Why PV-Testing: Quality Reasons

Similar documents
Transcription:

Why PV-Testing: Quality Reasons Current Quality Level, Risk in Supply Chain, Failures and Degradation Effects, General Risks and Risk Mitigation through Measurements

Quality Weaknesses in the PV Market Product quality is often not given due to the market situation (high competition, low financial recourses, personnel fluctuation, change of suppliers, lack of quality assurance knowledge) Project assumptions and feasibility are imprecise energy yield prediction too optimistic, cleaning concept missing or insufficient, lack of fixed contract requirements, lack of experience How to solve these problems? Low quality of planning and installation use of sub-subcontractors, high competition, lack of knowledge and experience, tight commissioning deadlines, weak quality assurance during construction Bankability of involved parties often not given unstable market situation, choose of Tier-1 manufacturers is not only a criteria for bankability, warranties are often not reliable 2 26.05.2017

Photovoltaic Modules: Fault Statistics from Module Certification Percentage of certification projects with test failures 2,000 certification projects in Germany from 2002 to 2013 (from 2007 c-si and TF are presented separately) 67% From 2008: primarily European products shown (opening of TÜV Rheinland laboratories in Japan, China, USA, Taiwan, India, Korea) 54% 53% From 2007: separate presentation of thin-film and crystalline modules 27% 30% 40% 39% 29% 30% 26% 21% 22% 19% 17% 2004 2007: high percentage of new Chinese manufacturers From 2007/2008: many thin-film technology start-ups 10% 10% 7% 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Crystalline technologies Thin-film technologies Both technologies! Today, modules are being constructed that fulfill the standard. This is not the real picture of PV modules that are available on the market!!!! 3 26.05.2017

Cause of Defects in PV Power Plants Results of TÜV Rheinland Internal Study Data (2014/ Q1. 2015) 2014/ Q1.2015 Main findings: 30 % of power plants show serious and particularly serious defects (incl. safety issues) or large number of issues > 50 % of defects are caused by installation errors Installation faults 55%! Systematic quality assurance is required Plant inspections and maintenance are imperative Miscellaneous Environmental influence 1% Maintenance 5% 5% Product defects 9% 25% Documentation & planning faults 4 26.05.2017

Quality Monitor 2015: Basis and Results of a TÜV Rheinland Study Basis of the study: Categorization: TÜV Rheinland has more than 12 GW plants inspected world wide (Europe, North America, South America, Central America, Asia and Africa) Basis of the study are > 100 plants (100 kwp - 30 MWp) (Main regions: Germany, Europe, RoW) Two periods (2012 2013 / 2014 - Q1. 2015) Particularly Serious Defects (PSD) Immediate action to prevent plant breakdown is required Serious Defects (SD) Plant operation is possible but defects must be repaired Less Serious Defects (LSD) No compelling need for action but monitoring of development is recommended 5 26.05.2017

Particularly serious Defects in PV Power Plants Immediate action to prevent plant breakdown is needed 2012 / 2013 2014 / Q1. 2015 Cabling Modules Modules 33% 48% 19% Infrastructure & environmental 7% 8% Potential equalization & grounding 13% Inverter Connection & distribution boxes 9% 11% Mounting structure Inverter 4% 4% Mounting structure 16% Connection & distribution boxes 28% Cabling 6 26.05.2017

Loss of Revenue Risks On-Site Risks Technical Risks Safety Risks Logistical Risks Political Risks Wind Lightning Snow, hail and ice Pollution Dust Rock fall Land slide Earthquake Flood Shading Animals Performance and yield Malfunction Degradation Aging Maintenance cost Repair Replacement Statics Appearance Accessibility Electric shock Electric arc Fire Statics Mechanical integrity Ergonomics Theft Vandalism Production delays Shipping Supply Raw materials Transport damages Change in legal situation (laws) Application procedures Social aspects Permissions Financial market risks Financial Risk 7 26.05.2017

Failure Examples in PV Systems (O&M, Installation, Foundation, Planning) 8 26.05.2017

Safety Risks (Serial-, Single failure) 9 26.05.2017

Fire Risk for Photovoltaic Systems 2014: > 1.5 million PV systems in operation in Germany 210+ cases of heat and fire damage caused by PV / 220+ fires involving PV Number of Fire Damages Fire in building with PV Breakdown of Damage by Roof configuration 21% Building burned down 19% 60% 34 Building damaged PV system damaged Component damaged 0 50 100 150 200 250 Roof-top PV Roof-integrated PV Flat-roof system Source: Research project on preventive fire protection in photovoltaic systems! At least 50 % of errors resulted from installation defects 10 26.05.2017

Durability and Performance Risk Potential induced Degradation (PID)! Unsuitable Backsheet! Underperformance Delamination Browning! - -40% 15% PID Unsuitable Backsheet Browning, Delamination Initial After 90h After 230h! No published failures in the range of 1 GWp 11 26.05.2017

Examples of Yearly Performance Losses, Potential Risks >30% Max. Min. 5% 4% 3% 2% 1% 0% 12 26.05.2017

Potential Induced Degradation (PID) Performance killer number one: potential induced degradation (PID) (occurs in cases of high voltage, sensitive module/material combinations and damp environments e.g. caused by condensation, high humidity) Reversible process through grounding or counter-potential (investments required) Test results of a PID test of PV modules from large-scale PV systems -15% -75% -95%! Knowledge of PID sensitivity of PV modules is necessary All material combinations of a module must be considered in order to declare it PID-resistant! 13 26.05.2017

Influence of Soiling Daily cleaning of one system, no cleaning of the other Section 1: both systems cleaned Section 2,3,4: both systems not cleaned from D on: rainfall and no manual cleaning Cleaning period [d] Power degradation [%] 0 0 2-5 5 13 10 18 15 25 20 35 25 45 30! Yield losses > 5 % within 1 week are possible Site specific cleaning concept is required 14 26.05.2017

Product warranty [years] Degradation, Service Lifetime of PV Modules A service lifetime analysis must be based on data from technologies already exposed in the field. One contemporary article [1] compares between 3000 4000 published degradation rates for different technologies. For crystalline technologies annual degradation rates averaging 0.5% are to be expected, for thin-film technology 1.0%. For climates with high air humidity and irradiance, experience leads us to expect partly higher levels. The spread of degradation rates indicates that poor-quality systems distort the degradation rates. TÜV Rheinland estimation shows that crystalline modules of high quality will exhibit annual degradation rates of < 0.3%. Published degradation rates for different module technologies. 1 exposed before 2000, 2 exposed after 2000 [1] Photovoltaic Degradation Rates An Analytical Review Dirk C. Jordan et al., Journal Article NREL/JA-5200-51664 (2012) 15 26.05.2017

0 Label Normalized Energy Yield [Wh/Wp] 796 863 863 864 852 853 851 831 876 887 881 863 910 959 920 1.081 1.040 1.167 1.119 1.134 1.176 1.096 1.186 1.082 1.174 1.109 1.173 1.099 1.184 1.138 1.156 1.151 1.190 1.171 1.192 1.182 1.216 1.152 1.230 1.210 1.191 1.251 1.221 1.163 1.309 1.431 1.457 1.470 1.477 1.483 1.483 1.532 1.537 1.554 1.558 1.560 1.604 1.644 1.653 Choice of technology: Global Energy Yield Benchmark 1800 1600 1400 1200 1000 800 First results Label Normalized Energy Yield (1 year data) Arizona Italy India Indien Germany Köln Italy 12 % Germany 13 % India 23 % Arizona 21 % Saudi Arabia Variation between technologies Not available yet 600 400 200 0 Data is not compensated for availability losses; Measurement uncertainty of the MPP tracking: 0.5 % Measurement uncertainty of STC value for referencing: 2.5 %! Choice of technology and optimised product is crucial for high energy yield and return of investment. 16 26.05.2017

Deviation from Rated Power: Project Related Precise Performance Measurement Secures Returns relative number of modules in % relative number of modules in % Results of performance measurements (2010 2013) Following doubt about system performance (modules that are as good as new, operation < one year) 30 25 20 15 10 Investors: (Court-) admissible controls necessary! Deviation from the nominal value (large-scale projects used; 51 module types) 5 0-8 -7-6 -5-4 -3-2 -1 0 1 2 3 4 5 6 7 8 deviation from the nominal value in % Contractually agreed measurements prior to installation in large-scale systems Manufacturers: no performance (returns) loss Critical performance evaluation (measurement) necessary in projects High level of measurement precision required for use in court 30 25 20 15 10 Deviation from the nominal value (large-scale projects new; 16 module types) 5 0-8 -7-6 -5-4 -3-2 -1 0 1 2 3 4 5 6 7 8 deviation from the nominal value in % 17 26.05.2017

Influence of Micro Cracks on Performance often overestimated Detected micro-cracks have their origins in: - Production (soldering process, handling, temperature, etc.) - Environmental influences (transportation, snow, hail, etc.) - Mechanical damage (installation) 18 26.05.2017

Degradation mechanisms in the field: Initial Degradation Degradation mechanisms in the field: Initial Degradation Especially crystalline PV modules exhibit so-called 'initial degradation'. In 'light induced degradation' (LID) the delivered power changes by a few per cent in the course of hours. Following this period, no further changes due to LID occur The magnitude of the changes depends on the cell technology installed in the module. V oc : open circuit voltage I sc : short circuit current P mpp : maximum power point FF: fill factor, P mpp / (V oc * I sc ) [1] S. Pingel et al: 'Initial degradation of industrial silicon solar cells in solar panels'; PVSEC 2010 19 26.05.2017

Occurrance [%] Light-induced (initial) Degradation 45 Light-induced degradation ( Initial Degradation ) 40 35 30 25 20 73 Modules 28 Module types 15 10 5 0 0,2-0,4 0,6-0,8 1,0-1,2 1,4-1,6 1,8-2,0 2,2-2,4 LID [%]! Through 'light induced degradation' (LID) initial power changes by a few percent in the course of hours. 20 26.05.2017

IAM-Faktor rel. PV module efficiency in % Energy Yield Prediction based on Precise Data IEC 61853-1 IEC 61853-2 TUV PAN File Irradiance Module temperature W m -2 15 C 25 C 50 C 75 C 1100 NA 1000 800 600 400 NA 200 NA NA 100 NA NA measuring points Incidence angle IAM 0-1 0 ±10 ±20 ±30 ±40 ±50 ±60 ±65 ±70 ±75 ±80 ±85 Efficiencies of base and TUV PAN File 105% 100% 95% 90% base PAN File TUV PAN File 85% 80% 0 200 400 600 800 1000 Irradiance in W/m 2 IAM-Faktor (Incidence Angle Modifier) 1 0,8 0,6 base PAN File 0,4 TUV PAN file 0,2 0 0 10 20 30 40 50 60 70 80 90 Angle of Incidence in! The complete set of measurements leads to more precise energy yield prediction and reduction of risk of over- or underestimation of revenues by several percent. 21 26.05.2017

Unforeseable Events, Continue to Secure Insurability of PV Systems Example: hail Intensity and frequency of severe hail storms has increased Insurance claims can be very large Identification of damaged modules is not obvious (not only glass damage, but also cell cracks are relevant) Product qualification only covers 25 mm ice balls Some insurers require hail resistance classified products or increase premium (30, 40, 50 mm) Adapted product testing and life time simulations required! Insurability is important, it can be created on the basis of test reports 22 26.05.2017

Quality Weaknesses in the PV Market Product quality is often not given due to the market situation (high competition, low financial recourses, personnel fluctuation, change of suppliers, lack of quality assurance knowledge) Project assumptions and feasibility are imprecise energy yield prediction too optimistic, cleaning concept missing or insufficient, lack of fixed contract requirements, lack of experience How to solve these problems? Low quality of planning and installation use of sub- and sub-subcontractors, high competition, lack of knowledge and experience, tight commissioning deadlines, weak quality assurance during construction Bankability of involved parties often not given unstable market situation, choose of Tier-1 manufacturers is not only a criteria for bankability, warranties are often not reliable 23 26.05.2017

Strategy to improve Quality on the PV Market The quality improvement must be initiated by investors, banks, insurers and owners Project related product testing and characterization (pretesting and batch related testing) Quality assurance and risk management is the key! Experienced third party project feasibility study, energy yield prediction on the basis of full product characterization and site influences Quality assurance of installation, installer education and qualification, inspections during installation, commissioning test, periodic inspection, monitoring Ensure high product quality with the prevention of later claims (power, yield, safety, reliability, durability), risk assessment 24 26.05.2017

Thank you for you attention! Image:www.spineuniverse.com 25 26.05.2017