4-OF AS9102 FAIR Forms and Instructions (SC)
|
|
- Harry Dorsey
- 6 years ago
- Views:
Transcription
1 A FAIR package consists of the following required documents: a) Completed AS9102 Forms 1, 2, and 3; or equivalent, b) Material/process certs, c) Performance test results, and d) A design record or balloon drawing Additional FAIR Package Requirements: a) First Articles and/or certificates of compliance for all sub-assembly and component part numbers from the parts list, including standard catalog hardware/cots items, listed on Form 1 must be reviewed by the supplier and maintained at the supplier's facility. b) The applicable sub-assembly and component FAIRs must be completed prior to the assembly or sub-assembly FAIR being delivered. Open part deliveries on purchase orders existing at the time of release of this procedure are grandfathered and exempt from this requirement. However, all new purchase orders issued after the release date of this procedure are not exempted. c) All applicable documents described in paragraphs a) and b) above for sub-assembly and component parts from the parts list related to the FAIR being produced by the supplier shall be retained by the supplier or available for review from sub-tier per the records retention requirement. These are considered quality records and as such fall under HRQP5.210 para 4.10 Quality Records, and shall be available for Woodward audit. FORM 1 - Woodward HRT / AS9102 REV B Form Instructions 1. (R) Part Number: Number of the FAI part [e.g., customer part number contained on the purchasing documents; part number from the associated Bill of Materials (BOM); manufacturer part number for internal parts, when customer part number is not available]. 2. (R) Part Name: Name of the FAI part. - Name of the part as shown on the drawing (verbatim). 3. (CR) Serial Number: Serial number of the FAI part; unique identifier assigned to a detail part, subassembly, or assembly by the organization or customer. - NA if part is not serialized. 4. (CR) FAIR Number: Reference number that identifies the First Article Inspection Report (FAIR); this may be an internal report number. - (Supplier) NA if no report number is used. - (Woodward) use Visual FAIR issued report number. NA if not applicable. Ref. 3-OF Page 1 of 4 Rev. 01/04/2016
2 5. (CR) Part Revision Level: Latest revision that affects the FAI part being inspected. If the part has not been revised, indicate as such (e.g., N/C, No Change). NOTE: The latest drawing revision (see field 7) does not always affect all parts contained on a drawing. - Record Revision level of part being inspected. For No Change mark NC or -. - NA is not acceptable. 6. (CR) Drawing Number: Drawing number associated with the FAI part; drawing may be from customer, internal system, or design definition. - Drawing number associated with the FAI part, as shown on the drawing (verbatim). 7. (CR) Drawing Revision Level: The revision level of the drawing associated with the FAI part. If the drawing has not been revised, indicate as such (e.g., N/C, No Change). - Record revision level of drawing associated with FAI part. For No Change mark NC or -. - NA is not acceptable. 8. (CR) Additional Changes: Provide reference numbers of any changes that are incorporated in the product, but not reflected in referenced drawing/part revision level (e.g., change in design, engineering changes, manufacturing changes, deviation or exclusion from certain drawing requirements). - OPMP, EO, Parts Lists with revision, ADCN, SPECO, etc. 9. (R) Manufacturing Process Reference: Reference number that provides traceability to the manufacturing record of the FAI part (e.g., router number, manufacturing plan number). Additional information such as lot number, batch number, date code, or line number may be included, as needed, to provide traceability to the specific manufacturing lot. - WO#, MP#, etc. This field is required and must be a traceable and unique number. 10. (R) Organization Name: Name of the organization performing the FAI. 11. (0) Supplier Code: A unique number given by customer to the organization; sometimes referred to as Vendor Code, Vendor Identification Number, or Supplier Number. Required: - List Woodward assigned supplier code. - (Woodward) Woodward cage code. If preformed for a specific customer (e.g. customer PN), customer number assigned to Woodward to be shown with Woodward cage code. Example: 81873/XXXXX Ref. 3-OF Page 2 of 4 Rev. 01/04/2016
3 12. (0) P.O. Number: Customer purchase order number, if applicable. - Required: List PO number part is made against. 13. (R) Detail Part I Assembly FAI: Check, as appropriate. 14. (R) Full FAI I Partial FAI: Check, as appropriate. For a partial FAI, provide the previous part number (Baseline Part Number), including revision level to which this partial FAI is performed and the reason for the current FAI (e.g., changes in design, process, or manufacturing location). For partial FAls based on similar parts (reference 9102, 4.6), provide the approved configuration FAI part number, including revision level. 15. (CR) Part Number: Part number included in the assembly and items from the BOM included in the drawing or next level assembly. Typically these are the part numbers, standard catalogue items, or subassembly numbers required to complete the product noted in field 1. - List all parts from the parts list on the face of the drawing or separate parts list. - Limited life material from the parts list does not need to be included on Form 1. - For assembly FAIRs: modified COTS or Standard catalogue hardware from the parts list must be listed on both Form 1 and Form 2. - If FAI is detail level, NA block (CR) Part Name: Name of the part installed in the assembly. - List part name as shown on the drawing (verbatim). - If FAI is detail level, NA block (CR) Part Serial Number: Serial number of the part that is installed in the assembly. - If FAI is detail level, NA block If Component/Sub-Assy is not serialized, NA block (CR) FAIR Number: Report number for the detail parts and associated assemblies. - If FAI is detail level, NA block If Report numbers are not used, NA block 18. Ref. 3-OF Page 3 of 4 Rev. 01/04/2016
4 19. (R) Signature: Printed name or unique identification, and signature of the person approving the FAIR. This signature certifies the evaluation activities in 9102, 4.5 are complete and the FAIR is approved. NOTE: Electronic identification or signature are both acceptable. Check "FAI Complete", if all characteristics are conforming. Check "FAI Not Complete", if nonconforming characteristics are documented in accordance with 9102, Printed Name or stamp and Signature 20. (R) Date: Date when field 19 was signed. 21. (0) Reviewed By: Printed name or unique identification, and signature of the person from the organization who approved the FAIR. NOTE: Electronic identification or signature are both acceptable. - (Woodward) Review required by another appropriate member at company - (Supplier) Recommended review by another appropriate member at company. 22. (0) Date: Date when field 21 was signed. 23. (0) Customer Approval: Used by customer to record approval, if required. - Leave Blank. SQE or delegate will sign and/or stamp after review and approval (Supplier). 24. (0) Date: Date when field 23 was signed. - Leave Blank. SQE or delegate will date after review (Supplier). Ref. 3-OF Page 4 of 4 Rev. 01/04/2016
5 FORM 2 - Woodward HRT / AS9102 REV B Form Instructions 1. (R) Part Number: Number of the FAI part [e.g., customer part number contained on the purchasing documents; part number from the associated Bill of Materials (BOM); manufacturer part number for internal parts, when customer part number is not available]. 2. (R) Part Name: Name of the FAI part. - Name of the part as shown on the drawing (verbatim). 3. (CR) Serial Number: Serial number of the FAI part; unique identifier assigned to a detail part, sub-assembly, or assembly by the organization or customer. - NA if part is not serialized. 4. (CR) FAIR Number: Reference number that identifies the First Article Inspection Report (FAIR); this may be an internal report number. - (Supplier) NA if no report number is used. - (Woodward) use Visual FAIR issued report number. NA if not applicable. 5. (CR) Material or Process Name: Name of applicable materials or special processes. - Material/Process as shown on drawing or other applicable engineering document (e.g. raw material, make from materials, limited life materials, process specification, etc.). 6. (CR) Specification Number: Provide the following information: Material specifications and material form (e.g., sheet, bar) for all materials incorporated into the FAI part (e.g., weld or braze filler). Special process specifications; including class, if applicable, and permitted substitutions. If standard catalogue items (e.g., fasteners) or COTS are modified, then list that standard hardware or COTS item. NOTE: Non-modified standard catalogue items are listed on Form 1, "Part Number Accountability". - Specifications as shown on the drawing (in an "OR" statement list applicable spec only). If substitutes/replacements are applicable list both the drawing requirement AND the substitute/replacement specification used. - Special process specifications must include material condition, class, type, and method, if applicable. - For assembly FAIRs: modified COTS or Standard catalogue hardware from the parts list must be listed on both Form 1 and Form 2. Ref. 3-OF Page 1 of 3 Rev. 01/04/2016
6 7. (0) Code: Any required code from the customer for material or process listing, as applicable. - (Woodward) Customer code for approved processes (e.g. Boeing D Approved Process Sources ), Boeing requirement. - NA if none or unknown. 8. (CR) Supplier: Identify supplier name, address, and code performing special processes or supplying material. Supplier name and address may be used, when supplier code is not available or not adequate for identification. - Full company name and address, must match certification. - (Supplier) Sub-contracted Material - if raw material/casting/forging was provided from WHRT then record Woodward HRT name and address. 9. (CR) Customer Approval Verification: Indicate if the special process(es) or material sources are approved by the customer. Enter "Yes" if approved; "No" if approval is required, but process source is not approved; or "NA" if customer approval is not required. - Only processes listed in HRQP5.210 Section 4.2 require Customer approved NADCAP suppliers. - Raw material does not require an approved supplier. - Stating "No" means you willingly admit to using the wrong, non-approved supplier. - Limited life materials such as paint, adhesive, sealant, etc. are not NADCAP controlled. 10. (CR) Certificate of Conformance Number: The applicable certificate number (e.g., special process completion certification, raw material test report number, modified standard catalogue item compliance report number, traceability number). - Order of preference: Heat number (for material), Batch or Lot number, certification number. - (Supplier) Sub-contracted Material - if raw material/casting/forging was provided to you from WHRT enter the Batch number of that material from the associated shipper. The WHRT reviewer will look up the material certification package from the provided batch number and attach the material certification package to the supplier s FAIR package. 11. (CR) Functional Test Procedure Number: Functional Test Procedure number identified as a design characteristic. 12. (CR) Acceptance Report Number: The functional test certification indicating that test requirements have been met. Ref. 3-OF Page 2 of 3 Rev. 01/04/2016
7 13. (0) Comments: Provide supporting comments, as applicable. - Document any nonconformance report numbers and/or any Form 2 clarifications for raw material, superseded specifications, etc., if needed. 14. (R) Signature: Printed name or unique identification, and signature of the person who prepared and approved this form. Signature indicates that all applicable materials, special processes, and functional testing are accounted for, meet requirements, are properly documented, and all associated nonconformances are documented on 9102 Form 3, "Characteristic Accountability, Verification, and Compatibility Evaluation". NOTE: Electronic identification and signature are both acceptable. - Printed name or stamp and Signature. 15. (R) Date: Date when field 14 was signed. Ref. 3-OF Page 3 of 3 Rev. 01/04/2016
8 FORM 3 - Woodward HRT / AS9102 REV B Form Instructions 1. (R) Part Number: Number of the FAI part [e.g., customer part number contained on the purchasing documents; part number from the associated Bill of Materials (BOM); manufacturer part number for internal parts, when customer part number is not available]. 2. (R) Part Name: Name of the FAI part. - Name of the part as shown on the drawing (verbatim). 3. (CR) Serial Number: Serial number of the FAI part; unique identifier assigned to a detail part, sub-assembly, or assembly by the organization or customer. - NA if part is not serialized. 4. (CR) FAIR Number: Reference number that identifies the First Article Inspection Report (FAIR); this may be an internal report number. - (Supplier) NA if no report number is used. - (Woodward) use Visual FAIR issued report number. NA if not applicable. 5. (R) Characteristic Number: Unique assigned number for each design characteristic. NOTE: A single design callout that applies to multiple characteristics may be recorded as one characteristic number. - Must cover all characteristics on drawing, including those shown in the TOL BLOCK section at the bottom of the drawing (e.g. remove all burrs, internal radii, break corners, etc.). Don't forget weight, commonly located under the title block. - Must provide associated bubble drawing. 6. (CR) Reference Location: Location of the design characteristic [e.g., drawing zone (page number and section), specification callout]. - NA if drawing has no defined locations. 7. (CR) Characteristic Designator: If applicable, record characteristic type [e.g., critical items (see 9100 clause 3.3), key characteristics (see 9100 clause 3.4 ), flight safety, defined by customer]. - Record as MINOR or NA for all others. Ref. 3-OF Page 1 of 3 Rev. 01/04/2016
9 8. (R) Requirement: Specified requirement for the design characteristic (e.g., drawing dimensional characteristic with associated nominal dimension and tolerances, drawing notes, specification requirements). - Must be complete per the drawing. - Basic dimensions are required. - Display either appropriate tolerances on each individual design characteristic line or display block tolerances as an individual requirement. - MUST incorporate all measurable items listed in tolerance block (e.g. break corners, internal radii, surface finish, etc.). - Must include Weight, if applicable. No tolerance applies. (usually located under the tolerance block) - Reflect multiple places (i.e 2X or 2 places), including when an arrow points in multiple places but is not referenced on the feature callout. 9. (R) Results: List measurement(s) obtained for the design characteristics. NOTE: The organization shall record the results in the units specified on the drawing or specification, unless otherwise approved by the customer. For multiple characteristics list each characteristic as individual values or list once with the minimum and maximum of measured values attained. If a characteristic is found to be nonconforming, then that characteristic shall be listed separately with the measured value noted. When qualified tooling (e.g., radius gauges) is used as a go/no-go gauge (reference 9102, b), record the results as an attribute (e.g., pass / fail). When automated inspection tooling produces measurement results, those results may be referenced on 9102 Form 3, identified as pass/fail, and attached only when: The characteristic numbers are clearly linked in the attached report. The results in the attached reports are clearly traceable to the characteristic numbers. The results are directly comparable to the design characteristic. NOTE: Coordinate Measurement Machine (CMM) data alone would not be acceptable for a positional tolerance; the results shall show the actual positional value. If a design requirement requires verification testing, record the actual results on the form. If a laboratory report or certificate of test is included in the FAIR, the results may be recorded as an attribute (e.g., pass / fail) and the test reference number recorded on the forms. The laboratory report or certificate of test shall show specific values for requirements and actual results. For characteristics with visual verification requirements that are rated against standard photographs, list the photo number of the closest comparison. A statement of conformance is acceptable; record the reference number on the forms. For processes that require verification per design characteristics, include a statement of conformance (e.g., certification of conformance, verification indicator -accept). For characteristics verified by attribute inspection include statement of conformance (e.g., accept). NA if none. Ref. 3-OF Page 2 of 3 Rev. 01/04/2016
10 10. (CR) Designed / Qualified Tooling: When design tooling or specially designed tooling, including NC programming as a media of inspection, is used for attribute acceptance of the characteristic, record the tool identification number. When qualified tooling is used for attribute acceptance, record the gauge value or range (e.g., minimum/maximum value), as applicable. - Designed Tooling - List type and identification number. - Qualified Tooling - List Inspection Instrument Type. Such as CMM, comparator, calipers, gauges, etc.) (Qualified tooling is defined as Universal (not part specific) calibrated monitoring and measuring equipment used to validate product design characteristics, that are uniquely identified and traceable to their calibration records.) - List as Visual for characteristics verified by visual inspection. - For characteristics that are verified by an operation on MP/ATIP/ATIR etc., list the document number, revision, and paragraph number. 11. (CR) Nonconformance Number: If the characteristic is found to be nonconforming, record a nonconformance document reference number. - Note: Also reference the nonconformance report number on Form 2 in Block 13 - Internal corrective action must be completed. 12. (R) Signature: Printed name or unique identification, and signature of the person who prepared and approved this form. Signature indicates that all applicable design characteristics are accounted for and meet requirements or are properly documented (reference 9102, 4.4). Note: Electronic identification and signature are both acceptable. - Printed name or stamp and Signature. 13. (R) Date: Date when field 12 was signed. 14. (0) Additional Data I Comments: This area is reserved for optional fields; add additional columns, as required, by the organization or customer. - NA if not used. Ref. 3-OF Page 3 of 3 Rev. 01/04/2016
FIRST ARTICLE INSPECTIONS
Page 1 of 17 Quality Assurance Controlling Department 06/13/06 Issue Date 08/04/11 Revision Date FIRST ARTICLE INSPECTIONS Notes: Compliant With AS 9102A:2004 Approvals: Product Engineering And Program
More informationQUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.
REF ONLY-DATA MANAGEMENT: 1 ST (2) PAGES IS NOT PART OF FORM 1135. QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised. FORM 1135 QUALITY ASSURANCE CLAUSES
More informationProduction Part Approval Process (PPAP)
Document ID: QN-M04 Page 1 of 13 Aerojet Rocketdyne Quality Note M04 Date: 03/16/2016 Table of Contents 1. PURPOSE... 2 2. APPLICATION... 2 2.1. Resubmissions... 2 2.2. Applicable Documents... 3 3. CONVENTIONS...
More informationVendor Qualification Survey
1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service
More informationQuality Management System
Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material
More informationQuality Clauses F Rev. I West Brooks Avenue North Las Vegas, NV Phone (702) Fax (702)
Quality Code Quality Clause Title Q-001 Flow Down Requirements Q-002 Quality System Q-003 Discrepancies Q-004 FOD Foreign Object Debris/Damage Program Q-005 ESD Electrostatic Discharge Control Program
More informationSUPPLIER QUALITY CODES
Supplier Quality s D07-00125 Rev A APPROVALS NAME AND TITLE SIGNATURE DATE M.G. Blankenship Senior Director, Operations I. Jimenez Materials Manager D07-00125-02 Page 1 of 5 SQC 1 SQC 2 SQC 3 SQC 4 SQC
More informationPCX Aerostructures, LLC Quality Notes Supplier Quality Assurance Requirements - Quality Clauses Revision 29 - March 30, 2017
PCX Aerostructures, LLC Quality Notes Supplier Quality Assurance Requirements - Quality Clauses Revision 29 - March 30, 2017 1.All special processes required by the Purchase Order must be performed by
More informationLM Logistic Services Quality Notes Conversion Chart
Page 1 of 10 LM Logistic Services s Conversion Chart The latest issue to this document is the version that is available on the Lockheed Martin Logistic Services Supplier Management website: http://www.lockheedmartin.com/us/suppliers/bu-info/aeronautics/sustainment-services.html
More informationRosen Aviation Supplier Quality Assurance Requirements
1. Purpose This document establishes the Quality Assurance Requirements for all Rosen Suppliers. This document is applicable to all Rosen Aviation Purchase Orders (POs). In addition to the requirements
More informationTITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager
Scope: This process outlines the Exotic Tool Welding (ETW) quality control terms and conditions levied to suppliers providing product or service for ETW. The QA codes identified on the purchase order correlate
More informationGRMA-032-PRO-00 Page 1 of 8
GRMA-032-PRO-00 Page 1 of 8 GR9100 - Goodrich Quality Requirements for Suppliers Author: Frank Reynolds Issue Date: January 2, 2012 Effective Date: March 2, 2012 1.0 PURPOSE / SCOPE 1.1 This document,
More informationQuality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)
Effective Date: 04/07/2014 AJR1: Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100) During the performance of this Contract/Purchase Order (C/PO), the seller
More informationPlan QAQ Supplier Quality Requirements (Rev 17)
1.0 Purpose To define Insitu s Supplier Quality Requirements for items procured from suppliers by Insitu for use in the manufacture and repair of products. 2.0 Scope This document applies to all suppliers
More informationCURTISS WRIGHT Actuation Systems 201 Old Boiling Springs Rd Shelby, NC SUPPLIER QUALITY REQUIREMENTS SQR-100. Rev. L.
CURTISS WRIGHT Actuation Systems 201 Old Boiling Springs Rd Shelby, NC 28152-8008 SUPPLIER QUALITY REQUIREMENTS SQR-100 Rev. L Approved by: PREFACE This document is to be used to define the quality requirements
More informationFAA Conformity Inspection Checklist Form N/C 10JAN16
Purpose The purpose of this checklist is to provide a system to assist with the FAA design and installation conformity inspection process. This form is primarily intended to serve applicants for FAA design
More informationSUPPLIER QUALITY SYSTEM SURVEY
SUPPLIER QUALITY SYSTEM SURVEY DATE (M/d/yy): 55 Dragon Court Woburn, MA 01801 Tel: (781) 933-7300 Fax: (781) 935-4529 GENERAL INFORMATION Supplier Name: Physical Address: City: State: Zip: Sr. Company
More informationOrbel Corporation Quality Assurance Provisions (QAP) for Suppliers
A. PURPOSE To define the Orbel quality assurance provisions for inventory materials received from strategic suppliers. This document is intended for use by Orbel strategic suppliers to aid in the quality
More informationSatellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6
TERMS & CONDITIONS Page 1 of 6 1.0 PURPOSE 1.1 Satellite Aerospace, Inc. Quality Requirements to Subtier Sources. 2.0 SCOPE 2.1 This document applies to all purchasing and sales personnel responsible for
More informationSupplier Quality Manual
Supplier Quality Manual Revision History Rev. Date Description of Change 1 9/23/16 New Release 2 6/7/17 Added to 9.2: Notify G&W immediately of any potential non-conforming product or any similar product
More informationExternal Provider Quality Requirements QCS-001 Processing Sources
Page 1 of 11 The latest issue to this document is the version that is available on the Lockheed Martin Logistics Services Supplier Quality Management website: http://www.lockheedmartin.com/us/suppliers/bu-info/aeronautics/sustainment-services.html
More informationGeneral Purchase Order Requirements
General Purchase Order Requirements [NOTE: Some of the requirements listed below are contingent upon other variables (i.e. aerospace products, when required by Purchase Order, if applicable, as applicable
More informationHouston Precision Fasteners Supplier Quality Requirements SQR-001. Revision: M Date: 04/07/16
Houston Precision Fasteners Supplier Quality Requirements SQR-001 Revision: M Date: 04/07/16 1 of 6 Purchase orders received from Houston Precision Fasteners will contain numerical Quality Requirement
More informationIAQG 9100:2016 Clarifications
According to IAQG Procedure 105.2, clarifications are provided by the IAQG and Sector Document Representatives are summarized below. Please contact the applicable Sector Document Representative if you
More informationZODIAC INTERCONNECT US ZODIAC AEROSYSTEMS SEGMENT ZODIAC INTERCONNECT DIVISION
Document Number: PWI-003 Document Title: Supplier Detailed Inspection Revision: A Released Date: 11-14-2017 Approved By: Harold Julander Signature Approval: See Electronic Approval Table of Contents: Section
More informationProcedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept
ALTA Quality Requirements for Suppliers 25 Sept 2017 1 2 3.2. Purchase order information a- When Alta customer is indicated on the purchase order or related engineering documents, customer quality requirements
More informationQuality Procedure QP320 Supplier Management
1. PURPOSE 1.1. This procedure outlines the process for management of suppliers including assessment, classification, risk mitigation, and maintenance of their approval status. 2. SCOPE 2.1. This procedure
More informationASA-100 QUALITY MANUAL
Your Company Name ASA-100 QUALITY MANUAL Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 Quality Manual Latest Revision Date Abstract: This quality manual describes (your Company's)
More informationSHELTON INDUSTRIAL PATTERN INC.
Defintions: Seller : Supplier of materials, parts and or services that support production Supplies : materials, parts that support production FOD : Foreign Object Debri / Damage 1. Quality Management System
More informationKey Process Audit Checklist Record answers and notes on blank turtle diagrams or audit checklist or note page
What machines, equipment, software, and materials are used to do this process? Are there adequate resources? Is the equipment maintained and supported? Are there gauges that require calibration? What Inputs
More informationSUPPLIER QUALITY REQUIREMENTS (SQR S)
SUPPLIER QUALITY REQUIREMENTS (SQR S) Q01 Q02 Q03 Q04 Q05 Q06 MANDATORY AMRO SOURCE INSPECTION When specified on individual Purchase Orders, Amro Source Inspection shall be performed at supplier s facility
More information3). DEFINITIONS. Title: Management Responsibility. Issue Date: June 19, Procedure Number: CP Page: 1 of 5 ACCEPT REJECT COMMENTS
Page: 1 of 5 1). PURPOSE This Data Configuration Control Procedure governs receipt, usage and distribution of product definition datasets. It defines the determination and identification of authority and
More informationReport number A0436 PRODUCT REQUIREMENTS FOR SELLERS OF BOEING DESIGNED DETAIL PARTS AND NON-FUNCTIONAL MINOR ASSEMBLIES
Report number A0436 PRODUCT REQUIREMENTS FOR SELLERS OF BOEING DESIGNED DETAIL PARTS AND NON-FUNCTIONAL MINOR ASSEMBLIES Revision date 14 DEC 2007 Revision letter T Issue date 30 APRIL 1970 Contract number
More informationQUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES
Your Company Name QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 QMS Policies and Procedures Latest Revision Date Abstract:
More informationPRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK
SAE AS9100 DOCUMENT PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK REV. 005 10/27/10 Page 2 Page 4 Page 5 Page 6 Page 7 Page 8 Page
More informationControlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70
Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 RUSSTECH PURCHASE ORDER CLAUSES RPOC 1000 EARLY DELIVERY OK "Time is of the essence for performance under this Purchase Order. Seller
More informationOrbital ATK QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER
This document includes Quality Assurance Provisions available for inclusion on purchase orders and subcontracts issued by Orbital ATK Inc. Other Quality Assurance Provisions that supplement this document
More informationStructural Systems Solutions Quality Clauses
Unless otherwise specified in the body of the purchase order, the following Purchase Order clauses apply to this Purchase Order based on the Commodity/Product/Service being provided to Ducommun Structural
More informationAS9102 Frequently Asked Questions
AS9102 Frequently Asked Questions General Who developed this standard? This International Standard for First Article Inspection (FAI) is developed by International Aerospace Quality Group (IAQG). The IAQG
More informationGE Aviation Joint Affiliates Sourcing Quality Specification
GE AVIATION JOINT AFFILIATES SUPPLIER REQUIREMENTS FOR CHARACTERISTIC ACCOUNTABILITY, VERIFICATION AND QUALITY PLANNING Specification Number: S-1007 This specification is in addition to and in no way limiting,
More informationINS QA Programme Requirements
Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued
More informationSupplier Quality Assurance Requirements
1 Scope No. 1.1 This document details the requirements to be satisfied by suppliers to Tekdata Interconnections Ltd (TIL). TIL requires each supplier and their sub-tier suppliers to comply with the quality
More informationClause "A" Subcontractor Controls, General Requirements (Applicable when Clause "A" is invoked in the Purchase Order "Remarks")
Clause "A" Subcontractor Controls, General Requirements (Applicable when Clause "A" is invoked in the Purchase Order "Remarks") (1) Any non-destructive testing defined within this Seyer Industries Purchase
More informationPPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: March 19, 2014 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
More information(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION,
(A) GENERAL: (A.1) PRATT & WHITNEY IS THE END USER. (A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION, ANALYSIS, AND APPROVAL
More informationClarification of Standard PA Codes For Goodrich ISR Systems Barrington, IL
Clarification of Standard s For Goodrich ISR Systems Barrington, IL (This document applies only to Barrington, IL suppliers. Barrington suppliers are to follow all PA codes listed in their purchase order,
More informationSTANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS
1. GOVERNMENT/CUSTOMER SOURCE INSPECTION: a. Government/Customer inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government/Customer representative
More informationCODE: FD10 Rev: A Date: 9/24/2008 CONFIGURATION MANAGEMENT
1.0 Definition of terms: CONFIGURATION MANAGEMENT 1.01 The term shall, will and may are used with specific intent thought-out these documents and will observe the following rules: 1.1 Requirements defined
More information2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either:
2.0. Supplier Quality Performance: 2.1. When requested by Boeing, Seller agrees to work with Boeing to develop and implement processes designed at improving Seller s quality performance. Process will include
More informationVendor Quality. Requirements Manual
ate Released 05/07/10 Last Review ate 03/14/16 Page 1 of 7 Vendor Quality Requirements Manual Nasco Aircraft Brake, Inc. 13300 Estrella Ave. Gardena California 90248 Telephone No. 310-532-4430 Fax. No.
More informationSupplier Quality Requirements
1 of 7 NOTE: YELLOW HI-LITE INDICATES CHANGE FROM THE PREVIOUS REVISION GENERAL REQUIREMENTS (Applies to all orders issued from GMW referencing this document) QR-01 Quality Management Systems AS9100 Suppliers:
More informationSUPPLIER QUALITY PROGRAM, IV (U)
PRODUCT QUALITY REQUIREMENTS PQR 1050 PAGE 1 OF 14 FEDERAL MANUFACTURING & TECHNOLOGIES (PQR 1050_L.doc) SUPPLIER QUALITY PROGRAM, IV (U) CHANGE HISTORY ISSUE DESCRIPTION OF CHANGE AUTHOR DATE D CORRECTED
More informationNumber Control SQRM 1.0 Appendix N/A Date Issued. E-Location DocuShare / Internet Approval Manager Quality Assurance
Title Supplier Quality System Requirements Originator Gary Hosker E-Location DocuShare / Internet Approval Manager Quality Assurance Number Control SQRM 1.0 Appendix N/A Date Issued Rev Level Date Revised
More informationSubcontractor Product Assurance Requirements L3-FOS
Doc ID: QN-M02 Page 1 of 11 Rev # Date 0 5/08/13 1. SCOPE: QUALITY REQUIREMENTS FOR SM-3 BLK 1B & IIA PROGRAMS The contents of this subcontractor product assurance requirement document are applicable to
More informationALTA Precision Inc. Quality Procedure
ALTA Precision Inc. Quality Procedure Procedure QAP 7.4.2 Issue 7 Date September 28, 2015 Page 1 of 5 ALTA Quality Requirements for Suppliers Prepared and issued by Marc Dumouchel Approved by Sonia Alonso
More informationTOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA
Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza
More informationISO 9001:2008 and AS9100 Rev. C. Supplier Quality Manual
ISO 9001:2008 and AS9100 Rev. C Supplier Quality Manual ffective Date: Section I Supplier (same as xternal Provider) xpectations 1.0 Introduction 2 of 7 This Supplier Quality Manual (SQM) has been created
More informationProduct Order Quality Requirements Meggitt (Orange County), Inc.
Product Order Quality Requirements Meggitt (Orange County), Inc. Reference QP8-051, Purchase Order Quality Requirements QP8-055, Review/Control Supplier Documentation PP-401, Quality Assurance Codes 50-2-351,
More informationVENDOR EVALUATION REPORT. Supplier Name: Type of Business: Manufacturer Service Distributor Other: Vendor Address:
NOTES 1. Vendor approval applies to the location identified below. All locations that apply to the scope of the business must be identified and included as a part of this survey. 2. Pre-prepared surveys
More informationSUPPLIER QUALITY ASSURANCE REQUIREMENTS MANUAL
SUPPLIER QUALITY ASSURANCE REQUIREMENTS MANUAL Ontic Engineering and Manufacturing, Inc. 20400 Plummer Street Chatsworth, CA 91311 U.S.A. PUF-101-3 Page 1 of 21 Issue 16, April 21, 2016 Overview Introduction
More informationAS9003A QUALITY MANUAL
AS9003A QUALITY MANUAL Origination Date: (month/year) Document Identifier: Date: Document Status: Document Link: AS9003A Latest Revision Date Draft, Redline, Released, Obsolete Location on Server (if used)
More informationQUALITY ASSURANCE PROCUREMENT PROVISIONS
ESAM, INC. QUALITY ASSURANCE PROCUREMENT PROVISIONS QAPP s escription of Change Date A Initial Release 10/1/2014 B Revised QAPP 12 to require 1/20/2016 written approval C Added QAPP 18.B 5/19/2016 D Revised
More information4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:
Approved By: Purchasing Manager Candice Lane (signature on file) Date: 5/26/17 Approved By: Process Owner James D. Moore (signature on file) Date: 5/26/17 1. PURPOSE 1.1. To define Cambridge Valley Machining,
More information2. GENERAL REQUIREMENTS
1. PURPOSE AND SCOPE 1.1 This document defines the Supplier Quality Requirements to be met by suppliers in the performance of the purchase order issued by Sagetech to ensure that externally provided processes,
More informationSupplier Quality Manual
Supplier Quality Manual DAVCO Technology is committed to providing our customers with the highest quality products at the best value. Total customer satisfaction is our top goal. As a supplier to DAVCO
More informationSRCTec, Inc. SUPPLIER QUALITY CLAUSES (SQC S)
01 SOURCE INSPECTIONS A1. Level 1: Government Source Inspection (GSI) Government Source Inspection is required prior to shipment from your facility. Upon receipt of this purchase order, notify the government
More informationAEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing
AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,
More informationATTACHMENT 1 FOR QAP1.6 PURCHASING / QUALITY CLAUSES
ATTACHMENT 1 FOR QAP1.6 PURCHASING / QUALITY CLAUSES Date Rev Revision History Approval 4/23/2015 B 8/26/2015 C 8/28/2015 D 4/4/2016 E 4/4/2017 F 6/14/2017 G Complete review and revised Added QPC-027 NTW
More informationPURCHASE ORDER ATTACHMENT A COX & COMPANY SUPPLIER PRODUCT ASSURANCE PROVISIONS SPAP-1
Page 1 of 6 PURCHASE ORDER ATTACHMENT A COX & COMPANY SUPPLIER PRODUCT ASSURANCE PROVISIONS SPAP-1 The following Product Assurance Provisions, with their terms and conditions, become an integral part of
More informationPPQ Requirements training pack for suppliers
PPQ Requirements training pack for suppliers 1 Purpose This appendix serves to define the concept of PPQ elements used within the PPQ process, and replace for Montreal a portion of Section B of EBQR. The
More informationQuality Management System Manual
This Page 1 of 47 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
More informationSupplier Quality Requirements Manual
Supplier Quality Requirements Manual Revision D 05/31/2017 Page 1 1.0 Purpose The purpose of this manual is to communicate the quality requirements pertaining to the systems, processes, tools and procedures
More informationFAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM
FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM 1 QA.101 rev. 3-2012 PURPOSE OF THIS STANDARD Fairfield is committed to continuous product quality improvement. Our management team is convinced that only with
More informationAltech Machining, Inc. Terms and Conditions
11000 Woodside Avenue North Phone: (619) 448-3392 Santee, CA 92071 Fax: (619) 448-6854 info@altechmachining.net Altech Machining, Inc. Terms and Conditions The terms and conditions listed in this document
More informationD. All distributors shall be reviewed and approved as per company procedure.
PROCEDURE Number: QM-251 Purchase Order (QAP) Quality Assurance Provisions Department: Quality Assurance Revision: 5 Publish Date: 2015-11-18 Prepared by: Quality Manager Authorised by: Director of Operations
More information12. Inventory - Receiving & Shipping
1.0 PURPOSE 1.1 To establish a procedure for dealing with Warehouse issues including: i ii iii iv Receiving Shipping Handling and storage including ESD RMA & Quarantine 2.0 RESPONSIBILITY 2.1 The Warehouse
More informationAppendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items
Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items REVISION RECORD The latest issue to this document is the version that is available on the Lockheed Martin
More informationAAMI Quality Systems White Paper: Comparison of 21 CFR Part 820 to ISO 13485:2016 1
AAMI s White Paper Comparison of 21 CFR Part 820 to ISO 13485:2016 February 2017 AUTHORS Seb Clerkin, GMP Advisory Services Nicola Martin, Owner, Nicola Martin Consulting Jack Ward, Owner, Ward Sciences
More informationQP-740. Revision J. Revision Date Reason Signature. B 4/14/11 Add sections: 6.4, 6.5, 9.9, 9.10 & Amend sections 6.2, & 9.
QP-740 Supplier Management Handbook Revision J Revision Date Reason Signature - 2/02/08 Initial Release Avis Rosenfield A 12/10/10 Complete update Ritchie Lacson B 4/14/11 Add sections: 6.4, 6.5, 9.9,
More informationNUMBER OF EMPLOYEES TOTAL ENGINEERING MANUFACTURING QUALITY SUPPLIER IN-HOUSE SPECIAL PROCESS CAPABILITIES
Kearfott/ACA SUPPLIER QUALITY SYSTEM SURVEY SUPPLIER NAME SUPPLIER CODE DATE ADDRESS & ZIP CODE AREA CODE & PHONE QUALITY MANAGEMENT (NAME & TITLE) PRODUCT LINE (DESCRIBE) NUMBER OF EMPLOYEES TOTAL ENGINEERING
More informationName: Title: Phone: Fax:
OVERVIEW PROCESS AUDIT COVER SHEET Supplier: I.D. No.: CAGE: Address Audited: Audited by: Lead Date/s Audited: DCMA REP: Phone: E-mail: DCMA Participated: YES NO Applicable Contract/Purchase Order: Supplier
More informationRFC-SOP-0002 Skyworks RF Ceramics Supplier Quality Manual
Skyworks RF Ceramics Supplier Quality Manual Page 1 of 8 RFC-SOP-0002 Rev. 1 1 Purpose and Scope 1.1 Purpose The purpose of this manual is to define the basic quality systems and business procedures required
More informationSUPPLIER QUALITY ASSESSMENT
Supplier Organization Name: Supplier Number: Street Address: Date of This Audit: City, State, Zip Code: Date of Last Audit: Country: of Employees: Main Phone Number: of Buildings/Size: Fax Number: Principal
More informationD1 4426, Approved Process Sources. Purchase Order Flow Down Requirements
D1 4426, Approved Process Sources Purchase Order Flow Down Requirements Common Commodity Requirements Unique Commodity Additional Requirements Chemical Processes Heat Treat Materials Testing Laboratories
More informationIADC GLOBAL SUPPLY CHAIN COMMITTEE. Manufacturing Record Book Guidance (GU-IADC-SC-004) Rev. 1
IADC GLOBAL SUPPLY CHAIN COMMITTEE Manufacturing Record Book Guidance (GU-IADC-SC-004) Rev. 1 1 Copyrighted 2017, IADC Unlimited license is hereby granted for reproduction of this document in its entirety,
More informationSupplier Quality Manual
Quality Page 2 of 39 Rationale This manual establishes The NORDAM Group (hereafter referred to as NORDAM) Quality Management System (QMS) requirements for suppliers and all members of their supply chain
More informationRevision no: 01 Date: Global Supplier Quality Assurance Network
Title: H-APQP Template Manual Purpose and Scope This document is aimed at internal and external stakeholders to describe the use of the H-APQP Template. Contents Introduction H-APQP... 2 1. Planning and
More informationRC-9000 Supplier Quality System Requirements
RC-9000 Supplier Quality System Requirements Document Number: 074-8432-119 Page 1 of 15 Revision Date: 10/17/2017 CORPORATE OVERVIEW Rockwell Collins is a pioneer in the design, production and support
More informationPurchasing Quality Clauses
Document No.: 7.4.1.3.1 Page: Page 1 of 11 1. PURPOSE This document describes the general and special product assurance requirements (clauses) that will be used by Arnold Magnetic Technologies on the Purchase
More information001 Inspection/Test Data Reports
BAE Systems P.O. Box 15512 York, PA 17405-1512 9/20/16 Supplier Quality Notice 095871 Contract Deliverable Requirements Rev 09 This is to notify you of changes to BAE Systems CDR Manual. Please see the
More informationEPICOR, INCORPORATED QUALITY ASSURANCE MANUAL
EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:
More information0. 0 TABLE OF CONTENTS
QUALITY MANUAL Conforming to ISO 9001:2008 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2
More informationPurpose Defines and explains quality requirements for supplier and supplier s sub-tiers on product purchased.
Purpose Defines and explains quality requirements for supplier and supplier s sub-tiers on product purchased. Scope This document is invoked by direct reference on the purchase order. This document replaces
More informationCERTIFICATE OF REGISTRATION
03/31/2017 CERTIFICATE OF REGISTRATION This Certificate bears witness that Great Western Registrar LLC (An ANAB-accredited CB) has assessed the management system of: INTEGRATED IDEAS & TECHNOLOGIES, INC.
More informationUNCONTROLLED IF PRINTED 2 of 13
Forward Revision History NR-L Various Remove Revision with over one year of information M: 05-09-16 Revised pages 9 and 10 to change Form Name to Supplier Evaluation for Limited Scopes ; Revised page 11
More informationInstructions for Supplier Survey
Instructions for Supplier Survey In order to be become a vendor and/or a repair station for Aero Precision, you are required to complete a Quality Systems Survey. Once you have completed the survey, please
More informationANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS
CONTROL OF NON-CONFORMING PRODUCTS (8.3) Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: ALL ALL RELEASE DATE: Revision Approval: J.BENTINK Signature: Date: 20/02/17
More informationProcurement Standard Text Codes Revision I - Dated 20 April, 2005
THE CODES LISTED HEREIN ARE ADDITIONAL REQUIREMENTS THAT MAY BE REFERENCED IN ORBITAL S PURCHASE DOCUMENTS. THE FIRST PORTION OF THIS FORM LISTS THE CODES AND THEIR TITLES SORTED BY THEIR CODE GROUPS.
More informationQUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A
Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production
More informationAS9003A QUALITY MANUAL
Your Logo AS9003A QUALITY MANUAL Origination Date: (month/year) Document Identifier: Date: Document Status: Document Link: AS9003A Quality Manual Latest Revision Date Draft, Redline, Released, Obsolete
More information