Congestion and Marginal Losses

Size: px
Start display at page:

Download "Congestion and Marginal Losses"

Transcription

1 Section 10 Congestion and Marginal Losses Congestion and Marginal Losses The Locational Marginal Price (LMP) is the incremental price of energy at a bus. The LMP at any bus is made up of three components: the system marginal price (SMP), the marginal loss component of LMP (MLMP), and the congestion component of LMP (CLMP). SMP, MLMP and CLMP are a product of the least cost, security constrained dispatch of system resources to meet system load. SMP is the incremental cost of energy, given the current dispatch, ignoring losses and congestion. Losses refer to energy lost to physical resistance in the transmission and distribution network as power is moved from generation to load. Marginal losses are the incremental change in system power losses caused by changes in the system load and generation patterns. Congestion occurs when available, least-cost energy cannot be delivered to all loads for a period because transmission facilities are not adequate to deliver that energy. When the least-cost available energy cannot be delivered to load in a transmissionconstrained area, higher cost units in the constrained area must be dispatched to meet that load. 1 The result is that the price of energy in the constrained area is higher than in the unconstrained area because of the combination of transmission limitations and the cost of local generation. Congestion is neither good nor bad but is a direct measure of the extent to which there are differences in the cost of generation that cannot be equalized because of transmission constraints. The components of LMP are the basis for determining participant and location specific congestion and marginal losses. The Market Monitoring Unit (MMU) analyzed marginal losses and congestion in PJM markets for Overview Marginal Loss Cost Before June 1, 2007, the PJM economic dispatch and LMP models did not include marginal losses. The losses were treated as a static component of load, and the physical nature and location of power system losses were ignored. The PJM Tariff required implementation of marginal loss modeling when required technical systems became available. On June 1, 2007, PJM began including marginal losses in economic dispatch and LMP models. 2 The primary benefit of a marginal loss calculation is that it more accurately models the physical reality of power system losses, which permits increased efficiency and more optimal asset utilization. Marginal loss modeling creates a separate marginal loss price for every location on the power grid. This marginal loss price (MLMP) is a component of LMP that is charged to load and credited to generation. network losses are determined by using a linearized approximation model based on the loss sensitivities to location-specific changes in power injection and withdrawal. Average losses are then calculated from total losses. marginal loss costs equal net marginal loss costs plus explicit marginal loss costs plus net inadvertent loss costs. Net marginal loss costs equal load loss payments minus generation loss credits. Explicit marginal loss costs are the net marginal loss costs associated with point-to-point energy transactions. Net inadvertent loss costs are the losses associated with hourly difference between the net actual energy flow and the net scheduled energy flow into or out of the PJM control area in that hour. 3 Unlike the other categories of marginal loss accounting, inadvertent loss costs are common costs not directly attributable to specific participants. Inadvertent related loss costs are distributed to load on a load ratio basis. Each of these categories of marginal loss costs is comprised of day-ahead and balancing marginal loss costs. Day-ahead marginal loss costs are based on day-ahead MWh priced at the marginal loss price component of Locational Marginal Price (LMP) while balancing marginal loss costs are based on deviations between day-ahead and real-time MWh priced at the marginal loss price component of Locational Marginal Price (LMP) in the Real-Time Energy Market. 1 This is referred to as dispatching units out of economic merit order. Economic merit order is the order of all generator offers from lowest to highest cost. Congestion occurs when loadings on transmission facilities mean the next unit in merit order cannot be used and a higher cost unit must be used in its place. 2 For additional information, see OATT Section OA. Schedule 1 (PJM Interchange Energy Market) State of the Market Report for PJM 261

2 2011 State of the Market Report for PJM Marginal loss charges can be positive or negative with respect to the reference bus. If an increase in load at a bus would decrease losses, the marginal loss component of LMP of that bus will be negative. If an increase in generation at a bus would result in an increase in losses, the marginal loss component of that bus will be negative. If an increase of load at a bus would increase losses, the marginal loss component of LMP at that bus will be positive. If an increase in generation at a bus results in a decrease of system losses, then the marginal loss component of LMP at that bus will be positive. Day-ahead marginal loss charges and credits are based on MWh and LMP in the Day-Ahead Energy Market. Balancing marginal loss charges and credits are based on the load or generation deviations between the Day- Ahead and Real-Time Energy Markets and LMP in the Real-Time Energy Market. If a participant has realtime generation or load that is greater than its dayahead generation or load then the deviation will be positive. If there is a positive load deviation at a bus where the real-time LMP has a positive marginal loss component, positive balancing marginal loss costs will result. Similarly, if there is a positive load deviation at a bus where real-time LMP has a negative marginal loss component, negative balancing marginal loss costs will result. If a participant has real-time generation or load that is less than its day-ahead generation or load then the deviation will be negative. If there is a negative load deviation at a bus where real-time LMP has a positive marginal loss component, negative balancing marginal loss costs will result. Similarly, if there is a negative load deviation at a bus where real-time LMP has a positive marginal loss component, negative balancing marginal loss costs will result. Marginal loss credits or loss surplus is the remaining loss amount from overcollection of marginal losses, after accounting for net energy charges and residual market adjustments, that is paid back in full to load and exports on a load ratio basis. Marginal loss credits are calculated as the day-ahead and balancing transmission loss charges paid by all customer accounts each hour, plus the spot market energy value of the actual transmission loss MWh during that hour, plus residual net market adjustments in that hour. 4 Residual net market 4 See PJM. Manual 28: Operating Agreement Accounting, Revision 39 (January 1, 2008). Note that the over collection is not calculated by subtracting the prior calculation of average losses from the calculated total marginal losses. adjustments are common costs, not directly attributable to specific participants, that are deducted from total marginal loss credits before marginal loss credits are distributed on a load weighted ratio basis. Residual market adjustments consist of the Known Day-Ahead Error Value (KDAEV), day-ahead loss MW congestion value and balancing loss MW congestion value. KDAEV are costs associated with MW imbalances created by discontinuities in, and adjustments to, the day-ahead market solution. The day-ahead and balancing loss congestion values are congestion costs associated with loss related MW. Marginal Loss Costs. marginal loss charges decreased by $255.3 million or 15.6 percent, from $1,634.8 million in 2010 to $1,379.5 million in Day-ahead marginal loss costs decreased by $235.1 million or 14.1 percent, from $1,665.6 million in 2010 to $1,430.5 million in Balancing marginal loss costs decreased by $20.3 million or 65.9 percent from -$30.7 million in 2010 to -$51.0 million in On June 1, 2011, PJM integrated the American Transmission Systems, Inc. (ATSI) Control Zone. The metrics reported in this section treat ATSI as part of MISO for the period from January through May and as part of PJM for the period from June through December. Monthly Marginal Loss Costs. Fluctuations in monthly marginal loss costs continued to be substantial. In 2011, these differences were driven by varying load and energy import levels, different patterns of generation and weather-induced changes in demand. Monthly marginal loss costs in 2011 ranged from $70.6 million in December to $213.7 million in July. Marginal Loss Credits. Marginal Loss Credits are calculated as total net energy charges (total energy charges minus total energy credits) plus total net marginal loss charges (total marginal loss charges minus total marginal loss credits plus inadvertent and residual net market adjustments). Marginal loss credit or loss surplus is the remaining loss amount from overcollection of marginal losses, after accounting for net energy charges and residual market adjustments that is paid back in full to load and exports on a load ratio basis. The marginal loss 262 Section 10 Congestion and Marginal Losses

3 Section 10 Congestion and Marginal Losses credits decreased by $250 million or 29.9 percent, from $836.7 million in 2010 to $586.7 million in Zonal marginal loss costs. In 2011, zonal marginal loss costs ranged from $3.2 million in RECO to $318.6 million in AEP. Compared to 2010, 2011 had a decrease in marginal loss costs across the PJM control zones, except PECO and DAY control zones. marginal loss costs in PJM in 2011 also changed due to the addition of the ATSI Control Zone, which accounted for $19.3 million or 1.4 percent of the total marginal loss costs. 5 Congestion Cost congestion costs equal net congestion costs plus explicit congestion costs plus net inadvertent congestion costs. Net congestion costs equal load congestion payments minus generation congestion credits. Explicit congestion costs are the net congestion costs associated with point-to-point energy transactions. Net inadvertent congestion costs are the congestion costs associated with hourly difference between the net actual energy flow and the net scheduled energy flow into or out of the PJM control area in that hour. Unlike the other categories of congestion cost accounting, inadvertent congestion costs are common costs not directly attributable to specific participants. Inadvertent related congestion costs are distributed to load on a load ratio basis. Each of these categories of congestion costs is comprised of day-ahead and balancing congestion costs. Day-ahead congestion costs are based on day-ahead MWh while balancing congestion costs are based on deviations between day-ahead and real-time MWh priced at the congestion price in the Real-Time Energy Market. Congestion charges can be both positive and negative. When a constraint binds, the price effects of that constraint vary. The system marginal price (SMP) is uniform for all areas, while the congestion components of Locational Marginal Price (LMP) will either be positive or negative in a specific area, meaning that actual LMPs are above or below the SMP. 6 If an area is downstream from the constrained element, the area will experience positive congestion costs. If an area is upstream from the 5 See the 2011 State of the Market Report for PJM, Volume II, Appendix G, Congestion and Marginal Losses, at Zonal Marginal Loss Costs. 6 The SMP is the price of the distributed load reference bus. The price at the reference bus is equivalent to the five minute real-time or hourly day-ahead load weighted PJM LMP. constrained element, the area will experience negative congestion costs. Day-ahead congestion charges and credits are based on MWh and LMP in the Day-Ahead Energy Market. Balancing congestion charges and credits are based on load or generation deviations between the Day-Ahead and Real-Time Energy Markets and LMP in the Real- Time Energy Market. If a participant has real-time generation or load that is greater than its day-ahead generation or load then the deviation will be positive. If there is a positive load deviation at a bus where realtime LMP has a positive congestion component, positive balancing congestion costs will result. Similarly, if there is a positive load deviation at a bus where real-time LMP has a negative congestion component, negative balancing congestion costs will result. If a participant has real-time generation or load that is less than its day-ahead generation or load then the deviation will be negative. If there is a negative load deviation at a bus where real-time LMP has a positive congestion component, negative balancing congestion costs will result. Similarly, if there is a negative load deviation at a bus where real-time LMP has a positive congestion component, negative balancing congestion costs will result. Congestion. congestion costs decreased by $425.4 million or 29.9 percent, from $1,423.6 million in 2010 to $998.2 million in Dayahead congestion costs decreased by $468.2 million or 27.3 percent, from $1,713.1 million in 2010 to $1,244.9 million in Balancing congestion costs increased by $42.8 million or 14.8 percent from -$289.5 million in 2010 to -$246.7 million in On June 1, 2011, PJM integrated the American Transmission Systems, Inc. (ATSI) Control Zone. The metrics reported in this section treat ATSI as part of MISO for the period from January through May and as part of PJM for the period from June through December. Monthly Congestion. Fluctuations in monthly congestion costs continued to be substantial. In 2011, these differences were driven by varying load and energy import levels, different patterns 7 The total zonal congestion numbers were calculated as of March 2, 2012 and are, based on continued PJM billing updates, subject to change State of the Market Report for PJM 263

4 2011 State of the Market Report for PJM of generation, weather-induced changes in demand and variations in congestion frequency on constraints affecting large portions of PJM load. Monthly congestion costs in 2011 ranged from $35.0 million in May to $241.6 million in January. Congestion of Locational Marginal Price (LMP). To provide an indication of the geographic dispersion of congestion costs, the congestion component of LMP (CLMP) was calculated for control zones in PJM. Price separation among eastern, southern and western control zones in PJM was primarily a result of congestion on the AP South interface, the 5004/5005 interface, the Belmont transformer, West Interface, and the AEP- Dominion interface. (Table 10 27) Congested Facilities. Congestion frequency continued to be significantly higher in the Day- Ahead Market than in the Real-Time Market in Day-ahead congestion frequency increased by 45.8 percent from 106,253 congestion event hours in 2010 to 154,868 congestion event hours in Day-ahead, congestion-event hours decreased on internal PJM interfaces while congestion-event hours increased on transmission lines, transformers and reciprocally coordinated flowgates between PJM and the MISO. Real-time congestion frequency decreased by 0.4 percent from 23,422 congestion event hours in 2010 to 22,468 congestion event hours in Real-time, congestion-event hours decreased on the internal PJM interfaces and transmission lines, while congestion-event hours increased on transformers and reciprocally coordinated flowgates between PJM and MISO. Facilities were constrained in the Day-Ahead Market more frequently than in the Real-Time Market. The Day-Ahead market is consequently more-frequent constrained conditions compared to its corresponding Real-Time Market. During 2011, for only 5.6 percent of Day-Ahead Market facility constrained hours were the same facilities also constrained in the Real-Time Market. During 2011, for 38.0 percent of Real-Time Market facility 8 In order to have a consistent metric for real-time and day-ahead congestion frequency, real-time congestion frequency is measured using the convention that an hour is constrained if any of its component five-minute intervals is constrained. constrained hours, the same facilities were also constrained in the Day-Ahead Market. The AP South Interface was the largest contributor to congestion costs in With $238.9 million in total congestion costs, it accounted for 23.9 percent of the total PJM congestion costs in The top five constraints in terms of congestion costs together contributed $466.2 million, or 46.7 percent, of the total PJM congestion costs in The top five constraints were the AP South interface, the 5004/5005 interface, West interface, the Belmont transformer and the AEP Dominion interface. Zonal Congestion.9 Measured in terms of the total congestion bill, calculated by subtracting generation congestion credits from load congestion payments plus explicit congestion costs by zone, ComEd was the most congested zone in ComEd had -$1,007.3 million in total load charges, -$1,277.3 million in total generation credits and -$30.9 million in explicit congestion, providing $239.0 million in total net congestion charges, reflecting significant local congestion between local generation and load, despite being on the upstream side of system wide congestion patterns. The Electric Junction Nelson transmission line, Crete St. Johns flowgate (a reciprocally coordinated flowgate between PJM and MISO), AP South interface, East Frankfort Crete transmission line and the Bunsonville Eugene flowgate contributed $104.7 million, or 43.8 percent of the total ComEd Control Zone congestion costs. Similarly, the AEP Control Zone recorded the second highest congestion cost in PJM in 2011, with $195.1 million. The AP South interface contributed $33.1 million, or 17.0 percent of the total AEP Control Zone congestion cost in The AP Control Zone recorded the third highest congestion cost in PJM in 2011, with a cost of $143.9 million. The AP South interface contributed $63.9 million, or 44.4 percent of the total AP Control Zone congestion cost in The control zones in the Western (AEP, AP, ATSI, ComEd, DAY and DLCO) and Southern (Dominion) regions accounted for $737.2 million, 9 Tables reporting zonal congestion have been moved from this section of the report to Appendix G. See the 2011 State of the Market Report for PJM, Volume II, Appendix G, Congestion and Marginal Losses. 10 The total zonal congestion numbers were calculated as of March 2, 2012 and are, based on continued PJM billing updates, subject to change. As of March 2, 2012, the total zonal congestion related numbers presented here differed from the March 2, 2012 PJM totals by $0.72 Million, a discrepancy of 0.07 percent (.0007). 264 Section 10 Congestion and Marginal Losses

5 Section 10 Congestion and Marginal Losses or 73.9 percent of congestion cost and the control zones in the Eastern region accounted for $261.0 million or 26.1 percent of congestion cost. Ownership. In 2011, financial companies as a group were net recipients of congestion credits, and physical companies were net payers of congestion charges. In 2011, financial companies received $108.2 million in net congestion credits, a decrease of $60.3 million or 35.8 percent compared to In 2011, physical companies paid $1,107.2 million in net congestion charges, a decrease of $484.9 million or 30.4 percent compared to Conclusion Marginal losses are incremental change in real system power losses caused by changes in system load and generation patterns. marginal loss costs decreased by $255.3 million or 15.6 percent, from $1,634.8 million in 2010 to $1,379.5 million in Marginal loss costs were significantly higher in the Day-Ahead Market than the Real-Time Market. The net marginal loss bill is calculated by subtracting the generation loss credits from the sum of load loss charges, net explicit loss charges and net inadvertent loss charges. Since the net marginal bill is calculated on the basis of marginal, rather than average losses, there is an overcollection of marginal loss related costs. This overcollection, net of total energy charges and residual market adjustments 11, is the source of marginal loss credits. Marginal loss credits are fully distributed back to load and exports. Marginal loss credits were $586.7 million in Congestion reflects the underlying characteristics of the power system, including the nature and capability of transmission facilities, the cost and geographical distribution of generation facilities and the geographical distribution of load. congestion costs decreased by $425.4 million or 29.9 percent, from $1,423.6 million in 2010 to $998.2 million in Congestion costs were significantly higher in the Day-Ahead Market than in the Real-Time Market. Congestion frequency was also significantly higher in the Day-Ahead Market than in the Real-Time Market. ARRs and FTRs served as an effective, but not total, offset against congestion. ARR and FTR revenues offset 96.8 percent of the total congestion costs in the Day-Ahead Energy Market and the balancing energy market within PJM for the 2010 to 2011 planning period. 12 During the first seven months of the 2011 to 2012 planning period, total ARR and FTR revenues offset more than 100 percent of the congestion costs within PJM. FTRs were paid at 88.1 percent of the target allocation level for the 12-month period of the 2010 to 2011 planning period, and at 84.9 percent of the target allocation level for the first seven months of the 2011 to 2012 planning period. 13 Revenue adequacy, measured relative to target allocations for a planning period is not final until the end of the period. The congestion metric requires careful review when considering the significance of congestion. The net congestion bill is calculated by subtracting generating congestion credits from load congestion payments. The logic is that increased congestion payments by load are offset by increased congestion revenues to generation, for the area analyzed. Net congestion, which includes both load congestion payments and generation congestion credits, is not a good measure of the congestion costs paid by load from the perspective of the wholesale market. 14 While total congestion costs represent the overall charge or credit to a zone, the components of congestion costs measure the extent to which load or generation bear total congestion costs. congestion payments, when positive, measure the total congestion cost to load in an area. congestion payments, when negative, measure the total congestion credit to load in an area. Negative load congestion payments result when load is on the lower priced side of a constraint or constraints. For example, congestion across the AP South interface means lower prices in western control zones and higher prices in eastern and southern control zones. in western control zones will benefit from lower prices and receive a congestion credit (negative 11 Residual net market adjustments are common costs, not directly attributable to specific participants, that are deducted from total marginal loss credits before marginal loss credits are distributed on a load weighted ratio basis. Residual market adjustments consist of the Known Day-Ahead Error Value (KDAEV), day-ahead loss MW congestion value and balancing loss MW congestion value. KDAEV are costs associated with MW imbalances created by discontinuities in, and adjustments to, the day-ahead market solution. The day-ahead and balancing loss congestion values are congestion costs associated with loss related MWs. 12 See the 2011 State of the Market Report for PJM Section 12, Financial Transmission and Auction Revenue Rights, at Table 12-36, ARR and FTR congestion hedging: Planning periods 2010 to 2011 and 2011 to See the 2011 State of the Market Report for PJM Section 12, Financial Transmission and Auction Revenue Rights, at Table 12-22, Monthly FTR accounting summary (Dollars (Millions)): Planning periods 2010 to 2011 and 2011 to The actual congestion payments by retail customers are a function of retail ratemaking policies and may or may not reflect an offset for congestion credits State of the Market Report for PJM 265

6 2011 State of the Market Report for PJM load congestion payment). in the eastern and southern control zones will incur a congestion charge (positive load congestion payment). The reverse is true for generation congestion credits. congestion credits, when positive, measure the total congestion credit to generation in an area. congestion credits, when negative, measure the total congestion cost to generation in an area. Negative generation congestion credits are a cost in the sense that revenues to generators in the area are lower, by the amount of the congestion cost, than they would have been if they had been paid LMP without a congestion component, the total of system marginal price and the loss component. Negative generation congestion credits result when generation is on the lower priced side of a constraint or constraints. For example, congestion across the AP South interface means lower prices in the western control zones and higher prices in the eastern and southern control zones. in the western control zones will receive lower prices and incur a congestion charge (negative generation congestion credit). in the eastern and southern control zones will receive higher prices and receive a congestion credit (positive generation congestion credit). As an example, total congestion costs in PJM in 2011 were $998.2 million, which was comprised of load congestion payments of $112.2 million, negative generation credits of $1,009.9 million and negative explicit congestion of $123.8 million (Table 10 15). Locational Marginal Price (LMP) s As of June 1, 2007, PJM changed from a single node reference bus to a distributed load reference bus. While there is no effect on the total LMP, the components of LMP change with a shift in the reference bus. With a distributed load reference bus, the energy component is now a load-weighted system price. There are no congestion or losses included in the load weighted reference bus price, unlike the case with a single node reference bus. Locational Marginal Price (LMP) at a bus reflects the incremental price of energy at that bus. LMP at any bus is made up of three basic components: the system marginal price (SMP), marginal loss component of LMP (MLMP), and congestion component of LMP (CLMP). SMP, MLMP and CLMP are a product of the least cost, security constrained dispatch of system resources to meet system load. SMP is the incremental cost of energy, given the current dispatch, ignoring incremental considerations of losses and transmission constraints. Losses refer to energy lost to physical resistance in the transmission and distribution network as power is moved from generation to load. The greater the resistance of the system to flows of energy from generation to loads, the greater the losses of the system and the greater the proportion of energy needed to meet a given level of load. Marginal losses are the incremental change in system power losses caused by changes in the system load and generation patterns. 15 The first derivative of total losses with respect to the power flow equals marginal losses, which are twice the average losses for that power flow. The term congestion is related to physical limitations of elements of the transmission system to move power from point to point. Congestion cost reflects the incremental cost of relieving transmission constraints while maintaining system power balance. Congestion occurs when available, least-cost energy cannot be delivered to all loads for a period because transmission facilities are not adequate to deliver that energy. When the leastcost available energy cannot be delivered to load in a transmission-constrained area, higher cost units in the constrained area must be dispatched to meet that load. 16 The result is that the price of energy in the constrained area is higher than in the unconstrained area because of the combination of transmission limitations and the cost of local generation. Table 10 1 shows the PJM real-time, load-weighted average LMP components for calendar years 2008 to The PJM price is weighted by accounting load, which differs from the state-estimated load used in determination of the energy component (SMP). The components of the average PJM system price result from these different weights. The load-weighted average realtime LMP in 2011 decreased $2.41 or 5.0 percent from $48.35 in 2010 to $45.94 in The load-weighted average congestion component decreased $0.03 or 34.4 percent from $0.08 in 2010 to $0.05 in The loadweighted average loss component decreased $0.01 or 15 For additional information, see the MMU Technical Reference for PJM Markets, at Marginal Losses. 16 This is referred to as dispatching units out of economic merit order. Economic merit order is the order of all generator offers from lowest to highest cost. Congestion occurs when loadings on transmission facilities mean the next unit in merit order cannot be used and a higher cost unit must be used in its place. 266 Section 10 Congestion and Marginal Losses

7 Section 10 Congestion and Marginal Losses 34.8 percent from $0.04 in 2010 to $0.02 in The load-weighted average energy component decreased $2.37 or 4.9 percent from $48.23 in 2010 to $45.87 in In terms of proportion of real-time LMP, the congestion and loss components both decreased, while the energy component became a greater proportion in Table 10 1 PJM real-time, load-weighted average LMP components (Dollars per MWh): Calendar years 2008 to Real-Time LMP Energy Congestion 2008 $71.13 $71.02 $0.06 $ $39.05 $38.97 $0.05 $ $48.35 $48.23 $0.08 $ $45.94 $45.87 $0.05 $0.02 Loss In the Real-Time Energy Market, the distributed load reference bus is weighted by system estimates of the load in real time. At the time the LMP is determined in the Real-Time Energy Market, the energy component equals the system load-weighted price. However, realtime bus-specific loads are adjusted, after the fact, according to updated information from meters. This meter adjusted load is accounting load that is used in settlements and forms the basis of the reported PJM load weighted prices. This after the fact adjustment means that the Real-Time Energy Market energy component of LMP (SMP) and the PJM real-time load-weighted LMP are not equal, as reported here. The difference between the real-time energy component of LMP and the PJM-wide real-time load-weighted LMP is due to the difference between estimated and meter corrected loads used to weight the load-weighted reference bus and the load-weighted LMP. Table 10 2 shows the PJM day-ahead, load-weighted average LMP components for calendar years 2008 through The load-weighted average day-ahead LMP in 2011 decreased $2.46 or 5.2 percent from $47.65 in 2010 to $45.19 in The load-weighted average congestion component decreased $0.11 or percent from $0.05 in 2010 to -$0.06 in The load-weighted average loss component decreased $0.08 or percent from -$0.07 in 2010 to -$0.15 in The loadweighted average energy component decreased $2.27 or 4.8 percent from $47.67 in 2010 to $45.40 in In 17 The years 2006 and 2007 were removed from Table 2-20 and Table 2-24 because PJM did not begin to include marginal losses in economic dispatch and LMP models until June 1, terms of proportion of day-ahead LMP, the congestion and loss components both decreased, while the energy component became a greater proportion in Table 10 2 PJM day-ahead, load-weighted average LMP components (Dollars per MWh): Calendar years 2008 to 2011 Day-Ahead LMP Energy Congestion Loss 2008 $70.25 $70.56 ($0.08) ($0.22) 2009 $38.82 $38.96 ($0.04) ($0.09) 2010 $47.65 $47.67 $0.05 ($0.07) 2011 $45.19 $45.40 ($0.06) ($0.15) In the Day-Ahead Energy Market, the distributed load reference bus is weighted by fixed-demand bids only and the day-ahead energy component is, therefore, a system fixed demand weighted price. The day-ahead weighted system price calculation uses all types of demand, including fixed, price-sensitive and decrement bids. In the Real-Time Energy Market, the energy component equals the system load-weighted price. However, in the Day-Ahead Energy Market the day-ahead energy component of LMP and the PJM day-ahead loadweighted LMP are not equal. The difference between the day-ahead energy component of LMP and the PJM dayahead load-weighted LMP is due to the difference in the types of demand used to weight the load-weighted reference bus and the load-weighted LMP. Zonal s The components of LMP were calculated for each PJM control zone. The components of LMP for the control zones are presented in Table 10 3 and Table 10 4 for calendar years 2010 and Table 10 3 shows the real-time load-weighted average LMP components by zone and PJM for calendar years 2010 and Price separation between eastern and western control zones in PJM was primarily a result of congestion on the AP South interface. This constraint generally had a positive congestion component of LMP in eastern and southern control zones located on the constrained side of the affected facilities while the unconstrained western zones had a negative congestion component of LMP. Table 10 4 shows the day-ahead load-weighted average LMP components by zone and PJM for calendar years 2010 and State of the Market Report for PJM 267

8 2011 State of the Market Report for PJM Table 10 3 Zonal and PJM real-time, load-weighted average LMP components (Dollars per MWh): Calendar years 2010 and Real-Time LMP Energy Congestion Loss Real-Time LMP Energy Congestion Loss AECO $57.03 $49.69 $3.87 $3.47 $57.81 $50.11 $4.95 $2.75 AEP $40.35 $47.45 ($4.67) ($2.43) $42.97 $48.64 ($3.99) ($1.68) AP $47.08 $47.42 ($0.05) ($0.28) $48.57 $48.99 ($0.22) ($0.20) ATSI NA NA NA NA $46.88 $51.24 ($3.85) ($0.51) BGE $59.19 $48.69 $8.04 $2.46 $58.74 $49.82 $6.62 $2.30 ComEd $36.21 $47.95 ($8.85) ($2.90) $38.97 $49.12 ($7.32) ($2.83) DAY $40.51 $48.10 ($6.66) ($0.93) $43.90 $49.40 ($4.57) ($0.93) DLCO $39.41 $47.89 ($6.68) ($1.79) $43.30 $49.12 ($4.15) ($1.67) Dominion $56.08 $48.86 $6.30 $0.92 $54.47 $49.83 $4.04 $0.60 DPL $56.51 $49.07 $4.59 $2.85 $56.76 $49.95 $3.82 $2.99 JCPL $56.00 $49.58 $3.92 $2.51 $58.09 $50.73 $4.62 $2.74 Met-Ed $53.47 $48.20 $4.22 $1.05 $53.64 $49.22 $3.42 $1.00 PECO $53.60 $48.36 $3.54 $1.70 $55.19 $49.47 $3.82 $1.90 PENELEC $45.17 $47.19 ($1.73) ($0.28) $48.18 $48.27 ($0.46) $0.37 Pepco $58.16 $48.70 $7.94 $1.51 $55.71 $49.82 $4.63 $1.26 PPL $51.50 $47.90 $2.84 $0.76 $53.76 $48.95 $3.85 $0.96 PSEG $55.78 $48.58 $4.73 $2.47 $57.16 $49.71 $4.78 $2.67 RECO $54.85 $49.48 $3.20 $2.17 $53.17 $50.88 ($0.15) $2.44 PJM $48.35 $48.23 $0.08 $0.04 $49.48 $49.40 $0.05 $0.03 Table 10 4 Zonal and PJM day-ahead, load-weighted average LMP components (Dollars per MWh): Calendar years 2010 and Day-Ahead LMP Energy Congestion Loss Day-Ahead LMP Energy Congestion Loss AECO $57.03 $49.69 $3.87 $3.47 $57.45 $49.53 $4.67 $3.25 AEP $40.35 $47.45 ($4.67) ($2.43) $42.90 $48.10 ($3.25) ($1.96) AP $47.08 $47.42 ($0.05) ($0.28) $47.66 $47.96 ($0.16) ($0.15) ATSI NA NA NA NA $46.14 $50.87 ($3.07) ($1.66) BGE $58.37 $48.37 $6.80 $3.20 $57.10 $49.19 $5.16 $2.75 ComEd $35.48 $47.12 ($7.62) ($4.02) $38.12 $48.12 ($6.46) ($3.55) DAY $40.18 $47.71 ($5.52) ($2.01) $43.25 $48.64 ($4.21) ($1.18) DLCO $40.03 $47.49 ($5.26) ($2.20) $42.60 $48.39 ($4.13) ($1.67) Dominion $56.08 $48.48 $6.05 $1.54 $53.16 $49.11 $3.35 $0.70 DPL $55.76 $48.66 $3.73 $3.37 $56.97 $49.29 $4.20 $3.48 JCPL $55.07 $48.61 $3.13 $3.32 $56.24 $49.45 $3.73 $3.06 Met-Ed $52.78 $47.72 $3.70 $1.35 $52.37 $48.08 $3.28 $1.01 PECO $53.63 $47.94 $3.18 $2.51 $55.35 $48.61 $4.33 $2.41 PENELEC $45.52 $46.41 ($0.88) ($0.00) $47.41 $47.72 ($0.56) $0.24 Pepco $56.41 $47.24 $6.85 $2.32 $54.99 $48.72 $4.49 $1.79 PPL $50.92 $47.45 $2.51 $0.95 $52.82 $48.27 $3.63 $0.93 PSEG $54.99 $48.02 $3.47 $3.50 $56.24 $48.89 $4.27 $3.09 RECO $55.56 $49.69 $2.67 $3.20 $53.55 $49.45 $1.75 $2.35 PJM $47.65 $47.67 $0.05 ($0.07) $48.34 $48.55 ($0.05) ($0.16) Energy Costs Energy Accounting The energy component of LMP is the system reference bus LMP, also called the system marginal price (SMP). The energy charge is based on the applicable day-ahead and real-time energy component of LMP (SMP). energy charges are equal to the load energy payments minus generation energy credits, plus explicit energy charges, incurred in both the Day-Ahead Energy Market and the balancing energy market. Due to losses, total generation will be greater than total load in any hour. Since the hourly integrated energy component of LMP is the same across the every bus in every hour, the net energy bill is negative, with more generation credits than load charges in any given hour. This net energy bill is netted against total net marginal loss charges plus net residual market adjustments, which 268 Section 10 Congestion and Marginal Losses

9 Section 10 Congestion and Marginal Losses provides for full recovery of generation charges, with any remainder distributed back to load and exports as marginal loss credits. Day-Ahead Energy. Day-ahead, load energy payments are calculated for all cleared demand, decrement bids and Day-Ahead Energy Market sale transactions. (Decrement bids and energy sales can be thought of as scheduled load.) Day-ahead, load energy payments are calculated using MW and the load bus energy component of LMP (energy LMP), the decrement bid energy LMP or the energy LMP at the source of the sale transaction, as applicable. Day-Ahead Energy Credits. Day-ahead, generation energy credits are calculated for all cleared generation and increment offers and Day- Ahead Energy Market purchase transactions. (Increment offers and energy purchases can be thought of as scheduled generation.) Day-ahead, generation energy credits are calculated using MW and the generator bus energy LMP, the increment offer energy LMP or the energy LMP at the sink of the purchase transaction, as applicable. Balancing Energy. Balancing, load energy payments are calculated for all deviations between a PJM member s real-time load and energy sale transactions and their day-ahead cleared demand, decrement bids and energy sale transactions. Balancing, load energy payments are calculated using MW deviations and the real-time energy LMP for each bus where a deviation exists. Balancing Energy Credits. Balancing, generation energy credits are calculated for all deviations between a PJM member s real-time generation and energy purchase transactions and the day-ahead cleared generation, increment offers and energy purchase transactions. Balancing, generation energy credits are calculated using MW deviations and the real-time energy LMP for each bus where a deviation exists. Explicit Energy. Explicit energy charges are the net energy charges associated with pointto-point energy transactions. These charges equal the product of the transacted MW and energy LMP differences between sources (origins) and sinks (destinations) in the Day-Ahead Energy Market. Balancing energy market explicit energy charges equal the product of the differences between the real-time and day-ahead transacted MW and the differences between the real-time energy LMP at the transactions sources and sinks. The explicit energy charges will sum to zero because the LMP (SMP) at the transactions sources and sinks will be the same for each transaction. Inadvertent Energy. Inadvertent energy charges are energy charges resulting from the differences between the net actual energy flow and the net scheduled energy flow into or out of the PJM control area each hour. This inadvertent interchange of energy may be positive or negative, where positive interchange typically results in a charge while negative interchange typically results in a credit. Inadvertent energy charges are common costs, not directly attributable to specific participants, that are distributed on a load ratio basis. 18 Calendar Year Energy Costs charges decreased 2.1 percent from 6.5 percent in 2010 to 4.4 percent in 2011 of annual total PJM billings. 19 Table 10 5 shows type of charges by year for 2010 and Energy charges decreased by $3.7 million from $797.9 million in 2010 to $794.2 million in Table 10 5 annual PJM charges by component (Dollars (Millions)): Calendar years 2010 and PJM Billing (millions) Energy Loss Congestion PJM Billing Percent of PJM Billing 2010 ($798) $1,635 $1,424 $2,261 $34, % 2011 ($794) $1,380 $998 $1,583 $35, % ($1,592) $3,014 $2,422 $3,844 $70, % energy charges are shown in Table 10 6 and Table Table 10 6 shows the 2010 and 2011 PJM energy costs by category. Table 10 7 shows the 2010 and 2011 PJM energy costs by market category. The 2011 PJM total energy costs were comprised of $47,656.9 million in load energy payments, $48,478.9 million in generation energy credits, $0.0 million in explicit energy charges and $27.8 million in inadvertent energy charges. 18 OA. Schedule 1 (PJM Interchange Energy Market) Calculated values shown in Section 10, Congestion and Marginal Losses, are based on unrounded, underlying data and may differ from calculations based on the rounded values in the tables. 20 The Energy, Loss and Congestion include net inadvertent charges State of the Market Report for PJM 269

10 2011 State of the Market Report for PJM Table 10 6 annual PJM energy costs by category (Dollars (Millions)): Calendar years 2010 and 2011 Energy Costs (Millions) Inadvertent Year Credits Explicit 2010 $53,101.4 $53,886.8 $0.0 ($12.5) ($797.9) 2011 $47,656.9 $48,478.9 $0.0 $27.8 ($794.2) Monthly Energy Costs Table 10 8 shows a monthly summary of energy costs by type for The highest monthly energy cost was in July and totaled -$120.1 million or 15.1 percent of the total. The majority of the energy costs was in the Day-Ahead Energy Market and totaled -$735.1 million. The day-ahead costs were offset, in part, by a total of -$86.9 million in the balancing market. Marginal Losses Marginal Loss Accounting With the implementation of marginal loss pricing, PJM calculates transmission loss charges for each PJM member. The loss charge is based on the applicable dayahead and real-time loss component of LMP (MLMP). Each PJM member is charged for the cost of losses on the transmission system, based on the difference between the MLMP at the location where the PJM member injects energy and the MLMP where the PJM member withdraws energy. More specifically, total loss charges are equal to the load loss payments minus generation loss credits, plus explicit loss charges, incurred in both the Day-Ahead Energy Market and the balancing energy market. Day-Ahead Loss. Day-ahead, load loss payments are calculated for all cleared demand, decrement bids and Day-Ahead Energy Market sale transactions. (Decrement bids and energy sales can be thought of as scheduled load.) Day-ahead, load loss payments are calculated using MW and the load bus loss component of LMP (MLMP), the decrement bid MLMP or the MLMP at the source of the sale transaction, as applicable. Day-Ahead Loss Credits. Day-ahead, generation loss credits are calculated for all cleared generation and increment offers and Day-Ahead Energy Market purchase transactions. (Increment offers and energy purchases can be thought of as scheduled generation.) Day-ahead, generation loss credits are calculated using MW and the generator Table 10 7 annual PJM energy costs by market category (Dollars (Millions)): Calendar years 2010 and 2011 Energy Costs (Millions) Balancing Inadvertent 2010 $53,164.8 $53,979.1 $0.0 ($814.3) ($63.4) ($92.3) $0.0 $28.9 ($12.5) ($797.9) 2011 $48,142.3 $48,877.4 $0.0 ($735.1) ($485.3) ($398.4) $0.0 ($86.9) $27.8 ($794.2) Table 10 8 Monthly energy costs by type (Dollars (Millions)): Calendar year 2011 Energy Costs (Millions) Balancing Inadvertent Jan $5,274.1 $5,364.4 $0.0 ($90.3) ($51.6) ($46.4) $0.0 ($5.2) $2.1 ($93.3) Feb $3,465.4 $3,526.5 $0.0 ($61.1) ($29.1) ($26.7) $0.0 ($2.4) $2.3 ($61.2) Mar $3,313.4 $3,365.7 $0.0 ($52.4) ($31.0) ($25.6) $0.0 ($5.4) $2.4 ($55.3) Apr $3,073.2 $3,123.1 $0.0 ($49.9) ($10.5) ($10.1) $0.0 ($0.4) $2.5 ($47.8) May $3,588.3 $3,643.0 $0.0 ($54.8) ($0.7) ($0.5) $0.0 ($0.2) $2.9 ($52.1) Jun $4,968.7 $5,050.8 $0.0 ($82.1) ($37.4) ($34.2) $0.0 ($3.2) $1.2 ($84.2) Jul $7,010.4 $7,120.4 $0.0 ($110.0) ($87.7) ($71.0) $0.0 ($16.8) $6.7 ($120.1) Aug $4,713.0 $4,779.8 $0.0 ($66.9) ($65.8) ($49.4) $0.0 ($16.4) $4.9 ($78.3) Sep $3,499.2 $3,554.2 $0.0 ($55.0) ($78.6) ($73.2) $0.0 ($5.5) $1.1 ($59.4) Oct $3,110.0 $3,152.7 $0.0 ($42.7) ($46.1) ($40.2) $0.0 ($5.9) $0.3 ($48.3) Nov $2,935.8 $2,966.0 $0.0 ($30.2) ($12.8) $1.8 $0.0 ($14.6) $0.8 ($44.0) Dec $3,191.0 $3,230.6 $0.0 ($39.6) ($34.1) ($23.0) $0.0 ($11.0) $0.6 ($50.1) $48,142.3 $48,877.4 $0.0 ($735.1) ($485.3) ($398.4) $0.0 ($86.9) $27.8 ($794.2) 270 Section 10 Congestion and Marginal Losses

11 Section 10 Congestion and Marginal Losses bus MLMP, the increment offer MLMP or the MLMP at the sink of the purchase transaction, as applicable. Balancing Loss. Balancing, load loss payments are calculated for all deviations between a PJM member s real-time load and energy sale transactions and their day-ahead cleared demand, decrement bids and energy sale transactions. Balancing, load loss payments are calculated using MW deviations and the real-time MLMP for each bus where a deviation exists. Balancing Loss Credits. Balancing, generation loss credits are calculated for all deviations between a PJM member s real-time generation and energy purchase transactions and the day-ahead cleared generation, increment offers and energy purchase transactions. Balancing, generation loss credits are calculated using MW deviations and the real-time MLMP for each bus where a deviation exists. Explicit Loss. Explicit loss charges are the net loss charges associated with point-to-point energy transactions. These charges equal the product of the transacted MW and MLMP differences between sources (origins) and sinks (destinations) in the Day-Ahead Energy Market. Balancing energy market explicit loss charges equal the product of the differences between the real-time and dayahead transacted MWs and the differences between the real-time MLMP at the transactions sources and sinks. Inadvertent Loss. Inadvertent loss charges are loss charges resulting from the differences between the net actual energy flow and the net scheduled energy flow into or out of the PJM control area each hour. This inadvertent interchange of energy may be positive or negative, where positive interchange typically results in a charge while negative interchange typically results in a credit. Inadvertent loss charges are common costs, not directly attributable to specific participants, that are distributed on a load ratio basis. 21 Marginal loss charges can be both positive and negative and consequently the load payments and generation credits can also be both positive and 21 OA. Schedule 1 (PJM Interchange Energy Market) 3.7 negative. The loss component of LMP is calculated with respect to the system reference bus LMP, also called the system marginal price (SMP). An increase in generation at a bus that results in an increase in losses will cause the marginal loss component of that bus to be negative. If the increase in generation at the bus results in a decrease of system losses, then the marginal loss component is positive. Calendar Year Marginal Loss Costs Loss charges decreased by 0.9 percent from 4.7 percent in 2010 to 3.8 percent in 2011 of annual total PJM billings. 22 Table 10 9 shows total marginal loss charges by year for 2010 and Loss charges decreased by $255.3 million from $1,634.8 million in 2010 to $1,379.5 million in Table 10 9 annual PJM Marginal Loss (Dollars (Millions)): Calendar years 2010 and 2011 Loss Percent Change PJM Billing Percent of PJM Billing 2010 $1,635 NA $34, % 2011 $1,380 (15.6%) $35, % $3,014 $70, % marginal loss costs for 2010 and 2011 are shown in Table and Table Table shows the 2011 PJM marginal loss costs by category and Table shows the 2011 PJM marginal loss costs by market category. The 2011 PJM total marginal loss costs were comprised of -$174.0 million in load loss payments, -$1,551.9 million in generation loss credits, $1.6 million in explicit loss costs and $12,775.2 in inadvertent loss charges. Table annual PJM marginal loss costs by category (Dollars (Millions)): Calendar years 2010 and 2011 Marginal Loss Costs (Millions) Year Credits Explicit Inadvertent 2010 ($122.3) ($1,707.0) $50.2 ($0.0) $1, ($174.0) ($1,551.9) $1.6 $0.0 $1, Calculated values shown in Section 10, Congestion and Marginal Losses, are based on unrounded, underlying data and may differ from calculations based on the rounded values in the tables State of the Market Report for PJM 271

12 2011 State of the Market Report for PJM Table annual PJM marginal loss costs by market category (Dollars (Millions)): Calendar years 2010 and 2011 Marginal Loss Costs (Millions) Balancing Inadvertent 2010 ($146.3) ($1,716.1) $95.8 $1,665.6 $23.9 $9.1 ($45.6) ($30.7) ($0.0) $1, ($215.4) ($1,592.1) $53.8 $1,430.5 $41.3 $40.2 ($52.2) ($51.0) $0.0 $1,379.5 Table Monthly marginal loss costs by type (Dollars (Millions)): Calendar year 2011 Marginal Loss Costs (Millions) Balancing Inadvertent charges Jan ($16.6) ($192.8) $12.3 $188.5 $5.3 $2.8 ($5.4) ($2.9) $0.0 $185.7 Feb ($9.9) ($124.8) $6.8 $121.8 $3.3 $3.2 ($1.9) ($1.8) $0.0 $119.9 Mar ($10.5) ($112.5) $6.8 $108.8 $2.0 $3.0 ($3.8) ($4.8) $0.0 $104.0 Apr ($10.3) ($91.6) $3.4 $84.8 $1.7 $2.3 ($5.1) ($5.6) $0.0 $79.2 May ($8.6) ($93.9) $9.0 $94.3 $3.3 $3.2 ($7.1) ($7.0) $0.0 $87.3 Jun ($34.4) ($158.4) $5.9 $129.9 $4.2 $4.4 ($4.3) ($4.5) $0.0 $125.4 Jul ($40.0) ($254.3) $3.1 $217.4 $8.4 $8.3 ($3.8) ($3.7) $0.0 $213.7 Aug ($25.3) ($162.1) $1.2 $137.9 $2.0 $2.7 ($2.7) ($3.5) $0.0 $134.5 Sep ($18.6) ($123.1) $3.1 $107.7 $5.4 $6.2 ($3.9) ($4.7) $0.0 $102.9 Oct ($9.8) ($93.5) $2.0 $85.7 $1.7 $1.3 ($4.1) ($3.6) $0.0 $82.0 Nov ($15.9) ($93.5) ($1.6) $76.0 $1.6 $0.5 ($2.9) ($1.7) $0.0 $74.3 Dec ($15.4) ($91.5) $1.6 $77.8 $2.6 $2.4 ($7.3) ($7.1) $0.0 $70.6 ($215.4) ($1,592.1) $53.8 $1,430.5 $41.3 $40.2 ($52.2) ($51.0) $0.0 $1,379.5 Monthly Marginal Loss Costs Table shows a monthly summary of marginal loss costs by type for The highest monthly loss cost was in July and totaled $213.7 million or 15.5 percent of the total. The majority of the marginal loss costs was in the Day-Ahead Energy Market and totaled $1,430.5 million. The day-ahead costs were offset, in part, by a total of -$51.0 million in the balancing market. Marginal Loss Costs and Loss Credits Marginal loss credits (loss surplus) are calculated by adding the total net energy costs, the total net marginal loss costs and net residual market adjustments. The total energy costs are equal to the net energy costs (generation energy credits less load energy payments plus net inadvertent energy charges plus net explicit energy charges). marginal loss costs are equal to the net marginal loss costs (generation loss credits less load loss payments plus net inadvertent loss charges plus net explicit loss charges). Ignoring interchange, the existence of losses will cause total generation to be greater than total load in any hour. Since the hourly integrated energy component of LMP is the same across every generator and load bus in every hour, the net energy bill will be negative (ignoring net interchange), with more generation credits than load charges collected in any given hour. This net energy bill is netted against total net marginal loss charges and net residual market adjustments, with the remainder distributed back to load and exports as marginal loss credits. Residual market adjustments consist of the known day-ahead error value, day-ahead loss MW congestion value and balancing loss MW congestion value. The known day-ahead error value is the financial calculation for the MW imbalance created when the day-ahead case is solved. The dayahead and balancing loss MW congestion values are congestion values associated with loss MW that need to be deducted from the net of the total marginal loss costs, total energy costs and day-ahead known error value before marginal loss credits can be distributed. Table shows the total net energy charges, the total net marginal loss charges collected, the net residual 272 Section 10 Congestion and Marginal Losses

Demand Response. Overview. Recommendations

Demand Response. Overview. Recommendations Section 6 Demand Response Demand Response Markets require both a supply side and a demand side to function effectively. The demand side of wholesale electricity markets is underdeveloped. Wholesale power

More information

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation. Section 3 Operating Reserve Operating Reserve Day-ahead and real-time operating reserve credits are paid to market participants under specified conditions in order to ensure that resources are not required

More information

CUSTOMER GUIDE TO PJM BILLING

CUSTOMER GUIDE TO PJM BILLING CUSTOMER GUIDE TO PJM BILLING Billing Line Items include PJM Open Access Tariff (OATT) references, PJM Operating Agreement (OpAgr) references, and PJM Manual references. Reports are available for viewing,

More information

Committed Offer: Offer on which a resource was scheduled by the Office of the Interconnection for a particular clock hour for the Operating Day.

Committed Offer: Offer on which a resource was scheduled by the Office of the Interconnection for a particular clock hour for the Operating Day. Proposed Tariff Revisions Attachment K-Appendix and Schedule 1 of the Operating Agreement Generator Offer Flexibility Senior Task Force Revisions Related To Make-Whole and Lost Opportunity Cost Payments

More information

2007 State of the Market Report. Volume 1: INTRODUCTION

2007 State of the Market Report. Volume 1: INTRODUCTION 2007 State of the Market Report Volume 1: NTRODUCTON Market Monitoring Unit March 11, 2008 2007 State of the Market Report Preface The Market Monitoring Unit of PJM nterconnection publishes an annual

More information

E&AS Offset Proposal Example With all PJM Zones

E&AS Offset Proposal Example With all PJM Zones E&AS Offset Proposal Example With all PJM Zones Paul M. Sotkiewicz, Ph.D CSTF August 19, 2014 PJM Proposal Outline Still requires the need to model historic revenues that will be adjusted for the forward

More information

Monitoring Analytics. Introduction. Operating Parameters. Generation Costs

Monitoring Analytics. Introduction. Operating Parameters. Generation Costs Introduction Pursuant to Attachment DD, Section 5.10(a)(v)(A, B and C) of the PJM Tariff, PJM provides the net energy and ancillary services revenue offset data for the PJM Region and each LDA or Region

More information

Section 5: Network Integration Transmission Service Accounting. 5.1 Network Integration Transmission Service Accounting Overview

Section 5: Network Integration Transmission Service Accounting. 5.1 Network Integration Transmission Service Accounting Overview Section 5: Network Integration Transmission Service Accounting Welcome to the Network Integration Transmission Service Accounting section of the PJM Manual for Open Access Transmission Tariff Accounting.

More information

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017 PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017 Prepared by Market Settlements Development Department PJM 2017 Table of Contents Table of Contents

More information

MISO-PJM Interface Pricing Post Implementation Metrics and Criteria

MISO-PJM Interface Pricing Post Implementation Metrics and Criteria MISO-PJM Interface Pricing Post Implementation Metrics and Criteria Contents 1 Introduction... 2 2 Real-Time Market Interchange Price Signal Effectiveness Metrics... 2 2.1 Post Implementation Pricing Monitoring

More information

Dispatch Signal & Locational Marginal Pricing (LMP)

Dispatch Signal & Locational Marginal Pricing (LMP) Dispatch Signal & Locational Marginal Pricing (LMP) PJM State & Member Training Dept. Objectives Students will be able to: Identify how PJM dispatches & utilizes LMP Dispatch Rate Economic control signal

More information

PJM M2M Market Flow Proposal. October 2014

PJM M2M Market Flow Proposal. October 2014 PJM M2M Market Flow Proposal October 2014 Table of Contents 1. Introduction... 1 2. M2M Market Flow... 1 3. Real-Time Balancing Congestion and M2M payments... 3 4. Firm Flow Entitlement Impact of Market

More information

Alternatives for Addressing the Interface Pricing Flaw

Alternatives for Addressing the Interface Pricing Flaw Alternatives for Addressing the Interface Pricing Flaw Presented to: Joint and Common Market Meeting David Patton President, Potomac Economics March 21, 2014 Introduction MISO and PJM s interface prices

More information

PJM ARR and FTR Market

PJM ARR and FTR Market PJM ARR and FTR Market PJM State & Member Training Dept. PJM 2016 Objectives Explain the concepts and principles of Auction Revenue Rights and Financial Transmission Rights Describe how to participate

More information

Interface Pricing Approach Whitepaper May 2015

Interface Pricing Approach Whitepaper May 2015 Interface Pricing Approach Whitepaper May 2015 This white paper represents MISO's current progress and assessment on the Interface Pricing issue. Additional analysis is underway and will be shared with

More information

PJM Manual 29: Billing. Revision: 23 Effective Date: January 1, Prepared by Strategic Market Services Department

PJM Manual 29: Billing. Revision: 23 Effective Date: January 1, Prepared by Strategic Market Services Department PJM Manual 29: Billing Revision: 23 Effective Date: January 1, 2012 Prepared by Strategic Market Services Department PJM 2012 Table of Contents PJM Manual 29: Billing Table of Contents Table of Contents...

More information

Markets Report. Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar January 20, 2015 PJM 2015

Markets Report. Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar January 20, 2015 PJM 2015 Markets Report Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar January 20, 2015 Executive Summary PJM Wholesale Cost for calendar year 2014 was $70.40/MWh, and increase of 47% and 33% over

More information

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q1 2017 Report on Market Issues and Performance July 10, 2017 Prepared by: Department of Market Monitoring TABLE OF CONTENTS Executive

More information

Joint and Common Market ITEM 4 PSEUDO TIES

Joint and Common Market ITEM 4 PSEUDO TIES Joint and Common Market ITEM 4 PSEUDO TIES Agenda 1. Overview 2. Background 3. PJM Update 4. MISO Update 5. Congestion Overlap Solution 6. Next Steps 2 Overview Purpose Provide a status update on MISO-PJM

More information

Schedule 9 and 10 PJM /23/2017

Schedule 9 and 10 PJM /23/2017 Schedule 9 and 10 PJM 2017 Schedule 9 PJM Scheduling, System Control and Dispatch Service How PJM pays its bills Unbundled Those who use the service, pay for it 6 categories plus FERC, NERC, RFC, OPSI,

More information

2015/2016 RPM First Incremental Auction Results

2015/2016 RPM First Incremental Auction Results Introduction This document provides information for PJM stakeholders regarding the results of the 2015/2016 Reliability Pricing Model (RPM) First Incremental Auction. Incremental Auctions provide both

More information

Load Management Performance Report 2015/2016

Load Management Performance Report 2015/2016 Load Management Performance Report 2015/2016 August 2016 PJM has made all efforts possible to accurately document all information in this report. However, PJM cannot warrant or guarantee that the information

More information

Locational Marginal Pricing (LMP): Basics of Nodal Price Calculation

Locational Marginal Pricing (LMP): Basics of Nodal Price Calculation MRTU Locational Marginal Pricing (LMP): Basics of Nodal Price Calculation CRR Educational Class #2 CAISO Market Operations Why are LMPs important to the CRR Allocation & Settlement Process The CRR revenue

More information

3.3.1 Cost of New Entry

3.3.1 Cost of New Entry Section 3: Demand in Reliability Price Model 3.3.1 Cost of New Entry The value for Cost of New Entry (CONE) (in ICAP terms) is determined in accordance with Attachment DD of the Open Access Transmission

More information

Load Management Performance Report 2017/2018. (mid Delivery Year update)

Load Management Performance Report 2017/2018. (mid Delivery Year update) Load Management Performance Report 2017/2018 (mid Delivery Year update) January 2018 PJM has made all efforts possible to accurately document all information in this report. However, PJM cannot warrant

More information

2013/2014 RPM Base Residual Auction Results

2013/2014 RPM Base Residual Auction Results Executive Summary The 2013/2014 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 152,743.3 MW of unforced capacity in the RTO at a Resource Clearing Price of $27.73/MW-day. This MW and

More information

RPM 101 Overview of Reliability Pricing Model

RPM 101 Overview of Reliability Pricing Model RPM 101 Overview of Reliability Pricing Model PJM 2017 Agenda Introduction Resource Adequacy Demand in RPM Supply in RPM Auction Structure Auction Clearing Resource Clearing Prices CTRs & ICTRs/CTR & ICTR

More information

PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations

PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, 2017 Prepared by Capacity Market Operations PJM 2017 Table of Contents Table of Contents Table of Exhibits...9 Approval...10 Current

More information

Day-ahead ahead Scheduling Reserve (DASR) Market

Day-ahead ahead Scheduling Reserve (DASR) Market Day-ahead ahead Scheduling Reserve (DASR) Market Agenda Implementation Overview of the DASR Market Market Clearing Process Market Clearing Example Performance Compliance Market Settlements Appendix: emkt

More information

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

the Real-Time Market will be based on the system marginal costs produced by the Real-Time 17.1 LBMP Calculation The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by the Real-Time Dispatch

More information

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator:

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator: ConOp Internal NYISO Controllable Lines Concept of Operation Author: Reviewers: Scott Harvey, LECG Project Sponsor: Point of Contact: Document Locator: Revision History Date Additions, deletions, modifications

More information

PJM PROMOD Overview. August 1, PJM

PJM PROMOD Overview. August 1, PJM PJM PROMOD Overview August 1, 2017 Market Analysis Software PROMOD PROMOD is a fundamental electric market simulation solution It incorporates future demand, generating unit operating characteristics,

More information

Pseudo-Tie Congestion Overlap

Pseudo-Tie Congestion Overlap Pseudo-Tie Congestion Overlap Tim Horger Director, Energy Market Operations Markets & Reliability Committee March 22, 2018 Congestion Overlap Background Pseudo-Tie Market-to-Market congestion overlap between

More information

RPM 301 Performance in Reliability Pricing Model

RPM 301 Performance in Reliability Pricing Model RPM 301 Performance in Reliability Pricing Model PJM State & Member Training Dept. PJM 2017 Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The

More information

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff ConOp Internal NYISO HVDC Controllable Line Scheduling Concept of Operation Author: Scott Harvey, LECG Reviewers: ISO Staff LECG Staff Project Sponsor: Point of Contact: C. King B. Kranz Document Locator:

More information

Capacity Market. Overview RPM Capacity Market. Market Design

Capacity Market. Overview RPM Capacity Market. Market Design Section 4 Capacity Capacity Market Each organization serving PJM load must meet its capacity obligations through the PJM Capacity Market, where load serving entities (LSEs) must pay the locational capacity

More information

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations Technical Bulletin 2009-06-03 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations June 15, 2009 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

More information

State of the Market Report for PJM

State of the Market Report for PJM State of the Market Report for PJM Volume 1: Introduction 2013 Monitoring Analytics, LLC Independent Market Monitor for PJM 3.13.2014 Section 1 Introduction Introduction 2013 in Review The state of the

More information

ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE

ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE Department of Market Monitoring ACKNOWLEDGEMENT The following members of the Department of Market Monitoring contributed to this report Eric Hildebrandt Keith

More information

Federal Energy Regulatory Commission Working Paper on Standardized Transmission Service and Wholesale Electric Market Design

Federal Energy Regulatory Commission Working Paper on Standardized Transmission Service and Wholesale Electric Market Design Federal Energy Regulatory Commission Working Paper on Standardized Transmission Service and Wholesale Electric Market Design To enhance competition in wholesale electric markets and broaden the benefits

More information

2014 State of the Market

2014 State of the Market 2014 State of the Market 24 August 2015 SPP Market Monitoring Unit Disclaimer The data and analysis in this report are provided for informational purposes only and shall not be considered or relied upon

More information

Distributed Solar Generation Update

Distributed Solar Generation Update Distributed Solar Generation Update Load Analysis Subcommittee November 15, 2017 Topics Review of Process to incorporate Distributed Solar Generation into the Long-Term Forecast Identical process to last

More information

Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources

Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources Market Issues Bulletin Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources March 10, 2015 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400

More information

FERC Order 764 Settlements

FERC Order 764 Settlements FERC Order 764 Settlements Spring Release 2014 The information contained in these materials is provided for general information only and does not constitute legal or regulatory advice. The ultimate responsibility

More information

June 10, Re: PJM Interconnection, L.L.C., Docket No. ER Pursuant to Section 205 of the Federal Power Act, 16 U.S.C.

June 10, Re: PJM Interconnection, L.L.C., Docket No. ER Pursuant to Section 205 of the Federal Power Act, 16 U.S.C. 955 Jefferson Avenue Valley Forge Corporate Center Norristown, PA 19403-2497 Jacqulynn Hugee Assistant General Counsel - Markets Telephone 610.666.8208 Facsimile 610.666.8211 hugeej@pjm.com Honorable Kimberly

More information

Analysis of the 2019/2020 RPM Base Residual Auction

Analysis of the 2019/2020 RPM Base Residual Auction Analysis of the 2019/2020 RPM Base Residual Auction The Independent Market Monitor for PJM August 31, 2016 Monitoring Analytics 2016 www.monitoringanalytics.com Introduction This report, prepared by the

More information

Con Ed/PSEG Wheel Replacement Proposal A joint white paper from the New York Independent System Operator and PJM Interconnection

Con Ed/PSEG Wheel Replacement Proposal A joint white paper from the New York Independent System Operator and PJM Interconnection Con Ed/PSEG Wheel Replacement Proposal A joint white paper from the New York Independent System Operator and PJM Interconnection DRAFT For Discussion Purposes Only V 4.0 December 19, 2016 Table of Contents

More information

Dispatching Variable Generation Resources

Dispatching Variable Generation Resources Dispatching Variable Generation Resources A Discussion Paper for Stakeholder Engagement 91 (Renewable Integration) Table of Contents Introduction... 3 IESO Dispatch Processes... 5 Registration... 5 Dispatch

More information

2017 Demand Response Operations Markets Activity Report: February 2018

2017 Demand Response Operations Markets Activity Report: February 2018 2017 Demand Response Operations Markets Activity Report: February 2018 James McAnany PJM Demand Side Response Operations February 8, 2018 This page intentionally left blank PJM 2018 www.pjm.com 2 P age

More information

Results and Assumptions For Single Economic Dispatch Production Cost Study PROMOD Component

Results and Assumptions For Single Economic Dispatch Production Cost Study PROMOD Component Results and Assumptions For Single Economic Dispatch Production Cost Study PROMOD Component Last Revised: May 25, 26 Disclaimer: "MIDWEST ISO MAKES NO REPRESENTATIONS OR WARRANTIES OF ANY KIND, EXPRESS

More information

Locational Marginal Pricing II: Unlocking the Mystery

Locational Marginal Pricing II: Unlocking the Mystery Locational Marginal Pricing II: Unlocking the Mystery Thomas D. Veselka Argonne National Laboratory Decision and Information Sciences Division Center for Energy, Environmental, and Economic Systems Analysis

More information

LMP Implementation in New England

LMP Implementation in New England IEEE PES General Meeting, Montreal Eugene Litvinov June, 2006 2006 ISO New England Inc. 1 New England s Electric Power System 14 million people; 6.5 million households and businesses 350+ generators 8,000+

More information

Day Ahead Market Enhancements: Issue Paper/Straw Proposal

Day Ahead Market Enhancements: Issue Paper/Straw Proposal Day Ahead Market Enhancements: Issue Paper/Straw Proposal Don Tretheway Senior Advisor, Market Design Policy Megan Poage Senior Market Design & Regulatory Policy Developer March 7, 2018 Agenda Time Topic

More information

2017 Distributed Energy Resources (DER) that participate in PJM Markets as Demand Response. PJM Demand Side Response Operations

2017 Distributed Energy Resources (DER) that participate in PJM Markets as Demand Response. PJM Demand Side Response Operations 217 Distributed Energy Resources (DER) that participate in PJM Markets as Demand Response PJM Demand Side Response Operations January, 218 217 Distributed Energy Resources (DER) in PJM Demand Response

More information

Further Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market

Further Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market Further Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market March 2001 Prepared by Eric Hildebrandt, Ph.D. Department of Market Analysis California Independent

More information

Locational Based Marginal Pricing

Locational Based Marginal Pricing Locational Based Marginal Pricing Gina Craan Manager, Market Training, NYISO Market Overview Course March 8, 2018 Rensselaer, NY 12144 1 Locational Based Marginal Pricing Attendees will be able to Explain

More information

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal Energy Imbalance Market Year 1 Enhancements Phase 2 Draft Final Proposal September 8, 2015 Energy Imbalance Market Year 1 Enhancements Phase 2 Draft Final Proposal Table of Contents 1 Introduction... 3

More information

Draft Whitepaper to Platte River Board of Directors

Draft Whitepaper to Platte River Board of Directors Draft Whitepaper to Platte River Board of Directors Report on Organized Power Markets RTOs and ISOs Presented for the October 2016 Board Meeting Overview This report on the potential formation of a regional

More information

Modeling the Restructured Illinois Electricity Market as a Complex Adaptive System

Modeling the Restructured Illinois Electricity Market as a Complex Adaptive System Modeling the Restructured Illinois Electricity Market as a Complex Adaptive System Charles M. Macal Gale A. Boyd Richard R. Cirillo Guenter Conzelmann Michael J. North Prakash R. Thimmapuram Thomas D.

More information

MARKET EFFICIENCY STUDY PROCESS AND PROJECT EVALUATION TRAINING

MARKET EFFICIENCY STUDY PROCESS AND PROJECT EVALUATION TRAINING MARKET EFFICIENCY STUDY PROCESS AND PROJECT EVALUATION TRAINING April 17, 2014 Training Objectives To Provide an Overview of: The Market Efficiency proposal window process The critical modeling inputs

More information

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh) For the first quarter of 2015, Ontario experienced overall demand that was typical for the province in winter, and strong generator output. Demand for Ontario electricity increased as a result of cold

More information

Electric Forward Market Report

Electric Forward Market Report Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08

More information

Midwest ISO. Prepared by: Midwest ISO Independent Market Monitor. David B. Patton, Ph.D. Potomac Economics. June Executive Summary: Introduction

Midwest ISO. Prepared by: Midwest ISO Independent Market Monitor. David B. Patton, Ph.D. Potomac Economics. June Executive Summary: Introduction 2009 State of the Market Report Midwest ISO Prepared by: Midwest ISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics June 2010 Executive Summary: Introduction This State of the Market

More information

Two Settlement PJM /06/2016

Two Settlement PJM /06/2016 Two Settlement PJM 2016 Objectives Describe Two-Settlement process Day-Ahead Market Balancing Market Explain Virtual Transactions and their settlement Inc Offers Dec Bids Up-to Congestion Transactions

More information

Energy Imbalance Market Overview

Energy Imbalance Market Overview Energy Imbalance Market Overview Presentation to: Portland General Electric EIM OATT Stakeholder Meeting David Timson Account Manager CAISO Strategic Alliances October 14, 2016 Topics for Discussion ISO

More information

The Virtues of A Virtual RTO

The Virtues of A Virtual RTO The Virtues of A Virtual RTO Jim Mayhew Mirant September 26, 2003 Harvard Electricity Policy Group 1 A Virtual RTO? An Organization That is a RTO in All but Name? Minimum Attributes? Regional Security

More information

Energy Markets - The Basics

Energy Markets - The Basics Disclaimer This training presentation is provided as a reference for preparing for the PJM Certification Exam. Note that the following information may not reflect current PJM rules and operating procedures.

More information

Applying PROBE for Congestion Analysis and Grid Planning

Applying PROBE for Congestion Analysis and Grid Planning Applying PROBE for Congestion Analysis and Grid Planning August 1, 2003 Jim Mitsche JMitsche@power-gem.com 518 393 3834 1 Topics Analysis Objectives Nature of Congestion Cost & Cost Calculation What is

More information

Market Settlements - Advanced

Market Settlements - Advanced Market Settlements - Advanced RPM Module PJM State & Member Training Dept. PJM 2017 Capacity vs. Energy Capacity A commitment of a resource to provide energy during PJM emergency under the capped energy

More information

2017/2018 RPM Base Residual Auction Planning Period Parameters

2017/2018 RPM Base Residual Auction Planning Period Parameters Introduction The RPM Base Residual Auction (BRA) for the 2017/2018 Delivery Year is scheduled to be conducted in May of 2014. This document describes the 2017/2018 BRA planning period parameters and also

More information

REVENUE SUFFICIENCY GUARANTEES AND COST ALLOCATION William W. Hogan i May 25, 2006

REVENUE SUFFICIENCY GUARANTEES AND COST ALLOCATION William W. Hogan i May 25, 2006 REVENUE SUFFICIENCY GUARANTEES AND COST ALLOCATION William W. Hogan i May 25, 2006 Introduction These comments address the Revenue Sufficiency Guarantee (RSG) and associated cost allocation issues discussed

More information

Bid cost recovery and variable energy resource settlement Straw proposal

Bid cost recovery and variable energy resource settlement Straw proposal Bid cost recovery and variable energy resource settlement Straw proposal April 9, 2015 Table of Contents 1. Background... 3 2. Schedule for policy stakeholder engagement... 3 3. Initiative scope... 3 4.

More information

IMM Quarterly Report: Fall 2017

IMM Quarterly Report: Fall 2017 IMM Quarterly Report: Fall 2017 MISO Independent Market Monitor David Patton, Ph.D. Potomac Economics December 5, 2017 Highlights and Findings: Fall 2017 The MISO markets performed competitively this fall,

More information

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) Paul L. Joskow September 28, 2007 ALTERNATIVE SYSTEM OPERATOR MODELS System operator (SO) is vertically integrated utility (G+T) Functional

More information

Briefing on 2018 Policy Initiatives Roadmap and Annual Plan

Briefing on 2018 Policy Initiatives Roadmap and Annual Plan Briefing on 2018 Policy Initiatives Roadmap and Annual Plan Greg Cook Director, Market and Infrastructure Policy EIM Governing Body Meeting General Session January 23, 2018 The ISO previously committed

More information

Impacts of the EU ETS on Electricity Prices

Impacts of the EU ETS on Electricity Prices Impacts of the EU ETS on Electricity Prices Prof. P. Capros E3Mlab - NTUA, kapros@central.ntua.gr Presented to Final Meeting of ETRES - Life Project Athens, March 31, 2006 The EU ETS - definition Cap and

More information

2. Market Operations Overview

2. Market Operations Overview 2. Market Operations Overview 2.5 Market Information This section summarizes and describes the common information that is used by the Day-Ahead and Real-Time processes. 2.5.1 Resource Static Data Static

More information

La regulación del incierto futuro de los sistemas eléctricos

La regulación del incierto futuro de los sistemas eléctricos La regulación del incierto futuro de los sistemas eléctricos Foro XM-2017 El futuro de la energía eléctrica en Colombia 25 de mayo, Cartagena, Colombia Carlos Batlle https://energy.mit.edu/profile/carlos-batlle

More information

Special Executive Report

Special Executive Report Special Executive Report DATE: August 3, 2016 SER#: SUBJECT: 7714R Initial Listing of Thirty Two (32) ISO PJM Day-Ahead and Real-Time Electricity Futures Contracts (This SER supersedes SER 7714 from earlier

More information

Data Miner 2 11/20/ PJM 2017

Data Miner 2 11/20/ PJM 2017 Data Miner 2 11/20/2017 Data Miner 2 Data Miner 2 will become the central data repository and interface for PJM public data. Key Product Features - Unified / highly available interface for all PJM public

More information

Business Practice Manual for The Transmission Planning Process

Business Practice Manual for The Transmission Planning Process Business Practice Manual for The Transmission Planning Process Posted: June 2, 2015 Intentionally left blank TABLE OF CONTENTS 1. Introduction... 9 1.1. Purpose of California ISO Business Practice Manuals...

More information

Electricity trading and transmission arrangements. Towards better electricity trading and transmission arrangements

Electricity trading and transmission arrangements. Towards better electricity trading and transmission arrangements Agenda Advancing economics in business Electricity trading and transmission arrangements Towards better electricity trading and transmission arrangements The UK is facing the significant challenge of integrating

More information

Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps

Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps As of March 20, 2018 www.pjm.com 2018 Roadmap Data Viewer, Voting, Account Manager, DR Hub and Power Meter, Data

More information

ISO Course Outline. Market Transactions Class

ISO Course Outline. Market Transactions Class ISO Course Outline Purpose Market Transactions Class This two-day training class is intended to be one of the cornerstones of the market training program and is designed to review the market concepts and

More information

Electricity Transmission Congestion Costs: A Review of Recent Reports

Electricity Transmission Congestion Costs: A Review of Recent Reports LBNL-54049 Electricity Transmission Congestion Costs: A Review of Recent Reports Prepared by Bernard C. Lesieutre and Joseph H. Eto Energy Analysis Department Environmental Energy Technologies Division

More information

Reserve Market. PJM State & Member Training Dept. PJM /06/2016

Reserve Market. PJM State & Member Training Dept. PJM /06/2016 Reserve Market PJM State & Member Training Dept. PJM 2016 Objectives Define Reserve products Explain the Reserve requirements Calculate Reserve offers PJM 2016 2 Reserves Reserves are additional generation

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

Of Polar Vortexes and PJM Price Spikes

Of Polar Vortexes and PJM Price Spikes Of Polar Vortexes and PJM Price Spikes By Judah Rose, David Gerhardt, John Karp, Frank Brock, Trisagni Sakya and Mohit Shrestha ICF International Executive Summary As discussed in the previous Polar Vortex

More information

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the FERC ELECTRIC TARIFF First Revised Sheet No. 121 ORIGINAL VOLUME NO. I Replacing Original Sheet No. 121 3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. 3.1 Nature of Relationship. Each Participating

More information

Flexible Ramping Product Cost Allocation Straw Proposal

Flexible Ramping Product Cost Allocation Straw Proposal Flexible Ramping Product Cost Allocation Straw Proposal March 15, 2012 Flexible Ramping Product Cost Allocation Straw Proposal Table of Contents 1 Introduction... 3 2 Prior discussion on Flexible Ramping

More information

Analysis of POC charging method and Regional Postage Stamp method for cost allocation for transmission line usage.

Analysis of POC charging method and Regional Postage Stamp method for cost allocation for transmission line usage. Analysis of POC charging method and Regional Postage Stamp method for cost allocation for transmission line usage. SAMEER MEHRA School of Electrical Engineering, VIT University Vellore, T.N. INDIA sameermehra2008@vit.ac.in

More information

2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017

2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017 2018 Draft Policy Initiatives Roadmap Market and Infrastructure Policy December 7, 2017 Primary drivers of proposed three-year roadmap Recent grid operations challenges pointing to need for day-ahead market

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

ATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE

ATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE ATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE This document outlines the process by which BGE determines Capacity

More information

3. Overview of Market Instruments

3. Overview of Market Instruments 3. Overview of Market Instruments 3.2 Ancillary Services Bids Four types of Ancillary Services are used by CAISO in its markets Regulation Up, Regulation Down, Spinning Reserve, and Non-Spinning Reserve.

More information

6.1.9 IFM Initial Conditions

6.1.9 IFM Initial Conditions 6.1.9 IFM Initial Conditions A Generating Unit that was committed in the previous day s Day-Ahead Market (IFM or RUC) run (TD-2 for TD-1) but was de-committed before HE24 would normally be considered initially

More information

Flexible Ramping Product. Draft Technical Appendix

Flexible Ramping Product. Draft Technical Appendix Flexible Ramping Product Draft Technical Appendix June 10, 2015 Table of Contents 1. Introduction... 3 2. Generalized flexible ramping capacity model... 3 3. Flexible ramping product summary... 5 4. Flexible

More information

ATTACHMENT M-2 (PECO) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE

ATTACHMENT M-2 (PECO) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE ATTACHMENT M-2 (PECO) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE This document outlines the process by which PECO determines Capacity

More information

ISO REVISED STAGING PLAN NO. 7

ISO REVISED STAGING PLAN NO. 7 ID Work Item Description 2 COMPLETE HIM Server An archival database is to be created for permanent historical storage of bidding, price and schedule data. HIM is defined in section 3.2.5 of the SI DSOW:

More information

Benefits from Generation and Storage on the Distribution System

Benefits from Generation and Storage on the Distribution System Benefits from Generation and Storage on the Distribution System Andrew Levitt Senior Market Strategist Emerging Markets Special MRC Meeting DER Aug 24, 2016 Generation/Storage Resource Location and Types

More information