MRCSP Overview and Large Scale CO 2 Storage in the Mt. Simon Reservoir

Similar documents
Transcription:

Managing Climate Change and Securing a Future for the Midwest s Industrial Base MRCSP Overview and Large Scale CO 2 Storage in the Mt. Simon Reservoir DOE Annual Partnership Review Meeting December 12, 2007 DOE Cooperative Agreement No. DE-FC26-05NT42589 David Ball MRCSP Project Manager

The MRCSP Region: The Nation s Engine Room One in Four Americans 1/5 of U.S. Electricity Supply ¾From Coal ~830 Million Tons of CO2/year ~340 Large Point Sources of CO2

Three Phase II terrestrial field efforts are being conducted Croplands Reclaimed Minelands Wetlands

Four Phase II geologic field efforts are being conducted Michigan Basin Site Appalachian Basin Site Ohio Deep Well Cincinnati Arch Site

MRCSP Membership U.S. Department of Energy/NETL

Upcoming Events Injection test in Michigan (~Dec 2007 Jan 2008) Complete injection test plan for Burger Compression and injection from Powerspan source Liquid CO2 from commercial source Drill injection well at East Bend (Late 2007 early 2008) Complete injection permits for Burger and East Bend Injection testing at Burger (start ~ late summer 2008) Injection testing at East Bend (start ~ late 2008) Update web site to improve tracking of demos Continue soil sampling and analysis for terrestrial tests

Proposed Phase III Geologic Test Sites Ethanol Plant in Ohio Primary site Inject 1 million tons of CO 2 over a four-year period Target is the Mt. Simon reservoir, the largest deep saline target in our region. IGCC in Indiana Optional site Possible 2 million tons of CO 2 injection over fouryear injection period Multiple injection zones and caprock layers

The TAME ethanol plant in Greenville, Ohio has been selected as the primary MRCSP Phase III test site TAME is a joint venture of The Andersons Inc. and Marathon Petroleum Company The Greenville plant is designed to produce 110 million gallons of ethanol per year As a result it will produce an estimated 280,000 tons of injection grade CO 2 per year Plant startup is expected to occur early in 2008 CO 2 Injection operations are expected to begin in early FY 10

Location of TAME Site Greenville, Ohio TAME Site

MRCSP Phase III Site Layout Potential Well Site and Compressor Station CO2 Vent Stack Fermentation Administration Grain Storage Area Rail Access

Duke s IGCC plant near Edwardsport, Indiana has been selected as an optional Phase III site 640 MW IGCC Power Plant ~500,000 tons of CO 2 per year Plant startup scheduled for late 2011 CO 2 injection operations could start in early 2012 Existing Power Plant IGCC Site Duke Property Line

Location of Duke s IGCC Plant Site of IGCC Plant Edwardsport, IN

Geologic Characteristics of Proposed MRCSP Phase III Test Sites Parameter TAME Ethanol Duke IGCC Geologic Setting Cincinnati Arch Illinois Basin Sed. Total Thickness 3600 8600 Primary Target Mt. Simon Mt. Simon Lithology Quartz Sandstone Sandstone Target Depth Interval (ft) 3300-3600 7500-8600 Total Thickness (ft) 300 1100 Avg. Porosity 0.12 0.1 Avg. Perm. (md) 50-400 10-200 Formation Pressure (psi) ~1450 ~3525 Formation Temperature (F) 88 130 Secondary Target none Knox Carbonates

Geologic Setting of Proposed MRCSP Phase III Test Sites Duke IGCC (Optional) TAME (Primary)

Comprehensive site characterization is planned for the Phase III test Regional geology Seismic Survey Test well Drilling Rock core sampling/tests Wireline logging Rock-Water Testing Geomechanical Analysis Reservoir Testing Reservoir Simulations

1 0 2 0 90 3 0 4 0 80 5 0 60 70 7 0 8 0 60 90 50 1 0 2 0 40 3 0 4 0 30 5 0 6 0 20 7 0 8 0 10 9 0 Phase III Measurement, Monitoring and Verification System Monitoring Phase III Monitoring Options A comprehensive MMV program is planned for the large scale Phase III project. Specific design will be based on field data obtained in site characterization. P re ss u re (PS I) 3950 3900 3850 3800 3750 3700 3650 0 20 40 60 80 100 Time (Days) Cross-well or 3D Seismic 140 120 100 80 60 40 20 0 Deep Monitoring Well Temperature (*F) Depth (ft bgs) 0 Injection Test Well 1,000 2,000 1620 1600 1580 Pressure1 Pressure2 Pressure3 Pressure4 Multi-level Monitoring Pressure Surface Flux and Soil Gas Probes Borehole Tiltmeters 95 90 85 Temperature Pressure (PSI) 1560 1540 1520 T em per atu re ( F) 80 75 Temp1 Temp2 Wireline, Coring and Mechanical Integrity 1500 1480 1460 0 10 20 30 40 50 60 70 Days 70 Temp3 Temp4 65 60 0 10 20 30 40 50 60 70 Days Not Shown: Wellhead Monitoring Acoustic Emissions 3,000 Storage Formation Brine Chemistry and Fluid Sampling Na Ca K 4,000

Thank You