Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG)

Size: px
Start display at page:

Download "Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG)"

Transcription

1 Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG) Bid Deadline 2:00 PM Mountain Time, March 22, 2018 Portable Document Format (.pdf) file of Open Season: EPNG is conducting a binding Open Season for existing available capacity and expansion capacity from existing and/or new receipt points in the Benedum/Edwards area, and Ozark Lake for delivery to existing and/or new points at or near EPNG s Waha and Keystone Compressor Stations. The expansion capacity will require system enhancements and modifications at EPNG s Sweetie Peck Junction (the Sweetie Peck Modifications ). The capacity offered in this Open Season (the Sweetie Peck Modifications Open Season ) will be available only on an interim basis until March 31, Rate Schedule: FT-1 Volume / TCD: 8,000 82,000 Dth/day Note: the specific amounts of existing and expansion capacity that are offered in this Open Season are described more thoroughly in the bid sheet attached hereto. Point(s): Points in the Benedum/Edwards Area including IBENDMWY, IEDWRDPL, and IBOBCAT up to 82,000 Dth/day Points in the /Ozark Lake Areas including IMNDZTRL and IOZARKLK up to 70,000 Dth/day Note: Shippers are encouraged to contact their customer service representatives or the individuals listed below to confirm the availability of capacity at specific points. Point(s): Keytran up to 61,000 dth/day Wahatran up to 40,000 dth/day Note: Shippers are encouraged to contact their customer service representatives or the individuals listed below to confirm the availability of capacity at specific points. Available Term: Existing Capacity can be made available as early as April 1, Expansion capacity will be available on the In-service date of the Sweetie 1

2 Peck Modifications. Subject to EPNG s receipt of sufficient shipper commitments and timely receipt of all necessary corporate and regulatory approvals, permits, and other authorizations required for the construction and operation of the Sweetie Peck Modifications, in a form and substance satisfactory to EPNG in its sole discretion, EPNG anticipates the ability to achieve an in-service date for the Sweetie Peck Modifications as early as October 1, The existing and expansion capacity offered in this Open Season will be available only until March 31, Open Season Start: 12:00 PM MST, March 15, 2018 End: 2:00 PM MST, March 22, 2018 Award Notification Date: 4:00 PM MST, March 28, attached Bid Sheet to KMWestBids@KinderMorgan.com NOTE: EPNG will rely upon the time the bid is received to determine whether the bid was timely. Bids that are received (as determined by the time stamp on the EPNG s inbox) after the end date and time listed above will be considered invalid bids and will not be eligible for an award of capacity in this Open Season. EPNG recommends that bids be submitted well in advance of the closing time listed above to minimize the risk that any delay could cause a bid to be excluded from consideration. General Open Season Requirements: Parties interested in bidding in this Open Season should submit completed Bid Sheet(s) (in the form attached hereto) to EPNG before the close of the open season via at the following address: KMWestBids@KinderMorgan.com. By submitting Bid Sheet(s) to EPNG, the bidding party certifies that (a) all information contained in the request is complete and accurate, (b) it satisfies, or will be able to satisfy, all the requirements of EPNG's Federal Energy Regulatory Commission ("FERC") Gas Tariff, Third Revised Volume No. 1A, as the same may be amended from time to time ("EPNG's Tariff"), and (c) the person submitting the bid has full authority to bind the bidding party. The Available Capacity and the Enhancement Capacity are not eligible for a right-of-first-refusal ( ROFR ) pursuant to section 4.2(c) of EPNG s Tariff. The bid rate must be presented as the reservation rate per Dth/month or stated as the maximum tariff rate. In addition to the bid rate, each bid shall be subject to the applicable maximum usage rate and maximum usage surcharges, all other maximum rates, charges and surcharges, including ACA, Fuel, lost and unaccounted-for gas ( L&U ), retainage and any other authorized surcharges assessed under the applicable Rate Schedule of EPNG's Tariff as those amounts maybe amended or superseded from time- 2

3 to-time. This includes incremental lateral charges and any third party charges resulting from the use of capacity that EPNG may hold on other pipelines. EPNG reserves the right to reject negotiated rate bids, bids that have rates less than the maximum recourse rate, bids stated as the dollar equivalent of the current maximum recourse rate, bids that are incomplete, contain offers of varying rates within the term, contain additional or modified terms or are inconsistent with the provisions of EPNG's Tariff. If EPNG does not receive maximum recourse or negotiated rate bids for quantities and terms sufficient to economically justify EPNG s capital investment in the Sweetie Peck Modifications, then EPNG reserves the right not to move forward with the project described in this Open Season, or to negotiate with bidders to propose a more appropriately sized expansion at a corresponding rate. Existing shippers with capacity on EPNG s system that could be used in lieu of the Sweetie Peck Modifications should notify EPNG if they wish to permanently turnback their capacity through a release to prospective shippers in this Open Season. Those who wish to so release their capacity should notify EPNG of the amount, the term, and any other conditions that would be necessary to effectuate such a release of their capacity. Such notices should be submitted to EPNG before the close of the Open Season. Current EPNG shippers may submit bids which include requests to reform their existing effective FTSAs (which may include point redesignations) to utilize the Available Capacity or Enhancement Capacity. For purposes of evaluating bids and awarding capacity, EPNG will consider only the incremental revenue that would be generated by the bid (e.g., the incremental revenue associated with a higher reservation rate, an increase in Transportation Contract Demand, or for a term that extends beyond the current FTSA term end date etc.). EPNG notes that FERC Order No. 894, in some cases, prohibits multiple affiliates of the same entity from bidding in an open season for capacity in which the pipeline may allocate capacity on a pro rata basis. It appears to EPNG that the restrictions imposed by FERC Order No. 894 will be applicable in this Open Season and FERC recommends that potential bidders review and adhere to the requirements of that FERC Order. Although this is a binding open season, EPNG reserves the right, in its sole discretion, to consider requests for Available Capacity or Enhancement Capacity received after the close of the Open Season period, including requests to modify a participant's validly submitted bid, but shall be under no obligation to do so. EPNG will review all bids and award capacity based upon the criteria outlined below. EVALUATION CRITERIA If EPNG receives acceptable bids for capacity in excess of the actual amount of Available Capacity or Enhancement Capacity, then EPNG will award and/or allocate the capacity in a manner that yields the highest total Present Value (PV) as calculated below. In determining which bid(s) yield the highest total PV, EPNG reserves the right to combine multiple bids, in whole or in part, in a manner that results in a total PV of the combined bids that exceeds the highest PV achievable by accepting one or more of the disaggregated bids. This process could result in a bidder being awarded less capacity than requested (unless such bidder elects on its bid sheet not to accept a pro rata allocation of capacity). PV will be calculated as the sum of the present values for all of the months beginning with the first month capacity is available through the end date of the bid term. Bids stating a commencement date upon the 3

4 in-service date of any to-be-constructed facilities will be evaluated using EPNG s estimate of the completion date of the required facilities. The PV for each month will be calculated as follows: PV = (R X Q)/((1+i) to the power of n) Where: R = the monthly reservation bid rate Q = the monthly bid quantity i = the monthly discount rate of % (which is the annual discount rate of 4.25% divided by 12). n = the number of months from the earliest date the capacity is available in the Open Season to the month the revenue will be received (the first month capacity is available n = 1, the second month n = 2, and so on). CREDITWORTHINESS REQUIREMENTS The successful bidder(s) must satisfy the creditworthiness requirements of EPNG's Tariff. A bidder that is unable to satisfy the general creditworthiness provisions set forth in EPNG s Tariff shall provide additional credit support (in the form of a Letter of Credit, a guaranty from a party that satisfies the creditworthiness standards, or such other form that is acceptable to EPNG in its sole discretion). CONTACT INFORMATION Questions concerning this Open Season should be directed to Greg Ruben ( ) or Ken Ulrich ( ) in the Business Development department. 4

5 Available Capacity s 2 KEYTRAN VA 10,000 9,000 8,000 8,000 8,000 9,000 10,000 46,000 12,000 s 2 WAHATRAN VA ,000 17,000 10,000 9,000 8,000 8,000 8,000 9,000 10,000 47,000 29, s 2 KEYTRAN VA 12,000 46,000 46,000 s 2 WAHATRAN VA 20,000 2,000 1,000 32,000 48,000 47, Area Area s 3 KEYTRAN VA ,000 0 Area s 3 WAHATRAN VA ,000 17, ,000 17, Area Area s 3 KEYTRAN VA 0 33,000 34,000 Area s 3 WAHATRAN VA 20,000 2,000 1,000 20,000 35,000 35,000 1 The Capacity and Area Capacity offered herein are mutually exclusive. 2 s include IBENDMWY, IEDWRDPL and IBOBCAT. 3 Area s include IMNDZTRL and IOZARKLK. *Please contact any of the EPNG representatives listed in the Open Season if you are interested in any potential receipt-delivery combination or quantities not shown. 5

6 Enhancement Capacity s 2 KEYTRAN VA ,000 15,000 15,000 s 2 WAHATRAN VA ,000 19,000 20, ,000 34,000 35, s 2 KEYTRAN VA 15,000 15,000 15,000 s 2 WAHATRAN VA 20,000 19,000 19,000 35,000 34,000 34, Area Area s 3 KEYTRAN VA ,000 15,000 15,000 Area s 3 WAHATRAN VA ,000 19,000 20, ,000 34,000 35, Area Area s 3 KEYTRAN VA 15,000 16,000 15,000 Area s 3 WAHATRAN VA 20,000 19,000 19,000 35,000 35,000 34,000 Notes: 1. The Benedume Area Capacity and Area Capacity offered herein are mutually exclusive. 2. s include IBENDMWY, IEDWRDPL and IBOBCAT. 3. Area s include IMNDZTRL and IOZARKLK. *Please contact any of the EPNG representatives listed in the Open Season if you are interested in any potential receipt-delivery combination or quantities not shown. 6

7 Combined Available and Enhancement Capacity s 2 KEYTRAN VA 10,000 9,000 8,000 8,000 8,000 9,000 25,000 61,000 27,000 s 2 WAHATRAN VA ,000 20,000 37,000 10,000 9,000 8,000 8,000 8,000 9,000 45,000 81,000 64, s 2 KEYTRAN VA 27,000 61,000 61,000 s 2 WAHATRAN VA 40,000 21,000 20,000 67,000 82,000 81, Area Area s 3 KEYTRAN VA ,000 49,000 15,000 Area s 3 WAHATRAN VA ,000 20,000 37, ,000 69,000 52, Area Area s 3 KEYTRAN VA 15,000 49,000 49,000 Area s 3 WAHATRAN VA 40,000 21,000 20,000 55,000 70,000 69,000 Notes: 1. The Benedume Area Capacity and Area Capacity offered herein are mutually exclusive. 2. s include IBENDMWY, IEDWRDPL and IBOBCAT. 3. Area s include IMNDZTRL and IOZARKLK. *Please contact any of the EPNG representatives listed in the Open Season if you are interested in any potential receipt-delivery combination or quantities not shown. 7

8 Available Capacity - Open Season Bid Sheet Available Capacity s 2 KEYTRAN VA s 2 WAHATRAN VA 2019 s 2 KEYTRAN VA s 2 WAHATRAN VA Area Area s 3 KEYTRAN VA Area s 3 WAHATRAN VA Area Area s 3 KEYTRAN VA Area s 3 WAHATRAN VA Notes: 1. The Benedume Area Capacity and Area Capacity offered herein are mutually exclusive. 2. s include IBENDMWY, IEDWRDPL and IBOBCAT. 3. Area s include IMNDZTRL and IOZARKLK. *Please contact any of the EPNG representatives listed in the Open Season if you are interested in any potential receipt-delivery combination or quantities not shown. 8

9 Enhancement Capacity s 2 KEYTRAN VA s 2 WAHATRAN VA 2019 s 2 KEYTRAN VA s 2 WAHATRAN VA 2018 Area Area s 3 KEYTRAN VA Area s 3 WAHATRAN VA 2019 Area Area s 3 KEYTRAN VA Area s 3 WAHATRAN VA Notes: 1. The Benedume Area Capacity and Area Capacity offered herein are mutually exclusive. 2. s include IBENDMWY, IEDWRDPL and IBOBCAT. 3. Area s include IMNDZTRL and IOZARKLK. *Please contact any of the EPNG representatives listed in the Open Season if you are interested in any potential receipt-delivery combination or quantities not shown. 9

10 s 2 KEYTRAN VA s 2 WAHATRAN VA Combined Available and Enhancement Capacity s 2 KEYTRAN VA s 2 WAHATRAN VA 2018 Area Area s 3 KEYTRAN VA Area s 3 WAHATRAN VA 2019 Area Area s 3 KEYTRAN VA Area s 3 WAHATRAN VA Notes: 1. The Benedume Area Capacity and Area Capacity offered herein are mutually exclusive. 2. s include IBENDMWY, IEDWRDPL and IBOBCAT. 3. Area s include IMNDZTRL and IOZARKLK. *Please contact any of the EPNG representatives listed in the Open Season if you are interested in any potential receipt-delivery combination or quantities not shown. 10

11 Open Season EBB Identifier: Sweetie Peck Modification Bid To: A. Shipper Information: Legal Name of Bidder: Name of Requesting Party: Title of Requesting Party: DUNS Number: Phone: B. Term of Service: Effective Start Date: Requested Term End Date: C. Transportation Contract Demand (TCD): Will you accept a pro rata allocation of capacity if necessary? (Select One) Yes / No *The sum of the MDQs at the Location(s) must equal the TCD. D. Bid Rate (express as a monthly rate per Dth or maximum reservation rate): *By submitting a bid to EPNG, the bidding party certifies that (a) all information contained in the request is complete and accurate, (b) it satisfies, or will be able to satisfy, all the requirements of EPNG s FERC Gas Tariff, and (c) the person submitting the bid has full authority to bind the bidding party. 11

Notice Text. Notice 17238/Previous Notice 17236

Notice Text. Notice 17238/Previous Notice 17236 TSP Name: El Paso Natural Gas Company,L.L.C TSP: 00-800-1703 Notice ID: 17238 Critical: N Notice Type Desc: Other Notice Stat Desc: Initiate Subject: Revised Line 1600 to Waha Open Season (17238) Prior

More information

El Paso Natural Gas Company Binding Open Season. Delaware Basin to Waha

El Paso Natural Gas Company Binding Open Season. Delaware Basin to Waha INTRODUCTION El Paso Natural Gas Company Binding Open Season Delaware Basin to Waha In response to increasing demand for take-away capacity from the Delaware Basin with deliveries to the Waha area interconnections,

More information

WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, Binding Open Season

WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, Binding Open Season WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, 2014 Binding Open Season WBI Energy Wind Ridge Pipeline, LLC announces a Binding Open

More information

LOCKRIDGE TO WAHA PROJECT NOTICE OF BINDING OPEN SEASON

LOCKRIDGE TO WAHA PROJECT NOTICE OF BINDING OPEN SEASON Announcement of Open Season Natural Gas Pipeline Company of America LLC ( NGPL ) has entered into a binding transaction with a third party ( Prearranged Shipper ) to develop a project to provide 500,000

More information

BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement

BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement Page 1 of 8 REX Cheyenne Hub Enhancement Rockies Express Pipeline LLC ( REX ) is pleased to announce a binding open season ( Open Season

More information

NOTICE OF NON-BINDING OPEN SEASON AG LINE EXPANSION PROJECT

NOTICE OF NON-BINDING OPEN SEASON AG LINE EXPANSION PROJECT Announcement of Non-Binding Open Season Natural Gas Pipeline Company of America LLC ( NGPL ) is soliciting interest from the market in developing a project to provide approximately 200,000 Dth/d of firm

More information

Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day

Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day Portable Document Format (.pdf) file of Open Season: https://pipeportal.kindermorgan.com/portalui/openseasondocs.aspx?tsp=cigd

More information

ALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance )

ALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance ) ALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance ) BINDING OPEN SEASON March 28 May 30, 2018 For: Capacity Expansion, Capacity Turn Backs,

More information

Cheyenne Connector Binding Open Season

Cheyenne Connector Binding Open Season Cheyenne Connector Binding Open Season Page 1 of 9 Cheyenne Connector Description Tallgrass Energy Partners, LP ( Tallgrass ) is pleased to announce a binding open season ( Open Season ) for the Cheyenne

More information

Vector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE

Vector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE Vector Pipeline L.P. Original Sheet No. 30 1. AVAILABILITY RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE This FT-1 Rate Schedule is available to any party (hereinafter called "Shipper"), for firm transportation

More information

Table of Contents. Trailblazer Pipeline Company LLC 6th Revised Volume No. 1. Rate Schedules. Rate Schedule FTS. Rate Schedule ITS.

Table of Contents. Trailblazer Pipeline Company LLC 6th Revised Volume No. 1. Rate Schedules. Rate Schedule FTS. Rate Schedule ITS. 6th Revised Volume No. 1 Table of Contents Rate Schedules Rate Schedule FTS Rate Schedule ITS Rate Schedule FTB Rate Schedule Wheeling Service Rate Schedule PALS Rate Schedules 6th Revised Volume No. 1

More information

TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018

TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018 TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018 Proposing firm service from Empress to the Chicago market area, including

More information

FERC GAS TARIFF. Second Revised Volume No. 1 CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF. Second Revised Volume No. 1 CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION FERC GAS TARIFF Second Revised Volume No. 1 Of CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: James R. Downs,

More information

Horizon Pipeline Company, L.L.C. First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS

Horizon Pipeline Company, L.L.C. First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS Horizon Pipeline Company, L.L.C. First Revised Sheet No. 100 Superseding Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject to, as applicable,

More information

FERC GAS TARIFF. First Revised Volume No. 1 NORTHERN BORDER PIPELINE COMPANY. Filed with. Federal Energy Regulatory Commission

FERC GAS TARIFF. First Revised Volume No. 1 NORTHERN BORDER PIPELINE COMPANY. Filed with. Federal Energy Regulatory Commission FERC GAS TARIFF of NORTHERN BORDER PIPELINE COMPANY Filed with Federal Energy Regulatory Commission Communications Concerning This Tariff Should Be Addressed To: Joan Collins Manager, Tariffs and Compliance

More information

FERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION FERC GAS TARIFF First Revised Volume No. 1 Of MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: John

More information

6th Revised Volume No. 1 Section Version: TABLE OF CONTENTS

6th Revised Volume No. 1 Section Version: TABLE OF CONTENTS Table of Contents TABLE OF CONTENTS Sixth Revised Volume No. 1 Table of Contents Preliminary Statement System Map Section Name Table of Contents Preliminary Statement System Map Currently Effective Rates

More information

FERC GAS TARIFF. Third Revised Volume No. 1. (Superseding Second Revised Volume No. 1) COLUMBIA GULF TRANSMISSION, LLC FILED WITH

FERC GAS TARIFF. Third Revised Volume No. 1. (Superseding Second Revised Volume No. 1) COLUMBIA GULF TRANSMISSION, LLC FILED WITH FERC GAS TARIFF (Superseding Second Revised Volume No. 1) of COLUMBIA GULF TRANSMISSION, LLC FILED WITH FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this tariff should be addressed to:

More information

FERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC.

FERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC. FERC NGA GAS TARIFF THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) of SEA ROBIN PIPELINE COMPANY, LLC Filed With The Federal Energy Regulatory Commission Communications Concerning

More information

Statement of Nature, Reasons, and Basis for Proposed Changes

Statement of Nature, Reasons, and Basis for Proposed Changes November 25, 2008 The Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First St., N.E. Washington, D.C. 20426 Dear Ms. Bose: RE: Great Lakes Gas Transmission Limited Partnership

More information

Issued February 21, Haynesville Global Access Pipeline LLC. Notice of Non-Binding Open Season

Issued February 21, Haynesville Global Access Pipeline LLC. Notice of Non-Binding Open Season Issued February 21, 2018 Haynesville Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Haynesville Global Access Pipeline LLC ( HGAP ), a wholly-owned subsidiary

More information

TransCanada s GTN System Notice of Available Multi-Month Parking Service. November 17, 2009

TransCanada s GTN System Notice of Available Multi-Month Parking Service. November 17, 2009 TransCanada s GTN System Notice of Available Multi-Month Parking Service November 17, 2009 TransCanada s GTN System ( GTN ) is providing notice of the availability of multi-month Parking Service, offered

More information

Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1

Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1 Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 RATE SCHEDULE FTS FIRM TRANSPORTATION SERVICE 1. AVAILABILITY This Rate Schedule FTS is available to any entity (hereinafter called Shipper) which:

More information

FERC GAS TARIFF THIRD REVISED VOLUME NO. 2. (Superseding Second Revised Volume No. 2) WYOMING INTERSTATE COMPANY, L.L.C.

FERC GAS TARIFF THIRD REVISED VOLUME NO. 2. (Superseding Second Revised Volume No. 2) WYOMING INTERSTATE COMPANY, L.L.C. FERC GAS TARIFF THIRD REVISED VOLUME NO. 2 (Superseding Second Revised Volume No. 2) of WYOMING INTERSTATE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION Communication Covering This

More information

Iroquois. Capacity Release. Training Guide

Iroquois. Capacity Release. Training Guide PAGE 1 OF 20 Iroquois Capacity Release Training Guide 10/14/2014 PAGE 2 OF 20 TABLE OF CONTENTS OVERVIEW... 3 DEFINITIONS OF TERMS... 3 INITIAL CONTRACTING REQUIREMENTS FOR RELEASING SHIPPERS... 4 INITIAL

More information

OPEN SEASON. I. The BKEP Condensate Pipeline Project

OPEN SEASON. I. The BKEP Condensate Pipeline Project OPEN SEASON I. The BKEP Condensate Pipeline Project Blueknight Energy Partners, L.P. ( BKEP ) is pleased to announce the commencement of an Open Season for the BKEP Condensate Pipeline Project. The BKEP

More information

EMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1

EMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 EMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 (Superseding Original Volume No. 1) Communication concerning this tariff should be addressed to: Randy C. Rucinski, Esq. Empire Pipeline,

More information

Table of Contents. Great Lakes Gas Transmission Limited Partnership. Third Revised Volume No. 1. Third Revised Volume No. 1 1 TABLE OF CONTENTS

Table of Contents. Great Lakes Gas Transmission Limited Partnership. Third Revised Volume No. 1. Third Revised Volume No. 1 1 TABLE OF CONTENTS Great Lakes Gas Transmission Limited Partnership Table of Contents 1 TABLE OF CONTENTS 2 PRELIMINARY STATEMENT 3 MAPS 4 STATEMENT OF RATES 4.1 Rate Schedules FT, LFT & EFT 4.2 Reserved for Future Use 4.3

More information

Kinder Morgan Louisiana Pipeline LLC First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS

Kinder Morgan Louisiana Pipeline LLC First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS Kinder Morgan Louisiana Pipeline LLC First Revised Sheet No. 100 First Revised Volume No. 1 Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject

More information

Table of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No.

Table of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No. Table of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No. 4 10 Sheet Nos. 5-99 11 Third Revised Sheet No. 100 12 Seventh

More information

FIRM TRANSPORTATION SERVICE AGREEMENT Rate Schedule KRF-1 CONTRACT NO. 1662

FIRM TRANSPORTATION SERVICE AGREEMENT Rate Schedule KRF-1 CONTRACT NO. 1662 FIRM TRANSPORTATION SERVICE AGREEMENT Rate Schedule KRF-1 CONTRACT NO. 1662 THIS FIRM TRANSPORTATION SERVICE AGREEMENT ( Agreement ) is made and entered into as of this 29th day of November, 2017, by and

More information

EXTENDED OPEN SEASON FOR INTERIM CAPACITY Ruby Pipeline Project

EXTENDED OPEN SEASON FOR INTERIM CAPACITY Ruby Pipeline Project EXTENDED OPEN SEASON FOR INTERIM CAPACITY Ruby Pipeline Project Ruby Pipeline, LLC ( Ruby ) is conducting an open season for a limited quantity of unsubscribed capacity commencing upon the In-Service Date

More information

Issued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season

Issued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season Issued March 21, 2018 Permian Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Permian Global Access Pipeline LLC ( PGAP ), a wholly-owned subsidiary of Tellurian

More information

Transportation. Tariff. Vector Pipeline Limited Partnership

Transportation. Tariff. Vector Pipeline Limited Partnership Transportation Tariff of Vector Pipeline Limited Partnership (Effective April 1, 2004 Unless Indicated Otherwise) Communications Concerning this Tariff Should be Addressed to: Vector Pipeline Limited 38705

More information

Sheet No. 5 - Currently Effective Rates - Rate Schedules FTS and ITS. Sheet No. 6 - Statement of Negotiated Rate Transactions

Sheet No. 5 - Currently Effective Rates - Rate Schedules FTS and ITS. Sheet No. 6 - Statement of Negotiated Rate Transactions Kinder Morgan Illinois Pipeline LLC Table of Contents Sheet No. 1 - Table of Contents Sheet No. 3 - Preliminary Statement Sheet No. 4 - System Map Sheet No. 5 - Currently Effective Rates - Rate Schedules

More information

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1. (Superseding Original Volume No. 1) SOUTHERN STAR CENTRAL GAS PIPELINE, INC.

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1. (Superseding Original Volume No. 1) SOUTHERN STAR CENTRAL GAS PIPELINE, INC. FERC Gas Tariff FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 ( Original Volume No. 1) Of SOUTHERN STAR CENTRAL GAS PIPELINE, INC. Filed With FEDERAL ENERGY REGULATORY COMMISSION Communications Covering Rates

More information

Philadelphia Gas Works

Philadelphia Gas Works Philadelphia Gas Works REQUEST FOR PROPOSALS For NATURAL GAS STORAGE ASSET MANAGEMENT RFP NO. 28399 April 1, 2014 through March 31, 2015 The Philadelphia Gas Works ( PGW ) is requesting proposals for asset

More information

November 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

November 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 November 20, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Gas Transmission Northwest LLC 700 Louisiana Street, Suite 700 Houston,

More information

FERC GAS TARIFF VOLUME NO. 1 KO TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF VOLUME NO. 1 KO TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION KO Transmission Company Filing Category: Amendment Filing Date: 07/27/2016 FERC Docket: RP16-01097-001 FERC Action: Accept FERC Order: 156 FERC 61,147 Order Date: 08/31/2016 Effective Date: 02/01/2017

More information

Table of Contents/Section Index With Links

Table of Contents/Section Index With Links Boardwalk Storage Company, LLC Third Revised Volume No. 1 Table of Contents/Section Index With Links Third Revised Volume No. 1 1. Table of Contents 2. Preliminary Statement 3. System Map 4. Currently

More information

Columbia Gas Transmission, LLC Section Original Volume No. 1.1 Version Non-Conforming Service Agreement No

Columbia Gas Transmission, LLC Section Original Volume No. 1.1 Version Non-Conforming Service Agreement No Columbia Gas Transmission, LLC Section 4.23 FERC NGA Gas Tariff Non-Conf Neg Rate Svc Agmts Original Volume No. 1.1 Version 0.0.0 Non-Conforming Service Agreement No. 161137 Cabot Oil & Gas Corporation

More information

Open Season Market-Based Storage in the Heart of the PA Marcellus Shale Region

Open Season Market-Based Storage in the Heart of the PA Marcellus Shale Region Open Season Market-Based Storage in the Heart of the PA Marcellus Shale Region Open Season starts 8:00AM Feb 12, 2018 Open Season bids due 12:00PM Feb 21, 2018 Contracts awarded on 12:00PM Feb 23, 2018

More information

Dominion Energy Transmission, Inc. FERC Gas Tariff Tariff Record No. 20. Fifth Revised Volume No. 1 Version TARIFF RATE SCHEDULES

Dominion Energy Transmission, Inc. FERC Gas Tariff Tariff Record No. 20. Fifth Revised Volume No. 1 Version TARIFF RATE SCHEDULES Rate Schedules FERC Gas Tariff Tariff Record No. 20. TARIFF RATE SCHEDULES TARIFF RATE RECORD SCHEDULE SERVICE NO. FT Firm Transportation Service 20.1 FTNN Firm Transportation, No-Notice Service 20.2 IT

More information

Texas Eastern Appalachiaa to Market Expansion Project (TEAM

Texas Eastern Appalachiaa to Market Expansion Project (TEAM Texas Eastern Appalachiaa to Market Expansion Project (TEAM 2014) Moving emerging natural gas supplies from the Appalachian region to diverse market destinations along the existing Texas Eastern footprint

More information

Currently Effective Rates - FTS and FTB Existing System. Currently Effective Rates FTS and FTB Expansion System

Currently Effective Rates - FTS and FTB Existing System. Currently Effective Rates FTS and FTB Expansion System 6th Revised Volume No. 1 Table of Contents Table of Contents Preliminary Statement System Map Currently Effective Rates Currently Effective Rates - FTS and FTB Existing System Currently Effective Rates

More information

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CHEYENNE PLAINS GAS PIPELINE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CHEYENNE PLAINS GAS PIPELINE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 of CHEYENNE PLAINS GAS PIPELINE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications regarding this Tariff should be addressed to:

More information

Columbia Gulf Transmission Company FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: November 1, 2012 Service Agreement No.

Columbia Gulf Transmission Company FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: November 1, 2012 Service Agreement No. Columbia Gulf Transmission Company FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: November 1, 2012 Service Agreement No. 135616 NJR Energy Service Company Option Code A Service Agreement

More information

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: May 1, 2018 Service Agreement No.

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: May 1, 2018 Service Agreement No. Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: May 1, 2018 Service Agreement No. 149760 Antero Resources Corporation Option Code A FTS SERVICE AGREEMENT Service

More information

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 OF CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: Stanley

More information

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 OFFICE OF ENERGY MARKET REGULATION Northern Natural Gas Company 1111 South 103rd Street Omaha, NE 68124-1000 In Reply Refer To: Letter Order Pursuant

More information

Rate Schedule FT Firm Transportation Service

Rate Schedule FT Firm Transportation Service Rate Schedule FT Firm Transportation Service 1. Availability This Rate Schedule is available for the transportation of natural gas by Heartland Gas Pipeline for any Customer: 1.1 Where Customer: a) Has

More information

INFORMATION MEMORANDUM AND BINDING OPEN SEASON NOTICE

INFORMATION MEMORANDUM AND BINDING OPEN SEASON NOTICE INFORMATION MEMORANDUM AND BINDING OPEN SEASON NOTICE I. The Rangeland RIO Pipeline On April 12, 2016, Rangeland RIO Pipeline, LLC ( Rangeland ) issued a press release announcing this open season ( Open

More information

MISO MODULE B FERC Electric Tariff TRANSMISSION SERVICE MODULES Effective On: November 19, 2013

MISO MODULE B FERC Electric Tariff TRANSMISSION SERVICE MODULES Effective On: November 19, 2013 MISO MODULE B TRANSMISSION SERVICE MISO I INTRODUCTION The Transmission Provider shall provide Point-To-Point and Network Integration Transmission Service pursuant to the applicable terms and conditions

More information

Electric Rate Schedule GS-TOU General Service Commercial, Time-of-Use

Electric Rate Schedule GS-TOU General Service Commercial, Time-of-Use Page 1 of 5 Applicability This Schedule is offered as an option to commercial customers having demands from 500 kilowatts up to 1,000 kilowatts in any month during the previous twelve (12) months. Character

More information

WELCOME TO IROQUOIS CAPACITY RELEASE TRAINING

WELCOME TO IROQUOIS CAPACITY RELEASE TRAINING WELCOME TO CAPACITY RELEASE TRAINING George Alcoforado Helena Clancy Business Analyst Sr. Transportation Services Rep (203) 944-7081 (203) 944-7047 George_Alcoforado@Iroquois.com Helena_Clancy@Iroquois.com

More information

FERC GAS TARIFF. First Revised Volume No. 1. Filed with. Federal Energy Regulatory Commission. Communication Covering Rates Should be Addressed To:

FERC GAS TARIFF. First Revised Volume No. 1. Filed with. Federal Energy Regulatory Commission. Communication Covering Rates Should be Addressed To: FERC GAS TARIFF First Revised Volume No. 1 Of Destin Pipeline Company, L.L.C. Filed with Federal Energy Regulatory Commission Communication Covering Rates Should be Addressed To: Regina Gregory, SVP, General

More information

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: October 25, 2018 Service Agreement No.

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: October 25, 2018 Service Agreement No. Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective : October 25, 2018 Service Agreement No. 176680 Noble Energy, Inc. Option Code A FTS SERVICE AGREEMENT Service Agreement

More information

First Revised Sheet No. 449 Canceling Original WN U-60 Sheet No. 449 PUGET SOUND ENERGY Electric Tariff G SCHEDULE 449 RETAIL WHEELING SERVICE

First Revised Sheet No. 449 Canceling Original WN U-60 Sheet No. 449 PUGET SOUND ENERGY Electric Tariff G SCHEDULE 449 RETAIL WHEELING SERVICE First Revised Sheet No. 449 Canceling Original WN U-60 Sheet No. 449 1. ELIGIBILITY FOR SERVICE RETAIL WHEELING SERVICE All Special Contract Customers, and all Schedule 48 Customers as of March 9, 2001,

More information

OPEN SEASON

OPEN SEASON OPEN SEASON 2012-2014 Rooted in Tradition, Branching to New Opportunities E astern Shore Natural Gas Company ( Eastern Shore ) is pleased to announce its Open Season 2012-2014. Eastern Shore has been serving

More information

Carlton Resolution Frequently Asked Questions

Carlton Resolution Frequently Asked Questions What is the? The is a negotiated settlement among Northern s shippers and Northern where the shippers agreed to deliver up to 250,000 Dth/day, upon request by Northern, at the interconnect between Northern

More information

Electric Rate Schedule GS-3 General Service - Industrial

Electric Rate Schedule GS-3 General Service - Industrial Page 1 of 5 Applicability This Schedule is applicable to industrial customers having demands of 1,000 kilowatts or greater in any month during the previous twelve (12) months. Character of Service Alternating

More information

Electric Rate Schedule GS-3 General Service - Industrial

Electric Rate Schedule GS-3 General Service - Industrial Page 1 of 5 Applicability This Schedule is applicable to industrial customers having demands of 1,000 kilowatts or greater in any month during the previous twelve (12) months. Character of Service Alternating

More information

Permian to Katy Pipeline. Non-Binding Open Season

Permian to Katy Pipeline. Non-Binding Open Season August - September 2017 TABLE OF CONTENTS Notice of Open Season and Project Overview...3 P2K Katy Hub...4 Anchor Shipper Status...6 Length of Open Season...6 Participation in the...6 Bid Evaluation Criteria...7

More information

PUBLIC WORKS REQUEST FOR QUOTATIONS TOPSOIL SUPPLY

PUBLIC WORKS REQUEST FOR QUOTATIONS TOPSOIL SUPPLY PUBLIC WORKS REQUEST FOR QUOTATIONS TOPSOIL SUPPLY APRIL 2018 Quotes shall be submitted by completing this document and placing it in a sealed, opaque envelope, clearly marked on the outside, Public Works

More information

Columbia Gas Transmission, LLC. Fourth Revised Volume No. 1 Version TABLE OF CONTENTS TO GENERAL TERMS AND CONDITIONS

Columbia Gas Transmission, LLC. Fourth Revised Volume No. 1 Version TABLE OF CONTENTS TO GENERAL TERMS AND CONDITIONS Part VII. Version 9.0.0 Section 1 Definitions 2 Electronic Bulletin Board (EBB) 3 Requests for Service TABLE OF CONTENTS TO GENERAL TERMS AND CONDITIONS 4 Availability of Capacity for Firm Services 5 Service

More information

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Original Sheet 32-1

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Original Sheet 32-1 P.U.C. Or. 25 Original Sheet 32-1 SERVICE AVAILABILITY: Service under this Rate Schedule is available on the Company s Distribution System to Non-Residential Customers in all territory served by the Company

More information

Millennium Pipeline Company, LLC FERC NGA Gas Tariff Millennium Pipeline Tariffs Proposed Effective Date: May 1, 2013 Non-Conforming/Negotiated Rate

Millennium Pipeline Company, LLC FERC NGA Gas Tariff Millennium Pipeline Tariffs Proposed Effective Date: May 1, 2013 Non-Conforming/Negotiated Rate Millennium Pipeline Company, LLC FERC NGA Gas Tariff Millennium Pipeline Tariffs Proposed Effective Date: May 1, 2013 Non-Conforming/Negotiated Rate Service Agreement No. 142020 Southwestern Energy Services

More information

DECLARATION OF AUTHORITY. This DECLARATION OF AUTHORITY ( Declaration ) is a declaration and certification made on by and between the following:

DECLARATION OF AUTHORITY. This DECLARATION OF AUTHORITY ( Declaration ) is a declaration and certification made on by and between the following: DECLARATION OF AUTHORITY This DECLARATION OF AUTHORITY ( Declaration ) is a declaration and certification made on by and between the following: ( Party A ) and Revised ( Party B - a PJM Member ) for the

More information

SOUTHERN LNG SERVICE REQUEST FORM

SOUTHERN LNG SERVICE REQUEST FORM SOUTHERN LNG SERVICE REQUEST FORM Southern LNG Company, L.L.C. Post Office Box 2563 Birmingham, AL 35202 Gentlemen: (Customer) hereby requests services from Southern LNG Company, L.L.C. (Southern LNG)

More information

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 First Revision of Sheet 32-1 Cancels Original Sheet 32-1

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 First Revision of Sheet 32-1 Cancels Original Sheet 32-1 P.U.C. Or. 25 First Revision of Sheet 32-1 Cancels Original Sheet 32-1 SERVICE AVAILABILITY: Service under this Rate Schedule is available on the Company s Distribution System to Non-Residential Customers

More information

APPENDIX D TO GAS TRANSPORTATION TARIFF OF NOVA GAS TRANSMISSION LTD. TERMS AND CONDITIONS RESPECTING CUSTOMER S INVENTORIES AND RELATED MATTERS

APPENDIX D TO GAS TRANSPORTATION TARIFF OF NOVA GAS TRANSMISSION LTD. TERMS AND CONDITIONS RESPECTING CUSTOMER S INVENTORIES AND RELATED MATTERS NOVA Gas Transmission Ltd. APPENDIX D TO GAS TRANSPORTATION TARIFF OF NOVA GAS TRANSMISSION LTD. TERMS AND CONDITIONS RESPECTING CUSTOMER S INVENTORIES AND RELATED MATTERS NOVA Gas Transmission Ltd. Page

More information

Foothills Pipe Lines Ltd.

Foothills Pipe Lines Ltd. Page 1 SERVICE AGREEMENT FIRM TRANSPORTATION SERVICE FOR TRANSPORTATION OF GAS This AGREEMENT made, 20 BETWEEN: AND: FOOTHILLS PIPE LINES LTD., a body corporate having an office and carrying on business

More information

Second Revised Volume No. 1 Section Version: 5.0.0

Second Revised Volume No. 1 Section Version: 5.0.0 Table of Contents Second Revised Volume No. 1 Section Version: 5.0.0 Description Section Preliminary Statement... Preliminary Statement System Maps System Map... System Map CHDP Zone Map... CHDP Zone Map

More information

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 First Revision of Sheet 32-1 Cancels Original Sheet 32-1

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 First Revision of Sheet 32-1 Cancels Original Sheet 32-1 P.U.C. Or. 25 First Revision of Sheet 32-1 Cancels Original Sheet 32-1 SERVICE AVAILABILITY: Service under this Rate Schedule is available on the Company s Distribution System to Non-Residential Customers

More information

Trailblazer Pipeline Company LLC Docket No. RP Exhibit No. TPC-0080

Trailblazer Pipeline Company LLC Docket No. RP Exhibit No. TPC-0080 Trailblazer Pipeline Company LLC Docket No. RP- -000 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Trailblazer Pipeline Company LLC ) ) ) Docket No. RP- -000 SUMMARY OF PREPARED

More information

1.0.0 Rate Schedule GPS Gas Parking Service GT&C Section 7. Operational Balancing Agreements

1.0.0 Rate Schedule GPS Gas Parking Service GT&C Section 7. Operational Balancing Agreements September 28, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Trunkline Gas Company, LLC Docket No. RP16- Revision to Term Provision

More information

Colorado Interstate Gas Company, L.L.C; Update to Non-Conforming Agreements; Docket No. RP16-

Colorado Interstate Gas Company, L.L.C; Update to Non-Conforming Agreements; Docket No. RP16- August 31, 2016 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20046 Attention: Ms. Kimberly D. Bose, Secretary Re: Colorado Interstate Gas Company, L.L.C; Update to Non-Conforming

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 30. Bid And Self-Schedule Submission For All CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3

More information

Network Integration Transmission Service Agreement (NITSA) and Network Operating Agreement (NOA)

Network Integration Transmission Service Agreement (NITSA) and Network Operating Agreement (NOA) Network Integration Transmission Service Agreement (NITSA) and Network Operating Agreement (NOA) 1. Please complete the NITS Application as follows and execute one (1) original: a. MISO will fill in the

More information

Magnum Gas Storage, LLC

Magnum Gas Storage, LLC MAGNUM GAS STORAGE PROJECT OPEN SEASON FOR INTERSTATE NATURAL GAS STORAGE SERVICES Response Due By July 31, 2009, at 5:00 MDT June 9, 2009 Magnum Gas Storage, LLC (Magnum), invites your company to participate

More information

Energy Auction for the CPV Sentinel Generating Facility

Energy Auction for the CPV Sentinel Generating Facility Energy Auction for the CPV Sentinel Generating Facility Energy Auction Instructions and Terms and Conditions of Participation Updated June 11, 2013 A. GENERAL A.1. Company ( SCE ) seeks to sell, by this

More information

APPLICABILITY The following Provisions shall apply to School/Government Suppliers under Rate 185.

APPLICABILITY The following Provisions shall apply to School/Government Suppliers under Rate 185. Vectren Energy Delivery of Indiana, Inc. (Vectren South) First Revised Page 1 of 5 Tariff for Gas Service Cancels Original Page 1 of 5 APPLICABILITY The following Provisions shall apply to School/Government

More information

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: December 1, 2016 Service Agreement No.

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: December 1, 2016 Service Agreement No. Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: December 1, 2016 Service Agreement No. 183409 Nytis Exploration Company, LLC Option Code A Service Agreement

More information

Northeast Energy Direct

Northeast Energy Direct Northeast Energy Direct The Northeast Pipeline Expansion Solution for Lower Energy Costs and Enhanced Electric Reliability Open Season for Firm Service www.northeastenergyfuture.com @NEDEnergy Open Season

More information

ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3.

ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3. ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3. PSEI EIM Participating Resource Application and Processing 3.1 Application

More information

UGI Storage Company Market-Based Storage in the Heart of the PA Marcellus Shale Region

UGI Storage Company Market-Based Storage in the Heart of the PA Marcellus Shale Region UGI Storage Company Market-Based Storage in the Heart of the PA Marcellus Shale Region Tioga: 3,739,980 Dth of MSQ with 60 day service open April 1, 2019 Meeker: 990,000 Dth of MSQ with 100 day service

More information

2017 Renewable Energy Sale - Request for Offers Solicitation Protocol

2017 Renewable Energy Sale - Request for Offers Solicitation Protocol 2017 Renewable Energy Sale - Request for Offers Solicitation Protocol Issuance Date: Week of January 23, 2017 i Table of Contents I. OVERVIEW... 1 A. OVERVIEW... 1 B. RENEWABLE ENERGY SALE RFO COMMUNICATION...

More information

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA 95132 408-923-1871 OFC 408-926-8329 FAX PREQUALIFICATION PACKAGE INSTRUCTIONS FOR PROSPECTIVE MEP SUBCONTRACTORS FEBRUARY

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 30. Bid and Self-Schedule Submission for all CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3

More information

Foothills Pipe Lines Ltd.

Foothills Pipe Lines Ltd. Page 1 SERVICE AGREEMENT SHORT TERM FIRM TRANSPORTATION SERVICE FOR TRANSPORTATION OF GAS This AGREEMENT made, 20 BETWEEN: AND: FOOTHILLS PIPE LINES LTD., a body corporate having an office and carrying

More information

December 11, 2013 VIA ELECTRONIC FILING

December 11, 2013 VIA ELECTRONIC FILING VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest Power Pool, Inc., Docket No. ER14- -000 Compliance

More information

Notice of Attachment H Transmission Owners Stakeholder Process for Order No Interregional Cost Allocation Proposals (June 10, 2013)

Notice of Attachment H Transmission Owners Stakeholder Process for Order No Interregional Cost Allocation Proposals (June 10, 2013) Notice of Attachment H Transmission Owners Stakeholder Process for Order No. 1000 Interregional Cost Allocation Proposals (June 10, 2013) Described on the following pages are the proposals of the Attachment

More information

EAST AFRICA TRADE AND INVESTMENT HUB REQUEST FOR PROPOSALS (RFP) RFP-NAI Payroll & Employee Benefits Management Services

EAST AFRICA TRADE AND INVESTMENT HUB REQUEST FOR PROPOSALS (RFP) RFP-NAI Payroll & Employee Benefits Management Services EAST AFRICA TRADE AND INVESTMENT HUB REQUEST FOR PROPOSALS (RFP) RFP-NAI-0049 Payroll & Employee Benefits Management Services Issue Date: February 02, 2017 WARNING: Prospective Offerors who have received

More information

RATE SCHEDULE IT-S INTERRUPTIBLE - ACCESS TO STORAGE

RATE SCHEDULE IT-S INTERRUPTIBLE - ACCESS TO STORAGE Page 1 RATE SCHEDULE INTERRUPTIBLE - ACCESS TO STORAGE 1.0 DEFINITIONS 1.1 The capitalized terms used in this have the meanings attributed to them in the General Terms and Conditions of the Tariff unless

More information

Millennium Pipeline Company, L.L.C. Docket No. RP Calculation of Reservation Charge Credits and Voluntary Interruption Commitments

Millennium Pipeline Company, L.L.C. Docket No. RP Calculation of Reservation Charge Credits and Voluntary Interruption Commitments One Blue Hill Plaza, 7th Floor Post Office Box 1565 Pearl River, NY 10965 845.620.1300 Voice 845.620.1320 Fax December 1, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First

More information

The Home Depot U.S.A., Inc. Instructions to Bidders

The Home Depot U.S.A., Inc. Instructions to Bidders The Home Depot U.S.A., Inc. Instructions to Bidders Home Depot Page 1 of 5 Article 1 Definitions 1.1 Bidding Documents include the Bidding Requirements and the proposed Contract Documents. The Bidding

More information

March 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

March 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C March 1, 2013 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 RE: TRANSWESTERN PIPELINE COMPANY, LLC Docket No. RP13-404- Tariff Filing

More information

Transportation Tariff of Alliance Pipeline Limited Partnership, Effective August 1, 2018

Transportation Tariff of Alliance Pipeline Limited Partnership, Effective August 1, 2018 of Alliance Pipeline Limited Partnership, Effective August 1, 2018 Communications concerning this tariff should be addressed to: Alliance Pipeline Ltd. Manager, Regulatory Affairs 800, 605-5th Ave. SW

More information

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: January 1, 2018 Service Agreement No.

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: January 1, 2018 Service Agreement No. Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: January 1, 2018 Service Agreement No. 173446 Kaiser Marketing Appalachian, LLC Option Code A FTS SERVICE AGREEMENT

More information

NOTICE OF NON-BINDING OPEN SEASON Kinder Morgan Texas Pipeline LLC Permian Highway Pipeline Project August 10, 2018

NOTICE OF NON-BINDING OPEN SEASON Kinder Morgan Texas Pipeline LLC Permian Highway Pipeline Project August 10, 2018 NOTICE OF NON-BINDING OPEN SEASON Kinder Morgan Texas Pipeline LLC Permian Highway Pipeline Project August 10, 2018 Announcement of Open Season In order to serve the growing needs for Permian Basin gas

More information