Calculation of the Grid Emission Intensity Factor for Alberta

Similar documents
Transcription:

Calculation of the Grid Emission Intensity Factor for Alberta Using the Wind Energy Working Group s Proposed Methodology Disclaimer The information and data provided in this report has been obtained or prepared from sources that are believed to Results be reliable and Analysis and accurate prepared but has for: not necessarily been independently verified. Energy Demand Consulting Associates Ltd. (EDC Associates Ltd.) makes no representations or warranties as to the accuracy or completeness Alberta Environment of such information and data nor the conclusions that have been derived from its use. Further, the data in this report is generally of a forecast nature and is based on what are believed to be sound and reasonable methodologies and assumptions, however cannot be warranted or guaranteed with respect to accuracy. Submitted Therefore, to: any use of the information by the reader or other recipient shall be at the sole risk and responsibility of such reader or recipient. Mr. Keith Denman The Senior information Policy Analyst provided in this report and the facts upon which the information is based as well as the information Alberta Environment itself may change at any time without notice subject to market conditions and the assumptions made 10th floor, thereto. Oxbridge EDC Place Associates Ltd. is under no obligation to update the information or to provide more complete 9820-106th or accurate St. information when it becomes available. Edmonton, Alberta, Canada T5K 2J6 EDC Associates Ltd. expressly disclaims and takes no responsibility and shall not be liable for any financial or economic decisions or market positions taken by any person based in any way on information presented in this report, for any interpretation or misunderstanding of any such information on the part of any person or for any losses, costs or other damages whatsoever and howsoever caused in connection with any use of such information, including all losses, costs or other damages such as consequential or indirect losses, loss of revenue, loss of expected profit or loss of income, whether or not as a result of any negligent act or omission by EDC Associates Ltd. Copyright EDC Associates Ltd., 2006 Draft Report Issued: This document was prepared under contract by EDC Associates Ltd. and may not be copied January or reproduced, 22, 2007 translated to electronic media in any form or manner whatsoever, in whole or in part, nor distributed to any third party without the prior written consent of Energy Demand Consulting Associates Ltd.

EDC Associates Ltd. Disclaimer The information and data provided in this report has been obtained or prepared from sources that are believed to be reliable and accurate but has not necessarily been independently verified. EDC Associates Ltd. makes no representations or warranties as to the accuracy or completeness of such information and data nor the conclusions that have been derived from its use. Further, the data in this report is generally of a forecast nature and is based on what are believed to be sound and reasonable methodologies and assumptions, however cannot be warranted or guaranteed with respect to accuracy. Therefore, any use of the information by the reader or other recipient shall be at the sole risk and responsibility of such reader or recipient. The information provided in this report and the facts upon which the information is based as well as the information itself may change at any time without notice subject to market conditions and the assumptions made thereto. EDC Associates Ltd. is under no obligation to update the information or to provide more complete or accurate information when it becomes available. EDC Associates Ltd. expressly disclaims and takes no responsibility and shall not be liable for any financial or economic decisions or market positions taken by any person based in any way on information presented in this report, for any interpretation or misunderstanding of any such information on the part of any person or for any losses, costs or other damages whatsoever and howsoever caused in connection with any use of such information, including all losses, costs or other damages such as consequential or indirect losses, loss of revenue, loss of expected profit or loss of income, whether or not as a result of any negligent act or omission by EDC Associates Ltd. Copyright EDC Associates Ltd., 2008 This document was prepared under contract by EDC Associates Ltd. and may not be copied or reproduced, translated to electronic media in any form or manner whatsoever, in whole or in part, nor distributed to any third party without the prior written consent of Alberta Environment. EDC Associates Ltd. 10th Floor, Bankers Hall West 888 3rd Street SW Calgary, Alberta T2P 5C5 www.edcassociates.com 2

Table of Contents Summary Results of Proposed Grid Intesity Factor Calculations... 4 Introduction... 5 Proposed GHG Emission Calculation Methodology... 5 Clarifications... 6 Operating Margin Component... 6 Capacity Margin Component... 6 Data Sources... 6 Detailed Calculations of Grid Intensity Factor & Components... 8 3

Summary Results of Proposed Grid Intesity Factor Calculations EDC Associates has been retained by Alberta Environment to provide electric energy system modeling tools and expertise to help derive the Grid Intensity Factor (GIF) for Alberta as using the proposed methodology offered by the Wind Energy Working Group. The purpose of this work is to provide some base metrics with respect to Green House Gas (GHG) emission intensity to determine an industry and government acceptable GHG offset credit calculation method that is fair and representative. The result of this process is to provide GHG emission intensity to be applied and used for wind and/or other zero emission renewable energy sources where the ultimate calculation from the final chosen methodology will be a GHG emission credit tonne/mwh. There are three intermediate results required to calculate the final Grid Intensity Factor: Operating Margin (OM), Grid Average (GA) and Build Margin (BM). The GIF breaks down as a weighted average of OM, GA and BM, with the respective weights for each component to be determined. The tables below present the numerical values for each of the three intermediate determinants calculated based on Alberta specific data. Table 1-2004 to 2006 Operating Margin Operating Margin Operating Margin 2004 0.761 2005 0.795 2006 0.808 Average 0.788 The operating margin represents the average emission rate of units on the margin in Alberta, which is defined as those units setting the marginal price. Table 2 2004 to 2006 0.539Grid Average Intensity Factor Grid Average Tonnes of Emissions Total MWh Grid Average 2004 49,491,646 56,296,030 0.879 2005 49,774,494 57,358,794 0.868 2006 50,695,924 58,639,655 0.865 Total 149,962,064 172,294,479 0.870 The grid average intensity factor represents total emissions divided by total MWh for all energy in Alberta, excluding behind the fence load. Table 3-2004 to 2006 Build Margin Build Margin Tonnes of Emissions Total MWh Grid Average 2004 1,547,406 3,997,657 0.387 2005 4,189,844 7,151,708 0.586 2006 4,949,971 8,676,586 0.570 Total 10,687,221 19,825,951 0.539 The build margin represents the total emissions from facilities built between 2002 and 2006 divided by the total MWh from those same facilities for each of 2004 through 2006. 4

Introduction EDC Associates has been retained by Alberta Environment to provide electric energy system modeling tools and expertise to help derive the grid emission intensity factor for Alberta as using the proposed methodology offered by the Wind Energy Working Group 1. The purpose of this work is to provide some base metrics with respect to Green House Gas (GHG) emission intensity using several different calculation methodologies in order to determine an industry and government acceptable GHG offset credit calculation method that is fair and representative. The result of this process is to provide GHG emission intensity to be applied and used for wind and/or other zero emission renewable energy sources where the ultimate calculation from the final chosen methodology will be a GHG emission credit tonne/mwh. After several iterations of data mining and analysis, a methodological approach has been put forward for discussion. This proposed methodology accounts for the overall emission intensity of the electric energy transported over the Alberta Integrated Electric System (AIES) or the grid from all producers as well as by what capacity has recently been added to the system or the new build margin. As such the proposed approach has three components; 1) the emission intensity of units on the margin (the operating margin component), and 2) the emission intensity of recent generation capacity additions (capacity addition component). Proposed GHG Emission Calculation Methodology The proposed methodology combines three key characteristics of the Alberta electricity system. The final result is identified as the Grid Intensity Factor (GIF) that represents the tonnes of GHG emissions that will be deemed to be offset by investment in renewable energy sources. The components of the proposed GIF are as follows: GIF = Y% X Operating Margin Component + (100 - Y%) X Capacity Addition Component 1. Operating Margin (OM) component: OM = % of time on the margin by technology type multiplied by representative intensity factor for each technology type. This is calculated for 2004 through 2006 and the final OM figure is the arithmetic average of the three yearly numbers. 2. Capacity Addition (CA) Component, is made up of two parts: a. Grid Average (GA) emission intensity factor: GA = energy by unit multiplied by unit specific intensity and then divided by the sum of total energy produced. The GA is calculated for each of 2004 through 2006, and the final GA figure is the energy volume weighted average of these three years. b. Build Margin (BM) component: BM = energy production (net MWh) weighted average of GHG intensity for all units commissioned for service between 2002 and 2006. For example, if 1,000,000 MWh with 0.5 tonnes/mwh intensity and 4,000,000 MWh with 1 tonne/mwh intensity were produced by new facilities, the BM would be 0.9 tonnes/mwh. Again, the final result is the energy volume weighted total average from 2004 through 2006. Given these definitions, GIF is therefore calculated as: GIF = {Y% X OM + (100% - Y%) X (Z% X GA + (100% Z%) X BM)} 1 Made up of representatives from: AltaGas, Enmax, Enbridge, Epcor, Nexen, Shell, Suncor, TransAlta and TransCanada. 5

The formula breaks down as a weighted average of OM, GA and BM where the weighting is determined by Y% and Z%. If Y% is 0%, then OM does not carry and weight and only the GA and BM will determine the result. On the other hand, if Z% is 0%, then GA does not carry any weight and only the OM and BM carry any weight. Simply by varying Y and Z percentages, the relative importance of any one of the three factors can be altered. Clarifications Given the definitions above, a number of clarifications are required to render the calculations transparent and ensure the formula will be robust in the future. Operating Margin Component The operating margin has two components the percent of time each technology is on the margin setting price and the representative emission intensity factor for that technology. 1. Capacity weighted average intensity factor for each technology type is used to calculate the average intensity factor for each of the fuel types identified as price setters. The specific values for each year and fuel type are included in the Appendix of this report. 2. The operating margin is calculated using MSA price setting data found in the 2004 through 2006 Year In Review reports available at http://www.albertamsa.ca/8.html. The specific data is found in the Figure titled: Price Setters by Fuel Type (All Hours). The values for each year can also be found in the Appendix of this report. Capacity Margin Component The capacity margin has two components, the grid average and the build margin. Grid Average The grid average calculation is relatively straightforward being the energy production weighted average of the emission intensity for all technologies that produced it. Several caveats must be noted in the calculation. 1. Imports are included in the total MWh, but the emissions remain in the originating district. In effect, imports have an intensity of 0 tonnes/mwh. 2. City of Medicine Hat is included in the calculation, both exports to Alberta and internal emissions. 3. Behind the fence load and its associated generation is ignored in the calculation. Build Margin The build margin is based on a production weighted average intensity factor for all capacity built between 2002 and 2006. 1. The Build Margin is basically a subset of the Grid Average made up of recent capacity additions. 2. Upgrades to existing capacity (Sheerness, Battle River and Sundance units) are weighted by the size of the upgrade. If the upgrade occurred mid year, the upgrade is also weighted by the portion of the year it was operational. 3. Behind the fence load and generation are again excluded. Data Sources In order to ultimately calculate the Grid Intensity Factor, the following data sources are used: 1. Unit specific GHG intensity factors: EDC Associates Ltd. (EDC) has developed, as part of several past assignments for the Clean Air Strategic Alliance in conjunction with the electric industry which has recently been reviewed and updated by the Toxics Watch Society, a detailed list of unit specific GHG intensity factors. This 6

detailed database, vetted by many of the generators in the province, has been made available to Alberta Environment and has been circulated for review and comment. 2. Generating unit specific energy production: This data is readily available from the Alberta Electric System Operator (AESO) via its website, where EDC has captured and entered this data into its own database over time (starting from Power Pool inception in 1996). 3. Operating Margin (OM) calculation: Data for generation on the margin by fuel/technology type is readily available at a very high level from the Alberta Market Surveillance Administrator (MSA), which aggregates the very detailed data provided to it by the AESO under strict confidence. The MSA data presents an annual average amount of time on the margin for four fuel/technology types: coal, cogeneration, gas (excluding cogeneration) and hydro. The data is found in the 2004 through 2006 Year In Review reports available at http://www.albertamsa.ca/8.html in the Figures titled: Price Setters by Fuel Type (All Hours). 4. List of Generation Developed between 2002 and 2006: EDC tracks generation development in the province in a very detailed fashion. This data is verified with generation developers and EDC will provide its list of recently commissioned generation projects and their respective net-to-grid output capacity (MW) for further verification and for the purpose of the calculations presented in this report. 7

Detailed Calculations of Grid Intensity Factor & Components The tables below illustrate the calculations behind the build margin and the operating margin. Table 4 - Build Margin Detailed Calculations Company / Project Location Fuel Type Unit Capacity (MW) Alberta Generation Projects Completed Generation Projects Existing Net Site Load Output to In-Service GHG (MW) AIES (MW) Date Intensity 2004 Total MWh 2004 Emissions 2005 Total MWh 2005 Emissions 2006 Total MWh 2006 Emissions TransAlta Waterton Waterton Wind 4 0 4 Feb-02-1,763-1,719-1,782 - TCP Bear Creek - LBC/SO Grand Prairie Gas 80 0 80 Dec-02 0.418 239,506 100,113 29,837 12,472 88,251 36,889 IOL (Mahkeses - Phase 11 to 13) Cold Lake Gas 180 120 60 Jan-03 0.418 465,695 194,660 422,611 176,651 383,178 160,168 ATCO/Shell Muskeg River Ft. McMurray Gas 200 86 114 Jan-03 0.418 529,429 221,301 516,770 216,010 597,771 249,868 ATCO/Shell Scotford (Upgrader) Ft. Saskatchewan Gas 184 136 48 Feb-03 0.418 7,410 3,098 6,811 2,847 3,286 1,373 Calpine Energy Center Calgary Gas 250 0 250 Mar-03 0.370 868,136 321,210 318,782 117,949 991,220 366,751 ENCANA Foster Ck Foster Ck Gas 80 0 80 May-03 0.418 564,205 235,838 535,277 223,746 511,915 213,980 ATCO Energen Old Man Hydro Oldman Dam Hydro 32 0 32 Aug-03-95,648-166,720-127,504 - Vision Quest McBride Lake Fort Macleod Wind 75 0 75 Aug-03-225,037-233,920-227,082 - Northstone Elmworth Gas 12 0 12 Jan-04 0.418 5,826 2,435 5,766 2,410 10,968 4,585 Irrican Lethbridge Hydro 7 0 7 May-04-11,340-15,966-17,611 - TCP Petro Can McKay River Ft. McMurray Gas 165 0 165 May-04 0.418 663,824 277,478 1,091,334 456,177 1,037,753 433,781 TAU/ATCO Sheerness 1 Upgrades Hanna Coal 12 0 12 Jul-04 1.108 43,249 47,920 95,596 105,921 86,882 96,265 Suncor/Enbridge/EHN Magrath Pincher Creek Wind 30 0 30 Oct-04-38,908-91,078-96,804 - TransAlta Summerview Pincher Creek Wind 68 0 68 Oct-04-70,810-210,874-209,104 - TransAlta Macleod Flats Pincher Creek Wind 3 0 3 Oct-04-167 - 5,801-5,000 - EPCOR Genesee 3 Wabamun Coal 450 0 450 Nov-04 0.860 166,688 143,352 3,252,675 2,797,300 3,672,928 3,158,718 CHD Taylor Wind Farm Magrath Wind 4 0 4 Dec-04-16 - 4,172-5,959 - Talisman Cogen Edson Gas 11 0 11 Feb-05 0.418 59,979 25,071 77,182 32,262 Canadian Gas & Electric / Canfor Grand Prairie Biomass 25 6 19 May-05-29,701-81,302 - TAU/ATCO Sheerness 2 Upgrades Hanna Coal 12 0 12 Jun-05 1.108 48,094 53,289 91,763 101,673 Epcor Landfill Methane Gas Plant Edmonton Gas 5 0 5 Sep-05-8,225-34,930 - Creststreet Kettles Hills (Phase 1) Pincher Creek Wind 9 0 9 Mar-06-21,762 - Syncrude (Mildred Lake G12) Ft. McMurray Gas 80 80 0 Mar-06 0.418 86,591 36,195 GW Power/Nexen Soderglen Pincher Creek Wind 71 0 71 Oct-06-83,916 - Suncor/Enbridge/EHN Chin Chute Pincher Creek Wind 30 0 30 Nov-06-18,044 - Syncrude (Aurora G21) Ft. McMurray Gas 85 85 0 Nov-06 0.418 86,591 36,195 ATCO Battle River 5 Upgrade Battle River Coal 20 0 20 Nov-06 1.090 19,510 21,267 Total 2,190 513 1,677 0.304 3,997,657 1,547,406 7,151,708 4,189,844 8,676,586 4,949,971 Build Margin (GHG Emissions / Total MWh) 0.39 0.59 0.57 Table 5 - Annual Operating Margin Calculations Fuel Type Operating Margin 2004 Operating Margin 2005 Operating Margin 2006 Intesity (Capacity Avg,) % of Time Set Price Operating Margin Fuel Type Intensity (Capacity Avg.) % of Time Set Price Operating Margin Fuel Type Intensity (Capacity Avg.) % of Time Set Price Operating Margin Coal 1.063 45% 0.478 Coal 1.063 57% 0.606 Coal 1.055 59% 0.622 Cogen 0.410 18% 0.074 Cogen 0.409 23% 0.094 Cogen 0.408 19% 0.078 Other Gas 0.580 36% 0.209 Other Gas 0.557 17% 0.095 Other Gas 0.542 20% 0.108 Hydro - 1% - Hydro - 3% - Hydro - 2% - Total - 100% 0.761 Total - 100% 0.795 Total - 100% 0.808 8

Proposed GHG Offset Credit Methodology for Renewables December 2007