Management of Embedded Technologies

Size: px
Start display at page:

Download "Management of Embedded Technologies"

Transcription

1 Management of Embedded Technologies

2 Version Date Change March 2015 First Draft April 2015 Second Draft IMPORTANT Disclaimer The information in this document is provided in good-faith and represents the opinion of Transpower New Zealand Limited, as the System Operator, at the date of publication. Transpower New Zealand Limited does not make any representations, warranties or undertakings either express or implied, about the accuracy or the completeness of the information provided. The act of making the information available does not constitute any representation, warranty or undertaking, either express or implied. This document does not, and is not intended to; create any legal obligation or duty on Transpower New Zealand Limited. To the extent permitted by law, no liability (whether in negligence or other tort, by contract, under statute or in equity) is accepted by Transpower New Zealand Limited by reason of, or in connection with, any statement made in this document or by any actual or purported reliance on it by any party. Transpower New Zealand Limited reserves all rights, in its absolute discretion, to alter any of the information provided in this document. Copyright The concepts and information contained in this document are the property of Transpower New Zealand Limited. Reproduction of this document in whole or in part without the written permission of Transpower New Zealand is prohibited. Contact Details Address: Transpower New Zealand Ltd 96 The Terrace PO Box 1021 Wellington New Zealand Telephone: Fax: system.operator@transpower.co.nz Website:

3 Purpose... 4 Introduction... 5 Background... 6 National Grid Frequency Deviation and Automatic Demand Disconnection, 27 May GB Industry Structure Relevant to the Events of 27 May National Grid s Role as GB System Operator (GBSO): Frequency Control and System Operating Margin... 6 Generators... 7 Distribution Network Operators... 7 NZ Industry Structure Relevant to Similar Events Today... 7 Transpower s Role as System Operator (SO): Principal Performance Obligations and Security of Supply Policy... 7 Generators... 8 HVDC owner... 9 Distributors... 9 Purchasers... 9 Risks to the NZ power system from embedded disruptive technologies Ability for the New Zealand framework to monitor and manage National Grid Event New Zealand New Zealand Experience Consequence of possible events Operability Frameworks National Grid: Future Electricity Scenarios & System Operability Framework UK RoCoF Regime for Distributed Generation Transpower: Annual Planning Report & System Security Forecast Need for change to existing frameworks Access to information Extended Reserves (AUFLS) Conclusion: Need For Ongoing Operational awareness

4 PURPOSE This paper explores whether, from an overall integrated power system at the system level, the structure of the New Zealand electricity industry is expected to support the prudent management of risks that may arise from the adoption of smart grid technologies. 4

5 INTRODUCTION The attention of Smart Grid Forum (SGF) members was drawn to the potential impact a large number of relatively small generation units, if not factored into power system security analysis, could have on overall power system stability and integrity. In his presentation to the Forum in February, John Scott, Director Chiltern Power, outlined two examples: the impact embedded generation had on UK power system during an underfrequency event in May ; and the changing reactive / active power ratio of Britain s load. While the latter is still under investigation in the UK John Scott considered the structural issues raised by both examples to be similar. 5 Subsequent discussion indicated that SFG members would like to know: how similar themes around risks to overall power system integrity due to distribution-embedded disruptive technologies would manifest themselves in New Zealand; likely consequences of such events; how existing institutions would monitor and control them; who would be accountable for mitigating them; what organisational support that entity would have; what authority would go with that accountability; and whether it would be adequate and effective. The following sections summarise salient points from the UK under-frequency event and prevailing GB and NZ industry structures, discusses issues raised by members about the NZ context, and identifies issues that we need to remain aware of as smart grid technologies are integrated into today s power system. 1 See pages of industries/energy/electricity/new- zealand- smart- grid- forum/meeting- 5/workstream- d- report- governance.pdf

6 BACKGROUND NATIONAL GRID FREQUENCY DEVIATION AND AUTOMATIC DEMAND DISCONNECTION, 27 MAY On 27 May 2008 the near simultaneous loss of four generators generating units totalling 1714MW resulted in a drop in system frequency to 49.15Hz. The frequency oscillated around this level for about 1.5 minute then fell to 49Hz when a further sharper drop to Hz occurred triggering the operation of automatic low frequency relays and the disconnection of 546MW of demand. The low frequency disconnection scheme operated as expected and the efficiency of the scheme did not come into question. Data from Distribution Network Operators (DNOs) indicated that during the frequency fall from 49.15Hz 279MW of embedded generation tripped 2. This event was the third incidence of frequency falling below 49.5Hz for 60 seconds since 1989/90 and the first operation of the National Low Frequency Demand Disconnection (LFDD) scheme since GB INDUSTRY STRUCTURE RELEVANT TO THE EVENTS OF 27 MAY 2008 The following outline of the GB industry structure is based on National Grid s description 3 of the industry framework relevant to the 27 May event and very limited review of the national Grid Code. National Grid, as GBSO, is responsible for the management of transmission network security and real time balancing of generation with demand. Any imbalance between generation and demand will result in frequency perturbations. National Grid manages the system frequency to the defined statutory limits of ±0.5Hz and operational limits of ± 0.2Hz. The GB Security and Quality of Supply Standard (GB SQSS) specifies the limit of frequency deviations for secured faults, which includes loss of a single generating unit or DC bi-pole as being: Normal Infeed Lost Risk (1000MW): Maximum deviation should not exceed 0.5Hz; and Infrequent Infeed Lost Risk (1320MW): Frequency should not deviate outside the range 49.5Hz to 50.5Hz for more than 60 seconds. The largest Infrequent Infeed Lost Risk is derived from the largest possible generation infeed loss on the transmission system that will result from a single secured event. For a generation losses larger than the Infrequent Infeed Lost Risk or a large generation deficit in an importing power island following a system split, the National Low Frequency Demand Disconnection (LFDD) scheme automatically disconnects demand. The LFDD 2 www2.nationalgrid.com/assets/0/745/746/3464/3466/3488/3475/745fc2ac-d57e-4df7-b619-4c68f2821e8d.pdf 3 www2.nationalgrid.com/assets/0/745/746/3464/3466/3488/3475/745fc2ac-d57e-4df7-b619-4c68f2821e8d.pdf

7 scheme facilitates the disconnection of 60% of load connected to the National Grid Transmission Area in nine blocks with trip frequencies ranging from 48.8Hz to 47.8Hz, and 40% of load connected to the Scottish Transmission Area (including Scottish Hydro) in six blocks with trip frequencies ranging from 48.6Hz to 48.0Hz. All transmission connected generation, and all registered (DNO connected) capacity of generation in: England and Wales >=50MW; Scottish Power Transmission Ltd region >=30MW; and Scottish Hydro- Electric Transmission Ltd region >=10MW, must maintain stable operation in the range 47.5Hz to 52Hz, and be able to operate for at least 20 seconds in the range 47Hz to 47.5Hz. 7 At the time, there was an expectation that all DNO connected, embedded generation below these values met the Engineering Recommendations (G75 or G59) to support stable operation in the range 47 or 48Hz to 52Hz, although the Recommendations were not mandatory. DNOs are required to maintain the requisite LFDD capability and procedures to implement manual demand control on instruction from the GBSO. NZ INDUSTRY STRUCTURE RELEVANT TO SIMILAR EVENTS TODAY The Electricity Industry Participation Code 2010 (Code), made and administered by the Electricity Authority (Authority) 4, specifies the Principal Performance Obligations (PPOs) of the SO. These obligations require the SO, as a reasonable and prudent operator 5, to: dispatch available assets (generation, transmission, demand, and ancillary services) in a manner that avoids cascade failure of assets resulting in the loss of demand; and but for momentary fluctuations, seek to maintain the frequency within the normal band (49.8Hz 50.2Hz). Frequency fluctuations should remain within 47Hz 52Hz and the incidence of fluctuations should not exceed specified quanta, the larger the quantum the less frequent the incidence, e.g. the incidence of frequency falling below 48Hz should not be more frequent than the statistical equivalent of once every five years. 4 In fulfilling this role the Authority may seek independent advice from the Security and Reliability Council (SRC) on the performance of the electricity system and reliability of supply issues. The SRC does not have the authority to commission analysis or to commit resources [but] may recommend resources, external to the Authority, the SRC considers to be necessary to perform its function. 5 Refer to the Code for a definition of this term

8 In its Policy Statement the SO sets out the policies and procedures it will employ to meet the PPOs and manage grid emergencies. One policy, the Security Policy 6, identifies the range of events (e.g. the loss of generation, the loss of one or both poles of the HVDC link) that may cause frequency deviations from the normal band. These events are classified into one of two categories: 8 contingent events, for which the impact and probability justify the procurement of ancillary services (principally instantaneous reserves) or the application of constraints in the scheduling and dispatch processes to maintain frequency above 48.0Hz and avoid demand shedding; and extended contingent events, for which the impact and probability do not justify the avoidance of demand shedding. Adequate instantaneous reserve is procured so that, in concert with automatic under-frequency load shedding (AUFLS) and the application of constraints in the scheduling and dispatch processes, frequency remains above 47Hz in the North Island and 45Hz in the South Island. For extended contingent events (e.g. the simultaneous loss of two large generating units, the loss of both poles of the HVDC link at times of high transfer) it is anticipated that the AUFLS scheme automatically disconnects demand. The AUFLS scheme facilitates the disconnection of 32% of either load directly connected to the grid 7 or distributor connected load in two blocks 8 with trip frequencies ranging between 47.8Hz and 47.5Hz in the North Island and between 47.5Hz and 45.5Hz in the South Island. In assessing the performance of the power system the SO may rely on asset owners meeting performance obligations specified in the Code and may seek any additional information it reasonably requires from asset owners to assist it in such assessments. In essence, through the requirement on generators (refer below) to notify their intent to connect or application to connect, the SO is able to learn of the existence of generation and, to meet its PPOs, the SO must identify and gather the information it requires to conduct the necessary analysis required to enable it to meet its obligations. Each generating station in excess of 30MW (or less if directed by the Authority), connected to either the grid or a local network must ensure its assets remain connected and makes the maximum possible contribution to maintaining frequency within the normal band or restore frequency to the normal band while the frequency in the North Island remains above 47.5Hz 9. For NI frequencies between 47.5Hz and 47Hz NI generators must remain connected for, declining, specified periods. In the SI generators must remain connected while the frequency remains above 47Hz and for 30 seconds if the frequency falls below 47Hz but remains above 45Hz. 6 The SO must adopt policies that are consistent with the Authority s objective to promote reliable supply by, and the efficient operation of, the electricity industry for the long-term benefit of consumers. In this policy the key trade-off is the cost of procuring instantaneous reserve and constraining generation, and the expected cost of lost load should an under-frequency event occur. 7 Many grid connected loads hold dispensations from this obligation. 8 The Authority and SO currently have a project underway that will split this obligation across four blocks. 9 Unlike the UK in 2008, there is no requirement for generation connected to local networks to install rate of change of frequency relays this would be at odds with contributing to the maintenance of frequency.

9 A generator who is planning to connect a unit of 1MW or greater must advise the SO of the intent to connect. Anyone wishing to connect generation, however small, to a local network must apply to the Distributor for connection. The HVDC owner must make the maximum possible contribution to maintaining frequency within the normal band or restore frequency to the normal band while frequency in both islands remains above 48Hz. For frequencies between 48Hz and 45Hz the HVDC must remain connected for, declining, specified periods. Distributors are required to maintain the AUFLS (or shortly, Extended Reserve) capability and procedures to implement manual demand control on instruction from the SO. 9 Distributors are required to provide information about connected load and generation reasonably requested by the SO. As new technologies emerge it is anticipated that related information will be requested on an ad hoc basis before forming part of asset capability statements. Purchasers must limit the magnitude of any instantaneous change in offtake to the levels reasonably required by the SO in light of its obligation to meet its PPOs.

10 RISKS TO THE NZ POWER SYSTEM FROM EMBEDDED DISRUPTIVE TECHNOLOGIES Forum member question(s) how similar themes around risks to overall power system integrity due to distribution-embedded disruptive technologies would manifest themselves in New Zealand? 10 The loss of embedded generation during the UK event does not seem to have been anticipated and has brought into question the lack of explicit frequency performance criteria for small embedded generation. The under-frequency performance of small embedded generation is but one of a number of risks that may arise from the integration of smart grid technologies into the NZ power system, others include: electric vehicles; the rate of change and quantum of demand at common charging times not reflected in prices observed by vehicle owners; and poor coordination of injection from storage; concentrated areas of embedded generation (e.g. PV, micro wind) may introduce distribution voltage management challenges; and ultimately complexity in the management of GXP voltages; wide scale utilisation energy management systems in homes and commercial premise s leading to a coincident demand response; and impact of distributed generation and demand response on provision of AUFLS (extended reserves) The above list is unlikely to be exhaustive however the method of frequency management, discussed below, is largely generic. If the expected incidence of underfrequency events increases different management practices may be more economic. With the possible exception of events more extreme than anticipated, power system security ought not to be threatened by unidentified risks.

11 ABILITY FOR THE NEW ZEALAND FRAMEWORK TO MONITOR AND MANAGE Forum member question(s): how existing institutions would monitor and control them? who would be accountable for mitigating them? NATIONAL GRID EVENT From the description provided by John Scott and that set out in the National Grid report it is not apparent the extent to which National Grid had to take account of the quantum or under-frequency performance of generation embedded within distribution networks. Or, whether in drafting the obligation on National Grid to balance generation with demand in real time did the authors assumed the level of embedded generation would be minimal, or embedded generation would comply with the prevailing Engineering Recommendations? 11 The National Grid report makes no comment on how it is expected to become aware of embedded generation or its capability. Requirement or comment on the need for small scale generation to apply to or notify DNOs of their existence has not been sighted. Similarly the requirement for DNOs to pass information about distributed generation to the GBSO, or for the GBSO to seek such information has not been sighted. At the end of the day the National Grid report concluded: based on simulation, the loss of grid connected generation, was sufficient in themselves to cause frequency to fall below 48.8Hz and initiate the LFDD scheme; and the LFDD scheme protected the overall system from exceptional generation loss as designed and prevented a wide scale shutdown. NEW ZEALAND The electricity industry (commonly considered, but not limited to: generation, transmission, distribution, and retail) is governed by the Authority who must promote reliable supply, and efficient operation, for the long-term benefit of consumers by, amongst other functions, administering the Code. In short the Authority is accountable for defining accountability and ensuring the industry participants (generators, grid owners, distributors, retailers, and service providers 10 have, or are able to obtain, the information and with, in some instances the Commerce Commission, resource to deliver required outcomes (adequate reward through market, regulatory, or service provider contract for cost of delivery). In respect of the reliable operation of the industry the Code: 10 Appointed by the Authority to fulfil the roles prescribed in the Code. The SO is one such service provider.

12 places asset performance obligations on generators, the grid owner, and distributors (asset owners); specifies system performance obligations (including the PPOs), to be attained by the system operator through acquiring asset owner information, analysis, and the scheduling and security constrained dispatch processes; and places an obligation on asset owners to provide information reasonably requested by the system operator. The system operator may rely on asset owners attaining their performance obligations but must also identify and gather the information required to schedule and dispatch assets, including load, in a manner that manages frequency and avoids cascade failure. 12 To assist the SO manage frequency the Code also: requires every generator who plans to connect a new generating unit in excess of 1MW to the grid or local network must advise the SO accordingly; requires all distributed generation to apply for connection to distributors. Applications must contain information required by distributors; provides for the SO to make reasonable requests of distributors for information about demand profiles, and frequency characteristics of demand and distributed generation; and enables the SO, if it is sufficiently concerned about the under-frequency performance of generation, to manage the consequent risk through the procurement of additional instantaneous reserves. The SO monitors and analyses information about frequency response characteristics of generation and demand obtained through asset owner asset capability statements, ad hoc requests and test results (commissioning and re-commissioning, routine, and post event). The SO also conducts post event analysis of asset and ancillary service provider performance from monitoring data collected by asset owners (SCADA, event recorders, phasor measurement units, metering). A recent example is the apparent under performance of an interruptible load provider has revealed the limited under-frequency performance of multiple sub 1MW generating units. The Code does not restrict the initiatives the SO can purse to improve the means it uses to meet its obligations. In fact the Code requires the SO to be a reasonable and prudent operator who employs good international practice. To this end, within the last three years, the SO: has conducted an extensive technical of the existing AUFLS regime 11 and an economic review alternate means of scheme options 12 ; has recommended New Zealand move from a two block AUFLS regime to a four block regime to reduce the impact of under-frequency load shedding during some events and improve the quality of frequency management 13 ; The Authority has extended this initiative to refine the selection of load to be shed during under-frequency events.

13 has upgraded the reserve management tool used in its scheduling and dispatch processes; is utilising the real-time digital simulator acquired by Transpower to design and commission Pole 3 and the new HVDC control system to augment its transient stability analysis; and begun to use phasor measurements and high resolution event data to understand the aggregate response of generation embedded within networks. In sum, the SO is responsible for achieving the frequency performance obligations set by the Authority. To achieve this outcome the SO is dependent on the receipt of quality information. To date, with few exceptions, quality information has been available to the SO. In respect of small scale distributed generation (sub 1 MW) it is expected distributors, or the Market Administrator, through the registration process will obtain the number, location, and connected capacities. While the Code provides for these channels to be a conduit for obtaining information about the technical capability of such generation it may be more pragmatic for the SO to obtain such information from suppliers or test the performance of such equipment itself. 13 NEW ZEALAND EXPERIENCE Compared to electricity systems in other first world countries New Zealand s power system, with a peak load of 7000MW, is small. In % of generation was from renewable resources: hydro, geothermal, and wind. Today there are only four fossil fuelled generating units in excess of 200MW in regular use. Consequently, by international comparison, the inertia of the power system is low and frequency deviations greater, under-frequency load shedding doesn t begin to occur until 47.8Hz in New Zealand. Successful management of frequency during contingent events is critical to the secure operation of the power system. Since the adoption of the frequency management policy described above in 2004 the AUFLS scheme has operated twice, on: 13 December , when 874 MW of generation was lost at Huntly. North Island frequency fell to Hz and block 1 of NI AUFLS and IL operated 15, shedding 564MW. Frequency returned to the normal range within about 14 seconds. The majority of load shed was restored within two and a half hours; and 12 November , 835 MW was lost in the North Island when there was an unanticipated HVDC ran back from 975 MW to 140 MW during a commissioning test. AUFLS and IL interrupted 606 MW of load. Frequency returned to the normal range within about 33 seconds. Comment from John Scott suggests surprise at New Zealand s tolerance for underfrequency load shedding events. As foot noted above the policy that gives rise the utilisation of under-frequency events is based on a trade-off between short term market costs (procurement of instantaneous reserves, constraints on generation (to manage the quantum of risks), and the co-optimisation of energy and reserve procurement in the scheduling process) and the expected cost of lost load arising from under-frequency load Metering does not allow AUFLS and IL to be identified separately. 16

14 shedding a function of the cost of non-supply and expected incidence. The rationale for the equivalent UK policy has not been explored. Within the New Zealand context it would seem that such an exercise would only be warranted if the Authority s objective was under review. 14

15 CONSEQUENCE OF POSSIBLE EVENTS Forum member questions(s): likely consequences of such events? The consequence of unanticipated events is a not entirely predictable. Asset owners are expected to maintain protection systems that isolate their equipment from outcomes that exceed specified voltage, frequency, and overload capabilities. The final event management measure is the disconnection of demand to maintain a balance with available supply. 15 The addition of new generation is observable, albeit with shorter and shorter lead times, and new risks should be identifiable. The addition of new demand should be observable within a timeframe that allows associated risks to be managed. The rapid adoption of demand management technologies may create some uncertainty. It is likely that such technologies will be facilitated through web or mobile communication networks. Events within these networks may have consequential impacts on electricity demand.

16 OPERABILITY FRAMEWORKS Forum member question(s): map UK system operability framework against NZ documents. NATIONAL GRID: FUTURE ELECTRICITY SCENARIOS & SYSTEM OPERABILITY FRAMEWORK 16 National Grid has developed a number of scenarios in response to possible domestic and international economic, energy, and climate change policy, described in the Future Electricity Scenarios 17 (FES). In its System Operability Framework 18 (SOF) National Grid aims to outline how it expects future system operability to change in response to the developments described in an endeavour to help existing and future customers identify new and enhanced service opportunities on its transmission systems out to National Grid expects to publish the FES annually with the aim of projecting future energy landscapes, in terms of demand, generation, and to identify the need for additional transmission capacity. The SOF, also expected to be an annual publication, is designed to study the scenarios described in FES from a system operability perspective, taking into account current system operation experience. It is expected to highlight the key operability variances under each of the scenarios set out in FES to provide an assurance that the risks associated with operability are identified. This is to ensure that the necessary mitigating measures can be evaluated early enough to allow for full economic assessment and timely implementation of solutions. Most distributor connected generation in the UK utilises a rate of change of frequency (RoCoF) protection regime to detect when the distribution system to which is connected has been isolated from the National Grid. As the UK invests in low inertia, renewable, generation frequency deviations arising from the loss of large generation units have the potential to activate distributor connected generation RoCoF protection regimes exacerbating the management of frequency. New Zealand does not face this issue as we do not utilise RoCoF protection to detect the islanding of distributed generation. TRANSPOWER: ANNUAL PLANNING REPORT & SYSTEM SECURITY FORECAST Transpower preparers and publishes an Annual Planning Report (APR) 19 that provides information about: the capabilities of the existing grid; The latest annual plan may be found on the Transpower website

17 demand and generation forecasts for up to 15 years; the grid s ability to meet future demand and generation needs; the role of the transmission grid in facilitating generation; grid investment that may be required to meet future needs for up to 15 years and beyond, by way of: o o grid backbone transmission plans for the main North and South Island transmission corridors, and for the HVDC link; and 13 regional plans; and a 10- year forecast of fault levels at each Transpower s transmission bus. Every second year the ARP includes: a Grid Reliability Report (GRR) 20, which sets out 10- year forecasts of demand at grid exit points and generation at grid injection points, and whether the National Grid can be reasonably expected to meet (n- 1) security requirements; and 17 a Grid Economic Investment Report (GEIR) 21, which identifies economic investments (creates net market benefits) that Transpower considers could be made in respect of the interconnection assets. In accord with the Code Transpower, as the SO, prepares a System Security Forecast (SSF) 22 every two years and updates six monthly in the intervening period. The SSF provides information about: the SO s ability to meet the principal performance obligations (PPOs) over the ensuing three period, which may be extended to up to five years or more to elaborate on areas of the network which may require the utilisation of operational constraints. The forecast takes into account the capabilities of the grid and connected assets based on information known to, and able to be disclosed by, the System Operator; and to identify and describe potential power system issues which may require operational management over the next three years or more to enable the System Operator to meet the PPOs prior to investment in upgrades and investment in transmission alternatives. 20 Requirement of Part 12 of the Code 21 Requirement of Part 12 of the Code 22 The latest System Security Forecast may be found on the Transpower website

18 NEED FOR CHANGE TO EXISTING FRAMEWORKS Forum member question(s): what organisational support that entity would have; what authority would go with that accountability; and whether it would be adequate and effective. 18 The SO has not identified any need for change to primary authority or accountabilities. Two areas in which refinement may be required are access to information about new technologies and refinement to the design of the extended reserves regime. Need for change has yet to be demonstrated. Each is discussed by way of example. ACCESS TO INFORMATION To date the requirement for the SO to be notified of new generation units in excess of 1 MW has created adequate opportunity for the SO to seek information from EDBs about those aspects of the new generation that will impact system management, principally those related to frequency characteristics. The SO doesn t have, nor is it resourced to have, an immediate relationship with smaller consumers. Most new technologies will be adopted by smaller consumers. The Code anticipates that the SO will seek information about small scale distributed generation (DG) and demand from EDBs. Until the emergence of wind and solar generation there has been little change in DG technologies. Historically DG has been owned by EDBs or the owners of manufacturing processes. These owners are usually familiar with the technical capability of the DG they own and operate. The transaction cost of obtaining information about such generation has usually been low for both EDBs and the SO. Demand has largely been passive, or managed by EDBs with the likes of ripple control. Again EDBs have been the natural source of information on such capabilities. It is anticipated that new DG, new demand (e.g. EVs), and new demand management capability will be acquired from multiple suppliers by multiple consumers. Obtaining information on these technologies, their uptake, and location in accord with the Code may impose higher transaction costs on EDBs. The SO expects to work with EDBs, and if needed the Authority, to ensure information required for security analysis is obtained cost effectively. EXTENDED RESERVES (AUFLS) The Authority is working towards the implementation of the Extended Reserves regime which will replace the t AUFLS regime. Under the AUFLS regime EDBs are responsible ensuring minimum quantities of load are armed for interruption. In order to select EDB feeders armed for interruption on a more efficient basis EDBs will be required to provide information about the nature of feeder loads to a central selection process. The regime anticipates that the primary selection of feeders armed for interruption will be made once every five years with an annual revision based on updated information.

19 The adoption of new technologies by consumers could materially change the nature of load connected to a feeder within a 12 month period. This may necessitate more frequent provision of information, from EDBs, and review of selected feeders. 19

20 CONCLUSION: NEED FOR ONGOING OPERATIONAL AWARENESS The current framework for monitoring the addition of new generation and obtaining the necessary information is adequate. 20 While new technologies and the rate at which they are adopted is expected to increase the complexity of power system operation for EDB operators and the SO, at least in transition, has not identified any need for change to primary authority, roles, or accountabilities. To meet its obligations the SO anticipates there will be greater and more frequent exchange of information between participants. A first pass suggests the following areas and primary stakeholders: uptake of demand response and response capability (SO, EDBs); ongoing currency with frequency and fault capability of small scale DG installed in NZ (SO, EDBs); ongoing EV uptake and capability, as previously outlined (EDBs, SO, GO); voltage management within distribution networks (EDBs); impact of distribution network voltage management on GXP voltage management (EDBs, GO, SO); integrity of protection systems with proliferation of small scale DG (EDBs, GO, SO); and uptake of stationary storage and utilisation (SO, EDBs). The SO does not underestimate the work that may be required to identify, build, and operate the systems necessary to facilitate information exchanges required to support a competitive market, and the ongoing reliable and efficient operation of the power system. The SO expects to work closely with relevant stakeholders, including the Authority, to facilitate the necessary outcomes.

Price separation observation during Haywards HVDC filter outages commencing 7 March Event No: 3229

Price separation observation during Haywards HVDC filter outages commencing 7 March Event No: 3229 Price separation observation during Haywards HVDC filter outages commencing 7 March 2016 Event No: 3229 Version Date Change 1.0 15/3/2016 Initial Issue Position Date Prepared By: System Operator 15/3/16

More information

System Operator ANCILLARY SERVICES PROCUREMENT PLAN

System Operator ANCILLARY SERVICES PROCUREMENT PLAN System Operator ANCILLARY SERVICES PROCUREMENT PLAN Ancillary Services Draft Procurement Plan This draft Procurement Plan is provided to the Electricity Commission in accordance with rule 4.1 of Section

More information

INTRODUCTION AND CONTENT 3 CONDITIONS FOR IMPLEMENTATION 5 DESCRIPTION OF ANCILLARY SERVICES 6

INTRODUCTION AND CONTENT 3 CONDITIONS FOR IMPLEMENTATION 5 DESCRIPTION OF ANCILLARY SERVICES 6 Schedule C5 - Contents Procurement Plan INTRODUCTION AND CONTENT 3 CONDITIONS FOR IMPLEMENTATION 5 DESCRIPTION OF ANCILLARY SERVICES 6 PRINCIPLES APPLIED IN MAKING NET PURCHASE QUANTITY ASSESSMENT 8 PROCESS

More information

Plan. Security of Supply Participant Rolling Outage. Plan

Plan. Security of Supply Participant Rolling Outage. Plan Plan Security of Supply Participant Rolling Outage Security of Supply - Participant Rolling Outage Plan 31 March 2017 Table of Contents 1 PURPOSE OF THIS DOCUMENT... 1 2 DEFINITIONS... 1 2.1 Associated

More information

1. How can Ofgem ensure that sharper Cash Out incentives from the Significant Code Review:

1. How can Ofgem ensure that sharper Cash Out incentives from the Significant Code Review: 1. How can Ofgem ensure that sharper Cash Out incentives from the Significant Code Review: encourage generators and suppliers to balance their own positions before gate closure, thus reducing the call

More information

Electricity Authority Work Programme. 1 July June June 2017

Electricity Authority Work Programme. 1 July June June 2017 Work Programme 1 July 2017 30 June 2018 30 June 2017 Contents Executive summary... 3 Introduction and purpose... 4 Programme A: Evolving technologies and business models... 7 Programme B: Consumer choice

More information

Connecting New Generation in New Zealand. Len Gould Customer Services Manager Transpower New Zealand Ltd

Connecting New Generation in New Zealand. Len Gould Customer Services Manager Transpower New Zealand Ltd Connecting New Generation in New Zealand Len Gould Customer Services Manager Transpower New Zealand Ltd Outline New Zealand s power system & Transpower s roles The planning process for new generation The

More information

System Management Action Flagging Methodology Statement

System Management Action Flagging Methodology Statement System Management Action Flagging Methodology Statement Effective Date: 01 April 20172018 Version Number: 910.0 Published in accordance with Standard Condition C16 of National Grid Electricity Transmission

More information

System Management Action Flagging Methodology Statement

System Management Action Flagging Methodology Statement System Management Action Flagging Methodology Statement Effective Date: 01 April 2017 Version Number: 9.0 Published in accordance with Standard Condition C16 of National Grid Electricity Transmission Licence

More information

Ancillary Service. the WEM System Management. June 2018

Ancillary Service. the WEM System Management. June 2018 Ancillary Service Report for the WEM 2018-19 June 2018 System Management Important notice PURPOSE AEMO publishes the Wholesale Electricity Market Ancillary Services report under clause 3.11.13 of the Wholesale

More information

CLARIFICATION OF GENERATOR TECHNICAL PERFORMANCE REQUIREMENTS (S5.2.5)

CLARIFICATION OF GENERATOR TECHNICAL PERFORMANCE REQUIREMENTS (S5.2.5) CLARIFICATION OF GENERATOR TECHNICAL PERFORMANCE REQUIREMENTS (S5.2.5) 1. PURPOSE AEMO has prepared this document to clarify AEMO s interpretation of particular clauses in Schedule 5.2 of the National

More information

Bulk Power System Integration of Variable Generation - Program 173

Bulk Power System Integration of Variable Generation - Program 173 Bulk Power System Integration of Variable Generation - Program 173 Program Description Program Overview A number of ongoing environmentally driven regulatory issues including greenhouse gas reductions

More information

GSR016: Small and Medium Embedded Generation Assumptions

GSR016: Small and Medium Embedded Generation Assumptions Stage 01: Workgroup National Electricity Transmission System Security and Quality of Supply Standards (NETS SQSS) GSR016: Small and Medium Embedded Generation Assumptions 01 02 03 Workgroup Industry Consultation

More information

Distribution System Operating Code

Distribution System Operating Code Distribution System Operating Code Draft Rev 5 Approved September 2007 Comments to this document can be forwarded to: RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission System

More information

Participant Outage Plan

Participant Outage Plan EA NETWORKS (ELECTRICITY ASHBURTON LTD) 20150324_Proposed_Participant_Outage_Plan Participant Outage Plan SYSTEM OPERATOR IMPOSED LOAD REDUCTION Reviewed March 2015 Contents Documentation Control... 2

More information

Network Support and Control Ancillary Service (NSCAS) Quantity Procedure

Network Support and Control Ancillary Service (NSCAS) Quantity Procedure Network Support and Control Ancillary Service (NSCAS) Quantity Procedure PREPARED BY: PLANNING VERSION: 1.0 DATE: 12 DECEMBER 2011 FINAL This document has been created by the Planning Department and will

More information

ANTICIPATING AND ADDRESSING SECURITY CHALLENGES IN AN EVOLVING POWER SYSTEM

ANTICIPATING AND ADDRESSING SECURITY CHALLENGES IN AN EVOLVING POWER SYSTEM ANTICIPATING AND ADDRESSING SECURITY CHALLENGES IN AN EVOLVING POWER SYSTEM January 2017 PRESENTED BY JENNY RIESZ SLIDE 1 AGENDA 1. Introduction to the NEM 2. Future Power System Security Program 3. Identifying

More information

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004 Glossary of Terms Used in Standards Preliminary Draft Version 0 Standards September 1, 2004 Source References (Noted in draft only will not be part of final glossary) Functional Model () Glossary (GL)

More information

BR04 SERVICE PERFORMANCE MEASURES

BR04 SERVICE PERFORMANCE MEASURES SERVICE PERFORMANCE MEASURES 1 October 2013 C O P Y R I G H T 2013 T R A N S P O W E R N E W Z E A L A N D L I M I T E D. A L L R I G H T S R E S E R V E D This document is protected by copyright vested

More information

Operating High Variable, Renewable Generation Power Systems Lessons Learned from Ireland and Northern Ireland

Operating High Variable, Renewable Generation Power Systems Lessons Learned from Ireland and Northern Ireland Operating High Variable, Renewable Generation Power Systems Lessons Learned from Ireland and Northern Ireland 16 th September 2015 Overview 2 EirGrid s Role EirGrid is the Transmission System Operator

More information

Rate of Change of Frequency Distribution Code Modifications. Response to the Consultation

Rate of Change of Frequency Distribution Code Modifications. Response to the Consultation Rate of Change of Frequency Distribution Code Modifications Response to the Consultation 1. INTRODUCTION 1.1 1.2 1.3 1.4 Following discussions held with the Transmission System Operators (TSOs) in Ireland

More information

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements 2. Number: PRC 006 RFC 01 3. Purpose: To establish ReliabilityFirst requirements for automatic underfrequency Load shedding

More information

Ergon Energy Corporation Limited

Ergon Energy Corporation Limited Ergon Energy Corporation Limited Request for Information Emerging Distribution Network Limitations in the Palm Island Area 1 May 2012 Disclaimer While care was taken in preparation of the information in

More information

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements 2. Number: PRC 006 RFC 01 3. Purpose: To establish ReliabilityFirst requirements for automatic Load shedding (UFLS) to support

More information

WIND AND SOLAR FARMS TESTING REQUIREMENTS FOR CONTINGENCY FCAS REGISTRATION

WIND AND SOLAR FARMS TESTING REQUIREMENTS FOR CONTINGENCY FCAS REGISTRATION WIND AND SOLAR FARMS TESTING REQUIREMENTS FOR CONTINGENCY FCAS REGISTRATION PREPARED BY: AEMO Operations Department Systems Performance & Commercial VERSION: 1.0 EFFECTIVE DATE: 5 October 2018 STATUS:

More information

Interconnection Feasibility Study

Interconnection Feasibility Study XXXXX Campbell River Power Enterprises Project April 5, 2011 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2011. All rights reserved. DISCLAIMER OF WARRANTY, LIMITATION

More information

Black Start Strategy

Black Start Strategy Issue 1 Revision Black Start Strategy Produced in accordance with Standard Condition C16 of the NGET Transmission Licence Effective from 1 st April 2017 to 31 st March 2018 DOCUMENT HISTORY Version 1.0

More information

TEMPORARY GRID RECONFIGURATIONS NET BENEFIT TEST METHODOLOGY

TEMPORARY GRID RECONFIGURATIONS NET BENEFIT TEST METHODOLOGY TEMPORARY GRID RECONFIGURATIONS NET BENEFIT TEST METHODOLOGY 1 1. Summary When one part of the grid is facing security of supply risk where local generation in one region of the grid is not enough for

More information

NATIONAL ELECTRICITY MARKET GUIDE TO GENERATOR EXEMPTIONS & CLASSIFICATION OF GENERATING UNITS

NATIONAL ELECTRICITY MARKET GUIDE TO GENERATOR EXEMPTIONS & CLASSIFICATION OF GENERATING UNITS NATIONAL ELECTRICITY MARKET GUIDE TO GENERATOR EXEMPTIONS & CLASSIFICATION OF GENERATING UNITS PREPARED BY: AEMO Markets and Strategy & Innovation VERSION: 2.2 EFFECTIVE DATE: 20 March 2018 STATUS: FINAL

More information

Busbar Classification Review

Busbar Classification Review Busbar Classification Review Updated Credible Methodology and Trial Results Transpower New Zealand Limited February 2017 Version Date Change 1 01/02/2017 Pubilshed for feedback IMPORTANT Disclaimer The

More information

Non-BM Balancing Services Volumes and Expenditure

Non-BM Balancing Services Volumes and Expenditure Non-BM Balancing Services Volumes and Expenditure Table of Contents Background... 1 Summary of Total Non-BM Service Provision... 2 Total Ancillary Services Expenditure... 2 Frequency Response... 3 Dynamic

More information

Regional Impact of Renewables: ERCOT

Regional Impact of Renewables: ERCOT Regional Impact of Renewables: ERCOT Kenan Ögelman VP, Commercial Operations, ERCOT February 1, 2018 The ERCOT Region The interconnected electrical system serving most of Texas, with limited external connections

More information

Participant Rolling Outage Plan

Participant Rolling Outage Plan Participant Rolling Outage Plan Effective Date: 12 June 2017 Version AEL.OP.001 R7 20170612 Version control The list of amendments made to this policy is available in Table 1Table 1 below. Table 1: Amendments

More information

Renewable Energy Impact to Distribution Network Performance and Reliability. ENGR. ROBERTO D. ISIP JR. Head, Network Asset Planning, MERALCO

Renewable Energy Impact to Distribution Network Performance and Reliability. ENGR. ROBERTO D. ISIP JR. Head, Network Asset Planning, MERALCO Renewable Energy Impact to Distribution Network Performance and Reliability ENGR. ROBERTO D. ISIP JR. Head, Network Asset Planning, MERALCO Presentation Outline 1. RE Integration and changes in the Electric

More information

Non-BM Balancing Services Volumes and Expenditure

Non-BM Balancing Services Volumes and Expenditure Non-BM Balancing Services Volumes and Expenditure Table of Contents Background... 1 Summary of Total Non-BM Service Provision... 2 Total Ancillary Services Expenditure... 2 Frequency Response... 3 Dynamic

More information

Requirements for the Provision of Load Shedding Service for Import Version 4.0

Requirements for the Provision of Load Shedding Service for Import Version 4.0 LOAD SHED SERVICE for IMPORT (LSSi) Requirements Requirements for the Provision of Load Shedding Service for Import Version 4.0 This document outlines the eligibility criteria and requirements that an

More information

Bluewaters Power 1 Pty Ltd

Bluewaters Power 1 Pty Ltd Bluewaters Power 1 Pty Ltd Electricity Generation Licence (EGL 4) 2014 Performance Audit (Independent Assurance) Report June 2014 Deloitte Touche Tohmatsu ABN 74 490 121 060 Woodside Plaza Level 14 240

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Interconnection System Feasibility Study

Interconnection System Feasibility Study Interconnection System Feasibility Study Zonnebeke Wind Project Report No: T&S Planning 2015-053 November 2015 FINAL British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority

More information

Reliability and the Future of the Electricity Grid: A North American Bulk Power System Perspective

Reliability and the Future of the Electricity Grid: A North American Bulk Power System Perspective Reliability and the Future of the Electricity Grid: A North American Bulk Power System Perspective Mark Lauby, Senior Vice President and Chief Reliability Officer North American Electric Reliability Corporation

More information

BALANCING CODE NO. 1 (BC1)

BALANCING CODE NO. 1 (BC1) Paragraph No/Title BALANCING CODE NO. 1 (BC1) PRE GATE CLOSURE PROCESS CONTENTS (This contents page does not form part of the Grid Code) Page Number BC1.1 INTRODUCTION... 1 BC1.2 OBJECTIVE... 1 BC1.3 SCOPE...

More information

Interconnection Feasibility Study

Interconnection Feasibility Study XXXXX Ditni Yoh Green Energy April 5, 2011 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2011. All rights reserved. DISCLAIMER OF WARRANTY, LIMITATION OF LIABILITY

More information

Revised Draft Final Proposal for Participation of Non-Generator Resources in California ISO Ancillary Services Markets

Revised Draft Final Proposal for Participation of Non-Generator Resources in California ISO Ancillary Services Markets Revised Draft Final Proposal for Participation of Non-Generator Resources in California ISO Ancillary Services Markets March 8, 2010 Revised Draft Final Proposal for Participation of Non- Generator Resources

More information

NETWORK CONTROL ANCILLARY SERVICE QUANTITY PROCEDURE

NETWORK CONTROL ANCILLARY SERVICE QUANTITY PROCEDURE NETWORK CONTROL ANCILLARY SERVICE QUANTITY PROCEDURE PREPARED BY: Electricity System Operations Planning and Performance DOCUMENT NO: 1.0 VERSION NO: 1.0 FINAL (Updated in July 2009 to reflect NEMMCO s

More information

AUDIT GUIDELINES: ELECTRICITY, GAS AND WATER LICENSING: AUDIT TEMPLATE FOR SMALLER ORGANISATIONS

AUDIT GUIDELINES: ELECTRICITY, GAS AND WATER LICENSING: AUDIT TEMPLATE FOR SMALLER ORGANISATIONS AUDIT GUIDELINES: ELECTRICITY, GAS AND WATER LICENSING: AUDIT TEMPLATE FOR SMALLER ORGANISATIONS This document is available from the Economic Regulation Authority website www.era.wa.gov.au. For further

More information

LFC Block Operational Agreement Ireland and Northern Ireland

LFC Block Operational Agreement Ireland and Northern Ireland LFC Block Operational Agreement Ireland and Northern Ireland For Publication; 05/10/2018 Notice This document, provided by EirGrid and SONI, is the draft for stakeholder consultation of the proposal for

More information

Electronic Dispatch Facility Enhancement Project. Service Enhancement Consultation Information. October 2016

Electronic Dispatch Facility Enhancement Project. Service Enhancement Consultation Information. October 2016 Electronic Dispatch Facility Enhancement Project Service Enhancement Consultation Information October 2016 IMPORTANT Disclaimer The information in this document is provided in good-faith and represents

More information

Connection Study Requirements

Connection Study Requirements Document Release Released: September 20, 2010 The Customer shall comply with all the applicable requirements in this document when performing connection studies to produce the engineering study report.

More information

Standard Development Timeline

Standard Development Timeline Standard TPL-001-4 Transmission System Planning Performance Requirements Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be

More information

Interconnection Feasibility Study

Interconnection Feasibility Study XXXXX Campbell River Power Enterprises Project April 5, 2011 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2011. All rights reserved. DISCLAIMER OF WARRANTY, LIMITATION

More information

Thank you for the opportunity to provide feedback on the working paper on the application of ACOT payments.

Thank you for the opportunity to provide feedback on the working paper on the application of ACOT payments. 31 January 2014 Submission Electricity Authority PO Box 10041 Wellington 6143 By email: submissions@ea.govt.nz Dear Sirs Re: Working Paper Transmission Pricing Methodology: Avoided cost of transmission

More information

Date of Request for Comment: April 7, 2017 Period of Comment: April 7, 2017 through May 5, 2017

Date of Request for Comment: April 7, 2017 Period of Comment: April 7, 2017 through May 5, 2017 Market Participant Comments and AESO Replies Matrix Proposed Amended Section 304.3, Wind and Solar Power Ramp Up Management ( amended Section 304.3 ) Date of Request for Comment: April 7, 2017 Period of

More information

RfG Banding; Operability context. Title slide photo option (Arial 28pt bold) Ben Marshall SMARTer System Performance.

RfG Banding; Operability context. Title slide photo option (Arial 28pt bold) Ben Marshall SMARTer System Performance. RfG Banding; Operability context Title slide photo option (Arial 28pt bold) Ben Marshall SMARTer System Performance. Topics. FES 2014- what this said about minimum demand, and levels of DG & micro SOF

More information

Standard TPL Transmission System Planning Performance Requirements

Standard TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 15.6.2013 Official Journal of the European Union L 163/1 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 543/2013 of 14 June 2013 on submission and publication of data in electricity

More information

Review of Load Following Ancillary Service Quantity Requirements

Review of Load Following Ancillary Service Quantity Requirements Review of Load Following Ancillary Service Quantity Requirements Presentation to MAC Meeting 12 December 2012 by Brendan Clarke DM# 9973825 Topics for Today 1 Drivers for Review Now 2 System Frequency

More information

Outage Protocol: Explanatory note

Outage Protocol: Explanatory note Outage Protocol: Explanatory note This is the version of the outage protocol (previously in section VII of part F of the Electricity Governance Rules 2003) that the Authority is required to publish by

More information

From: Keith Casey, Vice President, Market and Infrastructure Development

From: Keith Casey, Vice President, Market and Infrastructure Development California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market and Infrastructure Development Date: August 18, 2011 Re: Briefing on Renewable

More information

DOMESTIC COGENERATION OF HEAT AND ELECTRICITY

DOMESTIC COGENERATION OF HEAT AND ELECTRICITY DOMESTIC COGENERATION OF HEAT AND ELECTRICITY Henrik Weldingh DEFU - Denmark 1 hw@defu.dk INTRODUCTION CHP, Combined Heat and Power, or Cogeneration of Heat and Power, is the simultaneous production of

More information

Securing our Energy Future Draft RCP3 Transpower Proposals Meridian Submission

Securing our Energy Future Draft RCP3 Transpower Proposals Meridian Submission 31 August 2018 Transpower RCP3 Submissions PO Box 1021 Wellington By email: RCP3@transpower.co.nz Securing our Energy Future 2020-2025 Draft RCP3 Transpower Proposals Meridian Submission Meridian appreciates

More information

New Brunswick Electricity Business Rules. Chapter 3 Reliable Operations

New Brunswick Electricity Business Rules. Chapter 3 Reliable Operations New Brunswick Electricity Business Rules Chapter 3 Reliable Operations TABLE OF CONTENTS CHAPTER 3 RELIABLE OPERATIONS... 2 3.0 System Operator Roles and Responsibilities... 2 3.1 Reliability Assessments...

More information

Standard MH-TPL Transmission System Planning Performance Requirements

Standard MH-TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: MH-TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

Mapping Document for FAC-010-3

Mapping Document for FAC-010-3 Mapping Document for FAC-010-3 The Project 2015 09 standard drafting team (SDT) is proposing the retirement of the NERC FAC 010 3 Reliability Standard. The SDT further proposes a new paradigm regarding

More information

ENABLING EMBEDDED GENERATION

ENABLING EMBEDDED GENERATION APRIL 2014 ENABLING EMBEDDED GENERATION Turning Australian electricity on its head WHAT IS EMBEDDED GENERATION? Energy supply systems around the world are being transformed by embedded (or distributed)

More information

Nova Scotia Power System Operator (NSPSO)

Nova Scotia Power System Operator (NSPSO) Nova Scotia Power System Operator (NSPSO) Market Procedure MP-09 Outage Planning and Approval Effective Date: 2008 12 31 Wholesale Market Procedure MP-09 Table of Contents Page 1 Document Control and General

More information

Regulatory Approach to Maintaining Local Security of Supply in Electricity

Regulatory Approach to Maintaining Local Security of Supply in Electricity An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Regulatory Approach to Maintaining Local Security of Supply in Electricity Information Paper Reference: CRU17346 Date Published: 18/12/2017

More information

A SUPPORTING DOCUMENT TO OUR 2015 INTEGRATED TRANSMISSION PLAN SERVICES REPORT 2015

A SUPPORTING DOCUMENT TO OUR 2015 INTEGRATED TRANSMISSION PLAN SERVICES REPORT 2015 A SUPPORTING DOCUMENT TO OUR 2015 INTEGRATED TRANSMISSION PLAN SERVICES REPORT 2015 Services Report September 2015 ii TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Purpose... 1 1.2. Services covered by this

More information

Procurement Guidelines

Procurement Guidelines Procurement Guidelines Effective Date: 01 April 20172018 Version Number: 1516.0 Published in accordance with Standard Condition C16 of National Grid Electricity Transmission Licence Procurement Guidelines

More information

System Management Action. Flagging Methodology Statement. Version Date: [05 th November 2009]

System Management Action. Flagging Methodology Statement. Version Date: [05 th November 2009] System Management Action Flagging Methodology Statement Version Date: [05 th November 2009] System Management Action Flagging Methodology Statement 1 Version Control Date Version No. Notes 20.3.01 1.0

More information

Meridian Energy Investor Presentation

Meridian Energy Investor Presentation Meridian Energy Investor Presentation 5 November 2018 Attached is a presentation Meridian Energy Limited is making at a series of investor meetings during November 2018. ENDS Neal Barclay Chief Executive

More information

Scarcity Pricing & Default Buyback Technical Group

Scarcity Pricing & Default Buyback Technical Group Scarcity Pricing & Default Buyback Technical Group Scarcity Pricing - Core design options 11 November 2010 Note: this paper has been prepared for the purpose of discussion with the Scarcity Pricing and

More information

John Gleadow Director Transmission Electricity Commission VAr Measurement at Unity Power Factor Revision 0

John Gleadow Director Transmission Electricity Commission VAr Measurement at Unity Power Factor Revision 0 SSG REF: S026 Tuesday 27 May 2008 TO: FROM: John Gleadow Director Transmission Electricity Commission John.Gleadow@electricitycommission.govt.nz Ranil de Silva System Studies Group NZ Ltd ranil.desilva@ssgnz.com

More information

Operating Margins Report July 2016

Operating Margins Report July 2016 Operating Margins Report July 2016 Introduction In accordance with Special Condition 8C, this document provides an overview of our procurement activities used to secure our Gas Operating Margins (Gas OM)

More information

Adapting Distribution Network Planning Practices and Design Standards to Accommodate Distributed Energy Resources

Adapting Distribution Network Planning Practices and Design Standards to Accommodate Distributed Energy Resources 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Adapting Distribution Network Planning Practices and Design Standards to Accommodate

More information

IS Kawerau Electricity Resource Background Study

IS Kawerau Electricity Resource Background Study 1. Background IS Kawerau Electricity Resource Background Study New Zealand s electricity sector is broken down into four main parts: Generation: Various entities generate electricity at plants throughout

More information

JULY 2015 INITIATIVES PLAN FOR REGULATED TRANSMISSION SERVICES

JULY 2015 INITIATIVES PLAN FOR REGULATED TRANSMISSION SERVICES JULY 2015 INITIATIVES PLAN FOR REGULATED TRANSMISSION SERVICES TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 Services Covered by the Initiatives Plan... 3 1.2 Activities Covered by the Initiatives Plan...

More information

Chapter 5 Embedded Generation Information Pack

Chapter 5 Embedded Generation Information Pack Chapter 5 Embedded Generation Information Pack 27.04.18 27.04.18 1 Table of Contents 1. Connection Framework... 3 2. Negotiated Standards Chapter 5... 5 3. Connection Process... 6 4. Key Documents... 7

More information

Information Document Protection System Information ID# R

Information Document Protection System Information ID# R Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between the Information Document and the related authoritative document(s)

More information

Eastland Network Limited. Pricing Methodology Disclosure

Eastland Network Limited. Pricing Methodology Disclosure Eastland Network Limited Pricing Methodology Disclosure Pursuant to: Requirements 22 and 23 of the Electricity Information Disclosure Requirements 2004 For Line Charges introduced on 31 March 2011 April

More information

Renewable Integration at ERCOT

Renewable Integration at ERCOT Renewable Integration at ERCOT Dan Woodfin Director of System Operations ERCOT CIGRE Chile September 12, 2016 The ERCOT Region The interconnected electrical system serving most of Texas, with limited external

More information

Supporting Documentation A Changing Industry and Marketplace 0

Supporting Documentation A Changing Industry and Marketplace 0 Supporting Documentation A Changing Industry and Marketplace 0 Ergon Energy s Regulatory Proposal is presented in a number of documents to make it easier for our different stakeholders to access the information

More information

CHAPTER 6 - Load Forecast & Resource Plan

CHAPTER 6 - Load Forecast & Resource Plan CHAPTER 6 - Load Forecast & Resource Plan Introduction This Chapter describes the electric resource portfolio that may be acquired to meet the energy requirements of MBCP customers. The following overarching

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Non-Wires Alternatives Lessons and Insights from the Front Lines

Non-Wires Alternatives Lessons and Insights from the Front Lines Non-Wires Alternatives Lessons and Insights from the Front Lines Michael DeAngelo: Avangrid Mark Luoma, Steve Fine: Consumers Energy Richard Barone: Hawaiian Electric Company Erik Gilbert: Navigant - Moderator

More information

Strategic Investment Options for Low Carbon Economy in the South Wales. 15th June 2016

Strategic Investment Options for Low Carbon Economy in the South Wales. 15th June 2016 Strategic Investment Options for Low Carbon Economy in the South Wales 15th June 2016 WPD Our Area 4 of 14 Distribution UK Licence Areas 7.8 Million Customers Covers 55,500 Sq Km 220,000km of Network 185,000

More information

Re: RIT-T Market Modelling, high level review. Introduction & background. June Mr R Korte, Executive Manager Asset Management

Re: RIT-T Market Modelling, high level review. Introduction & background. June Mr R Korte, Executive Manager Asset Management Oakley Greenwood Pty Ltd 2/20 Baynes Street Margate Beach QLD 4019 PO Box 125 Margate Beach QLD 4019 Phone +617 3283 3249 Fax +617 3112 5068 June 2018 Mr R Korte, Executive Manager Asset Management ElectraNet

More information

POWER SYSTEM STABILITY GUIDELINES

POWER SYSTEM STABILITY GUIDELINES PREPARED BY: DOCUMENT REF: Planning PSSG-02 VERSION: 1.0 DATE: 25 May 2012 FINAL Final Matt Zema CEO Date 25/ 5 /2012 Version Release History VERSION DATE AUTHOR PEER REVIEW APPROVED COMMENTS 1.0 25/5/12

More information

Accommodating High Levels of Distributed Energy Resources

Accommodating High Levels of Distributed Energy Resources Accommodating High Levels of Distributed Energy Resources John Moura, Director of Reliability Assessment and System Analysis 2017 NARUC Winter Committee Meetings February 14, 2017 About NERC: Mission To

More information

Instantaneous Reserve Ancillary Service Schedule

Instantaneous Reserve Ancillary Service Schedule 1. Glossary and Interpretation 1.1 Glossary: In this Ancillary Service Schedule, unless the context otherwise requires, the following definitions apply: Block means a Block Dispatch Group or Station Dispatch

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

NYSRC RELIABILITY RULES For Planning And Operating the New York State Power System

NYSRC RELIABILITY RULES For Planning And Operating the New York State Power System NYSRC RELIABILITY RULES For Planning And Operating the New York State Power System Version 18 January 5, 2007 NYSRC RELIABILITY RULES For Planning and Operating the New York State Power System Version

More information

PROPOSED FCAS CALCULATION CHANGES IN TASMANIA

PROPOSED FCAS CALCULATION CHANGES IN TASMANIA PROPOSED FCAS CALCULATION CHANGES IN TASMANIA FOR THE NATIONAL ELECTRICITY MARKET PUBLISHED JUNE 2014 IMPORTANT NOTICE IMPORTANT NOTICE Purpose AEMO has prepared this document to provide information to

More information

Most Severe Single Contingency (MSSC) Impacts on Alberta Balancing Authority Area Operation. Observations and Information Sharing

Most Severe Single Contingency (MSSC) Impacts on Alberta Balancing Authority Area Operation. Observations and Information Sharing Most Severe Single Contingency (MSSC) Impacts on Alberta Balancing Authority Area Operation Observations and Information Sharing Date: June, 2015 Prepared by: AESO Table of Contents Executive Summary...

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System

Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System Primary Interest Groups Balancing Authorities (BAs) Transmission Operators (TOPs) Generator Operators

More information

Renewable energy connection requirements in Spain April 2012

Renewable energy connection requirements in Spain April 2012 Renewable energy connection requirements in Spain April 2012 agustin.diaz@ree.es Challenges Red Eléctrica de España (REE) is the Spanish TSO Rapid growth of RES and intrinsic system characteristic (Iberian

More information

NERC PLANNING STANDARDS

NERC PLANNING STANDARDS NERC PLANNING STANDARDS North American Electric Reliability Council April 2004 Version of All Planning Standards Terms and Their Definitions As Used in the Analysis (Study) an examination or simulation

More information

PRICING METHODOLOGY DISCLOSURE. For Year Commencing 1 April 2016

PRICING METHODOLOGY DISCLOSURE. For Year Commencing 1 April 2016 PRICING METHODOLOGY DISCLOSURE For Year Commencing 1 April 2016 Pursuant to Electricity Distribution Information Disclosure Determination (Issued 1 October 2012). For compliance with Part 2.4: Disclosure

More information

Terms of Reference AG 2017/01

Terms of Reference AG 2017/01 Long-term Analysis of the Chilean National Electricity System Considering Variable and Intermittent Energy Resources Terms of Reference AG 2017/01 February 2017 Index 1. Introduction... 2 2. Objectives

More information

Support continued transparency for policy and design choices

Support continued transparency for policy and design choices Transpower House 96 The Terrace PO Box 1021, Wellington New Zealand www.transpower.co.nz Catherine.jones@transpower.co.nz 04 590 8624 / 027 5646976 10 October 2017 John Rampton General Manager Market Design

More information