Western Electricity Coordinating Council WECC Glossary of Terms and Naming Conventions Updated: December 6, 2016

Size: px
Start display at page:

Download "Western Electricity Coordinating Council WECC Glossary of Terms and Naming Conventions Updated: December 6, 2016"

Transcription

1 Table of Contents Western Electricity Coordinating Council WECC Glossary of Terms and Naming Conventions Updated: December 6, 2016 Overview/Glossary Characteristics... 2 Terms Developed Using the WECC Reliability Standards Development Procedures... 4 Attachment: WECC Document Numbering Convention... 9 Standards Numbering... 9 Document Type Designations... 9 Errata with an Interpretation Interpretations Numbering Renaming WECC Regional Business Practices to WECC Criteria Categories/Abbreviations Used in NERC Standard Numbering Convention... 11

2 WECC Glossary Page 2 of 12 Overview/Glossary Characteristics The WECC Glossary of Terms and Naming Conventions (WECC Glossary) consists of terms that were developed using the WECC Reliability Standards Development Procedures (Procedures), or its successor. This glossary shall be used as the single-source repository for all defined terms developed using the Procedures. 1 The WECC Glossary shall not duplicate a defined term maintained by either the North American Electric Reliability Corporation (NERC) or the North American Energy Standards Board (NAESB). 2 Purpose Per the WECC Standards Committee (WSC) Charter, the WSC is responsible for performing an annual review of the WECC Glossary to ensure the document remains current. The following steps describe the process for adding, modifying, deleting, and administering the defined terms located in the WECC Glossary. Adding Terms The process for adding terms to the WECC Glossary is described in the Procedures. Modifying Terms The process for modifying an existing WECC Glossary term shall be initiated by filing a WECC Standards Authorization Request (SAR) and developed using the steps established in the Procedures. Upon final disposition, the WSC shall ensure the final term is included in the WECC Glossary. Deleting Terms When there is no longer a document (developed under the Procedures) with an active Effective Date in which a specific defined term is used, that term shall be deleted from the WECC Glossary. Administration During development, modification, or consideration for deletion of a defined term, the term shall be retained in the document under development. 1 This document has been developed from a Version Zero source and contains some defined terms that were not developed using the Procedures. 2 In the event NERC adopts an existing term from the WECC Glossary for inclusion in the NERC Glossary of Terms Used in Reliability Standards, a WECC SAR should be filed to review use of the term in affected documents.

3 WECC Glossary Page 3 of 12 Upon final disposition, the WSC shall ensure the final term is removed from the body of the document under development and moved into the WECC Glossary. The updated WECC Glossary shall be posted as soon after final disposition as is practical. The previous version of the WECC Glossary shall be archived. Defined terms developed for WECC Regional Reliability Standards will be handled in accordance with NERC s instructions. Annual Review The WSC shall ensure that the WECC Glossary is reviewed annually for accuracy. Contact The WECC Glossary is maintained by the WSC. If you have questions regarding the WECC Glossary, contact W. Shannon Black at (503)

4 WECC Glossary 4 Terms Developed Using the WECC Reliability Standards Development Procedures Term WECC Board Approval Approved Definition Term Origin Capacity Associated with Energy Recallable for Reserves December 6, 2007 C-RE: Capacity Associated with Energy Recallable for Reserves. This product is energy which is recallable within ten minutes of activation of reserves and has been included in the Source Balancing Authority s reserve resources. C-NS: Capacity for Non-Spinning Reserve. Capacity for Non Spinning Reserve December 6, 2007 On-Demand Non-Spinning Reserve obligation/resource is a Non-Spinning Reserve product that can be activated through the adjustment of a capacity e- Tag. C-SP: Capacity for Spinning Reserve. Capacity for Spinning Reserve December 6, 2007 On-Demand Spinning Reserve obligation/resource is a Spinning Reserve product that can be activated through the adjustment of a capacity e-tag. G-EX: Exchange of Firm Energy. Exchange of Firm Energy December 6, 2007 An exchange of firm energy where by one entity delivers energy to another entity at one point on the grid and receives an agreed upon amount of energy from that entity at another point on the grid. Firm Contingent December 6, 2007 G-FC: Firm Contingent. The energy is from a designated generating unit or source. This product may be interrupted only to the extent the output capability of the designated unit or source has been reduced due to a deration or outage of the designated unit or source. A G-FC product cannot be interrupted for economic reasons.

5 WECC Glossary Page 5 of 12 Term WECC Board Approval Firm Energy December 6, 2007 Firm Provisional Energy Hourly Firm Energy Interchange Authority (IA) Emergency December 6, 2007 December 6, 2007 July 29, 2010 G-F: Firm Energy. Approved Definition This product may be curtailed only in the event of a reliability condition or to meet Seller s public utility or statutory obligations for reliability of service to native load. A G-F product cannot be interrupted for economic reasons. G-FP: Firm Provisional Energy. This product may be interrupted only if the interruption is within the recall time and for conditions allowed by applicable provisions governing interruption of service, as mutually agreed to by the parties. A G-FP product cannot be interrupted for economic reasons. G-F1: Hourly Firm Energy. This product may be interrupted, consistent with the provisions of the transaction, provided the Purchasing- Selling Entity or Load-Serving Entity receives notification of the interruption 40 minutes or more prior to the start of the operating hour. A G-F1 product cannot be interrupted for economic reasons. A failure of the Interchange Authority software system that prevents the distribution of e-tags to Reliability Coordinators, Balancing Authorities, Transmission Service Providers, Purchasing-Selling Entities, Load-Serving Entities and Interchange Authorities for assessment of confirmed interchange transactions, for distribution of confirmed interchanged transactions, or both. Term Origin INT-020-WECC-CRT This term is proposed for retirement under WECC The project was approved for ballot by the WSC on December 6, 2016.

6 WECC Glossary Page 6 of 12 Term Interchange Authority Software Provider Local Area Protection Scheme (LAPS) WECC Board Approval July 29, 2010 June 22, 2011 Non-Firm Energy December 6, 2007 Primary Reference Source (PRS) June 22, 2011 Safety Net June 22, 2011 Approved Definition The Help Desk of the Software Vendor who is supporting the Interchange Authority Software System (WECC Interchange Tool). Contact information will be provided on the homepage of the WECC Interchange Tool. A Remedial Action Scheme (RAS) whose failure to operate would not result in any of the following: Violations of TPL-(001 thru 004)- WECC-1- CRT System Performance Criteria, Maximum load loss 300 MW, Maximum generation loss 1000 MW. G-NF: Non-firm Energy. This product may be interrupted for any reason or no reason, without liability on the part of either the buyer or seller. Primary Reference Source equipment provides a timing signal whose long-term accuracy is maintained at 1x10-11 or better with verification to universal time coordinated (UTC). A PRS signal is used as the basis of reference for control of other clocks within a telecommunications network. A type of Remedial Action Scheme designed to remediate TPL (System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D)), or other extreme events. Term Origin INT-020-WECC-CRT PRC-(012 through 014)- CRT COM-001-WECC-CRT-1 PRC-012 through 014- WECC-CRT This term is proposed for retirement under WECC The project was approved for ballot by the WSC on December 6, This term is proposed for retirement under WECC-0119B. The project was approved for ballot by the WSC on December 6, This term is proposed for retirement under WECC-0119B. The project was approved for ballot by the WSC on December 6, 2016.

7 WECC Glossary Page 7 of 12 Term WECC Board Approval Approved Definition Term Origin WECC Underfrequency Load Shedding Review Group (Review Group) December 6, 2012 A joint regional group comprised of WECC Balancing Authorities, Planning Coordinators, Transmission Operators, and Transmission Planners created by the WECC Joint Guidance Committee to review and maintain an accurate underfrequency load shedding database and simulation models reflecting the WECC Off-Nominal Frequency Load Shedding Plan. The Review Group shall also be responsible for conducting simulations of the Coordinated Plan to ensure the Coordinated Plan meets all the requirements of NERC Reliability Standard PRC PRC-006-WECC-CRT WECC Remedial Action Scheme Database: November 30, 2011 That database of information collected from the WECC Remedial Action Scheme Information required under PRC-012-(012 through 014)-WECC-CRT-2.1, WECC Remedial Action Scheme Information Sheet (Attachment A). PRC-(012 through 014)- WECC-CRT Western Electricity Coordinating Council Off- Nominal Frequency Load Shedding Plan (Coordinated Plan) December 6, 2012 The Coordinated Plan presented as Attachment A to PRC-006-WECC-CRT-1, or its successor, as required by NERC Reliability Standard PRC and adopted by all Planning Coordinators within WECC. PRC-006-WECC-CRT This term is proposed for retirement under WECC-0119C. The project was approved by a WECC Ballot Pool. On December 6, 2016, the WSC approved forwarding the project to the WECC Board of Directors with a request for approval. 8 This term is proposed for retirement under WECC-0119B. The project was approved for ballot by the WSC on December 6, This term is proposed for retirement under WECC-0119C. The project was approved by a WECC Ballot Pool. On December 6, 2016, the WSC approved forwarding the project to the WECC Board of Directors with a request for approval.

8 WECC Glossary Page 8 of 12 Term WECC Board Approval Approved Definition Term Origin Wide Area Protection Scheme (WAPS) November 30, 2011 A Remedial Action Scheme (RAS) whose failure to operate would result in any of the following: Violations of TPL-(001 thru 004)- WECC-1- CRT System Performance Criteria, Maximum load loss 300 MW, Maximum generation loss 1000 PRC-(012 through 014)- WECC-CRT-2.1, Attachment A This term is proposed for retirement under WECC-0119B. The project was approved for ballot by the WSC on December 6, 2016.

9 WECC Glossary 9 Attachment: WECC Document Numbering Convention As WECC creates new documents they will be numbered in accordance with the following numbering convention unless otherwise required by NERC or another regulatory body. 11 WECC Standards staff will assign the numbers on behalf of the drafting teams. Standards Numbering WECC-originated Regional Reliability Standards (RRS) will be numbered in accordance with the NERC Standards Numbering System or its successor. For example: BAL-002-WECC-1 The addition of the WECC designation to the NERC Standard nomenclature indicates the document is a RRS. A number of regional standards predate this numbering system (e.g., BAL-STD-002-0). As these standards are revised in the normal regional standards development process, WECC will revise the numbering to reflect the system described here. Document Type Designations A WECC Regional Criterion will be designated with a CRT designation. Documents previously designated as a WECC Regional Business Practice (RBP) have been recategorized as WECC Regional Criteria designated with a CRT designation. 12 The following example would apply to a CRT. Example... TPL-001-WECC-CRT-1.1b TPL... Three-letter designation to identify the general topical area of the criterion. WECC uses the same topic designations as NERC Three-digit numeral within the above topical area. These numbers will be assigned sequentially for new documents. WECC... Four letters that designate WECC origination. CRT... Three-letter designation to indicate this document was drafted under the development procedures as a regional criterion. 11 Should an exception to the nomenclature be encountered, WECC Standards personnel will assign the exception. 12 See WECC Board of Director s package June 2014.

10 WECC Glossary Page 10 of One-digit numeral identifying the version of the document, starting with the numeral 1 for new documents. For modified documents this is a sequential number to indicate how many times the original version has been modified. Errata with an Interpretation If a document has an erratum, the identification will include a period after the last number. The numbering after the period will be sequential. In the following example, assume the WECC Criterion has both an erratum as well two interpretations. The resulting nomenclature would be: EOP-007-WECC-CRT-1.1b The 1 is the version. The.1 is the single erratum. The b indicates the there are two interpretations. Interpretations Numbering If a document has an approved interpretation, the assigned nomenclature will have a lowercase letter after the version number. For each interpretation added to a particular document, the lowercase letter will sequence through the alphabet. For example, if there were two approved interpretations in the below example, the interpretation would be designated as: TPL-001-WECC-CRT-1.1b. Renaming WECC Regional Business Practices to WECC Criteria On June 25, 2014, the WECC Board of Directors (Board) approved the elimination of the Regional Business Practice (RBP) categorization in favor of a single WECC Criterion (CRT) category. No substantive changes were made as a result of the classification change; only the designation nomenclature has been changed. All INT WECC RBPs were reclassified as WECC CRTs. For example: INT-001-WECC-RBP-1 becomes INT-001-WECC-CRT-1 INT-002-WECC-RBP-1 becomes INT-002-WECC-CRT-1.

11 WECC Glossary Page 11 of 12 Categories/Abbreviations Used in NERC Standard Numbering Convention Abbreviation BAL CIP COM EOP FAC INT IRO MOD NUC ORG PER PRC TOP TPL VAR Standard Area Resource and Demand Balancing Critical Infrastructure Protection Communications Emergency Preparedness and Operations Facilities Design, Connections and Maintenance Interchange Scheduling and Coordination Interconnection Reliability Operations and Coordination Modeling, Data, and Analysis Nuclear Organization Certification Personnel Performance, Training, and Qualifications Protection and Control Transmission Operations Transmission Planning Voltage and Reactive

12 WECC Glossary Page 12 of 12 Version Date Action Change 0 May 1, 2014 Initial Update All current WECC Regional Business Practices and WECC Criteria were reviewed for inclusion into Version Zero. 0 May 5, 2014 Errata Included Contingent Firm. Previously omitted. 1 May 21, 2014 WSC approved Preamble added. 1 June 25, 2014 WECC Board of Directors (Board) WECC Board eliminated the Regional Business Practice (RBP) designation in favor of the WECC Regional Criterion (CRT) designation. See Board minutes for June 25, August 11, 2014 Errata Firm Contingent Energy was deleted from the Term to match INT-018-WECC-CRT-1. In the definition for Capacity Associated with Energy Recallable for Reserves Authorities was changed to the possessive form Authority s. 2 March 10, 2015 WSC approval Terms used on in MOD-001-WECC-0 were deleted from the glossary. The MOD was retired by the WSC pursuant Step 13 of the Reliability Standards Development Procedures. 3 March 8, 2016 WECC Standards Committee Approved Removed Performance Level Adjustment Record ; TPL-001- WECC-CRT-2, WR1 retired on October 8, WECC Remedial Action Scheme Database and Wide Area Protection Scheme (WAPS) reference for EOP-007-WECC-CRT-1.1 (retired July 1, 2013) updated to PRC-(012 through 014)-WECC- CRT-2.1. Associated PRC-(012 through 014)-WECC-CRT-1 updated to 2.1. WOULD in WAPS changed to lower case. NOT in LAPS changed to lower case. 4 December 6, 2016 WECC Standards Committee Approved INT-020-WECC-CRT-1.1 updated to 1.2. TPL-001-WECC-CRT-2.1 updated to 2.2. INT-018-WECC-CRT-1 updated to 1.2. PRC-006-WECC-CRT-1 updated to 1.1. Adjacent Transmission Circuits, used in TPL-001-WECC-CRT-2.2 was removed as it is no longer contained in TPL-001-WECC-CRT-3, as approved by the WECC Board of Directors. September 21, 2016.

WECC Standards Committee. WECC Standards Home Page

WECC Standards Committee. WECC Standards Home Page Document name Category Document date Adopted/approved by Date adopted/approved Custodian (entity responsible for maintenance and upkeep) Stored/filed Previous name/number Status WECC Glossary of Terms

More information

Performance Standards Issues. Donald Lamontagne Principal Engineer Arizona Public Service

Performance Standards Issues. Donald Lamontagne Principal Engineer Arizona Public Service Performance Standards Issues Donald Lamontagne Principal Engineer Arizona Public Service Free Template from www.brainybetty.com 2 Regulatory Entities FERC Energy Policy Act of 2005 NERC Designated Electric

More information

DESCRIPTION OF NERC AND NPCC STANDARD & CRITERIA DOCUMENTS

DESCRIPTION OF NERC AND NPCC STANDARD & CRITERIA DOCUMENTS DESCRIPTION OF NERC AND NPCC STANDARD & CRITERIA DOCUMENTS NERC RELIABILITY STANDARDS A NERC Reliability Standard includes a set of Requirements that define specific obligations of owners, operators, and

More information

Reading, Understanding, and Following NERC Standards

Reading, Understanding, and Following NERC Standards Reading, Understanding, and Following NERC Standards September 15, 2011 Greg Sorenson, PE Senior Compliance Engineer gsorenson.re@spp.org 501.688.1713 Outline Philosophy behind standards Reading standards

More information

Proposed Definitions for the NERC Glossary of Terms Project : Emergency Operations

Proposed Definitions for the NERC Glossary of Terms Project : Emergency Operations Proposed Definitions for the NERC Glossary of Terms Project 2009-03: Emergency Operations The Emergency Operations Standards Drafting (EOP SDT) proposes revisions to a defined term in the NERC Glossary

More information

August 1, ReliabilityFirst Compliance Contacts ReliabilityFirst Compliance Program Update Letter August Update

August 1, ReliabilityFirst Compliance Contacts ReliabilityFirst Compliance Program Update Letter August Update To: Subject: ReliabilityFirst Compliance Contacts 2017 ReliabilityFirst Compliance Program Update Letter August Update For your convenience, the ReliabilityFirst (RF) Data Submittal Schedule is attached

More information

Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources

Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources Draft White Paper Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources Project 2014-01 Standards Applicability for Dispersed

More information

WECC Criterion INT-004-WECC-CRT-2.1

WECC Criterion INT-004-WECC-CRT-2.1 WECC Criterion INT-004-WECC-CRT-2.1 A. Introduction 1. Title: Reliability Curtailments and Reload 2. Number: INT-004-WECC-CRT-2.1 3. Purpose: To define treatment and approval of reliability curtailment

More information

Mapping Document. Project Phase 2 of System Protection Coordination. Revisions or Retirements to Already Approved Standards

Mapping Document. Project Phase 2 of System Protection Coordination. Revisions or Retirements to Already Approved Standards Mapping Document Project 2007-06.2 Phase 2 of System Protection Coordination Revisions or Retirements to Already Approved Standards This mapping document explains how each of the existing Requirements

More information

Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources

Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources Draft White Paper Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources Project 2014-01 Standards Applicability for Dispersed

More information

NERC Standards Report, Status and Timetable for Addressing Regulatory Directives, and Periodic Review of Reliability Standards Docket No.

NERC Standards Report, Status and Timetable for Addressing Regulatory Directives, and Periodic Review of Reliability Standards Docket No. March 31, 2016 Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 Re: NERC Standards Report, Status and Timetable for Addressing Regulatory

More information

Implementation Plan Project Operations Personnel Training

Implementation Plan Project Operations Personnel Training Implementation Plan Project 2010-01 Operations Personnel Training Implementation Plan for PER-005-2 Operations Personnel Training Approvals Required PER-005-2 Operations Personnel Training Prerequisite

More information

NYSRC RELIABILITY RULE/NERC STANDARD CROSS-REFERENCE

NYSRC RELIABILITY RULE/NERC STANDARD CROSS-REFERENCE 7/1/05 NYSRC RELIABILITY RULE/NERC STANDARD CROSS-REFERENCE NYSRC Reliability A. RESOURCE ADEQUACY A-R1. Statewide Installed Reserve Margin Requirements A-R2. Load Serving Entity ICAP Requirements None

More information

DRAFT Reliability Standards Development Plan. June 15, 2016

DRAFT Reliability Standards Development Plan. June 15, 2016 DRAFT Reliability Standards Development Plan 2017 2019 June 15, 2016 I Table of Contents Background... iii Executive Summary... iv 2016 Progress Report...1 FERC Directives...1 Projects Completed in 2016...1

More information

WECC Criterion INT-007-WECC-CRT-3

WECC Criterion INT-007-WECC-CRT-3 WECC Criterion INT-007-WECC-CRT-3 A. Introduction 1. Title: Processing of Emergency Requests for Interchange (RFI) 2. Number: INT-007-WECC-CRT-3 3. Purpose: To define the processing of Emergency RFI 4.

More information

Mapping Document for FAC-010-3

Mapping Document for FAC-010-3 Mapping Document for FAC-010-3 The Project 2015 09 standard drafting team (SDT) is proposing the retirement of the NERC FAC 010 3 Reliability Standard. The SDT further proposes a new paradigm regarding

More information

Transfer Capability Methodology. for the Near-Term. Transmission Planning Horizon

Transfer Capability Methodology. for the Near-Term. Transmission Planning Horizon Transfer Capability Methodology for the Near-Term Transmission Planning FAC-013-2 Version 2.2 June 30, 2018 Table of Contents 1 PURPOSE... 3 2 DEFINITION... 3 3 APPLICABILITY... 3 4 TRANSFER CAPABILITY

More information

Risk-Based Registration Technical Justification. August 26, 2014

Risk-Based Registration Technical Justification. August 26, 2014 Risk-Based Registration Technical Justification August 26, 2014 Table of Contents Preface and NERC Mission... iv Executive Summary... v Introduction...1 Background...1 Functional Entities Considered...1

More information

WECC Board of Directors. Standards. Approved Regional Criteria (if any) NA. Final. Final

WECC Board of Directors. Standards. Approved Regional Criteria (if any) NA. Final. Final Document name Category Document date Adopted/approved by Date adopted/approved Custodian (entity responsible for maintenance and upkeep) Stored/filed Previous name/number Analysis, Reporting, and Mitigation

More information

WECC-0111 TOP-007-WECC-1a System Operating Limits Retire or Modify Supporting Narrative and Crosswalk to Retire

WECC-0111 TOP-007-WECC-1a System Operating Limits Retire or Modify Supporting Narrative and Crosswalk to Retire MEMO Date: August 6, 2015 Subject: Retirement of TOP-007-WECC-1a (TOP) System Operating Limits Posting 2 The WECC-0111, TOP-007-WECC-1a, System Operating Limits (TOP) Retire or Modify Drafting Team (DT)

More information

Table of Contents. To provide a methodology for determining the System Operating Limits (SOL) for the Planning Horizon at the California ISO.

Table of Contents. To provide a methodology for determining the System Operating Limits (SOL) for the Planning Horizon at the California ISO. Table of Contents Purpose... 1 Applicable Reliability Standard(s)... 1 Applicability to California ISO... 1 SOLs and IROLs... 1 Study Methodology... 2 Supporting Information... 6 Responsibilities... 6

More information

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004 Glossary of Terms Used in Standards Preliminary Draft Version 0 Standards September 1, 2004 Source References (Noted in draft only will not be part of final glossary) Functional Model () Glossary (GL)

More information

N ORTH A MERICAN E LECTRIC R ELIABILITY C OUNCIL

N ORTH A MERICAN E LECTRIC R ELIABILITY C OUNCIL N ORTH A MERICAN E LECTRIC R ELIABILITY C OUNCIL Princeton Forrestal Village, 116-390 Village Boulevard, Princeton, New Jersey 08540-5731 September 11, 2006 VIA OVERNIGHT MAIL Deb Young, Minister s Secretary

More information

Project Revisions to TOP and IRO Reliability Standards Mapping Document Updated December 2014

Project Revisions to TOP and IRO Reliability Standards Mapping Document Updated December 2014 Project 2014-03 Revisions to TOP and IRO Reliability Standards Mapping Document Updated December 2014 This mapping document showing the translation of Requirements in the following currently-enforceable

More information

Project : Generator Requirements at the Transmission Interface Background Resource Document

Project : Generator Requirements at the Transmission Interface Background Resource Document Project 2010-07: Generator Requirements at the Transmission Interface Background Resource Document Introduction The integrated grid consists of many parts such as power plants, Transmission, and Facilities

More information

Reliability Standards Development Plan

Reliability Standards Development Plan Reliability Standards Development Plan 2018-2020 October 18, 2017 NERC Report Title Report Date I Table of Contents Background... iii Executive Summary... iv 2017 Progress Report...1 FERC Directives...1

More information

Reliability Standards Development Plan:

Reliability Standards Development Plan: Reliability Standards Development Plan: 2010 2012 Volume I Overview October 7, 2009 Reliability Standards Development Plan: 2010 2012 Acknowledgement The NERC Reliability Standards Program would like to

More information

Standard TPL-004-0a System Performance Following Extreme BES Events

Standard TPL-004-0a System Performance Following Extreme BES Events A. Introduction 1. Title: System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D) 2. Number: TPL-004-0a 3. Purpose: System simulations

More information

Exhibit A. Reliability Standards Proposed for Approval

Exhibit A. Reliability Standards Proposed for Approval Exhibit A Reliability Standards Proposed for Approval Proposed New Standard IRO-006-5 Standard IRO-006-5 Reliability Coordination Transmission Loading Relief A. Introduction 1. Title: Reliability Coordination

More information

Implementation Plan for IRO Reliability Coordination Facilities Prerequisite Approvals Adoption of IRO-001-2, IRO-010-0, COM-001-2

Implementation Plan for IRO Reliability Coordination Facilities Prerequisite Approvals Adoption of IRO-001-2, IRO-010-0, COM-001-2 Prerequisite Approvals Adoption of IRO-001-2, IRO-010-0, COM-001-2 Conforming Changes to Requirements in s None Coordination with revisions proposed in other standards projects The IROL SDT proposes retiring

More information

FERC Directives in Order 693 Addressed in IROL Implementation Plan

FERC Directives in Order 693 Addressed in IROL Implementation Plan The following Interconnection Reliability Operating Limit (IROL) standards were under development when the Version 0 project was initiated: IRO-008 Reliability Coordinator Operational Analyses and Real-time

More information

WECC Criterion INT-007-WECC-CRT-2.23

WECC Criterion INT-007-WECC-CRT-2.23 WECC Criterion INT-007-WECC-CRT-2.23 A. Introduction 1. Title: Processing of Emergency Requests offor Interchange (RFI) 2. Number: INT-007-WECC-CRT-2.23 3. Purpose: To define the processing of Emergency

More information

Standard TPL-003-0b System Performance Following Loss of Two or More BES Elements

Standard TPL-003-0b System Performance Following Loss of Two or More BES Elements A. Introduction 1. Title: System Performance Following Loss of Two or More Bulk Electric System (Category C) 2. Number: TPL-003-0b 3. Purpose: System simulations and associated assessments are needed periodically

More information

NERC Reliability Functional Model

NERC Reliability Functional Model NERC Reliability Functional Model Function Definitions and Responsible Entities Version 3 Approved by Standing Committees: Operating Committee: December 6, 2006 Planning Committee: December 6, 2006 Standards

More information

Seasonal Assessments and Modeling of Sub-100 kv Elements (Southwest Outage Recommendations 5, 6, 7 and NERC2) May 7, 2014

Seasonal Assessments and Modeling of Sub-100 kv Elements (Southwest Outage Recommendations 5, 6, 7 and NERC2) May 7, 2014 Seasonal Assessments and Modeling of Sub-100 kv Elements (Southwest Outage Recommendations 5, 6, 7 and NERC2) May 7, 2014 Background In April 2012, the Federal Energy Regulatory Commission (FERC) and the

More information

Comparison of IV.A.M2 and IV.A.M3 to EOP-005-1

Comparison of IV.A.M2 and IV.A.M3 to EOP-005-1 Comparison of IV.A.M2 and IV.A.M3 to EOP-005-1 Proposed Draft Standard The drafting team proposes to revise existing standard EOP-005 to incorporate IV.A.M2 and IV.A.M3. IV.A.M2 is translated into requirements

More information

Standard TPL-003-0b System Performance Following Loss of Two or More BES Elements

Standard TPL-003-0b System Performance Following Loss of Two or More BES Elements Page 220 of 257 A. Introduction 1. Title: System Performance Following Loss of Two or More Bulk Electric System (Category C) 2. Number: TPL-003-0b 3. Purpose: System simulations and associated assessments

More information

Standard TPL (i) System Performance Under Normal Conditions

Standard TPL (i) System Performance Under Normal Conditions Standard TPL-001-0.1(i) System Performance Under rmal Conditions A. Introduction 1. Title: System Performance Under rmal ( Contingency) Conditions (Category A) 2. Number: TPL-001-0.1(i) 3. Purpose: System

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION ) QUARTERLY REPORT OF THE NORTH AMERICAN ELECTRIC RELIABILITY

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION NORTH AMERICAN ELECTRIC ) Docket No. RR06-1- RELIABILITY CORPORATION ) QUARTERLY REPORT OF THE NORTH AMERICAN ELECTRIC RELIABILITY

More information

Security Guideline for the Electricity Sector: Identifying Critical Assets

Security Guideline for the Electricity Sector: Identifying Critical Assets Note: The guideline was developed for CIP-002-1 but is also applicable to CIP- 002-2 and CIP-002-3. Security Guideline for the Electricity Sector: Identifying Critical Assets Disclaimer: This supporting

More information

Standard FAC System Operating Limits Methodology for the Planning Horizon

Standard FAC System Operating Limits Methodology for the Planning Horizon Standard FAC-010-1 System Operating Limits Methodology for the Planning Horizon Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will

More information

Technical Justification Resource Document Project Generator Requirements at the Transmission Interface Updated July 16, 2012

Technical Justification Resource Document Project Generator Requirements at the Transmission Interface Updated July 16, 2012 Technical Justification Resource Document Project 2010-07 Generator Requirements at the Transmission Interface Updated July 16, 2012 I. Background As part of its work on Project 2010-07 Generator Requirements

More information

Implementation Plan IRO Reliability Coordination Current Day Operations

Implementation Plan IRO Reliability Coordination Current Day Operations Implementation Plan IRO-005-4 Reliability Coordination Current Day Operations Approvals Required IRO-005-4 Reliability Coordination Current Day Operations Prerequisite Approvals None Revisions to Glossary

More information

153 FERC 61,228 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 40

153 FERC 61,228 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 40 153 FERC 61,228 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Part 40 [Docket Nos. RM15-7-000, RM15-12-000, and RM15-13-000 Order No. 818] Revisions to Emergency Operations Reliability

More information

4.1 Violation Reporting Remedial Action Directives Mitigation Plans Internal Training Self Assessments...

4.1 Violation Reporting Remedial Action Directives Mitigation Plans Internal Training Self Assessments... NERC Compliance Monitoring and Enforcement Program Florida Reliability Coordinating Council, Inc. Table of Contents 1. Introduction... 1 2. Florida Reliability Coordinating Council Compliance Monitoring

More information

Description of Current Draft: This is the first draft of the proposed standard posted for stakeholders comment.

Description of Current Draft: This is the first draft of the proposed standard posted for stakeholders comment. Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

Load Shed Philosophy

Load Shed Philosophy APPLICABILITY: Reliability Coordinator I. Background While time limits exist for mitigation of the exceedance of certain types of system operating limits, events can occur quickly necessitating a responsive

More information

A. Introduction Balancing Authority Reliability Coordinator Transmission Operator. 5. Effective Date:

A. Introduction Balancing Authority Reliability Coordinator Transmission Operator. 5. Effective Date: A. Introduction 1. Title: Emergency Operations 2. Number: EOP-011-1 3. Purpose: To address the effects of operating Emergencies by ensuring each Transmission Operator and Balancing Authority has developed

More information

July 15 July 31. August First ballot September 1 10, Drafting Team considers comments and makes any revisions indicated

July 15 July 31. August First ballot September 1 10, Drafting Team considers comments and makes any revisions indicated Standard FAC-008-1 Facility Ratings Methodology Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard

More information

Standard IRO Reliability Coordination Monitoring and Analysis

Standard IRO Reliability Coordination Monitoring and Analysis Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Standard BAL-502-RFC-02

Standard BAL-502-RFC-02 A. Introduction 1. Title: Planning Analysis, Assessment and Documentation 2. Number: BAL-502-RFC-02 3. Purpose: To establish common criteria, based on one day in ten year loss of Load expectation principles,

More information

Standard EOP Load Shedding Plans

Standard EOP Load Shedding Plans A. Introduction 1. Title: Load Shedding Plans 2. Number: EOP-003-2 3. Purpose: A Balancing Authority and Transmission Operator operating with insufficient generation or transmission capacity must have

More information

March 11, 2014 VIA ELECTRONIC FILING

March 11, 2014 VIA ELECTRONIC FILING March 11, 2014 VIA ELECTRONIC FILING Ms. Erica Hamilton, Commission Secretary British Columbia Utilities Commission Box 250, 900 Howe Street Sixth Floor Vancouver, B.C. V6Z 2N3 Re: North American Electric

More information

Transmission Planning Standards Industry Webinar: Footnote b. October 18, 2012 John Odom, FRCC, Standard Drafting Team Chair

Transmission Planning Standards Industry Webinar: Footnote b. October 18, 2012 John Odom, FRCC, Standard Drafting Team Chair Transmission Planning Standards Industry Webinar: Footnote b October 18, 2012 John Odom, FRCC, Standard Drafting Team Chair Topics Brief History Overview of Data Request and Results Approach to address

More information

NERC PLANNING STANDARDS

NERC PLANNING STANDARDS NERC PLANNING STANDARDS North American Electric Reliability Council April 2004 Version of All Planning Standards Terms and Their Definitions As Used in the Analysis (Study) an examination or simulation

More information

Periodic Review Recommendation FAC System Operating Limits Methodology for the Planning Horizon

Periodic Review Recommendation FAC System Operating Limits Methodology for the Planning Horizon Periodic Review Recommendation FAC-010-3 - System Operating Limits Methodology for the Planning Horizon Introduction NERC is required to conduct a periodic review of each NERC Reliability Standard at least

More information

Standard TPL-002-0b System Performance Following Loss of a Single BES Element

Standard TPL-002-0b System Performance Following Loss of a Single BES Element A. Introduction 1. Title: System Performance Following Loss of a Single Bulk Electric System Element (Category B) 2. Number: TPL-002-0b 3. Purpose: System simulations and associated assessments are needed

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, please email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability

More information

SYSTEM OPERATING LIMITS IN THE PLANNING HORIZON FAC-010 COMPLIANCE

SYSTEM OPERATING LIMITS IN THE PLANNING HORIZON FAC-010 COMPLIANCE SYSTEM OPERATING LIMITS IN THE PLANNING HORIZON FAC-010 COMPLIANCE System Operating Limits (SOLs) in the planning horizon are required to be identified by FAC-010. This guideline describes how Duke Energy

More information

Interchange Reference Guide line s Version 2

Interchange Reference Guide line s Version 2 Interchange Reference Guide line s Version 2 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table of Contents Table of Contents... 1 Revision

More information

Standard TPL System Performance Following Extreme BES Events

Standard TPL System Performance Following Extreme BES Events A. Introduction 1. Title: System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D) 2. Number: TPL-004-1 3. Purpose: System simulations

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Standard EOP Load Shedding Plans

Standard EOP Load Shedding Plans A. Introduction 1. Title: Load Shedding Plans 2. Number: EOP-003-12 3. Purpose: A Balancing Authority and Transmission Operator operating with insufficient generation or transmission capacity must have

More information

Standard EOP Capacity and Energy Emergencies

Standard EOP Capacity and Energy Emergencies A. Introduction 1. Title: Capacity and Energy Emergencies 2. Number: EOP-002-2 3. Purpose: To ensure Reliability Coordinators and Balancing Authorities are prepared for capacity and energy emergencies.

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Reliability Corporation ) ) Docket Nos. RM05-17-000 RM05-25-000 RM06-16-000 NORTH AMERICAN ELECTRIC RELIABILITY

More information

Transmission Interconnection Requirements. Table of Contents

Transmission Interconnection Requirements. Table of Contents Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection Agreement III. Facility Requirements IV. Interconnection Initiation I. Introduction A. Purpose and Scope

More information

City of Tacoma Department of Public Utilities - Tacoma Power. NERC Reliability Standards Compliance Assessment. Select Specification No.

City of Tacoma Department of Public Utilities - Tacoma Power. NERC Reliability Standards Compliance Assessment. Select Specification No. City of Tacoma Department of Public Utilities - Tacoma Power NERC Reliability Standards Compliance Assessment Select Specification PS15-0231F QUESTIONS and ANSWERS All interested parties had the opportunity

More information

Standard TPL-003-0a1a System Performance Following Loss of Two or More BES Elements

Standard TPL-003-0a1a System Performance Following Loss of Two or More BES Elements Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

Standard PRC Under-Voltage Load Shedding Program Database

Standard PRC Under-Voltage Load Shedding Program Database Attachment G Standard PRC-020-1 Under-Voltage Load Shedding Program Database Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will

More information

Operating Procedure PURPOSE... 1

Operating Procedure PURPOSE... 1 No. 5110A Table of Contents PURPOSE... 1 1. RESPONSIBILITIES... 1 2. SCOPE/APPLICABILITY... 2 2.1. Background... 2 2.2. Scope/ Applicability... 3 3. PROCEDURE DETAIL... 3 3.1. Importance of Standard Communication...

More information

Standard TPL System Performance Under Normal Conditions

Standard TPL System Performance Under Normal Conditions Standard TPL-001-0.1 System Performance Under rmal Conditions Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when

More information

Standard IRO Reliability Coordination Monitoring and Analysis

Standard IRO Reliability Coordination Monitoring and Analysis A. Introduction 1. Title: Reliability Coordination Monitoring and Analysis 2. Number: IRO-002-4 3. Purpose: Provide System Operators with the capabilities necessary to monitor and analyze data needed to

More information

Standards Authorization Request Form

Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.net NERC welcomes suggestions for improving the reliability of the Bulk-Power System through improved Reliability Standards. Please use this form to submit

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

NYISO Reliability Compliance Status Report for NYSRC RCMS Program Year: 2008

NYISO Reliability Compliance Status Report for NYSRC RCMS Program Year: 2008 Standard Number: BAL-001-0 (Real Power Balancing Control Performance) Description: CPS-1/2 Data Standard Number: BAL-002-0 (Disturbance Control Performance) Description: DCS Standard Number: BAL-006-1

More information

Functional Entity Roles and Responsibilities

Functional Entity Roles and Responsibilities Functional Entity Roles and Responsibilities NWPP MC Phase 3 Operations Integration Work Group 9/28/2014 Page 1 of 13 Table of Contents 1. Purpose... 3 2. Roles and Responsibilities of Functional Entities...

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Project Consideration of Commission Directives in Order No. 693

Project Consideration of Commission Directives in Order No. 693 Project 2009-02 Consideration of Commission Directives in Order Order P 905-906 Further, consistent with the NOPR, the Commission directs the ERO to modify IRO-002-1 to require a minimum set of tools that

More information

SUBMITTING ENERGY SCHEDULES

SUBMITTING ENERGY SCHEDULES SUBMITTING ENERGY SCHEDULES In this Section: Overview Designating Transmission Energy Product Codes PSE Assigned Cut Priority Capacity etags Dynamic Scheduling Spinning, Contingency Reserve and Regulation

More information

September 12, 2016 VIA ELECTRONIC FILING

September 12, 2016 VIA ELECTRONIC FILING !! September 12, 2016 VIA ELECTRONIC FILING Kirsten Walli, Board Secretary Ontario Energy Board P.O Box 2319 2300 Yonge Street Toronto, Ontario, Canada M4P 1E4 Re: North American Electric Reliability Corporation

More information

Standard Development Timeline

Standard Development Timeline Standard TPL-001-4 Transmission System Planning Performance Requirements Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be

More information

Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources

Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources Draft White Paper Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources Project 2014-01 Standards Applicability for Dispersed

More information

SUBMITTING ENERGY SCHEDULES

SUBMITTING ENERGY SCHEDULES SUBMITTING ENERGY SCHEDULES In this Section: Overview Designating Transmission Energy Product Codes PSE Assigned Cut Priority Capacity etags Dynamic Scheduling Spinning, Contingency Reservie and Regulation

More information

Standards Authorization Request Form

Standards Authorization Request Form NERC welcomes suggestions to improve the When completed, please email this form to: reliability of the Bulk-Power System through sarcomm@nerc.com. improved Reliability Standards. Please use this Standard

More information

Standard IRO Reliability Coordination Monitoring and Analysis

Standard IRO Reliability Coordination Monitoring and Analysis Page 349 of 577 A. Introduction 1. Title: Reliability Coordination Monitoring and Analysis 2. Number: IRO-002-4 3. Purpose: Provide System Operators with the capabilities necessary to monitor and analyze

More information

Standards Authorization Request Form

Standards Authorization Request Form When completed, please email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards. Please use this form to

More information

AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1)

AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1) (R1 FAC-010-AB-2.1) 1 Purpose This document sets out the System Operating Limits Methodology the Alberta Electric System Operator ( AESO ) uses for any studies conducted on the interconnected electric

More information

Standard Development Timeline

Standard Development Timeline FAC 015 1 Coordination of Planning Assessments with the Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the

More information

Standard Development Timeline

Standard Development Timeline FAC 015 1 Coordination of Planning Assessments with the Reliability Coordinator s SOL Methodology Standard Development Timeline This section is maintained by the drafting team during the development of

More information

Special Protection Systems (SPS) / Remedial Action Schemes (RAS): Assessment of Definition, Regional Practices, and Application of Related Standards

Special Protection Systems (SPS) / Remedial Action Schemes (RAS): Assessment of Definition, Regional Practices, and Application of Related Standards Special Protection Systems (SPS) / Remedial Action Schemes (RAS): Assessment of Definition, Regional Practices, and Application of Related Standards Draft for Planning Committee Review 3353 Peachtree Road

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Corporation ) and Northeast Power Coordinating Council, Inc. ) Docket No. RC09--000 INFORMATIONAL STATUS

More information

Periodic Review Template INT Implementation of Interchange

Periodic Review Template INT Implementation of Interchange INT-009-2.1 Implementation of Interchange Executive Summary The Subject Matter Expert (SME) stakeholder team completed an initial comprehensive review of INT- 009-2.1 Implementation of Interchange. The

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

Standard INT Interchange Transaction Tagging

Standard INT Interchange Transaction Tagging A. Introduction 1. Title: Interchange Transaction Tagging 2. Number: INT-001-0 3. Purpose: To ensure that Interchange Transactions, certain Interchange Schedules, and intra-balancing Authority Area transfers

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Standard Authorization Request Form

Standard Authorization Request Form Standard Authorization Request Form Title of Proposed Standard Withdraw 3 Midwest ISO Waivers Request Date April 2, 2009 SC Approval Date April 15, 2009 SAR Requester Information SAR Type (Check a box