1 10 Krey Boulevard Rensselaer, NY January 22, 2013 By Electronic Delivery Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC Re: New York Independent System Operator, Inc., Compliance Filing, Docket Nos. ER , RM , AD Dear Ms. Bose: The New York Independent System Operator, Inc. ( NYISO ) hereby submits a compliance filing in this docket to fulfill the Commission s directives in Ordering Paragraph C of the Commission s Order on Compliance Filings. 1 The Commission granted the NYISO an extension to January 22, 2013 for submitting this filing. 2 In this filing, the NYISO addresses the following topics, as directed by the Commission s November Order: i) how resource response rates are used in the selection of resources; 3 ii) temporary adjustments to the Regulation Movement Multiplier; 4 and iii) how opportunity costs are reflected in the Bids and/or settlement of Regulation Service providers. 5 In response to the Commission s rejection of the temporary Regulation Movement Bid Cap, the NYISO is also proposing mitigation measures specific to Regulation Movement that will adequately mitigate any exercise of market power by Generators bidding Regulation Movement FERC 61,105 (2012) ( November Order ). 2 New York Independent System Operator, Inc. Docket No. ER Notice of Extension of Time, November 29, See: November Order See: November Order See: November Order 75, 76

2 Honorable Kimberly D. Bose January 22, 2013 Page 2 I. Documents Submitted 1. This filing letter; 2. Affidavit of Dr. Pallas LeeVanSchaick ( Attachment I ). 3. A clean version of the proposed revisions to the NYISO s Market Administration and Control Area Services Tariff ( Services Tariff ) ( Attachment II ). 4. A blacklined version of the proposed revisions to the NYISO s Services Tariff ( Attachment III ); and II. Communications Communications and correspondence regarding this filing should be directed to: Robert E. Fernandez, General Counsel Ray Stalter, Director of Regulatory Affairs *Mollie Lampi, Assistant General Counsel New York Independent System Operator, Inc. 10 Krey Boulevard Rensselaer, N.Y Tel: (518) Fax: (518) rfernandez@nyiso.com rstalter@nyiso.com mlampi@nyiso.com *Persons designated to receive service III. How Resource Response Rates Are Used in the Selection of Resources A. The proposed term Regulation Movement Response Rate is equivalent to the Regulation Movement a resource can deliver in six seconds. With one caveat, the NYISO confirms the Commission s understanding that the term Regulation Movement Response rate ( RMRR ) is equivalent to the Regulation Movement a resource can deliver in six seconds. 6 The caveat is that the RMRR cannot be less than the six- Tariff. 6 Capitalized terms used but not defined in this filing shall have the meanings given to them in the Services

3 Honorable Kimberly D. Bose January 22, 2013 Page 3 second equivalent of the response a unit can deliver in five minutes (i.e. a unit s Regulation Capacity Response Rate). Should a Regulation Service provider submit a RMRR that is less than the six-second equivalent of its Regulation Capacity Response Rate, the NYISO would not accept it. As the tariff definition indicates, a Regulation Service provider s Regulation Movement Response Rate is: The amount of Regulation Movement a Regulation Service provider is capable of delivering in six seconds which shall not be less than, but can be equal to or greater than, the Regulation Capacity Response Rate equivalent. 7 B. The NYISO uses the RMRR in Dispatching Resources A unit s RMRR is not factored into the commitment of Regulation Resources in the Day- Ahead and Real-Time Markets. 8 These commitment decisions are made as part of the NYISO s co-optimized energy and ancillary services using the sum of each bidder s Regulation Capacity price Bid and the product of its Regulation Movement Bid and the Regulation Movement Multiplier. The Regulation Movement Response Rate is a factor, however, in the NYISO s dispatch of scheduled Regulation Service providers. The NYISO s algorithm for dispatching Regulation Service providers (the Automated Generator Control or AGC dispatch) allocates the megawatts needed (either as increased or decreased generation) over the next six second interval ( necessary dispatch ) on a pro rata basis to scheduled resources weighted by their RMRR. Those with larger RMRRs receive a greater allocation of the ACE correction signal. Thus, the necessary AGC dispatch is allocated to all units, based upon their ability to provide the necessary correction. The amount of the necessary dispatch allocated to Regulation Service Suppliers, ranked by their RMRR is limited, however, by several factors. For Limited Energy Storage Resources ( LESRs ) scheduled to provide Regulation Service in an interval, the allocation of an AGC dispatch is limited by the capacity that is physically remaining as available on the unit in the next six seconds. That is, an LESR that has exhausted its available capacity will not be allocated any portion of the necessary AGC dispatch unless the dispatch directionally enables the unit to refill 7 Services Tariff Section For non-lesr resources a unit s Regulation Capacity Response Rate determines the maximum amount of capacity the unit is eligible to offer the NYISO as Regulation Capacity. For LESR resources the supplier s Upper Operating Limit establishes the maximum amount of Regulation Capacity the unit is eligible to offer as Regulation Capacity. The software tests the accuracy of the number of megawatts offered to verify the unit is not offering more capacity than it can make available in five minutes.

4 Honorable Kimberly D. Bose January 22, 2013 Page 4 its capacity. 9 As well, the allocation of the necessary dispatch to all units is limited by system constraints. Units constrained from responding to the AGC signal by system limits (by sitting on the wrong side of a constraint, for instance) will not be allocated any portion of the required AGC dispatch in that interval. In addition, physical constraints of the resources themselves are considered (lower and upper operating limits) as is the five minute dispatch level. C. Use of a Uniform Regulation Movement Multiplier ( RMM ) Will Not Result in Under-Compensating a Unit That Provides More Regulation Movement Than Assumed by the Uniform RMM As the Commission noted, the NYISO uses the RMM to commit resources and does not use the RMM in dispatch or settlements. As a result, all scheduled units will be dispatched and settled (i.e. compensated) in the same fashion whether their RMRR is the same as, slower, or faster than the uniform RMM. 10 Since the determination of a unit s schedule depends on its price bids for Regulation Capacity and Regulation Movement, a uniform RMM treats each unit s price bid for Regulation Movement on the same, level field. By multiplying a unit s Regulation Movement Bid by a uniform RMM, the scheduling software treats a faster responder as no more expensive for Regulation Service than a slower responder if both have bid the same price for their Regulation Movement and Regulation Capacity. In supporting a uniform RMM, Beacon Power LLC explained why a faster resource may reasonably benefit from a uniform RMM: Furthermore, Beacon Power supports NYISO s use of a uniform RMM. NYISO s proposal to apply the RMM equally, or uniformly, to all resources bidding to provide Regulation Service ensures that each resource s bid is compared on an apples to apples basis by comparing the cost-per-unit of Movement. On the other hand, if NYISO were to use a resource-specific RMM, it would always make slower-ramping resources look artificially less expensive than faster-ramping resources because the slower resources are providing a lower total quantity of Movement than faster-ramping resources, even if their cost-per unit is higher. Thus, Beacon Power supports NYISO s proposal to apply a uniform RMM to all resources since it allows Movement offers to be evaluated on a comparable cost per unit of Movement basis and thus, enables the selection of the least cost set of resources The NYISO s AGC dispatch logic avoids completely exhausting such a Regulation Supplier s limited capacity by reducing the allocated AGC dispatch as such allocations move the unit away from its capacity mid-point (when it can provide its scheduled Regulation Capacity in either direction). 10 November Order New York Independent System Operator, Inc. Docket No. ER , Comments and Protest of Beacon Power LLC 9/7/2012

5 Honorable Kimberly D. Bose January 22, 2013 Page 5 IV. Temporary Adjustments to the Regulation Movement Multiplier The NYISO has reexamined its request for authority to temporarily adjust the RMM in the event that operational or reliability problems require an adjustment over a shorter period of time than would be available if all adjustments were to require a subsequent tariff filing. The RMM value is currently set at ten, a number, as the NYISO explained in its August 17 filing in this docket, that represents the 29 month average ratio of megawatts of Regulation Movement to Regulation Capacity provided each hour over this historic period. In an abundance of caution NYISO had requested the ability to instantly adjust the RMM. After further consideration, it does not appear that specific operational or reliability issues would require an instantly adjusted RMM. Thus the NYISO is including with this compliance filing, revised tariff sections that delete the proposed revision process and that set the RMM value to ten, to be constant over all hours, as approved by the Commission. 12 Any change to the RMM value will be pursued through the NYISO s stakeholder process as a tariff revision. V. How Opportunity Costs Are Reflected In The Bids And/Or Settlement Of Regulation Service Providers The Commission has asked the NYISO to explain how it will account for opportunity costs when committing resources and setting clearing prices in its Regulation Service market. Cross-product opportunity costs in the NYISO s Regulation Market are margins on the sale of Energy or Operating Reserves in the Day-Ahead or real-time markets that a Resource would forego if scheduling it to provide additional Regulation Service would lead to it being scheduled to provide less Energy or Operating Reserves. Cross-product opportunity costs are not expected to be bid by Regulation Service providers. Rather, they are included in the market price by the optimization software as a cost of scheduling the marginal Regulation Service provider. The NYISO s co-optimization of Energy and Ancillary Services reflects cross-product opportunity costs in the Day-Ahead and real-time market prices for Regulation Capacity. The co-optimization software solves for the lowest bid production cost of meeting all the Energy and Ancillary Services required over the optimization period. The Day-Ahead commitment software optimizes over a day, the real-time commitment software optimizes over a two and one-half hour time frame and the real-time dispatch software optimizes over approximately the next hour. 13 When the lowest bid production cost for the necessary Energy 12 See proposed revision to Section 2.18 and the November Order at Services Tariff Section : Each Real-Time Dispatch run will co-optimize to solve simultaneously for Load, Operating Reserves, and Regulation Service and to minimize the total cost of production over its bid optimization horizon (which may be fifty, fifty-five, or sixty minutes long depending on where the run falls in the hour.)

6 Honorable Kimberly D. Bose January 22, 2013 Page 6 and Ancillary Services requires the marginal resource to be scheduled for Operating Reserve or Regulation Service instead of Energy, and such a trade-off results in lost opportunity costs for the marginal resource, these cross-product opportunity costs are reflected in the market price for Regulation Capacity and, in some instances, also in the price of Energy and Operating Reserves. Rate Schedule 3 of the Market Services Tariff explains how the cross-product opportunity cost of the marginal Resource selected to provide Regulation Service is included in the Day-Ahead Shadow Price ( ) of the NYISO s Regulation Service constraint for the given hour, and in the Real-Time Shadow Price ( ) of the Regulation Service constraint for the given RTD interval: Each hourly Day-Ahead Shadow Price shall equal the marginal Bid cost of scheduling Resources to provide additional Regulation Service in that hour, including any impact on the Bid Production Cost of procuring Energy or Operating Reserves that would result from procuring an increment of Regulation Service in that hour, as calculated during the fifth SCUC pass described in Section of Attachment B to this ISO Services Tariff. As a result, the Shadow Price shall include the Day-Ahead Regulation Service Bids of the marginal Resource selected to provide Regulation Service, plus any margins on the sale of Energy or Operating Reserves in the Day-Ahead Market that the Resource would forego if scheduling it to provide additional Regulation Service would lead to it being scheduled to provide less Energy or Operating Reserves Each Real-Time Shadow Price in each RTD interval shall equal the marginal Bid cost of scheduling Resources to provide additional Regulation Service in that interval, including any impact on the Bid Production Cost of procuring Energy or Operating Reserves that would result from procuring an increment of Regulation Service in that interval. As a result, the Shadow Price shall include the Real-Time Regulation Service Bids of the marginal Resource selected to provide Regulation Service, plus any margins on the sale of Energy or Operating Reserves in the Real-Time Market that Resource would forego if scheduling it to provide additional Regulation Service would lead to it being scheduled to provide less Energy or Operating Reserves In addition, as explained in Attachment B of the Market Services Tariff, cross-product opportunity costs are also considered when determining the LBMP. As such, LBMPs will include the cross-product opportunity costs of the marginal Regulation Service provider: LBMPs calculated by SCUC and RTD will incorporate the incremental dispatch costs of Resources that would be scheduled to meet an increment of Load and, to the extent that tradeoffs exist between scheduling providers to produce Energy or reduce demand, and scheduling them to provide Regulation Service or Operating Reserves, LBMPs shall 14 Services Tariff Section (Rate Schedule 3) 15 Services Tariff Section (Rate Schedule 3).

7 Honorable Kimberly D. Bose January 22, 2013 Page 7 reflect the effect of meeting an increment of Load, given those tradeoffs, at each location on the Bid Production Cost associated with those services. As such, those LBMPs may incorporate: (i) Availability Bids for Regulation Service or Operating Reserves Inter-temporal opportunity costs are similarly accounted for in the NYISO s multi-period optimization process which, when making its Energy vs. Ancillary Services trade-off decisions, looks ahead either over the day (in the Day-Ahead Market) or over two and one-half hours in the real-time market. As mentioned, the optimization software represents inter-temporal or lost opportunity costs as a component of the marginal cost of dispatching a resource and thus reflects these costs in the Regulation Capacity clearing price and, in some instances in the LBMP. 17 If a Regulation Service Supplier has inter-temporal costs associated with providing Regulation Service for time periods outside of the optimization horizon (for example, a large storage facility which could fully discharge or charge over a 36 hour period), it is expected that the Supplier would include those costs in its Regulation Capacity and/or Regulation Movement Bids. If such a Resource is the marginal unit, these bid-in costs will be reflected in the Regulation Service clearing price and/or in the LBMP. Moreover, bid costs, including these bidin inter-temporal opportunity costs, will be protected across the day in each Resource s Bid Production Cost Guarantee. 18 The NYISO s Market Monitoring and Analysis group reviews a unit s bid costs when developing reference levels in consultation with a Market Participant pursuant to Section or when developing cost-based reference levels pursuant to Section Factors and adjustments that the NYISO reasonably determines to be appropriate, including appropriate inter-temporal costs, are allowed. VI. Proposed Tariff Revisions to Enhance Existing Market Mitigation Measures for Regulation Movement Bids As the attached affidavit from Dr. Pallas LeeVanSchaick makes clear, the NYISO and its Market Monitoring Unit believe that the rejection of NYISO s proposed temporary Regulation Movement Bid Cap requires an enhancement to the Regulation Movement mitigation measures currently in place. 19 Even with the revisions to Section and that 16 Services Tariff Section 17.1 (Attachment B) 17 See Sections and of the Market Services Tariff: RTC will co-optimize to solve simultaneously for all Load, Operating Reserves and Regulation Service and to minimize the total as-bid production costs over its optimization timeframe. 18 Services Tariff Section , ; see also, November Order The NYISO is assuming, however, that the Commission approved the proposed Bid floor of zero for both Regulation Capacity and Regulation Movement Bids, as described in the revisions proposed for Section Pursuant to the Commission s rejection of the temporary Bid Restriction, the NYISO is deleting the proposed revisions to Section which renders moot the Commission s request in Paragraph 78 for an errata change to this Section.

8 Honorable Kimberly D. Bose January 22, 2013 Page 8 were accepted in the Commission s November Order, existing measures will be insufficient to address concerns about the potential for market power in the Regulation Services market with respect to bidding Regulation Movement. Therefore, in addition to deleting the previously proposed revisions to Section , the Section that had authorized a temporary Regulation Movement Bid Cap, the NYISO is proposing a revision to the manner in which reference levels for Regulation Movement are developed. The proposed changes will ameliorate the concerns expressed by Dr. LeeVanSchaick and better ensure that Loads are protected from the exercise of market power in Regulation Movement bidding behavior. The NYISO s uses conduct and impact assessments to evaluate and mitigate market power. Conduct and impact assessments depend on the development of adequate and appropriate reference levels for each market product being sold. As documented in Services Tariff Section , a reference level based on a Generator s accepted Bids during competitive periods is the preferred calculation method, provided the NYISO has adequate data. 20 As Dr. LeeVanSchaick observes, the preference for Bid-based reference levels is based on the theory that a resource is incented to bid competitively i.e. to bid its marginal costs during competitive periods. 21 Therefore, it can be deterred from exercising market power by comparing its actions during any period to those it takes during competitive periods. The Regulation market design crafted by the NYISO in response to Order 755 creates incentives, even during competitive periods, that are different than those created by the market design for other market products like Operating Reserves and Energy. Because the ISO combines a unit s offer for Regulation Capacity and Regulation Movement for purposes of scheduling, but then pays each scheduled Resource for each MW of Regulation Movement that it provides in response to the NYISO s dispatch, Resource owners, even when they do not have market power (i.e. during competitive periods), have little incentive to offer their marginal Regulation Movement costs. As Dr. David Patton explained in his September 7, 2012 Comments in this proceeding: Any time a market selects the least cost resources using one criteria and then pays them based on a different criteria, firms may have incentives that lead to inefficient market outcomes. 22 Dr. LeeVanSchiack also explained why bid-based references are not likely to accurately represent a unit s marginal cost of Regulation Movement: Fast resources (ie. resources that usually move more than 10 MW per MWh of Regulation Capacity) will have strong incentives to raise their Regulation Movement Bid 20 Services Tariff Sections and MMU Affidavit, Motion To Intervene And Comments Of The New York ISO s Market Monitoring Unit, ER , page

9 Honorable Kimberly D. Bose January 22, 2013 Page 9 in order to be the marginal resource and, thereby, cause the distribution to be favorable towards fast resources. 23 He then provides an example which illustrates that the returns from raising offers above marginal cost can be quite large for fast regulation suppliers. 24 Dr LeeVanSchiack also concludes that the benefits of raising offer prices above marginal cost will be particularly large during regulation shortages. 25 Thus, bid-based references may not be a reliable indicator that a Resource is bidding its Regulation Movement competitively. Therefore, in the absence of a temporary Regulation Movement Bid Cap, the NYISO is proposing to modify the manner in which reference levels for Regulation Movement are to be determined. Pursuant to these proposed revisions, the NYISO will use only the calculation methods described in Sections and and will not use a calculation method based on accepted bids as described in Section Accordingly, the NYISO is proposing to amend Section to indicate that it will not establish real-time or Day-Ahead Reference Levels for Regulation Movement using the provisions found in Section In addition, the NYISO is clarifying Section to indicate that reference levels for Ancillary Services Bids, as well as Energy Bids, are intended to reflect a Generator s marginal costs. The NYISO is also clarifying this Section to indicate that other factors or adjustments as the ISO shall reasonably determine to be appropriate can be included in the Reference levels for for Ancillary Services, as well as Energy, set pursuant to Section or The NYISO is also clarifying that the calculation of the Regulation Capacity Market Price (both Day-Ahead and real-time) as demonstrated in the revisions to Services Tariff Sections and already approved in the Commission s November Order is also the price calculation employed during periods of shortage when the Regulation Service Demand Curve is activated. As these Tariff revisions demonstrate, when the Regulation Service Demand Curve is activated, the Shadow Price for the ISO s Regulation Service constraint for that interval either Day-Ahead or in real-time will be the appropriate Demand Curve price. In addition, these approved revisions demonstrate that the final Day-Ahead and real-time Regulation Capacity Market Price during periods of shortage when the Regulation Service Demand Curve is activated will reflect a subtraction of the marginal Resource s Day-Ahead or real-time Regulation Movement Bid, as appropriate. There are no new proposed tariff revisions being submitted in support of this clarification. 23 MMU Affidavit MMU Affidavit MMU Affidavit See also: MMU Affidavit for an explanation of how these consultations will occur and why they are unlikely to result in over-mitigation.

10 Honorable Kimberly D. Bose January 22, 2013 Page 10 VII. Effective Date The NYISO had developed and tested extensive software changes across a wide variety of its market and settlement systems in relation to the original changes proposed in its 755 response. These changes were ready to be activated, consistent with the original filing at the end of October The revisions to the proposal, described above, require additional software changes. While not as extensive as the initial set of software revisions, these changes likewise require a fully integrated set of testing and regression testing, as they are part of an overall larger integrated software solution. This process allows the NYISO to ensure its market and settlement results are of the highest quality while minimizing errors within these processes. Thus, the NYISO proposes that these changes become effective on or about June 14, 2013, to be designated by a two week notice to FERC and the NYISO s Market Participants. A major software installation, of which the changes in the Regulation Service market design are a part, is currently scheduled for June 12. Schedules are subject to change, however, and if the testing protocols expose flaws, the resolution of which takes additional time, or if the electric grid is exposed to system conditions that make any revisions to the scheduling and dispatch system a risk to reliability, the installation will be delayed. Therefore, the NYISO proposes to provide the FERC and its Market Participants with a two week notice of the effective date for this new Regulation Service redesign which actual effective date is expected to fall between June 12 and June 26, Accordingly, the e-tariff system will show the effective date / year for these proposed revisions as 12/31/9998 in recognition that a two-week notice indicating the precise effective date needs to be filed.

11 Honorable Kimberly D. Bose January 22, 2013 Page 11 VIII. Conclusion Wherefore, for the foregoing reasons, the New York Independent System Operator, Inc. respectfully requests that the Commission accept this compliance filing. Respectfully submitted, /s/ Mollie Lampi Mollie Lampi Assistant General Counsel New York Independent System Operator, Inc. 10 Krey Blvd. Rensselaer, New York (518) cc: Travis Allen Michael A. Bardee Gregory Berson Anna Cochrane Jignasa Gadani Morris Margolis Michael McLaughlin Joseph McClelland Daniel Nowak

12 CERTIFICATE OF SERVICE I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in this proceeding in accordance with the requirements of Rule 2010 of the Rules of Practice and Procedure, 18 C.F.R Dated at Rensselaer, NY this 22nd day of January, /s/ Mohsana Akter Mohsana Akter New York Independent System Operator, Inc. 10 Krey Blvd. Rensselaer, NY (518)

13 Attachment I

14 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION New York Independent System Operator, Inc. Docket Nos. ER , RM , AD AFFIDAVIT OF PALLAS LEEVANSCHAICK, PH.D. I. Qualifications 1. My name is Pallas LeeVanSchaick. I am an economist and vice president at Potomac Economics. Our offices are located at 9990 Fairfax Boulevard, Fairfax, Virginia Potomac Economics is a firm specializing in expert economic analysis and monitoring of wholesale electricity markets, and is the Market Monitoring Unit ( MMU ) for the New York Independent System Operator, Inc. ( NYISO ). Potomac Economics serves in a substantially similar role for ISO New England ( ISO-NE ), the Midwest Independent Transmission System Operator, Inc., and the Electric Reliability Council of Texas ( ERCOT ). 2. As the MMU for the NYISO, Potomac Economics is responsible for assessing the competitive performance of the market, for identifying potential market design flaws and abuses of market power, and for commenting on the NYISO s implementation of the mitigation rules. This has included providing advice on numerous issues related to the determination of generator reference levels. I currently serve as the Director of the MMU for the NYISO. 3. I have worked as an energy economist for over ten years, focusing primarily on wholesale power markets. I have provided advice to Regional Transmission Organizations on transmission pricing, market design, congestion management issues, and market power mitigation. I have co-authored a number of studies evaluating the competitiveness of market outcomes in the NYISO, ISO-NE, and ERCOT. I have provided expert testimony

15 Affidavit of Dr. Pallas LeeVanSchaick Page 2 of 11 before the Federal Energy Regulatory Commission ( Commission ) related to the application of market power mitigation rules and the efficient design of operating reserve markets. 4. I have a Ph.D. in Economics and a M.A. in Economics from George Mason University, and a B.A. in Economics and in Physics from the University of Virginia. II. Purpose and Summary of Affidavit 5. The NYISO plans to comply with the requirements of Order 755 by modifying the regulation market to set distinct clearing prices for Regulation Movement and Regulation Capacity. In the filing to which this affidavit is attached, the NYISO proposes to apply the existing market power mitigation measures for ancillary services to the new offer component for Regulation Movement ( Regulation Movement Bid ). However, the NYISO s proposal includes one significant modification in the application of the mitigation measures to the new Regulation Movement Bid. Specifically, the NYISO proposes not to use the bid-based reference level calculation method for the Regulation Movement Bid reference level. 1 Instead, the NYISO proposes to rely on the other established methods for calculating reference levels. 2 The purpose of this affidavit is to provide my assessment of the NYISO s proposal to rely on reference level calculation methods other than the bidbased method. Unless otherwise specified, capitalized terms used in my affidavit have the same meanings specified in the NYISO Market Services Tariff. 6. The remainder of my affidavit is divided into the following sections. Section III discusses the existing framework for market power mitigation in the energy and ancillary services markets and the principles for setting the reference levels that are used in the implementation of the mitigation measures. Section IVanalyzes the incentives for regulation suppliers under the new regulation market design and explains why these 1 2 Although the bid-based reference level and reference level are not capitalized terms, the bid-based reference level calculation method is described in NYISO MST , and various methods for calculating reference levels are described in NYISO MST The other established methods that the NYISO proposes to use for Regulation Movement are described in NYISO MST and

16 Affidavit of Dr. Pallas LeeVanSchaick Page 3 of 11 incentives make the bid-based reference level calculation method unsuitable for the Regulation Movement Bid reference level. Section V discusses the adequacy of other established methods for calculating reference levels and why the NYISO s proposal is not likely to result in mitigating competitive Regulation Movement Bids. Section VI summarizes my conclusions. III. Market Power Mitigation Measures and the Principles for Setting Reference Levels 7. The NYISO s existing mitigation measures are designed to limit the exercise of market power, while avoiding unnecessary market intervention. This section of the affidavit describes how reference levels are used in the existing mitigation measures and what principles are used in the calculation of reference levels. In particular, this section explains why it is important for the reference level to be an accurate estimate of the marginal cost of a resource. 8. The existing mitigation measures are designed considering that in a wholesale power auction with uniform clearing prices at every location, competitive suppliers generally have an incentive to offer at marginal cost. This is because one clearing price is paid to all suppliers whose offers are accepted in the auction. Therefore, a supplier (that does not possess market power) maximizes its profit by offering at marginal cost, since it will be selected whenever the clearing price is higher than its marginal cost and not be selected whenever the clearing price is lower than its marginal cost. 9. On the other hand, a supplier that possesses market power may benefit from withholding supply (i.e., not selling when its marginal cost is less than the clearing price), since the impact of withholding is to raise the clearing price paid for the supplier s remaining sales sufficient to compensate the supplier for any lost profit on the withheld capacity. The mitigation measures are designed to mitigate offers that are inflated above marginal cost when such offers are likely to raise the clearing price by more than certain clearly established thresholds. 3 Mitigation of an inflated offer is done by replacing the offer with an estimate of the supplier s marginal cost, which is known as the reference level. 3 These thresholds are established in NYISO MST 23.3.

17 Affidavit of Dr. Pallas LeeVanSchaick Page 4 of The reference level of a resource is supposed to approximate its marginal cost. The primary method that has been used to set reference levels for energy and ancillary services is the bid-based reference level method, which sets a resource s reference level based on the resource s accepted offers during competitive conditions over the previous 90 days. 4 This is based on the principle that a resource s accepted offers during competitive conditions over a substantial period of time should reasonably approximate the resource s marginal cost. For a resource that does not have a bid-based reference level, either because the resource did not have accepted offers in the previous 90 days or because the offers were not accepted during competitive conditions, the reference level is calculated using one of the following alternative methods. 11. The first alternative is to base the resource s reference level on an estimate the marginal cost using information received from consultation with the supplier. 5 Another alternative is to estimate the marginal cost using information from similar resources. 6 These alternative methods are used routinely to calculate the reference levels of resources that operate infrequently or in areas with limited competition. 12. For the Regulation Movement Bid, the NYISO is proposing not to use the accepted bidbased reference level method, since this method is not expected to yield a reliable estimate of the marginal cost of movement for resources on regulation. This is because regulation resources will not generally have an incentive to submit Regulation Movement Bids at marginal cost, even under competitive conditions. The following section analyzes the incentives of resources offering regulation and explains why they will not generally have an incentive to submit Regulation Movement Bids at marginal cost. IV. Incentives for Resources Offering Regulation 13. The bid-based reference level calculation method is generally reliable when suppliers have had an incentive to offer at marginal cost during the previous 90 days. However, an See NYISO MST See NYISO MST See NYISO MST

18 Affidavit of Dr. Pallas LeeVanSchaick Page 5 of 11 alternative calculation method should be used when a supplier does not have an incentive to offer at marginal cost. This section discusses the incentives for regulation suppliers under the new regulation market design and explains why regulation suppliers do not generally have an incentive to submit Regulation Movement Bids at marginal cost, making the bid-based reference level calculation method unsuitable for the Regulation Movement Bid parameter. 14. The incentives of suppliers in the new regulation market will depend on how resources are selected and how clearing prices are determined. In the new regulation market, the realtime market will select the regulation resources that have the lowest estimated cost of Regulation Service per MWh of Regulation Capacity, which will equal the sum of: (a) the Regulation Capacity Bid, (b) the opportunity cost of providing regulation rather than energy or operating reserves, and (c) the Regulation Movement Bid times the Regulation Movement Multiplier. The Regulation Movement Multiplier, which will initially be equal to 10 MW of Movement per MWh of Regulation Capacity, approximates the average amount that regulation resources have been moved per MWh of Regulation Capacity in recent years. Although regulation resources will be selected in merit order implicitly assuming they will be moved 10 MW for each MWh of Regulation Capacity scheduled, resources will be paid according to the actual amount they are moved. 15. In real-time market intervals in which the regulation requirement is satisfied, the marginal offer (i.e., the offer with the highest estimated cost of Regulation Service per MWh of Regulation Capacity) is used to set the clearing prices for regulation. The Regulation Movement Market Price is set equal to the Regulation Movement Bid of the marginal resource, and the Regulation Capacity Market Price is set equal to the marginal resource s estimated cost of Regulation Service per MWh of Regulation Capacity minus the marginal resource s Regulation Movement Bid times the Regulation Movement Multiplier. 16. In real-time market intervals in which the regulation requirement is not satisfied, the regulation market clears on the regulation demand curve. In such intervals, the NYISO proposes to set the Regulation Movement Market Price equal to the Regulation Movement Bid of the accepted offer with the highest estimated cost of Regulation Service per MWh of Regulation Capacity and to set the Regulation Capacity Market Price equal to the

19 Affidavit of Dr. Pallas LeeVanSchaick Page 6 of 11 regulation demand curve level minus the Regulation Movement Bid times the Regulation Movement Multiplier. 17. The actual movement of resources is expected to vary considerably by type of resource and operating conditions. Consequently, fast resources will generally move more than is assumed when the real-time market selects regulation resources, which will give them incentives to strategically adjust their offers to take advantage. The remainder of this section describes the two ways in which a fast resource can benefit from raising its Regulation Movement Bid above marginal cost. The first part discusses how a fast resource can benefit from its effect on the prices for regulation movement and capacity. The second part discusses how a fast resource can benefit from raising its Bid Production Cost Guarantee ( BPCG ) payment. A. Incentives to Raise Regulation Movement Market Price 18. Since the Regulation Movement Market Price is based on the offer of the marginal resource, the marginal resource can determine how the overall cost of regulation in the real-time market is distributed into the prices of each component. Fast resources (ie. resources that usually move more than 10 MW per MWh of Regulation Capacity) will have strong incentives to raise their Regulation Movement Bid in order to be the marginal resource and, thereby, cause the distribution to be favorable towards fast resources. The following example illustrates how a fast resource would benefit from being marginal. 19. Suppose that the marginal resource has an estimated cost of $10 per MWh of Regulation Capacity based on a Regulation Capacity Bid of $3 per MWh, a Regulation Movement Bid of $0.20 per MW, and a cross-product opportunity cost of $5 per MWh from not providing energy. 7 This would result in a Regulation Movement Market Price of $0.20 per MW and a Regulation Capacity Market Price of $8 per MWh. In this case, a fast resource that moves an average of 30 MW per MWh 8 of scheduled regulation capacity would expect to 7 8 Note, the cross-product opportunity cost is not a bid-able parameter. Rather, it is determined by the real-time market model when the model determines which product the resource is most economic to provide. This is consistent with the average quantity of movement for some resources in recent months.

20 earn $14 per MWh of Regulation Capacity. 9 Affidavit of Dr. Pallas LeeVanSchaick Page 7 of 11 However, if the fast resource submitted a Regulation Capacity Bid of $0 per MWh and a Regulation Movement Bid of $1.01 per MW, the resource s estimated cost of Regulation Service would rise to $10.10 per MWh, and it would become the marginal resource. Although this would increase the estimated cost of the marginal resource by just 1 percent to $10.10 per MWh, it would shift the distribution of the prices dramatically to $0 per MWh for Regulation Capacity and $1.01 per MW for Regulation Movement. Under this scenario, the fast resource would now expect to earn $30.30 per MWh of capacity, 116 percent higher than if it had not been the marginal resource. 10 This example shows that the returns from raising offers above marginal cost can be quite large for fast regulation suppliers. 20. In any auction with uniform clearing prices, a supplier might benefit from raising its offer price in order to be the marginal resource and thereby set the clearing price at a higher level. However, this is risky because the supplier may lose sales if it raises its offer too much and another supplier is selected instead. This sort of competitive discipline acts as a disincentive for suppliers to raise their offers strategically. However, the previous example shows that the returns from offering strategically would be higher for a fast resource in the regulation market than in the energy market. Furthermore, several aspects of the regulation market will tend to strengthen the incentive for certain suppliers to raise their offers above marginal cost. 21. First, the small size of the regulation market (as compared with the energy market) makes it easier for a supplier to predict how it would need to offer in order to be the marginal resource. For instance, in individual hours in the month of December 2012, an average of 3.6 distinct resources were on margin at some point during each hour in the regulation market, while an average of 9.4 distinct resources were on margin at some point during each hour in the energy market. When the marginal resource changes frequently, it is more difficult for a supplier to gauge the optimal level at which to offer in order to affect the 9 10 $14 per MWh = $8 per MWh Regulation Capacity Market Price + $0.20 per MW Regulation Movement Market Price * 30 MW of Movement per MWh of Capacity. $30.30 per MWh = $0 per MWh Regulation Capacity Market Price + $10.10 per MW Regulation Movement Market Price * 30 MW of Movement per MWh of Capacity.

21 Affidavit of Dr. Pallas LeeVanSchaick Page 8 of 11 clearing price. So, the smaller size of the regulation market makes it easier for supplier to benefit from raising their offers above marginal cost. 22. Second, the benefits of raising offer prices above marginal cost will be particularly large during regulation shortages. During regulation shortages, the accepted resource with the highest estimated cost will set the Regulation Movement Market Price, so a fast resource with no energy opportunity cost could submit a Regulation Movement Bid of $8 per MW and a Regulation Capacity Bid of $0 per MWh, and its estimated cost would be equal to the regulation demand curve level of $80 per MWh. The resource would set the prices at $8 per MW for Regulation Movement and $0 per MWh for Regulation Capacity. In this case, a fast resource that moves an average of 30 MW per MWh of capacity would expect to earn $240 per MWh of capacity from this strategy, three times the demand curve level for regulation of $80 per MWh. B. Incentives to Raise BPCG Payments 23. Although the real-time market model selects the resources with the lowest estimated cost, there is no guarantee that the Regulation Capacity Bids or Regulation Movement Bids of the selected resources will be lower than the respective clearing prices. Consequently, resources selected in merit order may still require BPCG payments to recoup their entire bids. Some suppliers will have strong incentives to raise the Regulation Movement Bids of their inframarginal resources above marginal cost in order to garner larger BPCG payments. 24. For example, suppose that the marginal resource s estimated cost is $10 per MWh and that its Regulation Movement Bid is $0.20 per MW, resulting in a Regulation Capacity Market Price of $8 per MWh and a Regulation Movement Market Price of $0.20 per MW. In this case, a fast resource that moves an average of 30 MW per MWh of capacity would expect to earn $14 per MWh. 11 However, if the fast resource submitted a Regulation Capacity Bid of $0 per MWh and a Regulation Movement Bid of $0.80 per MW, its estimated cost per MWh of Regulation Capacity would still be 20 percent lower than the marginal 11 $14 per MWh = $8 per MWh Regulation Capacity Market Price + $0.20 per MW Regulation Movement Market Price * 30 MW of Movement per MWh of Capacity.

22 Affidavit of Dr. Pallas LeeVanSchaick Page 9 of 11 resource, comfortably within the range necessary to be selected as a regulation resource. 12 This would enable the fast resource to receive a BPCG payment of $10 per MWh of capacity in addition to the market revenue of $14 per MWh. 13 As a matter of fact, any regulation movement offer between $0.47 and $0.99 per MW would enable the fast resource to increase its BPCG payment while still being inframarginal Although suppliers that raise their offer prices above marginal cost are at risk of not being selected when economic to provide regulation, the large size of the range in this example illustrates that many suppliers will benefit from raising their offers above marginal cost with little risk of not being selected. Furthermore, the incentive for suppliers to raise their offers above marginal cost will be present even under very competitive market conditions when there is a large number of suppliers and the supply of regulation is well in excess of the regulation requirement. C. Conclusions Regarding Incentives for Regulation Suppliers 26. The factors discussed in this section will provide some resources with strong incentives to raise their offer prices above marginal cost, even under competitive market conditions where the supply of regulation far exceeds demand. Although the discussion in this section focuses on the particular incentives of very fast resources, the incentives of other resources will also be affected to a lesser degree. Consequently, the accepted bids during competitive periods are not likely to provide a reliable indication of the marginal cost of Regulation The real-time market would estimate the cost of the fast resource as $8 per MWh of Regulation Service = $0 per MWh Regulation Capacity Bid + $0.80 per MW Regulation Movement Bid * Regulation Movement Multiplier of 10 MW per MWh of Capacity. This would be 20 percent lower than the estimated cost of the marginal resource. BPCG payment = {as-offered cost of regulation service} minus {revenue from regulation service} = {$0 per MWh Regulation Capacity Bid + $0.80 per MW Regulation Movement Bid * 30 MW of Movement per MWh of Capacity} minus {$8 per MWh Regulation Capacity Market Price + $0.20 per MW Regulation Movement Market Price * 30 MW of Movement per MWh of Capacity} = {$24 per MWh as-offered cost} minus {$14 per MWh of revenue} = $10 per MWh If the Regulation Movement Bid was $0.47 per MW, the as-offered cost of regulation would be $14.10 per MWh = $0 per MWh Regulation Capacity Bid + $0.47 per MW Regulation Movement Bid * 30 MW of Movement per MWh of Capacity, slightly in excess of the regulation revenue. Each increase of $0.01 per MW in the Regulation Movement Bid would result in a $0.30 per MWh increase in the BPCG payment.

23 Affidavit of Dr. Pallas LeeVanSchaick Page 10 of 11 Movement. Therefore, I support the NYISO s proposal not to calculate reference levels using the accepted bid-based method and, instead, rely on alternative calculation methods. The next section discusses why the alternative methods should provide an adequate basis for implementing the mitigation measures. V. Consultation with Suppliers Regarding Reference Levels 27. The NYISO proposes to calculate reference levels for Regulation Movement using two alternatives to the bid-based method. The first alternative is to base the resource s reference level on an estimate the marginal cost using information received from consultation with the supplier, while the second alternative supplements with information from similar resources. Whenever the NYISO calculates reference levels using one of these alternative methods, there is a possibility for a resource s costs to be under-estimated, so it is important to consider whether this is likely to result in over-mitigation (i.e., mitigation of a competitive offer). However, given the protections for suppliers that are currently built into the mitigation process for Ancillary Services, it is unlikely that the NYISO s proposal will lead to over-mitigation for several reasons. 28. First, the reference level consultation process allows suppliers to request a reference level adjustment to incorporate any type of legitimate cost. So, to the extent that a cost can be foreseen with substantial lead time, a supplier can request that the NYISO reflect the expected cost in its reference level Second, the mitigation measures for Ancillary Services use clearly-defined thresholds for identifying conduct that may warrant mitigation and for assessing the market impact of the conduct. The conduct threshold for Regulation Movement Bids identifies ones that exceed the reference level by at least 300 percent as potentially warranting mitigation. 16 To the extent that a resource s marginal costs fluctuate according to real-time operating conditions, this conduct threshold will provide ample room for most such variations NYISO MST allows the NYISO to calculate a reference level based on consultation with a supplier. The obligations of the NYISO and suppliers in the consultation process are provided in NYISO MST See NYISO MST

I. Documents Submitted

I. Documents Submitted 10 Krey Boulevard Rensselaer, NY 12144 The Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20245 Re: Compliance Filing in Docket No. ER14-2518-000

More information

15.3 Rate Schedule 3 - Payments for Regulation Service. This Rate Schedule applies to Suppliers that provide Regulation Service to the ISO.

15.3 Rate Schedule 3 - Payments for Regulation Service. This Rate Schedule applies to Suppliers that provide Regulation Service to the ISO. 15.3 Rate Schedule 3 - Payments for Regulation Service This Rate Schedule applies to Suppliers that provide Regulation Service to the ISO. A Behind-the-Meter Net Generation Resource that is comprised of

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) New York Independent System Operator, Inc. ) Docket No. ER17-446-000 ) MOTION TO INTERVENE AND COMMENTS OF THE MARKET MONITORING

More information

June 21, Southwest Power Pool, Inc., Docket No. ER Order No. 755 Compliance Filing

June 21, Southwest Power Pool, Inc., Docket No. ER Order No. 755 Compliance Filing June 21, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest Power Pool, Inc., Docket No. ER13- -000 Order No.

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket Nos. ER12-1630 Operator Corporation ) ER14-971 Informational Report of the California Independent System

More information

PJM Interconnection L.L.C., Docket No. ER Amended Compliance Filing Concerning the Offer Cap Rule

PJM Interconnection L.L.C., Docket No. ER Amended Compliance Filing Concerning the Offer Cap Rule PJM Interconnection, L.L.C. 2750 Monroe Blvd Audubon, PA 19403 Chenchao Lu Counsel 610.666.2255 fax 610.666.8211 Chenchao.Lu@pjm.com February 8, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy

More information

December 6, Docket No. ER Energy Imbalance Market Structural Market Power Informational Report

December 6, Docket No. ER Energy Imbalance Market Structural Market Power Informational Report California Independent System Operator Corporation December 6, 2016 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

PJM Interconnection L.L.C., Docket No. ER Compliance Filing: Discontinuing Netting of Internal Bilateral Transactions for Uplift Purposes

PJM Interconnection L.L.C., Docket No. ER Compliance Filing: Discontinuing Netting of Internal Bilateral Transactions for Uplift Purposes PJM Interconnection, L.L.C. 2750 Monroe Boulevard Audubon, PA 19403 Jennifer H. Tribulski Associate General Counsel T: (610) 666-4363 F: (610) 666-8211 Jennifer.Tribulski@pjm.com October 9, 2018 The Honorable

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: December 6, 2017 Re: Decision on contingency

More information

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

the Real-Time Market will be based on the system marginal costs produced by the Real-Time 17.1 LBMP Calculation The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by the Real-Time Dispatch

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator Corporation Docket No. ER06-615- REPORT OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent Operator ) Corporation ) Docket No. ER10-500-000 MOTION FOR CLARIFICATION OR IN THE ALTERNATIVE REHEARING

More information

Hybrid GT Pricing Improvements

Hybrid GT Pricing Improvements Hybrid GT Pricing Improvements Ethan Avallone Market Design Specialist Management Committee September 28, 2016 KCC 2000-2016 New York Independent System Operator, Inc. All Rights Reserved. Agenda Proposal

More information

June 23, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

June 23, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 June 23, 2016 Re: California Independent

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnecton, L.L.C. ) Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnecton, L.L.C. ) Docket No. ER UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnecton, L.L.C. ) Docket No. ER17-1138-000 MOTION TO INTERVENE AND PROTEST OF THE MISO INDEPENDENT MARKET MONITOR RELATED

More information

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

the Real-Time Market will be based on the system marginal costs produced by the Real-Time 17.1 LBMP Calculation The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by the Real-Time Dispatch

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) California Independent System ) Docket No. ER08-760-001 Operator Corporation ) ) MOTION FOR LEAVE TO FILE ANSWER OUT OF TIME AND

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Duke Energy Trading and Marketing Co. ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Duke Energy Trading and Marketing Co. ) Docket No. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Duke Energy Trading and Marketing Co. ) Docket No. EL03-152-000 PETITION FOR REHEARING OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR

More information

BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. ) Docket Nos. ER

BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. ) Docket Nos. ER BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. ) Docket Nos. ER16-372-000 MOTION FOR LEAVE TO ANSWER AND ANSWER OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION IN SUPPORT OF

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) Docket No. RM Operator Corporation )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) Docket No. RM Operator Corporation ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket No. RM19-2-000 Operator Corporation ) COMMENTS OF THE DEPARTMENT OF MARKET MONITORING FOR

More information

Single Schedule Market Pricing Issues

Single Schedule Market Pricing Issues Single Schedule Market Pricing Issues Presented by Scott Harvey and Susan Pope Phase 1 - Session 3 Module G: Market Power Mitigation June 29, 2017 Toronto, Ontario TOPICS June 2: Module A: Energy Pricing

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Uplift Cost Allocation and Transparency ) in Markets Operated by Regional ) Docket No. RM17-2-000 Transmission Organizations and

More information

144 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON REHEARING AND COMPLIANCE. (Issued July 18, 2013)

144 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON REHEARING AND COMPLIANCE. (Issued July 18, 2013) 144 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony Clark. PJM

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

Secretary. Dear Secretary Bose: February. 16, 2013 to. Anna McKenna. Deputy General Counsel. Folsom, CA

Secretary. Dear Secretary Bose: February. 16, 2013 to. Anna McKenna. Deputy General Counsel. Folsom, CA April 15, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System Operator Corporation Docket Nos.

More information

March 18, Docket Nos. ER and EL Exceptional Dispatch Informational Report Covering Period up to February 2019

March 18, Docket Nos. ER and EL Exceptional Dispatch Informational Report Covering Period up to February 2019 California Independent System Operator Corporation March 18, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination of Ancillary Service Standards... 4 8.2.2 Time-Frame for Revising Ancillary Service

More information

3.2 Market Buyers Spot Market Energy Charges.

3.2 Market Buyers Spot Market Energy Charges. 3.2 Market Buyers. 3.2.1 Spot Market Energy Charges. (a) The Office of the Interconnection shall calculate System Energy Prices in the form of Day-ahead System Energy Prices and Real-time System Energy

More information

October 21, 2011 VIA ELECTRONIC FILING

October 21, 2011 VIA ELECTRONIC FILING October 21, 2011 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: North American Electric Reliability

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ISO New England s Petition for Waiver of ) ISO-NE Transmission, Markets and Services ) Tariff Provisions to Retain Mystic 8 and

More information

August 15, Secretary. Dear Secretary Bose: July 15, Anna McKenna. Folsom, CA

August 15, Secretary. Dear Secretary Bose: July 15, Anna McKenna. Folsom, CA August 15, 20122 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System Operator Corporation Docket Nos.

More information

Ancillary Service Markets

Ancillary Service Markets Section 9 Ancillary Services Ancillary Service Markets The United States Federal Energy Regulatory Commission (FERC) defined six ancillary services in Order No. 888: 1) scheduling, system control and dispatch;

More information

December 17, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

December 17, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation December 17, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) PJM Interconnection, L.L.C. ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) PJM Interconnection, L.L.C. ) Docket No. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) PJM Interconnection, L.L.C. ) Docket No. ER18-988-000 ) MOTION FOR LEAVE TO ANSWER AND ANSWER OF PJM INTERCONNECTION, L.L.C. PJM

More information

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff ConOp Internal NYISO HVDC Controllable Line Scheduling Concept of Operation Author: Scott Harvey, LECG Reviewers: ISO Staff LECG Staff Project Sponsor: Point of Contact: C. King B. Kranz Document Locator:

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. ) ) ) Docket No. EL18-34-000 ANSWER AND MOTION FOR LEAVE TO ANSWER OF THE INDEPENDENT MARKET MONITOR

More information

REAL-TIME SCHEDULING PRIMER

REAL-TIME SCHEDULING PRIMER REAL-TIME SCHEDULING PRIMER Introduction System Market Design 2 (SMD2) is name given to a New York Independent System Operator (NYISO) program that replaces the NYISO s legacy control and computing platforms

More information

Broader Regional Markets Report

Broader Regional Markets Report Broader Regional Markets Report Rana Mukerji SENIOR VICE PRESIDENT MARKET STRUCTURES, NYISO Business Issues Committee Meeting February 14, 2018, Rensselear, NY 1 Market-to-Market Coordination-PJM Implement

More information

Energy Marketplace. Nicolé K. Grottoli. Market Overview Course. Senior Market Trainer, Market Training, NYISO. March 8, 2018 Rensselaer, NY 12144

Energy Marketplace. Nicolé K. Grottoli. Market Overview Course. Senior Market Trainer, Market Training, NYISO. March 8, 2018 Rensselaer, NY 12144 Energy Marketplace Nicolé K. Grottoli Senior Market Trainer, Market Training, NYISO Market Overview Course March 8, 2018 Rensselaer, NY 12144 1 NYISO Energy Marketplace Benefits to Understanding How is

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Reliant Energy Etiwanda, LLC ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Reliant Energy Etiwanda, LLC ) Docket No. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Reliant Energy Etiwanda, LLC ) Docket No. ER99-4398-000 ) MOTION TO INTERVENE OUT OF TIME AND STATEMENT OF SUPPORT OF THE CALIFORNIA

More information

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator:

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator: ConOp Internal NYISO Controllable Lines Concept of Operation Author: Reviewers: Scott Harvey, LECG Project Sponsor: Point of Contact: Document Locator: Revision History Date Additions, deletions, modifications

More information

Broader Regional Markets Report

Broader Regional Markets Report Broader Regional Markets Report Rana Mukerji SENIOR VICE PRESIDENT MARKET STRUCTURES, NYISO Business Issues Committee Meeting June 20, 2018, Rensselear, NY 1 Market-to-Market Coordination-PJM Implement

More information

RTC will make binding unit commitment and de-commitment decisions for the periods

RTC will make binding unit commitment and de-commitment decisions for the periods 4.4 Real-Time Markets and Schedules 4.4.1 Real-Time Commitment ( RTC ) 4.4.1.1 Overview RTC will make binding unit commitment and de-commitment decisions for the periods beginning fifteen minutes (in the

More information

SUBMITTED VIA E-TARIFF FILING. August 4, 2017

SUBMITTED VIA E-TARIFF FILING. August 4, 2017 Millennium Tower 719 Second Avenue, Suite 1150 Seattle, WA 98104 (206) 623-9372 Phone (206) 623-4986 Fax SUBMITTED VIA E-TARIFF FILING August 4, 2017 The Honorable Kimberly D. Bose Secretary Federal Energy

More information

2. Market Operations Overview

2. Market Operations Overview 2. Market Operations Overview 2.5 Market Information This section summarizes and describes the common information that is used by the Day-Ahead and Real-Time processes. 2.5.1 Resource Static Data Static

More information

Comparison Matrix of Existing Capacity Market Attributes: RPM & FCM

Comparison Matrix of Existing Capacity Market Attributes: RPM & FCM Comparison Matrix of Existing Capacity Market Attributes: RPM & FCM RPM / PJM FCM / ISO-NE Qualification for Existing Resources Qualification for New Resources Procurement cycle Commitment Term Base Auction

More information

March 15, Secretary. Washington , DC Re: the above. referenced Corporation included in. granted in 2012.

March 15, Secretary. Washington , DC Re: the above. referenced Corporation included in. granted in 2012. March 15, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System Operator Corporation Docket Nos.

More information

Case 15-E-0302 Proceeding on Motion of the Commission to Implement a Large-Scale Renewable Program and a Clean Energy Standard

Case 15-E-0302 Proceeding on Motion of the Commission to Implement a Large-Scale Renewable Program and a Clean Energy Standard 10 Krey Boulevard Rensselaer, NY 12144 April 22, 2016 By Electronic Delivery Hon. Kathleen H. Burgess Secretary New York State Public Service Commission Three Empire State Plaza Albany, New York 12223-1350

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) ISO New England Inc. ) Docket No. ER Regulation Market Changes ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) ISO New England Inc. ) Docket No. ER Regulation Market Changes ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ISO New England Inc. ) Docket No. ER14-1537 Regulation Market Changes ) ) MOTION TO INTERVENE AND PROTEST OF THE ENERGY STORAGE

More information

WASHINGTON October 4, 2010

WASHINGTON October 4, 2010 CAMBRIDGE SAN FRANCISCO WASHINGTON October 4, 2010 BRUSSELS Kimberly D. Bose Secretary, Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 LONDON MADRID Re: Docket No. RM10-17-000

More information

3.2 Market Settlements.

3.2 Market Settlements. 3.2 Market Settlements. If a dollar-per-mw-hour value is applied in a calculation under this section 3.2 where the interval of the value produced in that calculation is less than an hour, then for purposes

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator Corporation ) ) ) Docket Nos. ER09-241-000 INTERVENTION AND COMMENTS OF SOUTHERN CALIFORNIA

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. ) Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. ) Docket No. ER UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. ) Docket No. ER14-1145-000 MOTION TO INTERVENE AND PROTEST OF NEXTERA ENERGY POWER MARKETING, LLC Pursuant

More information

Lessons Learned from Market Monitoring in North American Electricity Markets

Lessons Learned from Market Monitoring in North American Electricity Markets Lessons Learned from Market Monitoring in North American Electricity Markets Presented at: World Bank Electricity Forum David B. Patton, Ph.D. Potomac Economics February 24, 2003 The Importance of Market

More information

Regulation Energy Management Draft Final Proposal

Regulation Energy Management Draft Final Proposal Regulation Energy Management Draft Final Proposal January 13, 2011 Renewable Integration: Market and Product Review Phase 1 Regulation Energy Management (REM) Revised Draft Final Proposal Table of Contents

More information

Broader Regional Markets Report

Broader Regional Markets Report Broader Regional Markets Report Rana Mukerji SENIOR VICE PRESIDENT MARKET STRUCTURES, NYISO Business Issues Committee Meeting April 11, 2018, Rensselear, NY 1 Market-to-Market Coordination-PJM Implement

More information

Stepped Constraint Parameters. Issue Paper

Stepped Constraint Parameters. Issue Paper Stepped Constraint Parameters May 5, 2016 Table of Contents 1. Introduction... 3 2. Plan for Stakeholder Engagement... 4 3. Transmission constraint relaxation parameter... 5 4. Shift factor effectiveness

More information

December 15, Southwest Power Pool, Inc., Docket No. ER Submission of Tariff Revisions to Attachment AE

December 15, Southwest Power Pool, Inc., Docket No. ER Submission of Tariff Revisions to Attachment AE December 15, 2014 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest Power Pool, Inc., Docket

More information

January 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

January 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation January 15, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ELECTRIC STORAGE PARTICIPATION ) IN REGIONS WITH ORGANIZED ) DOCKET NO. AD16-20-000 WHOLESALE ELECTRIC MARKETS ) ) RESPONSE OF THE

More information

Ancillary Service Markets

Ancillary Service Markets Section 9 Ancillary Services Ancillary Service Markets The United States Federal Energy Regulatory Commission (FERC) defined six ancillary services in Order No. 888: 1) scheduling, system control and dispatch;

More information

Market Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation

Market Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation Market Monitoring Presented by: Dr. Robert Sinclair Presented to: Georgian Energy Policy Delegation April 30, 2012 Kentucky Public Service Commission Potomac Economics Potomac Economics is a leading provider

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) Docket No. RM Operator Corporation )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) Docket No. RM Operator Corporation ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket No. RM17-3-000 Operator Corporation ) COMMENTS OF THE DEPARTMENT OF MARKET MONITORING FOR

More information

Summary of 2016 MISO State of the Market Report

Summary of 2016 MISO State of the Market Report Summary of 2016 MISO State of the Market Report Presented to: MISO Board Markets Committee David B. Patton, Ph.D. MISO Independent Market Monitor July 20, 2017 Introduction As the Independent Market Monitor

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southern California Edison ) Docket No. ER Company )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southern California Edison ) Docket No. ER Company ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southern California Edison ) Docket No. ER04-1209-000 Company ) MOTION TO INTERVENE AND COMMENTS IN SUPPORT OF FILING OF THE CALIFORNIA

More information

Analysis of the 2020/2021 RPM Base Residual Auction

Analysis of the 2020/2021 RPM Base Residual Auction Analysis of the 2020/2021 RPM Base Residual Auction The Independent Market Monitor for PJM November 17, 2017 Monitoring Analytics 2017 www.monitoringanalytics.com Introduction This report, prepared by

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Udi Helman, Principal Market Economist Anjali Sheffrin, Chief Economist / Director, Market and Product Development

More information

The DAM consists of the following functions performed in sequence: the MPM-RRD, IFM, and RUC.

The DAM consists of the following functions performed in sequence: the MPM-RRD, IFM, and RUC. FERC ELECTRIC TARIFF First Revised Sheet No. 589 FOURTH REPLACEMENT VOLUME NO. I Superseding Original Sheet No. 589 31 Day-Ahead Market. The DAM consists of the following functions performed in sequence:

More information

Reliability Pricing Model (RPM) Overview. April 11, 2005

Reliability Pricing Model (RPM) Overview. April 11, 2005 Reliability Pricing Model (RPM) Overview April 11, 2005 Drivers for Capacity Market Reform Generation Net Revenue Shortfall Inconsistency between capacity pricing and reliability requirements Result has

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Settlement Intervals and Shortage Pricing in Markets Operated by Regional Transmission Organizations And Independent System Operators

More information

Alberta Capacity Market

Alberta Capacity Market Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Proposal Document Section 1: Overview of the Alberta Capacity Market Prepared by: Alberta Electric System Operator Date: January 26, 2018

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Metcalf Energy Center LLC ) Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Metcalf Energy Center LLC ) Docket No. ER UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Metcalf Energy Center LLC ) Docket No. ER18-240-000 MOTION FOR LEAVE TO ANSWER AND ANSWER OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR

More information

New York Independent System Operator, Inc. NYISO Tariffs. OATT Schedules

New York Independent System Operator, Inc. NYISO Tariffs. OATT Schedules New York Independent System Operator, Inc. NYISO Tariffs OATT Schedules Document Generated On: 6/30/2010 Page 1 Contents 6 Schedules... 7 6.1 Schedule 1 Scheduling, System Control and Dispatch Service...

More information

NYISO Markets. New York s Marketplace for Wholesale Electricity

NYISO Markets. New York s Marketplace for Wholesale Electricity NYISO Markets New York s Marketplace for Wholesale Electricity Why Markets? Markets Support Reliability Competitive wholesale electricity markets preserve system reliability with pricing signals that attract

More information

Congestion Cost Metrics

Congestion Cost Metrics Congestion Cost Metrics DRAFT One of the features of a locational marginal price (LMP) based market is the ability to identify grid locations that are difficult to serve with economic generation due to

More information

Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor

Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor Summary Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor Draft Final Proposal Comments by Department of Market Monitoring August 23, 2016 The ISO proposal to lower the energy bid floor from

More information

Demand Response and Scarcity Pricing

Demand Response and Scarcity Pricing Item #/ Check When Complete Demand and Scarcity Pricing Begin End Category Sub-Category Order 719 Summary Draft Status SPP Notes References Assignment 41 47 63 Demand Allow DR to provide ancillary services

More information

Demand Response. Mathangi Srinivasan. New York Market Orientation Course (NYMOC) Senior Market Trainer, NYISO. March 20-23, 2018 Rensselaer, NY 12144

Demand Response. Mathangi Srinivasan. New York Market Orientation Course (NYMOC) Senior Market Trainer, NYISO. March 20-23, 2018 Rensselaer, NY 12144 Demand Response Mathangi Srinivasan Senior Market Trainer, NYISO New York Market Orientation Course (NYMOC) March 20-23, 2018 Rensselaer, NY 12144 1 Demand Response Module Objectives Upon completion of

More information

Price Formation in Energy and Ancillary Services Markets Operated by Regional Transmission Organizations and Independent System Operators

Price Formation in Energy and Ancillary Services Markets Operated by Regional Transmission Organizations and Independent System Operators UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Price Formation in Energy and Ancillary Services Markets Operated by Regional Transmission Organizations and Independent System

More information

Locational Export Capacity Proposal

Locational Export Capacity Proposal Locational Export Capacity Proposal Joshua A. Boles ICAP Market Operations New York Independent System Operator jboles@nyiso.com 518-356-6293 Business Issues Committee October 20, 2016 NYISO 2000-2016

More information

Docket Nos. ER , and EL July 2015 Exceptional Dispatch Report (Chart 1 data)

Docket Nos. ER , and EL July 2015 Exceptional Dispatch Report (Chart 1 data) California Independent System Operator September 15, 2015 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. : Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. : Docket No. ER UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. : Docket No. ER19-982-000 MOTION FOR LEAVE TO ANSWER AND ANSWER OF PJM INTERCONNECTION, L.L.C. TO PROTEST

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) Docket No. ER Operator Corporation )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) Docket No. ER Operator Corporation ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket No. ER18- -000 Operator Corporation ) PETITION FOR LIMITED TARIFF WAIVER AND REQUEST FOR

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION COMMENTS OF THE INDEPENDENT MARKET MONITOR FOR PJM

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION COMMENTS OF THE INDEPENDENT MARKET MONITOR FOR PJM UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. ) ) ) Docket No. ER16 372 005 COMMENTS OF THE INDEPENDENT MARKET MONITOR FOR PJM Pursuant to Rule 211

More information

March 1, California Independent System Operator Corporation, Docket No. ER Amendments to the ISO Tariff

March 1, California Independent System Operator Corporation, Docket No. ER Amendments to the ISO Tariff Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California Independent System Operator Corporation, Docket No. ER99- -000 Amendments to the ISO Tariff Dear

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Modifications to Customers Identified ) To Attachment H-13 from ) Docket No. ER15-3-000 Commonwealth Edison Company ) ) MOTION

More information

The Role Of The Independent Market Monitor

The Role Of The Independent Market Monitor The Role Of The Independent Market Monitor Presented to: Wisconsin Public Utility Institute Energy Utility Basics Michael W. Chiasson, P.E. MISO IMM April 13, 2018 Objectives The Role of the Market Monitor

More information

Energy and Bilateral Transactions

Energy and Bilateral Transactions Energy and Bilateral Transactions Tariff Review Robert Pike Director, Market Design New York Independent System Operator Market Issues Working Group February 25, 2010 Overview The NYISO is identifying

More information

139 FERC 61,057 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON COMPLIANCE FILING. (Issued April 19, 2012) Table of Contents

139 FERC 61,057 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON COMPLIANCE FILING. (Issued April 19, 2012) Table of Contents 139 FERC 61,057 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. PJM Interconnection,

More information

January 16, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 Frist Street, NE Washington, DC 20426

January 16, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 Frist Street, NE Washington, DC 20426 California Independent System Operator Corporation January 16, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 Frist Street, NE Washington, DC 20426 Re: California

More information

Less than 20 MW Constraint Reliability Margin Values

Less than 20 MW Constraint Reliability Margin Values Less than 20 MW Constraint Reliability Margin Values David Edelson Manager Operations Performance and Analysis Management Committee August 29, 2018 Rensselear, NY Background NYISO s tariff currently requires

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) PROTEST OF THE INDEPENDENT MARKET MONITOR FOR PJM

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) PROTEST OF THE INDEPENDENT MARKET MONITOR FOR PJM UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION New York Independent System Operator, Inc. ) ) ) ) Docket No(s) ER08 1281 005, 006, 007 and 010 PROTEST OF THE INDEPENDENT MARKET

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. ) Docket Nos. ER ) EL

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. ) Docket Nos. ER ) EL UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. ) Docket Nos. ER15-623-000 ) EL15-29-000 MOTION TO INTERVENE AND COMMENTS OF THE SOLAR ENERGY INDUSTRIES

More information

165 FERC 61,050 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING PROPOSED TARIFF REVISIONS. (Issued October 29, 2018)

165 FERC 61,050 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING PROPOSED TARIFF REVISIONS. (Issued October 29, 2018) 165 FERC 61,050 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Neil Chatterjee, Chairman; Cheryl A. LaFleur and Richard Glick. California Independent System Operator

More information

Docket Nos. ER and EL September 2018 Exceptional Dispatch Report (Chart 1 data)

Docket Nos. ER and EL September 2018 Exceptional Dispatch Report (Chart 1 data) California Independent System Operator Corporation November 15, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 Frist Street, NE Washington, DC 20426 Re: California

More information

Docket Nos. ER and EL November 2018 Exceptional Dispatch Report (Chart 1 data)

Docket Nos. ER and EL November 2018 Exceptional Dispatch Report (Chart 1 data) California Independent System Operator Corporation January 15, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 Frist Street, NE Washington, DC 20426 Re: California

More information

November 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 Frist Street, NE Washington, DC 20426

November 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 Frist Street, NE Washington, DC 20426 California Independent System Operator Corporation November 15, 2016 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 Frist Street, NE Washington, DC 20426 Re: California

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. : Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. : Docket No. ER UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. : Docket No. ER19-80-000 ANSWER OF PJM INTERCONNECTION, L.L.C. TO COMMENTS OF INDEPENDENT MARKET MONITOR

More information

Issue Paper. Modifying the DEC Bidding Activity Rule on Day-Ahead Schedules

Issue Paper. Modifying the DEC Bidding Activity Rule on Day-Ahead Schedules Issue Paper Modifying the DEC Bidding Activity Rule on Day-Ahead Schedules February 1, 2008 Modifying the DEC Bidding Activity Rule on Day Ahead Schedules Table of Contents 1 Introduction...3 2 Background:

More information

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal Energy Imbalance Market Year 1 Enhancements Phase 2 Draft Final Proposal September 8, 2015 Energy Imbalance Market Year 1 Enhancements Phase 2 Draft Final Proposal Table of Contents 1 Introduction... 3

More information