International Journal on Textile Engineering and Processes, ISSN: , Vol 1, Issue 1, Jan2015

Similar documents
An Empirical study A Study with Total Quality Management Approach to the Information system development processes.

Operations Management

Introduction to Quality Management. BPF 2123 Quality Management System

Lean Gold Certification Blueprint

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

Total Quality Service. Unit 5

CHAPTER 3 PROJECT MANAGEMENT AND QUALITY. Dr. Abdul Aziz A. Bubshait. CEM 515 Construction Quality Assurance

PROJECT QUALITY MANAGEMENT. 1 Powered by POeT Solvers LImited

Total Productive Maintenance OVERVIEW

BBA Sixth Semester Total Quality Management. -BIJAY LAL PRADHAN M Sc Statistics, FDPM(IIMA) PhD Scholar (TQM)

WHY QUALITY IS IMPORTANT? PRODUCT AND QUALITY COSTS OF POOR QUALITY COST OF ACHIEVING GOOD QUALITY. Prevention costs.

Historical Phases of Production

Project Quality Management. For the PMP Exam using PMBOK

Projektledning och Projektmetodik, VBEF01. Kristian Widén Tekn. Doktor Avd. För Byggproduktion Inst. För Byggvetenskaper Lunds Universitet

SHORT ANSWER QUESTIONS (KEY) UNIT- I

DEVELOPMENT OF TPM IMPLEMENTATION PLAN IN SWITCHGEAR & ENGINEERING COMPANY

Lean Flow Enterprise Elements

TQM and Reliability Engineering

Chapter 9 1. List and briefly explain the dimensions of product and service quality

Lean Silver Certification Essential Body of Work

TOTAL QUALITY MANAGEMENT AND LIBRARIES AND INFORMATION CENTERS

Using the Shingo Model for Operational and Quality Excellence

Learning Objectives. Defining Quality. Defining Quality 5 Ways. Manufacturing Quality vs. Service Quality. Cost of Quality. Chapter 5 Managing Quality

The Philosophy of TQM An Overview

Total Quality Management

Project Quality Management

Managing Quality: Integrating the Supply Chain, 5e (Foster) Chapter 2 Quality Theory

THE TOTAL QUALITY APPROACH TO QUALITY MANAGEMENT. TRUE/FALSE: Place T or F in the space provided to the left of the statement.

Dimensions of product and service quality

PMPA Tech Conference Do we have the Tools and Knowledge to weather the Storm?

Key of Toyota management success By Yi Jiang

In this unit we are going to speak about quality management in organizations.

Quality Management (PQM01) Chapter 04 - Quality Control

Lecture Notes on Statistical Quality Control

CERTIFIED QUALITY IMPROVEMENT ASSOCIATE

A Maintenance Philosophy. Asset Management: Phase II Total Productive Maintenance

Quality Management Chapter 14

Quality management in construction projects

4. Which of the following are generally easy to detect using statistical methods, and it is usually economical to remove them?

A FRAMEWORK FOR THE IMPLEMENTATION OF TOTAL QUALITY MANAGEMENT IN THE SOUTH AFRICAN AIR FORCE JACOBUS JOHANNES OSCHMAN

Total Quality Management Submitted in partial fulfillment of the requirement for the award of degree Of MBA

South Central. Course Catalog

MULTIMEDIA COLLEGE JALAN GURNEY KIRI KUALA LUMPUR

A PM on Lean Production Randel Ltd.

KINGS COLLEGE OF ENGINEERING DEPARTMENT OF MANAGEMENT STUDIES QUESTION BANK UNIT 1 INTRODUCTION

Online International Interdisciplinary Research Journal, {Bi-Monthly}, Volume-II, Issue-II, Mar-Apr2012

Continuous Improvement Toolkit. Standard Work. Continuous Improvement Toolkit.

SKF Manufacturing Excellence. Kent Viitanen Director, Industrial Division Manufacturing & Supply

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems

Quality Management EOE-072. It costs a lot to produce a bad product. Norman Augustine

Learning Objectives. 1. Explain how lean systems improve internal and supply chain operations

UNIT 2 QUALITY PHILOSOPHY

Malay (Rumi, Roman script)

Project Management CTC-ITC 310 Spring 2018 Howard Rosenthal

Process Performance and Quality Chapter 6

Chapter Two: Literature Review

MEETING STAKEHOLDER AND QUALITY NEEDS

IMPLEMENTATION OF TOTAL QUALITY MANAGEMENT FOR ORGANIZATIONAL EFFECTIVENESS

Total Quality Management

Process Performance and Quality

For the PMP Exam using PMBOK. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

MODULE 3 Introduction to Quality and Quality Improvement in Health) Unit 3.3 The Theoretical Framework for Modern Quality Improvement

Just In Time (JIT) Quality and Reliability Engg. (171906) H I T. Hit suyo na mono O Iru toki iru dake Tasukuran

Value creation on service sectors through Kaizen

Business Improvement Lean Manufacturing Toolkit

CORE VALUES AND CONCEPTS

PRODUCTION SYSTEM INTRODUCTION 5 SUSTAIN 4. PERFECT DELIVERY PERFORMANCE 1. NO DEFECTS 2. NO INVENTORY 5. HIGH COST EFFICIENCY 3.

Quality. Monitoring & Controlling Processes. Planning. Processes. Executing Processes. Process. Knowledge Area. Monitoring &

Techniques and Tools OPRE

Chapter 1 Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2013 John Wiley & Sons, Inc.

Town of Cochrane Strategic Plan

Presented by Renaldo de Jager 11-1

Chapter 28 Quality. Quality. Benefits of quality

QUALITY MANAGEMENT PRINCIPLES

Toyota s 14 Steps to Becoming Lean

Application of Continuous Improvement Process in Manufacturing Industry

Citation for published version (APA): Zhang, Z. (1997). Developing a TQM quality management method model. s.n.

Process Improvement Sudies in Appliance Manufacturing

The JURAN Quality Program

Total Quality Management (TQM): A Strategy for Competitive Advantage

DIRECTORATE OF TECHNICAL EDUCATION DIPLOMA IN MECHANICAL ENGINEERING. M SCHEME onwards III YEAR V SEMESTER CURRICULUM DEVELOPMENT CENTRE

Trend and Business. Business and Quality Management

"Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007

Project Quality Management Training - Brochure

PMP Exam Preparation Workshop Project Quality Management

TOTAL QUALITY MANAGEMENT IN EDUCATION: PROSPECTS, ISSUES AND CHALLENGES

Analysis of Software Quality Tools Samsung Galaxy Note 7 Recall Case

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

BEGINNER S GUIDE TO ISO 9001 : Quality Management System Requirements Explained

Ch.3 Quality Issues.

UNIT I - INTRODUCTION

Just-In-Time (JIT) Manufacturing. Overview

Implementation of Total Quality Management in Construction Company

LEAN PRODUCTION SYSTEM

15. Process improvement

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

AgileSHIFT. Creating a culture of enterprise agility

Transcription:

Total Quality Management in Terry Fabric Manufacturing Pranjali Chandurkar, CTF Abstract The challenge that companies face as the 21st Century gets underway, is to succeed in global economy where competition is fierce and where customers are becoming demanding of quality. Companies must take a global perspective. They must supply products and services that are competitive in both price and quality, and in international as well as in domestic markets. To maintain a competitive edge in such an environment they must continually improve the quality of what they offer. Total Quality Management (TQM) has proven itself as a way of managing and continuously improving quality. Its successful implementation in Japanese firms has been a major factor not only in their success, but also in establishing the levels of quality that customers now expect in whatever they purchase. What is Total Quality Management? What indeed do we mean by quality? Quality may be simply defined as meeting customer requirements. In fact, given the level of competition in today s market place, we might better define it as meeting and improving upon requirements. Total Quality Management, as the name indicates, regards the continuous improvement of customer-oriented quality as both requiring active management and involving the entire company and often suppliers and customers as well. TQM can be described in practical terms as customer focus, continuous improvement and teamwork. A great deal has been written about TQM, and more scholarly analyses have identified four fundamental orientations of TQM: Systems, customer, learning and change. From this perspective, TQM is seen as a dynamic economic effort by firms to adapt and survive indynamic environments. Introduction to TQM Total Quality Management is a management approach that originated in the 1950and has steadily become more popular since the early 1980. Total Quality is a description of the culture, attitude and organization of a company that strives to provide customers with products and services that satisfy their needs. The culture requires quality in all aspects of the company s operations, with processes being done right the first time and defects and waste eradicated from operations."tqm is a management approach for an organization, centered on quality, based on the participation of all its members and aiming at long-term success through customer satisfaction, and benefits to all members of the organization and to society. To be successful implementing TQM, an organization must concentrate on the eight key elements: Ethics Integrity Trust Training 40

Teamwork Leadership Recognition Communication Key Elements-TQM has been coined to describe a philosophy that makes quality the driving force behind leadership, design, planning, and improvement initiatives. For this, TQM requires the help of those eight key elements. These elements can be divided into four groups according to their function. The groups are: Foundation - It includes: Ethics, Integrity and Trust. Building Bricks - It includes: Training, Teamwork and Leadership. Binding Mortar - It includes: Communication. Roof - It includes: Recognition. Aim of TQM -One major aimof TQM is to reduce variation from every process so that greater consistency of effort is obtained. Implementation Process of Total Quality Management The implementation program of TQM is of nine stages: Stage 1: understanding the organization system. Stage 2: developing a strategic plan for the TQM effort. Stage 3: Planning Assumptions. Stage 4: specifying strategic objectives. Stage 5: specifying tactical objectives. Stage 6: implementation planning. Step 7: project management. Step 8: measurement & evaluation Step 9: evaluation, accountability, follow through, ensuring effective implementation. Requirements for successful implementation of TQM TQM is an approach to doing business that attempts to maximize the competitiveness of an organization through the continual improvement of the quality of its products, services, people, processes and environment. It is a customer oriented management system, which seeks to meet or exceed customer expectations by providing defect free goods or services the first time, on time, all the time. Although the ultimate goal is to satisfy external customers without meeting the requirements of the internal customers as well. Therefore, it seeks to meet or exceed the expectations of both internal and external customers. In TQM, the search of improvement is a never ending process. Thus, when the initial goals are meet, newer and higher goals are set. Seeking to achieve incremental 41

improvements continuously is the core stone of TQM. The continuous search for improvement requires the full participation and involvement of all stakeholders of the organization, including managers, employees, suppliers and customers. Particularly significant is the buy-in by employees, without whose support the TQM effort would be fruitless. Partnerships must also be forged with suppliers. In TQM, collaboration through team efforts among workers and departments is encouraged, and quality improvement becomes everyone s responsibility. In organization where the TQM culture is well established, the manager s role changes from being an administrator and controller to that of coach and facilitator. The best principles of TQM are applicable in any organization, whether manufacturing or service, public or private. Properly designed and implemented, TQM can help private firms to attain competitiveness both in domestic and international markets, and it can enable nations to achieve their economic growth objectives. In view of the fact that TQM introduction involves a major change in organization culture and structure, its implementation process should be adapted to the specific situation based on the objective assessment of the external and internal environment in which a firm operated. Even though the implementation process should be tailored to each organization s specific situation, however there are certain necessary conditions for the successful implementation of TQM. These basic requirements are as mentioned below: Top Management Support & Commitment The degree of support and commitment by top management is critical for TQM success. Top management must shoe unwavering support to quality and excellence, and must promote the effort aggressively in order to ensure support among middle managers and workers. A true test of management commitment lies in the amount of resources that are willing to allocate to the TQM implementation effort. Top managements willingness and commitment to accept such change can inspire the entire organization to embrace the TQM process. Long Term Orientation & Persistence TQM is a long term oriented process, which demands persistence and patience. It is not a quick fix and it often takes a long time before its impact can be known. Unwavering management support and its persistent guidance are needed in order to steer the organization towards successful implementation. Customer Orientation The customers needs and expectations must be carefully and continuously assessed and understood, and every effort must be made not just to meet those expectations but also to exceed them. This applies both to internal and external customers. 42

Employee Involvement TQM success is unthinkable without the full and active involvement of all employees. Workers should be encouraged to utilize their latent innovativeness and creativity should be empowered to make their own decisions in matters related to specific work. Training Through, continuous training is a must if the TQM efforts are to succeed. The training offered should include group dynamics, problem solving and task skills training. Quality Control Tools Among the most widely used tools are the seven quality control tools (QC7) Check sheets, Histograms, Stratification, Pareto diagrams, Cause and effect diagrams, Scatter diagrams, Control charts/graphs. Such tools must of course be used within a method of investigation. The typical TQMmethod is the PDCA (plan, do, check, act) Cycle, also known as Deming s Wheel. Statistical Process Control can be used to measure variation and to indicate its cause. Somevariation is tolerated in the output of processes. However, all variation is caused and cantherefore be reduced. Knowledge of variation theory is a powerful tool in the ongoingpursuit of quality.among the most widely used tools are the seven quality control tools (QC7): check sheets, Tools and techniques Central to the implementation of TQM is the gradual introduction of tools and techniques with a problem-solving focus. Many of these have been around for a long time, or are derived from traditional tools. Process mapping, where a flowchart is used to show all the steps in a process with the aim of revealing irregularities and potential problems, is not unlike work-study flow diagrams. TQM tools include those that are simple to use, those that most employees can be trained to use, and those, such as Statistical Process Control (SPC),that require specialist training. Statistical Process Control can be used to measure variation and to indicate its cause. Some variation is tolerated in the output of processes. However, all variation is caused and can therefore be reduced. Knowledge of variation theory is a powerful tool in the ongoing pursuit of quality. Among the 43

most widely used tools are the seven quality control tools (QC7): check sheets, histograms, stratification, Pareto diagrams, cause and effect diagrams, scatter diagrams, and control charts/graphs. Such tools must of course be used within a method of investigation. The typical TQM method is the PDCA (plan, do, check, act) Cycle, also known as Deming s Wheels and other techniques are Total Productive Maintenance (TPM) 5S, Six Sigma, Statistical methods, D.M.A.I.C, Lean Manufacturing,7 Wastes, Kanban system Total Productive Maintenance (TPM) The goal of Total Productive Maintenance is to improve Overall Equipment Effectiveness (OEE) by eliminating the "Big Six Losses" Breakdown losses Setup and Adjustment Losses Idling and Minor stoppage losses Speed losses Quality defects and rework Start-up/yield losses (reduced yield between machine start-up and stable production 5S. The five S's are Sort, Set-in-Order, Shine, Standardize, and Sustain. Together, the five S's work to organize and maintain an organized workplace. A workplace that has implemented 5S is one that has predictable, repeatable processes. Six sigma 6 Six Sigma is concerned with reducing variability. The goal of Six Sigma is a six-sigma level of quality or 3.4 defects per million opportunities. Then, project teams attack the problems using the DMAIC method: Define, Measure, Analyze, Improve, Control. 7 Wastes waste of overproduction; waste of time on hand (waiting); waste in transportation; waste of processing itself; waste of stock on hand (inventory); waste of movement; and Waste of making defective products. Kanban 44

Kanban is a material and information flow management tool. They are typically cards attached to containers of parts. The cards contain information about the parts and these cards are reused, traveling with parts. Kanban are used to control the minimal amount of inventory in the system. It is based on a formula that takes into account usage, lead-time to replenish, and a safety factory based on known or probable breakdowns in the system. Quantities of cards are added or removed based on seasonal changes in demand. Quantities of cards are also removed to make it harder to meet deliveries if there are problems, in effect exposing weaknesses. Kanban is used as an improvement tool with the aim of removing all slack from the system by eliminating the need for a safety factory through root cause countermeasures of the breakdowns in the system. The PDCA Cycle The PDCA Cycle, developed by Deming, one of the great original thinkers of TQM, is aninvaluable strategy for improving any situation, from solving a tiny production problem. It consists of 4 steps: Plan: Gather data on the problem, identify the causes, decide on possible solutions or Counter measures, and develop a plan with targets, and tests or standards that will check whether the countermeasures are correct. This should be done systematically and thoroughly. Do: Implement the countermeasures. Check: Check the results of the implementation of the countermeasures against the Standards established in the Plan stage. If the countermeasures do not work, begin the cycle again with Plan. Act. If the countermeasures are successful, standardize them and put them into regular use. The resulting standards may then be improved and refined in further cycles of PDCA. The PDCA Cycle is in fact more than a problem-solving strategy. It is essentially a means to continuous process improvement. Kondo, the Japanese TQM expert, has made the critical point that the PDCA cycle is based not on the idea of get it right first time, but rather on the fact that we rarely do get anything completely right the first time, nor indeed even the second or third times. The PDCA cycle must therefore be continuously applied if quality is to be a real goal. With each application the improvements made must be standardized and become the base for further improvement. Kondo has also emphasized that the PDCA cycle must operate. 45

ISO 9000 TQM has a close correspondence with the ISO 9000 series of standards, the set of internationally recognized standards of good management practice which ensure that the organization consistently provides products or services that meet the customer s quality requirements. They define the requirements of a quality management system that can be applied in any organization. A company may invite its customers to audit its quality system so that they can be confident the company is able to meet their quality requirements. It may also get an independent quality system certification body to obtain an ISO 9000 certification of conformity. This certificate is a good reference in dealing with potential clients, and reduces the need for customers to conduct their own audits. TQM can assist companies in avery practical way to meet the requirements of ISO certification. Gurus A number of original TQM thinkers, in both the west and Japan, have made important contributions to the development and spread of TQM. The chief gurus on the western sideare Deming, Crosby and Juran. Deming devised the PDCA Cycle and developed statistical process control. He emphasizes the importance of management and leadership in achieving quality. Major changes in business can only be brought about by an organizational culture dedicated to quality, and such a culture can only be achieved by changing the attitudes of top management. Crosby popularized the Zero Defects concept. He too emphasizes the importance of transforming the culture of an organization, and of gaining individual commitment to quality at each level of the organization. He believes that each organization must create its own quality improvement process plan. His approach has been effective in communicating the need to change attitudes and behavior, and is popular with many managers because of its success in getting organizations started with quality improvement. Juran has developed an approach in which problems are thought of as projects, with all improvements being made project by project. He advocates the annual formation of teams to analyze problems and find solutions to them. This approach helps build communication and teamwork within an organization, and has been successful in organizations in which upper management has been fully involved. The leading Japanese thinkers on quality, including Professors Ishikawa, Kondo,,Kano and Taguchi to name but a few have ensured that Japan is the country where the development and implementation of TQM has been most widespread. Conclusion Total Quality Management is a management philosophy that seeks to integrate all organizational functions (marketing, finance, design, engineering, and production, customer service, etc.) to focus on meeting customer needs and organizational objectives. TQM views an organization as a collection of processes. It maintains that organizations must strive to continuously improve 46

these processes by incorporating the knowledge and experiences of workers. The simple objective of TQM is Do the right things, right the first time, every time. TQM is infinitely variable and adaptable. Although originally applied to manufacturing operations, and for a number of years only used in that area, TQM is now becoming recognized as a generic management tool, just as applicable in service and public sector organizations. There are a number of evolutionary strands, with different sectors creating their own versions from the common ancestor. TQM is the foundation for activities. The success of any Six Sigma implementation project depends a lot on the level of support that is provided by the top management to Six Sigma teams handling the implementations. Support and commitment is required in the form of time, effort and resources, which are vital for the success of any quality improvement initiative undertaken by an organization. References: R.Subburaj, Total Quality Management, Tata Mc Graw Hill Pub.Com. Ltd. New Delhi, 2009 B.Purushothama, Effective Implementation of Quality Management System, Woodhead Publishing Ltd, New Delhi, 2010 H. Lal, Total Quality Management, New Age International Publishers Mumbai, 2009 G.Vijaykumar; V. L. Sohani, Design and Development of Computer based Training module for Total Quality Management in Textile Industry, The Bombay Textile Research Association Mumbai, 2004 47