ABC Metals, Inc. NONFERROUS METALS PRECISION SLITTING

Size: px
Start display at page:

Download "ABC Metals, Inc. NONFERROUS METALS PRECISION SLITTING"

Transcription

1 SCOPE This section describes the responsibility, authority, and management structure of the facility. 1.1 QUALITY POLICY The President has the ultimate responsibility for the facility s products and services. The President is responsible for setting the facility s Quality Policy. ABC Metals, Inc. has defined and documented its policy for quality and ensures that this policy is understood, at all levels of the organization. To accomplish this ABC Metals, Inc. has posted the Quality Policy in the warehouse and office areas and include a review of the Quality Policy in the New Employee Orientation process. 1.2 ORGANIZATION Responsibility and Authority The President is ultimately responsible for establishing, and maintaining the quality system. Specific responsibilities include defining the organizational structure; assigning authorities and responsibilities; reviewing the quality system; and making available the resources and personnel necessary to maintain the system. The responsibility, authority and the interrelation of personnel who manage, perform and verify work affecting quality are defined and documented. System procedures and work instructions define the responsibilities and authority in greater detail. Job descriptions are available which also define the level of empowerment for each employee. These all work together to support personnel who, in particular, need the organizational freedom and authority to: Initiate action to prevent the occurrence of any nonconformities relating to product, process and quality system. As appropriate, ABC Metals provides personnel responsible for quality the authority to stop production and when necessary to correct the problems. Identify and record any problems relating to the product, process and quality system through appropriate organizational channels. Initiate, recommend or provide solutions through designated channels. Verify the implementation of solutions. Control further processing, delivery or installation of nonconforming product until the deficiency or unsatisfactory condition has been corrected. Represent the needs of the customer in internal functions in addressing QS-9000 requirements. (Refer to ABC Metals, Inc.-Lg., Organizational Chart Section F) Section Title: Management Responsibility Revision No: 2 Section No: 1.0 Page 1 of 4 Approved by: Dan Kendall QSMR Reviewed: Dan Kendall Date: 9/14/01

2 1.2.2 Resources Resource requirements are reviewed during the Management meetings, at least annually, in order to evaluate adequacy of overall resources and the assignment of trained personnel for management, performance of work and verification activities, including internal quality audits. Reference of this review is documented in the meeting minutes for the month it is reviewed Management Representative The Vice President & General Manager also functions as the facility s Management Representative. The Management Representative has sufficient authority to ensure that the quality system is established, implemented and maintained in accordance with ISO 9002/QS 9000 International Standard. In the absence of the Management Representative, a qualified designee is appointed. This appointment is documented in the Management Review meeting minutes when appropriate. The Management Representative, or designee, is responsible for reporting on the performance of the quality system to the management group for review and as a basis for improvement. The responsibility of the Management Representative may also include liaison with external parties on matters relating to the quality system Organizational Interfaces ABC Metals, Inc. has systems in place to ensure the management of appropriate activities during concept development through production. ABC Metals, Inc. uses a multi-disciplinary approach for decision-making and has the ability to communicate necessary information and data in the customerprescribed format. (Guidelines established in the Advanced Product Quality Planning and Control Plan reference manual are applied, as appropriate.) Participants in APQP meetings include: Vice President & General Manager, Purchasing Manager, and Warehouse Manager. Other personnel such as inside or outside sales personnel, Production Lead supervision or the Quality Assistant may be included as needed Information to Management Management with responsibility and authority for corrective action are promptly informed of products or processes, which become noncompliant with specified requirements. 1.3 MANAGEMENT REVIEW Regular Management Review meetings, chaired by the President or Vice President & General Manager are conducted with a multi-disciplinary approach. These meetings include monitoring the suitability and effectiveness of all of the elements of the quality system to satisfy the requirements of the QS and the stated quality policy and objectives. The designated management staff attends these meetings. Records of such reviews are maintained as Management Review Meeting Minutes and are circulated among attendees. Meetings are conducted by agenda. (Refer to Quality System Procedure 1.1 Management Review.) Section Title: Management Responsibility Revision No: 2 Section No: 1.0 Page 2 of 4 Approved by: Dan Kendall QSMR Reviewed: Dan Kendall Date: 9/14/01

3 1.4 BUSINESS PLAN ABC Metals, Inc. has a formal, documented, comprehensive business plan. The Business Plan is a controlled document. Goals and plans cover short-term (6 mo.-1 years) and long-term (2-5 years or more) planning. The goals and plans are based on the analysis of competitive products and on benchmarking. Methods to determine current and future customer expectations are in place. Methods to track, update, revise and review the plan are documented to ensure that the plan is followed and communicated throughout the organization as appropriate. Data and information drive process improvement plans. ABC Metals, Inc. provides the means for employee empowerment in meeting business goals. All managers may contribute experience, information, and suggestions to the development of the business plan. Each year the President and/or Vice President & General Manager updates the business plan. 1.5 ANALYSIS AND USE OF COMPANY-LEVEL DATA The designated Department Heads analyze company-level performance data during each Management Review meeting. Trends in quality, operational performance (productivity, efficiency, effectiveness, cost of poor quality) and current quality levels for key product and service features are documented as appropriate. Trends in data and information are compared with progress towards overall business objectives and lead to action to support: Development of priorities for prompt solutions to customer-related problems. Determination of key customer-related trends and correlations to support status review, decisionmaking and longer-term planning. 1.6 CUSTOMER SATISFACTION ABC Metals, Inc. has a documented process for determining customer satisfaction, including frequency of determining customer satisfaction, and how objectivity and validity are assured. Trends in customer satisfaction and key indicators of customer dissatisfaction are documented and supported by objective information. These trends are compared to appropriate benchmarks and reviewed by senior management. Consideration is given to internal, external and final customers. Results are presented, when appropriate, at the management review meeting. Customer satisfaction is reviewed, as appropriate, through specific feedback from sales personnel and/or through annual Customer Satisfaction Surveys CERTIFICATION BODY/REGISTRAR NOTIFICATION ABC Metals, Inc. will notify the certification body/registrar in writing within five (5) working days when a customer places the site in any of the following statuses: Chrysler Needs Improvement Ford Q1 Revocation General Motors Level II Containment Section Title: Management Responsibility Revision No: 2 Section No: 1.0 Page 3 of 4 Approved by: Dan Kendall QSMR Reviewed: Dan Kendall Date: 9/14/01

4 1.7 REFERENCE QS-9000, Element 4.1 ANSI/ASQC Q9002, RELATED DOCUMENTATION Details of the approved methods are contained in Quality System Procedures: 1.1 Management Review 1.2 Business Plan 1.3 Analysis and Use of Company-Level Data 1.4 Customer Satisfaction Section Title: Management Responsibility Revision No: 2 Section No: 1.0 Page 4 of 4 Approved by: Dan Kendall QSMR Reviewed: Dan Kendall Date: 9/14/01

5 SCOPE This section describes the components of ABC Metals, Inc. quality system. 2.1 GENERAL ABC Metals, Inc. has established, documented and maintained a quality system as a means of ensuring that product conforms to specified requirements. The covers the requirements of QS The quality system is structured as follows: Level I - Level II - Quality System Procedures Level III Work Instructions Level IV - Records/Data, Forms, etc. Described below is an overview linking together all documents and records within these four levels. All employees are obligated to work in accordance with the specific requirements of the documented quality system. 2.2 QUALITY SYSTEM PROCEDURES All quality related activities are governed by procedures and written instructions and are circulated for use by management and employees as needed. ABC Metals provides for procedures with adequate detail that relate appropriately to the complexity of the work, the methods used, and the skills and training needed to carry out the activity. Procedures are consistent with the requirements of the QS and the stated quality policy. 2.3 QUALITY PLANNING As appropriate, for each process, specific quality planning is performed using a multidisciplinary approach. Quality System Procedure 2.1 Advanced Product Quality Planning references the Advanced Product Quality Planning and Control Plan reference manual as a guideline to developing control plans (quality plans). Consideration is given within the quality system, as appropriate, to the following activities in meeting the specified requirements for products, projects or contracts: the preparation of quality plans* the identification and acquisition of controls, processes, equipment, resources, and skills needed to achieve quality the compatibility of procedures for design, production process, installation, servicing, inspection and test the updating of quality control, inspection, and testing techniques, including the development of new instrumentation Section Title: Quality System Revision No: 4 Section No: 2.0 Page 1 of 5 Approved by: Dan Kndall QSMR Reviewed:Dan Kendall Date: 9/14/01

6 2.3 QUALITY PLANNING (CONT.) the identification of future measurement requirement capabilities the identification of suitable verification at appropriate stages the clarification of standards of acceptability the identification and preparation of quality records *Some quality plans may be in the form of a reference to a documented procedure forming an integral part of ABC Metal s quality system Advanced Product Quality Planning During the Advanced Product Quality Planning process, internal multidisciplinary activities are used to prepare for production of new or changed processes. The internal multidisciplinary activities may include, but not be limited to: development or review of special characteristics development or review of FMEAs establishment of actions to reduce the potential failure modes with high risk priority numbers greater than 100 development or review of Control Plans Special Characteristics The process control guidelines and similar documents such as FMEA s, Control Plans, Work Instructions will be marked with the customer s special characteristic symbol to indicate those process steps that affect Special Characteristics, when Special Characteristics are identified on the customer s design record. Special characteristics may be identified from any product characteristic category such as dimensional, material, appearance, or performance Feasibility Reviews ABC Metals, Inc. will investigate and confirm the manufacturing feasibility of proposed products submitted into the APQP process prior to contracting to produce those products. Feasibility reviews are documented using the Team Feasibility Commitment (QA014) as referenced in the Advanced Product Quality Planning and Control Plan reference manual Product Safety Appropriate care and product safety is considered in our process control policies and practices. ABC Metals, Inc. promotes internal awareness of safety considerations relative to our products and services. Section Title: Quality System Revision No: 4 Section No: 2.0 Page 2 of 5 Approved by: Dan Kndall QSMR Reviewed:Dan Kendall Date: 9/14/01

7 2.3.5 Process Failure Mode and Effects Analysis Process Failure Mode and Effect Analysis are documented to improve the process to achieve defect prevention rather than defect detection. PFMEA s (QA013) consider special characteristics as applicable and efforts taken to improve the process as referenced in the Potential Failure Mode and Effect Analysis reference manual. ABC Metals considers specific customer FMEA review and approval requirements prior to production part approval Mistake Proofing ABC Metals, Inc. utilizes appropriate mistake proofing methodologies during the planning of processes, facilities, equipment and tooling The Control Plan Control Plans will be developed at the system, subsystem, component and/or material level, as appropriate for the product supplied. Control Plans will include the information required in the control plan form in Appendix J of the QS-9000 Manual. The output of the advanced quality planning process is the Control Plan. Control Plans will be revised or updated when products or processes differ significantly from those in current production. Control Plans will cover the prototype, pre-launch and production phase, as appropriate, for the product supplied. Control Plans are reviewed and updated, as appropriate, when any of the following occur: Product is changed. Processes are changed. Processes become unstable. Processes become non-capable. Inspection method, frequency, etc. is revised. 2.4 PRODUCT APPROVAL PROCESS ABC Metals, Inc. fully complies with all requirements set forth in the Production Part Approval Process (PPAP) manual Subcontractor Requirements ABC Metals, Inc. utilizes a part approval process for subcontractors, when appropriate Engineering Change Validation ABC Metals, Inc. verifies that changes are properly validated. Section Title: Quality System Revision No: 4 Section No: 2.0 Page 3 of 5 Approved by: Dan Kndall QSMR Reviewed:Dan Kendall Date: 9/14/01

8 2.5 CONTINUOUS IMPROVEMENT ABC Metals, Inc. employs a continuous improvement philosophy throughout the entire organization. Efforts to continuously improve in quality, service and price for all customers is practiced and encouraged. Innovative improvements are encouraged and implemented when applicable. Continuous improvement extends to product characteristics with the highest priority on special characteristics. Cost elements are a key indicator within the continuous improvement system. Specific action plans for continuous improvement are developed in processes that are most important to the customer once those processes have demonstrated stability and acceptable capability. ABC Metals, Inc. will develop a prioritized action plan for continuous improvement in processes that have demonstrated stability, acceptable capability and performance Quality and Productivity Improvements ABC Metals, Inc. will identify opportunities for quality and productivity and implement appropriate improvement projects. Examples of situations which might lead to improvement projects are: Unscheduled machine downtime Machine set up and changeover times Excessive cycle time Scrap, rework and repair Non value-added use of floor space Excessive variation Less than 100% first run capability Process averages not centered on target values Testing requirements not justified by accumulated results Waste of labor and materials Cost of poor quality Excessive handling or storage New target values to optimize customer processes Marginal measurement system capability Customer dissatisfaction Techniques for Continuous Improvement ABC Metals, Inc. will demonstrate knowledge of appropriate continuous improvement measures and methodologies and will use those that are considered to be most appropriate. Possible techniques which might be used are listed below. Control Charts Design of Experiments Overall Equipment Effectiveness Value analysis Benchmarking Mistake Proofing Section Title: Quality System Revision No: 4 Section No: 2.0 Page 4 of 5 Approved by: Dan Kndall QSMR Reviewed:Dan Kendall Date: 9/14/01

9 2.6 FACILITIES AND TOOLING MANAGEMENT Facilities, Equipment, and Process Planning Effectiveness A multi-disciplinary approach for developing facilities, processes and equipment plans in conjunction with the advanced quality planning process is used. Plant layouts will minimize material travel and handling, facilitate synchronous material flow, and maximize value-added use of floor space. Methods are developed for evaluating the effectiveness of existing operations and processes considering the following factors: overall work plan, appropriate automation, ergonomics and human factors, operator and line balance, storage and buffer inventory levels, value-added labor content. ABC Metals, Inc. has identified and defined appropriate metrics to monitor the effectiveness of existing operations. Refer to Work Instruction 1.1 Key Measurables. 2.7 REFERENCE QS-9000, Element 4.2 Advanced Product Quality Planning and Control Plan reference manual Potential Failure Mode and Effects Analysis reference manual Production Part Approval Process reference manual Work Instruction 1.1 Key Measurables 2.6 RELATED DOCUMENTATION Details of the approved methods are contained in: Quality System Procedure Advanced Product Quality Planning Quality System Procedure Product Approval Process Quality System Procedure Continuous Improvement Quality System Procedure Tool Design & Fabrication Quality System Procedure Tooling Management Section Title: Quality System Revision No: 4 Section No: 2.0 Page 5 of 5 Approved by: Dan Kndall QSMR Reviewed:Dan Kendall Date: 9/14/01

10 SCOPE This section describes the method used by the facility to assure that the customer needs are understood by the facility throughout the production and delivery process including review of the availability of resources and the facility s capacity to meet customer requirements. 3.1 GENERAL Documented procedures have been established and maintained for contract review and for the coordination of these activities. 3.2 REVIEW The Sales function is responsible for the contract review activities. Before the contract or order will be accepted, the contract or order will be verified to ensure that: the requirements are adequately defined and documented, where the requirements have been communicated by verbal means, the order requirements will be documented and agreed upon before their acceptance; any differences between the contract or order requirements are resolved; the company has the capability to meet the contract or order requirements; all customer-specific requirements can be met. 3.3 AMENDMENT TO A CONTRACT Amendments to contracts will be identified and communicated to the functions concerned within the organization by submitting a sales order. 3.4 RECORDS Records of contract review are maintained. (4.16) 3.5 REFERENCE QS-9000, Element 4.3 ANSI/ASQC Q RELATED DOCUMENTATION Details of the approved methods are contained in Procedures: 3.1 Contract Review 3.2 Amendment to a Contract Section Title: Contract Review Revision No: 2 Section No: 3.0 Page 1 of 1 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/14/01

11 THIS ELEMENT APPLIES TO DESIGN RESPONSIBLE SUPPLIERS ONLY. ABC Metals, Inc. does not design any product of its own, therefore is not design responsible and this element does not apply. Section Title: Design Control Revision No: 1 Section No: 4.0 Page 1 of 1 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/14/01

12 SCOPE This section describes the method for controlling all documents and data that relate to the requirements of the QS GENERAL ABC Metals, Inc. has established and maintains documented procedures for the control of all documents and data that relate to the requirements of the QS-9000 including, to the extent applicable, documents of external origin such as standards and customer drawings. 5.2 DOCUMENT AND DATA APPROVAL AND ISSUE Documents and data whether electronic media or hard copy, will be reviewed and approved for adequacy by authorized personnel prior to use. Master lists and/or procedures identify the current revision status of documents and are readily available to preclude the use of invalid or obsolete documents. This control ensures that: Pertinent issues of appropriate documents are available at all locations where operations essential to the effective functioning of the quality system are performed. Examples of appropriate documents include: Engineering drawings Engineering standards Math (CAD) data Inspection instructions Test procedures Work instructions Operations sheets Quality manual Operational procedures Quality procedures Material specifications Invalid or obsolete documents are promptly removed from all points of issue or use, or otherwise assured against unintended use. Any obsolete documents retained for legal and/or knowledge-preservation purposes are suitably identified Engineering Specifications Procedures exist to assure the timely review, distribution and implementation of all customer engineering standards/specifications and changes. A record of the date on which each change is implemented in production will be maintained and the implementation will include updates to all appropriate documents. Section Title: Document and Data Control Revision No: 2 Section No: 5.0 Page 1 of 2 Approved by: Dan Kendall QSMR Reviewed: Dan Kendall Date: 9/14/01

13 5.3 DOCUMENT AND DATA CHANGES Changes to documents and data are reviewed and approved by the same functions that performed the original review and approval, unless specifically designated otherwise. The designated function will have access to pertinent background information upon which to base their review and approval. Where practicable, the nature of the change is identified in the document or the appropriate attachments. 5.4 REFERENCES QS-9000 Element 4.5 ANSI/ASQC Q RELATED DOCUMENTATION Details of the approved methods are contained in Quality System Procedures: 5.1 Document and Data Control 5.2 Document and Data Approval and Issue 5.3 Document and Data Changes Section Title: Document and Data Control Revision No: 2 Section No: 5.0 Page 2 of 2 Approved by: Dan Kendall QSMR Reviewed: Dan Kendall Date: 9/14/01

14 SCOPE This section describes the manner used to ensure that purchased product conforms to specified requirements. 6.1 GENERAL Procedures exist to ensure that purchased product conforms to specified requirements Approved Materials for Ongoing Production Where the customer has an approved subcontractor list, ABC Metals, Inc. will purchase the relevant materials from subcontractors on the list. Any additional subcontractors may only be used after they have been added to the list by the customer s Materials Engineering activity Government, Safety and Environmental Regulations All purchased materials used in processing will satisfy current governmental and safety constraints on restricted, toxic and hazardous materials; as well as environmental, electrical and electromagnetic considerations applicable to the country of manufacture and sale. 6.2 EVALUATION OF SUBCONTRACTORS ABC Metals, Inc. will: evaluate and select subcontractors on the basis of their ability to meet subcontract requirements including the quality system and any specific quality assurance requirements; define the type and extent of control exercised over the subcontractor. This will be dependent upon the type of product, the impact of subcontracted product on the quality of final product and, where applicable, on the quality audit reports and/or quality records of the previously demonstrated capability and performance of subcontractors; maintain quality records of acceptable subcontractors Subcontractor Development ABC Metals, Inc. will perform subcontractor quality system development with the goal of subcontractor compliance to QS-9000 using Section I of the QS-9000 as their fundamental quality system requirement. Assessments, if part of subcontractor development, will occur at a specified frequency. Subcontractor assessments to QS-9000 by the OEM customer, an OEM customerapproved second party, or an accredited third party certification body/registrar will be recognized in lieu of audits. Acceptance of the above audits is not intended to limit more specific subcontractor quality system and product development. The prioritization of subcontractor development is dependent upon the needs of the subcontractor relative to the requirements of QS-9000 and the importance of the product or service they supply. Section Title: Purchasing Revision No: 2 Section No: 6.0 Page 1 of 3 Approved by: Dan Kendalll QSMR Reviewed: Jim Wells Date: 9/14/01

15 6.2.2 Scheduling Subcontractors ABC Metals, Inc. requires 100% on-time delivery performance from subcontractors and will provide appropriate planning information and purchase commitments to enable subcontractors to meet this expectation. ABC Metals, Inc. will monitor the delivery performance of subcontractors with corrective actions taken as appropriate. Records of premium freight will include both ABC Metals, Inc. and subcontractor paid charges. 6.3 PURCHASING DATA Purchasing documents will contain data clearly describing the product ordered, including where applicable: the type, class, grade or other precise identification; the title or other positive identification, and applicable issues of specification, drawings, process requirements, inspection instructions and other relevant technical data, including requirements for approval or qualification of product, procedures, process equipment and personnel; the title, number and issue of the quality system standard to be applied, if appropriate. Purchasing documents are reviewed and approved for adequacy of specified requirements prior to release. 6.4 VERIFICATION OF PURCHASED PRODUCT Supplier Verification at Subcontractor s Premises Where ABC Metals, Inc. proposes to verify purchased product at the subcontractor s premises, ABC Metals, Inc. will specify verification arrangements and the method of product release in the purchasing documents Customer Verification of Subcontracted Product Where specified in the contract, a customer of ABC Metals, Inc. or the customer s representative will be afforded the right to verify at the subcontractor s premises and the supplier s premises that subcontracted product conforms to specified requirements. Such verification will not be used by ABC Metals, Inc. as evidence of effective control of quality by the subcontractor. Verification by the customer will not absolve ABC Metals, Inc. of the responsibility to provide acceptable product, nor will it preclude subsequent rejection by the customer. 6.5 REFERENCES QS-9000, Element 4.6 ANSI/ASQC Q Section Title: Purchasing Revision No: 2 Section No: 6.0 Page 2 of 3 Approved by: Dan Kendalll QSMR Reviewed: Jim Wells Date: 9/14/01

16 6.6 RELATED DOCUMENTATION Details of the approved methods are contained in Quality System Procedures: 6.1 Evaluation of Subcontractor 6.2 Purchasing Data 6.3 Verification of Purchased Product Section Title: Purchasing Revision No: 2 Section No: 6.0 Page 3 of 3 Approved by: Dan Kendalll QSMR Reviewed: Jim Wells Date: 9/14/01

17 SCOPE This section describes the control of verification, storage, maintenance, and incorporation of customersupplied products. 7.1 GENERAL ABC Metals, Inc. has established and maintains documented procedures for the control of verification, storage and maintenance of customer-supplied product provided for incorporation into the supplies or for related activities. Any customer-supplied product that is lost, damaged or is otherwise unsuitable for use will be recorded and reported to the customer. Customer supplied products are treated as purchased items and protected to prevent loss, damage or deterioration. Nonconformances are so identified and held for review with customer prior to disposition. Verification does not absolve the customer of the responsibility to provide acceptable product Customer Owned Tooling Customer-owned tools and equipment will be permanently marked so that ownership is visually apparent. 7.3 REFERENCES QS-9000, Element 4.7 ANSI/ASQC Q9002, RELATED DOCUMENTATION Details of the approved methods are contained in Quality System Procedures: 7.1 Control of Customer-Supplied Products Section Title: Control of Customer-Supplied Product Revision No: 2 Section No: 7.0 Page 1 of 1 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/14/01

18 SCOPE This section describes the system for identifying products from receipt and during all stages of production and delivery. 8.1 GENERAL ABC Metals, Inc. has established and maintains documented procedures for identifying the product by suitable means from receipt and during all stages of production, delivery, and installation. To the extent that traceability is a specified requirement, individual product, or batches will have unique identification. This identification is recorded. 8.2 REFERENCES QS-9000, Element 4.8 ANSI/ASQC Q9002, RELATED DOCUMENTATION Details of the approved methods are contained in Quality System Procedure: 8.1 Product Identification and Traceability Section Title: Product Identification and Traceability Revision No: 2 Section No: 8.0 Page 1 of 1 Approved by: Dan Kendall QSMR Reviewed: Dan Kendall Date: 9/18/01

19 SCOPE This section describes the method in which production processes and process equipment directly affecting quality are maintained and controlled. 9.0 GENERAL ABC Metals, Inc. will identify and plan the production processes that directly affect quality and will ensure that these processes are carried out under controlled conditions. Controlled conditions will include: documented procedures defining the manner of production where the absence of such procedures could adversely affect quality use of suitable production equipment and a suitable working environment Cleanliness of Premises ABC Metals, Inc. maintains the premises in a state of order, cleanliness and repair appropriate to the products processed. Contingency Plans ABC Metals, Inc. has prepared contingency plans to reasonably protect the customer s supply of product in the event of emergency, excluding natural disaster, etc. compliance with reference standards/codes, quality plans and/or documented procedures monitoring and control of suitable process parameters and product characteristics Designation of Special Characteristics As requested by the customer, ABC Metals, Inc. will comply with all customer requirements for designation, documentation and control of special characteristics. Documentation will be maintained showing compliance with these customer requirements. the approval of processes and equipment, as appropriate criteria for workmanship, which will be stipulated in the clearest practical manner suitable maintenance of equipment to ensure continuing process capability Preventative Maintenance Key process equipment will be identified and appropriate resources for machine/equipment maintenance and develop an effective planned total preventive maintenance system will be provided. At a minimum, this system will include: a procedure that describes planned maintenance activities scheduled maintenance activities predictive maintenance methods procedure providing for packaging and preservation of equipment, tooling & gaging availability of replacement parts for key manufacturing equipment. documenting, evaluating and improving maintenance objectives Section Title: Process Control Revision No: 4 Section No: 9.0 Page 1 of 4 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/18/01

20 Preventative Maintenance Where the results of processes cannot be fully verified by subsequent inspection and testing of the product and where, for example, processing deficiencies may become apparent only after the product is in use, the processes will be carried out by qualified operators and/or will require conditions monitoring and control of process parameters to ensure that the specified requirements are met. Records will be maintained for qualified processes, equipment and personnel, as appropriate. 9.1 PROCESS MONITORING AND OPERATOR INSTRUCTIONS ABC Metals, Inc. has prepared process monitoring and operator instructions that are available for all employees having responsibilities for operation of processes. These instructions are accessible at the workstations and are derived from the sources listed in the Advanced Product Quality Panning and Control Plan reference manual. Process monitoring and operator instructions will include or reference, as appropriate: Operation Name and Number keyed to process flow chart Part name and part number, or part family Current engineering level/date Required tools, gages and other equipment Material identification and disposition instructions Customer and supplier designated special characteristics SPC requirements Relevant engineering and manufacturing standards Inspection and test instructions Reaction plan Revision date and approvals Visual aids Tool change intervals and set-up instructions 9.2 MAINTAINING PROCESS CONTROL ABC Metals, Inc. maintains process capability or performance as approved via PPAP. To accomplish this, ABC Metals Inc. ensures that the Control Plan and Process Flow Diagrams are implemented, including but not limited to adherence to the specified: Measurement technique Sampling plans Acceptance criteria Reaction plans when the acceptance criteria is not met Significant process events are recorded on the control charts as appropriate. When process or product data indicate a high degree of capability, ABC Metals, Inc. may revise the Control Plan as appropriate. Section Title: Process Control Revision No: 4 Section No: 9.0 Page 2 of 4 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/18/01

21 9.2 MAINTAINING PROCESS CONTROL (CONT.) ABC Metals, Inc. will initiate the appropriate reaction plan from the Control Plan for characteristics that are identified on the Control Plan and are either unstable or non-capable. Reaction plans include containment of process output and 100% inspection. A corrective action plan is completed indicating specific timing and assigned responsibilities to assure that the process becomes stable and capable. These plans are reviewed with and approved by the customer when required. 9.3 MODIFIED PROCESS CONTROL REQUIREMENTS In some cases, the customer may require either higher or lower capability or performance requirements. In these cases, the Control Plan will be annotated accordingly. 9.4 VERIFICATION OF JOB SET-UPS Job set-ups will be verified as producing product that meet all requirements. Set-up instructions will be available for set-up personnel. Statistical methods of verification are used where applicable. 9.5 PROCESS CHANGES ABC Metals, Inc. maintains records of process change effective dates. Changes to promote continuous improvements are encouraged. As appropriate, customers are consulted for guidance on approval requirements for such changes. 9.6 APPEARANCE ITEMS When processing material designated by the customer as Appearance Items, ABC Metals, Inc. will provide: Appropriate lighting for evaluation areas Masters for color, grain, gloss, metallic brilliance, texture, distinctness of image as appropriate Maintenance and control of appearance masters and evaluation equipment Verification that personnel making appearance evaluations are qualified to do so. Note: Currently there are no appearance items required by our customers. When required, ABC Metals will address as detailed above. Section Title: Process Control Revision No: 4 Section No: 9.0 Page 3 of 4 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/18/01

22 9.7 REFERENCES QS-9000, Element 4.9 Advanced Product Quality Planning and Control Plan reference manual Production Part Approval Process reference manual 9.8 RELATED DOCUMENTATION Details of the approved methods are contained in Quality System Procedures: 2.3 Continuous Improvement 9.0 Contingency Plan 9.1 Preventative Maintenance 9.2 Process Monitoring and Operator Instructions 9.3 Ongoing Process Performance Requirements 9.4 Verification of Job Set-Ups 9.5 Order Verification Section Title: Process Control Revision No: 4 Section No: 9.0 Page 4 of 4 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/18/01

23 SCOPE This section describes the method for inspection and testing activities in order to verify that the specified requirements for the product are met GENERAL Documented procedures exist for inspection and testing activities in order to verify that the specified requirements for the product are met. The required inspection and testing, and the records to be established, are detailed in the Control Plan and/or documented procedures Acceptance Criteria for Attribute Characteristics Acceptance criteria for attribute data sampling plans is zero defects. Appropriate acceptance criteria for all other situations will be documented in the Control Plan and approved by the customer RECEIVING INSPECTION AND TESTING Incoming product is not used or processed until it has been inspected or otherwise verified as conforming to specified requirements. Verification of conformance to the specified requirements will be in accordance with the Control Plan and/or documented procedures. In determining the amount and nature of receiving inspection, consideration will be given to the amount of control exercised at the subcontractor s premises and the recorded evidence of conformance provided. Where incoming product is released for urgent production purposes prior to verification, it will be positively identified and recorded in order to permit immediate recall and replacement in the event of nonconformity to specified requirements Incoming Product Quality The incoming quality system will use one or more of the following methods: Receipt and evaluation of statistical data Receiving inspection and/or testing Second or third party assessments or audits of subcontractor locations when coupled with records of acceptable quality performance Product evaluation by accredited laboratories Section Title: Inspection and Testing Revision No: 3 Section No: 10.0 Page 1 of 4 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/18/01

24 10.3 IN-PROCESS INSPECTION AND TESTING ABC Metals, Inc. will: inspect and test the product as required by the Control Plan and/or documented procedures; hold product until the required inspection and tests have been completed or necessary reports have been received and verified, except when product is released under positiverecall procedures; direct process activities towards defect prevention methods, such as statistical process control, error proofing, visual controls, rather than defect detection FINAL INSPECTION AND TESTING Final inspection and testing will be carried out in accordance with the Control Plan and/or documented procedures to complete the evidence of conformance of the finished product to the specified requirements. The Control Plan and/or documented procedures for final inspection and testing will contain all specified inspection and tests, including those specified either on receipt of product or inprocess, have been carried out and that the results meet specified requirements. No product will be dispatched until all the activities specified in the Control Plan and/or documented procedures have been satisfactorily completed and the associated data and documentation are available and authorized Layout Inspection and Functional Testing When required by the customer, layout and functional verification will be performed for all products at a frequency established by the customer. Results will be available to the applicable customer for review Final Product Audit ABC Metals, Inc. conducts audits of packaged final product to verify conformance to all specified requirements at an appropriate frequency INSPECTION AND TEST RECORDS Records which provide evidence that the product has been inspected and/or tested will be established and maintained. These records will show clearly whether the product has passed or failed the inspection and/or tests according to defined acceptance criteria. Where the product fails to pass any inspection and/or test, the procedures for the control of nonconforming product will apply. Records will identify the inspection authority responsible for the release of the product. Section Title: Inspection and Testing Revision No: 3 Section No: 10.0 Page 2 of 4 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/18/01

25 10.6 SUPPLIER LABORATORY REQUIREMENTS Laboratory Quality Systems ABC Metals, Inc. maintains a limited laboratory scope. All applicable related policies, systems, programs, procedures, instructions and findings which enable the laboratory to assure quality of the calibration test results generated within the scope are documented Laboratory Personnel The personnel making professional judgement with reference to testing and/or calibration has appropriate background and experience Laboratory Product Identification and Testing The laboratory has procedures for the receipt, identification, handling, protection for calibration equipment items, including all provisions necessary to protect the integrity of the items. The calibration records are retained until final data is complete throughout the life of the item in the laboratory, enabling traceability from final data to raw data Laboratory Process Control ABC Metals, Inc. laboratory monitors, controls and records environmental conditions as required by relevant specifications or where they may influence the quality of results. Requirements for environmental conditions are established and maintained as appropriate to the technical activities concerned Laboratory Testing and Calibration Methods ABC Metals, Inc. laboratory uses test and/or calibration methods, including those for sampling, which meet the needs of the customer and are appropriate for the tests and/or calibrations undertaken. The laboratory verifies its capability to perform to the standard specifications before carrying out such work. When it is necessary to employ methods not covered by standard specifications, these will be subject to agreement with the customer Laboratory Statistical Methods Appropriate statistical techniques are applied, as appropriate, to verification activities whose deliverables are data ACCREDITED LABORATORIES ABC Metals, Inc. uses accredited laboratories when independent testing is required. Section Title: Inspection and Testing Revision No: 3 Section No: 10.0 Page 3 of 4 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/18/01

26 10.8 REFERENCES QS-9000, Element 4.10 ANSI/ASQC Q9002, RELATED DOCUMENTATION Details of the approved methods are contained in Quality System Procedures: 10.1 Receiving Inspection and Testing 10.2 Inspection and Testing 10.3 Final Inspection 10.4 Laboratory Scope Section Title: Inspection and Testing Revision No: 3 Section No: 10.0 Page 4 of 4 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/18/01

27 SCOPE This section describes the methods to control, calibrate and maintain inspection, measuring and test equipment used to demonstrate the conformance of product to the specified requirements GENERAL Procedures to control, calibrate and maintain inspection, measuring and test equipment used to demonstrate the conformance of product to the specified requirements are maintained. Inspection, measuring and test equipment will be used in a manner which ensures that the measurement uncertainty is known and is consistent with the required measurement capability. Where test software or comparative references such as test hardware are used as suitable forms of inspection, they will be checked to prove that they are capable of verifying the acceptability of product, prior to release for use during production and will be rechecked at prescribed intervals. The extent and frequency of such checks will be established and records as evidence of control will be maintained. Where the availability of technical data pertaining to the inspection, measuring, and test equipment is a specified requirement, such data will be made available, when required by the customer or customer s representative, for verification that the inspection, measuring, and test equipment is functionally adequate CONTROL PROCEDURE ABC Metals, Inc. will: determine the measurements to be made and the accuracy required, and select the appropriate inspection, measuring and test equipment that is capable of the necessary accuracy and precision identify all inspection, measuring and test equipment that can affect product quality, and calibrate and adjust them on prescribed intervals, or prior to use, against certified equipment having a known valid relationship to internationally or nationally recognized standards. Where no such standards exist, the basis used for calibration will be documented Calibration Services The calibration of inspection, measuring or test equipment will be conducted, as appropriate, by a qualified in-house laboratory, a qualified commercial independent laboratory, or a customer-recognized government agency. The ABC Metals, Inc. laboratory scope includes the calibration of such equipment. define the process employed for the calibration of inspection, measuring and test equipment, including details of equipment type, unique identification, location, frequency of checks, check method, acceptance criteria and the action to be taken when results are unsatisfactory identify inspection, measuring and test equipment with a suitable indicator or approved identification record to show the calibration status Section Title: Control of Inspection, Measuring & Test Eqmt. Revision No: 2 Section No: 11.0 Page 1 of 2 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/18/01

28 11.2 CONTROL PROCEDURE (CONT.) maintain calibration records for inspection, measuring and test equipment; assess and document the validity of previous inspection and test results when inspection, measuring or test equipment is found to be out of calibration; ensure that the environmental conditions are suitable for the calibrations, inspections, measurements and tests being carried out ensure that the handling, preservation and storage of inspection, measuring and test equipment is such that the accuracy and fitness for use is maintained safeguard inspection, measuring and test facilities, including both test hardware and test software, from adjustments which would invalidate the calibration setting 11.3 INSPECTION, MEASURING, AND TEST EQUIPMENT RECORDS Records of the calibration/verification activity on all gages, measuring, and test equipment, including employee-owned gages, will include: revisions following engineering changes (if appropriate) any out of specification readings as received for calibration statements of conformance to specification after calibration notification to customer if suspect material has been shipped MEASUREMENT SYSTEM ANALYSIS Appropriate statistical studies will be conducted to analyze the variation present in the results of each type of measuring and test equipment system. This requirement applies to all measurement systems referenced in the Control Plan. The analytical methods and acceptance criteria used conform to those in the Measurement Systems Analysis reference manual. Other analytical methods and acceptance criteria may be used if approved by the customer REFERENCES QS-9000, Element 4.11 ANSI/ASQC Q9002, 4.11 Measurement Systems Analysis reference manual 11.6 RELATED DOCUMENTATION Details of the approved methods are contained in Quality System Procedures: 10.4 Laboratory Scope 11.1 Control of Inspection, Measuring and Test Equipment 11.2 Inspection, Measuring, and Test Equipment Records 11.3 Measurement System Analysis Section Title: Control of Inspection, Measuring & Test Eqmt. Revision No: 2 Section No: 11.0 Page 2 of 2 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/18/01

29 SCOPE This section describes the method in which the inspection and test status of the product will be identified, which indicates the conformance or nonconformance of product with regard to inspection and tests performed GENERAL The inspection and test status of product will be identified by suitable means, which indicates the conformance or nonconformance of product with regard to inspection and tests performed. The identification of inspection and test status will be maintained, as defined in the Control Plan and/or documented procedures, throughout production to ensure that only product that has passed the required inspections and tests (or released under an authorized concession) is released or used. The location of the product in the normal production flow will not constitute suitable indication of inspection and test status unless inherently obvious Supplemental Verification When required by the customer, additional verification/identification requirements will be met REFERENCES QS-9000, Element 4.12 ANSI/ASQC Q9002, RELATED DOCUMENTATION Details of the approved methods are contained in Quality System Procedures: 12.1 Inspection and Test Status Section Title: Inspection and Test Status Revision No: 2 Section No: 12.0 Page 1 of 1 Approved by: Dan Kendall QSMR Reviewed:Dan Kendall Date: 9/18/01

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998) 1 SCOPE QS 9000: new: Introduction, applicability In addition to the applicability for supplier sites for production and services and their subcontractors for: - parts or materials, or - services like

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

Brumund Foundry Inc.

Brumund Foundry Inc. QUALITY ASSURANCE 1st TIER MANUAL Brumund Foundry Inc. 4400 West Carroll Ave. Chicago, IL 773-287-9250 PER ANSI/ASQC Q9002-1994 Page 1 of 7 THE PRESIDENT HAS DIRECTED THAT THE FOLLOWING POLICIES BE IMPLEMENTED

More information

YFTFC002 QUALITY SYSTEM REQUIREMENTS

YFTFC002 QUALITY SYSTEM REQUIREMENTS Machining YFTF002 PURPOSE: This specification outlines the Quality System requirements for Young & Franklin/Tactair Fluid ontrols suppliers. It is intended to assure that articles purchased from approved

More information

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production

More information

DEC STD ISO Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing

DEC STD ISO Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing Digital Internal Use Only DEC STD 017-1 - ISO 9001 - Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing DOCUMENT IDENTIFIER: A-DS-EL00017-01-0000

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology. Jordanian Quality Mark

The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology. Jordanian Quality Mark The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology Jordanian Quality Mark Amman in February, 1997 1 Abstract Article (18) of the Law of Standards & Metrology; law no. (15) for

More information

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

MANUAL QUALITY CONTROL & QUALITY ASSURANCE MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE

More information

QUALITY SYSTEM REQUIREMENTS FOR Manufacturer YFTFC001

QUALITY SYSTEM REQUIREMENTS FOR Manufacturer YFTFC001 PURPOSE: This specification outlines the Quality System requirements for Young & Franklin/Tactair Fluid ontrols suppliers. It is intended to assure that articles purchased from approved suppliers are as

More information

Comparison of Requirements ISO/TS vs. AS9100 and ISO 13485

Comparison of Requirements ISO/TS vs. AS9100 and ISO 13485 ISO/TS 16949 vs. AS9100 and ISO 13485 Introduction If your business is starting to diversify into the Medical or Aerospace industries, your existing ISO/TS 16949 certified quality management system (QMS)

More information

Plastics and Concepts of Connecticut Inc. Quality Manual

Plastics and Concepts of Connecticut Inc. Quality Manual Plastics and Concepts of Connecticut Inc. Quality Manual Nature of Changes For This Issue: 1. Initial Release 8/14/2000 2. Reformatted and grammatical errors corrected 6/11/02 3. Minor grammatical errors

More information

UNCONTROLLED DOCUMENT

UNCONTROLLED DOCUMENT Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision

More information

Quality Assurance Policy and Procedures

Quality Assurance Policy and Procedures 650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance

More information

Quality Commitment. Quality Management System Manual

Quality Commitment. Quality Management System Manual Quality Commitment Quality Management System Manual This printed copy is uncontrolled Page 1 of 30 Thor Machining Quality Management System Manual Section 1 TABLE OF CONTENTS Page # 1 Introduction 5 2

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL QUALITY SYSTEM MANUAL This Manual is a Proprietary Document and any Unauthorized Reproduction is prohibited. ISSUE DATE July 26, 2012 AUTHORIZED BY: Quality Management Representative Eric Hoff Managing

More information

AS 9100 Rev C Quality Systems Manual AS-050C-QM

AS 9100 Rev C Quality Systems Manual AS-050C-QM AS 9100 Rev C Quality Systems Manual AS-050C-QM Innovative Control Systems, Inc. 10801 N. 24 th Ave. Suite 101-103 Phoenix, AZ 85029 U.S.A. www.icsaero.com +01-602-861-6984 VOICE +01-602-588-9440 FAX Table

More information

QUALITY SYSTEM REQUIREMENTS FOR Raw Material YFTFC004

QUALITY SYSTEM REQUIREMENTS FOR Raw Material YFTFC004 Raw Material YFTF004 PURPOSE: This specification outlines the Quality System requirements for Young & Franklin/Tactair Fluid ontrols suppliers. It is intended to assure that articles purchased from approved

More information

QUALITY ASSURANCE AND QUALITY CONTROL MANUAL

QUALITY ASSURANCE AND QUALITY CONTROL MANUAL 1 QUALITY ASSURANCE AND QUALITY CONTROL 2 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION 9 SECTION 10 QUALITY POLICY & AUTHORITY MANAGEMENT RESPONSIBILITY

More information

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip UHV SPUTTERING INC Page 1 of 18 ECO REVISION HISTORY ECO# REVISION DATE MGR QA 1001 A 2/25/2008 R.Clement J.Haislip 1017 B 6/17/2008 T.Finneran J.Haislip 1071 C 1/13/2011 R.Clement J.Haislip 1078 D 5/15/2013

More information

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy QM001 Page 1 of 19 Quality Manual QM001 Page 2 of 19 Table of Contents Page Company Profile 4 Approval 4 Revision History 4 Distribution List 4 1.0 Scope 5 Section 2: Normative Reference 6 2.0 Quality

More information

LG SOURCING VENDOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS

LG SOURCING VENDOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS LG SOURCING VENDOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS LG Sourcing QMS ver01 03.29.2010 Page 1 of 16 PAGE INTENTIONALLY LEFT BLANK Copyright 2010, LF Corporation - All rights reserved No part of this

More information

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14 Page 1 of 14 Quality Manual This Quality Manual provides the overall quality strategy and objectives of Pyramid Semiconductor s quality system. It is based on the requirements of ISO 9000. This manual

More information

SECTION 1.0: PROCESS AUDIT STRATEGY AND PLANNING

SECTION 1.0: PROCESS AUDIT STRATEGY AND PLANNING SECTION 1.0: PROCESS AUDIT STRATEGY AND PLANNING a. Have Annual Quality Targets been agreed and submitted to Electrolux or other customers? 7.7f 5.4.1 Objectives and quantifiable targets are required to

More information

The Skyworks Quality Management System strives to:

The Skyworks Quality Management System strives to: Skyworks has embraced a workplace where Quality is the number one differentiator to achieve Customer Loyalty. Skyworks has adopted a single Quality Management System which drives efficiency, consistency

More information

UPGRADE ASSESSMENT CHECKLIST

UPGRADE ASSESSMENT CHECKLIST Checklist Instructions : Prior to auditing each element, the auditor shall review the documentation and mark a 0 in each box where functions /departments are referenced. As each function/department is

More information

Supplier Quality Requirements SQR-1.0 Rev. 3

Supplier Quality Requirements SQR-1.0 Rev. 3 Supplier Quality Requirements Rev. 3 Approved By: Brian Brown, Quality Manager The current issue of this document is maintained on LSP Technologies, Inc. s Internet Web Site at http://www.lspt.com/resources-supplier_requirements.asp.

More information

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza

More information

EMS Engineered Materials Solutions, LLC Quality Management System Manual

EMS Engineered Materials Solutions, LLC Quality Management System Manual EMS Engineered Materials Solutions, LLC Quality Management System Manual Location: 39 Perry Avenue Attleboro, MA 02703 USA Telephone: 508.342.2235 Fax: 508.342.2538 Internet: www.emsclad.com www.copperplus.com

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 This document belongs to Luminus Devices, Inc. It cannot be reproduced without authorized authority. Area: Quality System Document Page

More information

0. 0 TABLE OF CONTENTS

0. 0 TABLE OF CONTENTS QUALITY MANUAL Conforming to ISO 9001:2008 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2

More information

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,

More information

PRECISE INDUSTRIES INC. Quality Manual

PRECISE INDUSTRIES INC. Quality Manual PRECISE INDUSTRIES INC Revision N Issued July 5, 2017 Conforms to AS9100 Rev. D and ISO 9001:2015 Copyright Year2017 [PRECISE INDUSTRIES INC]; all rights reserved. This document may contain proprietary

More information

QMS Qualitäts-Management-Systeme. Key Points Regarding ISO/ TS 16949: 2009 If you have further questions let us know. We are ready to help.

QMS Qualitäts-Management-Systeme. Key Points Regarding ISO/ TS 16949: 2009 If you have further questions let us know. We are ready to help. Key Points Regarding ISO/ TS 16949: 2009 If you have further questions let us know. We are ready to help. Heribert Nuhn QMS Germany D-56587 Strassenhaus Deutschland Tel.: ++ 49 2634 9560 71 Fax.: ++ 49

More information

PRINTED COPY IS NOT CONTROLLED

PRINTED COPY IS NOT CONTROLLED Quality Manual We Deliver Quality on Time Form 1217 (01.16.2018) Rev. 12 SOR Inc. sorinc.com SOR QUALITY MANUAL Page 1 of 18 Table of Contents Quality Manual 8701-001 Revision 12 Introduction....4 1.0

More information

25 D.L. Martin Drive Mercersburg, PA (717)

25 D.L. Martin Drive Mercersburg, PA (717) QUALITY MANUAL D. L. MARTIN CO. 25 D.L. Martin Drive Mercersburg, PA 17236 (717) 328-2141 Revision 14 August 2012 Michael A. White Manager, QA & Engineering D.L. Martin Co. Quality Manual UNCONTROLLED

More information

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No TITLE: EECTIVE DATE: 09/18/2014 External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No Yes PROPRIETARY DOCUMENT No TABLE O CONTENTS QUALITY POLICY

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Table of Contents Contents 1. Introduction... 3 1.1. Process Approach...

More information

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual ISO9001:2008 Prepared By: Date: 06/28/2013 President Approved by: Date: 06/28/2013 Quality Assurance Manager Introduction Cal-Tron Corp has developed and implemented a Quality Management

More information

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10 QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL Revision 10 Page: 1 of 54 TABLE OF CONTENTS 1. DOCUMENT REVISION HISTORY... 5 2. INTRODUCTION... 6 2.1 Purpose... 6 2.2 Scope... 7 Figure 1: Sequence and Interaction

More information

Quality Manual ISO 9001:2000

Quality Manual ISO 9001:2000 Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10

More information

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev - February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February

More information

Quality Manual ISO 9001:2008 ISO 9001:2015

Quality Manual ISO 9001:2008 ISO 9001:2015 Quality Manual ISO 9001:2008 ISO 9001:2015 SAE CIRCUITS, INC. 4820 63 rd Street Suite 100 Boulder, CO 80301 USA www.saecircuits.com Table of Contents 1. Company Information 3 2. QMS Scope and Exclusions

More information

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc.

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc. ISO9001-2008 QUALITY MANUAL SCOPE HFI Fluid Power Products is a full line stocking distributor/manufacturer for both hydraulic and pneumatic

More information

ISO 9001:2000 Revision G

ISO 9001:2000 Revision G ISO 9001:2000 Revision G 1531 W. 17 th Street, Tempe AZ 85281 Table of contents Section Title Page Index 1 Revision History and Distribution 2 Introduction 3 Quality Policy / Mission Statement 4 Organizational

More information

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 2 of 18 REVISION HISTORY DATE CHANGE DESCRIPTION 10/11/06 Original release 10/21/09 Revised to ISO9001:2008

More information

PRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100

PRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100 N&P PRECISION MACHINE INC Quality Commitment Quality Management System Manual AS9100 This printed copy is uncontrolled Page 1 of 44 Revision B N&P Precision Machine, Inc. Quality Management System Manual

More information

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

14620 Henry Road Houston, Texas PH: FX: WEB:  QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24 Quality Manual Page 1 of 24 ISO 9001:2015 Standard to Quality Manual Section Matrix ISO 9001:2015 Quality Manual Section 1 Scope 1 Scope 1.1 General 4 Context of the organization 4 Quality management system

More information

Supplier Quality System Survey

Supplier Quality System Survey Supplier Division Address Date: Quality Contact: Reports to: Title: Title: Phone Fax e-mail Plant size (ft 2 ): Union: Contract expires: Total Employment: Direct Labor: Shifts: QA employees: This report

More information

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler. Polycraft, Inc. QM - 10 Title: Polycraft, Inc. Quality Manual Copy Approval: D. Wheeler This Quality Manual is the sole property of Polycraft, Inc. and intended for exclusive use by the organization. This

More information

Quality Systems Manual Rev. NC Issued July 9 / 2018

Quality Systems Manual Rev. NC Issued July 9 / 2018 NMT Specialized Machining Inc 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Quality Systems Manual Rev. NC Issued July 9 / 2018 Conforms to AS9100 Rev D and ISO 9001:2015 Table of Contents Introduction

More information

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing Supplier: Phone: Prime Contact/Title: Sales Contact/Title: Address: Fax: e-mail address e-mail address Quality Contact/Title: e-mail address 1. Type of Business: a) Number of years in business? b) Company

More information

Continental Steel & Tube Co. Quality Manual

Continental Steel & Tube Co. Quality Manual 312 SE 22 nd Street Fort Lauderdale, FL 33316 Mailing address P.O. Box 030040 Fort Lauderdale, FL 33303-0040 954-332-2290 Fax 954-332-2296 info@continentalsteel.com www.continentalsteel.com Introduction

More information

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual Stanley ISO 9001:2008 Table of Contents and STANLEY Document Reference Related STANLEY Section Page Procedure(s) 1. Introduction 1 None 2. Scope 1 None 3. Organizational Structure & 1 STANLEY Company History

More information

QUALITY POLICY MANUAL

QUALITY POLICY MANUAL C. L. HANN INDUSTRIES, INC. 1020 TIMOTHY DR. SAN JOSE CA 95133 QUALITY POLICY MANUAL Quality Policy Manual Rev. 1 8.18.97 MISSION STATEMENT C. L. Hann Industries, Inc. is designed to meet the precision

More information

Sensor Scientific, Inc.

Sensor Scientific, Inc. Sensor Scientific, Inc. 6 Kings Bridge Road Fairfield, New Jersey Quality Manual Revised: 26 September, 2012 Authorized By: G. R. Brinley Page 1 of 21 Table of Contents Page 1. Introduction 3 2. Purpose

More information

Quality Assurance Manual, Revision F Page 1 of 20

Quality Assurance Manual, Revision F Page 1 of 20 Quality Assurance Manual, Revision F Page 1 of 20 AUTOMATION TECHNOLOGY QUALITY ASSURANCE MANUAL Prepared By: Joseph Pollard Date: 7/6/2015 Quality Assurance Manager Quality Management System Representative

More information

SUPPLIER QUALITY ASSESSMENT

SUPPLIER QUALITY ASSESSMENT Supplier Organization Name: Supplier Number: Street Address: Date of This Audit: City, State, Zip Code: Date of Last Audit: Country: of Employees: Main Phone Number: of Buildings/Size: Fax Number: Principal

More information

OPERATIONS MANUAL ISO 9001 Quality Management System

OPERATIONS MANUAL ISO 9001 Quality Management System OPERATIONS MANUAL * ISO 9001 Quality Management System Page: 1 of 19 Revision History Date Change Notice Change Description 5/30/2012 Original Original Release. 9/20/2012 005 Clarify post-delivery exclusion

More information

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER PETROLEUM, PETROCHEMICAL AND NATURAL GAS INDUSTRIES -- SECTOR-SPECIFIC QUALITY MANAGEMENT SYSTEMS -- REQUIREMENTS FOR PRODUCT AND SERVICE SUPPLY ORGANIZATIONS

More information

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein.

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein. 1. SCOPE Quality Specification TEC-1019 12 Jul 11 Rev C All Paragraphs Revised Global Quality Management System Supplement for the Aerospace Industry Model, AS 9100 (C) 1.1. Content This specification

More information

Quality System Manual - Section 00

Quality System Manual - Section 00 Quality System Manual - Section 00 INDEX AND REVISION STATUS Issued by: Quality Assurance Eff. Date: 06/10/2014 Rev.: A Pg. 1 of 4 QUALITY SYSTEM MANUAL SECTION 0 - INDEX AND REVISION STATUS SECTION 1

More information

Quality Manual. AARD Spring & Stamping Quality Manual

Quality Manual. AARD Spring & Stamping Quality Manual Quality Manual Page 1 of 25 AARD Spring & Stamping QM/5.0 Title: QM 5.0 AARD Spring & Stamping Quality Manual Copy Approval Date: 1/27/2011 Reviewer(s): Sign / Print Title Date Dan Wheeler Document Originator

More information

ISO 9001:2008 Quality Management System QMS Manual

ISO 9001:2008 Quality Management System QMS Manual 2501 Kutztown Road Reading, PA, 19605 Tel. 610-929-3330 Fax 610-921-6861 ISO 9001:2008 Quality Management System QMS Manual The information contained in this document is Fidelity Technologies Corporation

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL Work Instruction Standard Locknut, LLC Supplier Quality Manual Doc. No. SQM-01 Page 1 of 11 Initial Date 11/1/2009 Rev. 4 Prepared By Dwight Beaty Revised By Shannon Smith Rev. Date 9/12/12 Approvals Purchasing

More information

Texas International Oilfield Tools, Ltd.

Texas International Oilfield Tools, Ltd. Originated by: J. Tuttle Texas International Oilfield Tools, Ltd. QUALITY SYSTEM MANUAL Revision Date: May 26, 2010 Number: QSM000 Subject: Texas International Quality System Revision: A 1.0 INTRODUCTION

More information

Reliance Aerospace Solutions

Reliance Aerospace Solutions Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a

More information

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R. ISO 9001 The Standard Illustrations The International Standard for Quality Management Systems Year 2000 Edition Leland R. Beaumont ISO 9001, The Standard Illustrations Figures excerpted from ISO 9001,

More information

Reference Paragraphs. Appendix B AQS Auditor Handbook

Reference Paragraphs. Appendix B AQS Auditor Handbook Introduction Auditing is a basic tool to assess effective implementation of and conformity to Quality Management System (QMS) requirements. In addition to the determination of conformity, this handbook

More information

Transitioning from ISO/TS 16949:2009 to IATF 16949:2016 Presented by Brandon Kerkstra Revision: 10/24/2016

Transitioning from ISO/TS 16949:2009 to IATF 16949:2016 Presented by Brandon Kerkstra Revision: 10/24/2016 Transitioning from ISO/TS 16949:2009 to IATF 16949:2016 Presented by Brandon Kerkstra Revision: 10/24/2016 1 For Web Training To Prepare for the training and to get the most out of this session: 1. Print

More information

QUALITY SYSTEM REQUIREMENTS FOR Dis tributor YFTFC005

QUALITY SYSTEM REQUIREMENTS FOR Dis tributor YFTFC005 PURPOSE: This specification outlines the Quality System requirements for Young & Franklin/Tactair Fluid Controls suppliers. It is intended to assure that articles purchased from approved suppliers are

More information

ISO9001 QUALITY POLICY MANUAL

ISO9001 QUALITY POLICY MANUAL 1 OF 26 Metalife Industries, Inc. Serial No.: Master Revision: 1 Issue Date: October 14, 2011 Originator: Becky Wentling ISO9001 QUALITY POLICY MANUAL Prepared By (Document Controller): Becky Wentling

More information

Quality Management System Manual

Quality Management System Manual SpecSys, Inc. recognizes its responsibility as a provider of quality products and services. To this end, SpecSys, Inc. has documented, implemented and maintains a System that complies with ISO 9001 2000.

More information

Quality Manual QM-9001 Revision 25 May 2013

Quality Manual QM-9001 Revision 25 May 2013 Lion Precision 563 Shoreview Park Road Shoreview, MN 55126 Phone: (651) 484-6544 Fax: (651) 484-6824 info@lionprecision.com Quality Manual QM-9001 Revision 25 May 2013 Approved by: Don Martin, President

More information

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM SYSTEM KARAN ADVISER & INFORMATION CENTER

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM   SYSTEM KARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM WWW.SYSTEMKARAN.COM 1 www.systemkaran.org Foreword... 5 Introduction... 6 0.1 General... 6 0.2 Process approach... 6 0.3 Relationship

More information

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people.

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people. Title: AS9100D Quality Manual Revision Date.: 05/04/2018 Page 1 of 22 The Quality Policy of Monroe Engineering is defined in the following statement: Monroe Engineering is committed to customer satisfaction;

More information

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX In completing your Documented Quality Management System Review, it is important that the following matrix be completed and returned to us as soon as possible. This will save time during the review and

More information

Supplier Quality Manual (QQS )

Supplier Quality Manual (QQS ) Monticello Spring Corporation Quality Management System Supplier Quality Manual (QQS 100.00) 1.0 Introduction 1.1 Scope The details stipulated in this manual are the minimum mandatory requirements for

More information

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: Gear Technology 10671 Civic Center Drive Rancho Cucamonga, CA 91730 GENERAL INFORMATION Attn: Manager of Quality

More information

Quality System Manual

Quality System Manual Page:1 of 20 Quality System Page:2 of 20 1 About this This manual was developed and is maintained by the Arrow Manufacturing Company Management Representative. Requests for changes should be submitted

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 9001 Third edition 2000-12-15 Quality management systems Requirements Systèmes de management de la qualité Exigences Reference number ISO 9001:2000(E) ISO 2000 Contents Page

More information

JDI Quality Assurance Guideline

JDI Quality Assurance Guideline JDI Quality Assurance Guideline For Supplier, 2017 Japan Display Inc. 7/1/2017 - Table of Contents - 1. Introduction... - 7-1.1. Purpose of this Guideline...- 8-1.2. Structure of this Guideline...- 8-1.3.

More information

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements Correspondence Between and 21 CFR Part 820 QMS Requirements 10411 Corporate Drive, Suite 102, Pleasant Prairie, WI 53158 262.842.1250 262.842.1240 info@rcainc.com rcainc.com 2 4 Quality Management System

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

CERTIFICATE OF REGISTRATION

CERTIFICATE OF REGISTRATION 03/31/2017 CERTIFICATE OF REGISTRATION This Certificate bears witness that Great Western Registrar LLC (An ANAB-accredited CB) has assessed the management system of: INTEGRATED IDEAS & TECHNOLOGIES, INC.

More information

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner A. SCOPE This document contains requirements for conducting business with Tri Star Metals, LLC and its customers. It is applicable to suppliers that provide

More information

ISO 9001:2000 The International Quality Management Business System

ISO 9001:2000 The International Quality Management Business System ISO 9001:2000 The International Quality Management Business System Table of Contents What is ISO 9000? Page 1 The Benefits of ISO 9001:2000 Page 1 Why an ISO 9001:2000 System? Page 2 Major Steps to Implementation

More information

CAPITAL AVIONICS, INC. Quality Manual

CAPITAL AVIONICS, INC. Quality Manual CAPITAL AVIONICS, INC. Issued 31 July 2018 Conforms to ISO 9001:2015 2018 ; all rights reserved. This document may contain proprietary information and may only be released to third parties with approval

More information

Technical Manufacturing Corporation (TMC)

Technical Manufacturing Corporation (TMC) Revision: 21 Pages: 1 of 14 Date Issued: 05/11/2016 Technical Manufacturing Corporation (TMC) Quality Manual 15 Centennial Drive Peabody MA 01960 Revision: 21 Pages: 2 of 14 Date Issued: 05/11/2016 1.

More information

BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL

BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL Page 1 of 33 TABLE OF CONTENTS SECTION TITLE PAGE 0 Company Introduction... 4 0 Organizational Chart.. 5 1 Scope.. 6 2 Related Documents... 6 3 Terminology...

More information

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM 1 QA.101 rev. 3-2012 PURPOSE OF THIS STANDARD Fairfield is committed to continuous product quality improvement. Our management team is convinced that only with

More information

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE AEROSPACE STANDARD AS9003 Issued 2001-10 Revised 2012-07 REV. A Superseding AS9003 (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE This standard

More information

WOODS CONTRACTING QUALITY ASSURANCE QUALITY CONTROL QA/QC MANUAL VERSION: REV.2

WOODS CONTRACTING QUALITY ASSURANCE QUALITY CONTROL QA/QC MANUAL VERSION: REV.2 WOODS CONTRACTING QUALITY ASSURANCE QUALITY CONTROL QA/QC MANUAL VERSION: 2.011218 REV.2 CONTENTS SECTION 1: QUALITY POLICY & AUTHORITY SECTION 2: MANAGEMENT RESPONSIBILITY SECTION 3: QUALITY SYSTEMS SECTION

More information

Odyssey Electronics, Inc Fairlane Livonia, MI 48150

Odyssey Electronics, Inc Fairlane Livonia, MI 48150 12886 Fairlane Livonia, MI 48150 Table of Contents Section Topic 1 Revision history 2 Review and approval 3 Organizational chart 4 Quality management system 4.1 General requirements 4.2 Documentation requirements

More information