Indicative Wholesale Charges Severn Trent Water

Similar documents
Wholesale charges

Wholesale charges

Wholesale charges

Wholesale charges

SEVERN TRENT CONNECT WHOLESALE CHARGES 2017/18 Non-Household

Summary of Charges A householder s guide to how we calculate your bill

Business Tariffs

W R reference S41 reference Property reference Rapid reference. DG2 Yes No Quote reference

Wholesale Charges Household and Non-household 2018/19

Scheme of Charges Thames Water Customers

Form H/01: Request for an allowance to wholesale charges and/or a volumetric adjustment

Our charging scheme for Southern Water Wholesale Region 2019/20. Primary Charges

Scheme of Charges Thames Water Customers

Scheme of Charges Thames Water Customers

Significant changes in our charges for 2016/17

Development enquiry request

Scheme of Charges Thames Water Customers

Standard Tariffs. Streamline Green: If your site uses less than 500 cubic metres of water a year, this tariff could be the best option for you.

Application form AWS2

Wholesale charges Non-Household. Severn Trent Water 2017/18

Wholesale Charges for 2018/19

adju swimming Wholesale charges scheme 2017/2019 Page 1 of 39

Scottish Water Business Stream Charges. Scheme of Charges:

Adoption of Sewers Application for the adoption of a sewer under Section 104 of the Water Industry Act 1991

Wholesale Statement of Principles and Charges

201 swimming Wholesale charges scheme 2017/2020 Page 1 of 40

New Water Connection Application (up to 32mm) Article 79 - Water and Sewerage Services (Northern Ireland) Order 2006

Wholesale charges scheme 2017/2018 Page 1 of 36

SELF LAY POINT OF CONNECTION

Final Wholesale Charges 2017/18

THE YORKSHIRE WATER SERVICES LIMITED INDICATIVE NON-HOUSEHOLD WHOLESALE CHARGES

Business Stream Retail Charging Statement England 2017/18

Application for new or replacement water connections

DIRECTIONS ISSUED TO LICENSED PROVIDERS PURSUANT TO STANDARD LICENCE CONDITION B1 THE WATER INDUSTRY COMMISSION FOR SCOTLAND.

Form A Application for a Permanent Water Connection

temporary water connection or for building water

Wholesale Statement of Principles and Charges

Water and Sewer connections application form. Section 1. 1a. Applicant details

LARGE DIAMETER CONNECTIONS

Please complete the application form (preferably electronically) and return it with a site location plan to:

Developer Services Schedule of Charges

Our charging statement Scotland 2018/19 Contracted primary charges

Water Company Lay Application

Scheme of Charges South East Water Customers

Non-household indicative wholesale charges schedule. for the supply of water and wastewater services for 2017/18

SELF LAY. Application to self lay a water supply (mains and connections) V1 04/17. SECTION 1 Applicant (correspondence address) Page 1 of 14

permanent water connection

Development enquiry request

Non Household Wholesale Charges Scheme

Scheme of charges How we calculate your bills. Non-household

Application for a water connection to a commercial or mixed use development

PRE-DEVELOPMENT ENQUIRY APPLICATION FORM

your guide to completing an application for a new or replacement water connection from your property to an existing water main

Our services and tariffs. A guide to our charges and policies

Bristol Water Schedule of Wholesale Charges. 1 st April 2019 to 31 st March 2020

ANGLIAN WATER SERVICES LIMITED

Helping your business to save water, money and the environment

Charges for Water and Sewerage Services to Non- Household Premises

Application for New Water Mains & Services Requisition and Self Lay

Yorkshire Water Wholesale Charges Scheme Published January 2019

Bristol Water Schedule of Wholesale Charges

Adoption of sewers. Application for the adoption of a sewer under Section 104 of the Water Industry Act Section 1A: Applicant s details

A householder s guide to how we calculate your bill.

Anglian Water Services Limited. Charges Scheme. (Customer Charges) for the year commencing 1st April 2015

Scheme of charges How we calculate your bills. Non-household

3. Sanitary Plumbing Single Stack System

Table of Contents INTRODUCTION

CRAFTSMAN EXAMINATION, NOVEMBER 2008 PLUMBING ANSWER SCHEDULE

September 11 th, 2012

Catering Waste Water Guide

Having a. water meter fitted. Will it benefit me?

1 SCOPE OF THIS CHARGES SCHEME DEFINITIONS... 4

Application to requisition a sewer Section 98 WIA 1991

STATEMENT OF ASSURANCE 2019/20 CHARGES

ENVIRONMENTAL/SANITARY CODES OF JEFFERSON COUNTY, KANSAS CHAPTER II: WASTEWATER DISPOSAL

SCOTTISH WATER CHARGES SCHEME

your charges explained

SCOTTISH WATER CHARGES SCHEME

Code Subsidiary Document No. 0206: Trade Effluent Processes

AS/NZS :1996 Plumbing and drainage - Part 2.2: Sanitary plumbing and drainage - Acceptable solutions

Non-Household Wholesale charges schedule 2019/20

Water Use Summary. NB EB Pre-requisite 2 3 Possible Credits Points 9 7 Possible Bonus Points 1 2. Credit Summary for NB: Credit Summary for EB:

Trade Effluent. 19 th October 2017

Form F3 Self Lay Application For Mains and/or Services

Scheme of Charges 1 April 2018 to 31 March 2019

Wholesale Charges 2019/20

BWT WATER FILTRATION Protecting what matters through innovative water filtration

ANGLIAN WATER SERVICES LIMITED CUSTOMER CHARGES SCHEME

Scheme of Charges 1 April 2019 to 31 March 2020

The Drainage and Plumbing Regulations 1996.

Summary of charges 2011/2012 A householder s guide

Non-household Wholesale charges schedule 2018/19

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS

CERTIFYING DRAINLAYER

Scheme of Charges setting out Default tariffs applicable to non-household customers in the Portsmouth Water supply area

Bylaws for Grey Water Reuse in Housing & Commercial Complexes in Aurangabad (Draft), 2012

Transcription:

Indicative Wholesale s 2018-19 Severn Trent Water

About this document Indicative wholesale charges (non-households) - 1 April 2018 to 31 March 2019 Ofwat published IN16-02 in March 2016. This set out new requirements for companies to publish indicative wholesale access charges. The charges contained in this document therefore represent the charges we expect to set for 2018-19 subject to any unforeseen significant changes in assumptions. Wholesale charges are limited by inflation-linked revenue controls set by Ofwat. Final charges will depend on the rate of inflation as per the Retail Price Index for November, which will be published on 12 December 2017. Our final wholesale charges will be published by 12 January 2018. We have also published Ofwat s standard schedule for wholesale charges separately on our website - https://www.stwater.co.uk/businesses/wholesale-charges/tariffs-and-charges These charges are for water retailers only. Business customers should refer to the charges set by their retailer. 2

Section C: Indicative Wholesale charges for 2018-19 C1 Introduction This section of the document sets our indicative wholesale water and sewerage charges for 2018-19. Section references correspond to the relevant sections of the Wholesale Scheme of s set out in section B. For example, unmetered charges explained in section B2 relate to the unmetered charges tables set out in section C2 below. C2 Unmetered charges Table 1: Unmetered water supply and sewerage charges Charging Zone Rate per pound of rateable value (p/ RV) Water supply Used and surface water Used water only Surface water only* 1 106.30 107.66 81.23 26.43 2 94.77 89.68 68.66 21.02 3 91.64 94.85 72.09 22.76 4 96.14 103.36 78.20 25.16 5 111.84 121.73 90.95 30.78 6 116.72 117.76 88.25 29.51 7 117.57 114.47 85.92 28.55 8 91.64 94.08 71.32 22.76 * Subject to a maximum charge of 111,270.15 Table 2: Unmetered fixed charges Water Supply Used Water Surface Water only Fixed charge per property 2.53 1.44 1.44 Table 3: Unmetered cattle trough per annum Fixed charge for a supply to a cattle trough 148.93 3

Table 4: Metered water supply volumetric charges Water Supply m 3 Standard water supply charge 0 to 4,999m3 1.4585 Standard water supply charge 5000 to 9,999m3 1.4585 Table 5: Metered used water charges Volumetric charges (charge per m 3 of used water discharged) Volume discharged directly or indirectly to a public sewer Volume of Water Supplied - per m3 0-9 Ml 10-49 Ml 50-250 Ml > 250 Ml For the first 9,999 m3 0.9699 0.9699 0.9699 0.9699 From 10,000 to 49,999 m3 0.9658 0.9658 0.9658 0.9658 From 50,000 to 249,999 m3 0.9310 0.9310 0.9310 0.9310 250,000 m3 and over 0.8851 0.8851 0.8851 0.8851 Volumes discharged directly to our sewage treatment works 0.7026 NA NA NA Table 6: Metered Standing and Fixed charges (a) Meter charges (standing charges) Meter size not exceeding Water Supply per year 15 mm 5.65 22 mm 6.90 30 mm 11.23 42 mm 20.65 50 mm 41.40 80 mm 105.37 100 mm 120.97 150 mm 310.19 200 mm 400.32 250 mm 490.73 300 mm 565.13 (b) Fixed charges Volume of water supplied/sewage discharged Water Supply per year Used Water per year Surface Water per year 0 to 4,999 m3 2.53 1.44 1.44 5,000 to 9,999 m3 2.53 1.44 1.44 10,000 to 49,999 m3 2.53 1.44 1.44 50,000 to 250,000 m3 2.53 1.44 1.44 250,000 m3 or greater 2.53 1.44 1.44 4

Table 7: Metered Non-household Surface Water Drainage charges (a) Rateable Value charges Charging Zone Rate per pound of rateable value (p/ RV) 1 26.43 2 21.02 3 22.76 4 25.16 5 30.78 6 29.51 7 28.55 8 22.76 Subject to a maximum charge of 111,270.15 (b) Site area surface water charges Band able area in m2 (all figures are inclusive) per year* 1 up to 20 8.69 2 21-99 47.52 3 100-199 95.25 4 200-299 158.78 5 300-499 254.16 6 500-749 397.33 7 750-999 556.37 8 1,000-1,499 794.72 9 1,500-1,999 1,112.18 10 2,000-3,999 1,906.63 11 4,000-7,499 3,654.76 12 7,500-9,999 5,561.95 13 10,000-14,999 7,945.58 14 15000-19,999 11,124.17 15 20,000-24,999 14,302.63 16 25,000-29,999 17,481.20 17 30000-34,999 20,659.57 18 35,000-39,999 23,840.02 19 40,000-44,999 27,020.48 20 45,000-49,999 30,201.04 21 50,000-99,999 47,680.41 22 Over 100,000 111,270.15 (c) Surface water charges - transition to site area per year Band T 158.95 5

Table 8: Intermediate and Large user tariffs Volume of water supplied during the year m 3 Additional fixed charge Rate m 3 of water supplied in the period per year From 1 October to 30 April inclusive Intermediate User 10,000 49,000 3,172.24 0.8528 1.5396 From 1 May to 30 September inclusive Large User 50,000 or greater 22,424.44 0.5545 1.0348 Table 9: Standby tariff capacity charges Total peak and off peak notified volumes (m 3 ) Fixed charge Rate m 3 of water supplied in the period per year From 1 October to 30 April inclusive 0 9,999-0.5427 1.4311 From 1 May to 30 September inclusive 10,000 49,000 2,009.72 0.4264 1.1132 50,000 or greater 13,801.22 0.2773 0.7576 Table 10: Standby tariff volume charges Total volume supplied (m 3 ) Rate m 3 of water supplied Fixed charge 0 9,999 0.5427 N/A 10,000 49,000 0.4264 1,163.00 50,000 or greater 0.2773 8,618.00 Table 11: Standby tariff premium charges where the notified volume is zero Rate m 3 of water supplied in the period From 1 October to 30 April inclusive From 1 May to 30 September inclusive 1.0854 2.8622 6

Table 12: Supplies to New Appointments and Variations (NAVs) s m 3 Up to 10 plots More than 10 plots References Water supply charge 1.2928 1.1352 Used water discharged to public sewer* 0.9478 0.9456 Standing charges - water supply (based on size of meter at boundary) None Apply Surface water drainage* Apply Apply Fixed charges (based on consumption) None None * For NAVs that also cover waste water services These charges apply to new appointments for unserved sites. They do not apply to new appointees serving large non-household customers using more than 50 Ml/a or variations by consent. See Table 6a See Table 7b See Table 6b C4 Assessed volume charges Table 13: Assessed volume charges Water Supply Used Water* per year per year 0.9699 per m3 x the volume of water that 1.4585 per m3 x the volume of water that we assess is we assess is supplied to such premises plus a supplied to such premises plus a fixed charge of 2.53 fixed charge of 1.44 *Plus the appropriate charge for surface water drainage (see table 7) Table 14: Trade effluent charges (a) 0 to 10 Ml of water supplied Charging element Volume discharged m 3 kg R (Reception and conveyance in the public foul water sewer) Up to 9,999m3 0.2674 - From 10,000 to 49,999m3 0.2633 From 50,000 to 249,999m3 0.2285-250,000 m3 and over 0.1826 - V (Volumetric treatment) 0.2420 - B (Biological treatment) - 0.4159 S (Treatment and disposal of primary sludge from reception and treatment at a sewage treatment works) - 0.3165 Discharge to a public surface water sewer under a consent 0.1337-7

(b) 10 to 50 Ml of water supplied Charging element Volume discharged m 3 kg R (Reception and conveyance in the public foul water sewer) Up to 9,999m3 0.2674 - From 10,000 to 49,999m3 0.2633 From 50,000 to 249,999m3 0.2285-250,000 m3 and over 0.1826 - V (Volumetric treatment) 0.2420 - B (Biological treatment) - 0.4159 S (Treatment and disposal of primary sludge from reception and treatment at a sewage treatment works) - 0.3165 Discharge to a public surface water sewer under a consent 0.1337 - (c) 50 to 250 Ml of water supplied Charging element Volume discharged m3 kg R (Reception and conveyance in the public foul water sewer) Up to 9,999m3 0.2674 - From 10,000 to 49,999m3 0.2633 From 50,000 to 249,999m3 0.2285-250,000 m3 and over 0.1826 - V (Volumetric treatment) 0.2420 - B (Biological treatment) - 0.4159 S (Treatment and disposal of primary sludge from reception and treatment at a sewage treatment works) - 0.3165 Discharge to a public surface water sewer under a consent 0.1337-8

(d) Greater than 250 Ml of water supplied Charging element Volume discharged m3 kg R (Reception and conveyance in the public foul water sewer) Up to 9,999m3 0.2674 - From 10,000 to 49,999m3 0.2633 From 50,000 to 249,999m3 0.2285-250,000 m3 and over 0.1826 - V (Volumetric treatment) 0.2420 - B (Biological treatment) - 0.4159 S (Treatment and disposal of primary sludge from reception and treatment at a sewage treatment works) - 0.3165 Discharge to a public surface water sewer under a consent 0.1337 - Table 15: Assessed trade effluent charges Assessed trade effluent m 3 Car wash 0.5559 Laundrette 0.8332 Surface water 0.1337 Swimming pool backwash 0.5172 Paint stripping 0.7019 Gas holder seal water 0.5562 Table 16: Fixed charge Volume of Trade Effluent discharged per year 0 to 9,999 m3 25.06 10,000 to 49,999 m3 25.06 50,000 to 249,999 m3 25.06 250,000 m3 or greater 25.06 9

C5 Other charges Table 17: Infrastructure charges Water service infrastructure charge Sewerage service infrastructure charge 379.63 379.63 Table 18: Infrastructure charge loading units Water Fitting (note 1) Loading Units WC flushing cistern 2.0 Wash basin in a household premises 1.5 Wash basin elsewhere 3.0 Bath (tap nominal size 3/4 0.75 in/20 mm) (note 2) 10.0 Bath (tap nominal size larger than 3/4 0.75 in/20 mm (note 2) 22.0 Shower 3.0 Sink (tap nominal size 1/2 0.5 in/15 mm) 3.0 Sink (tap nominal size larger than 1/2 0.5 in/15 mm) 5.0 Spray tap 0.5 Bidet 1.5 Domestic appliance (subject to a minimum of 6 loading units per household premises) (notes 3 & 4) 3.0 Communal or commercial appliance (note 3) 10.0 Any other water fitting or outlet (including a tap, but excluding a urinal or water softener 3.0 Notes to be read with table 1 8 1 Reference to any fitting includes reference to any plumbing, outlet, dedicated space or planning or other provision for that fitting; 2 Bath includes a whirlpool bath and a Jacuzzi; 3 Domestic appliance means an appliance (including a dishwasher, washing machine and waste disposal unit) in a household premises and communal or commercial appliance means an appliance (including a dishwasher, washing machine and waste disposal unit) elsewhere than in a household premises (including in communal facilities); 4 In any calculation under section B6.1 (vii), a minimum of six loading units shall be included, for each household premises, for domestic appliances (whether or not the household premises has any such appliances) except, in the case of any household premises, where neither a washing machine nor a dishwasher can be provided (and there is no plumbing, outlet, dedicated space or planning or other provision for either appliance) in the household premises. 10

5 In the case of any premises with a sewerage only connection and no water fittings, the relevant multiplier will be one. 6 If there is a dispute between us and the person on whom any infrastructure charge has been levied about the calculation of the relevant multi plier, or the number or type of fittings on which that calculation is based, such dispute may be referred by either party for determination by Ofwat. Table 19: s for water supplies for building or civil engineering purposes for water supplies for building or civil engineering purposes, per unit of property 80.47 11