International ejournals

Size: px
Start display at page:

Download "International ejournals"

Transcription

1 ISSN Available online at International ejournals International Journal of Mathematical Sciences, Technology and Humanities 21 (2011) ENERGY CONTROL CENTER FUNCTIONS FOR POWER SYSTEM 1 1 Department of Electrical & Electronics Engineering and Dean Academics, Hirasugar Institute of Technology, Nidasoshi , Karnataka, India hitdean@rediffmail.com ABSTRACT This paper presents the basic security concept, overview of Energy Control Center (ECC) state of the art, characteristics, functions for power system, Today s Energy Management System (EMS) is for the supervision and control of electric power systems. The responsibility today for supervising and controlling an electric power system is largely centralized. A small number of power system energy control centers each remotely control large number of power stations and substations. Keywords: Energy Control Center (ECC), Energy Management System, SCADA and RTUs. 1. Introduction Energy Control Center (ECC)) is designed and built for system operation. In order to have an efficient power system operation and control, various control centers have to be operated in the hierarchical level. The following Table-1 shows the level decomposition of control centers in the power system. There are 4 types of control centers. i) Local Control Centre ii) Area Load Dispatch Centre iii) State Load Dispatch Centre iv) Regional Control Centre Table-1. Level Decomposition of Control Centers Level System Monitoring & Control First Generating Stations, Substations Local Control Centre Second Sub transmission & Transmission Area Load Dispatch Centre Network Third Transmission System State Load Dispatch Centre Fourth Interconnected Power Systems Regional Control Centre Many functions being done in system control centres for operation planning purposes. These are run in an off-line or via a remote terminal linked to a large computer centre. 1.1 Local Control Centre A number of control functions are performed locally at the power stations and substations. The typical controls carried in the local control centre are,

2 206 Load Monitoring and Control Protection, Circuit Breaker to re-close Voltage Regulation Capacitor Switching Feeder Synchronization Load Shedding Network Restoration and Network Re-configuration etc. 1.2 Area Load Dispatch Centre In this, groups of generating stations or substations control are carried out. This requires system data a network topology for control. The area control center receives information and processes for appropriate control actions. 1.3 State Load Dispatch Centre In this centre, all the information is received from area load dispatch center and local centers. Then minute-to-minute operation of the power system at the state level is carried out. It may have the following functions, System Generation and Load Monitoring and Control for Demand Control. System wide State Monitoring and Control Circuit Breaker Condition Monitoring and Control Load Shedding and Restoration Supervisory Control for Transmission Lines and Equipments. System Alarm Monitoring and Corrective Actions. Planning and Monitoring of Power System Operation 1.4 Regional Control Centre The Regional Load Dispatch Centre may be regarded as a coordinating and monitoring center for state level load dispatch center with covering main objectives: Integrated Operation of State Level Dispatch centre Operation and Maintenance Schedules for maximum capacity Utilization Operation and Maintenance Schedules for Generating Plants Monitor and Control of inter-state Power Transactions Monitor and Control of inter-regional Power Transactions 2.0 Supervisory Control Systems Today s Supervisory control systems normally consist of a computer system and a number of remote terminal units (RTUs), located in the power stations and substations. Communications between the RTUs and the computer usually take place via radio links or via power line carrier equipment. The computer serves the personnel in the control center by presenting information about the current status of the power system and by passing on manually initiated control actions. Automatic control is used for different sub functions, e.g. sequential control and control of the network frequency. Video display units and keyboards are normally used for the man machine communications. In addition, map boards; printer and analog recorders are installed as required. Major supervisory control systems generally consist of several energy control centers, which cooperate in a hierarchical configuration. The basic functions in a supervisory control system consist of Acquisition from the power system of telemetered data, indications and other variables

3 207 Simple arithmetic and logic operations on these variables. e.g. calculations of the variables e.g. calculation of the apparent power P 2 +Q 2.Where P & Q are telemetered values Supervision of acquired and calculated variables with respect to changes and violation of limit values Storage of current variables for sequent use. e.g. in trend curve daily reports Presentation of acquired calculation, stored variables on video display units and other media. These variables may be presented in the form of one line diagram or curves Transmission of commands to RTUs Systems incorporating primarily these basic functions are traditionally called SCADA (Supervisory Control and Data Acquisition) systems. A characteristic feature of these systems is that they treat individual variables, which corresponds to transducers and actuators in the process. This means that the system doesn t need models of the power system as such. A SCADA system can consequently be built up to a large extent from standard software, which is not dependent on the fact that the process being treated involves a power system. Combining the variables available in a SCADA system with a model of the power system makes it possible to introduce functions that handle the power system and its components instead of individual measuring points A detailed network model enables one to calculate all power flows in the network, on the basis of a comparatively small number of telemetered data. A Supervisory Control System, which, in addition to the basic SCADA functions, incorporates functions based on a network model, is traditionally called an Energy Management System (EMS) shown in Fig.1 below. The Fig.2 below represents process oriented database structure. (Physical model and the database model)

4 208 The scope of the functions in an EMS system must always be adapted to the power system and operative organization of the customer. A broad spectrum of computing functions is therefore available. Since most of the building blocks consist of software, it is simple to adapt and upgrade the system as required. In addition to network model calculations, EMS comprises standardized solutions for the following functions Production Control (Automatic Generation Control-AGC) Economic Dispatch Calculation (EDC) Contingency Analysis Operators Load Flow (OFL) Load Forecasting Fig. 3 below gives an overview of the program functions available in the system 3. Overview of the State of the Art In simple terms, the goal of system control centre design is the implementation of security control. Security control requires the proper integration of both automatic and manual control functions, i.e. a total systems approach with the human operator being an integral part of the control system design. Security control requires that all conditions of operation be recognized and that control decisions by the man-computer system must be made not only when the power system is operating normally, but also when it is operating under abnormal conditions. 4. Basic Security Control Concepts The power system may be assumed as being operated under two sets of constraints: load constraints and operating constraints. The load constraints impose the requirement that the load demand must be met by the system. The operating constraints impose maximum or minimum operating limits on system variables and are associated with both steady state and stability limitations. Mathematically, the load constraints can be expressed in the form of the familiar load flow equations. The operating constraints can be expressed in the form of inequalities such as an equipment loadings, bus voltage, phase angle differences, generator real and reactive powers etc. The conditions of operation can than be categorized into three operating states Normal (or Preventive) State Emergency State Restorative State

5 209 A system is in the normal state when the load and operating constraints are satisfied. It is reasonable to assume that in the normal state the power system is in a quasi-steady-state condition. For any given time, the intersection of the load constraints and the operating constraints defines the space of all feasible normal operating states. The power system may be operated any where in this space. A system is in the emergency state when the operating constraints are not completely satisfied. Two types of emergency may be noted. One is when only steady state operating constraints are being violated, e.g. an equipment-loading limit is exceeded or the voltage at a bus is below a given level. The other is when a stability operating constraint is violated and as a result of which the system cannot maintain stability. The first type of emergency may be called Steady State emergency and the second type, dynamic emergency. A system is in the restorative state when the load constraints are not completely satisfied. This means a condition of either a partial or a total system shutdown. In case of a partial shutdown the reduced system may be in an emergency state. This is the start of a cascading situation and, if uncorrected, would lead to a further deterioration of the system. A normal operating point can be classified as being either secure or insecure with reference top an arbitrary set of disturbances or next contingencies. A normal system is said to be secure, i.e. at a secure operating point, if it can undergo any contingency in the next-contingency set without getting in to an emergency condition. On the other hand if there is at least one contingency in the next-contingency set which would bring about an emergency, the normal system would be called insecure. The concept of three operating states breaks up the complex operating problem into three operating sub-problems with different control objects of primary interest and of major impact on the design of system control centers is the control done in the normal state. It is the basically the development and implementation of functions in this area that represent the state of the art in system control centers. Emergency and restorative controls are needed for a complete security control system. 5. General Characteristics of System Control Centers The main features of a modern energy control center are Hierarchical structure consisting of several levels of computer systems. Dual Real-time computers with shared extra memory and peripherals. High speed digital telemetry and data acquisition equipment. System wide instrumentation of electrical quantities and device status. Dynamic wallboard group display. For system operation there were two functions to be implemented i) Area regulation (which we now call automatic generation control) and ii) Economic Dispatch. The totality of real-time features and functions at their centers include the following; Hierarchical Structure consisting of several levels of computer systems. Dual real time processors or multi- processors plus redundant peripherals. High speed digital telemetry and data acquisition equipment. System wide instrumentation of electrical quantities and device status. Colour CRTs with graphics for interactive display. Dynamic wallboard group display. Automatic Generation Control. Economic Dispatch Calculation. Automatic Voltage (VAR) Control. Supervisory Control (breakers, capacitors, transformer taps, generating unit startup and Shutdown. Security Monitoring.

6 210 State Estimation. On-line load flow. Steady State Security Analysis. Optimum Power Flow. Automatic System Trouble Analysis. On-line Short Circuit Analysis. Emergency Control automatic load shedding, generator shedding and line tripping. Automatic Circuit Restoration There is no control system that has all of the functions just enumerated. This is to be expected. Operating problems differ due to different networks and generation resources. Operating philosophy and the structure of operating responsibilities are not the same for all companies. 6. Functions to be Implemented at System Control Centres The functions that are being carried out by the digital computers at the control centers are 6.1 Automatic Generation Control (AGC) The automatic generation control (AGC) function is with very few exceptions the only closed loop control using implemented at system control centers. The sampling time for digital AGC varies from 1 second to 4 seconds. Most control centers send raise and lower signals or MW deviations to the generating units. The basic AGC algorithms, i.e., the calculation of area control error and the assignment of regulation to each unit recognizing the desired base plants, are well known. To apply these algorithms in a system control center requires the addition of modules, which in effect interface with the real time environment. These modules should take care of initializing the AGC function, coordinate all information from other programs which affect AGC, prepare and hand off to the data acquisition subsystem the signals to be sent to the plants and communicate with display subsystem. 6.2 Economic Dispatch Calculation (EDC) Economic Dispatch Calculation is performed every few minutes using the get of coordination equations, which requires that the incremental cost of delivered power from each generating unit to an arbitrary reference point be the same for each unit. The incremental cost of delivered power to a given point from a generating unit is equal to the incremental cost of generated power multiplied by a penalty factor. Traditionally the penalty factors are calculated using transmission loss -constants. The calculation of penalty factors is done on line using a real time optimum power flow. Every time there is a network change or when the system load has changed significantly in magnitude or in relative distribution between areas, the optimum power flow runs automatically and a new set of penalty factors is passed on to the EDC. 6.3 Automatic Voltage/VAR Control (AVC) The AVC regulates the voltage profile and also minimizes losses due to reactive power flow. The control variables are generator reactive powers, transformer taps, shunt capacitors and shunt reactors. The control is a two-step operation. Voltages and VAR flows are checked periodically and when there is any deviation beyond certain tolerances the voltage profile control calculation is initiated. At less frequent intervals the minimum loss calculation and control is executed. 6.4 Security Monitoring (SM) Security monitoring (SM) is the on-line identification and the display of the actual operating conditions of the power system. This one function has made the difference between the

7 211 traditional dispatch center and the modern system control center. SM requires a system wide instrumentation on a greater scale and variety than that required by a center without SM. The types of measurements include; MW and MVAR flows, branch currents, bus voltages, bus MW and MVAR injections, frequencies, energy readings, circuit breaker status or operation counts, manual switch positions, protective relaying operations, transformer tap positions and miscellaneous substation status and alarms. The SM function, in general checks the analog values against limits basically to determine whether the system is close to or at the emergency state. The limit checking also allows some kind of data validation and the rejection of incongruous data, limit checking is done as often as the data is brought in which is usually in the order of every one to a few seconds. The display required for SM entails the use of CRT s and a large number of display formats. The dynamic wall display is also used for SM. Part of the SM function is the online determination of the network topology. In most cases it is sufficient to determine the network configuration. In centers where there is a direct responsibility for transmission switching and safety is a paramount factor, the SM function should include an identification of the electrical status (energized or de-energized) of every physically isolatable segment. 6.5 Static State Estimation (SE) State estimation (SE) may be defined as a mathematical procedure for calculating, from a set of system measurements, a best estimate of the vector of bus voltage magnitude and phase angles of the network. The measurement set is understood to contain an adequate degree and spread of redundancy to allow the statistical correlation and correction of the measurements detect and preferably identify bad data, and yield calculated values for non-telemetered quantities. System control centers with SE in operational use; the measurement set consists of active and reactive line flows, bus injections, and voltage measurements. The SE runs every minute using the last set of measurements which are scanned every second. In addition, SE is started whenever there is a network change. The purpose of the SE is to obtain the vector of bus injections; check for abnormal metering errors. The vector of bus injections is then used by a Newton-Raphson on-line load flow for security analysis and for determining closed-loop corrective control for certain line outages. Bad data detection is based on the value of the sum of the squared residuals, i.e., the performance index, J. After two consecutive failures of the J-test procedures are initiated for bad data identification based on the estimation cycle. If this still fails after a few attempts, a logic procedure is initiated for determining network model errors. SE runs every 15 minutes or on request for major system changes. The results of the SE is used for SM (security Monitoring) and the operator is informed of overloads or other critical conditions. The SE results are stored in a historical file for a (7-day) particular period. This data is available to companies whose lines are represented in the SE model. The bad data detection is based on the performance index J. The measurement set consists of real and reactive power flows, real and reactive bus injections and bus voltages. The purpose of the SE is for security monitoring and for security analysis of the power system. The most important aspect of state estimation is bad data identification. This alone could be a worthwhile justification for including state estimation in a system control center. 6.6 On line Load Flow (OLF) An on line load flow (OLF) is one which is used for real time functions such as security monitoring security analysis and penalty factor calculation, and can also be used for study purpose OLF makes use of real-time data. Security Analysis consists of contingency evaluation and corrective action strategy. OLF may be used for one or both of these functions. The OLF require a vector of bus injections. In the general case, the bus injections are calculated from statistical data obtained on-line and some off-line historical information. The purpose of the OLF or more correctly OPF is to establish the base case for security analysis and for penalty factor calculation. The OLF routine will also be used for contingency evaluation in security analysis.

8 212 The Dc load flow is used as the OLF. This is used for contingency evaluation in security analysis. The on-line load flow is a necessary function for system control centers. 6.7 Steady State Security Analysis (SA) The first function of security analysis (SA) is to determine whether the normal system is secure or insecure. The second function is to determine what corrective action strategy should be taken when the system is insecure. The first function is commonly known as contingency evaluation since, by definition, the security of a system is determined with reference to a set of next contingencies. In present state of-art, only steady state contingency evaluation is done at system control centers. That is the emergency condition that is to be avoided is overloading of equipment or poor bus voltages. The second part of security analysis is Corrective Action Strategy. If the system is insecure, can be made secure? If so, how and at what cost? Conditions improve? Suppose the system is now insecure and there is no way of making it secure, how much load would be shed. 6.8 Optimum Power Flow (OPF) An optimum power flow (OPF) is a steady state solution to an optimization problem where the load flow equations and limits on system variables and on functions of these variables constitute the set of constraints. The OPF is used with the OLF as a subroutine to produce a real time base case for penalty factor calculation and eventually for security analysis. What is needed at a system control center is an OPF which can be used for determining corrective action strategies. 7. Conclusion This paper discusses the basic security concept, level decomposition of energy control centers (ECC), characteristics and its functions for power system. The responsibility today for supervising and controlling an electric power system is largely centralized. The energy management system (EMS) is for the supervision and control of electric power systems. A small number of power system energy control centers each remotely control large number of power stations and substations. References [1] Energy Control Center Functions for Power Systems ASEA Journal Vol.5 PP , [2] Prabha Kundur Power System Stability and Control McGraw Hill 1994.

Distribution Automation. What? D A. How? Why?

Distribution Automation. What? D A. How? Why? Distribution Automation What? How? D A Why? Typical Power System Generating Plant Step-up transformers Generation System Circuit breakers Transmission System Transmission System Distribution System substations

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

Seminar on African Electrical Interconnection. Module 8 - Interconnected Systems Operating Conditions

Seminar on African Electrical Interconnection. Module 8 - Interconnected Systems Operating Conditions Seminar on African Electrical Interconnection Module 8 - Interconnected Systems Operating Conditions Module 8 - Interconnected Systems Operating Conditions Contents 1) Technical Operating Agreements 2)

More information

FACILITY CONNECTION REQUIREMENTS NERC TO-FAC 001-0

FACILITY CONNECTION REQUIREMENTS NERC TO-FAC 001-0 FACILITY CONNECTION REQUIREMENTS NERC TO-FAC 001-0 TABLE OF CONTENTS (NERC TO-FAC-001-0) Facility Connection Requirements Introduction Procedures for Coordinated Joint Studies...1 Procedures for Notification...1

More information

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES --------------------------------------------- GAINESVILLE RENEWABLE ENERGY CENTER OPERATING PROCEDURES Revision 0; September 1, 2012 Revision 1; November

More information

NERC PLANNING STANDARDS

NERC PLANNING STANDARDS NERC PLANNING STANDARDS North American Electric Reliability Council April 2004 Version of All Planning Standards Terms and Their Definitions As Used in the Analysis (Study) an examination or simulation

More information

REVENUE METERING REQUIREMENTS MANUAL (REDLINE VERSION)

REVENUE METERING REQUIREMENTS MANUAL (REDLINE VERSION) REVENUE METERING REQUIREMENTS MANUAL (REDLINE VERSION) 9-10-2004 Revenue Meter Requirements Manual Revision: 1.0 Revision Date:9-10-2004 Disclaimer The information contained within this manual, along with

More information

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES --------------------------------------------- GAINESVILLE RENEWABLE ENERGY CENTER OPERATING PROCEDURES Revision 0; September 1, 2012 Revision 1; November

More information

Designated Entity Design Standards Task Force (DEDSTF) Minimum Design Requirements for FERC Order 1000 Projects. System Protection Subgroup

Designated Entity Design Standards Task Force (DEDSTF) Minimum Design Requirements for FERC Order 1000 Projects. System Protection Subgroup Designated Entity Design Standards Task Force (DEDSTF) Minimum Design Requirements for FERC Order 1000 Projects System Protection Subgroup For any substation facility included in the scope of a transmission

More information

Platte River Power Authority. Ten-Year Transmission Plan ( )

Platte River Power Authority. Ten-Year Transmission Plan ( ) Platte River Power Authority Ten-Year Transmission Plan (2015-2024) Prepared by PRPA System Planning December 31, 2014 Table of Contents I. Executive Summary II. III. IV. Scope Assumptions Criteria V.

More information

Wolverine Power Supply Cooperative, Inc. Senior Transmission System Operator

Wolverine Power Supply Cooperative, Inc. Senior Transmission System Operator I. OBJECTIVE Wolverine Power Supply Cooperative, Inc. Senior Transmission System Operator A. The Senior Transmission System Operator is responsible for the reliable and safe operation of Wolverine s transmission

More information

Standard PRC-002-NPCC-01 Disturbance Monitoring

Standard PRC-002-NPCC-01 Disturbance Monitoring A. Introduction 1. Title: Disturbance Monitoring 2. Number: PRC-002-NPCC-01 3. Purpose: Ensure that adequate disturbance data is available to facilitate Bulk Electric System event analyses. All references

More information

Standard Development Roadmap

Standard Development Roadmap Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

ABC AND AGC INTERFACE REQUIREMENTS TECHNICAL SPECIFICATION

ABC AND AGC INTERFACE REQUIREMENTS TECHNICAL SPECIFICATION ABC AND AGC INTERFACE REQUIREMENTS TECHNICAL SPECIFICATION Published: September 2018 IMPORTANT NOTICE Purpose AEMO has prepared this document to provide information about the requirements for interfacing

More information

Standard MH-TPL Transmission System Planning Performance Requirements

Standard MH-TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: MH-TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004 Glossary of Terms Used in Standards Preliminary Draft Version 0 Standards September 1, 2004 Source References (Noted in draft only will not be part of final glossary) Functional Model () Glossary (GL)

More information

Educating System Operators in the New Millennium! Background. Course Level. Target Audience. NERC Continuing Education Hours

Educating System Operators in the New Millennium! Background. Course Level. Target Audience. NERC Continuing Education Hours Background The class will be delivered over a 3-day period. The class is comprised of three training modules covering the areas of: Communications, Critical Thinking, and Restoration. The course consists

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR ANCILLARY SERVICES REQUIREMENTS PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR ANCILLARY SERVICES REQUIREMENTS PROTOCOL VOLUME NO. III Page No. 655 CALIFORNIA INDEPENDENT SYSTEM OPERATOR ANCILLARY SERVICES REQUIREMENTS PROTOCOL VOLUME NO. III Page No. 656 ANCILLARY SERVICES REQUIREMENTS PROTOCOL Table of Contents ASRP 1

More information

Connection Study Requirements

Connection Study Requirements Document Release Released: September 20, 2010 The Customer shall comply with all the applicable requirements in this document when performing connection studies to produce the engineering study report.

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

B Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation. G. M. Bastos (*) R. C. Valente E.

B Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation. G. M. Bastos (*) R. C. Valente E. 21, rue d'artois, F-75008 Paris http://www.cigre.org B3-214 Session 2004 CIGRÉ Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation G. M. Bastos (*) R. C. Valente E.

More information

Calpine Experience with Combined Cycle Plants in a Formal Market

Calpine Experience with Combined Cycle Plants in a Formal Market Calpine Experience with Combined Cycle Plants in a Formal Market Background Calpine currently operates CC plants in ERCOT, CAISO, PJM, ISO NE Various types of CC trains: 1x1, 2x1, 3x1, 4x1 Some plants

More information

Effects of Wide-Area Control on the Protection and Operation of Distribution Networks

Effects of Wide-Area Control on the Protection and Operation of Distribution Networks Effects of Wide-Area Control on the Protection and Operation of Distribution Networks Will Allen Schweitzer Engineering Laboratories, Inc. Published in Wide-Area Protection and Control Systems: A Collection

More information

TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA

TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA For Compliance with NERC Reliability Standard: TPL-001-4 1/10/2017 Version: 4.2 Table of Contents 1 Revision and Approval History... 2 1.1 Revision

More information

Critical Load Serving Capability by Microgrid using 100% Renewable Energy

Critical Load Serving Capability by Microgrid using 100% Renewable Energy 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Critical Load Serving Capability by Microgrid using 100% Renewable Energy P. PENKEY,

More information

Standard TPL Transmission System Planning Performance Requirements

Standard TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

Safe Integration of Renewables at Transmission and Distribution Level. Alexander Krauss - Digital Grid Software and Solutions

Safe Integration of Renewables at Transmission and Distribution Level. Alexander Krauss - Digital Grid Software and Solutions Safe Integration of Renewables at Transmission and Distribution Level Alexander Krauss - Digital Grid Software and Solutions siemens.com/digitalgrid Overview Table of content The Masterplan - One Platform

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Telecommunications. Generator Data Requirements. PJM State & Member Training Dept. PJM /27/2015

Telecommunications. Generator Data Requirements. PJM State & Member Training Dept. PJM /27/2015 Telecommunications Generator Data Requirements PJM State & Member Training Dept. Objectives Students will be able to: Identify the various PJM communication protocols and procedures Identify the various

More information

MATL Requirements Facility Interconnection Requirements

MATL Requirements Facility Interconnection Requirements Table of Contents 1. Purpose... 2 2. References... 2 3. Responsibility... 2 4. Interconnection Criteria... 3 4.1 R3.1. & R3.2. Procedures for Coordinated Studies and Notification of New or Materially Modified

More information

Glossary of Terms Used in Reliability Standards

Glossary of Terms Used in Reliability Standards Version 0 Draft 3 November 1, 2004 Adequacy Adjacent Balancing Authority Agreement The ability of the electric system to supply the aggregate electrical demand and energy requirements of the end-use customers

More information

CONTINUOUS POWER-TIE CONFIGURATION

CONTINUOUS POWER-TIE CONFIGURATION POWER AVAILABILITY CONTINUOUS POWER-TIE CONFIGURATION USER MANUAL Series 610 Multi-Module UPS TABLE OF CONTENTS 1.0 SYSTEM DESCRIPTION....................................................1 1.1 Function...................................................................

More information

NERC Reliability Functional Model

NERC Reliability Functional Model NERC Reliability Functional Model Function Definitions and Responsible Entities Version 3 Approved by Standing Committees: Operating Committee: December 6, 2006 Planning Committee: December 6, 2006 Standards

More information

Standard Development Timeline

Standard Development Timeline Standard TPL-001-4 Transmission System Planning Performance Requirements Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be

More information

ISO REVISED STAGING PLAN NO. 7

ISO REVISED STAGING PLAN NO. 7 ID Work Item Description 2 COMPLETE HIM Server An archival database is to be created for permanent historical storage of bidding, price and schedule data. HIM is defined in section 3.2.5 of the SI DSOW:

More information

Glossary of Terms Used in Reliability Standards

Glossary of Terms Used in Reliability Standards Version 0 Draft 4 January 7, 2005 Adequacy Adjacent Balancing Authority Agreement The ability of the electric system to supply the aggregate electrical demand and energy requirements of the end-use customers

More information

Reference Document. Interconnected Operations Services

Reference Document. Interconnected Operations Services N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL Princeton Forrestal Village, 116-390 Village Boulevard, Princeton, New Jersey 08540-5731 Reference Document Prepared by the Subcommittee Version 1.1 with Proposed

More information

Standards de planification du NERC

Standards de planification du NERC Demande R-3498-2002 Standards de planification du NERC PREUVE EN CHEF DE TRANSÉNERGIE Original : 2002-11-27 HQT-4, Document 2 (en liasse) NERC PLANNING STANDARDS North American Electric Reliability Council

More information

AEP Guidelines for Transmission Owner Identified Needs

AEP Guidelines for Transmission Owner Identified Needs AEP Guidelines for Transmission Owner January 2017 1 Document Control Document Review and Approval Action Name(s) Title Prepared by: Kevin Killingsworth Principal Engineer, Asset Performance and Renewal

More information

(D2-01_28) ROLE OF ICT in Power System

(D2-01_28) ROLE OF ICT in Power System CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS http:d2cigre.org STUDY COMMITTEE D2 INFORMATION SYSTEMS AND TELECOMMUNICATION 2013 Colloquium November

More information

Operations and Maintenance Considerations for Underfrequency Relaying Design

Operations and Maintenance Considerations for Underfrequency Relaying Design Operations and Maintenance Considerations for Underfrequency Relaying Design Edsel Atienza Schweitzer Engineering Laboratories, Inc. Presented at the 38th Annual Western Protective Relay Conference Spokane,

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

Mapping Document. Project Phase 2 of System Protection Coordination. Revisions or Retirements to Already Approved Standards

Mapping Document. Project Phase 2 of System Protection Coordination. Revisions or Retirements to Already Approved Standards Mapping Document Project 2007-06.2 Phase 2 of System Protection Coordination Revisions or Retirements to Already Approved Standards This mapping document explains how each of the existing Requirements

More information

Multi-Agent Model for Power System Simulation

Multi-Agent Model for Power System Simulation Multi-Agent Model for Power System Simulation A.A.A. ESMIN A.R. AOKI C.R. LOPES JR. G. LAMBERT-TORRES Institute of Electrical Engineering Federal School of Engineering at Itajubá Av. BPS, 1303 Itajubá/MG

More information

Omaha Public Power District Facility Connection Guide

Omaha Public Power District Facility Connection Guide Omaha Public Power District Facility Connection Guide Date Issued: 3/2010 Version: 2.1 Last Review Date: 1/2016 Next Review Date: Document Owner: Transmission Services Reviewed By: Amanda Underwood Approved

More information

Generator Operational Requirements

Generator Operational Requirements PJM Manual 14D: Generator Operational Requirements Revision: 38 Effective Date: June 01,2016 Prepared by: Generation Department PJM 2016 i Table of Exhibits PJM Manual 14D: Generator Operational Requirements

More information

1 Descriptions of Function

1 Descriptions of Function Distributed Energy Resource Controller Reconfigure s in response to Faulted Segment with Islanding 1 Descriptions of Function Version 1.2 January 13, 2010 This function describes the sequence of activities

More information

Standard TOP Monitoring System Conditions

Standard TOP Monitoring System Conditions A. Introduction 1. Title: Monitoring System Conditions 2. Number: TOP-006-2 3. Purpose: To ensure critical reliability parameters are monitored in real-time. 4. Applicability 4.1. Transmission Operators.

More information

Document Updated: 12/5/2018

Document Updated: 12/5/2018 Vice President Energy Delivery Document Updated: 12/5/2018 * Blue shading indicates a qualifying Transmission Function Employee Manager System Operations Manager Substation Supervisor System Control Supervisor

More information

South Carolina Electric & Gas Company Transmission Function Employees Job Titles and Descriptions. Electric Transmission

South Carolina Electric & Gas Company Transmission Function Employees Job Titles and Descriptions. Electric Transmission Electric Transmission VP Electric Transmission SCEG The Electric Transmission Officer is responsible for System Control; Operations Planning; Transmission Planning; ERO compliance; Transmission Training;

More information

Information Document Protection System Information ID# R

Information Document Protection System Information ID# R Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between the Information Document and the related authoritative document(s)

More information

5.4 Post Contingency Local Load Relief Warning

5.4 Post Contingency Local Load Relief Warning 5.4 Post Contingency Local Load Relief Warning Post Contingency Local Load Relief Warning Non-Market Post Contingency Local Load Relief Warning The purpose of the Post Contingency Local Load Relief Warning

More information

FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS. Reliability Coordinator Processes and Tools

FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS. Reliability Coordinator Processes and Tools FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS Reliability Coordinator Processes and Tools Objectives Describe how the FRCC Security Process addresses planning/coordination of the Bulk Electric System Describe

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination of Ancillary Service Standards... 4 8.2.2 Time-Frame for Revising Ancillary Service

More information

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014 Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014 1040 O Street, P.O. Box 80869 p: 402.475.4211 Lincoln, NE 68501-0869 www.les.com

More information

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position AA1-038

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position AA1-038 Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position AA1-038 Lexington Low Moor 230kV 10.1MW Capacity / 78.2MW Energy September / 2015 Introduction

More information

Circuit Breaker Asset Management Using Intelligent Electronic Device (IED)- Based Health Monitoring

Circuit Breaker Asset Management Using Intelligent Electronic Device (IED)- Based Health Monitoring 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Circuit Breaker Asset Management Using Intelligent Electronic Device (IED)- Based Health

More information

SMART GRID CONCEPTUAL MODEL

SMART GRID CONCEPTUAL MODEL SMART GRID CONCEPTUAL MODEL Version 1.0 April 20, 2010 Executive Summary This document describes the Smart Grid Conceptual Model, a tool for discussing the structure and operation of the power system.

More information

Reliability Standard Audit Worksheet 1

Reliability Standard Audit Worksheet 1 Reliability Standard Audit Worksheet 1 PER-006-1 Specific Training for Personnel This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity: NCR Number: Compliance

More information

Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25, 2012

Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25, 2012 Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25, 2012 1 Presentation Overview Joint Working Group The Issue Structure of the Report Wind Plant Configuration Wind Turbine Generators

More information

Approved RMWG Discussion was held. ??? John Simpson need to assign SMART rating

Approved RMWG Discussion was held. ??? John Simpson need to assign SMART rating ALR1-1 Generator Reactive Limit Metric:Voltage schedules How many times did generators encounter var limits associated with holding voltage schedule. 10 3 2 1 1 3 1 Initial pilot effort completed, reaching

More information

Mapping Document for FAC-010-3

Mapping Document for FAC-010-3 Mapping Document for FAC-010-3 The Project 2015 09 standard drafting team (SDT) is proposing the retirement of the NERC FAC 010 3 Reliability Standard. The SDT further proposes a new paradigm regarding

More information

Feasibility Study Report

Feasibility Study Report Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Stanly County, NC Total Output Requested By Customer: 30 MW Commercial Operation Date Requested By Customer: 12/1/2019 Feasibility

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Transfer Capability Methodology. for the Near-Term. Transmission Planning Horizon

Transfer Capability Methodology. for the Near-Term. Transmission Planning Horizon Transfer Capability Methodology for the Near-Term Transmission Planning FAC-013-2 Version 2.2 June 30, 2018 Table of Contents 1 PURPOSE... 3 2 DEFINITION... 3 3 APPLICABILITY... 3 4 TRANSFER CAPABILITY

More information

FUZZY LOGIC APPROACH TO REACTIVE POWER CONTROL IN UTILITY SYSTEM

FUZZY LOGIC APPROACH TO REACTIVE POWER CONTROL IN UTILITY SYSTEM FUZZY LOGIC APPROACH TO REACTIVE POWER CONTROL IN UTILITY SYSTEM Mr. C. Ramesh Dr. M. Rajaram (Corresponding author) Vice-Chancellor, Research Scholar, Anna University of Technology, Anna University of

More information

ExISTING SubSTATION INfORmATIONON

ExISTING SubSTATION INfORmATIONON ExISTING SubSTATION INfORmATIONON drives equipment LIFe extension, modernization, and retrofitting david dolezilek and GeraLdo rocha, Schweitzer Engineering Laboratories, Inc. i. introduction Much of the

More information

Secure energy supply Energy Automation for Airports

Secure energy supply Energy Automation for Airports Secure energy supply Energy Automation for Airports Power Transmission and Distribution HV Distribution Network ~ MV Main Distribution M M MV Substation Safe Bus LV LV LV LV G ~ Station 1 Station 2 Check-in

More information

DA concept for higherquality. supplies. 24 ABB Review 4/1996

DA concept for higherquality. supplies. 24 ABB Review 4/1996 DA concept for higherquality power supplies Low power network losses and an uninterrupted supply of electricity are no longer enough to satisfy today s consumers, who take a highquality power supply for

More information

California Independent System Operator Corporation Fifth Replacement Tariff

California Independent System Operator Corporation Fifth Replacement Tariff Table of Contents Method to Assess Available Transfer Capability... 2 L.1 Description of Terms... 2 L.1.1 Available Transfer Capability (ATC)... 2 L.1.2 Total Transfer Capability (TTC)... 2 L.1.3 Existing

More information

California Independent System Operator Corporation Fifth Replacement Tariff

California Independent System Operator Corporation Fifth Replacement Tariff Table of Contents Method to Assess Available Transfer Capability... 2 L.1 Description of Terms... 2 L.1.1 Available Transfer Capability (ATC)... 2 L.1.2 Total Transfer Capability (TTC)... 2 L.1.3 Existing

More information

Generation Interconnection Feasibility Study Report. For. PJM Generation Interconnection Request Queue Position AA1-038

Generation Interconnection Feasibility Study Report. For. PJM Generation Interconnection Request Queue Position AA1-038 Generation Interconnection Feasibility Study Report For PJM Generation Interconnection Request Queue Position AA1-038 Lexington Low Moor 230kV 10.1MW Capacity / 78.2MW Energy February / 2015 Introduction

More information

Requirements for the Connection of Facilities to The Dayton Power & Light Co. Transmission System

Requirements for the Connection of Facilities to The Dayton Power & Light Co. Transmission System The Dayton Power & Light Co Requirements for the Connection of Facilities to The Dayton Power & Light Co. Transmission System Compliance to NERC Standard FAC-001-2 November, 2017 Table of Contents INTRODUCTION...

More information

Design & Implementation of an Industrial Facility Islanding and Load Shed System

Design & Implementation of an Industrial Facility Islanding and Load Shed System Design & Implementation of an Industrial Facility Islanding and Load Shed System Mark Adamiak GE Digital Energy Bernard Cable GE Energy 1. Abstract The availability of electricity supply in all areas of

More information

POTOMAC ELECTRIC POWER COMPANY

POTOMAC ELECTRIC POWER COMPANY POTOMAC ELECTRIC POWER COMPANY FERC Form 715 (Part 4) - Transmission Planning Study Guidelines Transmission Reliability Guidelines 1. General Overview The reliability guidelines used to plan the transmission

More information

Transmission ITP. Data Exchange Requirements. PJM State & Member Training Dept. PJM /10/2018

Transmission ITP. Data Exchange Requirements. PJM State & Member Training Dept. PJM /10/2018 Transmission ITP Data Exchange Requirements PJM State & Member Training Dept. PJM 2018 Objectives The student will be able to: Recognize and correct any inconsistencies in data reported via EMS PJM 2018

More information

Fundamentals of Transmission Operations

Fundamentals of Transmission Operations Fundamentals of Transmission Operations Telecommunications PJM State & Member Training Dept. PJM 2014 9/10/2013 Objectives The student will be able to: Explain the back-up satellite phone testing requirements

More information

Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA. March 21, 2017

Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA. March 21, 2017 Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA March 21, 2017 Contents 1 Background...3 2 National and Regional Criteria and Guides...4 2.1 2.1 NERC Transmission Planning Standards...4 2.2

More information

Generator Interconnection Affected System Impact Study. Plains & Eastern Clean Line Final Report

Generator Interconnection Affected System Impact Study. Plains & Eastern Clean Line Final Report Generator Interconnection Affected System Impact Study Plains & Eastern Clean Line Final Report May 19, 2015 MISO 2985 Ames Crossing Eagan Minnesota - 55121 http://www.misoenergy.org Midcontinent Independent

More information

Automating LV Distribution networks using sensor technologies

Automating LV Distribution networks using sensor technologies Automating LV Distribution networks using sensor technologies Jayant Sinha Lead Consultant (Smart Networks) Enzen Global Ltd, UK 1 Managing the last mile Growing pressure on DNOs to improve LV network

More information

List of training courses on electrical power system for Cambodia, Laos, Vietnam and Thailand (CLVT) countries

List of training courses on electrical power system for Cambodia, Laos, Vietnam and Thailand (CLVT) countries List of training courses on electrical power system for Cambodia, (Responsible and coordinator : Dr. Tuan Nguyen, t.nguyen@ied-sa.fr) 1. TRAINING COURSE 1 CUSTOMER SERVICE METERING AND BILLING 2. TRAINING

More information

Power and Utilities 2018 Catalog

Power and Utilities 2018 Catalog Power and Utilities 2018 Catalog CONTENT :: COMPLIANCE :: TECHNOLOGY 2018 360training.com 888-360-TRNG (8764) www.360training.com About 360training.com 360training.com is a privately held, leading provider

More information

ASSOCIATED NERC STANDARD(S): TPL (referred to as TPL-001 in this document) IMPLEMENTATION: In effect when approved.

ASSOCIATED NERC STANDARD(S): TPL (referred to as TPL-001 in this document) IMPLEMENTATION: In effect when approved. ASSOCIATED NERC STANDARD(S): TPL-001-4 (referred to as TPL-001 in this document) IMPLEMENTATION: In effect when approved. Phase in of individual TPL-001 requirements will be based on the effective dates

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Electricity Market Design and Structure ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Electricity Market Design and Structure ) Docket No. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Electricity Market Design and Structure ) Docket No. RM01-12-000 REQUEST FOR CONSIDERATION OF INTERCONNECTED OPERATIONS SERVICES

More information

PROCESS AUTOMATION FOR DISTRIBUTION OPERATIONS MANAGEMENT. Stipe Fustar. KEMA Consulting, USA. Components

PROCESS AUTOMATION FOR DISTRIBUTION OPERATIONS MANAGEMENT. Stipe Fustar. KEMA Consulting, USA. Components PROCESS AUTOMATION FOR DISTRIBUTION OPERATIONS MANAGEMENT Stipe Fustar KEMA Consulting, USA INTRODUCTION To prosper in a competitive market, distribution utilities are forced to better integrate their

More information

Generator Assessment & Roles During A Restoration

Generator Assessment & Roles During A Restoration Generator Assessment & Roles During A Restoration PJM State & Member Training Dept. PJM 2015 Objectives Students will be able to: Identify the process and requirements for operating during system restoration

More information

Energy Management System (EMS) Model Updates and Quality Assurance (QA)

Energy Management System (EMS) Model Updates and Quality Assurance (QA) PJM Manual 3A: Energy Management System (EMS) Model Updates and Quality Assurance (QA) Revision: 8 Effective Date: January 2, 2014 Prepared by: Operation Support Division PJM 2014 PJM 2007 Revision 0,

More information

TSOs, taking into account the following: Whereas

TSOs, taking into account the following: Whereas All TSOs proposal for a common grid model methodology in accordance with Articles 67(1) and 70(1) of Commission Regulation (EU) 2017/1485 of 02 August 2017 establishing a guideline on electricity transmission

More information

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 25, Electric Grid Operations

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 25, Electric Grid Operations San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 25, 2018 Electric Grid Operations Associate Contracting Agent Construction Services: Supports completion

More information

Operation of ESS Interconnected to the Distribution Feeder by Distribution Management System

Operation of ESS Interconnected to the Distribution Feeder by Distribution Management System The 17 th IERE General Meeting & Canada Forum Operation of ESS Interconnected to the Distribution Feeder by Distribution Management System 18 th May, 2017 Wonwook Jung KEPCO Research Institute Contents

More information

S M A R T G R I D I N T E R O P E R A B I L I T Y P A N E L. Nokhum Markushevich (With contribution from Joe Hughes) TnD DEWG 1

S M A R T G R I D I N T E R O P E R A B I L I T Y P A N E L. Nokhum Markushevich (With contribution from Joe Hughes) TnD DEWG 1 S M A R T G R I D I N T E R O P E R A B I L I T Y P A N E L EXCHANGE OF AGGREGATED INFORMATION BETWEEN TRANSMISSION AND DISTRIBUTION DOMAINS (THE TRANSMISSION BUS LOAD MODEL CONCEPT) Nokhum Markushevich

More information

Standard TPL System Performance Following Extreme BES Events

Standard TPL System Performance Following Extreme BES Events A. Introduction 1. Title: System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D) 2. Number: TPL-004-1 3. Purpose: System simulations

More information

PSS ODMS. Advanced network modeling and applications software suite for operations and planning. Answers for energy.

PSS ODMS. Advanced network modeling and applications software suite for operations and planning. Answers for energy. PSS ODMS Advanced network modeling and applications software suite for operations and planning Answers for energy. PSS ODMS advanced, robust and efficient network modeling and network applications software

More information

EXELON UTILITIES TRANSMISSION FACILITY INTERCONNECTION REQUIREMENTS

EXELON UTILITIES TRANSMISSION FACILITY INTERCONNECTION REQUIREMENTS EXELON UTILITIES TRANSMISSION FACILITY INTERCONNECTION REQUIREMENTS In compliance with NERC standard FAC-001-2 01-01-2016 TABLE OF CONTENTS INTRODUCTION...4 RESPONSIBILITIES OF THE INTERCONNECTION REQUESTOR...6

More information

TOWARDS THE MODERNIZATION OF THE SCADA SYSTEMS OF THE HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR CONSIDERATIONS AND STEPS FORWARD

TOWARDS THE MODERNIZATION OF THE SCADA SYSTEMS OF THE HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR CONSIDERATIONS AND STEPS FORWARD TOWARDS THE MODERNIZATION OF THE SYSTEMS OF THE HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR CONSIDERATIONS AND STEPS FORWARD Nikos Hatziargyriou Vasilis Kleftakis Foivos Palaiogiannis HEDNO Greece

More information

Public Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018

Public Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018 Public Utility District Number 1 of Snohomish County Facility Connection Requirements February 9, 2018 1 Revision History: Number Date Description By Reviewed by Approved by: Original Sept. 29, 2011 Document

More information

Requirements for the Provision of Load Shedding Service for Import Version 4.0

Requirements for the Provision of Load Shedding Service for Import Version 4.0 LOAD SHED SERVICE for IMPORT (LSSi) Requirements Requirements for the Provision of Load Shedding Service for Import Version 4.0 This document outlines the eligibility criteria and requirements that an

More information

FERC Form No. 715 Part 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

FERC Form No. 715 Part 4 TRANSMISSION PLANNING RELIABILITY CRITERIA FERC Form No. 715 Part 4 TRANSMISSION PLANNING RELIABILITY CRITERIA The following information submitted for this Part 4 of FERC Form No. 715 consists of PJM's current Planning Criteria, and each member

More information

Design and Research on Co-simulation Training System of Large-Scale Power Grid with Distribution Network Based on Intelligent Materials System

Design and Research on Co-simulation Training System of Large-Scale Power Grid with Distribution Network Based on Intelligent Materials System Design and Research on Co-simulation Training System of Large-Scale Power Grid with Distribution Network Based on Intelligent Materials System BaiShan Mei 1, XiPing Zhang 2, Jie Xu 2, and YueHong Xing

More information

Public Utility District Number 1 of Snohomish County

Public Utility District Number 1 of Snohomish County Public Utility District Number 1 of Snohomish County Facility Connection Requirements September 29, 2011 1 Revision History: Number Date Description Original Sept. 29, 2011 Document Origination Compilation

More information