Figure2-DalySinclairField(01)

Size: px
Start display at page:

Download "Figure2-DalySinclairField(01)"

Transcription

1

2 Figure2-DalySinclairField(01) 10 anitoba Petroleum Branch

3 Figure No : 7 7 ' (' 6,1&/$,5 81,7 (%25 81,7 81,7 (:$57 81,7 ' (:$57 8 6,1&/$,5 81,7 7 ' '' 81,7 5 ' ' ' 5 5 : 7

4 FigureNo.3 Figure 21 - ap 3 Bakken & Bakken Torquay Formation Pools (60 & 62) 36

5 sinclair unit no. 19 well list.lwell to m3 75 BAKKEN; TORQUAY; THREEFK; 0.0 E3m3 BAKKEN Oil DALY (1) m3 Producing; Abandoned Zone; 62B 0.0 m3 Pumping; Potential; Comingled 0.0 E3m3 0.0 m3 IHS, Created in Accuap Datum: NAD27 T Page 1/1 Printed on 4/14/ :06:46 A

6

7 sinclair unit no. 1 section 4 well list to m3 wls 16 BAKKEN; TORQUAY 0.0 E3m3 Oil; Water Injection DALY (1) m3 Producing; Injection; Abandoned 62B 0.0 m3 162B E3m m3 IHS, Created in Accuap Datum: NAD27 T Page 1/1 Printed on 4/7/2016 1:58:15 P

8

9

10

11

12 FIGURE 11 Sinclair Water Injection System 500 Bbl 500 Bbl Charge Filters Filtered water tanks evaluating eter install here Source Well 102/ W Battery Site Injection Pump Injection Pump Sec Injection Wellhead meters (3) High Pressure out to Unit 5 wells low pressure transfer high pressure to Unit 8 wells new high pressure to Unit 11 / Unit 18 wells Remote Injection Pump at Future remote high pressure to Unit 10 wells existing high pressure to Ryerson Unit Wells 's Numerous Injection Wellhead meters Future High Pressure out to Unit 2 & some Unit 3 WIW's high pressure to Unit 1 wells Sinclair Unit#12 Future high pressure to Unit 3 wells Ewart Unit#1 Ewart Unit#10 Ewart Unit#2 Future high pressure to Unit 6 wells and Daly Unit 6/7 wells Ewart Unit#6 Future Future Ewart Unit#8 Unit#7 Ebor Unit#2 Sinclair Unit 17 Sinclair Unit 19 Ewart Unit#4 Ewart Unit#3 & Ewart Unit#9 Ewart Unit#5 Unit 8 Injection Wellhead meters

13 Tundra Oil And Gas Partnership Figure No. 12 TYPICAL CEENTED LINER WATER INJECTION WELL (WIW) DOWNHOLE DIAGRA Corrosion Protected ENC Coated Packer (set inside mm Casing / Liner) 60.3 mm or 73 mm TK-99 Internally Coated Tubing TK-99 Internally Coated Tubing Pup Jt Coated Split Dognut Annular space above injection packer filled with inhibited fresh water Bottom of Tubing mkb

14 Sinclair Unit No. 19 EOR Waterflood Project Planned Corrosion Control Program ** Source Well Continuous downhole corrosion inhibition Continuous surface corrosion inhibitor injection Downhole scale inhibitor injection Corrosion resistant valves and internally coated surface piping Pipelines Source well to Water Plant Fiberglass New High Pressure Pipeline to Unit 9 injection wells 2000 psi high pressure Fiberglass Facilities Water Plant and New Injection Pump Station o Plant piping 600 ANSI schedule 80 pipe, Fiberglass or Internally coated o Filtration Stainless steel bodies and PVC piping o Pumping Ceramic plungers, stainless steel disc valves o Tanks Fiberglass shell, corrosion resistant valves Injection Wellhead / Surface Piping Corrosion resistant valves and stainless steel and/or internally coated steel surface piping Injection Well Casing cathodic protection where required Wetted surfaces coated downhole packer Corrosion inhibited water in the annulus between tubing / casing Internally coated tubing surface to packer Surface freeze protection of annular fluid Corrosion resistant master valve Corrosion resistant pipeline valve Producing Wells Casing cathodic protection where required Downhole batch corrosion inhibition as required Downhole scale inhibitor injection as required Figure 13 ** subject to final design and engineering