Water State at a Glance: Manipur, Vol. 1(8), 2016

Similar documents
Transcription:

Water List of Tables 6.1: Distribution of Large Dams Completed 6.2: Live Storage Capacity of Large Dams/Reservoirs/Projects 6.3: Ultimate Irrigation Potential (UIP) 6.4: Plan-wise Financial Expenditure on Major and Medium Irrigation 6.5: Achievements of Bharat Nirman on Irrigation Potential Creation including Minor Irrigation 6.6: Year-wise Achievements of Irrigation Potential Created 6.7: Financial Expenditure on Flood Management Work 6.8: List of on-going Projects under Command Area Development and Water Management (CADWM) Programme 6.9: Central Released under the Command Area Development Programme (CADP) 6.10: Installation of Off-Grid/Decentralized Renewable Energy Systems/Devices 6.11: Source-wise Estimated Potential of Renewable Power 6.12: Installed Capacity of Power Utilities 6.13: Electricity-Installed Capacity, Generation and Consumption 6.14: Status of Hydropower Potential Development 6.15: Electricity Sold to Ultimate Consumers 6.16: Towns and Villages Electrified 6.17: District-wise Number of sub-stations 6.18: Demand and Supply of Power 6.19: Requirement of Power & Energy 6.20: Availability of Power 6.21: Power Scenario 6.22: District-wise Electricity Consumption of Power 6.23: Ground Water Resources Availability, Utilization and Stage of Development 6.24: Number of Habitation Covered by Rural Water Supply 6.25: Status of coverage of Rural Habitations under Rural Water Supply 6.26: Year-wise Release of Central Assistance ENVIS Centre on Himalayan Ecology 43

Table 6.1: Distribution of Large Dams Completed (as on October, 2014) Up to 1900 1901 to 1950 1951 to 1960 1961 to 1970 1971 to 1980 Year of completion 1981 to 1990 1991 to 2000 2001 & beyond Year of not Available Total Dams Under Construction Completed Construction - - - - 1-1 1-3 1 4 Total Table 6.2: Live Storage Capacity of Large Dams/Reservoirs/Projects (as on March, 2015) Total Live Storage Capacity (BCM) Completed Under Construction Total 0.407 8.509 8.916 Table 6.3: Ultimate Irrigation Potential (UIP) ( 000 ha) Irrigation Potential 2015 Major & Medium 135 Surface 100 Minor Ground 369 Sub-Total 469 Total 604 Source (Tables 6.1-6.3): Dam Safety Monitoring Directorate, Water Monitoring Directorate, Central Water Commission, National Registrar of Large Dam, Ministry of Water Resources, Planning and Progress Directorate, Central Water Commission, Govt. of India (Water and Related Statistics, 2015). http://www.cwc.gov.in/main/downloads/water%20&%20related%20statistics%202015.pdf (Accessed on 08.12.2016) ENVIS Centre on Himalayan Ecology 44

Table 6.4: Plan-wise Financial Expenditure on Major and Medium Irrigation (Rs. Crores) Ninth Plan Tenth Actual Actual Revised Revised Actual (1997-02) Plan Expenditure Expenditure Approved Approved Expenditure (2002-07) (2007-08) (2008-09) Outlay Outlay (2011-12) (2009-10) (2010-11) 171.7 229.8 107.4 40.7 238.1 275.2 108.4 Source: Dam Safety Monitoring Directorate, Water Monitoring Directorate, Central Water Commission, National Registrar of Large Dam, Ministry of Water Resources, Planning and Progress Directorate, Central Water Commission, Govt. of India (Water and Related Statistics, 2015). http://www.cwc.gov.in/main/downloads/water%20&%20related%20statistics%202015.pdf (Accessed on 08.12.2016) Table 6.5: Achievements of Bharat Nirman on Irrigation Potential Creation including Minor Irrigation ( 000 ha) Achievement from April 2005 to March 2009 Achievement 2010-11 2011-12 2012-13 2013-2014 Cumulative Achievement 16.14 4.00 0.10 4.00 1.20 29.31 Source: Ministry of Water Resources, Govt. of India (Hand Book on Water and Related Information, Central Water Commission January-2016). http://www.cwc.gov.in/main/downloads/handbook%20on%20water%20&%20related%20information- 2016.pdf (Accessed on 10.12.2016) ENVIS Centre on Himalayan Ecology 45

XI Plan Water State at a Glance: Manipur, Vol. 1(8), 2016 Table 6.6:Year-wise Achievements of Irrigation Potential Created/Utilised in respect of Minor Irrigation Projects of XI plan* ('000 ha) Ultimate Irrigation Potential 469 Cumulative achievement Up to X Plan IPC 92.69 IPU 73.3 Target IPC 22.3 IPU NF Achievement 2007-08 IPC - IPU NF Achievement 2008-09 IPC 7.5 IPU NF Achievement 2009-10 IPC NF IPU NF Achievement 2010-11 IPC 9 IPU NF Likely Achievement 2011-12 IPC 11.5 IPU NF *: Figures under reconciliation with states; IPC: Irrigation Potential Created; IPU: Irrigation Potential Utilised Table 6.7: Financial Expenditure on Flood Management Work (Rs. Crores) During IX Plan (1997-02) Upto IX Plan (1997-02) During X Plan (2002-07) Upto X Plan (2002-07) Actual Expenditure (2007-08) Actual Expenditure (2008-09) Revised Approved Outlay (2009-10) Revised Approved Outlay (2010-11) Actual Expenditure (2011-12) 32.14 81.76 48.55 30.31 18.08 27.38 131.54 167.58 49.28 Source (Tables 6.6-6.7): Planning and Progress Directorate, Central Water Commission, Water Resources Information System, Directorate, Information System Organisation, Water Planning & Projects Wing, Govt. of India (Water and Related Statistics-2015). http://www.cwc.gov.in/main/downloads/water%20&%20related%20statistics%202015.pdf (Accessed on 20.12.2016) ENVIS Centre on Himalayan Ecology 46

Table 6.8: List of on-going Projects under Command Area Development and Water Management (CADWM) Programme during the period of XI th Plan (2007-08 to 2011-12) (as on March, 2013) ( 000 ha) Project Name Cluster of 21 MI scheme in Bishnupur district Cluster of 37 MI scheme in Thoubal,Ukhrul, Chandel and Churachandpur district Cluster of 28 MI scheme in East and West Districts of Imphal Khuga Multipurpose Project Thoubal Irrigation Project, Ph-II Districts benefitted Year of Inclusion CCA CCA Covered till 31.3.2013 Reported balance of executable CCA Bishnupur 2007-08 9.6 9.636 0.0 Thoubal, Uhrul and Churachandpur Imphal West, Imphal East 2007-08 6.42 6.42 0.0 2007-08 6.665 6.665 0.0 Churachandpur 2010-11 9.575 4.938 4.637 Thoubal 2010-11 2.485 2.785 0.0 Total 34.745 30.14 4.601 CCA - Cultural Command Area Table 6.9: Central Released under the Command Area Development Programme (CADP) (Rs. Lakh) Total up to end of VIII Plan Up to IX Plan Up to X Plan Total XI Plan During XII Plan 2012-13 2013-14 2014-15 Cumulative Up to 2014-15 813.0 1273.4 2065.2 3804.3 775.4 204.2 6849.1 Source (Tables 6.8-6.9): Planning and Progress Directorate, Central Water Commission, Ministry of Water Resource, (CAD wing) Govt. of India (Water and Related Statistics, 2015). http://www.cwc.gov.in/main/downloads/water%20&%20related%20statistics%202015.pdf (Accessed on 08.10.2016) ENVIS Centre on Himalayan Ecology 47

Remote Village Solar Photovoltaic Water State at a Glance: Manipur, Vol. 1(8), 2016 Table 6.10: Installation of Off-Grid/Decentralized Renewable Energy Systems/Devices Year 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 Biogas Plants 2128.0 2128.0 2128.0 2128.0 2128.0 2128.0 Water Pumping Wind Mills (Nos.) - - - - 0.0 SPV Pumps (Nos.) 12.0 40.0 40.0 40.0 40.0 40.0 SLS (Nos.) 3883.0 928.0 928.0 928.0 928.0 928.0 HLS (Nos.) 2850.0 3865.0 3865.0 3865.0 3900.0 4141.0 SL (Nos.) 370.0 4787.0 4787.0 4787.0 4787.0 4787.0 PP(KWP) 28.0 28.0 216.0 216.0 456.0 456.0 Aerogen. Hybrid System (KW) 70.0 70.0 110.0 110.0 140.0 140.0 Solar Cooker (Nos.)# 365.0 365.0 - Biomass Gasifiers (Nos.) - - - - 0.0 0.0 Waste to Energy (MW) - - - - Villages (Nos.) 191.0 191.0 237.0 237.0 237.0 237.0 Hamlets (Nos.) - - 3.0 3.0 3.0 3.0 #Figures calculated for 2011-12 onwards in MW unit Note: SLS = Street Lighting System; HLS = Home Lighting System; SL = Solar Lantern; PP = Power Plants; SPV= Solar Photovoltaic; SHP = Small Hydro Power; MW = Mega Watt; KWP = Kilowatt peak Source: Ministry of Statistics and Programme Implementation, Govt. of India (Statistical Yearbook, India 2016). http://www.mospi.gov.in/statistical-year-book-india/2016; (Accessed on 16.11.2016) ENVIS Centre on Himalayan Ecology 48

Table 6.11:Source-wise Estimated Potential of Renewable Power (in MW) Power/ Energy 2012 2013 2014 2015 Biomass Power 13 13 13 13 Waste to Energy 2 2 2 2 Wind Power 7 7 56 56 Small Hydro Power 109 109 109 109 Cogeneration bagasse 0 0 0 - Solar Energy - - - 10630 Estimated Total Reverses 131 131 180 10811 Distribution (% ) 0.15 0.14 0.12 1.21 Source: Ministry of New and Renewable Energy, Govt. of India (Energy Statistics, 2013, 2014, 2015, 2016). http://mospi.nic.in/; (Accessed on 22.12.2016) Table 6.12: Installed Capacity of Power Utilities (Including allocated shares in Joint & Central sector utilities) (as on February, 2017) Ownershi p/sector Thermal Coal Gas Diesel Total Mode-wise Breakup Nuclear Hydro (Renewal) RES (MNRE) Grand Total State 0.00 0.00 36.00 36.00 0.00 0.00 5.45 41.45 Private 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 Central 15.70 71.61 0.00 87.31 0.00 80.98 0.00 209.75 Sub-Total 15.70 71.61 36.00 123.31 0.00 80.98 5.46 209.75 Source: Central Electricity Authority, Ministry of Power, Govt. of India. http://www.cea.nic.in/reports/monthly/installedcapacity/2017/installed_capacity-02.pdf (Accessed on 25.02.2017) ENVIS Centre on Himalayan Ecology 49

Table 6.13: Electricity-Installed Capacity, Generation and Consumption (Installed Capacity: Thousand kw); Generation: Gwh) Year 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Installed Capacity Hydro - 0 0 0 0 - Steam - 0 0 0 0 - Diesel and Wind 51 50.86 50.86 50.86 51 - Gas - 0 0 0 0 - Nuclear - 0 0 0 0 - Total 51 50.86 50.86 50.86 51 0 Electricity generated (Gross) Hydro - 0 0 0 0 0 Steam - 0 0 0 0 0 Diesel and Wind 19 20.04 16.28 16.14 16 15.26 Gas - 0 0 0 0 0 Nuclear - 0 0 0 0 0 Total 19 20.04 16.28 16.14 16 15.26 Consumption in Power Station - 0 0.02 0.02 0 0 Electricity Generated (Net) 19 20.04 16.26 16.12 16 15.26 Consumption* 197.12 220.65 271.1 324.83 379.01 379.01 Per capita consumption (kwh) Utilities 241.70 207.15 242.30 235.86 352.90 241.70 Non Utilities - - - 0.00 0.00 - Total 241.70 207.15 242.30 235.86 352.90 266.49 *: Relates to sales to ultimate consumers. Source: Central Electricity Authority, Ministry of Power, Ministry of Statistics & Programme Implementation, Govt. of India (Statistical Year Book India, 2016). http://www.mospi.gov.in/statistical-year-book-india/2016; (Accessed on 23.12.2016) ENVIS Centre on Himalayan Ecology 50

Table 6.14: Status of Hydropower Potential Development (Installed Capacity) Capacity as on 31.03.2015 as on 31.08.2016 Identified Capacity Total (MW) 1784 1784 Above 25 MW 1761 1761 Capacity Under Operation Mega Watts 105.0 105.0 Percent 5.96 5.96 Capacity under Construction Mega Watts 0.00 0.00 Percent 0.00 0.00 Capacity Under Operation & Under Construction Mega Watts 105.0 105.0 Percent 5.96 5.96 Capacity yet to be taken under Construction Mega Watts 1656.0 1656.0 Percent 94.04 94.04 Source: Central Electricity Authority, Ministry of Power, Govt. of India. http://cea.nic.in/reports/monthly/hydro/2015/hydro_potential_region-08.pdf; (Accessed on 23.12.2016) Table 6.15: Electricity Sold to Ultimate Consumers (Utilities only) (Gwh) Electricity Sold 2009-10 2010-11 2011-12 2012-13 2013-14 Total sold to ultimate consumers 220.65 271.10 324.83 379.01 379.01 Domestic 127.49 152.01 173.72 203.74 203.74 Commercial 16.01 22.75 27.20 30.81 30.81 Industrial Power at low & medium voltage 7.38 11.43 14.48 19.60 19.60 Industrial Power at high voltage 1.43 2.05 14.78 14.13 14.13 Public lighting 4.23 5.39 4.08 4.85 4.85 Traction 0.00 0.00 0.00 0.00 0.00 Agriculture 0.71 0.49 0.83 1.58 1.58 Public water works & sewage pumping 18.20 17.62 20.17 23.30 23.30 Miscellaneous 45.20 59.36 69.57 81.00 81.00 Source: Central Electricity Authority, Ministry of Power; Ministry of Statistics and Programme Implementation, Govt. of India (Statistical Year Book India, 2016). http://www.mospi.gov.in/statistical-year-book-india/2016; (Accessed on 03.06.2016) ENVIS Centre on Himalayan Ecology 51

Table 6.16: Towns and Villages Electrified (in Nos.) Year 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Towns Number of Towns 33 33 33 33 33 33 33 (2011 Census) Electrified 33 33 33 33 33 33 33 Percentage 100 100 100 100 100 100 100 Villages Number of Villages 2315 2315 2315 2315 2315 2315 2379 (2011 Census) Electrified 1986 1986 1997 1997 1997 1997 2061 Percentage 85.8 85.8 86.3 86.3 86.3 86.3 86.6 Source: Ministry of Statistics and Programme Implementation, Govt. of India (Statistical Year Book, India 2016). http://www.mospi.gov.in/statistical-year-book-india/2016; (Accessed on 06.01.2017) Table 6.17: District-wise Number of Sub-stations (MW) Districts 2012-13 2013-14 2014-15 132/33 KV 33/11 KV 132/33 KV 33/11 KV 132/33 KV 33/11 KV Senapati 2 8 2 8 5 8 Tamenglong 1 6 1 6 2 6 Churachandpur 1 5 1 6 3 6 Chandel 0 2 0 2 1 2 Ukhrul 0 6 0 6 1 6 Imphal East 2 7 2 7 5 10 Imphal West 1 10 1 10 3 10 Bishnupur 1 5 1 5 2 5 Thoubal 1 4 1 4 2 5 Manipur 9 53 9 54 24 58 Source: Directorate of Economics & Statistics, Lamphelpat, Govt. of Manipur (Economic Survey, Manipur 2015-16) http://desmanipur.gov.in/files/newsfiles/16mar2016121358esm,15-16%20final%20- %20Copy%20PDF.pdf (Accessed on 22.07.2016) ENVIS Centre on Himalayan Ecology 52

Table 6.18: Demand and Supply of Power (Power MW) Year Demand Part of the Demand Met Shortfall 2003-04 189 106 83 2004-05 116 108 8 2005-06 140 115 25 2006-07 155 110 45 2007-08 145 110 35 2008-09 157 100 57 2009-10 170 110 60 2010-11 184 110 74 2011-12 171 115 56 2012-13 201 119 82 2013-14 229 130 99 2014-15 262 232 30 Table 6.19: Requirement of Power & Energy Year Peak load (MW) Energy requirement (MU) 2010-11 184 838 2011-12 171 615 2012-13 201 722 2013-14 229 824 2014-15 262 956 Source (Tables 6.18-6.19): Annual Administrative Report, 2014-15, Manipur State Power Distribution Company Limited, (MSPDCL), Directorate of Economics & Statistics, Lamphelpat, Govt. of Manipur (Economic Survey, Manipur 2015-16). http://desmanipur.gov.in/files/newsfiles/16mar2016121358esm,15-16%20final%20- %20Copy%20PDF.pdf (Accessed on 22.07.2016) ENVIS Centre on Himalayan Ecology 53

Requirement Generated Purchased Free Energy from Loktak Hydro Electric Project Total Available (Col. 3 to Col. 5) Short-fall Per Capita Availability* Water State at a Glance: Manipur, Vol. 1(8), 2016 Table 6.20: Availability of Power Year (Power Lakh KWH) 2007-08 6410 17.30 5720.30 707.70 6445.30 35.3 246.06 2008-09 7020 6.46 5504.25 587.69 6098.40 921.60 228.41 2009-10 7660 20.11 4651.21 447.86 5119.18 2540.82 188.15 2010-11 8380 20.11 5672.18 709.09 6401.38 1978.62 230.93 2011-12 6150 15.64 5633.70 610.49 6259.83 109.83 216.77 2012-13 7220 10.08 5783.44 669.04 6462.56 757.44 218.62 2013-14 8240 10.10 6064.02 736.86 6810.98 1429.02 225.45 2014-15 9560 10.10 6425.8 424.2 6860.10 2699.90 222.21 Source: Annual Administrative Report, 2014-15, Manipur State Power Distribution Company Limited, (MSPDCL), Directorate of Economics & Statistics, Lamphelpat, Govt. of Manipur (Economic Survey, Manipur 2015-16). http://desmanipur.gov.in/files/newsfiles/16mar2016121358esm,15-16%20final%20- %20Copy%20PDF.pdf (Accessed on 22.07.2016) ENVIS Centre on Himalayan Ecology 54

Table 6.21: Power Scenario Year Installed Capacity (kw) Electricity Generated (lakh kwh) Energy purchased (lakh kwh) Electricity consumed (mill. kwh) Inhabited villages according to census Number of villages electrified Percentage of electrified villages to total villages 1993-94 12422 32.68 2763.51 216.510 2182 1525 69.89 1994-95 12622 29.67 2712.76 213.738 2182 1590 72.87 1995-96 12371 21.66 2550.26 247.315 2182 1748 80.11 1996-97 12371 10.71 3037.99 286.377 2182 1888 86.56 1997-98 12622 6.80 3463.14 322.180 2182 1940 88.91 1998-99 11845 7.57 3756.68 179.889 2182 1990 91.20 1999-00 11845 8.29 3926.73 173.066 2182 2001 91.70 2000-01 11845 4.29 3556.24 176.936 2182 2001 91.70 2001-02 11845 6.67 3798.26 167.562 2320 2001 86.25 2002-03 47252 35.77 4271.84 165.645 2320 2007 86.51 2003-04 47052 42.80 4313.49 165.383 2320 1899 81.85 2004-05 47252 14.325 5712.60 141.254 2320 1903 82.03 2005-06 47252 3.140 5209.86 299.815 2320 1930 83.19 2006-07 47252 31.053 4412.16 221.882 2320 1942 83.71 2007-08 46212 6.02 4252.31 334.964 2320 1966 84.74 2008-09 44820 6.46 6159.38 301.602 2320 1986 85.60 2009-10 45.420 20.105 4651.21 290.369 2524* 2002 79.32 2010-11 45.020 19.301 - - - - - 2011-12 45.020 16.150 - - - - - 2012-13 36.60 12.400 - - - - - 2013-14 36.60 8.440 - - - - - 2014-15 29.49 6.525 6449.9 442.27 2515 2134 84.85 - Not Available Source: Department of Electricity, Government of Manipur. Directorate of Economics & Statistics, Lamphelpat, Govt. of Manipur (Economic Survey, Manipur 2015-16). http://desmanipur.gov.in/files/newsfiles/16mar2016121358esm,15-16%20final%20- %20Copy%20PDF.pdf (Accessed on 22.07.2016) ENVIS Centre on Himalayan Ecology 55

Table 6.22: District-wise Electricity Consumption of Power (2014-15) District Domestic Commercial Industrial Public Lighting Irrigation & Agriculture Public Water Work Total Senapati 23.00 3.71 7.16 0.32 0.00 11.99 46.18 Tamenglong 2.13 0.18 0.02 0.02 0.00 0.33 2.68 Churachandpur 34.39 1.21 0.34 0.06 0.00 8.47 44.47 Chandel 3.23 0.99 0.004 0.37 0.00 7.09 11.68 Ukhrul 2.98 0.31 0.05 0.04 0.00 1.86 5.24 Imphal East 63.52 5.74 13.25 0.47 0.13 32.11 115.22 Imphal West 80.00 21.32 6.02 1.40 0.00 37.69 146.43 Bishnupur 20.74 1.44 0.80 1.65 1.74 3.43 29.80 Thoubal 26.66 0.93 1.48 0.10 0.54 10.86 40.57 Manipur 256.65 35.83 29.12 4.43 2.41 113.83 442.27 Source: Department of Economics & Statistics, Manipur. Department of Power, 2011-12; Directorate of Economics & Statistics, Lamphelpat, Govt. of Manipur (Economic Survey, Manipur 2015-16). http://desmanipur.gov.in/files/newsfiles/16mar2016121358esm,15-16%20final%20-%20copy%20pdf.pdf (Accessed on 22.07.2016) Table 6.23: Ground Water Resources Availability, Utilization and Stage of Development (as on, 2011) Year 2009 2011 Recharge from rainfall 0.24 0.23 Annual Replenish Monsoon Season Recharge from other sources 0.01 0.01 able Ground Water Non-monsoon Recharge from rainfall 0.19 0.19 Resource Season Recharge from other sources 0.01 0.01 Total 0.44 0.44 Natural Discharge during non-monsoon season 0.04 0.04 Net Annual Ground Water Availability 0.40 0.40 Annual Ground Water Draft Irrigation 0.0033 0.0033 Domestic and industrial uses 0.0007 0.0007 Total 0.0040 0.004 Projected demand for Domestic and Industrial uses up-to 2025 0.05 0.05 Ground Water Availability for future irrigation use 0.35 0.35 Stage of Ground Water Development (%) 1 1.02 Source: Ministry of Water Resources, River Development and Ganga Rejuvenation, Govt. of India; Central Ground Water Board Faridabad (Ground Water Year Book- India 2013-14 & 2014-15). http://www.cgwb.gov.in/documents/ground%20water%20year%20book%202013-14.pdf http://www.indiaenvironmentportal.org.in/files/file/ground%20water%20year%20book%202014-15.pdf (Accessed on 20.09.2016) ENVIS Centre on Himalayan Ecology 56

Table 6.24: Number of Habitation Covered by Rural Water Supply (as on 1 st April, 2014) Status Total number of habitations Percentage of habitations covered F.C. habitations 2089 72.79 N.C. habitations 121 4.22 P.C. habitations 660 22.99 Total 2870 100.00 F.C. Fully Covered, N.C. Not Covered, P.C. Partially Covered Source: Public Health Engineering Deptt., Manipur. Department of Power, 2011-12. Directorate of Economics & Statistics, Lamphelpat, Govt. of Manipur (Economic Survey, Manipur 2015-16). http://desmanipur.gov.in/files/newsfiles/16mar2016121358esm,15-16%20final%20- %20Copy%20PDF.pdf (Accessed on 22.07.2016) Table 6.25: Status of Coverage of Rural Habitations under Rural Water Supply (as on 1 st April, 2014) Total Total Quality No. of Habitations No. of Habitations With No. of Habitations No. of Habitations Total No. of Habitations 2870 0 121 178 178 304 781 2099 Source: Ministry of Drinking Water & Sanitation. Water Resources Information System Directorate, Information System Organisation, Water Planning & Projects Wing, Central Water Commission (Water and Related Statistics-2015). http://www.cwc.gov.in/main/downloads/water%20&%20related%20statistics%202015.pdf (Accessed on 20.12.2016) ENVIS Centre on Himalayan Ecology 57

CLA released Upto 2004-05 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 Cumulative CLA/Grant released upto March 15 Water State at a Glance: Manipur, Vol. 1(8), 2016 ENVIS Centre on Himalayan Ecology 58 Water State at a Glance: Manipur, Vol. 1(8), 2016 Table 6.26: Year-wise Central Assistance release to States for Major, Medium, ERM Projects under AIBP (Rs. in Crore) Year Grant released (Amount in Rs. Crore) 2004-05 to 2013-14 102.90 10.35 70.30 138.07 54.18 182.11 0.00 209.50 0.00 375.00 0.00 82.68 1225.10 Source: Mon(C), Project Monitoring Organisation, Central Water Commission. Water Resources Information System Directorate, Information System Organisation, Water Planning & Projects Wing, Central Water Commission, Govt. of India (Water and Related Statistics, 2015). AIBP: Accelerated Irrigation Benefits Programme. http://www.cwc.gov.in/main/downloads/water%20&%20related%20statistics%202015.pdf; (Accessed on 20.12.2016) ENVIS Centre on Himalayan Ecology 58