REPAIR STATION MANUAL

Size: px
Start display at page:

Download "REPAIR STATION MANUAL"

Transcription

1 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC 433 Breesport San Antonio, Texas REPAIR STATION MANUAL Including: QUALITY CONTROL SYSTEM FAA Certificated Repair Station W2XR853X Manual Number: Assigned To:

2 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: REVISION LOG AND TRANSMITTAL Manual Number: Revision Number: 11 Revision Page Number Instructions Page Number Instructions all insert Follow the instructions in the table above to incorporate this revision into your manual. For pages not included previously, you will be instructed to add the page. When you remove pages, those pages are to be discarded. After you have completed inserting this revision into your manual, sign and date this page in the space provided below. Make a copy of this page and insert it in front of the previous Revision Log and Transmittal pages in your manual. This will provide a chronological revision history. Return the original signed copy of this page to the Chief Inspector. Aeroweld RSM Rev 11 i

3 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: HIGHLIGHTS OF CHANGE Revision 9 Complete Rewrite 10 All pages reprinted for convenience. Changes made to the following pages: 2-1 Electronic Manuals Wording Clarified 2-2 Electronic Manuals Wording Clarified 3-10 Employee summary data requirements explained 4-1 Policy on rental equipment defined 5-1 Capabilities List yearly review explained Section 9 Contract Maintenance Explained New Maintenance Defect form and web site listed Self disclosure discussed. A-1 Housing Facilities Updated 11 All pages reprinted for convenience. Changes made to the following pages: iv Removed Capabilities List Wording 1-2 Modified Capabilities List Wording 2-1 Electronic Manuals Wording Clarified 5-1 Removed Capabilities List Description and Evaluation Program C-1 Deleted Capabilities List C-2 Deleted Capabilities List Aeroweld RSM Rev 11 ii

4 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: TABLE OF CONTENTS And LIST OF EFFECTIVE PAGES Title Page Rev Date COVER PAGE n/a REVISION LOG AND TRANSMITTAL i 11 2/06/13 HIGHLIGHTS OF CHANGE ii 11 2/06/13 TABLE OF CONTENTS/LIST OF EFFECTIVE PAGES iii 11 2/06/13 iv 11 2/06/13 v 11 2/06/13 PREFACE vi 11 2/06/13 SECTION 1: GENERAL POLICY AND PROCEDURE /06/ Introduction /06/ Definitions and Acronyms /06/ Changes to the Repair Station /06/ Capabilities List /06/13 SECTION 2: MANUAL REVISION AND CONTROL /06/ /06/13 SECTION 3: ORGANIZATION AND PERSONNEL /06/ General /06/ Organizational Structure /06/ Personnel Duties and Responsibilities /06/ Accountable Manager /06/ President /06/ Director Quality /06/ /06/ Quality Assurance Manager /06/ /06/ Chief Inspector /06/ /06/ Maintenance Manager /06/ NDT Manager /06/ NDT Level III /06/ NDT Level II Technician /06/ NDT Level I Technician /06/ Welder /06/ Technician /06/ Machinist /06/13 Aeroweld RSM Rev 11 iii

5 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: 3.4 Personnel Qualifications /06/ Supervisors /06/ Repairmen /06/ Inspection Personnel /06/ Personnel Records and Roster /06/ Inspection Personnel Roster /06/ Supervisor Personnel Records /06/13 SECTION 4: HOUSING AND FACILITIES /06/13 SECTION 5: CAPABILITIES LIST /06/13 SECTION 6: TRAINING /06/13 SECTION 7: OFF PREMISES MAINTENANCE /06/ Performance of Maintenance at a Location /06/13 Other than the Repair Station 7.2 Performance of Maintenance at A Location /06/13 Outside The United States /06/ Performance of Maintenance at A One Time of /06/13 Special Circumstance Location SECTION 8: AIR CARRIER MAINTENANCE 8.1 Airworthiness Release for Air Carrier Work /06/ Required Inspection Item RII /06/ Mechanical Reliability Reports /06/13 SECTION 9: CONTRACT SERVICES /06/13 SECTION 10: QUALITY CONTROL SYSTEM /06/ Introduction /06/ Revisions to the Quality Control System /06/ /06/ Initiating Work Orders /06/ Continuity of Inspection Responsibility /06/ Receiving Inspection /06/ Materials, Equipment, and Tools /06/ Preliminary Inspection /06/ /06/ Hidden Damage Inspection /06/ /06/ Part Identification and Tracking /06/ In-Process Inspection /06/ /06/ Final Inspection and Return to Service /06/ Major Repairs and Alterations /06/13 Aeroweld RSM Rev 11 iv

6 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: /06/ Record keeping System and Procedures /06/ Reports of Failures, Malfunctions, or Defects /06/ Scrap Parts Program /06/ Correcting Repair Station Deficiencies /06/ /06/ Technical Data /06/ /06/ Tools and Equipment /06/ Equivalent and Fabricated Special Tools /06/ Calibration Policy and Procedures /06/ /06/ Calibration Reference Standards /06/ /06/13 APPENDIX A: DESCRIPTION OF HOUSING AND FACILITIES A /06/13 A /06/13 APPENDIX B: APPROVED CONTRACT MAINTENANCE LIST B /06/13 Aeroweld RSM Rev 11 v

7 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: PREFACE This manual was developed by Aeroweld, Inc., Inc. to meet current requirements of 14 CFR Part 145. It is intended to satisfy the requirements for a Repair Station Manual and Quality Control Manual. It describes the facilities, equipment, personnel, policy and procedures used in the operation of this repair station. Forms are contained in Forms Manual FM-01. Housing and facility changes that require FAA acceptance are described in Appendix A of this manual. Maintenance functions contracted to an outside source must be approved by the FAA are listed in Appendix B of this manual. NOTE All forms mentioned in this manual are contained in the forms manual FM-01. Aeroweld RSM Rev 11 vi

8 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: SECTION 1: GENERAL POLICY AND PROCEDURE 1.1 Introduction To operate as a certificated repair station, the person or organization must have a valid Repair Station Certificate issued in accordance with 14 CFR Part 145. Aeroweld, Inc., Inc. has met these certification requirements and been issued ratings by the FAA under certificate number W2XR853X. All work will be performed in accordance with 14 CFR Part 43 and the limitations prescribed in our Operations Specification and Capabilities List found in Appendix C to this manual. This repair station will not perform any service for which it is not rated, and will not perform any service for which it is rated if it requires technical data, equipment, materials, facilities or trained personnel that are not available. Policy and procedures pertaining to specific requirements are described in this manual will be followed. A copy will be accessible for use by repair station personnel at all times. 1.2 Definitions and Acronyms The following definitions for terms and acronyms shall apply when referenced in this manual. Accountable Manager - the person designated by the certificated repair station who is responsible for and has the authority over all repair station operations conducted under Part 145, including ensuring that repair station personnel follow the regulations and serving as the primary contact with the Federal Aviation Administration (FAA). Article - an aircraft, airframe, aircraft engine, propeller, appliance, or component part. Contract maintenance maintenance functions performed by person(s) or organizations under an agreement with the repair station. This contract may be written, verbal, or implied. CHDO - the certificate holding district office of the FAA with oversight responsibility of the repair station. EPA Environmental Protection Agency FAA - Federal Aviation Administration FSDO Flight Standards District Office RII - Required Item Inspection 1-1

9 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: RSM Repair Station Manual. For the purposes of this manual, the RSM is includes the repair station manual, quality control manual, and training program combined. 1-2

10 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: 1.3 Changes to the Repair Station If Aeroweld, Inc., Inc. intends to change the location of its facilities or makes changes to existing housing or facilities that could have a significant effect on the repair station s ability to perform work, those changes will be submitted as a revision to Appendix A of this manual. The revised Appendix A must be accepted by the FAA prior to these changes becoming effective. The Accountable Manager is responsible for ensuring this is accomplished. In the event that Aeroweld, Inc., Inc. sells or transfers its assets, an amended repair station certificate is required. The Accountable Manager is responsible for reporting these changes to the FAA. The new owner is responsible for preparing and transmitting to the FAA, the application for such an amendment, and may not operate the Repair Station until these changes have been accepted by the FAA. This repair station certificate does not have any fixed duration. It is effective until it is surrendered, suspended, or revoked. If our certificate is suspended or revoked, or if we elect to surrender it, the Accountable Manager will be responsible for returning it to the FAA. 1.4 Capabilities List Aeroweld, Inc., Inc. does not use a Capabilities List at this time. 1-3

11 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: SECTION 2: MANUAL REVISION AND CONTROL Aeroweld uses both an electronic version of the RSM and a hard copy version as required. Aeroweld provides enough computer work stations so all personnel required to use the RSM have access to the manual while performing work for the repair station. Aeroweld personnel working off-site are issued an internet link to the electronic manual, as necessary. Revisions to this RSM may be initiated by the Chief Inspector and must be approved by the Accountable Manager. Each revision is identified using sequential numbering and a date representing when the revision was initiated. A vertical bar (change bar) is placed in the margin adjacent to revised text to make changes easier to recognize by users. Existing change bars are removed at the next revision to the page. The Table of Contents and List of Effective Pages are combined into one set of pages that help locate subject text and provide a means of verifying the current revision status of each page. Changes made to the RSM are approved by the Accountable Manager and documented by his/her signature on at the bottom of the last page of the Table of Contents and List of Effective Pages. Aeroweld electronic manuals are constructed and maintained consistent with the recommendations of FAA Advisory Circular AC (as revised). Only the Quality Assurance Manager or his/her designee shall have write capabilities to the Aeroweld manual system. Electronic versions will be published in Adobe Acrobat PDF format, and are password protected to prevent changes. Receipt of instruction and familiarization on electronic manuals or revisions thereof shall be reflected by completion and return of Aeroweld Revision Notice/Acknowledgment (AW-33). The Chief Inspector also notifies the CHDO when the RSM has been revised by letter or . Aeroweld provides the CHDO a paper or electronic copy or Compact Disc (CD) of the revised RSM as requested. The FAA CHDO notifies Aeroweld in writing whether it accepts or rejects the revised RSM. The Chief Inspector retains a copy of the CHDO s acceptance/rejection document for at least 2 years. Aeroweld will begin using the revised RSM as soon as it is issued. However, in the event the Federal Aviation Administration (FAA) subsequently notifies Aeroweld that a revision is not acceptable, the Director of Quality and the Manager of Quality Control determines whether any repair station work is or was affected by the unacceptable revised procedure(s). The Chief Inspector coordinates any rework required with the customer. If an article has already been approved for return to service, the Chief Inspector notifies the Accountable Manager and the customer, and works with the customer to develop an effective strategy to correct the deficiency. The Chief Inspector is responsible to ensure that revisions are issued for each copy of the RSM. The Revision Log and Transmittal Page are designed to provide a record of each revision and include instructions for entering the changes into the manual. When a revision 2-1

12 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: Manual Revision and Control (cont.) has been issued, a Revision Log/Transmittal Page is created for the revision. Instructions published on this page are followed by the manual holder when inserting the revision into their RSM. When this process is complete, the page is signed and dated at the bottom by person assigned to the manual. A copy of this page is made and inserted into the manual to provide a record of revision. As subsequent revisions to the manual occur, each Revision Log/Transmittal Page is copied and added to the manual in front of the previous record, creating a revision history. The original signed Revision Log/Transmittal Page is returned to the Chief Inspector. The original signed Revision Log/Transmittal Page is returned to the Chief Inspector to provide a record for monitoring and controlling the revision status of each RSM. A distribution log of manuals is maintained by the Chief Inspector listing all assigned copies of the manual by number and assignment. The original Revision Log/Transmittal Pages are kept on file with the distribution log and made available to the FAA upon request. NOTE: Electronic versions of this manual are completely reissued at each revision, the last date inserted and initials may remain blank on electronic copies of this document. Each supervisor and inspector listed on the repair station roster and the FAA CHDO are assigned a copy of this RSM. A current copy of this manual is also accessible for use by all repair station personnel. To prevent access to information that is not maintained current, no employee may make a copy of the manual or pages from the manual, without clearly identifying them as uncontrolled copies. The RSM is maintained current at all times. The individual to whom the manual copy is assigned is responsible for updating their manual, even if the task is delegated. If the Chief Inspector does not receive the signed Revision Log/Transmittal Page within 2 weeks of the revision distribution, he/she contacts the individual responsible for that manual. If the manual has been completely revised, old manuals are destroyed. 2-2

13 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: 11 SECTION 3: ORGANIZATION AND PERSONNEL 3.1 General This section contains policy and procedures that relate to personnel issues of the repair station. It includes a description of key positions in the repair station but may not describe other positions that do not directly affect the quality control system. Employees will be hired based on their skills, knowledge, and experience. Initial qualifications will be evaluated through a review of employment history, training records, and certifications. Job assignments will be made based on the employee s qualifications. Qualifications for specific positions are defined later in this section. 3.2 Organizational Structure This organization chart identifies (by title only) each position with authority to act on behalf of the repair station. Only positions that relate to the operation of the repair station are included. CEO Accountable Manager President Administration Director of Quality Director of Training Responsible Level III Maintenance Manager Quality Assurance Manager Chief Inspector NDT Manager Welder Machinist Technician Level III Technician Level II Technician Level I Technician 3-1

14 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: Personnel Duties and Responsibilities Accountable Manager The Accountable Manager is the person designated by the repair station with responsibility and authority over all repair station operations. All duties of the Accountable Manager may be delegated to any qualified assistant, as they deem necessary. However, such delegation does not relieve the Accountable Manager of the overall responsibilities. The Accountable Manager is responsible for: Providing adequate equipment, materials and competent, qualified personnel, as necessary, pertinent to the operation of the repair station, in order that it may comply with all applicable Federal Aviation Regulation and manufacturer s recommendations. Ensuring that all repair station housing, facilities, and equipment are properly maintained. Directing, planning, and laying out details of inspection standards, methods, and procedures used by the repair station in complying with all applicable Federal Aviation Regulations and manufacturers' recommendations. Ensuring that repair station personnel are trained in accordance with the Personnel Training Program listed in Section 6. Maintaining a current roster of all management, supervisory, and inspection personnel. Coordinating revisions to the Repair Station Manual to insure that changes initiated by the Chief Inspector are properly reviewed and incorporated into the manual. In the absence of the Accountable Manager, the Director Quality acts on his or her behalf President The President reports to the Accountable Manager and is responsible for operations. He is the executive responsible for all operations and management of Aeroweld additionally; he has approval authority for all job quotes. The President is responsible for and has the authority over all repair station operations that are conducted under part 145. His duties include ensuring that repair station personnel follow the regulations. In the absence of the President, the Director Quality acts on his or her behalf Director Quality 3-2

15 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: 11 The Director Quality is responsible to the Accountable Manager or the President for the overall state of the company s Quality and Inspection system and also serves as the primary contact with the Federal Aviation Administration (FAA). He shall be the final authority in returning to service airframes, engines, propellers, appliances and the component parts thereof. He is also responsible for utilizing organizational resources in order to meet company goals and tasks. The individual provides job quotes and schedules technicians accordingly. He has return to service authority. Additional duties include but are not limited to the following: Ascertain that all inspections are properly performed and that the proper inspection records, reports and forms used by the Repair Station are properly executed prior to releasing the product for return to service. Accomplish the final acceptance of all incoming material, including new parts, supplies and the airworthiness of articles on which work has been performed outside the Repair Station by contract. Ensures that preliminary, hidden damage, in-progress, and final inspections of all articles processed by the repair station are recorded as outlined in this manual. Oversee the proper tagging and identification of all parts and components as outlined in this manual. Provide for continuity of inspection responsibility, assuring completion of required inspection when personnel shift or assignment changes occur. Ensure rejected and unserviceable parts are handled in such a way as to prevent their reuse as serviceable parts. Ensure that all inspections are properly performed on all completed work before it is approved for return to service, and that the proper inspection and maintenance records, reports, and forms required for such release are properly executed. Maintain files of completed work orders and inspection forms in such a manner that the file pertaining to a specific repaired item can be located for review. In the absence of the Director of Quality, the NDT Manager acts on his or her behalf Quality Assurance Manager This individual reports to the Director Quality and has unimpeded access to the CEO. In addition, he is responsible for directing, planning, and laying out the details of inspection standards, methods, and procedures used by the repair station in complying with all applicable Code of Federal Regulations (CFR) and manufacturer s specifications and recommendations. 3-3

16 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: 11 The Quality Assurance Manager is authorized by the Accountable Manager to make applications for Repair Station Certification and/or rating, FAA Form , as it pertains to the original application for certification and rating, change in rating, and changes in location or housing facilities and other forms and initiate correspondence with the FAA in regard to the certification or operation of the Repair Station. It is the duty of the Quality Assurance Manager to: Assist the Director Quality and provide direction to all personnel assigned as nondestructive testing technicians. Maintain and keep a current file of pertinent CFR s, Specifications, and Airworthiness Directives Determine that all technical data on all articles inspected by the Repair Station are secured and kept current with the latest revisions. In addition, assure that all military technical orders used in the overhaul and repair of components have been evaluated and approved by the FAA. Assure that periodic checks are made on all inspection tools and the calibration of precision test equipment used by the repair station is current. Further, assure that a current record of those inspections and test is maintained. Determine that no defective, unserviceable, or unairworthy parts are installed in any component or articles released by the Repair Station. Submit reports to the FAA within 96 hours of discovering any failure, malfunction or defects of unairworthy condition in accordance with CFR The proper execution of Malfunction and Defects Report, Form or Service Difficulty Report, Form , when required. Assure the proper execution of FAA form 337, and / or a maintenance release when it is required. Report to the FAA Flight Standards District Office (FSDO) any known violations of CFR s that the Repair Station is responsible for. Reporting shall be in a manner consistent with AC , Voluntary Disclosure Report. Responsible for the drug and alcohol program. Providing adequate training, equipment, materials, and competent personnel pertinent to the operations of the repair station in order that it may comply with all applicable CFR, manufacturer s recommendations, company and quality standards and requirements. Assuring that all personnel who perform aircraft maintenance or preventive maintenance functions on Part 121 programs are relieved from duty for at least 24 consecutive hours during any seven day period or the equivalent thereof within any one calendar month. In the absence of the Quality Assurance Manager, the NDT Manager acts on his or her behalf. 3-4

17 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: Chief Inspector The Chief Inspector is responsible to the Director Quality for the overall operation of the inspection department and, as such will have authority in the returning to service. In addition, the inspector is responsible for directing, planning and laying out the details of inspection standards, methods and procedures used by the repair station complying with all applicable CFR s, manufacturer s specifications and recommendations. It is the Chief Inspector s duty to: Ascertain that all inspections are properly performed on all completed work and that the proper inspection records, reports and forms used by the repair station, are properly executed prior to releasing the product for return to service. Maintain and keep current a file of pertinent CFR s, specifications, type certification data sheets, and airworthiness directives. Shall be responsible to keep a record of test and calibration equipment. Shall see that test equipment is maintained and calibrated according to the standards specified in this manual. Determine that no defective, unserviceable, or unairworthy parts are installed in any component or articles released by the repair station. Submit reports of unairworthy condition in accordance with CFR Assure the proper execution of FAA Form when required, and/or a maintenance release. Accomplish the final acceptance of all incoming material, including new parts, supplies and the airworthiness of articles on which work has been performed outside the repair station by contract. Conduct the receiving, preliminary, hidden damage, in progress, and final inspection of all articles processed by the repair station and record results as outlined in this manual. Oversee the proper tagging and identification of all parts and components as outlined in this manual. Provide for continuity of inspection responsibility, assuring completion of required inspection when personnel shift or assignment change. See that rejected and unserviceable parts are handled in such a way as to prevent their reuse as serviceable parts. Ascertain that all inspections are properly performed on all completed work before it is approved for return to service, and that the proper inspection and maintenance records, reports, and forms required for such release are properly executed. Maintain files of completed work orders and inspection forms in such a manner that the file pertaining to a specific item repaired can be readily located for review. 3-5

18 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: 11 Responsible for the roster of certificated inspection personal authorized to sign a maintenance release for return to service. Audit the work order package to ensure all sign offs are correctly executed and all items accounted for prior to releasing the aircraft. Assigns trips outside the United States and notifies the CHDO. Maintains and distributes the Electronic Manual in accordance with Section IX of this manual. Issue badges to new employees. NOTE: The Chief Inspector may delegate all duties assigned to any qualified assistant as necessary, however, such delegation does not relieve the Chief Inspector of the overall responsibilities. In the absence of the Chief Inspector, the NDT Manager acts on his or her behalf Maintenance Manager The welding department manager is responsible for directing and maintaining all welding and other operations of Aeroweld as instructed by the Accountable Manager or President. Additional duties include but are not limited to the following: Directing all personnel assigned to the production department. Provide adequate training, equipment, materials and competent personnel pertinent to the operations of the repair station in an order that it will comply with all applicable CFR and manufacturer s recommendations. Ensure that all welding operations are properly performed and that the proper records, reports, and forms used by the repair station are properly executed. Ensure that preliminary, hidden damage, in-progress and final inspections of all articled processed by the repair station are recorded as outlined in this manual Responsible for reviewing welding documents submitted to Aeroweld and to provide support to parties involved. This individual is also responsible for the procurement and proper housing of materials and supply for the maintenance shop. Ensure that all maintenance and if necessary, calibration of equipment contained in the welding shop are maintained in accordance with manufacturer s recommendations. In the absence of the Maintenance Manager, the Director Quality acts on his or her behalf. 3-6

19 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: NDT Manager The NDT Manager is responsible to the Director Quality for the overall operations of the NDT Department. The Manager of NDT shall have the final authority in the NDT acceptance of airframe, engines, propellers, appliances and the component parts thereof. Additional duties include but are not limited to the following: Assist, supervise and direct all personnel assigned to the NDT Department. Ascertain that NDT inspections are properly performed on all completed work and that inspections records, reports and forms used by the Repair Station are properly executed prior to releasing the product for return to service. Ensure that periodic checks and calibration of all department equipment is performed. Perform additional duties as required by the Director Quality. In the absence of the NDT Manager, the Director Quality acts on his or her behalf NDT Level III An NDT Level III is responsible for the training, qualification and certification of NDT Level I and Level II Technicians. This position has return to service authority. Perform additional duties as required by the NDT Manager NDT Level II Technician An NDT Level II is a certificated repairman and as such has return to service authority. Perform additional duties as required by the NDT Manager NDT Level I Technician An NDT Level I Technician may receive guidance or supervision from a certified Level 2 or 3 when necessary. When authorized by the Responsible Level 3 may perform interpretations and evaluations of specific products(s) or product form(s) for acceptance or rejection in accordance with approved work instructions and have return to service only for those specific items authorized by the Level 3. Perform additional duties as required by the NDT Manager 3-7

20 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: Welder A welder performs welding under the direction of the Maintenance Manager. A welder does not have return to service authority. Perform additional duties as required by the Maintenance Manager Technician A technician performs any function that he is qualified for. The technician may hold an FAA Airframe, Power Plant, or Repairman certification. The Technician does not have return to service authority. Perform additional duties as required by the Maintenance Manager Machinist A Machinist performs machining operations under the direction of the Maintenance Manager. A Machinist does not have return to service authority. Perform additional duties as required by the Maintenance Manager. 3-8

21 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: Personnel Qualifications Supervisors Supervisors will be technically qualified and have a working knowledge of the overall job functions of the repair station. He/She will be certificated under 14 CFR Part 65 appropriate to the work assigned. The Accountable Manager is responsible for verifying this before assignment of a supervisor and must also meet these qualification requirements Repairmen Repairman certificated under 14 CFR Part 65 for this repair station may perform, supervise and approve aircraft for return to service work for the repair station under the ratings and limitations of their certificate. He/she may not supervise or return to service any work functions that are not specified on the certificate. To be qualified for any ratings under a repairman certificate, a candidate must have a minimum of 18 months of practical experience in the procedures, practices, inspection methods, materials, tools, and equipment generally used in the duties of the specific job. He/She must be familiar with and understand the policy and procedures of this manual and meet all other requirements of 14 CFR Part The Accountable Manager and the Director of Quality will determine when AEROWELD requires a repairman. The Accountable Manager and the Director of Quality will review the qualifications of all individuals AEROWELD recommends for repairmen to ensure they meet the requirement of 14 CFR Part for the job function they are occupying. The Accountable Manager will recommend individuals as repairmen. The Director of Quality will ensure all individuals who receive repairman certificates have their training record updated to reflect the certificate. If an employee leaves AEROWELD or no longer performs the job requiring the repairman certificate, the Director of Quality will ensure the individual s repairman certificate is surrendered to the FAA in accordance with 14 CFR Part 65 and the individual s training record annotated as such Inspection Personnel The Director of Quality selects inspection personnel based on an individual s qualifications and training. To be an inspector, an individual must be an employee of the repair station and have: 3-9

22 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: 11 Completed company training covering the applicable Federal Aviation Regulations and current RSM procedures in accordance with Training Program Manual TP-01. The ability to read, write, speak, and understand the English language. A thorough understanding of the inspection methods, techniques, and equipment used to determine the airworthiness of the article, including visual inspection aids. Before assignment as an inspector with the authority to approve an article for return to service, the Accountable Manager will determine that all of the above requirements have been met. This will be documented and maintained in the inspector s personnel records. Recurrent training will be conducted in accordance with the Training Program to ensure that proficiency is maintained (reference Training Program Manual TP-01). 3.5 Personnel Records and Roster The repair station will maintain a roster of all management, supervisory and inspection personnel, including identification of individuals responsible for approving articles for return to service and RII authorizations. The Accountable Manager is responsible for ensuring that this roster is kept current and will revise the roster within five days after any change in personnel or work assignments that could affect the accuracy of the roster, and will notify the CHDO in the same timeframe. This roster may be maintained either on paper or electronic format, as long as it contains all of the information listed above. The roster will be kept in the Accountable Manager s office and available for review by the FAA and repair station employees at any time. The repair station will also maintain employment summaries for each person whose name appears on the roster. The summary will include the employee s position, certificates held, experience, address, and at least the last three places of employment and description of responsibilities at those locations. Employment summaries will be maintained by the Accountable Manager in his/her office Inspection Personnel Roster The Inspection personnel roster will contain the following information: Legal name, present title, and scope of current position; total years of experience and the type of work performed; employment history, including name of previous employer and length of employment by month and year; a sample of the signature and initials used on work documents scope of present employment and Type and certificate number of any certificate held, along with any ratings or limitations. 3-10

23 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: Supervisor Personnel Records The Supervisor personnel roster will contain the following information: Legal name, present title, and scope of current position; total years of experience and the type of work performed; employment history, including name of previous employer and length of employment by month and year; a sample of the signature and initials used on work documents scope of present employment and Type and certificate number of any certificate held, along with any ratings or limitations. 3-11

24 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: 11 SECTION 4: HOUSING AND FACILITIES Aeroweld, Inc. (Aeroweld), FAA Certified Repair Station No. W2XR853X is located at 433 Breesport San Antonio, Texas Our offices and nondestructive testing instruments, welding and related equipment are stored and maintained at this location. The Accountable Manager is responsible for the efficient layout of the repair station and for ensuring the facilities and equipment are adequate to perform all work under the repair station certificate. The Chief Inspector shall be responsible for all tools / equipment that is rented, leased, or borrowed. He shall ensure that the tools / equipment meet the customer s requirements and if calibration is required he shall verify that the instrument has a proper calibration label and verify the label with the calibration certificate. In general, Aeroweld uses only company owned equipment. In some instances, an expensive and infrequently used piece of equipment may be rented. When special tools or equipment is required, the Quality Department will obtain the necessary tools or equipment. All tools and equipment, even if not owned or controlled by Aeroweld, will be received and processed through Aeroweld s receiving inspection process. This includes proper labeling and identification and, if required, verification of calibration. The calibration records must indicate that the equipment is calibrated to the standards established by the article manufacturer, the equipment manufacturer, or standards traceable to the National Institute for Standards and Technology (NIST) or equivalent. The building is of steel frame with concrete block walls construction on a concrete slab and is approximately 5000 square feet. The building has a 120/240 volt electrical supply system with central heat and air conditioning. The shop area has a 150 psig compressed air system. Equipment consists of welding machines, mill, shear, break, lathe, drill press, Heat Treat Oven and non destructive test sets. Whenever a significant change is anticipated to the location, housing, or facilities that might have a significant impact on the ability of the repair station to accomplish its work, the Chief Inspector will develop a revision to Appendix A. The Accountable Manager must approve this revision before a copy is sent to the FAA CHDO for acceptance. The FAA must approve these changes prior to their implementation. After FAA approval, standard manual revision procedures will be followed. 4-1

25 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: 11 SECTION 5: CAPABILITIES LIST Aeroweld does not use a Capabilities List at this time. 5-1

26 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: AEROWELD, INC. Issue: 11 SECTION 6: TRAINING Training of Repair Station personnel will be accomplished in accordance with the Repair Station Approved Training Program. This program is set forth in a stand-alone document titled, Training Program Manual, TP-01. The Quality Assurance Manager has the overall responsibility for seeing this program is fully implemented. He will also review the effectiveness of the program every 120 days, and initiate changes if found necessary. 6 1

27 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: SECTION 7: OFF PREMISES MAINTENANCE 7.1 Performance of Maintenance at a Location Other Than the Repair Station The NDT / Maintenance Manager will be responsible for assigning the personnel required to complete the job, and the supervision necessary to perform the work in a satisfactory manner. The Chief Inspector will insure that all required forms and work is completed as required by this manual. He will also assign a qualified Inspector who will be responsible for approving/returning the aircraft to service. In addition, the responsible Manager will ensure that the article undergoing maintenance will be protected from damage and from the elements, and that all Repair Station personnel will work in a safe environment. He will also be responsible for providing work forms, tools, technical data, and any other necessary equipment to accomplish the required work, as well as insuring that a copy of the RSM is available for use.. He will establish an effective communication system between the field site and the Repair Station. All personnel assigned to the field site will accomplish the specific function of work in the same manner as if it were performed at the Repair Station, unless deviations are approved by the Chief Inspector, and in accordance with all applicable Federal Aviation Regulations. 7.2 Performance of Maintenance at a Location Outside The United States Aeroweld Inspections may provide specialized service for its customers at a location outside the United States on a temporary basis. An occasion may arise in which an Aeroweld customer has an aircraft located in a foreign country that requires specialized services; Aeroweld will provide services for which it is rated, provided the following occurs: The Aeroweld customer inquires about the possibility of work being performed A Contract or Work Order is executed between Aeroweld and the customer describing the work to be performed. The CHDO will be notified of operations to be performed in a foreign country by the Chief Inspector by phone conversation and followed by a formal letter of request ed or faxed for approval. 7 1

28 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: Work is performed in accordance with procedures in this section. Services provided in a foreign country will be conducted on a temporary basis, and will terminate upon completion of the services as defined in the contract. Regardless of where maintenance services are to be performed, an evaluation will be made of the work to be performed by the Chief Inspector, or his designee, in determining the scope of work to be performed, required personnel, and material required to accomplish the job. The Chief Inspector may delegate his duties to the technician outside of the United States, if physical tasks normally performed by the Chief Inspector are required. 7.3 Performance of Maintenance At A One Time or Special Circumstance Location Should Aeroweld need to perform services at a location not previously approved under this RSM, the Chief Inspector will contact the CHDO to obtain permission. This contact will be either in writing or via . The response of the CHDO will be retained for a minimum of two years after the work is performed. 7 2

29 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: SECTION 8: AIR CARRIER MAINTENANCE Aeroweld may perform maintenance, preventive maintenance, alterations, and inspections for air carriers conducting operations under CFR Parts 121, 125, 129, and 135, and for other customers. Before work is accepted, the Chief Inspector will verify that Aeroweld is authorized and has the proper manuals, tools, test equipment, and qualified personnel to accomplish the work. If there is any special training required, including training by the customer (as would be the case for an RII), the Chief Inspector will notify the Accountable Manager. For training provided by the customer, the Manager of Training will work with the customer to ensure any Aeroweld personnel requiring training receive the training before beginning work. The Chief Inspector will be the principal contact for the Air Carrier. He will review all purchase orders and purchase order amendments for complete and correct instructions. The Chief Inspector will keep a file of the Air Carrier s procedures, including all necessary technical data. 8.1 Airworthiness Release For Air Carrier Work All work performed under the continues airworthiness requirement of CFR 121, 125, 129, and 135 will have an airworthiness release or appropriate entry in the aircraft log prepared in accordance with the certificate holders manual for the work performed. Aeroweld will maintain adequate personnel for the performance of work which it contracts. Prior to starting any work, Aeroweld will have in its possession, a current copy of the applicable section of the maintenance manual for the work that is to be performed. Each person performing maintenance or preventative maintenance, working a Part 121 aircraft under the provisions of continuous airworthiness requirement will be relieved from duty for 24 consecutive hours during any seven day period or its equivalent, in any one calendar month. A list of supervisory and inspection personnel is maintained at Aeroweld listing the authorized personnel in responsible for the maintenance and inspections and who hold an appropriate FAA Mechanic s or Repairman s Certificate. 8 1

30 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: 8.2 Required Inspection Item RII A Required Inspection Item (RII) is any maintenance operation, repair or alteration which, if improperly performed could result in a failure, malfunction or defect, endangering the safe operation of the Aircraft if not performed properly or if improper parts or materials are used will be given a required inspection. When work is performed for an air carrier under the continued airworthiness requirements of CFR Parts 121, 125, 129, and 135, and is and is a Required Inspection Item the person with the final acceptance shall be qualified as an RII Inspector by the owner/operator. The owner/operator shall furnish to Aeroweld, Inc. a list of Required Inspection Items and the Chief Inspector or his designee, will review the experience level, training records, and qualifications of inspection personnel who will perform the RII inspections and submit their names of qualified personnel to the air carrier for their approval. As a minimum each RII qualified personnel shall hold a valid FAA A&P certificate or appropriate Repairman s Certificate. 8.3 MECHANICAL RELIABILITY REPORTS When work is being accomplished for an air carrier and a defect as described under the Malfunction or Defect Report is found, the air carrier will be notified in order that a Mechanical Reliability Report may be issued by the air carrier. The certificate holder of the aircraft is responsible for reporting the Mechanical Reliability Report per CFR

31 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: SECTION 9: CONTRACT SERVICES Aeroweld only contracts minor services necessary as part of a larger effort. This includes items such as having an item sandblasted so that Aeroweld may perform an inspection on the bare item. If the item must be returned painted, that service would also be contracted. None of the primary services Aeroweld provides are contracted. The Quality Assurance Manager is responsible for the contract maintenance program. Aeroweld may contract maintenance to certificated and non-certificated facilities provided: a. The maintenance function is approved by the CHDO; b. Aeroweld provides a listing of maintenance functions to be contracted to each outside facility in a format acceptable to the CHDO; c. Aeroweld remains directly in charge of the work performed by the non-certificated person; d. Aeroweld verifies by test and/or inspection, that the work has been performed satisfactorily by the non-certificated person and that the article is airworthy before approving it for return to service; e. The non-certificated person follows a quality control system equivalent to the system followed by the certificated repair station; In accordance with the requirements of 14 CFR (c), Aeroweld will not approve for return to service any article on which a maintenance function was performed by a non-certificated person if the non-certificated person does not permit the FAA to make the inspection described in 14 CFR (b). In accordance with the requirements of 14 CFR (c), Aeroweld will not provide only approval for return to service of a complete type-certificated product following contract maintenance, preventive maintenance, or alterations. 9 1

32 UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: SECTION 10: QUALITY CONTROL SYSTEM NOTE All forms mentioned in this manual are contained in the forms manual FM Introduction This section defines quality control policies and procedures used by Aeroweld, Inc., Inc. The purpose of the quality control (QC) system is to ensure the airworthiness of the articles on which the repair station maintains or services. Other required elements of the quality control system pertain to currency of technical data and calibration of test equipment. Policy and procedures regarding technical data, equipment and tools can be found in this section. This section describes the following: the system and procedures for inspection of incoming raw materials. the system and procedures for preliminary inspection of parts to be plated. the system and procedures to inspect for hidden damage. the system and procedures for performing final inspection. the system and procedures for correcting repair station deficiencies. In addition, Appendix D of the RSM contains samples of all necessary standard forms and an explanation of how to complete those forms. Aeroweld services are offered at our location and at the location of the customer s aircraft. The Quality system has been designed to insure that work performed at any location meets the same requirements and standards. Services and locations are as follows: Non Destructive Testing (NDT) In shop and On Aircraft Welding - In shop and On Aircraft Machining In shop only Heat Treat In shop only Different procedures and forms are required depending on the type of work being performed and the location. Those differences are noted in the following sections Revisions to the Quality Control System 10 1

ELECTRONIC REPAIR STATION MANUAL

ELECTRONIC REPAIR STATION MANUAL UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: http://www.aero-weld.com/forms.htm AEROWELD, INC 433 Breesport San Antonio, Texas 78216 ELECTRONIC REPAIR STATION MANUAL Including: QUALITY

More information

West Star Aviation 796 Heritage Way Walker Field Airport Grand Junction, Co 81506

West Star Aviation 796 Heritage Way Walker Field Airport Grand Junction, Co 81506 DOMESTIC REPAIR STATION AND QUALITY CONTROL MANUALS West Star Aviation 796 Heritage Way Walker Field Airport Grand Junction, Co 81506 Federal Aviation Administration Repair Station Certificate Number WTXR173J

More information

FOR West Star Aviation, Inc. (GJT) 796 Heritage Way Grand Junction Regional Airport Grand Junction, Co 81506

FOR West Star Aviation, Inc. (GJT) 796 Heritage Way Grand Junction Regional Airport Grand Junction, Co 81506 DOMESTIC REPAIR STATION AND QUALITY CONTROL MANUAL S FOR West Star Aviation, Inc. (GJT) 796 Heritage Way Grand Junction Regional Airport Grand Junction, Co 81506 Federal Aviation Administration Repair

More information

PMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016

PMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016 PMA Quality Assurance Manual Date Aviation Technical Services, Inc. 3121 109 th Street SW Everett, WA 98204 425-423-3371 2600 West Casino Road Everett, WA 98204 10315 Airport Road Everett, WA 98204 www.atsmro.com

More information

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,

More information

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES C.A.S.E. 3-A STANDARD DISTRIBUTORS OF NEW AND SURPLUS PARTS QUALITY PROGRAM REQUIREMENTS Section Subject Page 1. Policy.... 2 2. Quality System and Quality Manual.... 3 3. Quality Organization..... 3 4.

More information

FAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT REQUIRED INSPECTION ITEMS (RII) JOB AID

FAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT REQUIRED INSPECTION ITEMS (RII) JOB AID SAFETY ELEMENT 1.3.4 REQUIRED INSPECTION ITEMS (RII) JOB AID The Federal Aviation Administration (FAA) is proactively moving away from compliance based safety surveillance programs to Systems Safety Risk

More information

FAA REPAIR STATION NO.: OGYR627Y

FAA REPAIR STATION NO.: OGYR627Y EASA Supplement To The OTTO Quality/Repair Station Manual OTTO 2 East Main Street Carpentersville, IL 60110 FAA REPAIR STATION NO.: OGYR627Y This supplement does not form part of the FAA FAR-145 Repair

More information

Facilities Planning and Construction (FP&C)

Facilities Planning and Construction (FP&C) Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:

More information

SPECTRUM AEROSPACE REPAIR STATION AND QUALITY CONTROL MANUAL FAA REPAIR STATION # 7SPR147B

SPECTRUM AEROSPACE REPAIR STATION AND QUALITY CONTROL MANUAL FAA REPAIR STATION # 7SPR147B REPAIR STATION AND QUALITY CONTROL MANUAL SPECTRUM AEROSPACE 609 WEST KNOX RD TEMPE, ARIZONA 85284 Original Rev June 19, 2008 Page 1 REPAIR STATION AND QUALITY CONTROL MANUAL TITLE: TABLE OF CONTENTS Table

More information

Mantor Aviation Company

Mantor Aviation Company Mantor Aviation Company QUALITY ASSURANCE MANUAL QA Manual 2013 Revision 8 Uncontrolled Copy Ph: 507-553-5053 Fax: 612-395-5267 Introduction Mantor Aviation Company is a supplier of aircraft parts, components,

More information

FAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT RII TRAINING REQUIREMENTS (AW) JOB AID

FAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT RII TRAINING REQUIREMENTS (AW) JOB AID SAFETY ELEMENT 4.2.2 - RII TRAINING REQUIREMENTS (AW) JOB AID The Federal Aviation Administration (FAA) is proactively moving away from compliance based safety surveillance programs to Systems Safety Risk

More information

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES REPAIR/OVERHAUL VENDOR AUDIT CHECKLIST Audit Date: Vendor Allocation #: C.A.S.E. Member #: Auditor: Vendor Name: U.S./Canadian Certificate #: EASA Certificate #: Expiration Date: Address Line 1: Address

More information

Quality Management System

Quality Management System Quality Management System ZYQ Testing Laboratory 11111 Testing Avenue Testing Town, Alaska 22222 (555) 555-5555 Date Prepared: January 19, 2009 1 Please note that this Quality Management System (QM) was

More information

Copyright 2012 Aeronautical Repair Station Association

Copyright 2012 Aeronautical Repair Station Association THE AERONAUTICAL REPAIR STATION ASSOCIATION S DOMESTIC MODEL FORMS MANUAL Copyright 2012 Aeronautical Repair Station Association 703 739 9543 www.arsa.org 121 North Henry Street Alexandria, VA 22314-2903

More information

QUALITY ASSURANCE MANUAL

QUALITY ASSURANCE MANUAL QUALITY ASSURANCE MANUAL REVISION 1.0 JANUARY 12, 2014 DYESS AVIATION, INC. 2000 W. BEND DR. GEORGETOWN, TX 78626 Dyess Aviation, Inc. Quality Assurance Manual Policy & Procedures Quality Management Introduction:

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

Instructions for Supplier Survey

Instructions for Supplier Survey Instructions for Supplier Survey In order to be become a vendor and/or a repair station for Aero Precision, you are required to complete a Quality Systems Survey. Once you have completed the survey, please

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

Vendor Qualification Quality Audit Checklist

Vendor Qualification Quality Audit Checklist In order for your firm to be placed on our Approved Vendor List, it is necessary that the person responsible for the Quality system in your firm fill out this audit form and return it to us via mail, fax,

More information

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26 Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including

More information

Washington Association of Building Officials. Standard 1702 Steel Fabricator Registration Program

Washington Association of Building Officials. Standard 1702 Steel Fabricator Registration Program Washington Association of Building Officials Standard 1702 Steel Fabricator Registration Program July 2010 1 Steel Fabricator Registration Program Scope: This registration program was developed to assist

More information

Procurement Quality Assurance Requirements

Procurement Quality Assurance Requirements 1. REQUIREMENTS 1.1 Quality System This document provides the minimum Quality System Requirements to externally provided processes, products and services to Superior Thread Rolling (STR). Suppliers must

More information

of Maintenance and/or Alteration Specifications Initiated by Change:

of Maintenance and/or Alteration Specifications Initiated by Change: U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Development and Approval /or 43-XXX 1. PURPOSE. This advisory circular (AC) sets forth acceptable methods for

More information

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 1.0 SCOPE This document establishes the quality program requirements for an organization providing engineering

More information

Voluntary Industry Distributor Accreditation Program (AC 00-56)

Voluntary Industry Distributor Accreditation Program (AC 00-56) U.S. Department of Transportation Federal Aviation Administration Voluntary Industry Distributor Accreditation Program (AC 00-56) FY 2004 Audit Report Prepared by Aircraft Certification Service & Flight

More information

Issuance of Policy Statement, Methods of Approval of Retrofit Shoulder Harness. SUMMARY: This document announces an FAA general statement of policy

Issuance of Policy Statement, Methods of Approval of Retrofit Shoulder Harness. SUMMARY: This document announces an FAA general statement of policy DEPARTMENT OF TRANSPORTATION Federal Aviation Administration [Policy Statement Number ACE-00-23.561-01] Issuance of Policy Statement, Methods of Approval of Retrofit Shoulder Harness Installations in Small

More information

INSPECTION SYSTEM REQUIREMENTS

INSPECTION SYSTEM REQUIREMENTS MILITARY SPECIFICATIONS MIL-I-45208A INSPECTION SYSTEM REQUIREMENTS This specification has been approved by the Department of Defense and is mandatory for use by all Agencies. 1. SCOPE 1.1 Scope. This

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

JOHN WOOD UNCONTROLLED COPY: THE JOHN WOOD COMPANY PO BOX HIGHLAND AVENUE OAKS, PENNSYLVANIA 19456

JOHN WOOD UNCONTROLLED COPY: THE JOHN WOOD COMPANY PO BOX HIGHLAND AVENUE OAKS, PENNSYLVANIA 19456 JOHN WOOD QUALITY CONTROL SYSTEM MANUAL FOR PRESSURE VESSELS CONSTRUCTED TO ASME BOILER & PRESSURE VESSEL CODE SECTION VIII, DIVISION 1 AND REPAIRS AND ALTERATIONS TO METALLIC PRESSURE RETAINING ITEMS

More information

CHECKLIST FOR PART 145 APPROVAL

CHECKLIST FOR PART 145 APPROVAL Section/division AIRWORTHINESS: AIRCRAFT MAINTENANCE ORGANISATION Form Number: CA 145-03 CHECKLIST FOR PART 145 APPROVAL AMO Number Name of organization Physical address Postal address Postal code Telephone

More information

20 September 2017 Document No. QM-ISO revision T ASTRONAUTICS CORPORATION OF AMERICA S. AS 9100 and FAA QUALITY MANUAL. Proprietary Notice

20 September 2017 Document No. QM-ISO revision T ASTRONAUTICS CORPORATION OF AMERICA S. AS 9100 and FAA QUALITY MANUAL. Proprietary Notice 20 September 2017 Document No. QM-ISO revision T ASTRONAUTICS CORPORATION OF AMERICA S AS 9100 and FAA QUALITY MANUAL Proprietary Notice Information disclosed herein is the property of Astronautics Corporation

More information

Vendor Quality Control Audit Form Quality Assurance Survey

Vendor Quality Control Audit Form Quality Assurance Survey Vendor Quality Control Audit Form Quality Assurance Survey Vendor/Supplier Information Company Name: Street Address: Company Phone: Company Fax Number: City: State: Zip Code: Country: Contact Name (Quality

More information

Executive Instruments Inc.

Executive Instruments Inc. Self Audit Report Agency Executive Instruments Inc. Phone 972 239 0231 Address 4141 Lindbergh Drive Fax 972 991 3271 Addison State T Zip 75001 Check applicable boxes below Original Equipment Manufacturer

More information

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope SECTION 1 Page 1/1 1.0 INTRODUCTION 1.1 Scope The purpose of the Quality Manual is to provide a documented quality management system for BOLTEX mfg. The manual includes the organization structure, responsibilities,

More information

FAIRCHILD APPLICATION FOR EMPLOYMENT

FAIRCHILD APPLICATION FOR EMPLOYMENT APPLICATION FOR EMPLOYMENT Driver Requirements A driver must meet the following requirements: Be in good health and physically able to perform all duties of a driver. Be at least 21 years of age. Speak

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR STRUCTURAL STEEL APPROVED FABRICATOR INSPECTION PROGRAMS 1.0 PURPOSE EC 020-2014 (Adopted

More information

DEPARTMENT OF CIVIL AVIATION MAURITIUS CIVIL AIRWORTHINESS REQUIREMENTS PART 145

DEPARTMENT OF CIVIL AVIATION MAURITIUS CIVIL AIRWORTHINESS REQUIREMENTS PART 145 MAURITIUS CIVIL AIRWORTHINESS REQUIREMENTS CONTENTS SECTION 1 REQUIREMENTS 145.1 General 145.3 Effectivity 145.5 Definitions 145.10 Applicability 145.15 Application and Issue 145.20 Extent of Approval

More information

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 RUSSTECH PURCHASE ORDER CLAUSES RPOC 1000 EARLY DELIVERY OK "Time is of the essence for performance under this Purchase Order. Seller

More information

TABLE OF CONTENTS 1.0 INTRODUCTION...

TABLE OF CONTENTS 1.0 INTRODUCTION... Advisory Circular Subject: Quality Assurance Programs Issuing Office: Civil Aviation, Standards Document No.: AC QUA-001 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 9376810-V14 Effective

More information

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza

More information

Vosky Precision Machining Corp. 70-B Air Park Drive, Ronkonkoma, NY Tel: (631) Fax: (631)

Vosky Precision Machining Corp. 70-B Air Park Drive, Ronkonkoma, NY Tel: (631) Fax: (631) Vosky Precision Machining Corp. 70-B Air Park Drive, Ronkonkoma, NY 11779 Tel: (631) 737-3200 Fax: (631) 737-3240 Quality Control Manual ISSUED: January 21, 2005 Revision. G (12/3/2003) Vosky Precision

More information

ASA-100 QUALITY MANUAL

ASA-100 QUALITY MANUAL Your Company Name ASA-100 QUALITY MANUAL Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 Quality Manual Latest Revision Date Abstract: This quality manual describes (your Company's)

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev - February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February

More information

2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either:

2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either: 2.0. Supplier Quality Performance: 2.1. When requested by Boeing, Seller agrees to work with Boeing to develop and implement processes designed at improving Seller s quality performance. Process will include

More information

European Aviation Safety Agency Foreign Part 145 approvals User Guide for Maintenance Organisation Exposition

European Aviation Safety Agency Foreign Part 145 approvals User Guide for Maintenance Organisation Exposition for Maintenance Organisation Exposition - for Maintenance Organisation Exposition Name Validation Date Prepared by: Marc GRAGNOLI Validated 21/10/2015 Verified by: Karl SPECHT Validated 22/10/2015 Reviewed

More information

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS 13VAC5-91-10. Definitions. The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise. Administrator means the Director of

More information

Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions

Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions PREFACE The DLA Troop Support Construction and Equipment Supply Chain (C & E) has instituted a Qualified Suppliers List

More information

ISO 9001 QUALITY MANUAL

ISO 9001 QUALITY MANUAL ISO 9001 QUALITY MANUAL Origination Date: 10/01/14 Document Identifier: AIF quality control manual Date: 10/01/14 Project: Customer review Document Status: Released Document Link: www.aeroindfast.com Abstract:

More information

1- English Language Proficiency Assessment Center (ELP AC) initial approval Certification process and procedure.

1- English Language Proficiency Assessment Center (ELP AC) initial approval Certification process and procedure. The Hashemite Kingdom of Jordan Civil Aviation Regulatory Commission Flight Operations Standards Department II ADVISORY CIRCULAR II No. : AC - 28-04-010 Date : 05 April 2017 A. SUBJECT: 1- English Language

More information

Chapter 2 GALP Implementation Assistance

Chapter 2 GALP Implementation Assistance Chapter 2 GALP The GALP Implementation is based on established data management principles. 1. PRINCIPLES Control is the essential objective behind most data management principles. Effective management

More information

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 Revision: 9 Issue Date: 28 April 2014 CONTROLLED COPY Number: Issued to: UNCONTROLLED COPY A.M.S. Electronics, Inc. 113 Pillow Street, Butler, PA 16001 (724)

More information

Supplier Quality Requirements

Supplier Quality Requirements 1 of 7 NOTE: YELLOW HI-LITE INDICATES CHANGE FROM THE PREVIOUS REVISION GENERAL REQUIREMENTS (Applies to all orders issued from GMW referencing this document) QR-01 Quality Management Systems AS9100 Suppliers:

More information

CERTIFICATE OF REGISTRATION

CERTIFICATE OF REGISTRATION 03/31/2017 CERTIFICATE OF REGISTRATION This Certificate bears witness that Great Western Registrar LLC (An ANAB-accredited CB) has assessed the management system of: INTEGRATED IDEAS & TECHNOLOGIES, INC.

More information

Certified Welding Fabricator (CWF) Program Information

Certified Welding Fabricator (CWF) Program Information Certified Welding Fabricator (CWF) Program Information (The enclosed documents provide information about the AWS Certified Welding Fabricator Program.) General Program Information Program Requirements

More information

BOWIE STATE UNIVERSITY ASSET MANAGEMENT POLICY & PROCEDURES MANUAL

BOWIE STATE UNIVERSITY ASSET MANAGEMENT POLICY & PROCEDURES MANUAL BOWIE STATE UNIVERSITY ASSET MANAGEMENT POLICY & PROCEDURES MANUAL Effective: July 2015 TABLE OF CONTENTS I. Purpose..3 II. General Information.4 III. Property Control....5-11 A. Tagged Items B. Non-Tagged

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Quality Manual ISO 9001:2000

Quality Manual ISO 9001:2000 Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10

More information

Reliance Aerospace Solutions

Reliance Aerospace Solutions Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a

More information

NATO MUTUAL GOVERNMENT QUALITY ASSURANCE (GQA) PROCESS

NATO MUTUAL GOVERNMENT QUALITY ASSURANCE (GQA) PROCESS AQAP 2070 NATO MUTUAL GOVERNMENT QUALITY ASSURANCE (GQA) PROCESS AQAP 2070 (January 2004) I ORIGINAL Page blank II ORIGINAL AQAP 2070 NORTH ATLANTIC TREATY ORGANIZATION NATO STANDARDISATION AGENCY (NSA)

More information

Objective Evidence Record (OER)

Objective Evidence Record (OER) This material is derived from SAE AS9101D, which is copyrighted intellectual property of SAE international. SAE is not responsible for outcomes resulting from use of this material. APPENDIX A OBJECTIVE

More information

Oklahoma State University Policy and Procedures

Oklahoma State University Policy and Procedures Oklahoma State University Policy and Procedures INVENTORY OF FIXED ASSETS 3-0125 ADMINISTRATION & FINANCE December 2011 INTRODUCTION AND GENERAL STATEMENT 1.01 Asset Management maintains a fixed assets

More information

Supplier Flow Down Requirements

Supplier Flow Down Requirements 1.0 SUPPLIER QUALITY REQUIREMENTS ISS: 1 REV: A Page: 1 of 20 Supplier Flow Down Requirements 1.0 SUPPLIER QUALITY REQUIREMENTS ISS: 1 REV: A Page: 2 of 20 This specification is in addition to and in no

More information

EASA Part 21 Compliance Matrix

EASA Part 21 Compliance Matrix Weston Aerospace CE8 Issue 2 EASA Part 21 Compliance Matrix Approved By: Peter Rush, Quality Director Date: 31 March 2011 This document is maintained on digital media. The current issue is located on the

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual 1 1. Introduction Scope Purpose Application Implementation 2. Purchasing Expectations Terms and Conditions Engineering / Technical Support Customer Support Resources Pricing Consistent

More information

Quality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms.

Quality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms. Quality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms August 29, 2017 2017 by Texas Department of Transportation 512/506-5808 All

More information

NTPEP Evaluation of Plain and Laminated Elastomeric Bridge Bearings

NTPEP Evaluation of Plain and Laminated Elastomeric Bridge Bearings Standard Practice for NTPEP Evaluation of Plain and Laminated Elastomeric Bridge Bearings AASHTO Designation: [Number] American Association of State Highway and Transportation Officials 444 North Capitol

More information

PROCUREMENT QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS

PROCUREMENT QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS GAA-000-0001 PROCUREMENT QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS LEGAL NOTICE These Procurement Quality Management Requirements for Suppliers are deemed part of any L-3 Communications MAS (Canada)

More information

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production

More information

Quality Assurance Policy and Procedures

Quality Assurance Policy and Procedures 650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance

More information

Quality Assurance QA STANDARD OPERATING PROCEDURE FOR FDA or Pharmaceutical Sponsored Audits

Quality Assurance QA STANDARD OPERATING PROCEDURE FOR FDA or Pharmaceutical Sponsored Audits Quality Assurance QA 601.01 STANDARD OPERATING PROCEDURE FOR FDA or Pharmaceutical Sponsored Audits Approval: Nancy Paris, MS, FACHE President and CEO 24 May 2017 (Signature and Date) Approval: Frederick

More information

VOLUME 10 Air Transportation Oversight System CHAPTER X SAFETY MANAGEMENT SYSTEM

VOLUME 10 Air Transportation Oversight System CHAPTER X SAFETY MANAGEMENT SYSTEM 11/3/2010 DRAFT For SMS NPRM Evaluation Only 8900.1 Change XX VOLUME 10 Air Transportation Oversight System CHAPTER X SAFETY MANAGEMENT SYSTEM Note: This draft SMS guidance material is being provided by

More information

PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR

PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR NOT MEASUREMENT SENSITIVE MIL-PRF-31032 1 November 1995 PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR This specification is approved for use by all Departments

More information

INDUSTRIALIZED HOUSING AND BUILDINGS Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 70

INDUSTRIALIZED HOUSING AND BUILDINGS Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 70 INDUSTRIALIZED HOUSING AND BUILDINGS Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 70 TABLE OF CONTENTS 70.1. Authority... 1 70.10. Definitions...

More information

The APIC Audit Programme Version 3, August 2010

The APIC Audit Programme Version 3, August 2010 The APIC Audit Programme Version 3, August 2010 Table of contents 1 General 2. APIC Audit Program 3 The Auditors 3.1 Educational Background and Experience 3.2 Auditor Training Courses for Certification

More information

Quality Management System Manual

Quality Management System Manual This Page 1 of 47 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies

More information

2. PRINCIPAL CHANGES.

2. PRINCIPAL CHANGES. U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Detecting and Reporting Suspected Unapproved Parts Date: xx/xx/10 Initiated by: AFS-300 AC No: 21-29C Change:

More information

Page 1 / 11. Version 0 June 2014

Page 1 / 11. Version 0 June 2014 Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning

More information

Rev A. Vendor Compliance Manual

Rev A. Vendor Compliance Manual 9004160 Rev A Vendor Compliance Manual Using the Vendor Compliance Manual This manual is designed to provide you with Automation Products Group, Inc. s (APG s) supply chain requirements. Please carefully

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL AERO SUPPLY USA 21941 US HWY 19 NORTH Clearwater, FL. 33765 USA P.(727) 754-4915 F.(727) 754-4920 Website: www.aerosupplyusa.com Email: sales@aerosupplyusa.com QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

More information

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS 1. GOVERNMENT/CUSTOMER SOURCE INSPECTION: a. Government/Customer inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government/Customer representative

More information

MDEP TR-VICWG-03. Technical Report. Common QA/QM Criteria for Multinational Vendor Inspection

MDEP TR-VICWG-03. Technical Report. Common QA/QM Criteria for Multinational Vendor Inspection MDEP TR-VICWG-03 Technical Report Multinational Design Evaluation Programme Technical Report TR-VICWG-03 Date: 30 January 2014 Validity: until next update or archiving Version : 1 MDEP Technical Report

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No / EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, C Draft COMMISSION REGULATION (EU) No / of [ ] amending Commission Regulation (EC) No 1702/2003 laying down implementing rules for the airworthiness

More information

ACCREDITATION OF FITTING MANUFACTURERS

ACCREDITATION OF FITTING MANUFACTURERS ACCREDITATION OF FITTING MANUFACTURERS TSSA GUIDE FOR REVIEW TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West 14th Floor, Centre Tower

More information

EPRI QUALITY PROGRAM MANUAL

EPRI QUALITY PROGRAM MANUAL Controlled Copy No. : If no Controlled Copy No. is assigned; this copy is uncontrolled EPRI QUALITY PROGRAM MANUAL REVISION 13 Effective TOC: TABLE OF CONTENTS Sec. Title Page SUMMARY OF CHANGES... 2 Mapping

More information

QUALITY ASSURANCE REQUIREMENTS

QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS PRETORIA QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS, PRETORIA Page 1 1.1 QUALITY ASSURANCE REQUIREMENTS In undertaking the works (including all incidental services

More information

How to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System

How to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System How to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System By BizMove Management Training Institute Other free books by BizMove that may interest you: Free starting

More information

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

MANUAL QUALITY CONTROL & QUALITY ASSURANCE MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

Business Management System: Manual 00-BMS-001

Business Management System: Manual 00-BMS-001 Business Management System: Manual 00-BMS-001 Preface This manual defines the Business Management System (BMS) established by GM Nameplate. The BMS is comprised of the processes needed to support GM Nameplate

More information

SECTION QUALITY REQUIREMENTS

SECTION QUALITY REQUIREMENTS SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.

More information

2. GENERAL REQUIREMENTS

2. GENERAL REQUIREMENTS 1. PURPOSE AND SCOPE 1.1 This document defines the Supplier Quality Requirements to be met by suppliers in the performance of the purchase order issued by Sagetech to ensure that externally provided processes,

More information

Aircraft Manufacturing Organisations Certification

Aircraft Manufacturing Organisations Certification Civil Aviation Rules Part 148, Amendment 4 Docket 8/CAR/1 Contents Rule objective... 3 Extent of consultation... 3 Summary of submissions... 3 Examination of submissions... 4 Insertion of Amendments...

More information

CIRCULAR GENERAL PROVISIONS

CIRCULAR GENERAL PROVISIONS MINISTRY OF CONSTRUCTION -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 10/2013/TT-BXD Hanoi, July 25, 2013 CIRCULAR ON CONSTRUCTION QUALITY MANAGEMENT Pursuant

More information

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

PPI/TZ Standard Quality Requirements for Suppliers -SQRS- PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: March 19, 2014 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact

More information

New Zealand Technical Standard Order NZTSO 2001

New Zealand Technical Standard Order NZTSO 2001 New Zealand Technical Standard Order NZTSO 2001 Revision 1 Time in Service Recorders 17/11/15 Published by Civil Aviation Authority PO Box 3555 WELLINGTON 6140 NEW ZEALAND Approved by Manager Aircraft

More information

UNCONTROLLED IF PRINTED 2 of 13

UNCONTROLLED IF PRINTED 2 of 13 Forward Revision History NR-L Various Remove Revision with over one year of information M: 05-09-16 Revised pages 9 and 10 to change Form Name to Supplier Evaluation for Limited Scopes ; Revised page 11

More information

ANYBODY'S MAINTENANCE ORGANISATION. Part 145 EXPOSITION

ANYBODY'S MAINTENANCE ORGANISATION. Part 145 EXPOSITION ANYBODY'S MAINTENANCE ORGANISATION Part 145 EXPOSITION Reference : Specimen / Expo / 1 Issue : 1 Copy Number : Holder : Date : Sept 2003 THE SPECIMEN EXPOSITION This specimen Exposition has been prepared

More information