1 Monte Carlo Simulation for Sparepart Inventory I Nyoman Pujawan 1, Niniet Indah Arvitrida 2, and Bathamas P. Asihanto Department of Industrial Engineering Sepuluh Nopember Institute of Technology Surabaya, Indonesia pujawan@ie.its.ac.id 1 niniet@ie.its.ac.id 2 Abstract - Most inventory models are based on assumptions that demand follows a certain theoretical distribution (such as Normal or Poisson distribution). For items with relatively fast moving, such an assumption may hold true. However, for slow moving items such as spare parts, we rarely found that demand follows such theoretical distribution. Consequently, using standard inventory control models to set inventory parameters for spare parts would result in either low service level, high inventory level, or both. In this study we use Monte Carlo simulation to determine inventory control parameters for spare parts. We employ a well known periodic review base-stock inventory control models where the replenishment decisions are governed by maximum and minimum inventory levels. The initial solutions were generated using standard inventory control models. Monte Carlo Simulation is then used to evaluate the parameters against other neighboring values in terms of inventory cost and service level. We apply the procedure for cabin spare parts in an aircraft maintenance facility. Keywords: inventory management, spare parts, simulation. 1. INTRODUCTION Managing spare parts inventory has always been challenging for a number of (conflicting) reasons. First, demand for spare parts is often intermittent or lumpy making it difficult to forecast. Second, the required service level is high for most spare parts as unavailability would result in costly consequences such as lengthy facility breakdown or high costs associated with urgent purchase. Third, the price for a spare part could be very high making it less favorable to hold inventories. For many companies, inventory investment for spare parts is enormously large. An informal discussion with a gas exploration company in Indonesia reveals that the spare parts inventory value in this company is about US$ 47 million. If the annual inventory holding cost is about 30% then the spare parts cost this company about US$12 million per year. In addition, the turnover ratio of spare parts is usually very low (usually between 0.5 and 1 which means that on average one spare part is consumed every one to two years. Despite that managing spare parts inventory is critical to most companies, studies addressing this issue is fairly limited, in contrast to inventory for raw materials or finished goods that have received much attention from academics. One of the reasons why inventory management for spare parts received only little attention is because the demand pattern for spare parts is slow moving, often intermittent or lumpy (Teunter et al, 2010). As a consequence, they are difficult to forecast. Lumpy demand is characterized by many periods with zero demand (Pujawan & Kingsman, 2003). The inventory control models that have been developed for fast moving items are hardly ever appropriate for spare parts. There are a number of different stream of papers about spare parts inventory. One of the streams is dealing with forecasting. Croston (1972) is among the early papers proposing a method for forecasting demand of spare parts inventory. This model basically decomposes demand pattern into two components, i.e., the magnitude of positive demand and time between demands. This method is further discussed or developed by other authors such as Regattieri et al (2005) and Syntetos & Boylan (2005). The other group of authors deal with optimum setting of replenishment parameters such as reorder point and maximum inventory. The most popular method appears to be the (s, S) or its periodic review version (R, s, S). This model works as follows. In a review period, when inventory falls to less than or equal to s then place an order to bring the inventory level back to S. The determination of : Corresponding Author
2 optimum s and S values has been discussed by many authors, but most of them have assumed that demand follows Normal or Poisson distribution. Due to its demand being intermittentt or lumpy, the demand distribution for spare parts hardly follows any theoretical distribution. Consequently, using standard inventory control models to set inventory parameters for spare parts would result in either low service level, high inventory level, or both. In this study we use Monte Carlo simulation to determine inventory control parameters for spare parts. By using simulation, we can capture various demand characteristics including those which do not follow any theoretical distribution. According to Regattieri et al. (2005), the demand pattern of a material is characterized by two attributes, i.e., the average demand internal (ADI) which is the average time between occurrence of two successive demands and the coefficient of variation of the positive demand (CV). Large values of both ADI and CV indicated high demand uncertainty and hence, large inventory investment is required to achieve an acceptable service level. As shown by figure 1, most items have CV larger than 50% and ADI more than 1.5, meaning that the degree of lumpiness of those items is high. 2. CASE STUDY We do the case study in PT. GMF Aeroasia (will be referred to as GMF in the rest of this paper), an aircraft maintenance facility, a sister company of Garuda Indonesia. The GMF manages the maintenance, repair, and overhaul of aircraft from various airline companies. A critical activity within the maintenance, repair, and overhaul is the management of spare parts inventory. With the increasing variety of aircrafts and the fact that each aircraft consists of a very large number of components, the management of spare parts inventory is becoming so critical to achieve an efficient operations as well as high service level. In general, there are two major classification of spare parts related to an aircraft. The first is spare parts that are required for safety flight such as break, wheel, and many others. If any of these components does not working well, the aircraft can not or is not allowed to fly because it will pose high safety risks. The second classification is related to cabin materials. If any of the cabin materials is not functioning well, the aircraft is still able to fly, but it will compensate the convenience of the passengers. In this study we will focus on seat materials for B as one class of cabin materials. In general the cabin materials can be classified into six groups, namely components related to seat (such as hydro-lock, arm rest, in arm table), in flight entertainment (such as seat electronic box, video monitor, and harness), lavatory (such as portable water tank, toilet assembly), lighting, luggage bin and galley (such as oven, coffee maker, and boiler). The current situation in GMF shows that many of the cabin materials are on what they refer to as hot item list or HIL, meaning that those items are not available when needed. For B alone, at the time this observation is made, there were 45 items on HIL status. Among those on the HIL status, the majority are for seat components. There are in total 94 items that belong to seat components of B Like other spare parts in general, we found that the demand pattern is lumpy for most of the seat materials. Figure 1 Demand pattern classification 2.1 The Use of Analytical Models Most inventory control models have been developed based on an assumption that demand follows a certain theoretical distribution. In particular, majority of the models have assumed that demand follows either normal or Poisson distribution. In reality, when demand is lumpy, such an assumption is hardly ever holds true. Consequently, the use of analytical models for lumpy demand often ends up with inappropriate inventory parameters. In this study we have used a periodic base-stock policy called (R, s, S) where R stands for interval between review periods, s is reorder point and S is maximum inventory position (Silver et al, 1998). The model reads as follows. During a review period, if inventory position falls below s then we have to order to bring inventory position back to S. Inventory position is on hand inventory plus on order minus backorder. Determination of optimum R, s, and S is not an easy task. All of these three parameters will affect both inventory costs and service level. One of the analytical methods often used for determining those parameters is called power approximation. However, this approximation does not always provide good results, especially when demand is lumpy. We have tried to use the power approximation to set inventory parameters for a couple of
3 spare parts. We then simulate the performance of those parameters to see if they can give good performance in terms of service level. One of our observations is that this approximation fails to achieve the intended service level for almost all situations. As shown in figure 2, the actual service level is always below the theoretical service level. Figure 2 - The actual service level (vertical) is always lower than the intended service level (horizontal) 2.2 The Use of Monte Carlo Simulation We have used the Monte Carlo simulation to evaluate the performance of the parameters from power approximation. As we believe that those parameters are rarely the best ones, we also evaluate other set of parameters close to those recommended by the power approximation. Since the demand for parameters is mostly slow moving, the choice of s and S values is relatively limited, making the simulation quite effective for finding the best set of parameters. The simulation procedure can be summarized as follows. First, based on historical data of 28 months, we model the empirical demand distribution. As an illustration, we will use item PN (we have made an arbitrary part number, different from the actual number used by the company). The historical data shows that 71% of months has no demand for this item. About 3.5% has a demand of 1 or 2, 10.7% has a demand of 3 or 4 and the rest is 5 or 6. To generate the demand, a uniform (0,1) random number is use. If random number falls between 0 and then demand is set to be zero. If random number is between and then demand is either 1 or 2 with an equal probability, and so on. Let D(t) = demand in period t, obtained through the above procedure. We then do the following steps: Update inventory: I(t) = I(t-1) + R(t) D(t) B(t) Update on-hand inventory: O(t) = max (0, I(t)) Update backlog: B(t) = max (0, -I(t)) Calculate inventory position: IP(t) = I(t) + O(t) Determine ordering decision: If IP(t) < s, Q = S IP(t), otherwise Q = 0 Update on order quantity: O(t) = O(t-1)+Q(t)-R(t) Determine order receipt schedule: R(t+L) = Q Where I(t)is inventory at the end of period t, O(t) is on hand inventory, B(t) is backlog in period t, R(t) is schedule receive in period t, Q(t) is order quantity in period t, and L lead time. As an illustration, we will use one part called PN (we have made an arbitrary part number, different from the actual number used by the company). The baseline parameters obtained from the power approximation is s = 5 and S = 6, with an intention to achieve a service level of 95%. We then do a parameter search by lowering and increasing both s and S values around their baselines. The result is shown in table 1. Assuming that service level 95% is required, then we have to exclude those alternatives with actual service level below 95%. Figure 3 shows that the remaining candidates are those at the right side of the vertical dotted line. Among the remaining candidates, we then have to again exclude those that are not at the efficient frontier. Efficient frontier can simply be defined as a curve connecting the most efficient candidates. The most efficient candidates can be visually seen as those at the outer side of group. By looking at figure 3, there appears to be only 4 candidates are remaining. Now, the decision maker has to make a choice among the 4 remaining candidates. Since the service level for each part should be dependent on part criticality, choosing a solution with a service level much higher than the initial target would be inappropriate. Thus, as long as the service level target has been set carefully with consideration of item criticality then the simple rule of thumb is to choose a candidate with lowest cost in the efficient frontier. Efficient frontier Figure 3 - Service level (horizontal) and cost (vertical) for each candidate
4 3. DEVELOPMENT OF DECISION SUPPORT SYSTEM A spreadsheet-based decision support system (DSS) has been developed to assist decision maker in performing the above procedure until the best candidate is obtained. We have tested the DSS with the data of 20 seat components. The tests show that the DSS has worked well and practical enough to use. 4. CONCLUDING REMARKS In this study, a decision support system has been developed to obtain the best replenishment policy for spare parts. As the demand pattern for most spare parts typically is lumpy, it is hardly ever true that it follows any theoretical distribution such as Normal or Poisson. The analytical models for inventory policy is normally assumed that the demand follows Normal, Poisson, or any other standard distribution. This has lead this study to use simulation to obtain the best inventory parameters. We use a periodic review (R, s, S) inventory model and the parameter s (the reorder point) and S (the maximum stock) is obtained through simulation. The results suggest that the values of s and S obtained by simulation are always better than those from analytical models in terms of costs and service level. REFERENCES Archibald, B. C., dan Silver, E. A. (1978). (s, S) policies under continuous review and discrete compound Poisson demand. Management Science 24, pp Babai, M. Z., Syntetos, A. A., dan Teunter, R. H. (2010). On the empirical performance of (T, s, S) heuristics. European Journal of Operational Research 202, pp Croston, J. D. (1972). Forecasting and stock control for intermittent demand. Operational Research Quarterly 23, pp Huiskonen, J. (2001). Maintenance spare parts logistics: Special characteristics and strategic choices. International Journal of Production Economics 71, pp Nenes, G., Panagiotidou, S., dan Tagaras, G. (2010). Inventory Management of multiple items with irregular demand: A case study. European Journal of Operational Research 205, pp Pujawan, I N. dan Kingsman, B. G. (2003). Properties of lot sizing rules under lumpy demand. International Journal of Production Economics 88, pp Regattieri, A., Gamberi, M., Gamberini, R., dan Manzini, R. (2005). Managing lumpy demand for aircraft spare parts. Journal of Air Transport Management 11, pp Rustenburg, W. D., van Houtum, G. J., dan Zijm, W. H. M. (2001). Spare parts management at complex technology-based organizations: An agenda for research. International Journal of Production Economics 71, pp Syntetos, A. A., dan Boylan, J. E. (2005). The accuracy of intermitten demand estimates. International Journal of Forecasting 21, pp Teunter, R. H., Syntetos, A. A., dan Babai, M. Z. (2010). Determining order-up-to levels under periodic review for compound binomial (intermittent) demand. European Journal of Operational Research 203, pp AUTHOR BIOGRAPHIES Nyoman Pujawan is professor of supply chain engineering at the Department of Industrial Engineering, Sepuluh Nopember Institute of Technology (ITS), Surabaya - Indonesia. He received his PhD from Lancaster University, UK. He has published papers in such journals as European Journal of Operational Research, International Journal of Production Economics, Production Planning and Control, Business Process Management Journal, and many others. He is the Editor-in-Chief of Operations and Supply Chain Management: An International Journal. He can be reached at< pujawan@ie.its.ac.id>. Niniet Indah Arvitrida is a Lecturer at the Department of Industrial Engineering, Sepuluh Nopember Institute of Technology, Surabaya - Indonesia. She received her bachelor and master degrees, both in Industrial Engineering, from ITS. Bathamas P. Asihanto graduated from the Department of Industrial Engineering, Sepuluh Nopember Institute of Technology, Surabaya - Indonesia in 2010.
5 Table 1 Simulation results for different parameters s and S for item PN INPUT RESULTS Experiment Theoretical Actual Holding Order Shortage Total No. S s SL SL Cost Cost Cost Cost ,50% 6,00 88,50% $ $6.668 $ $ ,50% 6,00 91,74% $ $6.337 $ $ ,50% 6,00 93,20% $ $5.368 $ $ ,50% 6,00 94,47% $ $4.634 $ $ ,50% 6,00 94,64% $ $3.892 $ $ ,00% 7,00 91,97% $ $6.668 $ $ ,00% 7,00 94,50% $ $6.337 $ $ ,00% 7,00 95,68% $ $5.368 $ $ ,00% 7,00 96,42% $ $4.634 $ $ ,00% 7,00 96,02% $ $3.892 $ $ ,50% 8,00 94,80% $ $6.668 $ $ ,50% 8,00 96,82% $ $6.337 $ $ ,50% 8,00 97,58% $ $5.368 $ $ ,50% 8,00 97,53% $ $4.634 $ $ ,50% 8,00 97,49% $ $3.892 $ $ ,00% 9,00 97,07% $ $6.668 $ $ ,00% 9,00 98,51% $ $6.337 $8.184 $ ,00% 9,00 98,35% $ $5.368 $7.810 $ ,00% 9,00 98,49% $ $4.634 $6.886 $ ,00% 9,00 98,53% $ $3.892 $6.644 $
Croston s Method with Alternative Demand Distributions
DECISION SCIENCES INSTITUTE An Examination of s Method with Alternative Time-Between-Demand Matthew Lindsey Stephen F. Austin State University lindseymd@sfasu.edu Robert Pavur The University of North Texas
More informationSupplier Selection of Technical Goods Using AHP Methods
Supplier Selection of Technical Goods Using AHP Methods Fatkhor Rozi Industrial Engineering, Engineering Faculty University of Surabaya Surabaya, Indonesia fatkhorrozi@gmail.com Evy Herowati Industrial
More informationOn the exact calculation of the mean stock level in the base stock periodic review policy
On the exact calculation of the mean stock level in the base stock periodic review policy Eugenia Babiloni, Manuel Cardós, Ester Guijarro Universitat Politècnica de València (SPAIN) mabagri@doe.upv.es;
More informationForecasting Workshop: Intermittent Demand Forecasting
Workshop: Intermittent Demand Recent Advances in Intermittent Demand John Boylan j.boylan@lancaster.ac.uk Professor of Business Analytics Intermittent Demand Recent Advances by John Boylan ( ) Practical
More informationLancaster University Management School.
Optimum Parameters for Croston Intermittent Demand Methods The 32 nd Annual International Symposium on Forecasting Nikolaos Kourentzes Lancaster University Management School www.lancs.ac.uk Production
More informationAvailable online at ScienceDirect. Procedia Engineering 100 (2015 ) Demand Modeling with Overlapping Time Periods
Available online at www.sciencedirect.com ciencedirect Procedia Engineering 100 (2015 ) 305 313 25th DAAAM International ymposium on Intelligent Manufacturing and Automation, DAAAM 2014 Demand Modeling
More informationA Parametric Bootstrapping Approach to Forecast Intermittent Demand
Proceedings of the 2008 Industrial Engineering Research Conference J. Fowler and S. Mason, eds. A Parametric Bootstrapping Approach to Forecast Intermittent Demand Vijith Varghese, Manuel Rossetti Department
More informationRecoupling the forecasting and inventory management processes
Recoupling the forecasting and inventory management processes Aris A. Syntetos Cardiff University Panalpina Chair in Manufacturing & Logistics Foresight Practitioner Conference: North Carolina State University,
More information1. Introduction. Chukwunonyelum E. Onyeocha 1, Joseph Khoury 2 and Ramy F. Harik 3
Comput Sci Appl Volume 1, Number 1, 2014, pp 31-47 Received: June 24, 2014; Published: July 25, 2014 Computer Science and Applications wwwethanpublishingcom Evaluation of Forecasting and Inventory Control
More informationEnhancement of Intermittent Demands in Forecasting for Spare Parts Industry
Indian Journal of Science and Technology, Vol 8(25), DOI: 10.17485/ijst/2015/v8i25/53374, October 2015 ISSN (Print) : 0974-6846 ISSN (Online) : 0974-5645 Enhancement of Intermittent Demands in Forecasting
More informationINVENTORY CONTROL SYSTEM ANALYSIS OF GOODS AT COMPANY X S MODERN TRADE
INVENTORY CONTROL SYSTEM ANALYSIS OF GOODS AT COMPANY X S MODERN TRADE Victor Suhandi 1, Lydiawari Silalahi 2, Vivi Arisandhy 3 Industrial Engineering Department, Maranatha Christian University Jl. Suria
More informationDetermining order-up-to level considering backorder cost per unit short on the base-stock inventory system under intermittent demand
Determining order-up-to level considering backorder cost per unit short on the base-stock inventory system under intermittent demand Keisuke agasawa Faculty of Engineering, Hiroshima University 1-4-1,
More informationSimulation approach in stock control of products with sporadic demand
Simulation approach in stock control of products with sporadic demand Jakub Dyntar, Eva Kemrová, Ivan Gros The stock management of products with sporadic demand is one of the main problems for many entrepreneurs.
More informationForecasting Intermittent Demand Patterns with Time Series and Machine Learning Methodologies
Forecasting Intermittent Demand Patterns with Time Series and Machine Learning Methodologies Yuwen Hong, Jingda Zhou, Matthew A. Lanham Purdue University, Department of Management, 403 W. State Street,
More informationINVENTORY DETERMINATION MODEL FOR PACKAGING MATERIALS WITH VARIOUS DEMAND DATA DISTRIBUTIONS IN CHEMICAL COMPANY
INVENTORY DETERMINATION MODEL FOR PACKAGING MATERIALS WITH VARIOUS DEMAND DATA DISTRIBUTIONS IN CHEMICAL COMPANY Inaki Maulida Hakim 1 and Putri Larassati 2 Industrial Engineering Department Faculty of
More information1. Inventory management
1. Inventory management 10.1 Introduction The importance of proper inventory management is evident when one considers that inventories have lead to the demise of many a business. The downfall of some companies
More informationBackorders case with Poisson demands and constant procurement lead time
The Lecture Contains: Profit maximization considering partial backlogging Example for backorder cases Backorders case with Poisson demands and constant procurement lead time The lost sales case for constant
More informationA Risk-Based Technique Based On Spare Parts Quantity and Cost for Optimizing Inventory Level In Plant Maintenance
A Risk-Based Technique Based On Spare Parts Quantity and Cost for Optimizing Inventory Level In Plant Maintenance Kamal Imran Sharif To Link this Article: http://dx.doi.org/10.6007/ijarbss/v8-i11/4950
More informationHow much money can you add to the bottom line with good inventory management?
Inventory Management Key Concepts: Inventory are those stocks or items used to support production (raw materials and work-in-process items), supporting activities (maintenance, repair, and operating supplies),
More informationOPTIMIZATION AND OPERATIONS RESEARCH Vol. IV - Inventory Models - Waldmann K.-H
INVENTORY MODELS Waldmann K.-H. Universität Karlsruhe, Germany Keywords: inventory control, periodic review, continuous review, economic order quantity, (s, S) policy, multi-level inventory systems, Markov
More information1 Introduction Importance and Objectives of Inventory Control Overview and Purpose of the Book Framework...
Contents 1 Introduction... 1 1.1 Importance and Objectives of Inventory Control... 1 1.2 Overview and Purpose of the Book... 2 1.3 Framework... 4 2 Forecasting... 7 2.1 Objectives and Approaches... 7 2.2
More informationLecture 12. Introductory Production Control
Lecture 12 Introductory Production Control 167 Where we ve come from: Models of Manufacturing Systems: Deterministic, Queuing, Simulation Key ideas: Some WIP useful for buffering stations, but More WIP
More informationBlood Supply Chain Challenges: Evidence from Indonesia
Blood Supply Chain Challenges: Evidence from Indonesia Agus Mansur 1,2 1 Industrial Engineering Department Institut Teknologi Sepuluh Nopember Surabaya, Indonesia. 2 Industrial Engineering Department Universitas
More informationDEMAND CATEGORISATION, FORECASTING, AND INVENTORY CONTROL FOR INTERMITTENT DEMAND ITEMS
DEMAND CATEGORISATION, FORECASTING, AND INVENTORY CONTROL FOR INTERMITTENT DEMAND ITEMS E. Babiloni 1*, M. Cardós, J.M. Albarracín 3, M.E. Palmer 4 Department of Management Polytechnic University of Valencia,
More informationSpare Parts Inventory Management with Demand Lead Times and Rationing
Spare Parts Inventory Management with Demand Lead Times and Rationing Yasar Levent Kocaga Alper Sen Department of Industrial Engineering Bilkent University Bilkent, Ankara 06800, Turkey {yasarl,alpersen}@bilkent.edu.tr
More informationCorrespondence should be addressed to Rita Gamberini,
Mathematical Problems in Engineering Volume 2010, Article ID 579010, 14 pages doi:10.1155/2010/579010 Research Article Forecasting of Sporadic Demand Patterns with Seasonality and Trend Components: An
More informationMATERIAL REQUIREMENT PLANNING
2 MATERIAL REQUIREMENT PLANNING MGT2405, University of Toronto, Denny Hong-Mo Yeh Material requirement planning is not only a technique for planning material requirements. It is also a logic that relates
More informationStored resource used to satisfy a current or future need: Raw materials, work-in-process, finished goods.
Summary 1. Introduction Statistics, management science, operations research, decision aid, 2. Advanced optimization Linear programming Integer programming Non-linear programming 3. Multicriteria decision
More informationIntegrated planning of operations and spare parts logistics under uncertainty in the supply chain of maintenance service providers
Integrated planning of operations and spare parts logistics under uncertainty in the supply chain of maintenance service providers Masoumeh Kazemi Zanjani, JEng, PhD Concordia University, Montreal, Canada
More informationSven Axsäter. Inventory Control. Third Edition. Springer
Sven Axsäter Inventory Control Third Edition Springer Contents 1 Introduction 1 1.1 Importance and Objectives of Inventory Control 1 1.2 Overview and Purpose of the Book 2 1.3 Framework 4 2 Forecasting
More informationOPERATIONS RESEARCH. Inventory Theory
OPERATIONS RESEARCH Chapter 5 Inventory Theory Prof. Bibhas C. Giri Department of Mathematics Jadavpur University Kolkata, India Email: bcgiri.jumath@gmail.com MODULE - 1: Economic Order Quantity and EOQ
More informationOn Intermittent Demand Model Optimisation and Selection
On Intermittent Demand Model Optimisation and Selection Nikolaos Kourentzes 1, Lancaster University Management School, Lancaster, LA1 4YX, UK Abstract Intermittent demand time series involve items that
More informationAdapting Wright s modification of Holt s method to forecasting intermittent demand
DePaul University From the SelectedWorks of Nezih Altay 28 Adapting Wright s modification of Holt s method to forecasting intermittent demand Nezih Altay, University of Richmond Frank Rudisill, University
More informationCorrespondence should be addressed to Rita Gamberini,
Hindawi Publishing Corporation Mathematical Problems in Engineering Volume 2010, Article ID 579010, 14 pages doi:10.1155/2010/579010 Research Article Forecasting of Sporadic Demand Patterns with Seasonality
More informationLOT SIZING IN MRP. Week Gross requirements Scheduled receipts Projected available balance Net Requirements
LOT SIZING IN MRP The net data is subjected lot sizing Lot sizes developed can satisfy the net for one or more weeks The basic trade-off involves the elimination of one or more setups at the expense of
More informationCase study of a batch-production/inventory system
Case study of a batch-production/inventory system Winands, E.M.M.; de Kok, A.G.; Timpe, C. Published: 01/01/2008 Document Version Publisher s PDF, also known as Version of Record (includes final page,
More informationInternational Journal of Mathematical Archive-3(7), 2012, Available online through ISSN
International Journal of Mathematical Archive-3(7), 2012, 2836-2843 Available online through www.ijma.info ISSN 2229 5046 INVENTORY REPLENISHMENT DECISION RULE FOR A TWO-ECHELON INVENTORY SYSTEM WITH VARIOUS
More informationFUNDAMENTALS OF INVENTORY MANAGEMENT AND CONTROL
FUNDAMENTALS OF INVENTORY MANAGEMENT AND CONTROL FUNDAMENTALS OF INVENTORY MANAGEMENT AND CONTROL SECOND EDITION RICHARD E. WARD CONTENTS ABOUT THIS COURSE xi HOW TO TAKE THIS COURSE xiii PART I CONTROL
More informationStrategies to Achieve Labor Flexibility in the Garment Industry
ISSN (Online): 1694-0784 ISSN (Print): 1694-0814 41 Strategies to Achieve Labor Flexibility in the Garment Industry Parisima Nassirnia 1, Masine Md. Tap 2 1 Department of Industrial Engineering, Faculty
More informationRisk evaluation of a spare part stock by stochastic simulation
Risk evaluation of a spare part stock by stochastic simulation P.-E. Hagmark & H. Pernu Tampere University of Technology, Tampere, Finland ABSTRACT: Spare part inventories are necessities in keeping equipment
More informationForecasting Survey. How far into the future do you typically project when trying to forecast the health of your industry? less than 4 months 3%
Forecasting Forecasting Survey How far into the future do you typically project when trying to forecast the health of your industry? less than 4 months 3% 4-6 months 12% 7-12 months 28% > 12 months 57%
More informationChapter 9. Managing Routine (Class C) Inventories. 9.1 The Nature of C Items. C Items (so-called cats and dogs) low annual dollar usage (low Dv)
Chapter 9 Managing Routine (Class C) Inventories 9.1 The Nature of C Items C Items (so-called cats and dogs) low annual dollar usage (low Dv) A low-dollar-usage item which should not be C items. (i) A
More informationChapter 17. Inventory Control
1 Chapter 17 Inventory Control 2 OBJECTIVES Inventory System Defined Inventory Costs Independent vs. Dependent Demand Single-Period Inventory Model Multi-Period Inventory Models: Basic Fixed-Order Quantity
More informationOn the Selection of Customer Service Metrics in Inventory Control
On the Selection of Customer Service Metrics in Inventory Control Guijarro E 1, Babiloni E, Cardós M, Estellés S Abstract Customer service metrics have been largely studied in literature due to their importance
More informationSimulation as Support for PBL Contract Design
Simulation as Support for PBL Contract Design Olle Wijk Systecon Rehnsgatan 20 104 32 Stockholm +46 8 459 0757 olle.wijk@systecon.se Patric Andersson Systecon Rehnsgatan 20 104 32 Stockholm +46 8 459 0766
More informationSERVICE TOOLS: WHY BOTHER?
SERVICE TOOLS: WHY BOTHER? Optimization of stock levels for service tool inventory SECOND ISRAELI-DUTCH WORKSHOP ON QUEUEING THEORY SEPTEMBER 29 - OCTOBER 1, 2010 INGRID VLIEGEN 1 Co-authors: Ana Bušić
More informationThe Next Generation of Inventory Optimization has Arrived
The Next Generation of Inventory Optimization has Arrived Cutting-edge demand classification technology integrated with network optimization and simulation enables cost reduction and increased inventory
More informationProceeding of 9 th International Seminar on Industrial Engineering and Management ISSN : X
Proceeding of 9 th International Seminar on Industrial Engineering and Management ISSN : 1978-774X PROPOSED MAINTENANCE POLICY AND SPARE PART MANAGEMENT OF GOSS UNIVERSAL PRINTING MACHINE WITH RELIABILITY
More informationCHAPTER 2 LITERATURE REVIEW AND THEORITICAL BACKGROUND
CHAPTER 2 LITERATURE REVIEW AND THEORITICAL BACKGROUND This chapter explains the previous researches in decreasing demand problems and theoretical background of lot sizing technique those are being used
More informationA Study on the Effects of the Future Value of Fares for Airline Revenue Management
A Study on the Effects of the Future Value of Fares for Airline Revenue Management H.C.C. HO Department of Industrial and Systems Engineering The Hong Kong Polytechnic University Hong Kong, China chichiu.ho@connect.polyu.hk
More informationDocument downloaded from: This paper must be cited as:
Document downloaded from: http://hdl.handle.net/025/0075 This paper must be cited as: The final publication is available at https://doi.org/0.504/ijstm.206.078539 Copyright Inderscience Enterprises Ltd.
More informationComputer Simulation and Learning Theory, Volume 3, 1977
TEACHING INVENTORY CONTROL VIA COMPUTER INTERACTION WITH INCREASING COMPLEXITY James W. Gentry * Edward T. Reutzel Submitted for the Third ABSEL Conference Knoxville, Tennessee October, 1975 * Assistant
More informationOperations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras
Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Module - 01 Lecture - 08 Aggregate Planning, Quadratic Model, Demand and
More informationA DISCRETE-EVENT SIMULATION MODEL FOR A CONTINUOUS REVIEW PERISHABLE INVENTORY SYSTEM
A DISCRETE-EVENT SIMULATION MODEL FOR A CONTINUOUS REVIEW PERISHABLE INVENTORY SYSTEM Mohamed E. Seliaman Shaikh Arifusalam Department of Systems Engineering King Fahd Univeristy of Petroleum and Minerals
More informationDesign of a spare part inventory control system for Vlisco Helmond
Eindhoven University of Technology MASTER Design of a spare part inventory control system for Vlisco Helmond Althuizen, M. Award date: 2016 Link to publication Disclaimer This document contains a student
More informationInventory systems for independent demand
Inventory systems for independent demand Roberto Cigolini roberto.cigolini@polimi.it Department of Management, Economics and Industrial Engineering Politecnico di Milano 1 Inventory systems for independent
More informationINVENTORY MANAGEMENT FOR STOCHASTIC DEMAND AND LEAD TIME PRODUCTS
INVENTORY MANAGEMENT FOR STOCHASTIC DEMAND AND LEAD TIME PRODUCTS 1 NAPASORN PRUKPAIBOON, 2 WIPAWEE THARMMAPHORNPHILAS 1,2 Department of Industrial Engineering, Faculty of Engineering, Chulalongkorn University,
More informationStochastic Modeling and Validation of Three-Tier Supply Chains Using Multiple Tools
Abstract Stochastic Modeling and Validation of Three-Tier Supply Chains Using Multiple Tools Alok K. Verma Old Dominion University averma@odu.edu Efficient and effective supply chain management assists
More informationISSN: International Journal of Innovative Research in Technology & Science(IJIRTS)
Algorithm for Supply Chain Management: to Suite the Present Industrial Need Dr.Ram Karan Singh 1 Professor, Department of Civil Engineering, King Khalid University, Kingdom of Saudi Arabia; A. Shanmuganathan
More informationApplication of Decision Trees in Mining High-Value Credit Card Customers
Application of Decision Trees in Mining High-Value Credit Card Customers Jian Wang Bo Yuan Wenhuang Liu Graduate School at Shenzhen, Tsinghua University, Shenzhen 8, P.R. China E-mail: gregret24@gmail.com,
More informationInventory Management. Copyright 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Independent demand items
Chapter 12 Inventory Management McGraw-Hill/Irwin Copyright 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Inventory Inventory A stock or store of goods Independent demand items Items that
More informationSIMULATION STUDY OF A BASIC INTEGRATED INVENTORY PROBLEM WITH QUALITY IMPROVEMENT AND LEAD TIME REDUCTION
SIMULATION STUDY OF A BASIC INTEGRATED INVENTORY PROBLEM WITH QUALITY IMPROVEMENT AND LEAD TIME REDUCTION Sofie Van Volsem, Johannes Verdiesen Department of Industrial Management Ghent University Technologiepark
More informationDynamic Model to Design and Control Maintenance Spare Parts Stock
Dynamic Model to Design and Control Maintenance Spare Parts Stock Jorge dos Santos Loureiro Jorge.s.loureiro@tecnico.ulisboa.pt Instituto Superior Técnico - Universidade de Lisboa, Portugal March2017 Abstract:
More informationA decision aid for make-to-order and make-to-stock classification
Chapter 3 A decision aid for make-to-order and make-to-stock classification Managers in food processing industries find it difficult to decide which products to make to order and which products to stock.
More informationDifferentiating the Hospital Supply Chain For Enhanced Performance By Derek T. DeScioli MLOG 2005
Introduction Differentiating the Hospital Supply Chain For Enhanced Performance By Derek T. DeScioli MOG 2005 ife and Money. These two vital concepts dominate the hospital industry, and each hospital must
More informationFolia Oeconomica Stetinensia DOI: /foli FORECASTING RANDOMLY DISTRIBUTED ZERO-INFLATED TIME SERIES
Folia Oeconomica Stetinensia DOI: 10.1515/foli-2017-0001 FORECASTING RANDOMLY DISTRIBUTED ZERO-INFLATED TIME SERIES Mariusz Doszyń, Ph.D., Associate Prof. University of Szczecin Faculty of Economics and
More informationCOORDINATING DEMAND FORECASTING AND OPERATIONAL DECISION-MAKING WITH ASYMMETRIC COSTS: THE TREND CASE
COORDINATING DEMAND FORECASTING AND OPERATIONAL DECISION-MAKING WITH ASYMMETRIC COSTS: THE TREND CASE ABSTRACT Robert M. Saltzman, San Francisco State University This article presents two methods for coordinating
More informationFitting the Statistical Distribution for Daily Rainfall in Ibadan, Based On Chi-Square and Kolmogorov-Smirnov Goodness-Of-Fit Tests.
Fitting the Statistical Distribution for Daily Rainfall in Ibadan, Based On Chi-Square and Kolmogorov-Smirnov Goodness-Of-Fit Tests. *Oseni, B. Azeez And **Femi J. Ayoola. *Department of Mathematics and
More informationA Conceptual Framework for Assessing Supply Chain Flexibility
A Conceptual Framework for Assessing Supply Chain Flexibility Nyoman Pujawan Center for Supply Chain and e-business Management Department of Industrial Engineering, Sepuluh Nopember Institute of Technology
More informationRELIABLE PREDICTION INTERVALS AND BAYESIAN ESTIMATION FOR DEMAND RATES OF SLOW-MOVING INVENTORY. Matthew Douglas Lindsey, B.S., M.B.A.
RELIABLE PREDICTION INTERVALS AND BAYESIAN ESTIMATION FOR DEMAND RATES OF SLOW-MOVING INVENTORY Matthew Douglas Lindsey, B.S., M.B.A. Dissertation Prepared for the Degree of DOCTOR OF PHILOSOPHY UNIVERSITY
More informationInventory Model Involving Controllable Lead Time through New Approach
Proceedings of the 2012International Conference on Industrial Engineering and Operations Management Istanbul, Turkey, July3 6, 2012 Inventory Model Involving Controllable Lead Time through New Approach
More informationDecision Support and Business Intelligence Systems
Decision Support and Business Intelligence Systems (9 th Ed., Prentice Hall) Chapter 4: Modeling and Analysis Learning Objectives Understand the basic concepts of management support system (MSS) modeling
More informationAIR FORCE INSTITUTE OF TECHNOLOGY
SIMULATION MODELING AND ANALYSIS OF AIR FORCE DEPOT ENGINE REPAIR DURING NORMAL AND INCREASED OPERATIONAL TEMPOS THESIS Changsung Kim, Captain, USAF AFIT-ENS-MS-16-M-109 DEPARTMENT OF THE AIR FORCE AIR
More informationANYTIME 500 KANBAN REPLENISHMENT
ANYTIME 500 KANBAN REPLENISHMENT Automate Manual Kanban Systems with Sage 500 ERP Blanket Purchase Orders. Kanban is a lean manufacturing and replenishment philosophy that originated from Japanese car
More informationShop Floor Control in Repair shops. Floor Cornelissen
Shop Floor Control in Repair shops Floor Cornelissen Shop Floor Control in Repair Shops Which shop floor control method can be used for which repair shop? Master program Production and Logistic Management
More informationA BAYESIAN APPROACH TO DEMAND FORECASTING. A Thesis Presented to the Faculty of the Graduate School. University of Missouri-Columbia
A BAYESIAN APPROACH TO DEMAND FORECASTING A Thesis Presented to the Faculty of the Graduate School University of Missouri-Columbia In Partial Fulfillment Of the Requirements for the Degree Masters of Science
More informationINTEGRATION OF STOCK KEEPING AREAS AND INVENTORY PLANNING
INTEGRATION OF STOCK KEEPING AREAS AND INVENTORY PLANNING Murat Düzgün 1, Mehmet Tanyaş 2 Abstract Inventory are a company's merchandise, raw materials, semi-finished and finished products which have not
More informationL R m. Bibliographic Information. Copyright Information. Contact Information
L R m Laboratory for Responsible Manufacturing Bibliographic Information Ilgin, M. A. and Gupta, S. M., "The Effect of Disassembly Process on Spare Parts Inventory Management in Post Product Life Cycle",
More informationInventory Management
Inventory Management Materials planning AGGREGATE PLANNING Master Production Schedule (MPS) MATERIALS PLANNING The planning of materials requirements consists of the determination of: What How much and
More informationThe authors thank Ruud Teunter, University of Groningen, Nikos Kourentzes, Lancaster
Forecasting Intermittent Inventory Demands: Simple Parametric Methods vs. Bootstrapping Aris A. Syntetos a,*, M. Zied Babai b,1, and Everette S. Gardner, Jr. c,2 a Cardiff Business School, Aberconway Building,
More informationInternational Journal for Management Science And Technology (IJMST)
Volume 3; Issue 2 Manuscript- 3 ISSN: 2320-8848 (Online) ISSN: 2321-0362 (Print) International Journal for Management Science And Technology (IJMST) VALIDATION OF A MATHEMATICAL MODEL IN A TWO ECHELON
More informationME 375K Production Engineering Management First Test, Spring 1998 Each problem is 20 points
Name ME 375K Production Engineering Management First Test, Spring 1998 Each problem is 2 points 1. A raw material inventory holds an expensive product that costs $1 for each item. The annual demand for
More informationIt deals with purchasing and controlling the materials used in the production process.
9. MATERIALS MANAGEMENT It deals with purchasing and controlling the materials used in the production process. 1. Materials (goods) planning and control Decisions to be taken in this are: a) Amount of
More informationDennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa
Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa In an inventory control system for a single product with random demand, where the inventory level is continuously monitored,
More informationDeriving the Exact Cost Function for a Two-Level Inventory System with Information Sharing
Journal of Industrial and Systems Engineering Vol. 2, No., pp 4-5 Spring 28 Deriving the Exact Cost Function for a Two-Level Inventory System with Information Sharing R. Haji *, S.M. Sajadifar 2,2 Industrial
More informationA Single Item Non Linear Programming (NLP) Economic Order Quantity Model with Space Constraint
A Single Item Non Linear Programming (NLP) Economic Order Quantity Model with Space Constraint M. Pattnaik Dept. of Business Administration Utkal University, Bhubaneswar, India monalisha_1977@yahoo.com
More informationSOME TYPICAL REAL BENEFITS Some benefits I have seen companies achieve with simulation modeling as part of their approach include
G-07 James J. Curry Simulation Modeling in Lean Programs This presentation provides examples where simulation modeling was used as a tool in lean improvement programs, as a complement to other techniques
More informationOperations Research Analysts
http://www.bls.gov/oco/ocos044.htm Operations Research Analysts * Nature of the Work * Training, Other Qualifications, and Advancement * Employment * Job Outlook * Projections Data * Earnings * OES Data
More informationPredicting Over Target Baselines (OTBs) 1
2010, Issue 4 The Magazine of the Project Management Institute s College of Performance Management Predicting Over Target Baselines (OTBs) 1 By Kristine Thickstun, MBA, MS, and Dr. Edward D. White Stick
More informationAn Improved Analogy-based Demand Forecasting Method for Service Parts
Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management An Improved Analogy-based Demand Forecasting Method for Service Parts Masaru Tezuka, Shinji Iizuka,
More informationRisk Assessment Techniques
This article was downloaded by: [Stephen N. Luko] On: 27 May 2014, At: 08:21 Publisher: Taylor & Francis Informa Ltd Registered in England and Wales Registered Number: 1072954 Registered office: Mortimer
More informationManagerial Economics Prof. Trupti Mishra S.J.M School of Management Indian Institute of Technology, Bombay. Lecture - 23 Theory of Cost (Contd )
Managerial Economics Prof. Trupti Mishra S.J.M School of Management Indian Institute of Technology, Bombay Lecture - 23 Theory of Cost (Contd ) In today s session we will continue our discussion on the
More informationModeling of competition in revenue management Petr Fiala 1
Modeling of competition in revenue management Petr Fiala 1 Abstract. Revenue management (RM) is the art and science of predicting consumer behavior and optimizing price and product availability to maximize
More informationNotes for Production and Operations Management- I
Notes for Production and Operations Management- I Factors affecting Process Design Decisions Nature of product/service demand Degree of vertical integration Production Flexibility Degree of automation
More informationSales and Operations Planning
Sales and Operations Planning Alessandro Anzalone, Ph.D. Hillsborough Community College, Brandon Campus 1. Purpose of Sales and Operation Planning 2. General Design of Sales and Operations Planning 3.
More informationThus, there are two points to keep in mind when analyzing risk:
One-Minute Spotlight WHAT IS RISK? Uncertainty about a situation can often indicate risk, which is the possibility of loss, damage, or any other undesirable event. Most people desire low risk, which would
More informationMulti-Echelon Multi-product Inventory Strategy in a Steel Company
Multi-Echelon Multi-product Inventory Strategy in a Steel Company Juan Iocco Advisor: Amanda J. Schmitt, PhD May 21, 2009 MIT, ESD Master of Engineering in Logistics Agenda Introduction Ternium s Problem
More informationFITTING THE STATISTICAL DISTRIBUTION FOR DAILY RAINFALL IN IBADAN, BASED ON CHI-SQUARE AND KOLMOGOROV- SMIRNOV GOODNESS-OF-FIT TESTS.
Abstract FITTING THE STATISTICAL DISTRIBUTION FOR DAILY RAINFALL IN IBADAN, BASED ON CHI-SQUARE AND KOLMOGOROV- SMIRNOV GOODNESS-OF-FIT TESTS. OSENI, B. Azeez 1 and Femi J. AYOOLA. 2* 1. Department of
More information3. INVENTORY CONTROL METHODS
UNIVERSIDAD COOPERATIVA DE COLOMBIA Bucaramanga Facultad de Ciencias Administrativas y Económicas BUSINESS ADMINISTRATION OPERATION RESEARCH I (120301451) Professor: HÉCTOR FLORENTINO HERNÁNDEZ CÁRDENAS
More informationINVENTORY MANAGEMENT SIMULATIONS AT CAT LOGISTICS. C. Ann Goodsell Thomas J. Van Kley
Proceedings of the 2000 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. INVENTORY MANAGEMENT SIMULATIONS AT CAT LOGISTICS C. Ann Goodsell Thomas J. Van Kley Caterpillar
More information