DEVELOPMENT OF BEST PRACTICES FOR PORTABLE CHANGEABLE MESSAGE SIGN USE IN WORK ZONES FOR DESIGN AND CONSTRUCTION ENGINEERS

Size: px
Start display at page:

Download "DEVELOPMENT OF BEST PRACTICES FOR PORTABLE CHANGEABLE MESSAGE SIGN USE IN WORK ZONES FOR DESIGN AND CONSTRUCTION ENGINEERS"

Transcription

1 DEVELOPMENT OF BEST PRACTICES FOR PORTABLE CHANGEABLE MESSAGE SIGN USE IN WORK ZONES FOR DESIGN AND CONSTRUCTION ENGINEERS Submitted: November, 0 Susan Paulus, P.E. Lakeside Engineers 0 W. Mayfair Road Wauwatosa, WI Phone: --00 ex. 0 Fax: susan.paulus@lakesideengineers.com Number of Words: Number of References: 00 Number of Figures: 000 Number of Tables: 00 Total:

2 Susan Paulus 0 0 ABSTRACT Portable Changeable Message Sign (PCMS) use has been increasing in Wisconsin over the past six years. In 0, the Wisconsin Department of Transportation (WisDOT) spent over $ million on PCMS s during highway improvement projects. With such a large amount of money being spent on PCMS s, adequate guidance is needed to ensure PCMS s are used properly. Currently, WisDOT has limited guidance for PCMS design and field implementation. WisDOT s main design guidelines, the Facilities Development Manual [] does not even mention PCMS s. Other WisDOT guidance documents do address some elements of PCMS use [] [], but limited information is provided on message content and PCMS location. National guidance, state-specific guidance, and existing research were reviewed to determine best practices for PCMS use in work zones. This paper summarizes typical PCMS use, PCMS field placement, message development, and typical applications. Finally, recommendations for PCMS use in work zones are provided. Recommendations are tailored to current practices in Wisconsin, but can be applied nationwide. Recommendations cover advanced notice of closures and advanced warning. Advanced notice of closure guidelines are developed for system ramps, service ramp, roadway closures, and lane closures. Advanced warning guidelines are developed for a variety of work zone applications, including: rolling closures, zipper merges, and speed reduction areas. For each scenario, typical display duration, phase length, PCMS placement, and sample messages are provided.

3 Susan Paulus INTRODUCTION In the United States, about percent of roadway crashes occur in work zones, amounting to,000 crashes per year []. However, work zone crash reporting varies by state. In Wisconsin, an average,00 work zone crashes occur per year. This number remains relatively steady while the number of injury or fatal crashes varies more. These numbers are likely under-reported as the policy for reporting a work zone crash may differ for each local law enforcement agency within Wisconsin. Preventing work zone crashes is a high priority as both road users and construction workers are at a higher risk due to reduced roadway space and proximity of workers to the traffic lanes, as well as other factors. Portable Changeable Message Signs (PCMS s) are one tool to provide roadway users work zone information, which can reduce confusion, reduce vehicle speeds, and increase safety. PCMS s have been featured in Wisconsin Department of Transportation (WisDOT) construction projects since the 0 s, and WisDOT has continually procured contractor-owned PCMS s by special provisions or standardized special bid item. In November 0, PCMS s were added to the State of Wisconsin Standard Specifications for Highway and Structure Construction (Standard Specs) []. WisDOT s PCMS use on awarded construction projects was reviewed to determine the need for a revision to Wisconsin s PCMS guidelines []. For WisDOT projects let in 00, 0 PCMS s were used daily on WisDOT construction projects during the typical construction season (April st to November th ). With an average bid price of $. per day, WisDOT spent $.M on PCMS s for projects let in 00. For WisDOT projects let in 0, PCMS use increased percent from 00, with the average bid price increasing to $. per day, resulting in $.M spent on PCMS s for projects let in 0. See Table for the annual breakdown. Note that some projects let in previous years may be multi-year projects, so the actual PCMS use and total dollars spent is likely to increase. With the number of PCMS s used in work zones increasing and the price per day increasing, guidelines for proper PCMS use for design and construction engineers should be developed to ensure WisDOT funds are used wisely. TABLE WisDOT PCMS Use by Let Year Year Let Estimated PCMS (Days) Actual PCMS (Days)* Average Bid Price Total Dollars Spent* 00 0,, $. $,0, 00,, $. $,, 0,,0 $.0 $,, 0,0, $. $,0,0 0,,0 $. $,, 0,, $. $,, *As of September 0 WISCONSIN STANDARDS AND GUIDELINES WisDOT developed the Facilities Development Manual (FDM) to aid in the design of highway facilities []. Section -0 is devoted to traffic control; however, nowhere in the FDM are PMCS s addressed or referenced. WisDOT has also developed a Traffic Guidelines Manual (TGM), containing more detailed design information on specific traffic control situations []. Chapter of the TGM includes guidance on work zone traffic control, with Section -- titled

4 Susan Paulus Portable Changeable Message Sign Use in Construction & Maintenance Projects. This guideline was originally developed in September 00 and was last updated in May 00. The TGM discusses PCMS s in general terms, providing one typical application (i.e. advanced warning of project start), and various example messages. The TGM states that all PCMS s used on highway improvement projects will be supplied and maintained by the contractor and that all messages displayed must be pre-approved by the project engineer. There is limited guidance for project engineers on acceptable message content in the TGM. The State of Wisconsin Standard Specifications for Highway and Structure Construction, 0 Edition describes the specifications for PCMS s, including: legend size, legibility, placement, and performance []. In Wisconsin, no statewide PCMS guidance describing PCMS use or scenario-specific messages exists. In a diverse state with five different WisDOT regions, the consistency of messages drivers see displayed on PCMS s throughout the state can vary greatly. Statewide guidance is needed to ensure all highway improvement projects throughout Wisconsin follow consistent guidelines on PCMS use. The development of typical PCMS applications and messages will help provide clear and consistent messages to the traveling public. NATIONAL STANDARDS AND GUIDELINES Nationwide, the Manual on Uniform Traffic Control Devices (MUTCD) contains standards and guidance for PCMS use []. Guidance is provided in Section F and Section L and includes items such as applications, legibility, visibility, appropriate abbreviations, and message content. The MUTCD does not provide guidance on when to use certain messages, on the duration messages should appear (i.e. the number of days), or on how messages should be worded. In addition to the MUTCD, the FHWA developed the Portable Changeable Message Handbook (PCMS Handbook) in 00 []. This handbook discusses different types of PCMS s, standard abbreviations, legibility, and field placement. Most recently, the American Traffic Safety Services Association (ATSSA) published the Guidance for the Use of Portable Changeable Message Signs in Work Zones (PCMS Guidelines) in 0 []. This document discusses different types of PCMS s, including advantages and disadvantages, message content, field placement, and some typical applications. Although these national guidelines provide a good baseline for basic PCMS principles, no current document has compiled the vast amount of research on driver comprehension of messages on PCMS s. For this paper, state guidelines and standards were reviewed for a number of states [] [0] [] [] [] [], in addition to research evaluating PCMS message content [] [] [] [] [] [0] [] [] [] [] [] []. A compilation of the review is provided below based on different aspects of PCMS s. The last section in this paper contains work zone PCMS recommendations and provides guidelines for both design and construction engineers to ensure consistent PCMS use. TYPICAL PCMS USE The MUTCD [] defines general uses for PCMS s in Section L. Some potential uses include: incident management and route diversion, special event applications associated with traffic control or conditions, travel times, warning situations, and speed control. PCMS s can also be used to display safety messages or transportation-related messages, but cannot be used to display advertising messages []. NCHRP Report 00, Human Factor Guidelines for Road Users contains a chapter on Changeable Message Signs (CMS s) []. The chapter begins by describing appropriate CMS use, which emulates the guidance contained in the MUTCD.

5 Susan Paulus Section F.0 of the MUTCD includes typical work zone PCMS applications: Speed differentials Queuing and delays Adverse environmental conditions Changes in alignment or surface conditions Advanced notice of closures Crash and incident management Changes in the road pattern Other agencies [] [0] have developed hierarchies of types of messages to display on work zone PCMS s. Florida DOT (FDOT) requires PCMS use for all night work occurring within feet of the traveled way []. Indiana DOT (INDOT) developed a priority list for the type of message to display; the priority (from highest to lowest) is []:. Road closure. Ramp closure or access restriction. Hazardous conditions. Real-time traffic information. Advanced notice for scheduled events. Public information pertinent to highway safety PCMS FIELD PLACEMENT The MUTCD [] provides the following guidance on the placement of PCMS s: Locate sufficiently upstream of known bottlenecks and high crash locations to enable road users to select an alternate route or take other appropriate action in response to a recurring condition. Locate sufficiently upstream of major diversion decision points, such as interchanges, to provide adequate distance over which road users can change lanes to reach one destination or the other. Do not locate within an interchange except for toll plazas or managed lanes. Do not position at locations where the information load on drivers is already high because of guide signs and other types of information. Do not locate in areas where drivers frequently perform lane-changing maneuvers in response to static guide sign information, or because of merging or weaving conditions. Horizontal Offset PCMS s are not crashworthy devices and should be protected. If possible, PCMS s should be placed behind barrier or guard rail, placed outside the clear zone, or protected by traffic control devices [] []. The horizontal offset needs to be considered, as well. The PCMS needs to be in the driver s cone of vision to ensure there is enough distance to read the message. The cone of vision extends 0 degrees to the left and the right of the viewer []. As the distance from a PCMS increases, the offset also increases. For example, on a - lane divided facility, a driver in the left lane can comfortably view a sign on the right shoulder until about 00 feet from the sign. This makes the last 00 feet of visibility less useful to the driver, therefore reducing the amount of time they have to view the entire message. This is not typically considered in the placement of PCMS s. FHWA s PCMS Handbook suggests putting the PCMS closest to the lane in which the message applies []. One study recommended placing PCMS s on both sides of the facility to ensure all drivers would receive the message [].

6 Susan Paulus 0 0 Advanced Placement to Field Conditions Advanced placement to the hazard or condition should also be considered to ensure drivers have adequate time to respond to the message provided. FHWA s PCMS Handbook recommends []: Minimum 00 feet to the decision point for a minor action, regardless of speed 000 feet for a major action for speeds 0 mph or less mile for a major action upstream for speeds mph or more FDOT recommends placing PCMS s 00 to 00 feet in advance, if the PCMS is supplemental to conventional traffic control devices or 0. to miles in advance of complex traffic schemes with new or unusual traffic patterns []. INDOT developed guidelines for PCMS placement on freeways and non-freeways, as shown in Tables and []. Other agencies rely on designers to determine the location and messages to be included on PCMS s []. In addition, placement to existing signs should also be considered. Oregon Department of Transportation (ODOT) recommends []: At least 000 feet from guide, warning or other critical signs on freeways At least 00 feet from guide, warning or other critical signs on non-freeways with posted speed of mph or higher Increase distance on multi-lane roadways At least 0 feet from guide, warning or other critical signs on multi-lane roads or arterials with posted speed of 0 mph or less At least 00 feet from guide, warning, or other critical signs on urban roads with posted speed of mph or less. PCMS Visibility and Legibility The MUTCD recommends PCMS s should be visible for 0. miles on facilities with speeds mph or greater []. The message should be legible for 00 feet for nighttime conditions and 00 feet for daytime conditions []. At mph, this results in viewing times of. seconds and. seconds, respectively. WisDOT Standard Specs state that PCMS signs should be legible for 0 feet or. seconds under both daytime and night time operations []. A number of documents recommend rotating the PCMS to improve visibility [] [] []. Recommendations vary from degrees to 0 degrees towards traffic.

7 Susan Paulus TABLE INDOT PCMS Placement on Freeways [] Min. # Event Duration required per approach Road Closure Any length Ramp Closure Lane Closure w/ Anticipated Queuing Lane Closure Frequent or Intermittent changes in Alignment Frequent or Intermittent Changes in Pavement Condition Speed Limits reduced by mph or more for Work Zone Location with a Significant Crash History Less than week Less than month for unplanned closure Any length Mobile or stationary at any one location less than weeks Any length Any length Any length Any length Location of st PCMS mile in advance of the detour exit (if provided) or the closure mile in advance of detour exit (if detour is provided) or the closed ramp mile in advance of the previous exit upstream of the anticipated queue length 00 in advance of previous exit upstream of the closure 000 in advance of the first construction sign 000 in advance of the first construction sign 000 in advance of the first construction sign 000 in advance of the first construction sign Location of nd PCMS 000 in advance of the detour exit (if provided) or the closure 000 in advance of the detour exit (if detour is provided) or the closed ramp 000 in advance of anticipated queue length 000 in advance of the first construction sign n/a n/a n/a n/a

8 Susan Paulus TABLE INDOT PCMS Placement for Non-Freeways [] Min. # Event Duration required per approach Road Closure Less than weeks Side Road Closure Lane Closure w/peak Hour Delay > minutes Lane Closure Frequent or Intermittent Changes in Alignment Frequent or Intermittent changes in Pavement Condition Speed Limits reduced by mph or more for Work Zone Location with a Significant Crash History Less than week Less than month for unplanned closure Any length Mobile or stationary at any one location less than weeks Any length Any length Any length Any length Location of st PCMS 00 in advance of the first construction sign 00 in advance of the closed side road 00 in advance of the first construction sign 00 in advance of the closed side road 00 in advance of the first construction sign 00 in advance of the first construction sign 00 in advance of the first construction sign 00 in advance of the first construction sign 0 0 MESSAGE DEVELOPMENT Messages on PCMS s need to be easily understandable as drivers have limited time to view, read, comprehend, and respond to the information provided. Message development includes the message s verbiage as well as the time the message is displayed, which is also known as phase length. Phase Length The MUTCD determines the minimum length of each phase by the lesser of one second per word or two seconds per bit of information []. In direct contradiction to this, Duduk recommended using the greater of these two values to ensure drivers have time to read the entire message []. FHWA s PCMS Handbook recommends phases with one or two lines to be displayed for. seconds and phases with three lines to be displayed for three seconds []. Phase length typically is determined by the content of the message, and not by the available viewing time. FDOT applies a different approach that requires signs to be legible at 00 feet and requires the driver be able to read the entire message twice when traveling mph []; this results in a viewing time of. seconds and maximum phase duration of. seconds. Similarly, the TGM states it is desirable for the driver to be able to read the entire message twice []. To allow drivers to read a PCMS twice while approaching the sign, Table was developed to determine the distance traveled and required legend height based on a legibility index of 0 feet for two PCMS viewings [].

9 Susan Paulus 0 0 TABLE Required Legend Height by Speed and Display Time Number Phase Time Distance Traveled Distance Traveled Speed of (Max) (One Viewing) (Two Viewings) Phases Legend Height Required* mph fps seconds feet feet inches *Assumes a legibility of 0 ft / in One element of PCMS message design, which is typically disregarded, is the legend height, as an -inch legend height has become standard on PCMS s. Manufacturers have been constructing PCMS s with line matrix and character matrix designs that restrict the legend height to the -inch minimum as required by the MUTCD []. An -inch legend height and a legibility index of 0 ft/in impacts the viewing time drivers have to read a PCMS. As shown in Table, an -inch legend is only adequate for speeds below mph, if the message is displayed for seconds. The shortcomings of the -inch legend height were described in FHWA s PCMS Handbook, where -inch legend was associated with a legibility distance of 0 feet, suitable for 0 mph []. These shortcomings have not been addressed in the various state and nationwide guidance that are currently available. A 00 study confirmed the 0 ft/in legibility index by evaluating a number of PCMS signs based on legibility of a word message and an eye chart message; the results are shown in Table []. This evaluation included three evaluators with corrected 0/0 vision driving towards the sign; however, their travel speeds were not recorded. TABLE Measured PCMS Legibility PCMS Number Legibility Distance (feet) Day, Word Day, Eye Chart Night, Word Night, Eye Chart PCMS(00)- 0 PCMS(00) PCMS(00)- 0 0 PCMS(00)- 0 PCMS(00)- 0 0 PCMS(00)- 0 0 PCMS(00) Average 0 Legibility (X ft / in).... Recommended guidance on the length of message and the phase time is shown in Table. This recommendation will ensure drivers have adequate time to view and read the message provided for the varying speed limits. For speeds mph or more, the two phases should be limited in length to ensure the message can be read. Using messages with varied phase lengths

10 Susan Paulus (i.e. three seconds and two seconds, etc.) can help ensure drivers have the maximum amount of time to read the entire message. TABLE PCMS Phase Recommendations for -inch Legend Speed Legend Height Maximum Viewing Time* Max Number of Phases Phase Time (Max) Number of Phases Viewed mph fps inches seconds seconds *Assumes a legibility of 0 ft / in Message Verbiage Messages need to be concise and readable in the allotted phase time. All messages displayed on PCMS s must be relevant []. Misleading or unreliable messages reduce the credibility of PCMS s. A proper message should be short and easily understandable. A number of sources discuss the content of a PCMS message, including the MUTCD [], the FHWA PCMS Handbook [], and various state guidelines. Units of Information The MUTCD states the length of the message should not have more than four units of information []. The unit of information may include: what, where, who, and desired response. Depending on the individual situation, the bits of information could be provided on one or two phases. All messages may not require all bits of information. ATSSA s PCMS Guidelines recommend keeping the message as short as possible to aid in driver readability and comprehension []. The FHWA PCMS Handbook provides recommendations on the phase content based on the number of phases used []: One-Phase PCMS: o Line Describe problem o Line Identify location or distance ahead o Line Provide motorist instruction Two-Phase PCMS: o Phase Describe problem o Phase Provide motorist instruction The TGM recommends the first phase should describe the condition that may be encountered, and the second phase should advise the driver of the appropriate response []. Message Content In Wisconsin, the limited guidance on message content is provided in the TGM []. The TGM refers to the MUTCD abbreviation list, and provides a list of messages that could be considered for use. ODOT has developed a number of typical messages, and Texas Department of Transportation developed a two page field guide with standard messages for field staff [].

11 0 Susan Paulus Additional message content guidance was developed in NCHRP 00 [] [], including: Abbreviations should be avoided where possible. Use days of the week rather than calendar dates if the dates are in the next week. If dates are used, use the three-letter month abbreviation and only display the month once. Do not display the day, date, and time information at once. Other studies have been completed, and guidelines have been developed covering different aspects of PCMS messages. ODOT developed a policy for locations and distances []. For distances under 0. mile, feet should be used. For miles, fractions are acceptable, but mile posts should not be used as they are not easily understood. ODOT also recommends using the hour time format followed by AM or PM []. An additional study looked at flashing messages that included a two-phase message with three lines of text and one line changing between phases []. The study found drivers could recall the message; however, average reading times increased significantly. One common example is TRUCKS EXITING RIGHT / TRUCKS ENTERING RIGHT. Other studies have evaluated messages for emergency purposes []. Flooding emergencies that are likely to occur in a work zone due to construction activities were evaluated. The word FLOODED was evaluated; however, there was no consensus as to whether study participants would continue on the roadway or not []. Additional information needs to be provided, such as the specific location of the flooding or the exit to divert from the facility []. Sequential PCMS s For freeways, a maximum of seven words is recommended, and for facilities with speeds less than mph, a maximum of eight words is recommended []. If more information needs to be provided, the use of a sequential PCMS is recommended. The second PCMS should be placed 000 feet from the first. One study looked at the comprehension of sequential PCMS s and found: Including five units of information between the two PCMS s results in low comprehension rates Using four units of information results in the same comprehension as the same information on a Dynamic Message Sign Repeating one unit of information on both PCMS s can enhance comprehension []. Message Layout The MUTCD provides the standard that a PCMS shall consist of no more than two phases, containing no more than three lines of text per phase. The message shall be understandable regardless of the order being read. The messages shall be centered within each line of the legend []. Graphics A number of studies have looked at the addition of graphics to CMSs [] [] [] []. Overall, well designed graphics can aid in comprehension of a message, especially for nonnative language speakers and elderly drivers. Drivers prefer text over graphics that replace text; however, drivers respond quickly to graphic displays that replace text []. Graphics can also more easily describe complex situations that are hard to explain with text.

12 Susan Paulus TYPICAL APPLICATIONS Some state guidance and national research include typical PCMS applications. Those that are currently documented are summarized in this section. Speed Management Speed management refers to situations where a reduced speed is desired due to hazards, work zones, adverse weather, incidents, or congestion [] [0]. Applications are temporary in nature, so PCMS s are ideal for these situations. In work zones, speed management may be considered when there is a high incidence of speeding drivers, high speed variance, high number of rear end crashes, or change in conditions within the work zone []. General guidelines include [] []: Provide a reason for the reduced speed Limit safety messages Use PCMS for speed reduction and enforcement Use in work zones greater than,00 feet in length Place PCMS 00 to 000 feet from the hazard within the work zone Do not place PCMS in high demand areas (tapers, interchanges, etc.) Show speeds of vehicles passing by Monitor and display real time conditions downstream Show current information about speed limits, delays, or construction Another study found the addition of graphics aided in reducing vehicle speeds by up to percent []. Inattentive Driving Inattentive driving is a problem in work zones and can have severe consequences []. PCMS s demand higher attention than regular static signage; therefore, they bring attention to the unique situation ahead. PCMS s should be considered to reduce inattentive driving in work zones with the following characteristics: greater than one mile in length, locations of unexpected queues, challenging or unique situations, or easy to miss maneuvers []. Demand Management PCMS s may be used in work zones for demand management; these situations typically include heavily traveled work zones (where peak demand exceeds capacity) or where queueing is expected that will impact traffic and/or the construction schedule []. California implemented this method by using existing roadway sensors to monitor traffic traveling through an I- work zone []. By providing users with information via CMS s in advance of decision points, the maximum delay was reduced from 0 minutes to minutes during construction. The messages provided on the CMS s considered both the construction roadway as well as alternate routes. Detour information was only provided when available detour routes had additional capacity. Advanced Notice Advanced notice on PCMS s involves making the public aware of a road, lane, or ramp closing in advance of the closure. ODOT recommends limiting the display of this information to drivers to two weeks before the closure takes place []. Minnesota Department of Transportation developed more specific guidelines based on the type of closure, time of closing (weekday vs. weekend), duration of closure (long-term vs. short-term) [0].

13 Susan Paulus 0 0 WORK ZONE PCMS RECOMMENDATIONS This section presents recommendations for PCMS use in work zones. The recommendations are tailored to current practices in Wisconsin but consider all the national guidance available. These recommendations can be used by design and construction engineers throughout the U.S. to ensure consistent messages. Advanced Notice of Closures Advanced notice of closures refers to the full or partial closure of a facility. Recommendations are shown in Figures and. System Ramp Closures For system ramp closures, place the PMCS along the ramp in which the message applies. During the actual closure, a PCMS should be placed to alert drivers of the closure and provide alternative route information. If the detour is before the driver reaches the closed ramp, provide a PCMS 0. miles before the detour or alternative route exit. If the detour is after the closed ramp, place a PMCS near the closed ramp. Service Ramp Closures For service ramp closures, place the PMCS along the ramp in which the message applies. If detours are provided, follow the System Ramp Closure guidelines above. For PCMS s on nonfreeways, the sign should be placed 00 to,000 feet advance of the preferred detour route. Roadway Closures For roadway closures, place the PCMS at the point of closure. During the actual closure, a PCMS should be placed to alert drivers of the closure and provide alternative route information. Provide a PCMS 0. miles before the detour route. An additional PCMS may be placed further upstream if capacity is expected to be exceeded on the detour route and other alternative routes are available. Lane Closures Under usual circumstances, PCMS s will not be used to give advanced notice of lane closures. Exceptions may include sporting events, holiday weekends, and other high traffic events in which some traffic may divert to alternative routes if they are aware of closures.

14 Susan Paulus System Ramp Closure Type Continuous Closure days or greater Continuous Closure days or less Nightly or Daily Closures Weekend Closures Service Ramp Closure Type Continuous Closure days or greater Continuous Closure days or less Nightly or Daily Closures Detour Type None Posted or Preferred Advanced Notice days days days 0 days (begin Thursday before) Advanced Notice 0 days to days to days Signed Detour (upstream of closure) Signed Detour (downstream of closure) Example Message LONGTERM Example Message Example Message D 0 EB D US 0 EB D I NB D D APR MAY FRIDAY OCT PM Phase Length (sec) / / APR - / NIGHTLY PM-AM / FRI PM MON AM APR MAY / Phase Length (sec) / APR - / NIGHTLY PM-AM / USE ALT ROUTE USE CTH BB USE BB Phase Length (sec) / / / USE NEXT / EXIT USE WIS / FIGURE Recommended PCMS Messages for Ramp Closures.

15 Susan Paulus 0 Roadway Closure Type Continuous Closure days or greater Continuous Closure days or less Nightly or Daily Closures Detour Sign Location At Closure Advance of Closure Advanced Notice 0 days to days to days Example Message ROAD ROAD ROAD ROAD Example Message ROAD D ROAD D MILE FREEWAY D AHEAD ROAD D AT US APR MAY Phase Length (sec) / APR - / NIGHTLY PM-AM / MON-THUR PM-AM / EXIT RIGHT ----> Phase Length (sec) / FOLLOW DEUR / EXPECT DELAYS / USE ALT ROUTE FIGURE Recommended PCMS Messages for Roadway Closures. Advanced Warning Advanced warning applies to a number of different situations. PCMS s can be used to enhance an existing static sign after a configuration change, provide a time-specific warning, or provide a warning about an on-going event. Recommendations are shown in Figures and. Another advance warning situation is for rolling slowdowns. Typically, minimal advanced notice is given to the public before a rolling slowdown. A PCMS should be placed before the start of the rolling slowdown at a distance that encompasses the expected queue length. Other PCMS s should be placed along the route to ensure traffic is aware of the slowdown. The zipper merge or dynamic late merge is a strategy directing drivers to stay in their lane until the merge point, which has been shown to increase capacity at the merge. PCMS s are used in real time to show messages when queueing is detected. When there is no queueing, the PMCS s should remain blank. /

16 Susan Paulus Advanced Warning Type Traffic Pattern Change Traffic Shift New Signal Location of PCMS 00 to 000 in advance 00 to 000 in advance Beyond expected queue Time Period to Display days days days Example Message NEW TRAFFIC PATTERN TRAFFIC SHIFTS RIGHT SIGNAL AHEAD X MILES BE PREPARED SP Phase Length (sec) / Work in Lane Closure Paving in Adjacent Lane Flagging Truck Egress/Access 00 to 000 in advance 00 to 000 in advance Beyond expected queue 00 to 000 in advance During Night Work During Work During Work During Work WORKERS IN ROAD AHEAD PAVING NEXT X MILES FLAGGER AHEAD TRUCKS ENTERING RIGHT SLOWDOWN IN WORKZONE WORKERS ON RIGHT PREPARE SP ON RIGHT TRUCKS EXITING / / / / Rough Road Flooding Advance of alternative route Advance of alternative route During Event During Event ROUGH ROAD MILE ROAD FLOODED AT US 0 USE NEXT EXIT / Rolling Slowdown Rolling Slowdown Advance of Slowdown Advance of Slowdown During Event During Event SLOWED TRAFFIC AHEAD SLOWED TRAFFIC XX MPH NEXT XX MILES DO NOT PASS / / Zipper Merge At merge point During Event MERGE HERE TAKE TURNS / Zipper Merge Zipper Merge Ahead of merge Advanced warning on other facilities During Event During Event USE ALL LANES I- WESTBND FIGURE Recommended PCMS Messages for Advanced Warning ( of ). DO NOT / MERGE BACKUPS AHEAD /

17 Susan Paulus 0 Speed management refers to situations where a reduced speed is desired and tools are used to measure vehicle speeds as they pass through the work zone. Typical applications include as drivers enter a work zone or within a reduced regulatory speed segment. PCMS s can be used to display real time information about travel times, delays, queues, or other traffic impacts. These messages can be generated from a contractor-supplied system or from incorporation into the existing detection. Additionally, messages could be used at specific times of the day when queues are expected that would not be anticipated by road users. Advanced Warning Type Speed Management Speed Management Speed Management Speed Management Real Time Travel Time Main Route Real Time Travel Time Alt Route Real Time Travel Time Comparison Real Time Queuing Anticipated Queuing Slowed Traffic Event Traffic Location of PCMS 00 to 000 in advance of hazard 00 to 000 in advance of hazard 00 to 000 in advance of hazard 00 to 000 in advance of hazard Advance of an alternative route Advance of an alternative route Advance of an alternative route to miles in advance of end of queue mile in advance of end of queue ½ to mile in advance Advance of alternative route Time Period to Display During Work During Work During Work During Work While delays are present or continuously While delays are present or continuously While delays are present or continuously During queueing During anticipated queueing During expected or measured During Event Example Message YOU ARE SPEEDING YOUR SPEED IS XX MPH YOUR SPEED IS XX MPH YOU ARE SPEEDING MINS I- MINS I- VIA 0 MINS I- SPPED TRAFFIC X MILES SLOWED TRAFFIC MILE LFT LANE NARROWS 00 FT EVENT TRAFFIC MILES Phase Length (sec) SLOW DOWN / SLOW DOWN / THANKS FOR NOT / SPEEDING MINIMUM FINE $XXX / USE ALT ROUTE MINS I- VIA 0 / / EXPECT DELAYS / LEFT LANE D FIGURE Recommended PCMS Messages for Advanced Warning ( of ). / SLOWED TRAFFIC / AHEAD EXPECT DELAYS /

18 Susan Paulus ACKNOWLEDGMENT Dr. David Noyce provided valuable direction and oversight in completing this work for an independent study course at the University of Wisconsin-Madison. REFERENCES Wisconsin Department of Transportation, "Facilities Development Manual," Wisconsin ] Department of Transportation, Madison. Wisconsin Department of Transportation, "Traffic Guidelines Manual," Wisconsin ] Department of Transportation, Madison. Wisconsin Department of Transportation, State of Wisconsn Standard Specifications for ] Highway and Structure Construction 0 Edition, Madison: Wisconsin Department of Transportation, 0. Wisconsin Department of Transportation, State of Wisconsin Standard Specifications for ] Highway and Structure Construction 0 Ediition, Madison: Wisconsin Department of Transportation, 0. D. Castleberg, Interviewee, Construction Standards & Publications Supervisor. [Interview]. ] December 0. Federal Highway Administration, "Manual on Uniform Traffic Control Devices," Federal ] Highway Administration, 00. Federal Highway Administration, "Portable Changeable Message Sign Handbook," Federal ] Highway Administration, 00. American Traffic Safety Services Association, "Guidance for the Use of Portable ] Changeable Message Signs in Work Zones," U.S. Department of Transpotation, 0. Indiana Department of Transportation, "INDOT Guidelines for Portable Changeable ] Message Signs (PCMS)," Indiana Department of Transportation, 0. Michigan Department of Transportation, "Portable Changeable Message Sign Guidelines," 0] Michigan Department of Transportation, 0. "Oregon Portable Changeable Message Sign Handbook," Oregon Department of ] Transportation, 0. Minnesota Department of Transportation, "0 CMS Manual of Practice," Minnesota ] Department of Transportation, 0. New York State Thruway Authoritt, "Guidelines for Use of Variable Message Signs ] (VMS)," New York State Thruway Authoritt, 0. Florida Department of Transportation, "Plans Preparation Manual," Florida Department of ] Transportation, 0. A. Clark, J. Wang, V. Miaer-Speredelozzi and C. Collyer, "Assisting Elfer Drivers' ] Comprehension of Dynamic Message Signs," Washington, D.C., 00. M. A. Flak, M. Jackson, W. Sorenson and A. Garms, "Comprehensive USe of Semi- ] Permanent Dynamic Message Signs for Regionwide ATIS Programs," Washington, D.C., 00. S. Hesar, J. Wang and C. Collyer, "Adding Graphics to Dynamic Message Sign Messages," ] Washington, D.C., 00.

19 Susan Paulus ] ] 0] ] ] ] ] ] ] ] ] Y. Huang and Y. Bai, "Effectiveness of Graphic -aided Portable Changeable Message Signs in Reducing Vehicle Speeds in Highway Work Zones," Washington, D.C., 0. E.-B. Lee and C. Kim, "Automated Work Zone Information System (AWIS) on Urban Freeway Rehabilitation: California Implementation," Washington, D.C., 00. M. T. Sorrell, W. A. Satasus, W. J. Davis, J. H. Ogle and A. Dunning, "Use of Radar Equipped Portable Changeable Message Sign to Reduce Vehicle Speed in South Carolina Work Zones," Washington, D.C., 00. B. R. Ullman, C. L. Dudek and N. D. Trout, "Amber Alert and Major Catastrophe Messages on Dynamic Message Signs: Focus Group Studies in Texas," Washington D.C., 00. B. R. Ullman, N. D. Trout and C. L. Dudek, "Use of Graphics and Symbols on Dynamic Message Signs: Technical Report," Texas Transportation Institute, College Station, 00. B. R. Ullman, G. L. Ullman, C. L. Dudek and A. A. Williams, "Diver Understanding of Messages Displayed on Sequential Portable Changeable Message Signs in Work Zones," Washington, D.C., 00. C. L. Dudek and G. L. Ullman, "Flashing Messages, Flashing Lines, and Alternating One Line on Changeable Message Signs," vol. 0, 00. G. L. Ullman, C. L. Dudek and B. R. Ullman, "Development of a Field Guide for Portable Changeable Message Sign Use in Work Zones," Texas Transportation Institue, College Station, 00. G. L. Ullman, B. R. Ullman and C. L. Dudek, "Evaluation of Alternative Dates for Advance Notification on Portable Changeable Message Signs in Work Zones," Washington, D.C., 00. J. Campbell and C. Richard, NCHRP Report 00: Human Factor Guidelines for Road Systems, Washington, D.C.: Transportation Research Board, 0. American Association of State Highway and Transportation Officials, "Field Performance Evaluation Results of Flashing Arrow Panels (Arrowboards) & Portable Changeable Message Signs (PCMS)," American Association of State Highway and Transportation Officials, Washington, D.C., 00.

NEW JERSEY TURNPIKE AUTHORITY

NEW JERSEY TURNPIKE AUTHORITY NEW JERSEY TURNPIKE AUTHORITY GARDEN STATE PARKWAY NEW JERSEY TURNPIKE GUIDELINE FOR USE OF VMS SYSTEMS FOR CONSTRUCTION WITHIN WORK ZONES Revised March 2017 TABLE OF CONTENTS I. PURPOSE OF GUIDELINE...

More information

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for

More information

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE FORWARD It shall be the responsibility of the person in charge to institute the placing of all appropriate cautionary devices and controls as may be required for the particular job. Traffic protection

More information

TRAFFIC INCIDENT MANAGEMENT SYSTEM (TIMS)

TRAFFIC INCIDENT MANAGEMENT SYSTEM (TIMS) TRAFFIC INCIDENT MANAGEMENT SYSTEM (TIMS) GUIDELINES 1. Purpose A. Ensure that an Ohio Turnpike and Infrastructure Commission (OTIC) Guideline exists to manage traffic backups and travel delays. B. Ensure

More information

SECTION 616 TEMPORARY TRAFFIC CONTROL

SECTION 616 TEMPORARY TRAFFIC CONTROL SECTION 616 TEMPORARY TRAFFIC CONTROL 616.1 Description. This work shall consist of furnishing, installing, operating, maintaining, cleaning, relocating and removing temporary traffic control devices and

More information

Welcome!! Traffic Control Supervisor. Training Course

Welcome!! Traffic Control Supervisor. Training Course Welcome!! Traffic Control Supervisor Training Course Traffic Control Supervisor Training Course Two-day course Begins promptly at 8:00 AM Ends no later than 5:00 PM Flexible schedule!! 0-2 Course Objectives

More information

Table of Contents. List of Appendices

Table of Contents. List of Appendices Table of Contents Page Executive Summary 3 Description of Project 3 TMP Roles and Responsibilities 3 Area Engineer 3 Communications Office 4 TMP Monitoring 4 Existing and Future Conditions 4 Traffic Counts

More information

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division 2016 MUTCD CONCEPT TTC COMMENTS Michael A. Chacon Traffic Operations Division MUTCD 4 Ballot items were discussed at the June 2014 meeting in TTC, as well as additional topics. TTC No. 1 Pedestrian and

More information

Field Guide on. Safe Maintenance and. Work Zone Operations

Field Guide on. Safe Maintenance and. Work Zone Operations Field Guide on Installation and Removal of Temporary Traffic Control for Safe Maintenance and Work Zone Operations August 2008 Introduction This field guide provides field personnel with introductory guidance

More information

Dynamic Lane Merge Systems

Dynamic Lane Merge Systems Dynamic Lane Merge Systems Acknowledgements Maryland State Highway Administration University of Maryland, College Park Michigan Department of Transportation Wayne State University Lane Merging Issues Merging

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION OPERATIONS DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM SUPERSEDES:

VIRGINIA DEPARTMENT OF TRANSPORTATION OPERATIONS DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM SUPERSEDES: VIRGINIA DEPARTMENT OF TRANSPORTATION OPERATIONS DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Changeable Message Signs NUMBER: IIM-OD-13-03 SPECIFIC SUBJECT: Changeable Message

More information

SMART WORK ZONE SOLUTIONS

SMART WORK ZONE SOLUTIONS SMART WORK ZONE SOLUTIONS JAMLOGIC WHY USE JAMLOGIC IN SMART WORK ZONES? IN US WORKZONES, THERE WERE: 669 47,758 FATALITIES IN 2014 41% INJURIES IN 2013 OF FATAL CRASHES WERE REAR-END COLLISIONS IN 2014

More information

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES Bureau of Transportation Safety and Technology 700 SW Harrison, Topeka, KS 66603 July 30, 2008 Definitions Significant Project All Federal-aid

More information

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY 805.1 DESCRIPTION Provide, erect, maintain and remove traffic control devices as shown in the Contract Documents. On roadways that carry traffic through

More information

Concept of Operations

Concept of Operations Concept of Operations Monitoring Traffic in Work Zones: The icone System September 30, 2009 Prepared for: Minnesota Department of Transportation Prepared by: SRF Consulting Group, Inc. Project No. 6845

More information

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS

More information

Merging Taper Lengths for Short Duration Lane Closures

Merging Taper Lengths for Short Duration Lane Closures Merging Taper Lengths for Short Duration Lane Closures By LuAnn Theiss, P.E. (Corresponding Author) Associate Research Engineer Texas Transportation Institute TAMU College Station, Texas - Phone: () -

More information

LANE CLOSURE GUIDELINES

LANE CLOSURE GUIDELINES LANE CLOSURE GUIDELINES OBJECTIVE: Provide guidance for the development and approval of various types of lane closure requests. Detail the process for requesting approvals, necessary data to support a

More information

M D 355 [FR E D E R IC K R O A D] OVER

M D 355 [FR E D E R IC K R O A D] OVER M D 355 [FR E D E R IC K R O A D] OVER LITTLE BENNETT CREEK MAINTENANCE OF TRAFFIC ALTERNATIVE ANA LYSIS Prepared by: INTRODUCTION The purpose of this report is to present the results of traffic analyses

More information

Utility Work Zone Safety Guidelines and Training

Utility Work Zone Safety Guidelines and Training Utility Work Zone Safety Guidelines and Training State-of-the-Art Synthesis and State-of-the-Practice Synthesis Prepared for: United States Department of Transportation Federal Highway Administration Office

More information

MUTCD Part 6F: Temporary Traffic Control Zone Devices

MUTCD Part 6F: Temporary Traffic Control Zone Devices MUTCD Part 6F: Temporary Traffic Control Zone Devices 6F.01 Types of Devices FHWA policy requires that all roadside appurtenances such as traffic barriers, barrier terminals and crash cushions, bridge

More information

IMPROVING THE SAFETY OF MOVING LANE CLOSURES PHASE II

IMPROVING THE SAFETY OF MOVING LANE CLOSURES PHASE II CIVIL ENGINEERING STUDIES Illinois Center for Transportation Series No. 10-072 UILU-ENG-2010-2013 ISSN: 0197-9191 IMPROVING THE SAFETY OF MOVING LANE CLOSURES PHASE II Prepared By Douglas Steele William

More information

THE USE OF LANE CONTROL SIGNALS AND CHANGEABLE MESSAGE SIGNS ON TEXAS HIGHWAYS

THE USE OF LANE CONTROL SIGNALS AND CHANGEABLE MESSAGE SIGNS ON TEXAS HIGHWAYS THE USE OF LANE CONTROL SIGNALS AND CHANGEABLE MESSAGE SIGNS ON TEXAS HIGHWAYS Wallace E. Ewell, P.E. Supervising Traffic Engineer Texas State Department of Highways and Public Transportation District

More information

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures Scarborough Fire Department Scarborough, Maine Standard Operating Procedures Book: Emergency Operations Chapter: Alarm & Response Procedures Subject: 3020 - Safe Vehicle Positioning Revision Date: 7/31/2007;

More information

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment Concept of Operations prepared for Minnesota Department of (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment December 22, 2014 Table of Contents 1. Introduction and Concept Overview...1

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

Safety. Introduction. Total System

Safety. Introduction. Total System Safety Introduction Ohio is the 35 th largest state in the nation based on geographic size, however it carries the 5 th largest total traffic volume and the 4 th largest truck traffic volume. With such

More information

May 2004 Traffic Control 600-i. Table of Contents 601 WORK ZONE TRAFFIC CONTROL DESCRIPTION OF WORK

May 2004 Traffic Control 600-i. Table of Contents 601 WORK ZONE TRAFFIC CONTROL DESCRIPTION OF WORK DIVISION 600 Traffic Control SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004 May 2004 Traffic Control 600-i Section Table of Contents Page 601 WORK ZONE TRAFFIC CONTROL...601-1 601.1 DESCRIPTION

More information

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY 805.1 DESCRIPTION Provide, erect, maintain and remove traffic control devices as shown in the Contract Documents. BID ITEMS UNITS Work Zone Signs (0 to

More information

The Secrets to HCM Consistency Using Simulation Models

The Secrets to HCM Consistency Using Simulation Models The Secrets to HCM Consistency Using Simulation Models Ronald T. Milam, AICP David Stanek, PE Chris Breiland Fehr & Peers 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 r.milam@fehrandpeers.com (916)

More information

CHAPTER 16: TRAFFIC. In either situation, the plan must contain the detail for the interim pavement markings.

CHAPTER 16: TRAFFIC. In either situation, the plan must contain the detail for the interim pavement markings. CHAPTER 16: TRAFFIC ADVANCE WARNING SIGN SPACING The Advance Warning Sign Spacing for 0-30 mph has been reduced from 300 feet to 100 feet. This is more in line with the Federal MUTCD and accounts for more

More information

Distracted Driving Detection System for Work Zones. Systems Requirements

Distracted Driving Detection System for Work Zones. Systems Requirements Distracted Driving Detection System for Work Zones Systems Requirements December 2015 Acknowledgements This document was prepared for the Minnesota Department of Transportation (MnDOT) Systems Engineering

More information

Night Work Specification

Night Work Specification 1.0 HOURS OF WORK Night Work Specification Night time hours are defined as per the Tender documents. 2.0 TRAFFIC CONTROL PLAN Prior to the start of work the Contractor shall submit 4 bound copies of a

More information

A Guide to Short Term Stationary, Short Duration, and Mobile Work Zone Traffic Control

A Guide to Short Term Stationary, Short Duration, and Mobile Work Zone Traffic Control A Guide to Short Term Stationary, Short Duration, and Mobile Work Zone Traffic Control Page i 1. Report No. 2. Government Accession No. 3. Recipient Catalog No. 4 Title and Subtitle A Guide to Short-Term

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

Risk Analysis of Freeway Lane Closure During Peak Period

Risk Analysis of Freeway Lane Closure During Peak Period Risk Analysis of Freeway Lane Closure During Peak Period Jake Kononov and Zane Znamenacek This paper examines risks associated with peak period lane closure during construction or maintenance work on urban

More information

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM Tom Creasey, PE, PhD Principal, Stantec Consulting Services Inc. Chair, TRB Highway Capacity and Quality of Service Committee Presented

More information

QUALITY STANDARDS for Temporary Traffic Control Devices

QUALITY STANDARDS for Temporary Traffic Control Devices QUALITY STANDARDS for Temporary Traffic Control Devices Contents Introduction 1 Quality Requirements 2 Quality Standards 2 General 2 Barricades, Channelizing Devices, and Signs 3 Warning Lights 3 Flashing

More information

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement 2 Purpose and Need 2.1 Study Area Interstate 81 (I-81) is relied upon for local and regional travel and interstate travel in the eastern United States. It extends 855 miles from Tennessee to New York at

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-11/

Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-11/ 1. Report No. FHWA/TX-11/0-6427-1 Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle USE OF INTELLIGENT TRANSPORTATION SYSTEMS IN RURAL WORK

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM OFS:CRB 1 of 8 APPR:JJG:LWB:10-30-13 a. Description. This work consists of providing, installing, operating,

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS Delete this Section in its entirety and replace with the following: SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS 905-1 DESCRIPTION: This

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-04/4174-1 4. Title and Subtitle IDENTIFICATION OF HAZARDS ASSOCIATED WITH MOBILE AND SHORT DURATION WORK ZONES 7. Author(s) Brooke R. Ullman, Melisa D. Finley, and Nada D. Trout 9.

More information

WorkZone Safety:Traffic Control Plans and Intrusion Prevention Basic Work Zone Traffic Control Principles External Traffic Control

WorkZone Safety:Traffic Control Plans and Intrusion Prevention Basic Work Zone Traffic Control Principles External Traffic Control WorkZone Safety:Traffic Control Plans and Intrusion Prevention Basic Work Zone Traffic Control Principles External Traffic Control Intrusion of the Traveling Population Employees exposed to traffic Internal

More information

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT February 2016 INTERSTATE 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION PROJECT Commonwealth of Virginia Virginia

More information

FINAL REPORT IMPROVING NIGHT WORK ZONE TRAFFIC CONTROL. B. H. Cottrell, Jr. Senior Research Scientist

FINAL REPORT IMPROVING NIGHT WORK ZONE TRAFFIC CONTROL. B. H. Cottrell, Jr. Senior Research Scientist FINAL REPORT IMPROVING NIGHT WORK ZONE TRAFFIC CONTROL B. H. Cottrell, Jr. Senior Research Scientist (The opinions, findings, and conclusions expressed in this report are those of the author and not necessarily

More information

Concept of Operations for Intersection Conflict Warning Systems (ICWS)

Concept of Operations for Intersection Conflict Warning Systems (ICWS) Concept of Operations for Intersection Conflict Warning Systems (ICWS) November 2012 Prepared for: ENTERPRISE Transportation Pooled Fund TPF-5(231) www.enterprise.prog.org Prepared by: Athey Creek Consultants

More information

ACRP Report 52. Available since late 2011 Download from TRB web site Provide airport operators updated resource on wayfinding and signing guidelines

ACRP Report 52. Available since late 2011 Download from TRB web site Provide airport operators updated resource on wayfinding and signing guidelines Available since late 2011 Download from TRB web site Provide airport operators updated resource on wayfinding and signing guidelines 1 Panel Broward County Aviation Dept. Port of Oakland Massachusetts

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Interstate, NHS Non-Interstate and Non-NHS (IJR / IMR Guidance) SPECIFIC SUBJECT:

More information

Greater Yellowstone Rural ITS Priority Corridor Project. Task 5. ITS Vision Working Paper

Greater Yellowstone Rural ITS Priority Corridor Project. Task 5. ITS Vision Working Paper Greater Yellowstone Rural ITS Priority Corridor Project Task 5. ITS Vision Working Paper Prepared for the: Montana Department of Transportation and Federal Highway Administration, US Department of Transportation

More information

APPENDIX I. Florida Department of Transportation and Florida Highway Patrol Open Roads Policy RFP-DOT-16/ JR

APPENDIX I. Florida Department of Transportation and Florida Highway Patrol Open Roads Policy RFP-DOT-16/ JR APPENDIX I Florida Department of Transportation and Florida Highway Patrol Open Roads Policy State of Florida OPEN ROADS POLICY AGREEMENT (Revised January 2014) Quick Clearance for Safety and Mobility

More information

TRAFFIC CONTROL STRATEGIES FOR SHORT- TERM, SHORT-DURATION, AND MOBILE WORK ZONES

TRAFFIC CONTROL STRATEGIES FOR SHORT- TERM, SHORT-DURATION, AND MOBILE WORK ZONES TRAFFIC CONTROL STRATEGIES FOR SHORT- TERM, SHORT-DURATION, AND MOBILE WORK ZONES Training Program FHWA GRANT DTFH61-11-RA-00012 1 DISCLAIMER Opinions, findings, and conclusions expressed in this presentation

More information

Chapter 8 WORK ZONE TRAFFIC CONTROLS

Chapter 8 WORK ZONE TRAFFIC CONTROLS October 31, 2009 Chapter 8 WORK ZONE TRAFFIC CONTROLS TABLE OF CONTENTS Page 8-1.00 INTRODUCTION..........................................................8-3 1.01 Purpose 1.02 Scope 1.03 Relation to Other

More information

Wisconsin Department of Transportation (WisDOT) Stand-alone Signals and ITS Program FY17 Project Application Form GENERAL INSTRUCTIONS

Wisconsin Department of Transportation (WisDOT) Stand-alone Signals and ITS Program FY17 Project Application Form GENERAL INSTRUCTIONS Wisconsin Department of Transportation (WisDOT) Stand-alone Signals and ITS Program FY17 Project Application Form GENERAL INSTRUCTIONS APPLICATIONS DUE: FEBRUARY 16, 2016 Please upload applications to

More information

National Traffic Incident Management Coalition. Improving Traffic Incident Management Together

National Traffic Incident Management Coalition. Improving Traffic Incident Management Together National Traffic Incident Management Coalition Improving Traffic Incident Management Together Promoting a National Agenda for Traffic Incident Management Why is Traffic Incident Management Important? Incidents

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 5-1 July 2015 501.1 General... 5-1 501.2 Interchange Type... 5-1 501.2.1 General... 5-1 502 Interchange Design Considerations... 5-2 502.1

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION SECTION TRAFFIC CONTROL Page 628, subsection.01. Delete the following bid items: Advance

More information

North Central Texas Council of Governments 157

North Central Texas Council of Governments 157 13. Transportation System Safety The goal of the Transportation System Safety Program Area is to improve transportation safety throughout the region by supporting planning efforts to develop safety policies,

More information

USING A SIMULATION ENVIRONMENT FOR DYNAMIC TOLL ANALYSIS

USING A SIMULATION ENVIRONMENT FOR DYNAMIC TOLL ANALYSIS USING A SIMULATION ENVIRONMENT FOR DYNAMIC TOLL ANALYSIS ABSTRACT Robert Kerns and Darryn Paterson Transurban, USA 1421 Prince Street, Suite 200 Alexandria, Virginia 22314 571-527-2050; rkerns@transurban.com;

More information

Woodburn Interchange Project Transportation Technical Report

Woodburn Interchange Project Transportation Technical Report Final Report Woodburn Interchange Project Transportation Technical Report Prepared for Oregon Department of Transportation April 212 Prepared by DKS Associates Contents Methodologies... 4 Volume Development...

More information

Operations in the 21st Century DOT Meeting Customers Needs and Expectations

Operations in the 21st Century DOT Meeting Customers Needs and Expectations Operations in the 21st Century DOT Meeting Customers Needs and Expectations 1 Purpose of this Meeting: Share Thoughts & Discuss Challenges brought about by the changing transportation environment and public

More information

FREEWAY PERFORMANCE MEASUREMENT SYSTEM (PeMS): AN OPERATIONAL ANALYSIS TOOL

FREEWAY PERFORMANCE MEASUREMENT SYSTEM (PeMS): AN OPERATIONAL ANALYSIS TOOL FREEWAY PERFORMANCE MEASUREMENT SYSTEM (PeMS): AN OPERATIONAL ANALYSIS TOOL Tom Choe Office of Freeway Operations California Department of Transportation District 7 120 S Spring Street Los Angeles, CA

More information

Advanced Highway Maintenance and Construction Technology Research Center

Advanced Highway Maintenance and Construction Technology Research Center Advanced Highway Maintenance and Construction Technology Research Center Department of Mechanical and Aerospace Engineering University of California at Davis Evaluation of Methods to Reduce Speeds in Work

More information

Variable Speed Warnings on DMS

Variable Speed Warnings on DMS Variable Speed Warnings on DMS Evolving Tools for Better Safety and Service Jeanne Olubogun, P.E. District Traffic Engineer - St. Louis Region Jeanne.Olubogun@modot.mo.gov 314-275-1536 2014 Traffic and

More information

Wisconsin s Traffic Incident Management and Emergency Responders

Wisconsin s Traffic Incident Management and Emergency Responders May 2008 Wisconsin s Traffic Incident Management and Emergency Responders SUBJECT: Wisconsin Department of Transportation (WisDOT) Emergency Traffic Control and Scene Management Guidelines Dear Traffic

More information

Construction Alternative Screening with Regional Travel Demand Model

Construction Alternative Screening with Regional Travel Demand Model Construction Alternative Screening with Regional Travel Demand Model By: Marty Milkovits (Corresponding Author) Cambridge Systematics, Inc. 100 CambridgePark Drive, Suite 400 Cambridge, MA 02140 Phone:

More information

IMPROVING EXIT RAMP VISIBILITY IN WORK ZONES. Proposal submitted by: Cleveland State University and Ohio University. Principal Investigators:

IMPROVING EXIT RAMP VISIBILITY IN WORK ZONES. Proposal submitted by: Cleveland State University and Ohio University. Principal Investigators: IMPROVING EXIT RAMP VISIBILITY IN WORK ZONES Proposal submitted by: Cleveland State University and Ohio University Principal Investigators: Stephen F. Duffy, Ph.D., P.E., F.ASCE for Cleveland State University

More information

The Cost Savings Potential of Sustainability Practices

The Cost Savings Potential of Sustainability Practices The Cost Savings Potential of Sustainability Practices The Sustainability Triple Bottom Line The Triple Bottom Line (TBL) means addressing Environmental, Economic and Social Equity dimensions of a project

More information

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1 TRANSPORTATION IMPACT STUDY (TIS) GUIDELINES FOR DEVELOPMENT APPLICATIONS Transportation and Works Department The Regional Municipality of York 17250 Yonge Street Newmarket, Ontario L3Y 6Z1 August, 2007

More information

ASTI Transportation Systems

ASTI Transportation Systems ASTI Transportation Systems Smart Work Zone Systems. Noah Jenkin ASTI Transportation Systems Inc. 302-328-3220 noah@asti-trans.com 1 Information Is KING! Real-Time information is Power! Motorist Receives:

More information

Wisconsin Traffic Operations Performance Management System (TOPMS)-Phase 1. Advisory Group Meeting-November 10, 2014

Wisconsin Traffic Operations Performance Management System (TOPMS)-Phase 1. Advisory Group Meeting-November 10, 2014 Wisconsin Traffic Operations Performance Management System (TOPMS)-Phase 1 Advisory Group Meeting-November 10, 2014 Project Approach 3-Phase, 3-Year Project to Design and Build TOPMS Phase 1 Planning/Design,

More information

ODOT Transportation Systems Management & Operations Plan

ODOT Transportation Systems Management & Operations Plan ODOT Plan Performance Measures Prepared for: Prepared by: May 2017 Updated December 2017 This page intentionally left blank Table of Contents List of Tables Introduction 1 ODOT s TSMO Performance Measures

More information

for Law Enforcement KVE Developed by the Kentucky Transportation Center University of Kentucky in cooperation with the

for Law Enforcement KVE Developed by the Kentucky Transportation Center University of Kentucky in cooperation with the A Checklist for Law Enforcement Fire & Rescue EMS CRASH SITE Towing KYTC KVE Emergency Management Developed by the Kentucky Transportation Center University of Kentucky in cooperation with the Kentucky

More information

Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING

Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning by Hiron Fernando, BSCE A Thesis In CIVIL ENGINEERING Submitted to the Graduate Faculty of Texas Tech

More information

53.20 PAINTED ROADWAY LINES

53.20 PAINTED ROADWAY LINES 53.20 PAINTED ROADWAY LINES 53.20.1 GENERAL The Work consists of supplying paint and painting roadway lines on pavement surfaces. The various configurations of roadway lines are shown in the Department

More information

TRAFFIC STUDY GUIDELINES

TRAFFIC STUDY GUIDELINES TRAFFIC STUDY GUIDELINES December 2013 The scope of the traffic impact analysis (TIA) should follow these guidelines and the requirements of VMC 11.80.130 and VMC 11.70, transportation concurrency (attached

More information

2015 ATSSA Traffic Expo Report

2015 ATSSA Traffic Expo Report 2015 ATSSA Traffic Expo Report February 8-10, 2015 Tampa, Florida By: Victor Lund, St. Louis County Traffic Engineer Submitted: February 11, 2015 Sunday, February 8, 2015 Power Talk Grassroots Advocacy:

More information

Analytical Tools and Decision Support Systems SANDAG I-15 ICM. ITS PA January 30 th, 2014

Analytical Tools and Decision Support Systems SANDAG I-15 ICM. ITS PA January 30 th, 2014 Analytical Tools and Decision Support Systems SANDAG I-15 ICM ITS PA January 30 th, 2014 Project Partners/Stakeholders National ICM Evaluator National AMS Contractor 2 San Diego I-15 Corridor 21 mile corridor

More information

A VISION-BASED APPROACH TO STUDY DRIVER BEHAVIOR IN WORK ZONE AREAS

A VISION-BASED APPROACH TO STUDY DRIVER BEHAVIOR IN WORK ZONE AREAS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 A VISION-BASED APPROACH TO STUDY DRIVER BEHAVIOR IN WORK ZONE AREAS Yichang

More information

COMPANY OFFICER SAFE VEHICLE PRACTICES DURING ON-HIGHWAY INCIDENTS. 3 hours TIME FRAME: LEVEL OF INSTRUCTION: AUTHORITY: BEHAVIORAL OBJECTIVE:

COMPANY OFFICER SAFE VEHICLE PRACTICES DURING ON-HIGHWAY INCIDENTS. 3 hours TIME FRAME: LEVEL OF INSTRUCTION: AUTHORITY: BEHAVIORAL OBJECTIVE: TOPIC: TIME FRAME: LEVEL OF INSTRUCTION: SAFE VEHICLE PRACTICES DURING ON-HIGHWAY INCIDENTS 3 hours II AUTHORITY: BEHAVIORAL OBJECTIVE: Condition: Behavior: Standard: A written quiz The student will confirm

More information

A MODAL COMPARISON OF DOMESTIC FREIGHT TRANSPORTATION EFFECTS ON THE GENERAL PUBLIC EXECUTIVE SUMMARY. November 2007

A MODAL COMPARISON OF DOMESTIC FREIGHT TRANSPORTATION EFFECTS ON THE GENERAL PUBLIC EXECUTIVE SUMMARY. November 2007 A MODAL COMPARISON OF DOMESTIC FREIGHT TRANSPORTATION EFFECTS ON THE GENERAL PUBLIC EXECUTIVE SUMMARY November 2007 Prepared by CENTER FOR PORTS AND WATERWAYS TEXAS TRANSPORTATION INSTITUTE 701 NORTH POST

More information

Maintenance of Traffic for Innovative Geometric Designs Work Zones

Maintenance of Traffic for Innovative Geometric Designs Work Zones Maintenance of Traffic for Innovative Geometric Designs Work Zones by HENRY BROWN, P.E. Research Engineer, Dept. of Civil & Environmental Engineering, University of Missouri, E2509 Lafferre Hall, Columbia,

More information

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES The City Engineer, under the authority of the Public Works Director and recommendations from the Traffic Engineer, will make the final decision on the need for a traffic study. The purpose of the traffic

More information

Chapter 1.0 Introduction

Chapter 1.0 Introduction Chapter 1.0 Introduction 1.1 Background Interstate 81 runs from Danbridge, Tennessee to the US/Canada border, connecting the six states of Tennessee, Virginia, West Virginia, Maryland, Pennsylvania, and

More information

Update on the Human Factors Guidelines (HFG) for Road Systems: Status and Implementation Activities

Update on the Human Factors Guidelines (HFG) for Road Systems: Status and Implementation Activities Update on the Human Factors Guidelines (HFG) for Road Systems: Status and Implementation Activities Presentation to the AASHTO Standing Committees on Traffic Engineering & Highway Traffic Safety John L.

More information

RAPID INCIDENT SCENE CLEARANCE (RISC)

RAPID INCIDENT SCENE CLEARANCE (RISC) Approved: Effective: September 18, 2008 Traffic Engineering and Operations Topic No. 750-030-020-a RAPID INCIDENT SCENE CLEARANCE (RISC) PURPOSE: Rapid Incident Scene Clearance (RISC) is a highly innovative

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

A Quality Assurance Program For Work Zone Traffic Control TRB Paper James E. Bryden, PE Laurel B. Andrew, PE

A Quality Assurance Program For Work Zone Traffic Control TRB Paper James E. Bryden, PE Laurel B. Andrew, PE A Quality Assurance Program For Work Zone Traffic Control TRB Paper 01-2223 James E. Bryden, PE Laurel B. Andrew, PE New York State Department of Transportation Construction Division 1220 Washington Avenue

More information

An Application of ITS for Incident Management in Second-Tier Cities: A Fargo, ND Case Study

An Application of ITS for Incident Management in Second-Tier Cities: A Fargo, ND Case Study 30 MID-CONTINENT TRANSPORTATION SYMPOSIUM 2000 PROCEEDINGS An Application of ITS for Incident Management in Second-Tier Cities: A Fargo, ND Case Study SHAWN BIRST AND AYMAN SMADI Congestion on urban freeways,

More information

SR 99 Incident Response After- Action Plan

SR 99 Incident Response After- Action Plan SR 99 Incident Response After- Action Plan Background On June 10, 2014 at 1:52 PM, a pickup truck and a passenger car collided on southbound SR 99 (E Marginal Way S), just south of S Spokane St. The SDOT

More information

ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION

ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION Dr. Arun Chatterjee Professor Emeritus Dept of Civil & Environmental Engineering The University of Tennessee Knoxville,

More information

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106.

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. There are notes in the plans regarding driving the test pile without the use of a follower. The

More information

Successful Incident Management on a Major Reconstruction Project

Successful Incident Management on a Major Reconstruction Project Transportation Research Board 81 st Annual Meeting January 13-17, 2002 Washington, DC Successful Incident Management on a Major Reconstruction Project Pacific Motorway Project, Queensland Australia Professor

More information

General Guidelines for the Preparation of Traffic Impact Studies

General Guidelines for the Preparation of Traffic Impact Studies ENGINEERING & OPERATIONS DIVISION General Guidelines for the Preparation of Traffic Impact Studies April 2010 Prepared by: Highway Planning and Design Branch Table of Contents 1. INTRODUCTION 1 2. TRAFFIC

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: ROADWAY SAFETY FEATURES SPECIFIC SUBJECT: NCHRP 350 TEST REQUIREMENTS LOCATION

More information

Chapter URBAN & RURAL FREEWAY DESIGN

Chapter URBAN & RURAL FREEWAY DESIGN Chapter 5 URBAN & RURAL FREEWAY DESIGN 5.1 INTRODUCTION This chapter provides standards and guidance for urban and rural freeways on new construction/reconstruction projects. The chapter also provides

More information