Procedure 3 Quotes and Contract Review

Size: px
Start display at page:

Download "Procedure 3 Quotes and Contract Review"

Transcription

1 Procedure 3 Quotes and Contract Review

2 Table of Contents 1 Definitions Quotes and Contract Review Process Flow Calculating Audit Day Requirements Process Flow Audit Duration Effective Number of Personnel Methodology for Determining Audit Duration Initial Assessments Surveillance Assessments Reassessment Assessments Temporary Sites Multisite Organisations Audit Times Calculating Sample Sizes Adding New Sites Combined/Integrated Systems Suspension, reduction, Withdrawal Amended Quotations Document Revision History Proc 03 / Issue 18 Page 1 of 12

3 1 Definitions Quotes and Contract Review Audit Duration-Audit duration for all types of audits is the effective time measured in auditor days required to carry out auditing activity. Auditor Day-The duration of an auditor day is normally 8 hours and may or may not include travel time or lunch depending upon local legislation. Effective Number of Personnel-The effective number of personnel consists of all full time personnel involved within the scope of certification including those working on each shift. Nonpermanent (seasonal, temporary, sub-contractors and contracted personnel) and part time personnel who will be present at the time of the audit shall be included in this number. Temporary Site-A temporary site is one set up by an organisation in order to person specific work or a service for a finite period of time and which will not become a permanent site. (e.g. a construction sites). Complexity Category (EMS, H&S only)- For EMS and H&S Systems, the provisions specified in this procedure are based on five primary complexity categories of the nature, number and gravity of environmental aspects or health and safety risks of an organisation that fundamentally affects the auditor time. Multisite Organisation- Multisite organisations are defined as organisations that have an identified central function (head/central office) at which certain activities are planned, controlled or managed and a network of local or branch offices at which such activities are fully or partially carried out. Audit of Integrated Management System- An audit of an organisation s management system against two or more sets of audit criteria/standards conducted at the same time. Integrated Management System- A single management system managing multiple aspects of organismal performance to meet the requirements of more than one management standard, at a given level of integration. A management system may range from a combined system adding separate management systems for each set of audit criteria/standard, to an Integrated Management System, sharing in single system documentation, management system elements, and responsibilities. Level of Integration- The level to which an organisation uses one single management system to manage multiple aspects of an organisational performance to meet the requirements of more than one management system standard. Integration relates to the management system being able to integrate documentation, appropriate management system elements and responsibilities in relation to two or more sets of audit criteria/standards. Proc 03 / Issue 18 Page 2 of 12

4 2 Quotes and Contract Review Process Flow Proc 03 / Issue 18 Page 3 of 12

5 3 Calculating Audit Day Requirements Process Flow 4 Audit Duration Audit duration for all types of audits includes on site time at a client s premises and time spent off-site carrying out planning, document review, interaction with client personnel and report writing. It is expected that the audit duration involved in the above processes should not typically reduce the total on-site audit duration to less than 80% of the time calculated shown in Doc 9, 14, 16, 26, 36 and 44 as applicable. This applies to the initial, surveillance and recertification audits. Where additional time is required for planning and/or report writing, this will not be justification for reducing on-site audit duration for any audit. If an organisation operates shifts, justification for and against auditing all shifts shall be detailed within the contract review. All justifications for additive and subtractive factors in relation to audit time shall be shown on the contract review form including adjustments made (Form 2 s). It is unlikely that the reduction of the audit duration would exceed 30% of the guidance times stated in Doc 9, 14, 26, 36 and 44 as applicable. A reduction is not permitted for AS 9100 or AS9120 time as specified in Doc 16. Proc 03 / Issue 18 Page 4 of 12

6 4.1 Effective Number of Personnel The effective number of personnel us used as a basis for the calculation of audit duration. Dependent upon the hours worked, part time personnel numbers may be reduced and converted into an equivalent number of full time personnel. Appropriate reduction should be made to the temporary unskilled personnel who may be employed in considerable numbers in some countries due to the low level of technology and automation. Appropriate reduction of number of personnel also should be made where significant proportion of staff carry out a similar function, for instance; transport, line work, assembly lines, etc. 4.2 Methodology for Determining Audit Duration The methodology used as a basis for the calculation of audit duration of an initial audit (Stage 1 & Stage 2) involves the interpretation of tables and figures within Documents 9, 14, 16, 26 and 36. A reduction is not permitted for AS 9100 or AS9120 time as specified in Doc 16. The QMS requirements identified in Doc 9 is based solely upon the effective number of personnel but does not provide for minimum or maximum duration. With regards to EMS, H&S and ISMS, the effective number of personnel within their respective docs (14, 26, 36) is also based on the complexity of the organisation and does not provide minimum or maximum duration. Where product or service realisation processes operate on a shift basis, the extent of auditing of each shift depends on the processes done on each shift, and the level of control of each shift that is demonstrated by the client. The organisation shall identify shift patterns within their application questionnaires and justification for or against auditing these shall be documented within the relevant Form 2. Auditing of shifts is mandatory within the Aerospace Scheme within the cycle as per Doc 16. Once the general starting point for auditor time has been established from the relevant scheme guidance table, the required time allocated to the audit shall be adjusted to account for the differences within the individual organisations Management System. Refer to the individual scheme documents for additional guidance (Doc 14, Doc 16, Doc 26, Doc 36, Doc 44) as some schemes have specific requirements for this process. Example factors requiring additional auditor time could be: Complicated logistics involving more than one building or location within the scope of the Management System; Staff speaking in more than one language or preventing individual auditors from working independently; High degree of regulation; Highly complex processes or relatively high number of unique activities; Processes involve a combination of hardware, software, process and service; Activities that require visit temporary sites to confirm the activities of the permanent sites whose Management System is subject to certification. Example factors requiring additional auditor time for EMS and H&S could be: Higher sensitivity of business compared to typical location for the industry sector; Views of interested parties; Indirect aspects and risks necessitating increase in auditor time; Proc 03 / Issue 18 Page 5 of 12

7 Additional or unusual environmental aspects or hazards or regulated conditions for the sector. Example factors permitting less auditor time could be: No/low risk product/processes; Prior knowledge of the organisation; Client preparedness for certification (already certified by another 3 rd party scheme); Processes involve a single general activity; Maturity of the Management System in place; Low complexity; High percentage of employees performing the same task. The time spent by any team member that is not assigned as an auditor (i.e. Technical Experts, Translators, Interpreters, Observers and Auditors-in-Training) shall not count in the established audit time and may require additional time to be added to the audit. The number of auditor days allocated shall not be reduced by planning longer hours per working day. Any additive or sub-tractive time shall be justified and document within the contract review document related to that scheme (Form 2 s). 4.3 Initial Assessments Audit duration involved in combined off-site activities (planning, document review, report writing etc) should not reduce the total on-site audit duration to less than 80% of the time calculated following the methodology as detailed above in section 4.2. Where additional time is required for planning and/or report writing, this will not be justification for reducing on-site audit duration. Certification audit duration may include remote auditing techniques such as interactive webbased collaboration; web meetings, teleconferences and/or electronic verification of the client s processes. IMS do not currently perform remote auditing techniques, if we should in the future then these must be performed in accordance with IAF MD Surveillance Assessments The total amount of time spent annually on surveillance visits should be 1/3 of the time spent on the initial certification audit rounded up to the nearest 0.25 days. The day allocation shall be reviewed each year during the audits to ascertain changes in the business including personnel numbers. The audit plans and contracts stipulate that clients are to inform us of any changes. 4.5 Reassessment Assessments The total amount of time spent on reassessments should be 2/3 of the time that would be required for an initial certification audit rounded up to the nearest 0.25 days. Proc 03 / Issue 18 Page 6 of 12

8 A full review is completed prior to the reassessment using a triennial review form (Form 34). A review of the employee numbers, performance and changes over the surveillance cycle shall be performed and the reassessment days calculated from that review. A new quotation shall be issued at this point. If after a full surveillance cycle an individualised surveillance and recertification programme may be designed for the client. If this option is chosen the cycle will follow the requirements of IAF MD3 for Advanced Surveillance and Recertification Procedures. 4.6 Temporary Sites In situations where the certification applicant or certified client provides their products or services at temporary sites, such sites shall be incorporated into the audit programme. Temporary sites could range from major project management sites to minor service/installation sites. The need to visit such sites and the extent of sampling should be based on an evaluation of the risks of the failure of the Management System to control product or service output. The sample of the sites selected should represent the range of the client s competency needs and service variations having given consideration to sizes and types of activities, and the various stages of projects in progress and associated impacts and risks. Organisations are asked about their temporary sites during their application process and shall be monitored during each assessment for changes. Justification for visiting sites shall be documented during the contract review stage within the relevant Form 2. Typically on-site audits of temporary sites would be performed. However, the following methods could be considered as alternatives to replace some on-site audits: Interviews or progress meetings with the client and/or its customer in person or by teleconference; Document review of temporary site activities; Remote access to electronic site(s) that contains records or other information that is relevant to the assessment of the management system and the temporary site(s); Use of video and teleconference and other technology that enables effective auditing to be conducted remotely. 5 Multisite Organisations Please note that any audits under the AS 9100, AS 9120 or AS 9110 scheme do not follow the below requirements for time allocation. For the number of sites to be audited under these schemes, please see the individual scheme document (Doc 16) for multisite procedures under those standards. The below guidance can be used to establish if conditions for multi-site can be met by the organisation. Multisite organisations are defined as organisations that have an identified central function (head/central office) at which certain activities are planned, controlled or managed and a network of local or branch offices at which such activities are fully or partially carried out. This can also include associated storage of raw materials, by-products, intermediate products, end products and waste material, and any equipment or infrastructure involved in the activities, whether or not fixed. Proc 03 / Issue 18 Page 7 of 12

9 Temporary sites are generally not considered multisite but may be subjected to auditing on a sample basis (such as construction). They may, however be included within the scope of registration but shall be identified as a temporary site within the certification documentation. Examples of possible multi-site organisations are: Organisations operating with franchises Manufacturing companies with a network of sales offices Service companies The processes at each site have to be substantially of the same kind and operating to similar methods and procedures. Where some sites conduct fewer processes than others, they may be eligible for inclusion providing that the sites conducting the most processes or critical processes are subject to a full audit. Organisations which conduct their business through linked processes in different locations are also eligible for sampling providing all other provisions are met. The sampling plan shall include at least one example of each process conducted by the organisation (e.g. fabrication of electronic components in one location, assembly of the same components-by the same company in several other locations). The organisation s management system shall be under a centrally controlled and administered plan and be subject to central management review. All additional sites shall be subject to internal audits and shall have been audited prior to IMS conducting the assessment. The organisation must be able to demonstrate its ability to collect and analyse data from all sites including the central office. Any client wishing to apply under the multisite scheme shall be reviewed using the contract review form (Form 2 s) and details of each location recorded including the scope of activities at each site, size of each site, variations and number of temporary sites as applicable. The time required at each site no matter what standard (AS9100, 9001, etc) will be calculated individually. The time allocation will be based on individual site employees and not the overall number of employees. For example if the organisation has four sites, Head office with 40, site 1 with 10, site 2 with 20 and site 3 with 15. The audit time allocated to each site for 9001 would be as follows: Head office - 4 days, Site 1-2 days, Site 2-3 days and Site days. You can then apply the multisite requirements, completing the allotted days for each site. 5.1 Audit Times The number of mandays per site will be calculated utilising Doc 9, 14, 16, 26, 36 and/or 44 as applicable. Reductions can be applied to take into account the clauses that are not relevant to the central office and/or local sites. Reasons for the justification shall be recorded on the contract review form (Form 2 s). Proc 03 / Issue 18 Page 8 of 12

10 The total time expended on initial assessment and surveillance visits is the total sum of the time spent on each site plus the central office and shouldn t be less than that which would have been calculated for the size and complexity of the operation if all the work had been undertaken at a single site. 5.2 Calculating Sample Sizes At least 25% of the sample size shall be taken at random. Site selection may include the following aspects: Results of internal audits and management reviews Results of previous external audits Records of complaints Significant variations, variations in shift patterns Complexity of the management system and processes Modifications since the last certification audit Maturity of the management system Environmental issues and extent of aspects and associated impacts Differences in culture, language or regulatory requirements Geographical dispersion The selection process does not need to be carried out at the start of the audit process and may be done after the central office has been completed. The central office shall be audited during the initial assessment and reassessment and at least annually as part of the surveillance cycle. Initial Assessment: The size of the sample should be the square root of the number of remote sites rounded to the upper whole number (Y= X). Surveillance visit: The size of the annual sample should be the square root of the number of remote sites with 0.6 as a coefficient rounded to the upper whole number (Y=0.6 X) Reassessment: The size of the sample should be the same as for an initial assessment. However, where the management system has proved to be effective over a period of three years, the size of the sample could be reduced by a factor of 0.8 rounded to the upper whole number (Y=0.8 X). Y=Required number of remote sites to be audited. X=Number of remote sites. If felt necessary due to the performance of the organisation the sample size should be increased. All justifications and calculations will be recorded on the contract review form (Form 2 s). 5.3 Adding New Sites Any new site added to an already existing network of multi-site organisation shall be considered independent for the determination of the sample size (if multiple new sites). An Proc 03 / Issue 18 Page 9 of 12

11 audit questionnaire (form 1, 1A, 1B, 1C, 1D, 1E as applicable) shall be completed by the multisite organisation and a contract review (Form 2 s) carried out to determine the time required to include the new site. After inclusion, the new sites should be cumulated to the previous ones for determining the sample size for future surveillance and recertification audits. 6 Combined/Integrated Systems If an organisation applies for a combined system certification scheme (for example, IS and ISO 14001), the time required to perform the audit can be reduced depending on the level of integration and the ability of the auditors to perform a combined systems audit. The Combined Audit Contract Evaluation (Form 64) shall be used in conjunction with the Contract Review Form (Form 2 s) and Table 1 below. Calculation for Reduction due to Integration Table Level of Integration % Ability to Perform Combined Audit % To determine the audit time required for a combined audit covering two or more management system standards, e.g. ISO ISO OHSAS 18001, the contract review personnel shall calculate the required audit time for each management system standard separately (applying all relevant factors provided as per the contract review form (Form 2 s). The starting point for the duration of the combined audit shall be calculated utilising the combined audit contract evaluation (Form 64) and recorded in the top section of the form. Proc 03 / Issue 18 Page 10 of 12

12 The combined day allocation can be adjusted taking into account factors that may increase ore reduce the time required for the audit. Factors for reduction shall include but are not limited to: The extent to which the organisations management system is integrated; The ability of the organisations personnel to respond to questions concerning more than one management systems standard; The availability of auditor(s) competent to audit more than one management system standard/specification Factors for increases include but are not limited to: The complexity of the audit of an IMS compared with single management system audits. The client shall be contacted to determine the level of integration applicable to the organisation and section 2 of form 64 shall be completed. After Form 64 has been completed, the contract review form can be finalised with the allowable reductions stated. It is unlikely that the sum of all adjustments made for a given organisation, considering all factors, would reduce the time required for a combined audit by more than 20% from the starting point figure. For ISMS assessments that are combined with other standards, the ISMS audit report shall be completed as well as the standard audit report. During a stage 1 audit, the audit team shall confirm the level of integration of the IMS. The Certification Body shall review and modify, as necessary, the audit duration that was based on information provided in the application stage. The level of integration shall be reviewed during each assessment and reported upon within the relevant audit report. Should there be a level of integration change, a contract review shall be performed to ascertain any impact on the day allocations. 6.1 Suspension, reduction, Withdrawal If certification to one or more management system standard(s)/specification(s) is subject to suspension, reduction or withdrawal, a review shall be performed to investigate the impact of this on the certification to other management system standard(s)/specification(s). This shall be performed as per procedure 9. 7 Amended Quotations If an organisation chooses part of a quotation and not all the items quoted then a contract review is required to take place prior to commencing any certification activities. A new quotation may be required if the contract review process has an effect on the resources allocated. An example of this situation may be that IMS have quoted for the transfer of an organisations ISO 9001 certification and then to include ISO 14001, OHSAS or AS9100 as a new certification. The client may decide to not transfer their 9001 and just have ISO 14001, OHSAS Proc 03 / Issue 18 Page 11 of 12

13 18001 or AS9100 with IMS. The original contract review may have taken into consideration their ISO 9001 certification as justification for reducing the allocated time for ISO 14001, OHSAS or AS9100. Therefore a new contract review will need to be completed to ensure that sufficient resources have been allocated to the ISO 14001, OHSAS or AS9100 certification audits. If the change has affected the resources, a new quotation shall be issued to the client for acceptance. If the change has not affected the allocated resources; the contract review form shall show this decision. 8 Document Revision History Date Amendment Revision 18 th June 2014 Added this revision Box 17 Removed reference to TickIT Included requirements for ISMS Added the Addition and reduction factors information Amended the responsibilities within process flowcharts to be in line with current organizational structure (Operations Manager instead of Assessment Manager) Updated combined audits process to include ISMS requirements Introduced Cover Page from IMS standard Template Included Definitions Revised the requirements in line with IAF MD5: th May 2015 Included reference to Form 1E which is used by SIMS and also HSPM applications Made reference to Doc 44-HSPM scheme document Removed reference to Form 6 for transfers and form 1A and 1C as not used anymore, form 1 been modified to accommodate the same information Removed reference to quote log in flowchart as not used anymore Allowed contracts to be in place instead of quotations, mainly for the purpose of operating in China Changed responsibility for quotes from General Manager to Business Development Manager 18 Proc 03 / Issue 18 Page 12 of 12

Section No.: PM 22 Issue No. 01 Issue Date Page 1 of 9 Rev. No. 03 Rev. Date: Procedure for Audit of a Multi-site Organization

Section No.: PM 22 Issue No. 01 Issue Date Page 1 of 9 Rev. No. 03 Rev. Date: Procedure for Audit of a Multi-site Organization Page 1 of 9 Rev. No. 03 Rev. Date: 01-10-2016 1.0. Purpose: To document, establish, implement and maintain the system for conducting the audit of a multi -site organization, in accordance with requirements

More information

ASSESSMENT AND CERTIFICATION OF SHIP RECYCLING MANAGEMENT SYSTEMS

ASSESSMENT AND CERTIFICATION OF SHIP RECYCLING MANAGEMENT SYSTEMS Page 1/10 1 SCOPE AND FIELD OF APPLICATION This document defines the methods for the auditing, certification, periodic surveillance and recertification of Ship recycling Management Systems compliant with

More information

IAF Mandatory Document. for the Audit and Certification of a Management System Operated by a Multi-Site Organization (IAF MD 1:2018)

IAF Mandatory Document. for the Audit and Certification of a Management System Operated by a Multi-Site Organization (IAF MD 1:2018) IAF Mandatory Document IAF Mandatory Document for the Audit and Certification of a Management System Operated by a Multi-Site Organization Issue 2 (IAF MD 1:2018) Issued: 29 January 2018 Application Date:

More information

Procedure 14 Internal Audits

Procedure 14 Internal Audits Procedure 14 Internal Audits Table of Contents 1 Introduction... 2 2 Audit Planning... 2 2.1 Head Office... 2 2.2 Critical Locations... 3 3 Conducting the Audit... 3 4 Non-conformances... 3 5 Client file

More information

IAF Mandatory Document

IAF Mandatory Document IAF-MD 11:2013 IAF Mandatory Document IAF MANDATORY DOCUMENT FOR THE APPLICATION OF ISO/IEC 17021 FOR AUDITS OF INTEGRATED MANAGEMENT SYSTEMS (IAF MD 11: 2013) Page 2 of 12 The (IAF) details criteria for

More information

IAF Mandatory Document IAF MANDATORY DOCUMENT FOR THE APPLICATION OF ISO/IEC FOR AUDITS OF INTEGRATED MANAGEMENT SYSTEMS

IAF Mandatory Document IAF MANDATORY DOCUMENT FOR THE APPLICATION OF ISO/IEC FOR AUDITS OF INTEGRATED MANAGEMENT SYSTEMS IAF Mandatory Document IAF MANDATORY DOCUMENT FOR THE APPLICATION OF ISO/IEC 17021-1 FOR AUDITS OF INTEGRATED MANAGEMENT SYSTEMS Issue 2 () Issued: 17 January 2019 Application Date: 17 January 2020 2019

More information

Procedures on Management System Certification

Procedures on Management System Certification 1. Purpose Procedure PR-005 describes the roles, responsibilities and processes in a certification body according to ISO 17021 involved in the certification of management systems (MS). The certification

More information

Procedure 11 Recruitment and Training

Procedure 11 Recruitment and Training Procedure 11 Recruitment and Training Table of Contents 1 Introduction... 2 2 Head Office Personnel... 2 3 Auditors and Technical Expert Recruitment... 4 3.1 Flowchart of Recruitment Process... 4 3.2 Auditors

More information

QP 02 Audit and Certification Procedure

QP 02 Audit and Certification Procedure 1. AUDIT PROGRAMME [9.1.1] The audit programme shall be conducted in stages within a 3-year certification cycle as follows; Initial audit: Two stage process Surveillance audit: Conducted in the first and

More information

Webinar audit time calculation 22 June 2015

Webinar audit time calculation 22 June 2015 Webinar audit time calculation 22 June 2015 Mission FSSC 22000 To be the world s leading, independent, GFSI recognized, ISO based food safety and quality management system for the entire food supply chain.

More information

PT. TÜV NORD Indonesia. CERTIFICATION PROCEDURE of ISO / HACCP

PT. TÜV NORD Indonesia. CERTIFICATION PROCEDURE of ISO / HACCP CERTIFICATION PROCEDURE of ISO 22000 / HACCP PT. TÜV NORD INDONESIA CERTIFICATION PROCEDURE of ISO 22000 /HACCP Document Number : PF-TNI-01 Revision Number : 02 Issued Date : 25 April 2017 Prepared by

More information

DANAK ACCREDITION REGULATION

DANAK ACCREDITION REGULATION to certification of Occupational Health and Safety Systems Page : 1/14 1. Application The accreditation regulation applies to all bodies which are or apply for accreditation to certification of Occupational

More information

IAQG Frequently Asked Questions (FAQs) 1 of 5

IAQG Frequently Asked Questions (FAQs) 1 of 5 Frequently Asked s (s) Issue: June 2012 1 2 3 9104-1 Frequently Asked s () Log 9104-1 clause 5.2.c and clause 6.4. What does "continuing" mean in both of these clauses? Does "continuing" mean the person

More information

Forest Management Systems Scheme (FMS Scheme) Australia and New Zealand

Forest Management Systems Scheme (FMS Scheme) Australia and New Zealand Joint Accreditation System of Australia and New Zealand Forest Management Systems Scheme (FMS Scheme) Australia and New Zealand Requirements for bodies providing audit and certification of Forest Management

More information

Human Services Scheme (HS Scheme)

Human Services Scheme (HS Scheme) Joint Accreditation System of Australia and New Zealand Human Services Scheme (HS Scheme) Part 1 - Common requirements for bodies certifying Human Services 9 September 2012 Authority to Issue Dr James

More information

IAF Mandatory Document. Application of ISO/IEC for the Certification of Occupational Health and Safety Management Systems (OH&SMS)

IAF Mandatory Document. Application of ISO/IEC for the Certification of Occupational Health and Safety Management Systems (OH&SMS) IAF Mandatory Document Application of ISO/IEC 17021-1 for the Certification of Occupational Health and Safety Management Systems (OH&SMS) Issue 1 (IAF MD 22:2018) Issue 1 Application of ISO/IEC 17021-1

More information

Procedure 4 Assessment Scheduling and Audit Team Appointment

Procedure 4 Assessment Scheduling and Audit Team Appointment Procedure 4 Assessment Scheduling and Audit Team Appointment Table of Contents 1 Assessment Scheduling and Audit Team Appointment Process Flow... 2 2 Initial Welcoming Letter and Obtaining Documentation...

More information

IQNet basic document BD 301

IQNet basic document BD 301 301BD-Integrated audits 2011-04-01 6 1 from 10 CONTENTS 1. Foreword 2. Definitions 3. Reference Documents 4. Audit Duration 5. Auditor Qualification Criteria Annex 1 Example of the integrated audit duration

More information

Frequently Asked Questions (FAQ) Log Revision: 20 Nov 2017

Frequently Asked Questions (FAQ) Log Revision: 20 Nov 2017 Applicable to 9104-001: Click here to go to the end of the log 1 2 9104-001 clause 5.2.c and clause 6.4. What does "continuing" mean in both of these clauses? Does "continuing" mean the person is currently

More information

Rules for Ship Recycling Management System Certification

Rules for Ship Recycling Management System Certification Rules for Ship Recycling Management System Certification Effective from July 1 st 2009 RINA Società per azioni Via Corsica, 12-16128 Genova - Italy Tel.: +39 01053851 - Fax: +39 0105351000 www.rina.org

More information

Auditee Guidelines Auditee Guidelines and Obligations IMS Reliance Limited

Auditee Guidelines Auditee Guidelines and Obligations IMS Reliance Limited Auditee Guidelines and Obligations IMS Reliance Limited Doc 07 / 21 Page 1 of 31 Table of Contents Auditee Guidelines and Obligations... 1 IMS Reliance Ltd... Error! Bookmark not defined. 1. Introduction...

More information

BINDT AUDIT PROCEDURE CONFORMITY ASSESSMENT AND CERTIFICATION/VERIFICATION OF MANAGEMENT SYSTEMS

BINDT AUDIT PROCEDURE CONFORMITY ASSESSMENT AND CERTIFICATION/VERIFICATION OF MANAGEMENT SYSTEMS Certification Services Division Midsummer House Riverside Way, Bedford Road Northampton, NN1 5NX United Kingdom Tel: +44(0)1604-438-300. E-mail: pcn@bindt.org CP14 ISSUE 6 DATED 1 st OCTOBER 2017 IMPLEMENTATION

More information

Document 07 Auditee Guidelines and Obligations

Document 07 Auditee Guidelines and Obligations Document 07 Auditee Guidelines and Obligations Table of Contents 1 Introduction... 3 1.1 Scope and Applicability... 3 1.2 Introduction to IMS International... 3 2 Quality Policy... 4 2.1 Organisational

More information

Policy on Witnessing Activities and Scope Management for Certification and Verification Bodies

Policy on Witnessing Activities and Scope Management for Certification and Verification Bodies Policy on Witnessing Activities and Scope Management for Certification and Verification Bodies PS22 1 Purpose In order to conform with ISO/IEC 17011 clause 7.4.5 and 7.9.2 and IAF MD17:2015, INAB shall

More information

Certification Procedure

Certification Procedure Perry Johnson Registrars, Inc. Quality Systems Certification Procedure PJR offers certification services to companies, which seek independent validation of their management systems. Certification to an

More information

Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19

Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19 SRI Quality System Registrar Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19 Booklet Version 171122 Revision Date QP 4.0 Pre-Audit Registration Procedures 15 11/07/15 QP 5.0 On-Site Audit Procedure

More information

YOUR CERTIFICATION PROCESS EXPLAINED

YOUR CERTIFICATION PROCESS EXPLAINED ISO 22000 FOOD SAFETY MANAGEMENT SYSTEMS FSSC 22000 FOOD SAFETY SYSTEM CERTIFICATION This document outlines the audit process for the above referenced standard. It outlines the stages to audit and gives

More information

Management System Manual International Compliance Group

Management System Manual International Compliance Group Granting, refusing, maintaining, renewing, suspending, restoring or withdrawing certification. Page 1-1 Initial certification audit General - ICG s auditing work is conducted in two stages: Stage 1 and

More information

OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS REQUIREMENTS WITH GUIDANCE FOR USE (ISO 45001:2018)

OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS REQUIREMENTS WITH GUIDANCE FOR USE (ISO 45001:2018) OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS REQUIREMENTS WITH GUIDANCE FOR USE (ISO 45001:2018) The International Organization for Standardization (ISO) is currently developing Occupational Health

More information

EA Procedure and Criteria. For the Evaluation of Conformity. Assessment Schemes by EA. Accreditation Body Members

EA Procedure and Criteria. For the Evaluation of Conformity. Assessment Schemes by EA. Accreditation Body Members Schemes by EA Accreditation Body Members Publication Reference EA-1/22 A: 2016 EA Procedure and Criteria For the Evaluation of Conformity Assessment Schemes by EA Accreditation Body Members PURPOSE This

More information

UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009)

UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009) CIS 11 Edition 1 September 2016 UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009) CIS 11 / Edition: 1 Page 1 of 7 Contents

More information

PART I REQUIREMENTS FOR ORGANIZATIONS THAT REQUIRE CERTIFICATION

PART I REQUIREMENTS FOR ORGANIZATIONS THAT REQUIRE CERTIFICATION FSSC 22000 Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART I REQUIREMENTS FOR ORGANIZATIONS THAT REQUIRE CERTIFICATION

More information

HKQAA Certification Guide

HKQAA Certification Guide HKQAA Guide Introduction Thank you for choosing HKQAA as your certification partner. In order to help your organization to go through the certification process as smoothly as possible, and to help HKQAA

More information

NVT QUALITY CERTIFICATION PVT. LTD.

NVT QUALITY CERTIFICATION PVT. LTD. NVT QUALITY CERTIFICATION PVT. LTD. CAP-1, EOIZ, Export Promotion Industrial Park, Near ITPL, Whitefield, Bangalore - 560 066, India TEL: +91-80-65343536 / 37 FAX: +91-80-28416767 E-MAIL: nvtqc@vsnl.com

More information

ISO Client Program and Audit Manual

ISO Client Program and Audit Manual 1 Great Western Registrar LLC ISO Client Program and Audit Manual Based on the requirements of ISO17021 and Associated ANAB Accreditation Rules 04/02/2018 Created and Approved by: Karey S. Yates, President/Owner

More information

BRC Global Standard for Food Safety Issue 8 F806: Audit Duration Calculator

BRC Global Standard for Food Safety Issue 8 F806: Audit Duration Calculator BRC Global Standard for Food Safety Issue 8 F806: Audit Duration Calculator Document Scope: This document is applicable to all audits associated with Issue 8 of the BRC Global Standard for Food Safety.

More information

FSC INTERNATIONAL STANDARD

FSC INTERNATIONAL STANDARD Forest Stewardship Council FSC INTERNATIONAL STANDARD Forest management evaluations addendum Forest certification reports FSC-STD-20-007a (V1-0) EN ACCREDITATION Title: Document reference code: Scope:

More information

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ Quality Manual Quality Manual Issue I Dated 8 th October 2012 Contents Page Section 1 - Introduction 2 Section 2 - Company Details 2 Section

More information

Sampling for Assessment

Sampling for Assessment Page of 4 208-0-6 Prepared by: Getnet Tsigemelak Position: Quality Manager Signature: Approved by: Araya Fesseha Position : Director General Signature: Contents: Page 0. Introduction.... Purpose and Scope...2

More information

Quality Safety Environment

Quality Safety Environment Transition Planning Guidance for ISO 9001:2015 and ISO 14001:2015 Compliance Australia Certification Services Procedures - MAN 32 Version Number - V01 Release Date - 2 nd November 2015 Approved by - Managing

More information

Rules for the certification of Occupational Health and Safety Management Systems

Rules for the certification of Occupational Health and Safety Management Systems Rules for the certification of Occupational Health and Safety Management Systems Effective from 1 st April 2018 RINA Via Corsica 12 16128 Genova - Italia tel +39 010 53851 fax +39 010 5351000 web site

More information

Accreditation Process Requirements

Accreditation Process Requirements SAAS Accreditation Process Requirements Work Instructions for Accreditation Auditors, Procedures 311 and 314 Social Accountability Accreditation Services, June 2010 Accreditation Process and Policies SAAS

More information

ISOQAR CLIENT COMPANY DETAILS FOR ISO 9001: 2008 STAGE 1 IN OFFICE VISITS at RPH Manufacturing Ltd

ISOQAR CLIENT COMPANY DETAILS FOR ISO 9001: 2008 STAGE 1 IN OFFICE VISITS at RPH Manufacturing Ltd ISOQAR CLIENT COMPANY DETAILS FOR ISO 9001: 2008 STAGE 1 IN OFFICE VISITS at RPH Manufacturing Ltd Certificate No: 9493 Expiry date: Visit No/Follow up: Accredited: Yes Guidelines Ref: EAC Code(s): 17m

More information

SPECIAL AUDITS WHAT, WHY AND HOW?

SPECIAL AUDITS WHAT, WHY AND HOW? SPECIAL AUDITS WHAT, WHY AND HOW? Mike McRandall and Don McFarland (NSF-ISR) Introductions: Mike McRandall NSF-ISR Business Unit Manager, Aerospace mmcrandall@nsf.org Don McFarland NSF-ISR Technical Scheme

More information

Table of Contents. Project Agreement Schedule 14

Table of Contents. Project Agreement Schedule 14 Table of Contents PART 1 DEFINITIONS... 3 PART 2 INTEGRATED MANAGEMENT SYSTEM REQUIREMENTS... 6 2.1. Introduction... 6 2.2. Overview... 6 2.2.1 Management System Requirements... 7 2.2.2 Certification...

More information

IAF Guidance on the Application of ISO/IEC Guide 66

IAF Guidance on the Application of ISO/IEC Guide 66 IAF GD 6:2003 In terna tion a l A ccred itation Forum,In c. IAF Guidance Document IAF Guidance on the Application of ISO/IEC Guide 66 General Requirements for Bodies Operating Assessment and Certification/registration

More information

FAQ 9101:2014 / 9101E

FAQ 9101:2014 / 9101E Rev. 4.0 20160927 Note 1: These FAQs correspond to 9101:2014 (9101E). Note 2: The item number corresponds with the order of submittal of the questions. This will support traceability. The questions and

More information

WHAT TO EXPECT ON YOUR FIRST PJR AUDIT PRESENTED BY: SHANNON CRADDOCK, PROGRAMS & ACCREDITATIONS MANAGER

WHAT TO EXPECT ON YOUR FIRST PJR AUDIT PRESENTED BY: SHANNON CRADDOCK, PROGRAMS & ACCREDITATIONS MANAGER WHAT TO EXPECT ON YOUR FIRST PJR AUDIT PRESENTED BY: SHANNON CRADDOCK, PROGRAMS & ACCREDITATIONS MANAGER TODAY S PRESENTATION WILL COVER: Quotation Stage Prior to the Stage 1 Stage 1 audit Stage 2 audit

More information

SPECIFIC PROVISIONS FOR THE ACCREDITATION OF VERIFICATION BODIES IN THE «GHG ETS» FIELD (Greenhouse Gas Emission Trading Scheme)

SPECIFIC PROVISIONS FOR THE ACCREDITATION OF VERIFICATION BODIES IN THE «GHG ETS» FIELD (Greenhouse Gas Emission Trading Scheme) BELAC 2-405 GHG ETS R2 2013 SPECIFIC PROVISIONS FOR THE ACCREDITATION OF VERIFICATION BODIES IN THE «GHG ETS» FIELD (Greenhouse Gas Emission Trading Scheme) The only valid versions of the documents of

More information

An EMS is a management tool to improve environmental performance by providing a systematic way of managing an organization s environmental affairs.

An EMS is a management tool to improve environmental performance by providing a systematic way of managing an organization s environmental affairs. ISO 14001 The ISO 14001 standard provides organizations with the framework for an effective environmental management system (EMS) focused on achieving their environmental and economic goals and objectives.

More information

For Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits

For Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits 1 2 3 4 5 6 SAAS Procedure 201A Accreditation Requirements 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 For Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits October

More information

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT FSC36 Safe Feed/Safe Food (www.safefeedsafefood.org) is a facility certification program for the American Feed Industry Association (www.afia.org) Version 7.0

More information

Audit Report AS/NZS ISO 9001:2008. RRW and Co Pty Ltd trading as National On Site Training

Audit Report AS/NZS ISO 9001:2008. RRW and Co Pty Ltd trading as National On Site Training Audit Report AS/NZS ISO 9001:2008 RRW and Co Pty Ltd trading as National On Site Training AUDIT D E T A I L S Invoice Reference Number Certificate Number Review Date/s Review Time Hours S13894 158 23 rd

More information

RULES FOR THE ISSUE OF THE CERTIFICATE OF COMPLIANCE OF THE SUSTAINABILITY OF BIOFUELS AND BIOLIQUIDS ACCORDING TO KZR INiG SYSTEM

RULES FOR THE ISSUE OF THE CERTIFICATE OF COMPLIANCE OF THE SUSTAINABILITY OF BIOFUELS AND BIOLIQUIDS ACCORDING TO KZR INiG SYSTEM RULES FOR THE ISSUE OF THE CERTIFICATE OF COMPLIANCE OF THE SUSTAINABILITY OF BIOFUELS AND BIOLIQUIDS ACCORDING TO KZR INiG SYSTEM In force as from 14/11/2016 RINA Poland Sp. z.o.o. Katowice Certification

More information

Auditing Requirements

Auditing Requirements Requirements for conformity assessment bodies that conduct certification audits of providers holding contracts with the Ministry of Health Disability Support Services, district health boards and/or the

More information

Microgeneration Installation Standard: MCS 001. MCS Contractor certification Scheme requirements Issue 3.0

Microgeneration Installation Standard: MCS 001. MCS Contractor certification Scheme requirements Issue 3.0 Microgeneration Installation Standard: MCS 001 MCS Contractor certification Scheme requirements Issue 3.0 This Microgeneration Installation Standard is the property of Department of Energy and Climate

More information

Audit Documentation Guidance

Audit Documentation Guidance The list below provides some additional detail into the expectations of audit document completion. These items represent some of PRI Registrar s expectations for a completed audit package. This list should

More information

PT. TÜV NORD Indonesia MANAGEMENT SYSTEM CERTIFICATION PROCEDURE

PT. TÜV NORD Indonesia MANAGEMENT SYSTEM CERTIFICATION PROCEDURE PT. TÜV NORD Indonesia MANAGEMENT SYSTEM CERTIFICATION PROCEDURE PT. TÜV NORD INDONESIA MANAGEMENT SYSTEM CERTIFICATION PROCEDURE Document Number : PMLF-TNI-02 Revision Number : 15 Issued Date : 2 Mei

More information

Regulations on the ZNU Group Certification (Multi-Site)

Regulations on the ZNU Group Certification (Multi-Site) Regulations on the ZNU Group Certification (Multi-Site) 1. General Information and Requirements 2. Procedure and Determination of the Audit Sample 3. Fees and Audit Costs 4. Certificates and Dealing with

More information

General Conditions for the Certification of Management System

General Conditions for the Certification of Management System General Conditions for the Certification of Management System The National Standards Authority of Ireland, Inc. (hereinafter referred to as NSAI) located at 20 Trafalgar Square Nashua, NH 03063 provides

More information

Microgeneration Installation Standard: MCS 001. MCS Contractor certification scheme requirements Issue 2.5

Microgeneration Installation Standard: MCS 001. MCS Contractor certification scheme requirements Issue 2.5 Microgeneration Installation Standard: MCS 001 MCS Contractor certification scheme requirements Issue 2.5 This Microgeneration Installation Standard is the property of Department of Energy and Climate

More information

EA Procedure and Criteria for the Evaluation of Conformity Assessment Schemes by EA Accreditation Body Members

EA Procedure and Criteria for the Evaluation of Conformity Assessment Schemes by EA Accreditation Body Members Publication Reference EA-1/22 A-AB: 2014 EA Procedure and Criteria for the Evaluation of Conformity Assessment Schemes by EA PURPOSE This document contains the procedure and criteria to be applied by EA

More information

Sampling for Assessment

Sampling for Assessment Page of 4 208-0-6 Prepared by: Getnet Tsigemelak Position: Quality Manager Signature: Approved by: Araya Fesseha Position : Director General Signature: Contents: Page 0. Introduction.... Purpose and Scope...2

More information

ISO 9001:2000 expires globally after November 12, 2010

ISO 9001:2000 expires globally after November 12, 2010 February 18, 2010 Attention NSF-ISR ISO 9001:2000 certified customers, This is a reminder that ISO 9001:2000 expires globally after November 12, 2010. Consistent with the initial transition arrangements

More information

OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM

OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM MS DOC 101b OHS Rev:01 (10/10/2011) GENERAL TERMS AND CONDITIONS FOR OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM CERTIFICATION In accordance with the OHSAS 18001:2007 standard 1 GENERAL TERMS AND

More information

GUIDANCE FOR CERTIFICATION OF MANAGEMENT SYSTEMS Date of Establish: October 12, 2007

GUIDANCE FOR CERTIFICATION OF MANAGEMENT SYSTEMS Date of Establish: October 12, 2007 Rev. No. 10 Date of Approval 2018.06.10 GUIDANCE FOR CERTIFICATION OF MANAGEMENT SYSTEMS Date of Establish: October 12, 2007 This Guidance is intended to provide guidelines as to details of the requirements

More information

Transition plan for Global Certification Pty Ltd ISO Bruce Smith

Transition plan for Global Certification Pty Ltd ISO Bruce Smith Transition plan for Global Certification Pty Ltd ISO 45001 Bruce Smith 1 New Standards in 2018 ISO 45001 was published in March 2018. Both JAS-ANZ and the IAF have a greed to a transition from OHSAS 18001:2007,

More information

Document 32 Auditor Handbook

Document 32 Auditor Handbook Document 32 Auditor Handbook Table of Contents 1 Introduction to IMS International... 3 2 Scope of Activities... 3 3 Definitions... 3 4 Quality Policy... 5 5 Environmental Policy... 6 6 Health and Safety

More information

COC-Section. Audit Checklist PEFC COC. material/products. Guidance to auditor(s):

COC-Section. Audit Checklist PEFC COC. material/products. Guidance to auditor(s): Guidance to auditor(s): This document is intended to provide structured assistance to conduct the audit. To fit that purpose it is related to the relevant standard clauses. It shall not be part of the

More information

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing Supplier: Phone: Prime Contact/Title: Sales Contact/Title: Address: Fax: e-mail address e-mail address Quality Contact/Title: e-mail address 1. Type of Business: a) Number of years in business? b) Company

More information

Policy on Witnessing Activities and Scope Management for Certification and Verification Bodies

Policy on Witnessing Activities and Scope Management for Certification and Verification Bodies Policy on Witnessing Activities and Scope Management for Certification and Verification Bodies PS22 1) Purpose In order to conform with ISO/IEC 17011 clause 7.5.6, INAB shall: ensure that appropriate mechanisms

More information

RULES FOR THE CONCESSION AND MAINTENANCE OF CHAIN OF CUSTODY CERTIFICATION OF FOREST BASED PRODUCTS (PEFC - CHAIN OF CUSTODY)

RULES FOR THE CONCESSION AND MAINTENANCE OF CHAIN OF CUSTODY CERTIFICATION OF FOREST BASED PRODUCTS (PEFC - CHAIN OF CUSTODY) RULES FOR THE CONCESSION AND MAINTENANCE OF CHAIN OF CUSTODY CERTIFICATION OF FOREST BASED PRODUCTS (PEFC - CHAIN OF CUSTODY) In force from 10/10/2016 RINA Via Corsica 12 16128 Genova - Italy tel +39 010

More information

APPLICATION for ISO Certification (All Standards) Contents

APPLICATION for ISO Certification (All Standards) Contents Section 1 APPLICATION for ISO Certification (All Standards) Contents General Information (Please complete this section for All standards) (Please complete ONLY the sections for the Standard(s) that you

More information

Sedex Members Ethical Audit (SMETA) Best Practice Guidance

Sedex Members Ethical Audit (SMETA) Best Practice Guidance Sedex Members Ethical Audit (SMETA) Best Practice Guidance (Version 2 July 2013 ) Sedex Members Ethical Audit (SMETA) Best Practice Guidance Supplement for Assessing Working Conditions for Employees of

More information

Annual Surveillance Audit Report

Annual Surveillance Audit Report Annual Surveillance Audit Report Organisation Name Jet-Set (EU) Ltd t/as Meadow Court Organisation Address Trenchard Park Gardens, Minehead Road, Norton Fitzwarren, Taunton, Somerset TA2 6NS Audit location(s),

More information

APPLICATION for ISO Certification (All Standards) Contents

APPLICATION for ISO Certification (All Standards) Contents Section 1 APPLICATION for ISO Certification (All Standards) Contents General Information (Please complete this section for All standards) (Please complete ONLY the sections for the Standard(s) that you

More information

Alaska Responsible Fisheries Management (RFM) Chain of Custody Standard Issue 2.4 November 2015

Alaska Responsible Fisheries Management (RFM) Chain of Custody Standard Issue 2.4 November 2015 Alaska Responsible Fisheries Management (RFM) Chain of Custody Standard Issue 2.4 November 2015 Alaska RFM Chain of Custody Standard, Issue 2.4 November 2015 1 Table of Contents Page Principles of the

More information

Quality Management System. Manual MASTER COPY

Quality Management System. Manual MASTER COPY Quality Management System Manual MASTER COPY Revisions: Date Summary Rev. July 2010 14 Oct 2010 28 Jan 2011 9 Feb 2011 9 June 2011 6 March 2012 11 July 2013 13 July 2017 Initial Draft Issued Minor changes

More information

FSC STANDARD. Chain of Custody Evaluations. Forest Stewardship Council FSC-STD V2-0 EN ACCREDITATION

FSC STANDARD. Chain of Custody Evaluations. Forest Stewardship Council FSC-STD V2-0 EN ACCREDITATION Forest Stewardship Council FSC STANDARD All rights reserved FSC International (FSC F000100) ACCREDITATION Title: Document reference code: Approval: FSC Board of Directors 03 July 2014 Contact for comments:

More information

LMS Certification Ltd. ISO 9001 and ISO Transition

LMS Certification Ltd. ISO 9001 and ISO Transition LMS Certification Ltd. ISO 9001 and ISO 14001 Transition Objective Section 1: presentation of LMS s interpretation of the high level structure of Annex SL; Section 2: To provide an overview of the changes

More information

AS9101 Revision E Understanding the Changes

AS9101 Revision E Understanding the Changes AS9101 Revision E Understanding the Changes Introduction Aviation, space and defense (ASD) organizations are highly regulated to ensure their products are safe and reliable, conform to statutory and regulatory

More information

LMS Certifications Pvt. Ltd. ISO 9001 and ISO Transition

LMS Certifications Pvt. Ltd. ISO 9001 and ISO Transition LMS Certifications Pvt. Ltd. ISO 9001 and ISO 14001 Transition Objective Section 1: presentation of LMS s interpretation of the high level structure of Annex SL; Section 2: To provide an overview of the

More information

AS&D Client Program and Audit Manual

AS&D Client Program and Audit Manual 1 Great Western Registrar LLC AS&D Client Program and Audit Manual Based on ISO 17021, AS9104, Associated ANAB Accreditation Rules & ICOP Resolutions 04/02/2018 Created and Approved by: Karey S. Yates,

More information

VERIFICATION OF THE LIFE CYCLE OF PRODUCTS OR SERVICES

VERIFICATION OF THE LIFE CYCLE OF PRODUCTS OR SERVICES VERIFICATION OF THE LIFE CYCLE OF PRODUCTS OR SERVICES 1 di 15 1. SCOPE AND OBJECTIVE This instruction defines the modality of verification of the LCA of products and services of an Organization, according

More information

ISO 22000:2018 Transition Workshop (Auditors)

ISO 22000:2018 Transition Workshop (Auditors) ISO 22000:2018 Transition Workshop (Auditors) What has changed? high level structure consistent with all MS standards risk approach different approach to understanding risk consistent with other MS standards

More information

Organisation Details:

Organisation Details: Organisation Details: Business Name Address Applicable Standard (s) ISO 45001: 2018 Audit Type Transition to ISO 45001:2018 GRS Reference Management contact: Total no of employee Risk Category High Medium

More information

Code of Practice for the TL 9000 Certification Process Release 8.0

Code of Practice for the TL 9000 Certification Process Release 8.0 Code of Practice for the TL 9000 Certification Process Release 8.0 This document is a product of the Oversight Work Group of the TIA Business Performance Community ( BPC ). It is subject to change by the

More information

CERTIFICATION COMMITTEE. EA/CC FAQs QUESTIONS ASKED AND ANSWERS GIVEN AT THE CERTIFICATION COMMITTEE MEETINGS FROM SEPTEMBER 2016 ONWARDS

CERTIFICATION COMMITTEE. EA/CC FAQs QUESTIONS ASKED AND ANSWERS GIVEN AT THE CERTIFICATION COMMITTEE MEETINGS FROM SEPTEMBER 2016 ONWARDS Version 05-10-2017 EA/CC FAQs QUESTIONS ASKED AND ANSWERS GIVEN AT THE MEETINGS FROM SEPTEMBER 2016 ONWARDS Contents 1. Questions relating to ISO/IEC 17021-1: 2015 Management Systems Certification 2. Questions

More information

SPECIFIC CONDITIONS OF ISO/TS CERTIFICATION SERVICES

SPECIFIC CONDITIONS OF ISO/TS CERTIFICATION SERVICES SPECIFIC CONDITIONS OF ISO/TS 16949 CERTIFICATION SERVICES 1. GENERAL 1.1 These specific terms and conditions of service (the Specific Conditions ) are governed by the General Conditions for Certification

More information

IAF Mandatory Document. Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries. Issue 2 IAF MD 12:2016

IAF Mandatory Document. Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries. Issue 2 IAF MD 12:2016 IAF Mandatory Document Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries Issue 2 IAF MD 12:2016 2016 Issue 2 Accreditation Assessment of Conformity Page 2 of

More information

BRC Global Standard for Consumer Products CP429: Position Statement BRC GS Unannounced audits

BRC Global Standard for Consumer Products CP429: Position Statement BRC GS Unannounced audits BRC Global Standard for Consumer Products CP429: Position Statement BRC GS Unannounced audits Document Scope Position Statement on Unannounced audits for the BRC Global Standard for Consumer Products.

More information

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME Copyright TUV SUD BABT 2017 A Certification Body of: Page 1 of 33 Contents AMENDMENT RECORD 3 0. INTRODUCTION 3 1. PRE-CONDITIONS TO SUPPORT PRODUCTION

More information

Chain of Custody Standard

Chain of Custody Standard FAO- BASED RESPONSIBLE FISHERIES MANAGEMENT (RFM) Chain of Custody Standard Issue 2.3 1 August 2013 Contents Page Principles of the Process 3 Definitions 4 Outline of the Certification Process 6 Chain

More information

SQF Fundamentals, Edition 1 First published May Introduction SQF Basic Fundamentals Primary Production

SQF Fundamentals, Edition 1 First published May Introduction SQF Basic Fundamentals Primary Production Introduction 2017 Food Marketing Institute (FMI). All rights reserved. First Printed May 1995 No portion of this document may be reproduced or used in any manner whatsoever without the express written

More information

Facilitating relationships that build businesses.

Facilitating relationships that build businesses. Facilitating relationships that build businesses. Services for professional procurement. Be better informed, make better decisions. Achilles Supply-Line Verify Scheme Rule Book Issue 2 March 2017 Page

More information

Guide to certification for the European Water Stewardship standard

Guide to certification for the European Water Stewardship standard Statiestraat 164 B-2600 Berchem-Antwerpen +32 3 287 37 60 +32 3 287 37 61 www.tuv-nord-integra.com info@tuv-nord-integra.com BE 0465 666 712 Guide to certification for the European Water Stewardship standard

More information

Environmental Management System Manual (EM-01) Revision No. : 2 Date : 1/6/2017. Revision History Sections Affected

Environmental Management System Manual (EM-01) Revision No. : 2 Date : 1/6/2017. Revision History Sections Affected ECS GROUNDWORK LTD Management (EM-01) Revision No. : 2 Date : 1/6/2017 Prepared by : Approved by : Stephen Roth (EMR) Martin Reynolds (Managing Director) Revision Date Description Revision History Sections

More information

EFR CERTIFICATION Standard Operating Procedure Management and Auditor Competency

EFR CERTIFICATION Standard Operating Procedure Management and Auditor Competency Page 1 of 21 1. OBJECTIVES 1.1 This document details the EFRC policy and procedure to select, evaluate and maintain auditor competency. 1.2 This procedure also outline the competency criteria in the logical

More information

ENVIRONMENTAL MANUAL Page 1 of 7. Section 4 - General Requirements of System (4.1)

ENVIRONMENTAL MANUAL Page 1 of 7. Section 4 - General Requirements of System (4.1) ENVIRONMENTAL MANUAL Page 1 of 7 Contents Section 1 - Introduction Section 2 - Company Details Section 3 - Scope of System Section 4 - General Requirements of System (4.1) 4.1 Interaction of the EMS 4.2

More information

GUIDE FOR MANAGEMENT SYSTEM AUDITORS COMPILING STAGE 1 AND STAGE 2 AUDIT REPORTS

GUIDE FOR MANAGEMENT SYSTEM AUDITORS COMPILING STAGE 1 AND STAGE 2 AUDIT REPORTS GUIDE FOR MANAGEMENT SYSTEM AUDITORS COMPILING STAGE 1 AND STAGE 2 AUDIT REPORTS TABLE OF CONTENTS 1. TABLE OF CONTENTS...1 2. GENERAL...2 3. DEFINITIONS...2 4. STAGE 1...3 5. STAGE 2...7 6. PERIODIC SURVEILLANCE

More information