JULY 11, 2017 SECTION 009504-1 BULLETIN NO. 4 AC/MOXY 20150080 PART 1 - GENERAL SECTION 009504 BULLETIN NO. 4 1.1 GENERAL REQUIREMENTS A. The Contract Documents for the above project are revised as described herein. The changes shall take precedence upon receipt of Notice to Proceed, and all other provisions of the Contract Documents shall remain in force. B. This is not a notice to proceed. The Contractor shall analyze the work included in this Bulletin, shall determine if an increase or a decrease to the Contract Sum or Contract Time is called for, and shall submit a proposal to the Owner. The Owner has the right to reject, accept, or negotiate the Contractor s proposal. If the Owner accepts the Contractor's proposal, the work shall proceed with the change in scope, and the Contract Sum and Contract Time shall be revised. If the Owner rejects the proposal, the work shall proceed as if the bulletin had never been issued. PART 2 - DRAWING CHANGES 2.1 REVISED DRAWINGS A. The following Drawings have been revised, bear revision date July 11, 2017, are issued with this Bulletin, and are deemed a part thereof. The changes to be made are identified on each Drawing. Number Title Landscape L1.03 Pool Deck Hardscape Plan L1.13 Pool Deck Layout Plan Structural S1.01 Reference Floor Plans - Level 1 S1.06 Reference Floor Plans - Level 6 S2.24 Tunnel Foundation Plan at MOXY & AC - Level 1 - Zone B & C S2.37 Floor Framing Plan - Level 6 / Pool Deck - Zone A S2.37 Pt Framing Plan - Level 6 / Pool Deck - Zone A S2.38 Floor Framing Plan - Level 6 / Pool Deck - Zone B S2.39 Floor Framing Plan - Level 6 / Pool Deck - Zone C S2.39 PT Framing Plan - Level 6 / Pool Deck - Zone C S2.50 Pool Deck/Canopy Framing Plan S5.04 Post Tensioned Beam Schedules & Details S5.07 Concrete Framing Sections & Details S7.02 Shear Wall & Braced Frame Elevations Mechanical M0.3 HVAC Schedules M0.4 HVAC Schedules M2.02A Level 2 - HVAC M2.12A Roof HVAC M2.01A Level 1 - HVAC

JULY 11, 2017 SECTION 009504-2 BULLETIN NO. 4 AC/MOXY 20150080 Number Title Electrical E4.01 AC Electrical Guest Unit Plans E4.02 AC Electrical Guest Unit Plans E4.03 AC Electrical Guest Unit Plans E1.01B MOXY Lobby Level Floor Plan B - Power Plumbing P1-02AS P1-02AW P1-06AS P1-06AW P1-07AS P1-07AW P1-08AS P1-08AW P1-09AS P1-09AW P1-10AS P1-10AW P1-11A" P1-11AW Plumbing Enlarged Floor Plan - Level 2 AC - S,W,&V Plumbing Enlarged Floor Plan - Level 2 AC - Water & Gas Plumbing Enlarged Floor Plan - Level 6 / Pool Deck - S,W,&V Plumbing Enlarged Floor Plan - Level 6 / Pool Deck - Water & Gas Plumbing Enlarged Floor Plan - Level 7 / Guestroom 2 - S,W,&V" Plumbing Enlarged Floor Plan - Level 7 / Guestroom 2 - Water & Gas Plumbing Enlarged Floor Plan - Level 8 / Guest Room 3 - S,W,&V Plumbing Enlarged Floor Plan - Level 8 / Guest Room 3 - Water & Gas Plumbing Enlarged Floor Plan - Level 9 / Guest Room 4 - S,W,&V Plumbing Enlarged Floor Plan - Level 9 / Guest Room 4 - Water & Gas Plumbing Enlarged Floor Plan - Level 10 / Guestroom 5 - S,W,&V Plumbing Enlarged Floor Plan - Level 10 / Guestroom 5 - Water & Gas Plumbing Enlarge Floor Plans - Level 11 / Guestroom 6 - S,W,&V Plumbing Enlarge Floor Plans - Level 11 / Guestroom 6 - Water & Gas Architecture A1.01 Reference Floor Plans - Level 1 / MOXY Lobby & Level 2 / AC Lobby A1.02 Reference Floor Plans - Level 2.5 / Parking 0.5 & Level 3 / Parking 1 A1.03 Reference Floor Plans - Level 4 / Parking 2 & Level 5 / Parking 3 A1.04 Reference Floor Plans - Level 6 / Pool Deck (Guest Room 1) & Level 7 / Guest Room 2 A2.01 Enlarged Plan - MOXY Lobby - Level 1 - Zone A A2.13 Enlarged Plan - AC Lobby - Level 2 - Zone C A2.14 Enlarged Plan Parking Level 3 - Zone P-C A2.15 Enlarged Plan Parking Level 3 - Zone P-B A2.18 Enlarged Plan Parking Level 4 - Zone P-A A2.19 Enlarged Plan Level 6 - Zone A A2.25 Edge Of Slab Plans - Level 2/ AC Lobby - Zone A A2.26 Edge Of Slab Plans - Level 2/ AC Lobby - Zone B A2.27 Edge Of Slab Plan - Level 2.5/ Parking 0.5 A2.28 Edge Of Slab Plan - Level 3 / Parking Levels - Zone A A2.29 Edge Of Slab Plan - Level 3 / Parking Levels - Zone B A2.30 Edge Of Slab Plan - Level 3 & 4 / Parking Levels - Zone C A2.31 Edge Of Slab Plan - Level 5 / Parking 3 - Zone A A2.32 Edge Of Slab Plan - Level 4 & 5 / Parking 3 - Zone B A2.33 Edge Of Slab Plan - Level 5 / Parking 3 - Zone C A2.34 Edge Of Slab Plan - Level 6 / Pool Deck - Zone A A2.35 Edge Of Slab Plan - Level 6 / Pool Deck - Zone B A4.01 Building Elevations A4.02 Building Elevation A5.20 Component - Pool Bar A5.21 Component - Pool Bar A5.21B Component - Pool Bar A6.14 Exterior Enlarged Section Details A7.11 Elevator 1&2-3&4 - Plans A7.13 Elevator 5& 6 - Plans & Sections

JULY 11, 2017 SECTION 009504-3 BULLETIN NO. 4 AC/MOXY 20150080 Number Title Architecture (continued) A8.21 Enlarged Typical AC Guestroom - Construction Plans & RCP- AC K 1- AC K 1.C- AC K 2 A8.22 Enlarged Typical AC Guestroom - Construction Plans & RCP- AC K 3- AC K 4- AC K 5 A8.23 Enlarged Typical AC Guestroom - Construction Plans & RCP- AC QQ 1- AC QQ 1.C- AC QQ 2 A8.24 Enlarged Typical AC Guestroom - Construction Plans & RCP- AC QQ 3- AC QQ 4- AC ACC K 1.T A8.25 Enlarged Typical AC Guestroom - Construction & RCP Plans- AC ACC QQ 1.T- AC ACC QQ 1.S - AC ACC K1.S A8.31 Enlarged AC Bathroom RCP & Plan A8.82 Pool Plans (Enlarged Plans & Sections) A9.06 Meeting Room Details A9.11 Door Schedule - Public & BOH Levels 06 Thru Roof A9.14 Door and Frame Types A9.21 BOH Finish Schedule A9.31 Window Schedule and Types Interior Design ID0.02 ID2.01 ID8.03 ID8.04 ID8.07 ID8.08 ID8.13 ID8.14 ID8.16 ID8.35 ID8.36 ID10.09 ID10.10 Materials, Finish Legend, TA Legend & Details Enlarged Id Plan - AC Lobby - Level 2 - Zone A Enlarged AC Guestroom - Furniture & Finish Plans & RCP - AC K2 Enlarged AC Guestroom - Furniture & Finish Plans & RCP - AC K3 Enlarged AC Guestroom - Furniture & Finish Plans & RCP - AC QQ1 Enlarged AC Guestroom - Furniture & Finish Plans & RCP - AC QQ1.C Enlarged AC Guestroom - Furniture & Finish Plans & RCP - AC ACCQQ1.S Enlarged AC Guestroom - Furniture & Finish Plans & RCP - AC ACCQQ1.T Enlarged AC Guestroom - Furniture & Finish Plans & RCP - AC ACCSTE Enlarged AC Guestroom - Furniture & Finish Plans & RCP - AC QQ4 Enlarged AC Guestroom - Furniture & Finish Plans & RCP - AC QQ5.C Millwork - Fitness Center and Elevator Lobby Hydration Station Millwork - Pool Bar PART 3 - SPECIFICATION CHANGES 3.1 NEW SPECIFICATIONS A. The following additional Specification sections dated July 11, 2017, are issued with this Bulletin, and are deemed a part thereof. In addition, these sections are added to the Table of Contents within the Project Manual. Section Number Title 009504 Bulletin No. 4

JULY 11, 2017 SECTION 009504-4 BULLETIN NO. 4 AC/MOXY 20150080 3.2 REVISED SPECIFICATIONS A. The following Specification sections have been revised, bear revision date July 11, 2017, are issued with this Bulletin, and are deemed a part thereof. The changes to be made are identified on the revised pages of each section, attached hereinafter, unless noted otherwise. Section Number TOC Title Table of Contents END OF SECTION 009504

REVISED JULY 11, 2017 TOC- 1 VOLUME ONE MISCELLANEOUS Responsibility Matrix Revised 01/18/17 PROCUREMENT AND CONTRACTING REQUIREMENTS Division 00 Procurement and Contracting Requirements 003104 Marriott Design Standards Revised 01/18/17 * 003119 Existing Condition Information To be Issued 003132 Geotechnical Data 005200 Agreement Form To be Issued 007200 General Conditions To be Issued 009101 Addendum No. 1 Issued 08/24/16 ---------- Addendum No. 2 Issued 10/25/17 009103 Addendum No. 3 Issued 01/18/17 009501 Bulletin No. 1 Issued 03/24/17 ---------- Bulletin No. 2 Issued 05/19/17 009503 Bulletin No. 3 Issued 06/09/17 009504 Bulletin No. 4... Issued 07/11/17 SPECIFICATIONS 1 Division 01- General Requirements 011000 Summary Revised 01/18/17 * 011000 Summary To be Issued 012100 Allowances Revised 01/18/17 012200 Unit Prices Issued 01/18/17 012600 Contract Modification Procedures 012613 Request for Information Procedures 012900 Payment Procedures 012978 Interim Contractor's Affidavit and Waiver of Liens 012979 Final Contractor's Affidavit and Waiver of Liens 013113 Project Coordination 013119 Project Meetings 013200 Construction Progress Documentation 013300 Submittal Procedures 014150 Special Inspections 014200 References 014500 Quality Control 014523 Inspecting and Testing Services 015000 Temporary Facilities and Controls 015800 Temporary Project Identification 016000 Product Requirements 017123 Field Engineering 017329 Cutting and Patching 017419 Construction Waste Management and Disposal 017700 Closeout Procedures 018113 Sustainable Design Requirements * 018113.16 Sustainable Design Requirements (Commercial Interiors) To be Issued 019100 Commissioning Requirements

REVISED JULY 11, 2017 TOC- 2 Division 02 Existing Conditions 024119 Selective Demolition Division 03- Concrete 033000 Cast-In-Place Concrete * 033543 Polished Concrete Finishing To be Issued 033500 Concrete Finishing Issued 03/24/17 * 033543 Polished Concrete Finishing Deleted 03/24/17 033816 Post-Tensioning Reinforcement for Concrete 034500 Precast Architectural Concrete 034900 Glass-Fiber-Reinforced Concrete (GFRC) Deleted 01/18/17 035216 Lightweight Insulating Concrete Division 04- Masonry * 042100.01 Clay Unit Masonry-Thin Brick Issued 08/24/16 042113 Brick Masonry Deleted 01/18/17 042200 Concrete Unit Masonry * 044313.13 Anchored Stone Masonry Veneer To be Issued * 044313.16 Adhered Manufactured Masonry Veneer Issued 08/24/16 047200 Cast Stone Masonry Division 05- Metals 051200 Structural Steel 052100 Steel Joists/ Girders 053100 Steel Deck 053200 Epicore MSR Composite Floor Deck System 054000 Cold-Formed Steel Framing 054100 Pre-Panelized Load-Bearing Steel Stud Wall 055000 Metal Fabrications 055113 Metal Pan Stairs Revised 03/24/17 055213 Pipe and Tube Railings Revised 08/24/16 055250 Barrier Cable System 055313 Bar Gratings * 057000.01 Decorative Metal Issued 08/24/16 057300 Decorative Metal Railings * 057300 Decorative Metal Railings To be Issued * 057313.01 Glazed Decorative Metal Railings Revised 01/18/17 057500 Decorative Formed Metal Issued 08/24/16 Division 06 Wood, Plastics, and Composites 061053 Miscellaneous Rough Carpentry 061600 Sheathing 062023 Interior Finish Carpentry Deleted 01/18/17 * 062023 Interior Finish Carpentry Issued 01/18/17 * 064023.01 Interior Architectural Woodwork Issued 08/24/16 064113 Wood-Veneer-Faced Architectural Cabinets Deleted 08/24/16 * 064113.01 Wood-Veneer-Faced Architectural Cabinets Issued 08/24/16 064116 Plastic-Laminate-Faced Architectural Cabinets Deleted 08/24/16 * 064116.01 Plastic-Laminate-Faced Architectural Cabinets Issued 08/24/16 * 064219.01 Plastic-Laminate-Faced Wood Paneling Issued 08/24/16 066113 Cultured Marble Fabrications Deleted 08/24/16

REVISED JULY 11, 2017 TOC- 3 Division 06 Wood, Plastics, and Composites (continued) * 066113.01 Cultured Marble Fabrications Issued 08/24/16 * 066400.01 Plastic Paneling Solid Polymer Fabrications Issued 08/24/16 Division 07- Thermal and Moisture Protection 071326 Self-Adhering Sheet Waterproofing Revised 01/18/17 * 071400 Hot Fluid-Applied Waterproofing To be Issued 071413 Hot Fluid-Applied Rubberized Asphalt Waterproofing Revised 08/24/16 071416 Cold Fluid-Applied Waterproofing Issued 06/09/17 071616 Crystalline Waterproofing 071800 Traffic Coatings 072100 Thermal Insulation Revised 01/18/17 072119 Foamed-In-Place Insulation 072419 Water-Drainage Exterior Insulation and Finish System (EIFS) 072600 Vapor Retarders 072726 Fluid-Applied Membrane Air Barriers Deleted 01/18/17 074213.13 Formed Metal Wall Panels Revised 03/24/17 074213.23 Metal Composite Material Wall Panels Revised 01/18/17 075423 Thermoplastic Polyolefin (TPO) Roofing 076200 Sheet Metal Flashing and Trim Revised 01/18/17 077100 Roof Specialties Revised 01/18/17 077200 Roof Accessories 078100 Applied Fireproofing 078123 Intumescent Fireproofing Deleted 01/18/17 078413 Penetration Firestopping Revised 08/24/16 078443 Joint Firestopping Revised 08/24/16 079100 Preformed Joint Seals 079200 Joint Sealants Division 08- Openings 081113 Hollow Metal Doors and Frames Revised 01/18/17 * 081216 Aluminum Frames To be Issued * 081400 Wood Doors To be Issued 081416 Flush Wood Doors * 083100 Access Doors and Panels To be Issued 083113 Access Doors and Frames 083313 Coiling Counter Doors Issued 01/18/17 083323 Overhead Coiling Doors 083513 Folding Doors Issued 08/24/16 084113 Aluminum-Framed Entrances and Storefronts Revised 01/18/17 * 084126 All-Glass Entrances and Storefronts To be Issued 084229.23 Sliding Automatic Entrances Revised 01/18/17 084233 Revolving Door Entrances Revised 01/18/17 085113 Aluminum Windows Issued 01/18/17 * 085119.01 Stainless Steel Window Deleted 01/18/17 087100 Door Hardware Revised 06/09/17 087413 Electronic Guest Room Security Systems 088000 Glazing 088300 Mirrors Deleted 08/24/16 * 088300.01 Mirrors Issued 08/24/16 089119 Fixed Louvers

REVISED JULY 11, 2017 TOC- 4 Division 09- Finishes * 090013.43 Interior Finish Index Issued 08/24/16 092116.23 Gypsum Board Shaft Wall Assemblies 092216 Non-Structural Metal Framing 092900 Gypsum Board Revised 06/09/17 * 092900 Gypsum Board To be Issued 093000 Tiling Deleted 08/24/16 * 093013.01 Ceramic Tiling Revised 01/18/17 Division 09- Finishes (continued) * 093033.01 Stone Tiling Issued 08/24/16 095113 Acoustical Panel Ceilings Deleted 08/24/16 * 095113.01 Acoustical Panel Ceilings Issued 08/24/16 * 095123.01 Acoustical Tile Ceilings Issued 08/24/16 * 095133 Acoustical Metal Pan Ceilings Issued 01/18/17 * 096340 Stone Flooring To be Issued * 096400 Wood Flooring To be Issued 096513 Resilient Base and Accessories Deleted 08/24/16 * 096513.01 Resilient Base and Accessories Issued 08/24/16 096519 Resilient Tile Flooring Deleted 08/24/16 * 096519.01 Resilient Tile Flooring Issued 08/24/16 096536 Static-Control Resilient Flooring * 096566.01 Resilient Athletic Flooring Deleted 01/18/17 096813 Tile Carpeting Deleted 08/24/16 * 096813.01 Tile Carpeting Issued 08/24/16 096816 Sheet Carpeting Deleted 08/24/16 * 096816.01 Sheet Carpeting Issued 08/24/16 097200 Wall Coverings Deleted 08/24/16 * 097200.01 Wall Coverings Issued 08/24/16 09911300 Exterior Painting Revised 08/24/16 * 099123.01 Interior Painting Issued 08/24/16 * 099413.01 Textured Finishing Issued 08/24/16 Division 10- Specialties * 101100.01 Visual Display Surfaces Issued 08/24/16 * 101400.01 Signage Deleted 01/18/17 101423 Panel Signage Deleted 01/18/17 102113.16 Plastic-Laminate-Clad Toilet Compartments Deleted 08/24/16 * 102113.16 Plastic-Laminate-Clad Toilet Compartments Issued 08/24/16 102116.17 Phenolic-Core Shower and Dressing Compartments Deleted 08/24/16 * 102116.19 Plastic Shower and Dressing Compartments Issued 08/24/16 102233 Accordion Folding Partitions Deleted 01/18/17 102238 Operable Panel Partitions Deleted 01/18/17 102239 Folding Panel Partitions Deleted 08/24/16 * 102239.01 Folding Panel Partitions Issued 08/24/16 * 102239.13 Folding Glass-Panel Partitions To be Issued 102600 Wall and Door Protection Deleted 08/24/16 * 102600.01 Wall and Door Protection Issued 08/24/16 102800 Toilet, Bath, and Laundry Accessories Deleted 08/24/16 * 102800.01 Toilet, Bath and Laundry Accessories Issued 08/24/16 * 102819.01 Tub and Shower Doors Issued 08/24/16 102819.13 Shower Doors Deleted 08/24/16 103100 Manufactured Fireplaces * 103100 Manufactured Fireplaces To be Issued 104413 Fire Protection Cabinets Revised 08/24/16

REVISED JULY 11, 2017 TOC- 5 Division 10- Specialties (continued) * 104413 Fire Protection Cabinets To be Issued 104416 Fire Extinguishers * 104416 Fire Extinguishers To be Issued 105113 Metal Lockers Deleted 08/24/16 * 105113.01 Metal Lockers Issued 08/24/16 * 105613.01 Metal Storage Shelving Issued 08/24/16 * 105723.13 Wire Closet and Utility Shelving Issued 08/24/16 107313 Awnings Revised 01/18/17 107316 Canopies Revised 01/18/17 107527 Plaza-Mounted Flagpoles Deleted 01/18/17 VOLUME TWO Division 11- Equipment 112173 Commercial Laundry Equipment Deleted 01/18/17 * 112300 Commercial Laundry and Dry Cleaning Equipment To be Issued 112429 Tie-Back and Life-Line Anchors * 112513.01 Registration Equipment Issued 08/24/16 * 113100.01 Residential Appliances Deleted 01/18/17 114000 Foodservice Equipment Revised 03/24/17 115213 Projection Screens * 118226 Facility Waste Compactors To be Issued Division 12- Furnishings 122113 Horizontal Louver Blinds Deleted 01/18/17 * 122200.01 Curtains and Drapes Deleted 01/18/17 122413 Roller Window Shades Deleted 08/24/16 * 122413.01 Roller Window Shades Deleted 01/18/17 * 123000 Architectural Woodwork To be Issued * 123213 Manufactured Wood-Veneer-Faced Casework To be Issued * 123216 Manufactured Plastic Laminate Clad Casework To be Issued 123623.13 Plastic-Laminate-Clad Countertops Deleted 08/24/16 * 123623.13 Plastic-Laminate-Clad Countertops Issued 08/24/16 123661 Simulated Stone Countertops Deleted 08/24/16 * 123661 Simulated Stone Countertops To be Issued * 123661.13 Cultured Marble Countertops Issued 08/24/16 * 123661.16 Solid Surfacing Countertops Issued 08/24/16 * 123661.19 Quartz Agglomerate Countertops Issued 08/24/16 * 123661.20 Formed Concrete Countertops Revised 01/18/17 124813 Entrance Floor Mats and Frames Deleted 08/24/16 * 124813.01 Entrance Floor Mats and Frames Issued 08/24/16 * 125413.13 Hospitality Furniture Installation Issued 08/24/16 * 129300 Site Furnishings To be Issued 129313 Bicycle Racks Revised 03/24/17 Division 13- Special Construction 131100 Swimming Pools To be Issued Division 14- Conveying Equipment 142100 Electric Traction Elevators Revised 08/24/16 149133 Laundry and Linen Chutes 149182 Trash Chutes Deleted 01/18/17

REVISED JULY 11, 2017 TOC- 6 Division 15 to Division 20 (Not Applicable) Division 21- Fire Suppression 210500 Common Work Results for Fire Suppression 211200 Fire-Suppression Standpipes Revised 01/18/17 211313 Wet-Pipe Sprinkler Systems 211316 Dry-Pipe Sprinkler Systems Revised 01/18/17 213113 Electric-Drive, Centrifugal Fire Pumps Division 22- Plumbing 220500 Common Work Results for Plumbing 220523 General Duty Valves for Plumbing Piping 220529 Hangers and Supports for Plumbing Piping and Equipment 220553 Identification for Plumbing Piping and Equipment 220700 Plumbing Insulation Revised 01/18/17 220800 Plumbing Commissioning Requirements 221113 Facility Water Distribution Piping 221116 Domestic Water Piping Revised 01/18/17 221119 Domestic Water Piping Specialties 221216 Facility Natural Gas Piping 221313 Facility Sanitary Sewers 221316 Sanitary Waste and Vent Piping Revised 01/18/17 221319 Sanitary Waste Piping Specialties Revised 01/18/17 221413 Storm Drain Piping 221423 Storm Drainage Piping Specialties Revised 01/18/17 223400 Fuel-Fired, Domestic Water Heaters Revised 01/18/17 224000 Plumbing Fixtures Division 23- Heating, Ventilating, and Air-Conditioning (HVAC) 230500 Common Work Results for HVAC 230529 Hangers and Supports for HVAC Piping and Equipment Revised 10/07/16 230553 Identification for HVAC Piping and Equipment Revised 01/18/17 230593 Testing, Adjusting, and Balancing for HVAC Revised 01/18/17 230700 HVAC Insulation Revised 01/18/17 230800 HVAC and Commissioning Requirements To be Issued 230900 Instrumentation and Control for HVAC Revised 01/18/17 230993 Sequence of Operations for HVAC Controls Revised 10/07/16 232300 Refrigerant Piping 233113 Metal Ducts 233300 Air Duct Accessories Revised 01/18/17 233700 Air Outlets and Inlets 234100 Particulate Air Filtration 236313 Air-Cooled Condensers Revised 01/18/17 237433 Dedicated Outdoor-Air Units Revised 01/18/17 238113.13 Packaged Terminal Air-Conditioning Units Revised 01/18/17 238126 Split-System Air-Conditioners Deleted 01/18/17 238129 Variable Refrigerant Flow HVAC Systems Revised 01/18/17

REVISED JULY 11, 2017 TOC- 7 Division 24 to Division 25 (Not Applicable) Division 26- Electrical (Not Applicable) 260500 Common Work Results for Electrical 260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260533 Raceways and Boxes for Electrical Systems 260553 Identification for Electrical Systems 260800 Electrical Commissioning Requirements 262200 Low-Voltage Transformers 262400 Switchboards and Panelboards 262726 Wiring Devices Division 26- Electrical (continued) 262816 Enclosed Switches and Circuit Breakers 262913 Enclosed Controllers 263533 Power Factor Correction Equipment 264113 Lightning Protection for Structures 265100 Interior Lighting * 265100 Interior Lighting To be Issued 265600 Exterior Lighting 266000 Lighting Accessories * 266000 Lighting Accessories To be Issued Division 27- Communications (Not Applicable) Division 28- Electronic Safety and Security (Not Applicable) 283100 Fire Alarm and Detection Systems Division 29 to Division 30 (Not Applicable) Division 31- Earthwork 311000 Site Clearing 312000 Earth Moving 312319 Dewatering 313180 Rock Excavation 315000 Excavation Support and Protection 316316 Augered Cast-In-Place (ACIP) Piles Division 32- Exterior Improvements 321216 Asphalt Paving 321313 Concrete Paving 321400 Unit Paving 321723 Pavement Markings and Removal 323113 Chain Link Fences and Gates Issued 01/18/17 323119.13 Decorative Metal Gates 323223 Segmental Retaining Walls 328000... Irrigation Deleted 01/18/17 329115 Soil Preparation (Performance Specification) Deleted 01/18/17 329200 Turf and Grasses Deleted 01/18/17 329300 Plants Deleted 01/18/17

REVISED JULY 11, 2017 TOC- 8 Division 33- Utilities 330500 Common Work Results for Utilities 334100 Storm Utility Drainage Piping VOLUME THREE AC Hotels by Marriott: Design Standards; October 2013, Revised August 2015 AC Hotels Marriott: Interior Product and Finish Specifications, dated October 31, 2013, Revised December 21, 2015 AC Hotels Marriott: Heart of House Guide 2015 VOLUME FOUR Marriott Hotels: Hotel Design Standards, January 2013, Revised April 2015 Revised 01/18/17 Marriott Hotels, North America, Guest Room + Corridors + Suites: Design Approach, June 2, 2014 Moxy Hotels: U.S. / Canada - Hotel Design Standards; March 2015, Revised May 2015 Moxy Hotels: Interior Product + Finish Specifications, North America, December 31, 2015 END OF