RUWACON QUALITY MANUAL

Size: px
Start display at page:

Download "RUWACON QUALITY MANUAL"

Transcription

1 RUWACON QUALITY MANUAL Rev Date Preparation Review Approved Description of Revision 1 29 June SHEQ Manager SHEQ Manager Managing 2011 Director Ruwacon (PTY) Ltd P.O. Box Noordstad 9303 THIS DOCUMENT IS THE PROPERTY OF RUWACON (PTY) LTD AND MAY NOT BE USED, REPRODUCED, TRANSMITTED AND/OR DISCLOSED WITHOUT PRIOR WRITTEN APPROVAL Page 1 of 15

2 Title CONTENTS Page no 1. SCOPE 4 2. GENERAL 4 3. VISION STATEMENT 4 4. MISSION STATEMENT 4 5. PROFILE 5 6. RWC CORE BUSNIESS 5 7. APPROACH 5 8 QUALITY POLICY 5 9. QUALITY OBJECTIVES 6 10 QUALITY MANAGEMENT SYSTEMS PLANNING MANAGEMENT RESPONSIBILITY INTERNAL COMMUNICATION MANAGEMENT REVIEW 8 15 RESOURCE MANAGEMENT 8 16 PROJECT DELIVERY 9 17 DESIGN AND CONTROL PURCHASING IDENTIFICATION, TRACEABILITY AND MONITORING CLIENT PROPERTY HANDLING, STORAGE, PACKAGING, DELIVERY CONTROL /MONITORING AND MEASURING EQUIPMENT 13 Page 2 of 15

3 26 MEASUREMENT, ANALYSIS AND IMPROVEMENT PROCESS CONTROL AUDITS AND INSPECTIONS CONTROL OF NON CONFORMANCE PRODUCTS ANALYSIS OF DATA IMPROVEMENT 15 Page 3 of 15

4 1. Scope. The manual describes Ruwacon s quality management system in accordance with ISO General 2.1 Manual responsibility. The preparation, review and approval of the manual are the responsibility off: Preparation: SHEQ Manager Review: SHEQ Manager Approval: Managing Director 2.3 Work and implementation responsibility. All employees of Ruwacon are responsible to implement the contents of the manual. 2.4 Applicability. The manual applies to all work and activities executed by Ruwacon, including the interactions with sub contractors, suppliers, vendors and service providers. 3. Vision statement The vision of Ruwacon is to become market leaders of the construction industry in South Africa. The company strives to earn the respect of stakeholders through its commitment to continuous improvement driven by respect, integrity, respect, trust and teamwork. 4. Mission statement The mission statement of Ruwacon is to deliver high-quality, cost effective projects on schedule. 5. Profile 5.1 Ruwacon was established in 1999 by Pieter Ruthven, the current Chief Executive Officer of the company. At that point in time the closed corporation was a civil construction company. In 2003, the closed corporation converted to a private company and 30% of its shares were acquired by Gavin Davids, the current Managing Director of Ruwacon (Pty) Ltd. 5.2 The company showed tremendous revenue growth and a new office complex was built in Bloemfontein in Regional offices have been established in Cape Town, Centurion, Prieska and East London. 5.3 Ruwacon (Pty) Ltd has a 9GBPE 8CEPE rating with the Construction Industry Development Board. This puts Ruwacon (Pty) Ltd in a favourable position since the company is one of a few construction companies in South Africa with 51% Page 4 of 15

5 black ownership and a 9BG grading. 5.4 Transformation is driven at the highest level and pro-active measures are taken to ensure that the company complies with the Codes of Good Practice as stipulated in Government Gazette Ruwacon (Pty) Ltd currently holds a level 4 BEE rating 6 Core business: As a civil construction company we mainly focus on : 6.1 Long term repairs and maintenance projects RAMP 6.2 General construction work 6.3 Water pipelines 7. Approach. Management believes in a hands-on approach and therefore regular visits to sites countrywide, are imperative.senior management has committed themselves to the principles of integrity, respect and transparency as set by Corporate Governance in South Africa. 8. Quality Policy (Clause 5.3) Ruwacon (Pty) Ltd has as a matter of policy adopted ISO 9001 as quality management principles to achieve the desired result. It is further the policy of Ruwacon (Pty) Ltd to continuously identify and develop processes and procedures. Top management are committed to ensure that: 8.1 Continually improve the management system and quality to ensure effectiveness safe working conditions and rendering a satisfactory service to our clients. 8.2 Management skills, expertise and resources are used in the most cost effective manner to produce complete the projects of the required standard and quality. 8.3 Ruwacon (Pty) Ltd is compliant with all legislation and regulations relevant to our industry. 8.4 The policy including the management system, the objectives and procedures are communicated to and understood by all employees and parties involved in our operations. 8.5 All employees and other parties involved in our operations implement and maintain the management system. 8.6 An annual review of the management system is done to ensure continuous improvement. 8.7 Line managers are authorized and directly responsible to ensure execution of the Page 5 of 15

6 said policy, objectives and Quality Management System. 9. Quality Objectives (Clause 5.4.1). The following objectives are applicable: 9.1 Providing agreed levels of product quality and services to our clients, by appreciating and fully understanding their needs and expectations. 9.2 Maintaining competent and capable resources to comply with regulatory, client and company requirements. 9.3 Continuous assessment of our employees training needs are done and necessary training is provided in order to benefit all stakeholders. 9.4 The reduction of our operational cost through the effective implementation of the Quality Management System. 9.5 Involving and encouraging our Suppliers and Sub- Contractors to continuously improve their performances 10.. Quality Management Systems Planning. (Clause 5.4.2) The established management system has been developed into four tiers of documents to ensure that the controls identified in the planning is effective to meet the general requirements of ISO 9001 as well as the quality objectives. Level Document Definition 9001 Requirements 1 Quality Policy & Manual 2 Procedures Manual States the scope of the QMS Describes the processes of the QMS Profile of the organization. Quality Policy and Objectives Management Responsibility. Responsibility, authority and communication This describes the quality processes and the interdepartmental control. ISO 9001 mandates six systems procedures: Additional will be identified to ensure effective planning, execution and control of the processes Documented statements: Quality Manual Quality Policy 5.3 Quality Objectives Control of documents Control of records Internal audits 8.3 Control of non conforming products Corrective Action Preventative Action 3 Work procedures and Instructions Explain details of specific tasks or activities. It includes: Project quality plans, quality control sheets, procedure documents, work instructions, drawings, flowcharts, workman standards, test methods, checklists, product specifications, operating and machine manuals. 4 Record Completed forms, checklists, tags, labels, test results, evaluations on worked performed, suppliers, available as evidence of compliance the requirements of ISO 9001 Documents required for effective planning, operation, and control of the processes. Requirement as per ISO Page 6 of 15

7 11. Management Responsibility and authority (Clause 5) 11.1 As stipulated in the Quality Policy Ruwacon s management teams are committed to define, implement and control the Quality management system as per QMANUAL-/ Management shall ensure that employees on all levels are acquainted with the Quality management system, objectives and procedures. These will be regularly discussed at the site- departmental, cost and board meetings in respect of client requirements, achievement of objectives, legal, statutory and regulatory requirements Managers on all levels are responsible to ensure execution of the procedures with respect to their functions and works in the various departments or on projects Management Representative(Clause 5.5.2). The MD as appointed by top management shall have the following responsibilities: Ensuring that processes needed for the quality management system are established, implemented and maintained Reporting to top management on the performance of the quality management system and any need for improvement, and Ensuring the promotion of awareness of client requirements throughout the organization Ensuring that appropriate communication processes are established within the organization and that communication takes place regarding the effectiveness of the quality management system Ensure that a review of the organization's quality management system, at planned intervals, are done to ensure its continuous suitability, adequacy and effectiveness. This review shall include assessing opportunities for improvement and the need for changes to the quality management system, including the quality policy and quality objectives Ensure that the Quality Management System is audited on a regular basis and any deficiencies are identified and promptly addressed Ensure that all personnel are trained in the usage of the Quality Management System and that all such training is applied to all operations and activities the company. Page 7 of 15

8 Ensure that records from management reviews are maintained 12 Internal Communication. (Clause 5.5.3). All requirements, content and results of the effectiveness of the implemented Management System will be well communicated to all company personnel and interested parties through the usage of manuals, bulletin boards, s, news letters, memos, companies-meetings, faxes and training. Input and feedback from all levels and parties will be encouraged by management. 13. Management Review. (Clause 5.6). The overall compliance of the Quality Management System is discussed on a monthly basis during the Cost meetings. An annually review of the total system is done as per the Quality Manual and monthly feedback reports. This will include the following: 13.1 Client evaluation reports/ feedback Results of monthly audits Performance on processes and procedures Feedback on recovery plans 13.5 Non conformances reports 13.6 Follow up on previous review sessions Status of preventative and corrective actions Changes on the quality management system Recommendations on improvement. 14. The records of the management review include the decisions and actions in respect of the following: 14.1 Improvement of the quality management system and its processes 14.2 Improvement of product related to client requirements 15. Resource management. (Clause 6). Management will identify and provide resources to: 15.1 Implement and maintain the quality management system Ensure client satisfaction by meeting client requirements In this regard emphasis is placed on the following: Human resources. The identification and acquisition of human resources with respect to competency will be controlled by the human resources manger. (Refer QHR-MANUAL/01) Competence, training and Awareness. The following is maintained: Page 8 of 15

9 Job profiles will form an integral part of the identification of required training for all personnel whose activities can have a impact on the quality of work Company personnel at all levels will be evaluated upon their employment and on a ongoing basis to determine their individual and collective competency and The Human Resource Manager in consultation with the Managing Director,if necessary with Senior personnel will determine the level and type of training required The SHEQ manager will undertake training in the effective use of the company's Quality Management System All new personnel or new duties to be allocate too personnel, will be assessed to determine their competency, capability, and required training needs A training matrix will be established for all personnel. Records of all training undertaken will be generated and maintained. (Refer to Training Procedures) The effectiveness of all training given or received will be monitored Infrastructure. Management will provide the required infrastructure in terms of the following: Site and associated facilities Process equipment (hardware and soft ware) Supporting services such as transport, communication, information systems Working environment. Ruwacon will determine and manage the work environment in order to achieve the requirements as per safety, health and environmental specifications and programs. 16. Project Delivery (Clause 7) 16.1 Planning of Projects. Ruwacon will plan and develop activities as per Estimators policy and procedure and the various operational procedures. (Refer to QOPS- PROC/01- After contract awarding) to achieve the following: Quality objectives and requirements Safety, health and environmental objectives and requirements. Page 9 of 15

10 Project requirements in terms of program and other specifics in terms of the project Required verification, validation, monitoring, inspection and tests for the specific project Maintain records to provide proof of the requirements in terms of the project and other specifications Client Related Process.(Clause 7.2)All orders,tender requirements, or products received will be reviewed for the right requirements related to the product, services by authorized personnel, prior to acceptance, to ensure that: All requirements are adequately defined and documented Any regulatory features applicable to the enquiry are considered Specified requirements are within the company's scope of supply, capability and capacity Any additional resources and controls are identified and taken cognizance of All contracts, tenders are formally submitted All received orders,including contractual pricing will be correlated and verified against submitted tenders and quotations Any ambiguities, queries are resolved and agreed on prior to the acquisition/ purchasing any additional resources or the commencement of any production or site activity or stock delivery Any proposed deviation from the clients regulatory or technical requirements are identified and formally addressed Lines and methods of communication will be established, including client's satisfaction information, regarding the company's products, services and activities. 17. Design and development. (Clause 7.3) Due to the nature of the Company's business activities- Construction erection to individual clients requirements, Design & Development has not been included into the Quality Management System 18. Purchasing. (Clause 7.4) Ruwacon has established a comprehensive purchasing procedure to ensure the correct materials at the required time at the specific project location. (Refer to QPUR-PROC/01) The following is applicable: Page 10 of 15

11 18.1 Any material, product consumables or sub-contracted service procured, which could positively impact on the quality of the site activities, or products provided by the company, will be purchased from approved suppliers/ sub-contractors The selection of suppliers or sub-contractors may be based upon assessment by management,past proven performances,black economic empowerment, client recommendations, supplier of branded products, price structure,reliability and quality of products 18.3 Orders and any related purchase specifications will clearly identify requirements by type, drawing numbers, standards, specifications, preservation, packaging identification, traceability and protection All company requirements will formally communicated to suppliers, sub-contractors who will be encouraged to implement their own Management System to improve their supply of services and products on an ongoing basis Monitoring of suppliers / sub-contractors will be undertaken by verification or testing of supplied products or services All supplied documentation will be reviewed for deficiencies related to quality quantity, price, and delivery time Data from verifications will be analyzed on a continual basis via the Quality Assurance Officer three monthly 1 reports The location of inspections including any of the company's clients that they may wish to undertake will be specified as agreed on, should it not be upon receipt at the clients premises Suppliers or sub-contractors will where necessary be assisted in attaining the company's requirements and compliance to specified management system elements All purchased products that do not conform to requirements from suppliers or subcontractors may be removed from the company's suppliers list, if consistently fail to comply with the company's requirements 19. Identification, traceability and monitoring (Clause7.5.3) All materials will be identified from their initial receipt,through all processing activities and their monitoring status known.traceability is not normally a specific requirement for our clients. The methods by which materials will be identified,and their monitoring status known will include : 19.1 Purchase orders Page 11 of 15

12 19.2 Supplier delivery notes 19.3 Identification tags/ labels or markings 19.4 Serial numbers and specific descriptions of materials 19.5 Material certification (if applicable) 19.6 Inspection sheet 19.7 Project quality control plans 19.8 Measuring sheets of worked done Identifying materials and products through drawings and specifications 20. Client Property. (Clause Management will ensure procedures and measures to protect and safeguard the value of clients property. Such controls will be monitored on a continual basis. Should any client s property be subject to loss or damage, or any incident, while under control of Ruwacon or a sub contractor, it will be immediately recorded, reported and investigated. Feedback will be given to the client concerned. 21. Handling, Storage, Packaging, Protection and Delivery. Clause 7.5.5) This includes the following: 21.1 Handling. Training in the correct methodology of handling of material, products, and equipment will be provided to the company's personnel to prevent damage / decoration of company property. Only trained and licensed personnel will be permitted to drive, handled or handling equipment or to operate I company's vehicles. Special attention will be taken, for handling hazardous materials, all fragile material, electrostatic sensitive devices 21.2 Storage. Designated storage areas, lay down areas, and pallets will be specified and provided to ensure that all received material and products are protected to minimize the risk of loss, damage, leaks or deterioration. Storage areas and their contents will be monitored on an ongoing basis to verify storage conditions and the integrity of the storage goods. Good storage practices implemented by: Stock control I inventory management system Conducting regular stock counts 21.3 To prevent cross contamination and mixing of materials, segregation of these materials will be a priority Ruwacon will take great care regarding, toxic materials, flammable products and corrosive items. 22. Packaging, Preservation and Protection. All packaging and its protection requirements, related to all supplied material will be stipulated to the extend necessary to Page 12 of 15

13 our suppliers and sub contractor. Site store personnel to ensure conformance to Health and Safety requirements, and the protection of materials. 23. Delivery. The communication related to, and the timing of delivery of material to clients sites, will be agreed on tender or contract receipt stages and will be monitored by site management. The company's suppliers / sub contractors adherence to the clients or company delivery requirements will be monitored regularly. 24. Company delivery vehicles will be maintained in a satisfactory road worthy condition and the continual assessment of the licenses of company drivers will be undertaken. The safe loading of company and approved transport delivery vehicles will be monitored through necessary documentation e.g. delivery notes or purchase orders 25. Control of monitoring and measuring equipment Clause 7.6) Ruwacon will determine the monitoring and measuring equipment required to ensure evidence of conformity of product, prevention of any hazard and risk as identified through the risk assessment process. General control and inspections of monitoring and measuring equipment will be in accordance with the procedure for management of plant and equipment. The following will be ensured: 25.1 The company will identify, select and provide all necessary, measuring and monitoring devices for the successful activities of its operations Any device, which may be utilized as aid to control site activities or verification of materials will be controlled by using surveys and checklists 25.3 Any equipment identified as being outside of specific limits will necessitate (where practical) in the re-inspection of materials/products, previously accepted or supplied Records of all measuring and monitoring devices and their subsequent calibration I verification equipment will be retained All the equipment been used, will be stored in such manner to protect it integrity when on or off site. 26. Measurement, Analysis and Improvement. Clause 8) Ruwacon will implement measurement, analysis and improvement processes to ensure and determine client satisfaction. This will include the following: 26.1 Demonstrate conformity of the product as per client specifications To demonstrate of the quality management system Page 13 of 15

14 26.3 To continually improve the quality management system by evaluating the compliance to legislation, regulations and conforming to ISO 9001 and the client project specifications. 27. Process Control. Ruwacon will ensure that all processes in the execution of the work are controlled. This will be based on the principle of monitoring the specific activity as part of the process and institute corrective actions where the process will deviate from the prescribed route. The control measures will include the utilization of the following tools: 27.1 Specific procedure manuals for working activities 27.2 Task inspections performed on the various activities as per procedures 27.3 Project control sheets as per work done. 28. Internal audits and inspections.(claus 8.2.2) Audits will be planned and conducted as follow: 28.1 Monthly audits. Informal monthly audits/ inspections are conducted to monitor the execution of the procedures and to ensure that all procedures as distributed are available on site. The audits sheet will be updated as the procedures are completed and distributed. The personnel of the SHEQ department is responsible for these audits and inspections. Feedback on the audits will be included in the monthly quality report to senior management Compliance audits. These audits are done on the total quality management system every six months. The results hereof with the monthly audits will be used in the management review Follow-up inspections and audits will be conducted to ensure that corrective actions had been taken on the non conformances. 29. Control of non conforming products. Clause 8.3) Ruwacon will ensure that all products, services and processes that do not conform to the set requirements are identified and immediate corrective actions take. Records of non conformances and action taken will be kept and also used for the management review purposes.the detail of the non conformances will also be used to determine preventative actions. 30 Analysis of data. (Clause 8.4) Ruwacon will determine the appropriate data required to ensure the effectiveness of the quality management system. The sources of information that will be applicable are as follows: 30.1 Client reports on projects 30.2 Minutes of progress and technical meetings 30.3 Audits reports (monthly and six monthly) 30.4 Audits reports (internal and external) Page 14 of 15

15 30.5 Evaluation on suppliers and vendors performances Evaluation reports on sub contractors and performances 30.7 Monthly Cost meeting reports 30.8 Specific NCR s issued. 31. Improvement. (Clause 8.5) Ruwacon will continually improve on the quality management system through the use of the various policies and objectives, reports, data analysis and corrective and preventative actions. This will also revolve around the following actions: 31.1 Corrective actions. Ruwacon will take action to determine non conformances and corrective measures to prevent re-occurrence Preventative actions. Ruwacon will determine and eliminate non conformances and implement actions to prevent these non conformances in time and the re-occurrences. Page 15 of 15

Quality Assurance Audit Checklist

Quality Assurance Audit Checklist Quality Assurance Audit Checklist Form: ASQF-406 Rev. 5 Date: 01-22-2018 Page: 1 of 14 The following is a checklist for process approach internal auditing conducted by Analytic Stress Relieving Inc. based

More information

ISO 9001:2008 Quality Management System QMS Manual

ISO 9001:2008 Quality Management System QMS Manual 2501 Kutztown Road Reading, PA, 19605 Tel. 610-929-3330 Fax 610-921-6861 ISO 9001:2008 Quality Management System QMS Manual The information contained in this document is Fidelity Technologies Corporation

More information

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

MANUAL QUALITY CONTROL & QUALITY ASSURANCE MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL TITLE: QUALITY SYSTEM MANUAL Page 1 of 15 QUALITY SYSTEM MANUAL TITLE: QUALITY SYSTEM MANUAL Page 2 of 15 Index PARAGRAPH TITLE... PAGE 1.0 GENERAL INFORMATION... 3 2.0 DEFINITIONS... 5 3.0 RELATED DOCUMENTS...

More information

Quality System Manual - Section 00

Quality System Manual - Section 00 Quality System Manual - Section 00 INDEX AND REVISION STATUS Issued by: Quality Assurance Eff. Date: 06/10/2014 Rev.: A Pg. 1 of 4 QUALITY SYSTEM MANUAL SECTION 0 - INDEX AND REVISION STATUS SECTION 1

More information

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General 1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General The organization s management with executive The commitment and involvement of the responsibility shall define, document

More information

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008 Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008 Copy Number Issued to CONTROLLED / UNCONTROLLED Uncontrolled manuals are current at time of issue but will not be updated. Document history.

More information

Quality Management System Plan

Quality Management System Plan Quality Management System Plan Rev. 2 February, 2004 Shaw Environmental & Infrastructure, Inc. 4171 Essen Lane Baton Rouge, LA 70809 Page iii Rev. 2 Table of Contents PAGE Approvals Quality Policy &

More information

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ Quality Manual Quality Manual Issue I Dated 8 th October 2012 Contents Page Section 1 - Introduction 2 Section 2 - Company Details 2 Section

More information

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Table of Contents Contents 1. Introduction... 3 1.1. Process Approach...

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX In completing your Documented Quality Management System Review, it is important that the following matrix be completed and returned to us as soon as possible. This will save time during the review and

More information

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip UHV SPUTTERING INC Page 1 of 18 ECO REVISION HISTORY ECO# REVISION DATE MGR QA 1001 A 2/25/2008 R.Clement J.Haislip 1017 B 6/17/2008 T.Finneran J.Haislip 1071 C 1/13/2011 R.Clement J.Haislip 1078 D 5/15/2013

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

UPGRADE ASSESSMENT CHECKLIST

UPGRADE ASSESSMENT CHECKLIST Checklist Instructions : Prior to auditing each element, the auditor shall review the documentation and mark a 0 in each box where functions /departments are referenced. As each function/department is

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL QUALITY SYSTEM MANUAL This Manual is a Proprietary Document and any Unauthorized Reproduction is prohibited. ISSUE DATE July 26, 2012 AUTHORIZED BY: Quality Management Representative Eric Hoff Managing

More information

Vendor Qualification Survey

Vendor Qualification Survey 1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service

More information

IBS Electronics, Inc.

IBS Electronics, Inc. ******************************* *** Quality Policy Manual ISO9001:2015 Uncontrolled When Printed 3506-D W. Lake Center Dr. Santa Ana, Ca 92704 U.S.A. 714.751.6633 800.527.2888 714.751.8159 FAX. E-mail:

More information

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3 CONTENTS QUALITY MANUAL 1.0 INTRODUCTION... 2 2.0 POLICY AND OBJECTIVES... 2 3.0 DEFINITIONS... 3 4.0 SCOPE... 3 5.0 QUALITY SYSTEM... 3 6.0 ORGANISATIONAL CHARTS... 4 6.0 BRISBANE HEAD OFFICE... 4 7.0

More information

Brumund Foundry Inc.

Brumund Foundry Inc. QUALITY ASSURANCE 1st TIER MANUAL Brumund Foundry Inc. 4400 West Carroll Ave. Chicago, IL 773-287-9250 PER ANSI/ASQC Q9002-1994 Page 1 of 7 THE PRESIDENT HAS DIRECTED THAT THE FOLLOWING POLICIES BE IMPLEMENTED

More information

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24 Quality Manual Page 1 of 24 ISO 9001:2015 Standard to Quality Manual Section Matrix ISO 9001:2015 Quality Manual Section 1 Scope 1 Scope 1.1 General 4 Context of the organization 4 Quality management system

More information

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM APPROVED BY: JOSE ALBERTO APPROVED ON: 08/10/2017 Rev.: 1 M001 QUALITY MANAGEMENT SYSTEM PAGE: 1 of 20 TABLE OF CONTENTS SECTION TITLE PAGE Table of Contents

More information

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008 QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008 EXPRESS CONTRACTING SERVICES PTY LTD TRADING AS GOLDEN BROWN CLEANING SERVICES Unit 8/217 Mickleham Road Tullamarine VIC 3043 www.goldenbrown.com.au

More information

Quality Management System Manual

Quality Management System Manual SpecSys, Inc. recognizes its responsibility as a provider of quality products and services. To this end, SpecSys, Inc. has documented, implemented and maintains a System that complies with ISO 9001 2000.

More information

DEC STD ISO Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing

DEC STD ISO Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing Digital Internal Use Only DEC STD 017-1 - ISO 9001 - Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing DOCUMENT IDENTIFIER: A-DS-EL00017-01-0000

More information

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3 CONTENTS QUALITY MANUAL 1.0 INTRODUCTION... 2 2.0 POLICY AND OBJECTIVES... 2 3.0 DEFINITIONS... 2 4.0 SCOPE... 3 5.0 QUALITY SYSTEM... 3 6.0 ORGANISATIONAL CHARTS... 4 6.0 BRISBANE HEAD OFFICE... 4 6.1

More information

Comparison Matrix ISO 9001:2015 vs ISO 9001:2008

Comparison Matrix ISO 9001:2015 vs ISO 9001:2008 Comparison Matrix ISO 9001:2015 vs ISO 9001:2008 Description: This document is provided by American System Registrar. It shows relevant clauses, side-by-side, of ISO 9001:2008 standard and the ISO 9001:2015

More information

QUALITY ASSURANCE AND QUALITY CONTROL MANUAL

QUALITY ASSURANCE AND QUALITY CONTROL MANUAL 1 QUALITY ASSURANCE AND QUALITY CONTROL 2 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION 9 SECTION 10 QUALITY POLICY & AUTHORITY MANAGEMENT RESPONSIBILITY

More information

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler. Polycraft, Inc. QM - 10 Title: Polycraft, Inc. Quality Manual Copy Approval: D. Wheeler This Quality Manual is the sole property of Polycraft, Inc. and intended for exclusive use by the organization. This

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD USA Office: (410) Fax: (410)

Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD USA Office: (410) Fax: (410) ISO 9001 Page: 1 of 29 Quality Assurance Manual ISO 9001:2008 Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD 21108 USA Office: (410) 507-2779 Fax: (410) 451-9609 APPROVALS

More information

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14 Page 1 of 14 Quality Manual This Quality Manual provides the overall quality strategy and objectives of Pyramid Semiconductor s quality system. It is based on the requirements of ISO 9000. This manual

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 9001 Third edition 2000-12-15 Quality management systems Requirements Systèmes de management de la qualité Exigences Reference number ISO 9001:2000(E) ISO 2000 Contents Page

More information

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev - February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February

More information

CMI Guidance Document

CMI Guidance Document CMI Guidance Document for Product Quality Plan Requirements Reference CMI-GD-PQP This document has been produced by the Administration Department of CertMark International (CMI). For technical information

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS Project Procedure INTERNAL QUALITY AUDITS 09/21/2012 PAGE 1 OF 8 1.0 PURPOSE The purpose of this procedure is to establish the requirements for a comprehensive system of planned and documented internal

More information

Pressure Relief Devices Requirements QMS written description verification CHECKLIST AB-524(b)

Pressure Relief Devices Requirements QMS written description verification CHECKLIST AB-524(b) AB-524b 2014-01 Company Name: Company Address: Title of the written description of the management system or manual(s): Person responsible for the overall management of the pressure relief devices program:

More information

Business Management System Manual Conforms to ISO 9001:2015 Table of Contents

Business Management System Manual Conforms to ISO 9001:2015 Table of Contents Table of Contents 1.0 Welcome to Crystalfontz... 3 2.0 About the Crystalfontz Business Systems Manual... 4 3.0 Terms and Conditions... 5 4.0 Context of the Organization... 6 4.1. Understanding the Organization

More information

QP.00 Quality Procedure Manual Scope and Purpose

QP.00 Quality Procedure Manual Scope and Purpose QP.00 Quality Procedure Manual Scope and Purpose Table of Contents QP.00 Company Quality Policy Procedure... 3 1. Company Policy... 4 2. Quality System Scope and Exclusions... 4 3. Organisation... 5 4.

More information

Quality Manual. AARD Spring & Stamping Quality Manual

Quality Manual. AARD Spring & Stamping Quality Manual Quality Manual Page 1 of 25 AARD Spring & Stamping QM/5.0 Title: QM 5.0 AARD Spring & Stamping Quality Manual Copy Approval Date: 1/27/2011 Reviewer(s): Sign / Print Title Date Dan Wheeler Document Originator

More information

AERO GEAR, INC. SUPPLIER QUALITY MANUAL

AERO GEAR, INC. SUPPLIER QUALITY MANUAL AERO GEAR, INC. SUPPLIER QUALITY MANUAL REVISION HISTORY REVISION EFFECTIVE DATE SUMMARY OF CHANGES A 30-JAN-1998 Original Issue B 17-OCT-2002 Added note re: subcontractors may not subcontract to another

More information

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 2 of 18 REVISION HISTORY DATE CHANGE DESCRIPTION 10/11/06 Original release 10/21/09 Revised to ISO9001:2008

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By Conforms to ISO 9001:2015 Revision history Revision Date Record of Changes Approved By 0.0 [Date of Issue] Initial Issue Control of hardcopy versions The digital version of this document is

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual ISO9001:2008 Prepared By: Date: 06/28/2013 President Approved by: Date: 06/28/2013 Quality Assurance Manager Introduction Cal-Tron Corp has developed and implemented a Quality Management

More information

Quality Commitment. Quality Management System Manual

Quality Commitment. Quality Management System Manual Quality Commitment Quality Management System Manual This printed copy is uncontrolled Page 1 of 30 Thor Machining Quality Management System Manual Section 1 TABLE OF CONTENTS Page # 1 Introduction 5 2

More information

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy POLICY MANUAL FOR ISO 9001:2008 Document: PM-9001:2008 Date: April 7, 2015 REVIEWED BY: Tim Powers DATE: 4-7-2015 APPROVED BY: C._Bickford Uncontrolled Copy DATE: 4-7-2015 1.0 GENERAL ISS: 1 REV: E Page:

More information

PCA ELECTRONICS, INC. Quality Manual

PCA ELECTRONICS, INC. Quality Manual PCA ELECTRONICS, INC. Conforms to ISO 9001:2015 (c) 2018 PCA Electronics, Inc.; all rights reserved. This document may contain proprietary information and may only be released to third parties with approval

More information

CAPITAL AVIONICS, INC. Quality Manual

CAPITAL AVIONICS, INC. Quality Manual CAPITAL AVIONICS, INC. Issued 31 July 2018 Conforms to ISO 9001:2015 2018 ; all rights reserved. This document may contain proprietary information and may only be released to third parties with approval

More information

Machined Integrations, LLC

Machined Integrations, LLC QUALITY MANUAL Machined Integrations, LLC ISO9001: 2008 Electronically Controlled by Quality Representative, Rev2, January 2014 Page 2 of 25 TABLE OF CONTENTS SECTION ELEMENT PAGE No A Revision and Approval

More information

Table of Contents. Project Agreement Schedule 14

Table of Contents. Project Agreement Schedule 14 Table of Contents PART 1 DEFINITIONS... 3 PART 2 INTEGRATED MANAGEMENT SYSTEM REQUIREMENTS... 6 2.1. Introduction... 6 2.2. Overview... 6 2.2.1 Management System Requirements... 7 2.2.2 Certification...

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

The Skyworks Quality Management System strives to:

The Skyworks Quality Management System strives to: Skyworks has embraced a workplace where Quality is the number one differentiator to achieve Customer Loyalty. Skyworks has adopted a single Quality Management System which drives efficiency, consistency

More information

PURCHASING AND RECEIVING INSPECTION

PURCHASING AND RECEIVING INSPECTION PURCHASING AND RECEIVING INSPECTION Rev Issued To Title Date Signed By Rev 0 Management Team 12-03-07 ###### Rev 1 Management Team 19-04-07 ###### Rev 2 Management Team 25-05-09 ###### Rev 3 Management

More information

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy QM001 Page 1 of 19 Quality Manual QM001 Page 2 of 19 Table of Contents Page Company Profile 4 Approval 4 Revision History 4 Distribution List 4 1.0 Scope 5 Section 2: Normative Reference 6 2.0 Quality

More information

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company.

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company. The following is an example systems manual from a low volume (TE, but not an automotive supplier) company. You will note that this is essentially a copy of ISO 9001:2000. I take this path because long

More information

Quality Systems Manual Rev. NC Issued July 9 / 2018

Quality Systems Manual Rev. NC Issued July 9 / 2018 NMT Specialized Machining Inc 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Quality Systems Manual Rev. NC Issued July 9 / 2018 Conforms to AS9100 Rev D and ISO 9001:2015 Table of Contents Introduction

More information

Quality Manual Power Engineering & Manufacturing Inc th Lane NE Blaine Minnesota MN 55449

Quality Manual Power Engineering & Manufacturing Inc th Lane NE Blaine Minnesota MN 55449 Quality Manual Power Engineering & Manufacturing Inc 1463 94th Lane NE Blaine Minnesota MN 55449 COVER PAGE PD 0002 rev. 3 Section QM 01 Page 1 of 17 This document is approved for use Manual Contents Section

More information

Correlation Matrix & Change Summary

Correlation Matrix & Change Summary The correlation matrix compares the new requirements of ISO 9001:2015 to the requirements of ISO 9001:2008, and provides a summary of the changes. Correlation Matrix & Change Summary Introduction Correlation

More information

OPERATIONS MANUAL ISO 9001 Quality Management System

OPERATIONS MANUAL ISO 9001 Quality Management System OPERATIONS MANUAL * ISO 9001 Quality Management System Page: 1 of 19 Revision History Date Change Notice Change Description 5/30/2012 Original Original Release. 9/20/2012 005 Clarify post-delivery exclusion

More information

Parsippany, NJ QUALITY ASSURANCE MANUAL. QM-01 Rev. 6

Parsippany, NJ QUALITY ASSURANCE MANUAL. QM-01 Rev. 6 Parsippany, NJ QUALITY ASSURANCE MANUAL 1 TABLE OF CONTENTS SECTION REFERENCE TITLE PAGE 0.1 Title Page. 1 0.2 Table of Contents 2 0.3 Forward 5 0.4 Document Control 6 0.5 Statement of Authority 7 0.6

More information

UNCONTROLLED DOCUMENT

UNCONTROLLED DOCUMENT Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision

More information

ISO9001 QUALITY POLICY MANUAL

ISO9001 QUALITY POLICY MANUAL 1 OF 26 Metalife Industries, Inc. Serial No.: Master Revision: 1 Issue Date: October 14, 2011 Originator: Becky Wentling ISO9001 QUALITY POLICY MANUAL Prepared By (Document Controller): Becky Wentling

More information

IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL

IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL E L E C T R O N I C C O N N E C T O R S IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL CONTENTS Section Title Related Procedure 1. Introduction & Company Profile 2. Policy & Objectives 3. Definitions 4. Quality

More information

Continental Steel & Tube Co. Quality Manual

Continental Steel & Tube Co. Quality Manual 312 SE 22 nd Street Fort Lauderdale, FL 33316 Mailing address P.O. Box 030040 Fort Lauderdale, FL 33303-0040 954-332-2290 Fax 954-332-2296 info@continentalsteel.com www.continentalsteel.com Introduction

More information

PRINTED COPY IS NOT CONTROLLED

PRINTED COPY IS NOT CONTROLLED Quality Manual We Deliver Quality on Time Form 1217 (01.16.2018) Rev. 12 SOR Inc. sorinc.com SOR QUALITY MANUAL Page 1 of 18 Table of Contents Quality Manual 8701-001 Revision 12 Introduction....4 1.0

More information

QUALITY MANUAL. ISO 9001:2015, ISO and ATEX/IECEX Directive 2014/34/EU

QUALITY MANUAL. ISO 9001:2015, ISO and ATEX/IECEX Directive 2014/34/EU ISO 9001:2015, ISO 80079-34 and ATEX/IECEX Directive 2014/34/EU Reason for Revisions and Sections Affected: INITIAL RELEASE Rev. A Revision B / 6.24.2014 Added: PR-02-0005 to Procedure Table Section: 2.0,

More information

Supplier Quality Requirements SQR-1.0 Rev. 3

Supplier Quality Requirements SQR-1.0 Rev. 3 Supplier Quality Requirements Rev. 3 Approved By: Brian Brown, Quality Manager The current issue of this document is maintained on LSP Technologies, Inc. s Internet Web Site at http://www.lspt.com/resources-supplier_requirements.asp.

More information

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..

More information

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA 7949 Silverton, Suite 924 San Diego, CA 92126 USA This document is approved for use Copy Holder Copy Holder: President Copy Number: 1 Scope: This Covers the activities and functions performed by operating

More information

Environmental Management System Manual (EM-01) Revision No. : 2 Date : 1/6/2017. Revision History Sections Affected

Environmental Management System Manual (EM-01) Revision No. : 2 Date : 1/6/2017. Revision History Sections Affected ECS GROUNDWORK LTD Management (EM-01) Revision No. : 2 Date : 1/6/2017 Prepared by : Approved by : Stephen Roth (EMR) Martin Reynolds (Managing Director) Revision Date Description Revision History Sections

More information

Quality Assurance Manual, Revision F Page 1 of 20

Quality Assurance Manual, Revision F Page 1 of 20 Quality Assurance Manual, Revision F Page 1 of 20 AUTOMATION TECHNOLOGY QUALITY ASSURANCE MANUAL Prepared By: Joseph Pollard Date: 7/6/2015 Quality Assurance Manager Quality Management System Representative

More information

CHAPTER 8 INTEGRATION OF QMS AND LMS

CHAPTER 8 INTEGRATION OF QMS AND LMS 152 CHAPTER 8 INTEGRATION OF QMS AND 8.1 QUALITY MANAGEMENT SYSTEM There are various reasons for implementing a quality system that conforms to an ISO standard. The primary reason is that customers are

More information

Quality Manual Template ISO 9001:2015 Quality Management System

Quality Manual Template ISO 9001:2015 Quality Management System Quality Manual Template Table of Contents 1 INTRODUCTION... 5 2 QUALITY MANAGEMENT PRINCIPLES... 6 3 REFERENCES & DEFINITIONS... 6 4 CONTEXT OF THE ORGANIZATION... 8 4.1 ORGANIZATIONAL CONTEXT... 8 4.2

More information

Quality Manual QM-9001 Revision 25 May 2013

Quality Manual QM-9001 Revision 25 May 2013 Lion Precision 563 Shoreview Park Road Shoreview, MN 55126 Phone: (651) 484-6544 Fax: (651) 484-6824 info@lionprecision.com Quality Manual QM-9001 Revision 25 May 2013 Approved by: Don Martin, President

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 9001 Third edition 2000-12-15 Quality management systems Requirements Systèmes de management de la qualité Exigences Reference number ISO 9001:2000(E) ISO 2000 PDF disclaimer

More information

HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL. ISO 22000:2005 Quality Manual

HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL. ISO 22000:2005 Quality Manual HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL ISO 22000:2005 Quality Manual QUALITY MANUAL ISO 22000:2005 Food Safety Management HACCPEuropa Publications 2012 Table of Contents Introduction...

More information

QHSEM. Quality, Environmental & Occupational Health and Safety Manual

QHSEM. Quality, Environmental & Occupational Health and Safety Manual BIDI STEEL Quality, Environmental & Page 1 of Quality, Environmental & Occupational Health and Safety Manual QHSEM Copy No. ( 1 ) BIDI STEEL Quality, Environmental & Page 2 of MANUAL APPROVAL Document

More information

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R. ISO 9001 The Standard Illustrations The International Standard for Quality Management Systems Year 2000 Edition Leland R. Beaumont ISO 9001, The Standard Illustrations Figures excerpted from ISO 9001,

More information

Quality Manual ISO 9001:2000

Quality Manual ISO 9001:2000 Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10

More information

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig QUALITY MANUAL Origination Date: XXXX Document Identifier: Date: Document Status: Latest Revision Date Revision Orig Abstract: This document describes the tailored quality management system for the build

More information

ISO AUDIT PREPARATION KIT 2016

ISO AUDIT PREPARATION KIT 2016 ISO AUDIT PREPARATION KIT 2016 IQY Technical College Table of Contents ISO... 3 ISO 9001:2008 Fact Sheet... 6 Further Information... 6 Preparing for the ISO 9001:2008 Audit - 2016... 7 ISO 9001:2008 Definitions...

More information

Plastics and Concepts of Connecticut Inc. Quality Manual

Plastics and Concepts of Connecticut Inc. Quality Manual Plastics and Concepts of Connecticut Inc. Quality Manual Nature of Changes For This Issue: 1. Initial Release 8/14/2000 2. Reformatted and grammatical errors corrected 6/11/02 3. Minor grammatical errors

More information

4. Quality Management System 4.1 GENERAL REQUIREMENTS

4. Quality Management System 4.1 GENERAL REQUIREMENTS Checklist Instructions : Prior to auditing each element, the auditor shall review the documentation and mark an 0 in each box where functions /departments are referenced. As each function/department is

More information

Awareness to ISO 9001:2000

Awareness to ISO 9001:2000 Awareness to ISO 9001:2000 Tutor s Introduction Course Objectives Be able to understand and interpret the requirements of the standard Planning to implement the requirements of the standard Course Structure

More information

AS 9100 Rev C Quality Systems Manual AS-050C-QM

AS 9100 Rev C Quality Systems Manual AS-050C-QM AS 9100 Rev C Quality Systems Manual AS-050C-QM Innovative Control Systems, Inc. 10801 N. 24 th Ave. Suite 101-103 Phoenix, AZ 85029 U.S.A. www.icsaero.com +01-602-861-6984 VOICE +01-602-588-9440 FAX Table

More information

25 D.L. Martin Drive Mercersburg, PA (717)

25 D.L. Martin Drive Mercersburg, PA (717) QUALITY MANUAL D. L. MARTIN CO. 25 D.L. Martin Drive Mercersburg, PA 17236 (717) 328-2141 Revision 14 August 2012 Michael A. White Manager, QA & Engineering D.L. Martin Co. Quality Manual UNCONTROLLED

More information

Doc. No: UPHDB/QM/01 Prepared By: AMR Issue No.:01 Rev. No.: 00 Eff. Date: Page: 1 of 18 Issued by: MR

Doc. No: UPHDB/QM/01 Prepared By: AMR Issue No.:01 Rev. No.: 00 Eff. Date: Page: 1 of 18 Issued by: MR Doc. No: UPHDB/QM/01 Prepared By: A Page: 1 of 18 Issued by: 7.1 PLANNING OF UPHDB has established a system to plan and develop the processes needed for product realisation. The planning of the product

More information

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 Policies and Procedures Latest Revision Date Abstract: This handbook

More information

PRECISE INDUSTRIES INC. Quality Manual

PRECISE INDUSTRIES INC. Quality Manual PRECISE INDUSTRIES INC Revision N Issued July 5, 2017 Conforms to AS9100 Rev. D and ISO 9001:2015 Copyright Year2017 [PRECISE INDUSTRIES INC]; all rights reserved. This document may contain proprietary

More information

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0) TABLE OF CONTENTS INTRODUCTION... 4 1. Purpose... 4 2. Scope... 4 3. References... 4 4 Terminology and Definitions... 5 4.1.1 Subcontractor... 5 4.1.2 Significant Subcontractor... 5 4.1.3 Manufacturers...

More information

Document 2007 Rev 0 December 2005 Page 1 of 8

Document 2007 Rev 0 December 2005 Page 1 of 8 Document 2007 Rev 0 December 2005 Page 1 of 8 1. Scope... 2 2. Definitions... 2 a. LabTest...2 b. Factory Location/ Manufacturer's Premises...2 c. Manufacturer...2 d. Subcontractor...2 e. f. Out-Worker...2

More information

The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology. Jordanian Quality Mark

The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology. Jordanian Quality Mark The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology Jordanian Quality Mark Amman in February, 1997 1 Abstract Article (18) of the Law of Standards & Metrology; law no. (15) for

More information

Texas International Oilfield Tools, Ltd.

Texas International Oilfield Tools, Ltd. Originated by: J. Tuttle Texas International Oilfield Tools, Ltd. QUALITY SYSTEM MANUAL Revision Date: May 26, 2010 Number: QSM000 Subject: Texas International Quality System Revision: A 1.0 INTRODUCTION

More information

HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY

HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY Quality, Health, Safety & Environmental Integrated Management System Manual HAZARD : An object, physical effect, or condition with potential to

More information

Quality Assurance Policy and Procedures

Quality Assurance Policy and Procedures 650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance

More information

QUALITY MANUAL REVISION CONTROL LOG. Number Rev Rev Date SS Description of Change By Chk App

QUALITY MANUAL REVISION CONTROL LOG. Number Rev Rev Date SS Description of Change By Chk App Superecedes: QPOL-1001.24 Section: REVISION CONTRO LOG REVISION CONTROL LOG Number Rev Rev Date SS Description of Change By Chk App QPOL-0001 18 02-JAN-12 A Review & Update Quality Manual JD CN JD QPOL-0001

More information

Integrated Manual. Quality, Occupational Health & Safety and Environment. Code of Document: Issue No: Date of the next review: Eng. A.F. Kahale.

Integrated Manual. Quality, Occupational Health & Safety and Environment. Code of Document: Issue No: Date of the next review: Eng. A.F. Kahale. Name of Document: Integrated Manual Code of Document: IM Issue No: 03 Date of Issue: 15.01.2012 Date of the next review: 15.01.2015 Controlled copy number: Uncontrolled Prepared by Reviewed by Approved

More information

ISO 9001:2000 Revision G

ISO 9001:2000 Revision G ISO 9001:2000 Revision G 1531 W. 17 th Street, Tempe AZ 85281 Table of contents Section Title Page Index 1 Revision History and Distribution 2 Introduction 3 Quality Policy / Mission Statement 4 Organizational

More information