP 2016) Energy-saving indexes based on symbolic dynamic applied to Efficiency Power Plants (EPP) of typical high energy consuming industries

More information

and type II customers arrive in batches of size k with probability d k

and type II customers arrive in batches of size k with probability d k xv Preface Decision making is an important task of any industry. Operations research is a discipline that helps to solve decision making problems to make viable decision one needs exact and reliable information

More information

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A.

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A. Proceedings of the 2000 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION Raid Al-Aomar Classic Advanced Development

More information

Production Line Simulation

Production Line Simulation Production Line Simulation A A Valuable Tool for Improvement Presented by: John Moore, VP of Operations Roeslein & Associates, Inc. Roeslein Background Consulting Unitizing Engineering Pre-Assembly Project

More information

Assigning Storage Locations in an Automated Warehouse

Assigning Storage Locations in an Automated Warehouse Proceedings of the 2010 Industrial Engineering Research Conference A. Johnson and J. Miller, eds. Assigning Storage Locations in an Automated Warehouse Mark H. McElreath and Maria E. Mayorga, Ph.D. Department

More information

CS626 Data Analysis and Simulation

CS626 Data Analysis and Simulation CS626 Data Analysis and Simulation Instructor: Peter Kemper R 14A, phone 221-3462, email:kemper@cs.wm.edu Office hours: Monday, Wednesday 2-4 pm Today: Stochastic Input Modeling based on WSC 21 Tutorial

More information

A study on production lines with discrete batch WIP inventory transfer

A study on production lines with discrete batch WIP inventory transfer Int. J. Production Economics 55 (1998) 71 85 A study on production lines with discrete batch WIP inventory transfer Erdal Erel* Faculty of Business, Administration Bilkent University, 06533 Ankara, Turkey

More information

DEVELOPMENT AND INVESTIGATION OF A SIMULATION BASED EXPERT SYSTEM FOR DYNAMIC RESCHEDULING OF AN INTEGRATED JOB SHOP

DEVELOPMENT AND INVESTIGATION OF A SIMULATION BASED EXPERT SYSTEM FOR DYNAMIC RESCHEDULING OF AN INTEGRATED JOB SHOP Association for Information Systems AIS Electronic Library (AISeL) AMCIS 2002 Proceedings Americas Conference on Information Systems (AMCIS) December 2002 DEVELOPMENT AND INVESTIGATION OF A SIMULATION

More information

Introduction to Analytics Tools Data Models Problem solving with analytics

Introduction to Analytics Tools Data Models Problem solving with analytics Introduction to Analytics Tools Data Models Problem solving with analytics Analytics is the use of: data, information technology, statistical analysis, quantitative methods, and mathematical or computer-based

More information

Transactions on Information and Communications Technologies vol 19, 1997 WIT Press, ISSN

Transactions on Information and Communications Technologies vol 19, 1997 WIT Press,   ISSN The neural networks and their application to optimize energy production of hydropower plants system K Nachazel, M Toman Department of Hydrotechnology, Czech Technical University, Thakurova 7, 66 9 Prague

More information

SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING

SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING Kim Hindle Project

More information

A Queuing Approach for Energy Supply in Manufacturing Facilities

A Queuing Approach for Energy Supply in Manufacturing Facilities A Queuing Approach for Energy Supply in Manufacturing Facilities Lucio Zavanella, Ivan Ferretti, Simone Zanoni, and Laura Bettoni Department of Mechanical and Industrial Engineering Università degli Studi

More information

MODELING SELECTIVITY BANKS FOR MIXED MODEL ASSEMBLY LINES

MODELING SELECTIVITY BANKS FOR MIXED MODEL ASSEMBLY LINES MODELING SELECTIVITY BANKS FOR MIXED MODEL ASSEMBLY LINES Alex Blatchford (a)(1), Yakov Fradkin (a)(2), Oleg Gusikhin (a)(3), Ravi Lote (b)(4), Marco Pucciano (c)(5), Onur Ulgen (b,d)(6) (a) Ford Motor

More information

Ch 19 Flexible Manufacturing Systems

Ch 19 Flexible Manufacturing Systems Ch 19 Flexible Manufacturing Systems Sections: 1. What is a Flexible Manufacturing System? 2. FMS Components 3. FMS Applications and Benefits 4. FMS Planning and Implementation Issues 5. Quantitative Analysis

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A. M. Uhrmacher, eds.

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A. M. Uhrmacher, eds. Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A. M. Uhrmacher, eds. A SIMULATION-BASED LEAN PRODUCTION APPROACH AT A LOW-VOLUME PARTS MANUFACTURER

More information

Contents PREFACE 1 INTRODUCTION The Role of Scheduling The Scheduling Function in an Enterprise Outline of the Book 6

Contents PREFACE 1 INTRODUCTION The Role of Scheduling The Scheduling Function in an Enterprise Outline of the Book 6 Integre Technical Publishing Co., Inc. Pinedo July 9, 2001 4:31 p.m. front page v PREFACE xi 1 INTRODUCTION 1 1.1 The Role of Scheduling 1 1.2 The Scheduling Function in an Enterprise 4 1.3 Outline of

More information

Proceedings of the 2016 Winter Simulation Conference T. M. K. Roeder, P. I. Frazier, R. Szechtman, E. Zhou, T. Huschka, and S. E. Chick, eds.

Proceedings of the 2016 Winter Simulation Conference T. M. K. Roeder, P. I. Frazier, R. Szechtman, E. Zhou, T. Huschka, and S. E. Chick, eds. Proceedings of the 2016 Winter Simulation Conference T. M. K. Roeder, P. I. Frazier, R. Szechtman, E. Zhou, T. Huschka, and S. E. Chick, eds. DECENTRALIZED DISPATCHING FOR BLOCKING AVOIDANCE IN AUTOMATED

More information

A Systematic Approach to Performance Evaluation

A Systematic Approach to Performance Evaluation A Systematic Approach to Performance evaluation is the process of determining how well an existing or future computer system meets a set of alternative performance objectives. Arbitrarily selecting performance

More information

EVALUATION OF CLUSTER TOOL THROUGHPUT FOR THIN FILM HEAD PRODUCTION

EVALUATION OF CLUSTER TOOL THROUGHPUT FOR THIN FILM HEAD PRODUCTION Proceedings of the 1999 Winter Simulation Conference P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, eds. EVALUATION OF CLUSTER TOOL THROUGHPUT FOR THIN FILM HEAD PRODUCTION Eric J.

More information

Chapter 2. 2 Literature review

Chapter 2. 2 Literature review 2 Literature review Chapter 2 This chapter discuss about findings from the literature review. The literature review is focused on layout planning methods, efficiency improvement in layout planning special

More information

REVENUE AND PRODUCTION MANAGEMENT IN A MULTI-ECHELON SUPPLY CHAIN. Alireza Kabirian Ahmad Sarfaraz Mark Rajai

REVENUE AND PRODUCTION MANAGEMENT IN A MULTI-ECHELON SUPPLY CHAIN. Alireza Kabirian Ahmad Sarfaraz Mark Rajai Proceedings of the 2013 Winter Simulation Conference R. Pasupathy, S.-H. Kim, A. Tolk, R. Hill, and M. E. Kuhl, eds REVENUE AND PRODUCTION MANAGEMENT IN A MULTI-ECHELON SUPPLY CHAIN Alireza Kabirian Ahmad

More information

Industrial & Sys Eng - INSY

Industrial & Sys Eng - INSY Industrial & Sys Eng - INSY 1 Industrial & Sys Eng - INSY Courses INSY 3010 PROGRAMMING AND DATABASE APPLICATIONS FOR ISE (3) LEC. 3. Pr. COMP 1200. Programming and database applications for ISE students.

More information