INSTRUCTIONS FOR CERTIFICATION OF FACTORY PRODUCTION CONTROL

Size: px
Start display at page:

Download "INSTRUCTIONS FOR CERTIFICATION OF FACTORY PRODUCTION CONTROL"

Transcription

1 . August 2017 were approved by Manager of Product Certification Bureau of the Polish Register of Shipping on 25 August 2017 Copyright by, GDAŃSK, AUGUST /12

2 CONTENTS 1. Factory Production Control Definition of Factory Production Control General information Personnel responsibilities and authorizations Supervision of FPC documentation and records Control and checking of raw materials and material components to be used in production Control and examinations at the production time Supervision of production machinery and equipment Identification and traceability of finished product Supervision of measuring, control and testing equipment Activities taken in case of nonconforming products Supervision of corrective and preventive actions Product packaging, storage, CE marking and delivery Handling complaints Training List of external documents to be applied at FPC certification 10 2/12

3 1. Factory Production Control 1.1. Definition of Factory Production Control Factory Production Control (FPC) permanent, internal production control conducted by a manufacturer. All the elements, requirements and provisions adopted by the manufacturer are documented in a systematic manner in the form of written records or procedures. Production control system documentation ensures a common understanding of quality assurance and enables to achieve constancy of construction product performance and to verify effectiveness of factory production control system. The purpose of established and effectively implemented system of factory production control (FPC) is to ensure production stability and achieving, by a construction product, characteristics conforming to the technical specifications and to performance declared by the manufacturer. The FPC system shall be tailored to the performance of a construction product requirements and take into account level of production lines and machinery automation. The FPC system shall define: a) Responsibility, authorities and interrelations of the personnel who manage, execute and verify activities affecting product conformity with the requirements; b) Procedures related to functioning of factory production control, necessary to demonstrate constancy of product performance at relevant production stage; c) Principles of records keeping and supervising; d) Principles of training the personnel whose activities have effect on quality; e) Principles of complaints handling; f) Principles of conducting corrective actions, aimed at removal of disclosed nonconformities. The FPC documentation shall at least include, or refer to the below documents: FPC Manual describing the scope of factory production control; Note: If a manufacturer outsources realization of any process, which affects product conformity with the requirements, he shall ensure control over this process. The control method shall be defined in FPC documentation. Technical specifications: for products (in accordance with reference document, depending on intended use); for raw materials and materials to be used in production; for products at particular production stages; Documented procedures / instructions for: supervision of production process and conducting inspections and testing to demonstrate product conformity at particular stages of its production; supervision of equipment for inspection and testing of the product during all phases of its manufacture; assessments and verification of constancy of product performance basing on tests. dealing with nonconforming products; 3/12

4 complaints handling; carrying out corrective and preventive actions. Informative documents: legal regulations; technological descriptions; technical documentation; organizational chart. Factory production control documentation should be subject to surveillance by a duly designated person holding the relevant competences and authority. Such documentation shall be kept up-to-date and supplemented in the event of modifications to production process, product or factory production control system. The manufacturer shall keep specification of surveillance documents and records. Valid documents shall be available at places of their use General information According to the Regulation (EU) of the European Parliament and of the Council No. 305/2011 of 9 March 2011 (Construction Product Regulations CPR) and the Polish Act of 16 April 2004 on construction products (Journal of Laws, 2004, No. 92, item 881, as further amended), a construction product may be placed on the market and incorporated in construction works, if It has the CE marking affixed, It is included in the European Commission specification of products which do not essentially affect health and safety, for which manufacturer issued declaration of constancy of product performance, to recognized principles of building art. Procedure of declaring product performance and marking it with the CE marking: definition of harmonized technical specifications, i.e. depending on intended use of product. It may be a harmonized Polish Standard which is not a withdrawn standard or the European Assessment Document; performance of product conformity assessment with harmonized technical specification, with participation of a notified body (notified product certification body or a notified laboratory), if the applied conformity assessment system so require; when performed assessment of constancy of product performance demonstrate that the product fulfils the requirements given in harmonized technical specifications, the manufacturer of a construction product, or its authorized representative, issues at its own responsibility a declaration of performance for the product, acc. to Article 6 of Construction Product Regulations (CPR) and subsequently affix the CE marking to the product, acc. to CPR Article 8 and 9, enclosing required information thereto. derogations from drawing up a declaration of performance have been defined in Article 5 of the Regulation (EU) of the European Parliament and of the Council (UE) No. 305/ /12

5 1.3. Personnel responsibilities and authorizations The manufacturer shall appoint a person responsible for management and surveillance of factory production control (e.g. FPC Proxy). In relation to the personnel, the manufacturer shall define and document responsibilities and appointed authority, interrelations of the personnel managing, executing and verifying activities which have effect on product conformity with the requirements, and in particular those in respect to: establishing necessary procedures; defining requirements for raw materials and materials to be used in production; release of raw materials and materials for production; assessment of subcontractors; supervision of production process, including breaking the process; assessment and verification of performance of product essential characteristics at particular production stages; defining requirements for finished construction product; release of finished construction product; supervision of marking and securing finished construction product; issue of declaration of performance; supervision of the nonconforming product; finding nonconformities and analysing their causes; analysis of complaints; establishing appropriate corrective actions; supervision of production machinery and equipment; control of monitoring and measuring equipment; execution of any other activities within the scope of FPC, such as inspections and testing, identification and traceability. The manufacturer shall ensure training for the personnel, whose activities affect the product conformity with the requirements Supervision of FPC documentation and records The manufacturer shall determine a period of time and a place for keeping documents and records as well as the method of handling them to demonstrate conformity and effectiveness of factory production control. The manufacturer is obliged to keep any records pertaining to particular products or product batches for a period of time defined in technical specifications or appropriate legal regulations. 5/12

6 1.5. Control and checking of raw materials and material components to be used in production The manufacturer shall establish and supervise method of evaluation of suppliers of production means (materials, components, subassemblies) and subcontractors of services affecting factory production control and shall define the requirements for such means and services. When choosing the method of supervision, the control made by the manufacturer and documented conformity evidences (conformity declarations, attestations, certificates, test reports, safety data sheets, acceptance protocols and other) shall be considered. The manufacturer shall ensure that supplied production means have been verified for their conformity before being applied or processed. The manufacturer shall keep records to document purchasing process. The manufacturer shall perform inspections and examinations of deliveries (raw materials, materials and components) and define: requirements for raw materials and components at particular stages of production; criteria of assessment of inspections and test results (for raw materials, components); method of conducting control of deliveries conformity with orders (including control method of documents confirming conformity of the delivery with requirements), method of taking samples for inspections and tests, appropriate plan of tests to cover: tested features, methods, frequency and responsible persons; principles of supplies release for production and the persons responsible for execution thereof; kind of records of inspections and tests. The manufacturer shall have appropriate technical competences to carry out inspections and tests or use services of laboratories having such competency Control and examinations at the production time The manufacturer shall supervise the process of construction product manufacturing and carry out inspections and testing to make product conforming with requirements. The manufacturer shall, in particular: define stages of the production process; define type, scope, frequency and methods of tests carried out during production; define the parameters to be controlled together with assumed tolerances; define the persons responsible for carrying out inspections and examinations; provide document specifying product performance and containing appropriate workplace procedures/ instructions; provide appropriate equipment for inspections and examinations. 6/12

7 The manufacturer shall keep records to document inspections and testing activities during production. When any nonconformities have been identified during production process, the manufacturer shall take appropriate corrective actions provided by factory production control system. After removal of the nonconformities, inspection or testing shall be repeated to prove that the fault has been eliminated Supervision of production machinery and equipment The manufacturer shall provide supervision of production machinery and equipment, including their maintenance, inspections, overhauls and repairs, in accordance with prepared schedule. Execution of these activities shall be controlled. The manufacturer shall also define the method of post-repair and post-overhaul control activities. Performed activities shall be recorded Control and testing of finished product The manufacturer shall carry out examinations in accordance with test plan, within the scope, by methods and with frequency specified in technical specifications and/or other reference documents. The manufacturer shall define the method of taking samples, as well as sample and batch sizes. Procedures for examinations shall define criteria of assessment of examination results and the principles of finished products release for sale shall be established. The manufacturer shall keep records confirming execution of the activities. The records of inspection and examination results shall include at least: product identification; date of manufacture, size of product batch; method of taking samples for inspection and examinations; methods of examination of particular properties; examination procedures, as indicated in the reference document; examination results; assessment of conformity of the inspection/examination results with the criteria established in harmonized technical specifications; identification and signature of the authorized person, who performed the inspections/ examinations. In the case the product does not comply with the requirements, the manufacturer shall take necessary corrective/correction actions provided by factory production control. After nonconformity removal, inspection or examination of the product shall be repeated, to demonstrate that the nonconformity has been eliminated Identification and traceability of finished product The manufacturer shall establish a method of identifying product at the stages of its manufacturing (if it is possible) and of finished product. Particular products or product batches shall be capable of being identified and their production history shall be traceable. The manufacturer is obliged to keep records for 7/12

8 particular products or product batches, together with relevant detailed information pertaining to product s manufacture and characteristics. Retrieval of any essential information such as: manufacture date, applied raw materials, materials, components and products, product batch, product type, designation or intended use, method of marking product with safety mark, date of sale, product recipient, etc., shall be possible on the basis of the records made Supervision of measuring, control and testing equipment The manufacturer shall establish and document a method of supervision, calibration/ verification and maintaining in appropriate condition of measuring, control and testing equipment. The manufacturer shall supervise equipment and: define instruments necessary for measuring, control and examination, taking into account appropriate level of accuracy (on the basis of tests plan); keep the list of all own equipment and keep it identified; prepare the schedule of metrological verifications for the instruments and supervise realization of the schedule; have manuals of operation and current verification of the instruments; maintain calibration and verification by the method ensuring maintaining measurement traceability; perform calibration by the national metrological institution (in Poland it is Central Office of Measures), by accredited calibration laboratories or in own capacity, if having appropriate technical facilities; define a method of proceeding with damaged measuring equipment; define persons responsible for supervision of the equipment and give them appropriate authorizations. Supervision of equipment shall also cover standard measures (control instruments) used in internal verifications. If the manufacturer has no appropriate technical competences to carry out inspections and testing, he may subcontract the services. The manufacturer shall keep records to document supervision activities over equipment and/or subcontracted services. Calibration certificates issued by accredited measurement laboratories shall be subject to supervision in accordance with the recording principles Activities taken in case of nonconforming products The manufacturer shall ensure identification and supervision of nonconforming product so as to prevent its inadvertent use or delivery to recipient. The manufacturer shall ensure that: nonconforming product is duly marked and isolated to prevent its release for use; activities to eliminate disclosed nonconformities as well as corrective actions have been taken; further steps with nonconforming product have been established; records have been kept on the nature of nonconformity and on any follow-up actions taken; responsibilities and authority concerning the method of handling the nonconforming product have 8/12

9 been defined for person(s) responsible for management and supervision of factory production control (e.g. FPC Proxy) Supervision of corrective and preventive actions The manufacturer shall determine a method of proceeding in case of taking corrective and preventive actions. Corrective actions shall include: analysis of product nonconformity causes, production process, FPC system; determination of the method of eliminating established causes and taking appropriate actions; assessment of effectiveness of taken actions. Preventive actions shall cover: use of available information sources, their analysis considering elimination of causes of potential product nonconformities, production process, FPC; determination of method of proceeding to eliminate established causes of nonconformities and taking appropriate actions; assessment of effectiveness of performed actions. The manufacturer shall keep records to document preventive and corrective actions Product packaging, storage, CE marking and delivery The manufacturer shall define and describe a method of handling finished product, a method of its packing, storage, marking and transportation. The method shall meet the principles specified in valid relevant regulations and instructions contained in relevant technical specifications. The manufacturer shall ensure that packaging and storage conditions do not have negative effect on the product quality and that the product compliance with requirements will be maintained. If it is necessary and may affect product quality/conformity, the manufacturer shall ensure proper environmental conditions for product storage and monitor them, if necessary. The conditions for receiving finished product into a warehouse shall be explicitly defined and appropriate records shall be made on the process of product receipt into a warehouse and its further dispatch. The manufacturer is obliged to attach the below information to the construction product marked with The CE mark: name, seat and address of the manufacturer and address of manufacturing plant, if other than that of manufacturer seat; name, trade name, type, variety, brand, class according to the technical specifications; designation of the harmonized technical specification, which performance of construction product conformity was assessed with (number of the harmonized standard or the European Technical Assessment and the year of its issue); number and date of issue of a declaration of product performance; name of certification body, if the body participated in the conformity assessment; other data according to the harmonized technical specification. 9/12

10 Finished construction products shall be marked in accordance with the requirements of reference documents and valid law regulations. The product marking is possible only when the manufacturer has implemented and maintains the FPC system, has carried out conformity assessment in accordance with appropriate conformity assessment system as well as issued a declaration of performance Handling complaints The manufacturer shall establish procedures for dealing with complaints, both submitted by construction product recipients and made by the manufacturer against suppliers of raw materials, materials, product components to be used in production. The manufacturer is obliged to: keep records of complaints about conformity of product with the requirements of harmonized technical specifications; take appropriate actions as regards complaints and any detected product faults; carry out periodical assessment of complaints, including analysis of nonconformity causes, analysis of effectiveness of corrective actions taken and justness of decisions made; use own complaints for the periodical assessment of suppliers of raw materials, materials and product components; keep records to document actions taken within complaint procedure and corrective and/or preventive actions resulting from these complaints Training The manufacturer shall establish training procedures and ensure training of personnel engaged in activities affecting construction product quality. The manufacturer shall keep records to document performed training. Records on training shall be kept up-to-date and stored. 2. List of external documents to be applied at FPC certification Legal basis Item Document name Designation 1. Act of 16 April 2004 on construction materials (in force in Poland) Journal of Laws, No. 92, item 881, as further amended 2. Act of 30 August 2002 on the conformity assessment system (in force in Poland) 3. Regulation (EU) No 305/2011 of the European Parliament and of the Council of 9 March 2011 laying down harmonized conditions for the marketing of construction products and repealing Council Directive 89/106/EEC 4. Commission Delegated Regulation (EU) No 157/2014 of 30 October 2013 on the conditions for making a declaration of performance on construction products available on a website Journal of Laws, No. 204, item 2087, as further amended Official Journal of the European Union (entry into force ) Official Journal of the European Union (entry into force ) 10/12

11 Item Document name Designation 5. Commission Delegated Regulation (EU) No 568/2014 of 18 February 2014 amending Annex V to Regulation (EU) No 305/2011 of the European Parliament and of the Council as regards the assessment and verification of constancy of performance of construction products 6. Commission Delegated Regulation (EU) No 574/2014 of 21 February 2014 amending Annex III to Regulation (EU) No 305/2011 of the European Parliament and of the Council on the model to be used for drawing up a declaration of performance on construction products 7. Commission Delegated Regulation (EU) 2016/364 of 1 July 2015 on the classification of the reaction to fire performance of construction products pursuant to Regulation (EU) No 305/2011 of the European Parliament and of the Council (valid from ) 8. Commission communication in the framework of the implementation of Regulation (EU) No 305/2011 of the European Parliament and of the Council laying down harmonised conditions for the marketing of construction products and repealing Council Directive 89/106/EEC Standards for products Item Document name Designation 1. Execution of steel structures and aluminium structures. Requirements for conformity assessment of structural components 2. Execution of steel structures and aluminium structures. Technical requirements for steel structures 3. Execution Of Steel Structures And Aluminium Structures - Part 3: Technical Requirements For Aluminium Structures Official Journal of the European Union of (entry into force 20 days from publication) Official Journal of the European Union of (entry into force 3 days from publication) Official Journal of the European Union L 84/4 of Official Journal of the European Union 2017/C 267/04 of EN :2009+A1:2011 EN :2008+A1:2011 EN : Aggregates for concrete EN 12620:2002+A1: Aggregates for bituminous mixtures and surface treatments for roads, airfields and other trafficked areas 6. Lightweight aggregates. Lightweight aggregates for concrete, mortar and grout 7. Lightweight aggregates. Lightweight aggregates for bituminous mixtures and surface treatments and for unbound and bound applications EN 13043:2002 EN :2002 EN : Aggregates for mortar EN 13139: Aggregates for unbound and hydraulically bound materials for use in civil engineering work and road construction EN 13242:2002+A1: Aggregates for railway ballast EN 13450: Armour stone. Specification EN :2002 Requirements 11/12

12 Item Name of document Designation 1. Conformity assessment Requirements for bodies certifying products, processes and services Other requirements ISO/IEC 17065:2013 Item Name of document Designation 1. EA Document on Accreditation for Notification Purposes EA-2/17 INF 2. Accreditation of product certification bodies. Detailed requirements DACW-01, ed. 4 of Accreditation of bodies participating in the process of assessment and verification of construction products performance with reference to the Regulation (EU) of the European Parliament and of the Council No. 305/2011 (CPR)) 4. Polish Centre for Accreditation policy on provision of measurement traceability DA-06 DAN-01 ed. 2 of Approved by PRS Product Certification Bureau Manager Formal approval on the original document 12/12

CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT

CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT TF N 548 Rev1 2012-03-29 CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT How to draft clauses on Assessment and Verification of the Constancy of Performance (AVCP) in harmonized standards for construction

More information

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 PPE-R/00.018 Version 1 RECOMMENDATION FOR USE Number of pages: 5 Approval stage : Approved on : Origin : Horizontal Committee, C2D Ad hoc group

More information

OPAC EN Operating Procedure for the Attestation of Conformity of Structural Bearings in compliance with Annex ZA of EN 1337/3/4/5/6/7

OPAC EN Operating Procedure for the Attestation of Conformity of Structural Bearings in compliance with Annex ZA of EN 1337/3/4/5/6/7 OPAC EN1337-00 Operating Procedure for the Attestation of Conformity to EN1337 Revision 00 Approved by BT3 on 20050525, by Board of directors on 20050610 Operating Procedure for the Attestation of Conformity

More information

Certification Programme No. PCW-12. for construction products System 1, 1+ (certification of constancy of performance) CPR-1,1+

Certification Programme No. PCW-12. for construction products System 1, 1+ (certification of constancy of performance) CPR-1,1+ I N S T Y T U T N A F T Y i G A Z U O IL AN D G AS INS TI TUTE PL 31-503 Kraków, ul. Lubicz 25A Tel. +48/12/ 4210033 Fax: +48/12/ 4210050 B I U R O C E R T Y F I K A C J I CERTIFICATION OFFICE Tel. +48/12/

More information

COMMISSION RECOMMENDATION. of XXX. on the audits and assessments performed by notified bodies in the field of medical devices

COMMISSION RECOMMENDATION. of XXX. on the audits and assessments performed by notified bodies in the field of medical devices EUROPEAN COMMISSION Brussels, XXX [ ](2013) XXX draft COMMISSION RECOMMENDATION of XXX on the audits and assessments performed by notified bodies in the field of medical devices (Text with EEA relevance)

More information

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS AC196. April 2017 (Effective June 1, 2017) PREFACE

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS AC196. April 2017 (Effective June 1, 2017) PREFACE ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS April 2017 (Effective June 1, 2017) PREFACE The attached accreditation criteria have been issued to provide all interested

More information

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality? Factory s Quality Assurance Ability 1 Responsibilities and Resources 1.1 Responsibilities a) Have the responsibilities and interrelation of various personnel involved in quality activities been defined?

More information

WELMEC European cooperation in legal metrology

WELMEC European cooperation in legal metrology WELMEC 8.6 Issue 1 WELMEC European cooperation in legal metrology Measuring Instruments Directive 2004/22/EC Presumption of Conformity of the Quality System of Manufacturers with Module D or H 1 when EN

More information

SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE

SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE 1. General This annex specifies the requirements for the Factory

More information

Certification program "Quality Mark TMT" Checklist initial surveillance inspection

Certification program Quality Mark TMT Checklist initial surveillance inspection Certification program "Quality Mark TMT" Checklist initial surveillance inspection Name and site of factory Date of inspection Inspection performed by (name, company) present factory representatives Person

More information

The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology. Jordanian Quality Mark

The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology. Jordanian Quality Mark The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology Jordanian Quality Mark Amman in February, 1997 1 Abstract Article (18) of the Law of Standards & Metrology; law no. (15) for

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

TURBO MACH A DIVISION OF VT SAA

TURBO MACH A DIVISION OF VT SAA TERMS AND CONDITIONS PAGE: 1 OF 5 1. PURPOSE To define specific terms and conditions for the purchase of product, materials and services. 2. SCOPE All products, materials and services purchased for use

More information

WELMEC Application of module D Quality assurance Under directive 2014/32/EU (MID) or directive 2014/31/EU (NAWID)

WELMEC Application of module D Quality assurance Under directive 2014/32/EU (MID) or directive 2014/31/EU (NAWID) WELMEC 8.4 2017 Application of module D Quality assurance Under directive 2014/32/EU (MID) or directive 2014/31/EU (NAWID) WELMEC is a cooperation between the legal metrology authorities of the Member

More information

WELMEC European cooperation in legal metrology

WELMEC European cooperation in legal metrology WELMEC 8.0 Issue 1 WELMEC European cooperation in legal metrology Measuring Instruments Directive 2004/22/EC Generalities on the Assessment and Operation of Notified Bodies performing Conformity Assessment

More information

Vendor Qualification Survey

Vendor Qualification Survey 1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service

More information

AAMI Quality Systems White Paper: Comparison of 21 CFR Part 820 to ISO 13485:2016 1

AAMI Quality Systems White Paper: Comparison of 21 CFR Part 820 to ISO 13485:2016 1 AAMI s White Paper Comparison of 21 CFR Part 820 to ISO 13485:2016 February 2017 AUTHORS Seb Clerkin, GMP Advisory Services Nicola Martin, Owner, Nicola Martin Consulting Jack Ward, Owner, Ward Sciences

More information

CE marking is regarded as a passport for products to enter and circulate freely within the 30 counties forming part of the EEA.

CE marking is regarded as a passport for products to enter and circulate freely within the 30 counties forming part of the EEA. CE Marking Services What is CE Marking? Many products that are placed on the single market in the European Economic Area (EEA) (28 EU countries, together with Iceland, Liechtenstein and Norway) contain

More information

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME Copyright TUV SUD BABT 2017 A Certification Body of: Page 1 of 33 Contents AMENDMENT RECORD 3 0. INTRODUCTION 3 1. PRE-CONDITIONS TO SUPPORT PRODUCTION

More information

CSA Group Products, Processes and Services Scheme

CSA Group Products, Processes and Services Scheme 1. CONTACT CSA CSA Group Products, Processes and Services Scheme 1.1 Getting started is easy. There are three ways to contact us: Call 866 797 4272 Email client.services@csagroup.org Complete a request

More information

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements Correspondence Between and 21 CFR Part 820 QMS Requirements 10411 Corporate Drive, Suite 102, Pleasant Prairie, WI 53158 262.842.1250 262.842.1240 info@rcainc.com rcainc.com 2 4 Quality Management System

More information

Measuring Instruments Directive 2014/32/EU Assessment of Notified Bodies in Charge of Type Examination Presumption of Conformity based on EN 17065

Measuring Instruments Directive 2014/32/EU Assessment of Notified Bodies in Charge of Type Examination Presumption of Conformity based on EN 17065 WELMEC 8.5, 2017 Measuring Instruments Directive 2014/32/EU Assessment of Notified Bodies in Charge of Type Examination Presumption of Conformity based on EN 17065 For information: This guide is available

More information

Rules for accreditation of providers of proficiency testing/interlaboratory

Rules for accreditation of providers of proficiency testing/interlaboratory Rules for accreditation of providers of proficiency testing/interlaboratory tests Scope: With this regulation the requirements for accreditations of providers of proficiency testing/interlaboratory tests/ring

More information

UNCONTROLLED DOCUMENT

UNCONTROLLED DOCUMENT Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision

More information

Document 2007 Rev 0 December 2005 Page 1 of 8

Document 2007 Rev 0 December 2005 Page 1 of 8 Document 2007 Rev 0 December 2005 Page 1 of 8 1. Scope... 2 2. Definitions... 2 a. LabTest...2 b. Factory Location/ Manufacturer's Premises...2 c. Manufacturer...2 d. Subcontractor...2 e. f. Out-Worker...2

More information

Surveillance and CoP clearance

Surveillance and CoP clearance INFORMATION for MANUFACTURERS regarding: Surveillance and CoP clearance EC Directives and ECE Regulations Vehicle Category L, M, N, O, T, separate technical units, systems and components. INFORMATION for

More information

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS ISO 22000:2005 Standard Food Safety Management System INTERNATIONAL STANDARDS REGISTRATIONS 3.1 FOOD SAFETY concept that food will not cause harm to the consumer when it is prepared and/or eaten according

More information

Brumund Foundry Inc.

Brumund Foundry Inc. QUALITY ASSURANCE 1st TIER MANUAL Brumund Foundry Inc. 4400 West Carroll Ave. Chicago, IL 773-287-9250 PER ANSI/ASQC Q9002-1994 Page 1 of 7 THE PRESIDENT HAS DIRECTED THAT THE FOLLOWING POLICIES BE IMPLEMENTED

More information

IECQ PUBLICATION QC IEC Quality Assessment System for Electronic Components (IECQ System)

IECQ PUBLICATION QC IEC Quality Assessment System for Electronic Components (IECQ System) QC 080000 Edition 3.0 2012-05 IECQ PUBLICATION IEC Quality Assessment System for Electronic Components (IECQ System) Hazardous Substance Process Management System Requirements (HSPM) QC 080000:2012(E)

More information

REGULATION FOR PRODUCTION CONTROL OF PERSONAL

REGULATION FOR PRODUCTION CONTROL OF PERSONAL Page 1 of 6 INDEX 1 PURPOSE AND PREMISE... 2 2 ENTRUSTMENT OF ASSIGNMENT... 2 3 INSPECTION OPERATIONAL ACTIVITY... 2 3.1 Methodology... 2 3.1.1 Sampling... 2 3.1.2 Verifica della omogeneità della produzione...

More information

Checklist for the assessment based on the standards

Checklist for the assessment based on the standards ISO & MDD & Checklist for the assessment based on the standards ISO :2016 ISO :2016 associate with EC Directive 93/42 EEC Where applicable EC Directive 93/42/EEC Annex II/V/VI Company: Audit date Auditor:

More information

MPA Update on the Development of European Aggregate Standards

MPA Update on the Development of European Aggregate Standards Members Briefing No: 17/2017 25 October 2017 MPA Update on the Development of European Aggregate Standards Introduction The production of the 2 nd generation aggregate harmonized European standards (hens)

More information

Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses

Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses Supplementary Quality Assurance Clauses The Supplementary Quality Assurance Clauses specified on the face of the attached Purchase Order are listed below. Your compliance with these requirements is necessary

More information

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 11 Status : APPROVED Effective: 09/07/2017 Page 2 of 32 Quality Manual Table of Contents

More information

DC 102 FACTORY INSPECTION PROCEDURES AND TESTS. Requirements for Manufacturers

DC 102 FACTORY INSPECTION PROCEDURES AND TESTS. Requirements for Manufacturers FACTORY INSPECTION PROCEDURES AND TESTS Requirements for Manufacturers Warszawa, February 1, 2012 CONTENTS Page No. FOREWORD 2 1 INTRODUCTION 2 2 DEFINITIONS 2 2.1 Factory Location/Manufacturer s Premises

More information

Conformity assessment procedures for the Personal Protective Equipment Scheme

Conformity assessment procedures for the Personal Protective Equipment Scheme Conformity assessment procedures for the Personal Protective Equipment Scheme This scheme document describes the conformity assessment procedures and requirements for Personal Protective Equipment for

More information

European Technical Approval No. ETA-12/0056

European Technical Approval No. ETA-12/0056 SINTEF Building and Infrastructure P.O.Box 124 Blindern N-0314 Oslo Tel. 47 22 96 55 55 Fax 47 22 69 94 38 Authorised and notified according to Article 10 of the Council Directive 89/106/EEC of 21 December

More information

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined

More information

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition CEN Keymark Scheme Rules for Thermostatic Radiator Valves 2 nd Edition Content Foreword... 3 Introduction... 3 1 Scope... 4 2 References... 4 3 Terms and Definitions... 4 4 Application... 5 4.1 Product

More information

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS APPLICABLE FOR: AIRBUS DEFENCE AND SPACE - SPACE BUSINESS UNIT ORBITAL ISSUE: 02c RELEASE DATE:

More information

Legal Obligations of Distributors under the Construction Products Regulation and other Associated European Legislation as from 1 st July 2013

Legal Obligations of Distributors under the Construction Products Regulation and other Associated European Legislation as from 1 st July 2013 Legal Obligations of Distributors under the Construction Products Regulation and other Associated European Legislation as from 1 st July 2013 Construction Products Regulation 1 (CPR) The CPR imposes many

More information

SUPPLIER SURVEY FORM Instructions

SUPPLIER SURVEY FORM Instructions SUPPLIER SURVEY FORM Instructions 1. The following Supplier Survey was developed by Vishay Measurements Group, Inc. to assess and document the capability of its supplier base. 2. The Supplier Survey is

More information

Self-Audit Checklist

Self-Audit Checklist Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Page 2 Number of non-compliances:

More information

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner A. SCOPE This document contains requirements for conducting business with Tri Star Metals, LLC and its customers. It is applicable to suppliers that provide

More information

Quality System Manual - Section 00

Quality System Manual - Section 00 Quality System Manual - Section 00 INDEX AND REVISION STATUS Issued by: Quality Assurance Eff. Date: 06/10/2014 Rev.: A Pg. 1 of 4 QUALITY SYSTEM MANUAL SECTION 0 - INDEX AND REVISION STATUS SECTION 1

More information

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production

More information

AAMI Quality Systems White Paper

AAMI Quality Systems White Paper AAMI s White Paper Comparison of 21 CFR Part 820 to ISO 13485:2016 February 2017, Updated February 2018 AUTHORS Seb Clerkin, GMP Advisory Services Nicola Martin, Owner, Nicola Martin Consulting Jack Ward,

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

3 rd revised version. March Replaces the October 2005 version

3 rd revised version. March Replaces the October 2005 version Good Manufacturing Practices for the Production of Packaging Inks formulated for use on the non-food-contact surfaces of food packaging and articles intended to come into contact with food 3 rd revised

More information

BAM-GGR 001 Part A Manufacturing and remanufacturing

BAM-GGR 001 Part A Manufacturing and remanufacturing Recognition and monitoring of quality assurance programs for the manufacturing and re-manufacturing of packaging for dangerous goods Synonyms used auditor auditor, surveillance auditor dangerous goods

More information

General Accreditation Guidance. ISO/IEC 17025:2017 Gap analysis. April 2018

General Accreditation Guidance. ISO/IEC 17025:2017 Gap analysis. April 2018 General Accreditation Guidance Gap analysis April 2018 Copyright National Association of Testing Authorities, Australia 2018 This publication is protected by copyright under the Commonwealth of Australia

More information

Addendum No. 1 to the CSTBat Certification Reference System: Connection hoses

Addendum No. 1 to the CSTBat Certification Reference System: Connection hoses CERTIFICATION Addendum No. 1 to the CSTBat Certification Reference System: Connection hoses Identification No.: QB 10 Addendum No. 1, approved by the CSTB Technical Management on: 02/08/2016 Application

More information

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS 1 INTERPRETATION... 1 1.1 Definitions... 1 2 QUALITY MANAGEMENT SYSTEM... 2 2.1 Quality Management

More information

Royal Decree of 29 April 1999 on the authorisation of external services for technical inspections at the workplace (Belgian Official Gazette 2.9.

Royal Decree of 29 April 1999 on the authorisation of external services for technical inspections at the workplace (Belgian Official Gazette 2.9. Royal Decree of 29 April 1999 on the authorisation of external services for technical inspections at the workplace (Belgian Official Gazette 2.9.1999) Amended by: (1) Royal Decree of 28 August 2002 on

More information

Manufacturers Guideline to the Construction Product Regulation and its Implementation

Manufacturers Guideline to the Construction Product Regulation and its Implementation ecspa cpr guideline - draft rev 2.docx Draft Rev 2, 29 June 2012 ManufacturersGuidelinetothe ConstructionProductRegulationand itsimplementation Index 1 General / Introduction...3 1.1 The Objectives of

More information

Texas International Oilfield Tools, Ltd.

Texas International Oilfield Tools, Ltd. Originated by: J. Tuttle Texas International Oilfield Tools, Ltd. QUALITY SYSTEM MANUAL Revision Date: May 26, 2010 Number: QSM000 Subject: Texas International Quality System Revision: A 1.0 INTRODUCTION

More information

Supplier Quality Requirements SQR-1.0 Rev. 3

Supplier Quality Requirements SQR-1.0 Rev. 3 Supplier Quality Requirements Rev. 3 Approved By: Brian Brown, Quality Manager The current issue of this document is maintained on LSP Technologies, Inc. s Internet Web Site at http://www.lspt.com/resources-supplier_requirements.asp.

More information

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,

More information

Scope: 71 SD Revision: September 2016

Scope: 71 SD Revision: September 2016 Requirements for certification bodies which certify organic products in third countries according to production rules and control measures recognised as equivalent to Regulation (EC) No. 834/2007 and it

More information

AS 9100 Rev C Quality Systems Manual AS-050C-QM

AS 9100 Rev C Quality Systems Manual AS-050C-QM AS 9100 Rev C Quality Systems Manual AS-050C-QM Innovative Control Systems, Inc. 10801 N. 24 th Ave. Suite 101-103 Phoenix, AZ 85029 U.S.A. www.icsaero.com +01-602-861-6984 VOICE +01-602-588-9440 FAX Table

More information

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015 Clause A - Quality System Requirements All references to the term Government in any of the documents referenced below shall be replaced with the term Curtiss-Wright and/or the Government. All references

More information

Quality Commitment. Quality Management System Manual

Quality Commitment. Quality Management System Manual Quality Commitment Quality Management System Manual This printed copy is uncontrolled Page 1 of 30 Thor Machining Quality Management System Manual Section 1 TABLE OF CONTENTS Page # 1 Introduction 5 2

More information

IECRE OPERATIONAL DOCUMENT

IECRE OPERATIONAL DOCUMENT IECRE OD-405-2 Edition 1.0 2016-09-26 IECRE OPERATIONAL DOCUMENT IEC System for Certification to Standards relating to Equipment for use in Renewable Energy applications (IECRE System) IECRE Quality System

More information

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev - February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February

More information

European INSULATION VDI Scheme for Thermal Insulation Products

European INSULATION VDI Scheme for Thermal Insulation Products European INSULATION for Thermal Insulation Products (2016-11-21) insulation vdi scheme rules 2_0 draft (2016-11).docx INSULATION Page: 2 of 22 Foreword This for Thermal Insulation Products is prepared

More information

Quality Manual Power Engineering & Manufacturing Inc th Lane NE Blaine Minnesota MN 55449

Quality Manual Power Engineering & Manufacturing Inc th Lane NE Blaine Minnesota MN 55449 Quality Manual Power Engineering & Manufacturing Inc 1463 94th Lane NE Blaine Minnesota MN 55449 COVER PAGE PD 0002 rev. 3 Section QM 01 Page 1 of 17 This document is approved for use Manual Contents Section

More information

Requirements for Suppliers

Requirements for Suppliers 1.0 INTRODUCTION This document establishes requirements designed to ensure Park Engineering & Manufacturing Inc. (PEM) suppliers produce product that meets PEM s quality expectations and terms. Only suppliers

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

TASK REQUIREMENTS. Supplier Quality Requirements

TASK REQUIREMENTS. Supplier Quality Requirements This document is applicable only to suppliers of Production Items as defined below and their subtier suppliers. Non-Production Item suppliers are not subject to this document. This document specifies the

More information

Quality Assurance Manual

Quality Assurance Manual McGarvin Engineering Inc. 35 Maple St. Lowell Ma. 01852 ph. 978-454-2741 fx. 978-459-7999 Quality Assurance Manual 1 Table of Contents Section Element 1.0 Scope and Policy 2.0 Organization 3.0 Quality

More information

NATO STANDARD AQAP-2131 NATO QUALITY ASSURANCE REQUIREMENTS FOR FINAL INSPECTION AND TEST

NATO STANDARD AQAP-2131 NATO QUALITY ASSURANCE REQUIREMENTS FOR FINAL INSPECTION AND TEST NATO STANDARD AQAP-2131 NATO QUALITY ASSURANCE REQUIREMENTS FOR FINAL INSPECTION AND TEST Edition C Version 1 DECEMBER 2017 NORTH ATLANTIC TREATY ORGANIZATION ALLIED QUALITY ASSURANCE PUBLICATION Published

More information

Use of Manufacturers Laboratories For Surveillance Testing

Use of Manufacturers Laboratories For Surveillance Testing HAR Agreement PERMANENT DOCUMENT PD 14 Use of Manufacturers Laboratories For Surveillance Testing Approved by the HAR Group on 24 April 2006 Date of issue: May 2006 This document contains 9 pages Including

More information

Quality Management System Manual

Quality Management System Manual 19240 144 th Ave NE, ldg 2 Woodinville, WA 98072 (425) 487-0672 FAX (425) 487-4669 Quality Management System Manual Approvals Name Title Initial Name Title Initial Lisa Tiffany President On File Dan McDrummond

More information

Quality Management System

Quality Management System Quality Management System ZYQ Testing Laboratory 11111 Testing Avenue Testing Town, Alaska 22222 (555) 555-5555 Date Prepared: April 03, 2017 Please note that this Quality Management System (QM) was originated

More information

Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3

Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3 Supplier Quality Manual Original Issue 12 February 2015 Uncontrolled in printed form Page 1 of 8 f Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3 Supplier Responsibility...3

More information

L 96/26 EN Official Journal of the European Union. REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL.

L 96/26 EN Official Journal of the European Union. REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. L 96/26 EN Official Journal of the European Union REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 10 March 2004 on the interoperability of the European Air Traffic Management

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL Work Instruction Standard Locknut, LLC Supplier Quality Manual Doc. No. SQM-01 Page 1 of 11 Initial Date 11/1/2009 Rev. 4 Prepared By Dwight Beaty Revised By Shannon Smith Rev. Date 9/12/12 Approvals Purchasing

More information

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements Document 0000000000000045 Rev: State: RELEASED see Smarteam for approval authorities This document is applicable only to suppliers of Production Items as defined below and their sub-tier suppliers. Non-

More information

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: Gear Technology 10671 Civic Center Drive Rancho Cucamonga, CA 91730 GENERAL INFORMATION Attn: Manager of Quality

More information

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE Page 1 of 8 1.0 PURPOSE 1.1 The purpose of this manual is to have a single document which conveys the minimum quality requirements and manufacturing practices expected of suppliers for value added products

More information

IPD Quality Management System Supplier Questionnaire Instructions

IPD Quality Management System Supplier Questionnaire Instructions IPD Quality Management System Supplier Questionnaire Instructions 1. The following Supplier Questionnaire was developed by Industrial Parts Depot (IPD) to assess and document the capability of its supplier

More information

MCS: 010. Product Certification Scheme Requirements: Factory Production Control Requirements. Issue 1.5

MCS: 010. Product Certification Scheme Requirements: Factory Production Control Requirements. Issue 1.5 MCS: 010 Product Certification Scheme Requirements: Factory Production Control Requirements Issue 1.5 This Microgeneration Installation Standard is the property of Department of Energy and Climate Change

More information

2.2.2 GUIDE TO THE IMPLEMENTATION OF DIRECTIVES BASED ON THE NEW APPROACH AND THE GLOBAL APPROACH

2.2.2 GUIDE TO THE IMPLEMENTATION OF DIRECTIVES BASED ON THE NEW APPROACH AND THE GLOBAL APPROACH 2.2.2 GUIDE TO THE IMPLEMENTATION OF DIRECTIVES BASED ON THE NEW APPROACH AND THE GLOBAL APPROACH The CE marking on a product indicates that it complies with all relevant directives. The socalled new approach

More information

PRODUCT CERTIFICATION REQUIREMENTS

PRODUCT CERTIFICATION REQUIREMENTS PRODUCT CERTIFICATION REQUIREMENTS SIRIM QAS International Product Certification Page 1 of 14 QUALITY SYSTEM 1. GENERAL 1.1 This document defines the responsibilities and obligations of the Licensee with

More information

Microgeneration Certification Scheme: MCS 010

Microgeneration Certification Scheme: MCS 010 Microgeneration Certification Scheme: MCS 010 Product Certification Scheme Requirements: Factory Production Control Requirements Issue 1.4 This Microgeneration Installation Standard is the property of

More information

Quality system implementation from a manufacturers viewpoint

Quality system implementation from a manufacturers viewpoint OD005 IECEx Quality System Requirements for Manufacturers Quality system implementation from a manufacturers viewpoint Evans Massy Rockwell Automation October 3, 2005 31/10/2005 1 1515 1545 Manufacturer

More information

Quality Management System

Quality Management System Quality Management System ZYQ Testing Laboratory 11111 Testing Avenue Testing Town, Alaska 22222 (555) 555-5555 Date Prepared: January 19, 2009 1 Please note that this Quality Management System (QM) was

More information

Bundesanstalt für Materialforschung und -prüfung (BAM) Pyrotechnics Division 2.3 Explosives D Berlin Berlin,

Bundesanstalt für Materialforschung und -prüfung (BAM) Pyrotechnics Division 2.3 Explosives D Berlin Berlin, Bundesanstalt für Materialforschung und -prüfung (BAM) Pyrotechnics Division 2.3 Explosives D -12200 Berlin Berlin, 2015-09-04 Pyrotechnic Articles Directive 2013/29/EU Information on the Conformity Assessment

More information

PRQ 7.4/A QUALITY REQUIREMENTS FOR SUPPLIERS OF ELETTROMIL

PRQ 7.4/A QUALITY REQUIREMENTS FOR SUPPLIERS OF ELETTROMIL 1 di 13 QUALITY REQUIREMENTS FOR SUPPLIERS OF ELETTROMIL INTERNAL DISTRIBUTION First issue M. Milic M. Milic S. Milic Rev. Data Description PREP VER APPR INDEX 1.PURPOSE...3 2. APPLICABILITY...3 3. REFERENCES.3

More information

STATIONARY SOURCE AUDIT SAMPLE PROGRAM [VOLUME 1, MODULE 1] GENERAL REQUIREMENTS FOR STATIONARY SOURCE AUDIT SAMPLE PROVIDERS

STATIONARY SOURCE AUDIT SAMPLE PROGRAM [VOLUME 1, MODULE 1] GENERAL REQUIREMENTS FOR STATIONARY SOURCE AUDIT SAMPLE PROVIDERS [V1M1-2014]-Rev2.0 STATIONARY SOURCE AUDIT SAMPLE PROGRAM [VOLUME 1, MODULE 1] GENERAL REQUIREMENTS FOR STATIONARY SOURCE AUDIT SAMPLE PROVIDERS TNI Working Draft Standard P.O. Box 2439 Weatherford, TX

More information

Supporting CE-Marking Obligations of Our Customers: The Role of the Galvanizer

Supporting CE-Marking Obligations of Our Customers: The Role of the Galvanizer Supporting CE-Marking Obligations of Our Customers: The Role of the Galvanizer NORDIC GALVANIZERS ANNUAL MEETING 8 MAY 2014 COPENHAGEN MURRAY COOK EXECUTIVE DIRECTOR EUROPEAN GENERAL GALVANIZERS ASSOCIATION

More information

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..

More information

Recycled aggregates: Guidance for producers and purchasers

Recycled aggregates: Guidance for producers and purchasers John Barritt Consulting Ltd. Recycled aggregates: Guidance for producers and purchasers Introduction This guidance document explains the fundamental procedures that must be in place to ensure that recycled

More information

European INSULATION KEYMARK Scheme for Thermal Insulation Products. Revision: 2.0 ( ) insulation keymark scheme rules 2_0 ( ).

European INSULATION KEYMARK Scheme for Thermal Insulation Products. Revision: 2.0 ( ) insulation keymark scheme rules 2_0 ( ). European INSULATION KEYMARK for Thermal Insulation Products (2016-11-21) insulation keymark scheme rules 2_0 (2016-11).docx Page: 2 of 28 Foreword This KEYMARK for Thermal Insulation Products is prepared

More information

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses Quality Requirements The following requirements apply at minimum, additional requirements may be incorporated with the company purchase order. Material and Hardware Providers - Q1, Q2, Q3, Q4, Q5, Q8,

More information

TÜV SÜD BABT Production Quality Certification Scheme

TÜV SÜD BABT Production Quality Certification Scheme TÜV SÜD BABT Production Quality Certification Scheme The Production Quality Certification Scheme for Manufacturers A Certification Body of Copyright TÜV SÜD BABT 2014 Page 1 of 38 CONTENTS Page AMENDMENT

More information

Official Journal of the European Communities

Official Journal of the European Communities 13.6.2001 EN Official Journal of the European Communities L 156/9 COMMISSION REGULATION (EC) No 1148/2001 of 12 June 2001 on checks on conformity to the marketing standards applicable to fresh fruit and

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

DECISION TO ACCREDIT

DECISION TO ACCREDIT DECISION TO ACCREDIT Determine the requirements of the regulator, legislation and customer s needs prior to deciding on the standard to implement. Process is based on the following: Top management s decision

More information

Green Gold Label Program

Green Gold Label Program Green Gold Label Program Version 2013.1 (January 2013) Introduction & scope Green Gold Label biomass are (residual) products of agricultural or forestry and related industries that align with the criteria

More information