1 September 30, 2016 University Region FY 2023 Final Scoping Package I-496/US-127 Scoping From I-96 to the I-496/US- 127 Interchange CS JN

2 I-496/US-127 STUDY EXECUTIVE SUMMARY UNIVERSITY REGION MICHIGAN DEPARTMENT OF TRANSPORTATION This document includes the Executive Summary for the study, covering the overview, study area, congestion mapping, existing conditions, and alternatives analysis. The entire document is available for viewing by appointment. FOR MORE INFORMATION CONTACT: TRI-COUNTY REGIONAL PLANNING COMMISSION, JIM

3 Section 2: Executive Summary 2.1 Introduction This I-496/US-127 study was commissioned by the Michigan Department of Transportation (MDOT) to investigate existing and anticipated future conditions located in the cities of Lansing and East Lansing, Delhi and Lansing townships, Ingham County, Michigan. The findings of this planning level document are intended to be used as a guide for investment decisions and as a tool to help prioritize the need for future projects within the study area. The goal of this study is to evaluate the existing roadway and bridge conditions, existing and future traffic operations, and safety within the study corridor and develop a consistent strategy to provide safe and efficient movement of people and goods under existing and future conditions. 2.2 Study Area The initial focus of the proposed study area covered approximately 7.5 miles of I-496 and US-127 from College Road northerly to the westerly and northerly limits of the I-496/US-127/Trowbridge Road interchange area within the City of Lansing, City of East Lansing, Lansing Township, and Delhi Township, in Ingham County as shown in the exhibit below. Exhibit 2-1: Project Location US-127 Trowbridge Road Interchange I-496 I-496/US-127 Dunckel Road Interchange I-96 I-96 Interchange US-127 College Rd I-496 is a circumferential auxiliary highway of I-96 which extends from the west side of the city of Lansing, passes along the south side of the downtown business district, and then joins US-127 as a dual route running north/south reconnecting to I-96 on the southeast side of the city. There are 3 interchanges within the study limits: The I-496/US-127/I-96 interchange on the south end, Dunckel Road interchange which is approximately 1-mile north of I-96 and the I-496/US- 127/Trowbridge Road interchange at the northerly limits of the study area. Page 2-1

4 2.3 AM and PM Congestion Mapping Based on field observations and congestion scans using the Regional Integrated Transportation Information Software (RITIS) that archives vehicle speeds and travel time along the corridor, it was observed that typical commuting traffic heading northbound in the morning and southbound in the afternoon experiences recurring congestion. Exhibit 2-2: RITIS AM Congestion Mapping AM Peak: Figure 2-2 illustrates the average travel speed during the AM rush hour and the recurring congestion along northbound I-496/US-127. The most severe congestion is caused by the merge of the Dunckel Road entrance ramp traffic with a near capacity northbound I-496/US-127 mainline. The congestion from this merge area regularly spills back through the I-96/I- 496/US-127 system interchange. Northbound I-496/US-127 traffic also experiences a slowdown from the Dunckel Road entrance ramp merge to the US-127 and I-496 split north of Trowbridge Road. This slowdown is caused by lane changing and driver decision time at the I-496/US-127 Interchange. Exhibit 2-3: RITIS PM Congestion Mapping PM Peak: Figure 2-3 illustrates the regular congestion that occurs in the eastbound/southbound direction during the afternoon commuter rush. This congestion is due to limited capacity and multiple lane drops on EB I-496. The congestion begins in the afternoon peak at the left-hand lane drop along southbound I-496/US-127 immediately north of the Mt. Hope Avenue Bridge. The congestion spills back and creates stop and go conditions for EB I-496. This congestion is further exacerbated along eastbound I-496 by two consecutive lane drops prior to the merge with southbound US-127. Southbound US- 127 is also impacted by this congestion where the two mainline freeways merge together. Page 2-2

5 2.4 Existing Conditions Overview Based on review of old plans, survey information and field observations, an existing conditions overview is detailed below. Additional details with regard to the analysis of the existing geometry within the proposed project limits is included in Sections 3 and Roadway Cross Sections Within the study limits I-496/US-127 is an existing 4-lane freeway with an open ditch median and flush shoulders. The median width is generally 70 feet from north of Jolly Road to the CN Railroad just south of Trowbridge Road. North and south of those limits the median widens out through the Trowbridge interchange and I-96 interchange, respectively. The existing Right-of-Way (ROW) along the corridor is generally 300 feet in width and then widens out at each interchange area. There is a westbound/ northbound auxiliary lane that originates where the ramp from WB I-96 joins WB I-496/NB US-127 and extends to the WB I-496/NB US-127 exit loop ramp to Dunckel Road. There are also auxiliary lanes along NB US-127 between the Trowbridge and Kalamazoo Street interchanges. On EB I-496/SB US-127 between I-96 and Dunckel road there are 3 lanes. The Dunckel Road entrance ramp to EB I-496/SB US-127 adds an outside lane which then continues on as the outside lane on SB US-127 south of I-96. The median side lane of EB I- 496/SB US-127 drops at the exit ramp to EB I-96. Near the north end of the study area, at the merging area of EB I- 496 and SB US-127, there is a median side lane drop on EB I-496 approaching the merge and a median side lane drop on SB US-127 following the merge area, south of the CN Railroad. Ramps at the I-96, Dunckel Road, and Trowbridge Road interchanges generally consist of one 16-foot travel lane with flush shoulders. The EB I-496/SB US- 127 exit ramp to EB I-96 consists of two 12-foot lanes with flush shoulders Roadway Pavement Section Travel lanes on I-496/US-127 between I-96 and the south end of the mainline bridges over the CN Railroad consist of 2 to 7½ inches of hot mix asphalt (HMA) over 9-inches of jointed reinforced concrete pavement, 4 inches of aggregate base and 10 inches of sand subbase. The concrete pavement was originally constructed in 1964 and was most recently resurfaced with HMA in The shoulders in this section consist of 5 to 8 inches of HMA over aggregate base. The existing pavement is exhibiting high severity transverse and longitudinal joint reflective cracking with some areas exhibiting apparent failures in the underlying concrete pavement (see Exhibit 2-4). Exhibit 2-4: Existing Pavement Conditions (EB I- 496 / SB US-127 North of Forest Road) From the railroad bridges to the westerly limits along I-496 the existing pavement section consists of 10 inches of jointed reinforced concrete pavement, 4 inches of open-graded drainage course and 10 inches of sand subbase (reconstructed in 2001). Shoulders in this area consists of 5 inches of HMA over aggregate. The existing pavement is exhibiting low to moderate transverse and longitudinal joint spalling, but in general appears to be in good condition. A 1,600-foot WB/NB portion of this segment, from the south Exhibit 2-5: High Friction Surface Course on WB I-496 / NB US-127 North of Trowbridge Road end of the bridge over the CN RR to approximately 1,000 feet north of Trowbridge Road has an existing high friction surface course. The friction course is deteriorating and delaminating from the underlying concrete surface (see Exhibit 2-5). From the I-496/US-127 junction to the northerly limits along US-127 the existing pavement consists of 9 inches of jointed reinforced concrete, 4 inches of aggregate base and 10 inches of sand subbase (constructed in 1964). Existing shoulders in this section are HMA over aggregate. The pavement is in poor condition with areas of severe transverse Page 2-3

6 joint deterioration, mid-panel cracking and surface spalling. Nearly all of the original transverse joints have been previously repaired with full depth concrete repairs. The existing ramps at the Trowbridge Road interchange and the Dunckel Road interchange consist of 9 inches of jointed reinforced concrete pavement over 4 inches of aggregate base and 10 inches of sand subbase (constructed in 1964). Portions of the EB I-496/SB US-127 exit ramp to Dunckel Road were reconstructed in 2009 with an HMA over aggregate pavement section. Also, portions of the Dunckel Road ramps near the gores and along the tapers adjacent to the freeway have been overlaid with HMA. The concrete pavement portions of the ramps are in poor condition with areas of severe transverse joint deterioration, midpanel cracking, and surface spalling. Most of the original transverse joints have been previously repaired with full depth concrete repairs. The existing ramps at the I-96 interchange consist of variable thickness HMA over 9 inches of jointed reinforced concrete pavement over 4 inches of aggregate base and 10 inches of sand subbase (constructed in 1964). The pavement condition along these ramps is similar to the I-496/US-127 mainline pavement between I-96 and the CN Railroad Bridges The existing bridges located within the limits of this project were evaluated in their current state. Condition ratings in the current National Bridge Inspection Standards (NBIS) were confirmed in the field during the scoping inspections performed in 2016 (see Table 2-1 for a summary of these ratings). The bridges along I-496/US127 were constructed in the 1960 s, some of which have since been reconstructed. For bridges that were not reconstructed, various rehabilitation has been performed including overlays, widening and barrier replacements. Table 2-1: Current NBIS Conditions Ratings Summary for I-496 / US A Feature Feature Item 58 Bridge ID Deck Surface Carried Crossed Deck Exhibit 2-6: Ramp Condition (WB Trowbridge Rd Entrance Ramp to WB I-496) Item 59 Stringer Item 60 Abut Item 60 Pier R03 of EB I-496 CSX RR R05 of EB I-496 CN RR S10-3 of EB I-496 Mt. Hope Rd S09-3 of EB I-496 Forest Rd S12 of EB I-496 Jolly Rd S15 of Dunckel Rd. EB/WB I R04 of WB I-496 CSX RR R06 of WB I-496 CN RR R07 of WB I-496 Trowbridge Exit Ramp Rd. & CSX S10-4 of WB I-496 Mt. Hope Rd S09-4 of WB I-496 Forest Rd S14 of WB I-496 Jolly Rd S13 of US-127 NB I-96 WB Ramp S14 0f US-127 NB I-96 WB / 1997 S02 of US-127 NB I-96 EB / 1997 NBIS Condition Rating Scale: 9 = New, 7-8 = Good, 5-6 = Fair, 3-4 = Poor, 2 or less = critical. Year Built Page 2-4

7 2.4.4 Horizontal Alignment Five (5) horizontal curves on mainline I-496 / US-127 do not meet minimum radius requirements as noted in Table 2-2. Table 2-2: Mainline I-496/US-127 Horizontal Alignment Compliance Ex / (Min) Radius Location 1 (ft) WB I-496 / NB US-127 near Trowbridge Road P.I. Sta Curve NB 7 EB I-496 / SB US-127 near Trowbridge Road P.I. Sta Curve SB 6 SB US-127 merging area at EB I-496 P.I. Sta Curve SB 7 NB US-127 at Red Cedar River P.I. Sta Curve NB 8 SB US-127 at Red Cedar River P.I. Sta Curve SB 8 1 Minimum radius for a 75 mph design speed. 2 See Section 6 for crash analysis and proposed mitigations for this crash concentration Existing Design Speed Crash Concentration Noted? 1, (2,344) 60 mph No 1, (2,344) 65 mph Yes 2 1, (2,344) 65 mph Yes 2 1, (2,344) 60 mph Yes 2 1, (2,344) 65 mph Yes 2 Four (4) loop ramp curves have radii of 230 ft, which is less than the desired 260 ft minimum as follows: (1) NB US- 127 loop ramp to WB I-96; (2) WB I-96 loop ramp to SB US-127; (3) WB I-496/NB US-127 exit loop ramp to Dunckel Rd; and (4) WB Trowbridge Rd entrance loop ramp to EB I-496/SB US-127 Additionally, the WB I-496/NB US-127 exit ramp to EB Trowbridge Rd has a 230 ft radius, which is less than the required 464 ft minimum for a 40 mph design speed and the radius for the EB I-496/SB US-127 exit ramp to EB I-96 does not meet the minimum radius of 1,922 feet for a 70 mph curve, but does meet for a 65 mph design speed. All other mainline and ramp radii meet the minimum requirements for the desired design speeds Vertical Alignment The vertical alignment information used for the analyses was obtained from record plans and was noted that eight (8) mainline freeway crest vertical curves within the limits of proposed work do not meet minimum rate of curvature (Kvalue) requirements for a 75 mph design speed. Of the 8 mainline crest curves that do not meet the required K-value, five (5) meet K-value requirements for 70 mph, two (2) meet K-value requirements for 65 mph and one (1) meets the K-value requirements for 60 mph. Three (3) mainline freeway sag vertical curves within the limits of proposed work do not meet minimum rate of curvature (K-value) requirements for a 75 mph design speed. Of the 3 sag vertical curves that do not meet, two (2) meet the required K-value for a 65 mph design speed and one (1) meets the required K-value for a 50 mph design speed. One (1) ramp vertical curve (on the EB I-496/SB US-127 ramp to EB I-96) does not meet the K-value requirements for the desired ramp design speed of 70 mph, but does meet K-value requirements for 65 mph which exceeds the existing horizontal alignment design speed of 60 mph for this ramp. All mainline curves meet the minimum curve length criteria and all but one (1) ramp vertical curve within the limits of proposed work meet minimum curve length criteria; however, this is a short vertical curve approaching a stop condition at the ramp terminal on the EB I-496/SB US-127 exit ramp to Dunckel Rd. Page 2-5

8 2.4.6 Grade All mainline and ramp vertical grades, with the exception of one (2) locations, meet current geometric criteria: The vertical grade on SB US-127 between vertical curves SB-14 and SB-15 is a 3.11% up-grade, which exceeds the criteria of 3% maximum. The vertical grade on the WB I-496/NB US-127 exit ramp to EB Trowbridge Rd between vertical curves DD1 and DD2 is a 5% down-grade, which exceeds the criteria of 4% max Stopping Sight Distance Eight (8) mainline freeway crest vertical curves do not meet minimum SSD requirements for a 75 mph design speed. Of the eight (8) mainline crest curves that do not meet the required SSD, five (5) meet SSD requirements for 70 mph, two (2) meet SSD requirements for 65 mph and one (1) meets the SSD requirements for 60 mph. Three (3) mainline freeway sag vertical curves within the limits of proposed work do not meet minimum SSD requirements for a 75 mph design speed. Of the three (3) sag vertical curves that don t meet requirements, two (2) meet the required SSD for a 65 mph design speed and one (1) meets the required SSD for a 50 mph design speed. One (1) ramp vertical curve (on the EB I-496/SB US-127 ramp to EB I-96) does not meet the SSD requirements for the desired ramp design speed of 70 mph, but does meet vertical SSD requirements for 65 mph. In addition to vertical sight distances, horizontal sightline offsets were calculated to determine if stopping sight distance requirements were met for horizontal curves. Seven (7) locations were identified as having obstructions that inhibit the SSD as noted in Section 3 (Existing Conditions) Cross Slope The existing I-496/US-127 mainline cross slope on the through lanes is 1.5% - 2.0%, with the crown point located at the right edge of the median lane on each bound. Shoulder cross slopes are 4.0%. Old plan information shows ramp lane cross slopes at 1.5%, with the crown point located at the left edge of pavement. Ramp shoulder cross slopes are shown at 4.0% Superelevation Twelve (12) mainline freeway curves within the limits of proposed work do not meet the required rate of superelevation for the design speed (per Standard Plan R-107). Of these 12 curves, eight (8) meet the required rate of superelevation per the Straight Line Method; four (4) do not meet Straight Line. Two (2) ramp curves within the limits of proposed work do not meet the required rate of superelevation per Standard Plan R-107. One (1) of these 2 curves meets Straight Line requirements. Page 2-6

9 Vertical Clearance The existing vertical clearance for each structure within the proposed work limits along I-496 and US-127 is shown in Table 2-3. Table 2-3: Existing Bridge Vertical Clearance Structure Feature Being Crossed Roadway Over Approx. Station Existing Vertical Clearance Required Minimum & (Desired) Vertical Clearance Criteria Met? (Y/N) B01 of Red Cedar River and Ramp V EB I Y Y B02 of Red Cedar River and Ramp V WB I Y Y Exempted Bridge on Special Route? (Y/N) R03 of R04 of CSX RR EB I-496/SB US N - Trowbridge Rd (Ramps A, B, & F) EB I-496/SB US Y N CSX RR WB I-496/NB US Y - Trowbridge Rd (Ramps A, B, E & F) WB I-496/NB US Y N R05 of CN RR EB I-496/SB US Y - R06 of CN RR WB I-496/NB US Y - R07 of CSX RR WB I-496/NB US-127 Ramp to EB Trowbridge N - Rd S05 of SB US-127 Ramp to Trowbridge Rd EB I N N S06 of SB US-127 WB I Y - S09-3 of Mt. Hope Rd EB I-496/SB US (16-3 ) Y N S09-4 of Mt. Hope Rd WB I-496/NB US (16-3 ) Y N S10-3 of Forest Rd EB I-496/SB US (16-3 ) Y N S10-4 of Forest Rd WB I-496/NB US (16-3 ) Y N S12 of Jolly Rd EB I-496/SB US (16-3 ) N N S13 of EB I-496 Ramp to EB I-96 WB I-496/NB US (14-9 ) N Y* S14 of Jolly Rd WB I-496/NB US (16-3 ) N N S15 of WB I-496/NB US-127 Dunckel Rd (14-9 ) Y Y EB I-496/SB US-127 Dunckel Rd (14-9 ) Y Y S16 of SB US-127 Ramp to Trowbridge Rd WB I Y - B01 of Red Cedar River and Ramp V NB US Y Y* B02 of Red Cedar River and Ramp V SB US Y Y* *Not on MDOT s list of Exempt Bridges for Special Routes in Highly Urbanized Areas, but is over a ramp connecting a Special Route and a 16-0 Route. Vertical clearance sketches produced from Lidar scan data with detailed vertical clearance dimensions at each fascia are included at the end of Section 15. As shown in Table 2-3 six (6) existing structures within the limits of proposed work do not meet minimum vertical clearance requirements Horizontal Clearance A review of the project limits revealed that there are numerous objects such as bridge piers, slope paving, bridge abutments, railings, and overhead sign foundations, that are within the clear recovery area, and are currently protected by crashworthy barriers. Page 2-7

10 Ramp Acceleration and Deceleration Length Existing ramp geometry throughout the project was evaluated based on the MDOT Geometric Guides. Two (2) of the six (6) freeway entrance ramps within the proposed work limits do not meet the required L a distance. Four (4) out of eight (8) exit ramps within the proposed work limits do not meet the required L d distance Crash Analysis A crash analysis was completed for this project for a five-year period between 2011 and 2015, inclusive. The limits of this analysis include the mainline segments of I-496/US-127, system interchange ramps, and Trowbridge interchange ramps, from Trowbridge Road to I-96. This section of freeway experiences (on average) one crash every 1.75 days. The most frequent crash types for the mainline freeway segments were single vehicle (44%) and rear-end (37%) collisions. The leading crash types for the study interchange ramps were also single vehicle (70%) and rear-end (17%) crashes. The comprehensive crash report can be found in Section 6. On I-496 / US-127, crash concentrations were identified on the mainline S-curves through the Trowbridge interchange. These crashes predominantly involved vehicles losing control in the curves when surface friction was reduced, where 65%-80% of single vehicle and sideswipe crashes occurred in wet, snowy, icy, or slush road conditions. There was also a pattern of rear-end crashes on I-496 WB / US-127 NB from I-96 to Dunckel Road, and within the Trowbridge interchange, where 80% of the rear end collisions occurred during peak traffic conditions and recurring congestion. As described above, AM peak period congestion regularly spills back from Dunckel Road through the I-96/I-496/US- 127 system interchange. Crash concentrations can also be seen on I-96 related to this congestion, with westbound crash clusters (rear end specifically) at College Road and Hagadorn Road. A crash cluster related to peak period congestion is also observed on the ramp from I-496 EB to US-127 NB. Other mainline segments and ramps were not identified to experience specific crash clusters related to congestion; however, building congestion identified in the analysis of future no-build conditions could exacerbate crash patterns or cause new spot concentrations to develop. 2.5 Alternatives Studied Based on extensive study of the Existing and Base Future Conditions in addition to the geometric conditions, nine (9) build alternatives have been developed. Based on the findings outlined in the Existing Conditions Analysis Section of this Study, including safety elements, traffic operations, bridge conditions, geometrics, etc., alternatives were identified (as shown in Table 2-4) and preliminary traffic operations were reviewed to determine if the specific alternative should be moved forward for further study. Based on this preliminary analysis, the Preliminary Alternatives Analysis Meeting held on 06/30/2016 and the Preliminary Scope Review Meeting held on 08/26/16, six (6) of the nine (9) alternatives were proposed to move forward in addition to the Northbound and Southbound No-Build Alternatives. The six (6) alternatives as well as the no-build alternatives that were proposed to move forward for more in-depth review are as noted in Table 2-4 and as shown in Exhibits 2-7 through It should be noted that the alternatives as shown in the table on the following page have been broken up into Northbound Alternatives, Southbound Alternatives, and I-496/US-127 Interchange Realignment Alternatives. As presented, any of the Northbound and Southbound Alternatives could be combined with each other in order to form a merged alternative which addresses both the Northbound and Southbound operational, safety and geometric issues. Additionally, the I-496/US-127 Interchange Realignment Alternatives could also be combined with any of the Northbound and Southbound Alternatives to create a complete corridor fix. The I-496/US-127 Interchange Realignment Alternatives have been developed in order to understand what it might cost to modify the interchange configuration to meet current geometric standards as well as addressing the existing operational and safety issues. For overall work limit comparison purposes, the I-496/US-127 Interchange Realignment Alternatives incorporate the features of the Northbound and Southbound operational improvement Alternatives which include permanent lane additions (e.g. Northbound Alternative 4 and Southbound Alternative 5a). Page 2-8

11 Table 2-4: Proposed No-Build and Build Alternatives Treatment Extend NB Dunckel On-Ramp Acceleration Lane based on current MDOT/FHWA standards and traffic operation needs (widening to outside) Northbound Alternatives No- Build 3 1 1a 2 2a 3 3a 3b 3 3c 3d 4 2,3 4a 1 4b 1 X X X X X X X X X X X NB Dunckel On-Ramp to I-496/US-127 Metering X X X Extend 3 rd lane south from the I-496/US-127 split to meet current MDOT/FHWA standards (widening in median) X X X Part Time Shoulder Use from just north of the Jolly Road bridge (on NB US-127) to the I-496/US-127 split (north of the CSXT Railroad bridge) (widening in median) X X X X Part Time Shoulder Use from just north of the Jolly Road bridge (on NB US-127) to just south of the CN Railroad X bridge (widening in median) Permanent 3 rd Lane from Dunckel to I-496/US-127 split (widening in median) X X X Extend 4 th lane south from the I-496/US-127 split to meet current MDOT/FHWA standards (widening in median) X X Auxiliary Lane addition from the NB Dunckel On-Ramp to the EB Trowbridge Exit Ramp (widening to outside) 1 Alternative 4b is the same as 4a except MDOT would reclaim the existing (old) pavement width at the WB I-496 and NB US-127 split and put the lane lines back on the actual pavement joints. 2 Alternative 4 includes an option (add on) for an extension of the 4 th lane south from the I-496/US-127 split to meet current MDOT/FHWA standards with widening in the median. No-Build Alternative developed to compare against the build alternatives X Treatment Southbound Alternatives Interchange Realignment Alts No- Build 3 5 5a 3 6 6a 7 7a 7b 7c 3 7d Auxiliary Lane from the WB Trowbridge On-Ramp to EB I-496/SB US-127 to the Dunckel Exit Ramp (widening to outside), for Alternative 7c this would be a lane extension from the EB I-496 lane drop to Dunckel Exit Ramp Permanent lane addition from lane drop north of Mt. Hope Rd to approximately the Dunckel bridge over EB I- 496/SB US-127 (widening in median) with parallel extension of WB Trowbridge On-Ramp to EB I-496/SB US- 127 per current standards (widening to outside) Part Time Shoulder use from lane drop north of Mt. Hope Rd to I-96 (widening in median) X X X No-Build Alternative developed to compare against the build alternatives X X X Realign I-496/US-127 connections to I-496 and X US-127 (applies to Alternatives 8 and 9) Permanent upgrade of EB I-496/SB US-127 to EB I-96 exit X X New Mt. Hope Extension of the EB I nd thru lane (widening to outside) X X X X X Road Interchange Reconstruct/realign WB Trowbridge entrance loop ramp to EB I-496/SB US-127 due to extension of the EB I nd thru lane (widening to outside) Page 2-9 X X X X Remove the WB Trowbridge On-Ramp to EB I-496/SB US-127 X X Extend the median lane drop along EB I-496/SB US-127 south to just south of the Mt. Hope Road Bridge (widening in median) extended to a tangent segment of roadway 3 Graphical depictions of the alternatives selected to move forward for further study are included on the following pages. Color indicates alternatives to move forward in the study per the June 30, 2016 Progress Meeting. Color indicates alternatives not to move forward in the study per the June 30, 2016 Progress Meeting. Color indicates alternatives not to move forward in the study per the August 26, 2016 Preliminary Scope Review Meeting. X X Modified Trowbridge Rd Interchange Ramp Connections

12 Exhibit 2-7, Northbound No-Build Alternative (Detailed Map) Page 2-10

13 Exhibit 2-8, Alternative 3b (Detailed Map and Typical Cross Section) Page 2-11

14 Exhibit 2-9, Alternative 4 (Detailed Map and Typical Cross Section) Page 2-12

15 Exhibit 2-10, Southbound No-Build Alternative (Detailed Map) Page 2-13

16 Exhibit 2-11, Alternative 5a (Detailed Map and Typical Cross Section) Page 2-14

17 Exhibit 2-12, Alternative 7c (Detailed Map and Typical Cross Section) Page 2-15

18 Exhibit 2-13, Alternative 8 (Detailed Map) Page 2-16

19 Exhibit 2-14, Alternative 9 (Detailed Map) Page 2-17

20 Below is the reasoning for the alternatives which were not proposed to move forward in the study per the 06/30/2016 Progress Meeting and 08/26/16 Preliminary Scope Review Meeting with MDOT as shown in the table on the previous page (no additional costs or traffic information have been developed for these alternatives). 1 Alternatives eliminated as part of the 06/30/2016 Progress Meeting: Alternatives 1, 1a, 2 and 2a were eliminated as potential build alternatives as they did not alleviate existing traffic issues in the base and future year VISSIM models. As part of the VISSIM model development, it was determined that either a permanent third lane or Part Time Shoulder Use (PTS) lane in the peak hours was needed in order to alleviate the existing and future operational issues. Alternatives 3 and 3a were eliminated as potential build alternatives as the team determined that a permanent extension of the Northbound third lane at the WB I-496/NB US-127 split south of the rail bridges (widening in the median) should be included in the build alternatives. This permanent extension would be in use during peak and non-peak traffic periods and would upgrade the existing tapers to current standards. Alternatives 6 and 6a were eliminated as potential build alternatives as they did not alleviate existing traffic issues in the base and future year VISSIM models. Merging of the Westbound Trowbridge Road entrance ramp to EB I-496/SB US-127 was determined to be a significant issue as the alternatives were developed and traffic models developed and the accommodation of this issue was not addressed as part of these alternatives. Alternatives 7, 7a and 7d were eliminated as potential build alternatives as they did not alleviate existing traffic issues in the base and future year VISSIM models or meet the objectives of the study with regard to local agency considerations (i.e. Alternatives 7a and 7d required the removal of the WB Trowbridge entrance ramp). Alternatives eliminated as part of the 08/26/2016 Preliminary Scope Review Meeting: Alternative 3c was eliminated as a potential build alternative as the only difference between this alternative and Alternative 3b is proposed ramp metering on the NB Dunckel On-Ramp to WB I-496/NB US-127. As part of the VISSIM model development, it was determined that the ramp metering did not add additional capacity for WB I-496/NB US-127 and the metering actually queued traffic back onto Dunckel Road from the ramp. Alternative 3d was added for review during the meeting but was ultimately eliminated as a potential build alternative as it did not alleviate existing traffic issues in the base and future year VISSIM models. Based on review of the VISSIM model developed, this alternative pushed the bottleneck issue north from its current location near the Dunckel Road interchange to the Trowbridge Road interchange area. Alternatives 4a and 4b were eliminated as potential build alternatives as the team determined that a permanent extension of the 4 th lane south from the WB I-496/NB US-127 split to meet current MDOT/FHWA standards should be included in Alternative 4 as an option for future consideration. Based on development and review of the VISSIM model for Alternative 4, the extension of the 4 th lane is not required in order to alleviate existing traffic issues in the base and future year models. Additionally, the extension of this lane would require additional widening of the CN and CSXT rail bridges, increasing the cost of these alternatives. Alternative 5 was eliminated as a potential build alternative as the only difference between this alternative and Alternative 5a is the permanent lane addition occurs to the outside (Alternative 5 Auxiliary Lane addition from Trowbridge to Dunckel) while the Alternative 5a widening occurs to the median. The VISSIM model shows acceptable LOS for both alternatives, however the widening to the median is more cost effective. Alternative 7b was eliminated as a potential build alternative as it was shown in the base and future year VISSIM models that an operational improvement which extends beyond Dunckel Road is not necessary. Alternative 7c is proposed to be moved forward for further study which addresses many of the components of Alternative 7b with regard to EB I-496 lane balance fixes, but does not extend beyond Dunckel Road. Page 2-18

21 Northbound I-496 / US-127 Scoping SECTION 2 Executive Summary 2.6 Traffic Operations and Total Alternative Costs Future traffic operations were reviewed throughout the proposed work area to ensure that the design was able to accommodate future traffic volumes and could improve problem areas identified within the existing interchange and the future No- Build alternative. Tables 2-5, 2-6 and 2-7 give a brief summary of traffic operations for the Alternatives developed, the annual benefit in cost over a future No-Build alternative and a side-by-side comparison of anticipated impacts. Table 2-5: Traffic Operations Summary and Total Alternative Cost (Alternatives are highlighted as selected to move forward or eliminated as shown in this table and as detailed in Table 2-4) Alternative Description Annual Benefit* Total Estimated (Annual User Delay) Alternative Cost ** No-Build This alternative does not eliminate congestion on WB I-496/NB US-127. ($6,590,459) $50,707,000 Alternative 3b This alternative eliminated the congestion on northbound US-127/I-496 at the $4,131,450 $56,013,000 (Static) Dunckel on-ramp and improved operations near the US-127/I-496 split. ($2,459,009) $58,167,000 (Dynamic) Southbound Interchange Realignment Alternative 3c This alternative eliminated the congestion on northbound US-127/I-496 at the Dunckel on-ramp and improved operations near the US-127/I-496 split. $4,024,414 ($2,566,045) $60,125,000 (Full ATM) $56,125,000 (Static) $58,752,000 (Dynamic) $61,140,000 (Full ATM) Alternative 4 This alternative eliminated the congestion on northbound US-127/I-496 at the $4,237,262 $57,713,000 Dunckel on-ramp and improved operations near the US-127/I-496 split. ($2,353,197) Alternatives 4a and 4b This alternative eliminated the congestion on northbound US-127/I-496 at the Dunckel on-ramp and improved operations near the US-127/I-496 split. $4,163,477 ($2,426,982) $68,273,000 (4a) $67,597,000 (4b) No-Build This alternative does not eliminate congestion on EB I-496/SB US-127. ($10,259,887) $44,370,000 Alternative 5 This alternative eliminated the congestion on southbound US-127/I-496 although $8,567,675 $50,247,000 small amounts of congestion still remains on eastbound I-496 at the ($1,692,212) lane drop between the Trowbridge ramps. Alternative 5A This alternative eliminated the congestion on southbound US-127/I-496 although small amounts of congestion still remains on eastbound I-496 at the lane drop between the Trowbridge ramps. $8,563,887 ($1,696,000) Alternative 7B This alternative eliminated the congestion on southbound US-127/I-496. $8,629,203 ($1,630,684) Alternative 7C This alternative eliminated the congestion on southbound US-127/I-496. $8,594,925 ($1,664,962) Alternative 8 The analysis of future conditions with a new interchange at Mt. Hope Road Not indicates network operations similar to the other alternatives that have been Calculated moved forward for further study. Mainline traffic speeds would average between 50 and 65 miles per hour, with slight speed reductions at the system interchange (40 to 45 mph). Overall, traffic operations would be improved as compared to existing and future no-build conditions. Alternative 9 The analysis of future conditions with reconfiguration of the Trowbridge Road interchange indicates network operations similar to the other alternatives that have been moved forward for further study. Mainline traffic speeds would average between 60 and 70 miles per hour. Overall, traffic operations would be improved as compared to existing and future no-build conditions. Not Calculated $48,187,000 $56,784,000 (Static) $59,291,000 (Dynamic) $62,255,000 (Full ATM) $54,671,000 $238,247,000 $260,307,000 * Annual benefit based on user delay cost savings relative to a future No-Build alternative. ** See the following page with regard to details/definition with regard to the system components (i.e. Static, Dynamic, Full ATM). Page 2-19

22 Table 2-6: System Component Detail for Part Time Shoulder Use Alternatives Static PTS Dynamic PTS System Component Alternative Alternative Full ATM PTS Alternative Hours of Operation Fixed Variable to Conditions Variable to Conditions Capital Cost Lowest Highest Maintenance Cost Lowest Moderate Highest Available for Incident Management Available for Event Management Able to have queue warning and variable speed limits No Partial- PTS only Yes- For all Lanes Only if during normal hours of operation Yes Yes No No Yes Page 2-20

23 Table 2-7: Side by Side Comparison of Alternatives METRIC No-Build Alternative (Northbound) Alternative 3b (Northbound) Alternative 4 (Northbound) No-Build Alternative (Southbound) Alternative 5a (Southbound) Alternative 7c (Southbound) Alternative 8 (Interchange Realignment) Alternative 9 (Interchange Realignment) Operational Improvements Crash Analysis Review Does not improve current or future operational issues Eliminates congestion on northbound US-127/I-496 at the Dunckel on-ramp and improved operations near the US-127/I-496 split Crash concentrations were identified as follows: along the mainline S-curves through the Trowbridge interchange (loss of control due to weather and speed) and rear-end crashes on the mainline from I-96 northerly to the Dunckel Road interchange (due to traffic congestion) No improvement anticipated for the I-96 to Dunckel Road crash pattern High friction surface to be reapplied through the S-curve, horizontal curves will not be upgraded to current standards These alternatives eliminate congestion on northbound US-127/I-496, therefore it is anticipated that this will help in alleviating the existing crash pattern from I-96 to Dunckel Road High friction surface to be reapplied through the S- curve, horizontal curves will not be upgraded to current standards Does not improve current or future operational issues Eliminates congestion on southbound US-127/I- 496, some congestion still remains on EB I-496 at the lane drop between the Trowbridge ramps Eliminates the congestion on southbound US- 127/I-496 Crash concentrations were identified along the mainline S-curve through the Trowbridge interchange due to vehicles losing control in the curves when surface friction was reduced in inclement weather conditions Placement of a high friction surface treatment along with advanced curve warning signs with reduced speed are recommended (similar to what was completed along the WB I-496/NB US-127 S-curves through the Trowbridge interchange area) Eliminates congestion on northbound and southbound US-127/I-496 throughout the project limits Crash concentrations were identified as follows: along the mainline S-curves (NB & SB) through the Trowbridge interchange (loss of control due to weather and speed) and rear-end crashes on the mainline from I-96 northerly to the Dunckel Road interchange (due to traffic congestion) These alternatives eliminate congestion on NB US-127/I-496, therefore it is anticipated that this will help in alleviating the existing crash pattern from I-96 to Dunckel Modifications of the horizontal curves through the Trowbridge interchange are proposed which will eliminate the substandard geometrics and help in alleviating the existing crash pattern through the S-curves Design Exceptions Drainage Pavement Fix and Service Life Bridge Fix Environmental (wetlands, floodplain, etc.) Right-of-Way (ROW) Impacts Utility Impacts Railroad Impacts Minor roadway and bridge widening will increase the impervious area requiring additional retention (MS4 requirements) Rubblize with HMA Resurfacing (14-year service life) Minimal bridge widening for MOT and ramp geometrics Bridge replacement/rehab based on condition NPDES Permitting required along with tree removals Drainage easement for retention ITS Facilities and utilities (i.e. fiber optics) running along the railroads for bridge replacement Significant coordination with the CSXT & CN Railroads for bridge replacements Anticipate 1 to 2 years of coordination after Preliminary Plans are developed Significant roadway and bridge widening from I-96 through the I-496/US-127 interchange will increase the impervious area requiring additional retention based on MS4 requirements HMA Mill and Overlay (9-year service life) Rubblize with HMA Resurfacing (14-year service life) Significant bridge widening for new Part Time Shoulder Use and/or permanent lane additions and geometric modifications Bridge replacement/rehab based on condition NPDES Permitting required, wetland along with stream and floodplain impacts to the unnamed tributary of the Red Cedar River and its flood plains crossing the freeway south of Mt. Hope Road Additionally, tree removals will be required CSXT & CN Railroad ROW acquisition (easements) Drainage easement for retention ITS Facilities and utilities (i.e. fiber optics) running along the railroads for bridge replacement Relocation of Consumers Energy 46Kv line Realignment of the WB I-496/NB US-127 to EB Trowbridge Rd Ramp will require ROW acquisition (easements) from the CSXT & CN Railroads Anticipate 2 to 3 years of coordination after Preliminary Plans are developed Minor roadway and bridge widening will increase the impervious area requiring additional retention (MS4 requirements) Minimal bridge widening for MOT and ramp geometrics Bridge replacement/ rehab based on condition NPDES Permitting required along with tree removals Drainage easement for retention Significant roadway and bridge widening from I-96 through the I-496/US-127 interchange will increase the impervious area requiring additional retention based on MS4 requirements Rubblize with HMA Resurfacing (14-year service life) Rubblize with HMA Resurfacing (14-year service life) Significant bridge widening for permanent lane additions, lane balancing and geometric modifications Bridge replacement/rehab based on condition NPDES Permitting required, wetland along with stream and floodplain impacts to the unnamed tributary of the Red Cedar River and its flood plains crossing the freeway south of Mt. Hope Road Addition of a noise wall between Jolly and Dunckel Additionally, tree removals will be required CSXT & CN Railroad coordination Drainage easement for retention ITS Facilities and utilities (i.e. fiber optics) running along the railroads for bridge replacement Reconstruction and widening of the existing EB I-496/SB US-127 bridges over the CSXT & CN Railroads will require coordination and permitting Anticipate 1 to 2 years of coordination after Preliminary Plans are developed Significant roadway and bridge widening from I-96 through the I-496/US-127 interchange along with the reconfiguration of the Trowbridge interchange will increase the impervious area requiring additional retention based on MS4 requirements Pavement Recon in Interchange (26-year service life) Rubblize with HMA Resurfacing south to I-96 (14-year service life) Significant bridge replacement and reconfiguration within the I-496/US-127/Trowbridge interchange area due to the proposed geometric modifications Bridge replacement/rehab based on condition south of the I-496/US-127/Trowbridge interchange area NPDES Permitting required, wetland along with stream and floodplain impacts to the unnamed tributary of the Red Cedar River and its flood plains crossing the freeway south of Mt. Hope Road Addition of a noise wall between Jolly and Dunckel Additionally, tree removals will be required CSXT & CN Railroad ROW acquisition (easements) Drainage easement for retention Significant utility impacts are anticipated: Relocation of Consumers Energy 46Kv line; an in-depth review of the East Lansing waste water plant will be needed; AT&T, Comcast, Consumers, METC, etc. will all be reviewed in-depth Realignment of bridges within the I-496/US-127/Trowbridge interchange will require ROW acquisition (easements) from the CSXT & CN Railroads Anticipate 2 to 3 years of coordination after Preliminary Plans are developed Page 2-21

24 The findings of this study are considered conceptual and not final. Please note that a preferred alternative(s) has not been selected to date. Advancing specific alternative recommendations may require development of an environmental study and the appropriate environmental clearance approval. Additional examination of the proposed alternatives may be required throughout the environmental review process and design phase. To implement the proposed improvements identified in this study, some combination of available federal, state and local public and private funding sources would need to be leveraged when funding becomes available and construction schedules are determined. Page 2-22

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc.

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc. Active Traffic Management in Michigan Patrick Johnson, P.E. HNTB Michigan Inc. Active Traffic Management (ATM) Active Traffic Management Strategies: Dynamic Lane Use Dynamic Shoulder Use Queue Warning

More information

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0 SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 5-1 July 2015 501.1 General... 5-1 501.2 Interchange Type... 5-1 501.2.1 General... 5-1 502 Interchange Design Considerations... 5-2 502.1

More information

MEMORANDUM: INITIAL CONCEPTS SUMMARY

MEMORANDUM: INITIAL CONCEPTS SUMMARY MEMORANDUM: INITIAL CONCEPTS SUMMARY INTRODUCTION This memo presents a summary of initial concepts that have been identified as development of the project study has progressed, along with a recommendations

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

I-65/I-70 North Split Project

I-65/I-70 North Split Project I-65/I-70 North Split Project Public Open House October 10, 2018 Alternatives Development Process Define Problems Identify Context Gather Input Define Alternatives Balance Trade-Offs Select Alternative

More information

Community Advisory Committee Meeting No. 2. June 22, 2006

Community Advisory Committee Meeting No. 2. June 22, 2006 Community Advisory Committee Meeting No. 2 June 22, 2006 Introductions The Study Team KDOT Wichita Partners Consultants CAC members Overview Today s Agenda Opinion Survey Study Status Starting Concept

More information

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015 WELCOME Public Meeting for I-35 / I-44 Interchange October 6, 2015 TEAM INTRODUCTIONS PURPOSE OF THIS MEETING is to present the alternative alignments for the I-35/I-44 and I-35/NE 63rd Street Interchanges

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 1 501.1 General... 1 501.2 Interchange Type... 1 501.2.1 General... 1 502 Interchange Design Considerations... 2 502.1 Determination of

More information

I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge

I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge Client: AJR or IJR? This is a TO-MAY-TO This is a TO-MAH-TO Practical Design PRACTICAL

More information

Diverging Diamond Interchanges in Michigan

Diverging Diamond Interchanges in Michigan 2015 MDOT / ACEC Partnering Workshop Diverging Diamond Interchanges in Michigan Lori Swanson MDOT Oakland TSC John Katers OHM Advisors Chris Van Norwick MDOT Grand Region Rob Leppala TranSystems Topics

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

I-65/I-70 North Split Project. Alternatives Screening Report CAC Meeting October 9, 2018

I-65/I-70 North Split Project. Alternatives Screening Report CAC Meeting October 9, 2018 I-65/I-70 North Split Project Alternatives Screening Report CAC Meeting October 9, 2018 Alternatives Development Process Define Problems Identify Context Gather Input Define Alternatives Balance Trade-Offs

More information

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV Noise Technical Report 2015 Addendum NOISE TECHNICAL REPORT 2015 Addendum PREPARED FOR: Federal Highway Administration and Georgia Department of Transportation PREPARED BY: Parsons Brinckerhoff Project

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

9.0 I-26 & I-526 Interchange Improvements

9.0 I-26 & I-526 Interchange Improvements 9.0 I-26 & I-526 Interchange Improvements The I-26 & I-526 System-to-System interchange currently consists of a combination of directional and loop ramps providing for all movements from one Interstate

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 CHAPTER 1: INTRODUCTION... 5 1.1 Study Purpose and background... 5 1.2 Study Approach... 6 1.3 Study Area... 6 CHAPTER 2: DESCRIPTIONS OF ALTERNATIVES... 7 2.1

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information

M D 355 [FR E D E R IC K R O A D] OVER

M D 355 [FR E D E R IC K R O A D] OVER M D 355 [FR E D E R IC K R O A D] OVER LITTLE BENNETT CREEK MAINTENANCE OF TRAFFIC ALTERNATIVE ANA LYSIS Prepared by: INTRODUCTION The purpose of this report is to present the results of traffic analyses

More information

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT February 2016 INTERSTATE 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION PROJECT Commonwealth of Virginia Virginia

More information

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR : Douglas Avenue to NW 86 th Street FOR Iowa Department of Transportation City of Urbandale City of Grimes February 7, 2013 FINAL Prepared by: HR Green, Inc. HR Green Project Number: 40110031 TABLE OF

More information

Performance Based Practical Design (PBPD)

Performance Based Practical Design (PBPD) Performance Based Practical Design (PBPD) 2016 ODOT D08 LPA Day John R. Kasich, Ohio Governor Jerry Wray, ODOT Director PBPD PBPD Presenter Katherine DeStefano, P. E. District 08 Design Engineer ODOT D08

More information

GRE PID 80468

GRE PID 80468 Assessment of Feasible Alternatives Prepared for Ohio Department of Transportation 505 South SR 741 Lebanon, OH 45036-9518 December 2011 One Dayton Centre, Suite 1100 One South Main Street Dayton, OH 45402

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),

More information

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT District 2 1109 South Marion Avenue Lake City, FL 32025-5874 INTERSTATE 10 (SR 8) / SR

More information

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 TRANSPORTATION INTERSTATE 87 INTERCHANGE 11A TOWN OF MALTA SARATOGA COUNTY, NY DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 PROJECT REPORT NEW YORK STATE DEPARTMENT OF TRANSPORTATION JOSEPH

More information

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018 Project Prioritization for Urban and Rural Projects 2018 TEAM CONFERENCE March 7, 2018 Challenge Limited funding for transportation improvements requires strategic selection of projects to ensure resource

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update

I-64 Capacity Improvements Segment I Financial Plan Annual Update I-64 Capacity Improvements Segment I December 1, 2016 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479), NHA-064-3(479) UPC 104905

More information

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

DRAFT AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida

More information

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT 6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT Project Location The 6 th Street Viaduct (Bridge No. 53C-1880) and Sixth Street Overcrossing (Bridge No. 53-0595) comprise a single structure, which spans

More information

TABLE OF CONTENTS. Manual Section. Introduction 1. Using This Manual 2-3. Administrative Actions 4-6. Road and Bridge Project Types 7

TABLE OF CONTENTS. Manual Section. Introduction 1. Using This Manual 2-3. Administrative Actions 4-6. Road and Bridge Project Types 7 ii TABLE OF CONTENTS Manual Section Pages Introduction 1 Using This Manual 2-3 Administrative Actions 4-6 Road and Bridge Project Types 7 Road and Bridge Funding Programs 8-9 Project Planning and Eligible

More information

175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS

175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS 175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS June 2012 Prepared by: Public Works Department City of Overland Park, KS EXECUTIVE SUMMARY... 2 INTRODUCTION...

More information

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida November 7, 2014 SUBMITTED BY: Dewberry Bowyer-Singleton 520 South

More information

CHAPTER 18 TEMPORARY ROADS AND BRIDGES

CHAPTER 18 TEMPORARY ROADS AND BRIDGES Change #1 - Revised 12/12 CHAPTER 18 TEMPORARY ROADS AND BRIDGES 18.0 INTRODUCTION These guidelines are to be used to design temporary roads and bridges where traffic will be maintained at the construction

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA PUBLIC OFFICIALS MEETING MAY 11, 2016 AGENDA I. INTRODUCTIONS V. CURRENT PROJECT STATUS VI. PROJECT SCHEDULE VII. UPCOMING ACTIVITIES VOPEN DISCUSSION & QUESTIONS IX. ACTION ITEMS 1 A. Bridge Lighting

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

Transportation Connectivity, Accessibility and Economic Opportunity Study

Transportation Connectivity, Accessibility and Economic Opportunity Study COMMERCE CORRIDOR Transportation Connectivity, Accessibility and Economic Opportunity Study Richmond Regional Transportation Planning Organization Citizens Transportation Advisory Committee 9/15/2016 Photo:

More information

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD To: Steve Gramm, SDDOT Memo From: HDR Project: SDDOT I-190 Silver Street Interchange Study Rapid City, SD HDR Project No. 000000000137390 Date: December 27, 2011 RE: Replacement of Existing I-190 Twin

More information

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report s Evaluation Report Appendix C s Evaluation Report I-35W North Corridor Project EA Minnesota Department of Transportation Final Project s Report I-35W North Corridor Preliminary Design Project Report Version

More information

Environmental Consequences and Mitigation

Environmental Consequences and Mitigation Chapter 4 Environmental Consequences and Mitigation 4.1 Introduction This chapter provides a detailed description of the impacts (and indirect impacts where applicable) associated with the alternatives

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI) 2013 ITE Western District Annual Meeting COCEPT DEVELOPMET, AALYSIS, AD DESIG OF A EW PARKWAY AT GRADE ITERSECTIO (PAGI) Lead Author: James M. Witkowski, PhD Supporting Author: Darrell Truitt, PE The Pima

More information

NJTPA Transportation Improvement Program Fiscal Years

NJTPA Transportation Improvement Program Fiscal Years Routes Name: CR 571 Mileposts: 4.85 DBNUM: N1127 County Route 571/County Route 527, Reconstruction, Toms River Township This project is for intersection improvements at CR 571 and CR 527 in Tom s River

More information

Alternatives Development Report. Twin Ports Interchange Reconstruction Project

Alternatives Development Report. Twin Ports Interchange Reconstruction Project Alternatives Development Report Twin Ports Interchange Reconstruction Project SP 6982-322 and SP 6980-60 City of Duluth St. Louis County, Minnesota Prepared for: Minnesota Department of Transportation

More information

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange Jeromy Grenard, PE, PTOE American Structurepoint Hardik Shah, PE, PTOE American Structurepoint Roundabouts

More information

Chapter URBAN & RURAL FREEWAY DESIGN

Chapter URBAN & RURAL FREEWAY DESIGN Chapter 5 URBAN & RURAL FREEWAY DESIGN 5.1 INTRODUCTION This chapter provides standards and guidance for urban and rural freeways on new construction/reconstruction projects. The chapter also provides

More information

PERFORMANCE BASED PRACTICAL DESIGN

PERFORMANCE BASED PRACTICAL DESIGN PERFORMANCE BASED PRACTICAL DESIGN DOT S FACE INCREASING CHALLENGES ENGINEERING CULTURE We learned from those who taught us how and why we follow the standards There are valid reasons that tell us we now

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

NEPA and Design Public Hearings

NEPA and Design Public Hearings NEPA and Design Public Hearings Monday, December 5, 2016 Washington-Lee High School 1301 N. Stafford Street Arlington, VA 22201 Thursday, December 8, 2016 Mary Ellen Henderson Middle School 7130 Leesburg

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

Informational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island

Informational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island Informational Brochure Proposed Interchange OF Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island October 5, 2016 Department of Transportation Two Capitol

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form

More information

ITEM 8 Action May 17, 2017

ITEM 8 Action May 17, 2017 ITEM 8 Action May 17, 2017 Approval of Maryland Department of Transportation (MDOT) Additional Project Submission for the Out-Of-Cycle Air Quality Conformity Analysis for the Amendment to the 2016 CLRP

More information

South Dakota Interstate Corridor Study. Phase I Summary Report

South Dakota Interstate Corridor Study. Phase I Summary Report South Dakota Interstate Corridor Study Phase I Summary Report December 2000 Prepared for: South Dakota Department of Transportation 700 East Broadway Avenue Pierre, South Dakota 57501-2586 Prepared by:

More information

TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1

TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1 TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1 FLORIDA S TURNPIKE ENTERPRISE PRODUCTION DESIGN DEPARTMENT OCOEE, FL June 2016 January 3, 2017 Addendum #2 The following are changes,

More information

2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM 2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM A. District: 1 2 3 4 5 6 7 TPK C.O. B. Nomination Category: (Select only one category) Outstanding Major Project

More information

VIII. LAND USE ISSUES

VIII. LAND USE ISSUES VIII. LAND USE ISSUES The & Route 57 Land Use and Circulation Study (Land Use Study, Figure 6) was completed for the Town of Clay in November 1999 (Clough, Harbour & Associates). This study investigated

More information

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. Located in the heart of South Carolina, the I-20/26/126 Corridor is the crossroads of the state

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

Berkshire Region TIP Project Data Form

Berkshire Region TIP Project Data Form BASIC INFORMATION: 1. TIP ID #: 2. MUNICIPALITY: 3. ROUTE# AND/OR NAME: Berkshire Region TIP Project Data Form 4. PROJECT TYPE (CHECK BEST DEFINITION OF PROJECT): Intersection Improvement Road Resurfacing

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

Zoo Interchange Reconstruction

Zoo Interchange Reconstruction May 14, 2013 Roberto Gutierrez, PE WisDOT Chris Hager, PE - WisDOT Zoo Interchange Reconstruction Overview of Presentation overview WisDOT Southeast Region I-94 North-South I794/I-94 restriping Hoan bridge

More information

Lehigh Valley Transportation Study

Lehigh Valley Transportation Study ITEM: IV-A Lehigh Valley Transportation Study SUBJECT: PA 33 Preservation SR 22-Belfast COUNTY... Northampton FED.-AID SYSTEM... On-NHS S.R./SEC.... 33/07M DECADE OF INVESTMENT... No A.D.T.... 25,463 CAPITAL

More information

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) 10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents

More information

Table of Contents TOC. General Information. Street Classifications. Geometric Design Criteria

Table of Contents TOC. General Information. Street Classifications. Geometric Design Criteria Design Manual Chapter 5 - Roadway Design Table of Contents TOC Table of Contents Chapter 5 - Roadway Design 5A General Information 5A-1---------------------------------General Information A. Concept.....

More information

Conclusions & Lessons Learned

Conclusions & Lessons Learned What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County

More information

Chapter GRADE SEPARATIONS & INTERCHANGES

Chapter GRADE SEPARATIONS & INTERCHANGES Chapter 9 GRADE SEPARATIONS & INTERCHANGES 2012 ODOT Highway Design Manual Grade Separations And Interchanges 9.1 GENERAL INFORMATION There are three types of roadway intersections: intersections at-grade,

More information

100 Design Controls and Exceptions

100 Design Controls and Exceptions 100 Design Controls and Exceptions Table of Contents 100 Introduction... 1 101 Functional Classification... 1 101.1 General... 1 101.2 Urban & Rural... 1 101.3 Classification Used In ODOT Design Criteria...

More information

Appendix C. Wetland Impact Assessment and Two-Part Finding. I-94 St. Michael to Albertville Minnesota Department of Transportation

Appendix C. Wetland Impact Assessment and Two-Part Finding. I-94 St. Michael to Albertville Minnesota Department of Transportation Appendix C Wetland Impact Assessment and Two-Part Finding I-94 St. Michael to Albertville Minnesota Department of Transportation Office of Environmental Stewardship 395 John Ireland Blvd. St. Paul, MN

More information

US-23 Flex Route First Active Traffic Management (ATM) System in Michigan

US-23 Flex Route First Active Traffic Management (ATM) System in Michigan Jennifer Foley Michigan Department of Transportation, Jackson, Michigan 49201 United States of America Karianne Steffen, P.E. PTOE HNTB Michigan, Inc. 3100 West Road Building 2, Suite 202 East Lansing,

More information

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report APPENDIX B Excerpts from the October 2002 Interstate 83 and PA Route 921 The objective for the SR 921 interchange site was to study alternatives for construction of a new interchange. There are no short-term

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

STREET IMPROVEMENTS (Refer to Title 18, chapter entitled "STREETS" of the Layton Municipal Code.)

STREET IMPROVEMENTS (Refer to Title 18, chapter entitled STREETS of the Layton Municipal Code.) STREET IMPROVEMENTS (Refer to Title 18, chapter 18.24 entitled "STREETS" of the Layton Municipal Code.) I. Street widths STREET TYPE (ALL MEASUREMENTS IN FEET) ROW WIDTH LAYTON CITY STANDARD STREET SECTIONS

More information

Webinar on: Concrete Overlay Design Details and Joints. Dale S. Harrington P.E. March 5, 2015

Webinar on: Concrete Overlay Design Details and Joints. Dale S. Harrington P.E. March 5, 2015 Webinar on: Concrete Overlay Design Details and Joints Dale S. Harrington P.E. March 5, 2015 System of Concrete Overlays Concrete Overlays Bonded Overlay System Unbonded Overlay System Concrete Pavements

More information

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS HPTER 5 PRLLEL PRKWY ORRIDOR IMPROVEMENTS nother key area within the Village West study area is the Parallel Parkway corridor. This chapter focuses on the segment of Parallel Parkway between 106 th Street

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VIII. ENGINEERING AND ENVIRONMENTAL EVALUATION INTERSECTION IMPROVEMENTS SOUTHERN For the southern end of the corridor, traffic volumes are expected to increase over existing levels. The Phase A Report

More information

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont)

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont) South Dakota Department of Transportation Interchange Modification Justification Report Interstate 90 Exit 44 (Bethlehem Road - Piedmont) February 28, 2014 Prepared By: SDDOT Office of Project Development

More information

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR July 12, 2002 A Paper Submitted for the AREMA Annual Conference by: Paul B. Satterly, P.E. HNTB CORPORATION 111 Monument Circle, Suite 1200 Indianapolis,

More information

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013 I-64 Peninsula Shoulder Usage Evaluation Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013 Briefing Purpose Evaluation Area / Existing Conditions Code and Policy Engineering Facts

More information

Truck Route Access Evaluation: Norfolk Southern Rail Terminal, Louisville, Site #1767

Truck Route Access Evaluation: Norfolk Southern Rail Terminal, Louisville, Site #1767 Transportation Kentucky Transportation Center Research Report University of Kentucky Year 1999 Truck Route Access Evaluation: Norfolk Southern Rail Terminal, Louisville, Site #1767 Lisa Aultman-Hall Kenneth

More information

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement 2 Purpose and Need 2.1 Study Area Interstate 81 (I-81) is relied upon for local and regional travel and interstate travel in the eastern United States. It extends 855 miles from Tennessee to New York at

More information

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5 MEMO TO: Timothy Nesbitt, P.E. DATE: August 26, 2002 FROM: SUBJECT: Sandy Wesch-Schulze, P.E., AICP IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives

More information

FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR

FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR PROJECT NO. WIP-599-1(102) CONTROL NO. D5SF2 APRIL 2010 Prepared for: New Mexico Department of Transportation Northern Design Bureau P.O. Box 1149

More information

State Highway 10A Improvements (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma)

State Highway 10A Improvements (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma) (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma) Open House January 31, 2017 Open House Purpose Explain purpose and need for SH-10A improvements

More information

2399 Pavement Surface Smoothness

2399 Pavement Surface Smoothness 2399 Pavement Surface Smoothness 2399.1 DESCRIPTION The final mainline and all other pavement surfaces where the posted vehicle speed is 30 mph [48 km/hr] or greater shall be measured using an Inertial

More information

Appendix B Highway 407 Interchange Review - Cochrane Street Area

Appendix B Highway 407 Interchange Review - Cochrane Street Area Appendix B Highway 407 Interchange Review - Cochrane Street Area AECOM 300 ater Street hitby, ON, Canada L1N 9J2 www.aecom.com Memorandum To Michael May, P.Eng., Town of hitby Page 1 CC Subject Greg Hardy,

More information

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award S.R. 0070, Section T20 Engineering District 12-0 ASHE National Project of the Year Award AMERICAN SOCIETY OF HIGHWAY ENGINEERS National Project of the Year Award OFFICIAL ENTRY FORM AWARD CATEGORY (Check

More information

PAVEMENT DESIGN MEMORANDUM

PAVEMENT DESIGN MEMORANDUM PAVEMENT DESIGN MEMORANDUM FOR SR 70 (15TH STREET EAST) ROUNDABOUT MANATEE COUNTY FINAL SUBMITTAL FPID 435090-1-52-01 PREPARED FOR: FLORIDA DEPT. OF TRANSPORTATION DISTRICT 1 FEBRUARY 16, 2018 PREPARED

More information