TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

Similar documents
Transcription:

Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB AND GUTTERS, CONCRETE SURFACING, SIDEWALKS, DRIVEWAYS AND BIKEWAYS Chapter 12 - PORTLAND CEMENT CONCRETE PAVEMENT Chapter 33 - SEEDING AND SODDING Chapter 37 - CONSTRUCTION EROSION CONTROL Standard Details

Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES 3.00 SCOPE 3.10 GENERAL 3.20 MATERIALS 3.21 WATER MAIN MATERIAL A. DUCTILE IRON PIPE B. FITTINGS C. FIRE HYDRANTS D. VALVES E. GATE VALVES F. VALVE BOXES G. TAPPING TEES, CROSSES AND VALVES H. COUPLINGS 3.22 WATER SERVICES A. COPPER TUBING B. CORPORATION STOPS C. TAPPING SADDLES D. CURB STOPS AND BOXES 3.23 FIRE SERVICE LINES A. DUCTILE IRON PIPE B. DOMESTIC WATER SERVICES 3.30 CONSTRUCTION METHODS 3.31 EXCATION, TRENCHING, BEDDING AND BACKFILLING 3.32 WATER MAIN INSTALLATION A. LOWERING OF WATER MAIN INTO TRENCH B. INSPECTION BEFORE INSTALLATION C. CLEANING OF PIPE AND FITTINGS D. PLACEMENT OF PIPE E. CUTTING OF PIPE F. BELL ENDS TO FACE DIRECTION OF LAYING G. UNSUITABLE CONDITIONS FOR LAYING PIPE H. BRIDGING OF PIPE I. INSULATION BETWEEN DIFFERENT METALIC PIPE MATERIALS 3.33 GENERAL REQUIREMENTS OF PIPE JOINTING A. MECHANICAL JOINTS B. PUSH-ON JOINTS C. RESTRAINED JOINTS 3.34 CONNECTIONS WITH EXISTING PIPE LINES A. CONNECTION B. PRESSURE CONNECTION 3.35 RELATION OF WATER MAINS TO SEWERS A. PARRALLEL INSTALATION B. CROSSING 3.40 WATER MAIN APPURTENANCES 3.41 SETTING OF VALVE AND FITTINGS 3.42 SETTING OF FIRE HYDRANTS 3.43 INSTALLATION OF BRACING, SUPPORTING AND ANCHORING A. ANCHORAGE FOR FIRE HYDRANTS B. ANCHORAGE FOR PLUGS, CAPS, TEES, TAPS AND BENDS

C. FORMING FOR CONCRETE THRUST BLOCKS AND ANCHORS 3.50 SERVICE CONNECTIONS A. WATER SERVICES B. SANITARY SEWER SERVICES 3.70 QUALITY ASSURANCE A. DISINFECTION B. METHOD C. TESTING D. PRESSURE AND LEAKAGE TESTS E. TEST EQUIPMENT AND FACILITIES F. PRESSURE TEST G. LEAKAGE TEST 3.80 SUBMITTALS A. Certification by Manufacturer B. Quality Control Testing C. Shop Drawings 3.90 MEASUREMENT AND PAYMENT A. Measurement and payment B. Water Mains C. Pipeline Specials D. Fire Hydrants E. Connections F. Pressure Connections G. Water and Sewer Crossings H. Service Lines I. Service Reconnections for Water and Sewer Chapter 4 - SANITARY SEWER 4.00 SCOPE 4.10 GENERAL 4.20 MATERIALS 4.21 GRAVITY SEWERS A. VITRIFIED CLAY SEWER PIPE B. DUCTILE IRON PIPE 4.22 PRESSURE SEWERS A. DUCTILE IRON PIPE AND FITTINGS B. GATE VALVES C. PLUG VALVE D. VALVE BOXES 4.30 CONTRUCTION METHODS A. EXCAVATION, TRENCHING AND BACKFILLING B. PIPE INSTALLATION C. PLUGGING OF PIPE DURING INSTALLATION D. DEWATERING IN PIPE INSTALLATION 4.40 SEWER APPURTENANCES A. MANHOLES B. WYE BRANCHES AND TEES C. SERVICE CONNECTIONS D. ANCHORAGE FOR PLUGS, CAPS, WYES, TEES AND BENDS E. RELATION OF WATERMAINS TO SEWERS

F. ADAPTOR COUPLINGS 4.70 QUALITY ASSURANCE 4.71 TESTING GRAVITY SEWERS A. FIELD QUALITY CONTROL B. LIGHT TEST C. INFILTRATION AND AIR TEST D. AIR TEST E. TELEVISION INSPECTION 4.72 TESTING PRESSURE SEWERS A. HYDROSTATIC TEST B. PRESSURE AND LEAKAGE TESTS C. TEST EQUIPMENT AND FACILITIES D. PRESSURE TEST E. LEAKAGE TESTS 4.90 MEASUREMENT AND PAYMENT A. MEASUREMENT AND PAYMENT B. SEWER PIPE C. STANDARD MANHOLES D. DROP MANHOLES E. WYE BRANCHES AND TEES F. CLEANOUTS G. SERVICE CONNECTIONS H. SPECIAL FOUNDATIONS I. CONNECTIONS TO EXISTING MANHOLE J. SERVICE RECONNECTIONS FOR WATER AND SEWER K. WATER AND SEWER CROSSING L. ADAPTOR COUPLINGS M. FORCEMAIN CLEANOUT Chapter 5 - STORM SEWER 5.00 SCOPE OF WORK 5.20 STORM SEWER MATERIALS A. REINFORCED CONCRETE PIPE B. REINFORCED CONCRETE LOW-HEAD PRESSURE PIPE C. REINFORCED CONCRETE ARCH CULVERT D. REINFORCED CONCRETE ELLIPTICAL CULVERT E. STORM SEWER INLET FRAMES AND GRATES F. GRADE RINGS G. MANHOLE RINGS AND COVER H. GROUT I. CONCRETE J. REINFORCING STEEL K. REINFORCING BARS L. JOINT MATERIALS M. BITUMINOUS JOINT FILLER N. GASKET TYPE JOINTS O. LIFT HOLE 5.30 CONSTRUCTION METHODS A. PROTECTION OF EXISTING UTILITIES B. STRUCTURE SUBGRADE PREPARATION

C. PIPE LAYING AND JOINTING D. PLACEMENT OF PIPE E. CUTTING OF PIPE F. PIPE BEDDING G. HORIZONTAL AND VERTICAL PIPE SEPARATION H. MANHOLES I. STORM SEWER INLETS J. EXCAVATION TRENCHING, BEDDING AND BACKFILLING K. FLOWABLE BACKFILL L. EXPOSURE OF SANITARY PIPE OR MANHOLES 5.40 DRAINAGE STRUCTURE CONSTRUCTION A. CONCRETE WORK B. FORM WORK C. FORM REMOVAL D. CONCRETE PLACEMENT E. FINISHING F. CONSTRUCTION JOINTS G. PROTECTION AND CURING H. WATERPROOFING I. CLEANING 5.70 QUALITY ASSURANCE A. TESTING B. LIGHT TEST C. AIR TEST. D. TELEVISION INSPECTION E. UNUSUAL CONDITIONS F. GENERAL OF CONCRETE PIPE H. EVALUATION OF BACKFILL 5.71 ACCEPTANCE A. ACCEPTANCE 5.80 SUBMITTALS A. SUBMITTALS Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING 6.00 SCOPE 6.10 GENERAL 6.30 CONSTRUCTION METHODS 6.31 TRENCH EXCAVATION A. COMMON EXCAVATION B. UNCLASSIFIED EXCAVATION C. GENERAL PREPARATION OF SUB-GRADE D. TRENCH WIDTH E. DEWATERING 6.32 BEDDING A. CLASSES OF BEDDING B. CONCRETE CRADLE BEDDING, CLASS A C. FIRST CLASS BEDDING, CLASS B D. ORDINARY BEDDING, CLASS C E. SPECIAL BEDDING, CLASS D

6.33 TRENCH BACKFILL A. BACKFILLING B. COMMON TRENCH BACKFILL C. BACKFILL AROUND STRUCTURES AND APPURTENANCES D. BACKFILL MATERIAL E. BACKFILL MOISTURE CONTROL F. BACKFILL GRAVEL G. FREEZING WEATHER H. DISPOSAL OF SURPLUS MATERIAL 6.34 MISCELLANEOUS A. PROTECTION OF EXISTING UTILITIES AND PROPERTIES B. ABANDONMENT OF UTILITIES C. SURVEY REFERENCE PROTECTION D. CONSTRUCTION RIGHT-OF-WAY E. PROTECTION F. SETTLEMENT 6.35 CLEANUP A. PROJECT CLEAN-UP 6.70 QUALITY CONTROL 6.71 TESTING A. SOILS TESTING B. GEOTECHNICAL LABORATORY TESTING 6.72 EROSION CONTROL A. SOIL EROSION AND SEDIMENTATION CONTROL 6.90 MEASUREMENT AND PAYMENT A. MEASUREMENT AND PAYMENT B. REMOVAL AND REPLACEMENT OF EXISTING PAVEMENTS C. UNCLASSIFIED EXCAVATION D. DISPOSAL OF SURPLUS MATERIAL E. UNSUITABLE MATERIALS Chapter 11 - CONCRETE CURBS, CURB AND GUTTERS, CONCRETE SURFACING, SIDEWALKS, DRIVEWAYS AND BIKEWAYS 11.00 SCOPE 11.10 GENERAL 11.20 MATERIALS A. CONCRETE B. PORTLAND CEMENT C. GRADATION LIMITS- FINE AGGREGATE D. GRADATION LIMITS- COURSE AGGREGATE E. WATER F. SLUMP G. WORKABILITY H. MIXING I. ADMIXTURES J. FLY ASH K. WATER REDUCING, SET CONTROLLING ADMIXTURE L. REINFORCING STEEL M. REINFORCING BARS N. DOWEL BARS

O. EXPANSION JOINTS P. JOINT SEALING MATERIAL: 11.30 CONSTRUCTION METHODS A. PREPARATION OF SUBGRADE 11.32 FORMS A. RIGID FORMS B. SLIP FORMS 11.33 CONCRETE PLACEMENT A. VIBRATING B. FINISHING C. CURING D. PROTECTION 11.34 CURBS, CURB AND GUTTERS AND VALLEY GUTTERS 11.35 MEDIAN SURFACING 11.36 STAMPED AND COLORED BRICK PATTERN CONCRETE SURFACING 11.38 SIDEWALKS. 11.39 DRIVEWAYS 11.40 ACCESS RAMPS 11.40 CONSTRUCCTION APPURTENANCES 11.41 PLACING REINFORCING STEEL 11.42 JOINTS A. CONTRACTION JOINTS B. EXPANSION JOINTS C. JOINT SEALING 12.43 COLD WEATHER CONCRETING A. COLD WEATHER CONCRETING 12.44 HOT WEATHER CONCRETING A. HOT WEATHER CONCRETING 11.90 MEASURMETN AND PAYMENT A. MEASUREMENT AND PAYMENT B. CURBS AND GUTTERS C. VALLEY GUTTERS D. SIDEWALKS E. DRIVEWAYS F. DETECTABLE TRUNCATED SURFACEING Chapter 12 - PORTLAND CEMENT CONCRETE PAVEMENT 12.00 SCOPE 12.10 GENERAL 12.20 PAVEMENT MATERIALS A. CONCRETE B. PORTLAND CEMENT C. GRADATION LIMITS- FINE AGGREGATE D. GRADATION LIMITS- COURSE AGGREGATE E. WATER F. SLUMP G. WORKABILITY H. MIXING I. ADMIXTURES

J. FLY ASH K. WATER REDUCING, SET CONTROLLING ADMIXTURE L. REINFORCING STEEL M. REINFORCING BARS N. DOWEL BARS O. EXPANSION JOINTS P. JOINT SEALING MATERIAL Q. METAL SUPPORTS R. EXPANSION TUBES 12.30 CONSTRUCTION METHODS 12.31 EARTHWORK A. CLEARING AND GRUBBING B. SITE PREPARATION C. EXCAVATION D. EMBANKMENT E. BORROW F. SURPLUS MATERIAL 12.32 SUB-GRADE A. SUB-GRADE B. SUB-GRADE PREPARATION C. FAULTY FOUNDATION D. GRANULAR FOUNDATION COURSE 12.33 PAVEMENT A. BLOCK OUTS B. CONCRETE PLACEMENT REQUIREMENTS D. MACHINE PLACEMENT E. FORMED METHOD G. FORM REMOVAL H. PLACING REINFORCING STEEL I. FLOATING AND SCRAPING J. EDGING K. FINAL SURFACE FINISH L. INTEGRAL CURBS M. INTEGRAL CURB JOINTS N. PROTECTION O. CURING 12.34 JOINT APPLICATIONS A. CONTRACTION JOINTS B. PLANNED CONSTRUCTION JOINTS C. EMERGENCY CONSTRUCTION JOINTS D. LONGITUDINAL JOINTS E. EXPANSION JOINTS 12.35 ADJUSTMENTS A. ADJUSTMENT OF MANHOLES AND STORM SEWER INLETS B. ADJUSTMENT OF VALVE BOXES 12.36 BACKFILLING A. BACKFILLING B. FINAL GRADING AND TOPSOILING 12.37 OPENING TO TRAFFIC A. OPENING TO TRAFFIC 12.38 CLEANUP

A. CLEANUP B. COATING FOR CAST IRON CASTINGS 12.40 OTHER PAVEMENT OPERATIONS 12.41 COLD WEATHER CONCRETING A. COLD WEATHER CONCRETING 12.42 HOT WEATHER CONCRETING A. HOT WEATHER CONCRETING 12.43 PAVEMENT PATCHING, REMOVAL AND REPLACEMENT A. PAVEMENT PATCHING, REMOVAL AND REPLACEMENT 12.70 QUALITY ASSURANCE A. CONCRETE TESTING SERVICE B. MIX DESIGN C. QUALITY CONTROL 12.71 THICKNESS A. REQUIREMENTS FOR THICKNESS B. LENGTH AND WIDTH OF UNITS C. CORES D. DETERMINATION OF THICKNESS E. THICKNESS - THICKNESS DEFICIENT MORE THAN 8.0% - 12.80 SUBMITTALS A. SUBMITTALS 12.90 MEASUREMENT AND PAYMENT A. MEASUREMENT AND PAYMENT B. CLEARING AND GRUBBING C. PREPARATION D. COMMON EXCAVATION E. EMBANKMENT F. BORROW G. SUB-GRADE PREPARATION. H. GRANULAR FOUNDATION COURSE I. ADJUSTING MANHOLES, INLETS AND VALVE BOXES J. PORTLAND CEMENT CONCRETE PAVEMENT K. INTEGRAL CURB L. HEADERS M. TRANSVERSE EXPANSION AND MISCELLANEOUS JOINTS N. MISCELLANEOUS O. CONCRETE TESTING Chapter 33 - SEEDING AND SODDING 33.00 SCOPE 33.10 GENERAL 33.20 MATERIALS A. GENERAL PLANT MATERIALS REQUIREMENT - B. SEED (GENERAL) - C. APPROVED VARIETIES INCLUDE: TYPE A TYPE B TYPE C TYPE D TYPE E TYPE F

TYPE G TYPE H TYPE I D. SOD (GENERAL) - E. FERTILIZER F. TOPSOIL G. COMPOST H. MULCH I. LIMESTONE J. WATER 33.30 CONSTRUCTION METHODS A. EXAMINATION B. UNDERGROUND FACILITIES C. PREPARATION OF SOIL E. FERTILIZING F. SITE CLEAN-UP 33.31 COVER CROP (Temporary Seeding) A. EARLY SEASON (SPRING COVER CROP) B. MID-SEASON (LATE SUMMER/FALL COVER CROP) C. LATE SEASON (WINTER COVER CROP) 33.32 SEEDING A. GENERAL B. TOPSOIL C. SEED D. MULCHING E. SEEDING METHOD - 1. FESCUE/BLUEGRASS SEEDING 2. NATIVE SEEDING F. WATERING 33.33 SODDING A. GENERAL B. TOPSOIL. C. CARE AND HANDLING D. INSTALLATION. G. MAINTENANCE J. WATERING 33.40 CONSTRUCTION APPURTENANCES 33.41 PLANTING SEASON 33.42 ACCEPTANCE AND ESTABLISHMENT PERIOD A. INSPECTION B. ESTABLISHMENT C. FINAL INSPECTION 33.43 REPLACEMENT OF MATERIAL AND GUARANTEE PERIOD 30.70 QUALITY ASSURANCE A. SOD B. SEED C. COMPLIANCE D. INSPECTION 33.71 SOURCE QUALITY CONTROL A. CERTIFICATES OF INSPECTION

B. SUBSTATUTIONS C. CERTIFIED ANALYSIS 33.80 SUBMITTALS 33.90 MEASUREMENT AND PAYMENT A. GENERAL Chapter 37 - CONSTRUCTION EROSION CONTROL 37.00 SCOPE OF WORK 37.10 GENERAL 37.20 MATERIALS 37.30 CONSTRUCTION METHODS 37.31 STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND NDEQ PERMITTING: A. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) B. RESPONSIBILITIES AND DUTIES 37.32 LOCATION OF STORM WATER POLLUTION PREVENTION PLAN (SWPPP) 37.33 STABILIZATION PRACTICES FOR DISTURBED LAND 37.34 STOCKPILES, SIDE CASTING, AND STORAGE OF CONSTRUCTION MATERIALS 37.35 STABILIZATION PRACTICES 37.36 SEEDING AND SODDING: 37.37 STRUCTURAL PRACTICES A. SILT FENCE B. CONSTRUCTION SPECIFICATIONS C. SILT FENCE MAINTENANCE D. REMOVAL OF SILT FENCE E. TEMPORARY SEDIMENT TRAP F. ROLLED EROSION CONTROL PRODUCTS (RECP) S G. STORM DRAIN INLET PROTECTION H. OFF- SITE VEHICLE TRACKING I. WASHING J. ENTRANCE/EXIT MAINTENANCE. K. CONCRETE WASHOUT L. EROSION CONTROL MAINTENANCE M. GENERAL BMP MAINTENANCE 37.40 OTHER CONTROLS A. WASTE DISPOSAL B. PORTABLE SANITARY FACILITIES 37.41 TIMING OF CONTROLS/MEASURES 37.42 MAINTENANCE AND INSPECTION PROCEDURES A. EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES B. ALLOWABLE NON- STORM WATER DISCHARGES 37.43 TIMELY REPAIRS BY CONTRACTOR 37.44 SPILL PREVENTION: A. MATERIAL MANAGEMENT PRACTICES B. INVENTORY FOR POLLUTION PREVENTION PLAN C. SPILL PREVENTION CONTROL PRACTICES 37.90 MEASUREMENT AND PAYMENT A. MEASUREMENT AND PAYMENT

B SILT FENCE, TEMPORARY BERMS, TEMPORARY DIVERSIONS, AND TEMPORARY CULVERT PIPE C. EROSION CONTROL BALES AND CHECK D. SEDIMENT TRAPS AND SEDIMENT BASINS E. ROLLED EROSION CONTROL PRODUCTS F. TIME OF PAYMENT FOR EROSION CONTROL ITEMS G. FAILURE TO PERFORM STANDARD DETAILS PAVEMENT DETAILS 3 SHEETS DRIVEWAY DETAILS CURB INLET DETAILS INLET DETAILS JUNCTION MANHOLE AND MISC. DETAILS SEDIMENT CONTROL DETAILS SIDEWALK DETAILS WATER DETAILS SANITARY SEWER DETAILS