Flood Analysis: Hydrologic Principles & Analysis. Charles Yearwood. Drainage Unit, Ministry of Public Works Sept 2007

Similar documents
Transcription:

Flood Analysis: Hydrologic Principles & Analysis. Charles Yearwood Drainage Unit, Ministry of Public Works Sept 2007 Research interest: Hydrologic data collection; Early warning systems; & Integrated flood management

Presentation Content Introduction Objective Theory Data Collection Analysis

Over the past few years the disharmony between human use systems and natural systems has resulted in repeated flooding in the Caribbean, eg: Jamaica (1979, 1984, 1985, 1986, 1988, 2004, 2005), Barbados (1970, 1984, 1986, 1988, 1998, 2004), Guyana (1996, 2005); and Trinidad and Tobago (1988, 1993, 1998, 1999) Recently disastrous flooding in Haiti and the Dominican Republic, Trinidad and Tobago, and Barbados reinforces this reality. Introduction Guyana 2005 Barbados 2004 Jamaica Nov 2004

Uses & Users of Flood Analysis Conduct Flood assessments Hazard maps Vulnerability assessments Risk assessment Develop Flood mitigation, prevention, preparedness and flood reduction measures to the flood risk Set criteria and guidelines for sound risk management four types of users: Town planners Emergency managers Community groups Private sector

Propose of Flood Analysis Watercourse/River planning Flood discharge Water resource Low flow rate Flood runoff analysis Peak discharge Hydrograph Flood forecasting River discharge in several hours in advance (e.g. 3 hours, 6 hours) Long-term runoff analysis Low flow rate

Objective of Flood Analysis Identify factors affecting runoff from watersheds Determine areal rainfall estimation from point data Understand the cause effect relation between rainfall and stage/runoff Development of runoff hydrographs from rainfall, Rainfall probability analysis, Design storm, Estimation techniques for runoff hydrographs Methods of controlling runoff.

Flooding in the Caribbean often result from one of the following: Severe rainfall events Hurricanes, tropical storms between June to November Riverine flooding excess runoff to gullies, streams, rivers Flash flooding High intensity - short/long duration rainfall events; Prolonged rainfall events

Why Flooding Occurs? High elevation:short reach (gullies lengths); Coincidence of high tide with rainfall events; Development pressures; Dense development on flat lands; Inadequate drainage systems and structures; and/or High sand build-up at the outfall;

Flood Issues Inundation of properties; Lost of Business; Soil loss & erosion; Degradation beaches & reefs; Publics nuisance and inconvenience; Increased development and assoc. runoff; Disruption to traffic flows; utilities & businesses Illegal dumping;

Theory Hydrological Principles Hydrological processes in agricultural watersheds

Rainfall-Runoff in Watersheds Rainfall (unity) Interception Loss (retention in the soil) Groundwater flow Unsaturated flow Overland flow River discharge Depression storage

Infiltration in the Soil Infiltration rate (mm/hr) Potential infiltration Rainfall Actual infiltration Time(hr) Infiltration rate decreases as time passes.

Rainfall Effective Rainfall Rainfall loss due to infiltration and local storage Saturation Time

Factors affecting runoff magnitude Scale of features, vegetation Total rainfall, rainfall intensity, duration, spatial distribution Soil wetness, initial flow rate, evaporation, air temperature, season Land-use

Procedure of flood runoff analysis Investigation of flood data Calculation of flood runoff 1)Method of flood runoff calculation 2)Division of catchment 3)Verification of runoff model and allowable errors

Procedure of flood runoff analysis Investigation of flood record 1)Preparation of lists of existing flood data Check records of rainfall, water level, discharge at observation stations within the area to be studied. 2)Determination of floods to be analyzed and floods to be estimated based on the records in (1) Floods to be analyzed are used for the parameter calibration and should have sufficient information on the measured discharge hydrograph. It is recommended to use three events for small, medium and large floods. Floods to be estimated are the floods for which the hydrograph must be estimated by a certain method.

Procedure of flood runoff analysis Investigation of flood record 3)Supplementing records for missing observed values of rainfall Missing records of rainfall should be supplemented with the records at other rain gauge stations based on the correlation analysis. 4)Calculation of average rainfall depth in watershed If there are sufficient number of rain gauge stations: 1)Arithmetic mean method 2)Thiessen polygon method 3)Isohyetal method If there are insufficient rain gauge stations: Representative coefficient method

Hydrological Data Analysis: Barbados Case Study Watershed studies Rainfall: elevation relationships Wells Infiltration Watercourse Surveys Rainfall:Stage Rainfall:Runoff Storage (check dam/retention pond) Monitoring Flood Observations and Surveys

Rainfall (mm) Rainfall:Elevation Relationships Comparative Rainfall:Elevation Between Indian Ground and Indian Ground 600 500 400 300 200 100 0 Jun-04 Aug-04 Oct-04 Dec-04 Feb-05 Apr-05 Jun-05 Aug-05 Oct-05 Monthly Rainfall Indian Ground at 262m The Rock at 160m Dec-05 Feb-06 Apr-06 Jun-06 2 per. Mov. Avg. (The Rock at 160m) 2 per. Mov. Avg. (Indian Ground at 262m)

Water Depth in Well Water Depth in Culvert Height (mm) Well Infiltration Lascelles Terr Well infiltration 1.600 1.400 1.200 13-Jan 21-Jan Lascelles Well Infiltration 23-Jan 12.000 0.000 1.000 1-Feb 3-Feb 0.800 12-Feb 10.000 0.200 0.600 0.400 1 12 23 34 45 56 67 78 89 100 111 122 133 144 8.000 Time (mins) 0.600 6.000 0.800 4.000 1.000 1.200 2.000 1.400 0.000 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 Well (Culvert) Inflows H Time Well Outflows H

Height (m) Portvale Rainfall:Stage Relationship Study Cross section C (Ch 20) 116.000 114.000 112.000 110.000 108.000 106.000-11.3-9.7-3.6-1.4 0 1.9 5.3 7.8 11.8 Offset Chainage (m) Instrument Location Cross Section Survey

Brucevale Valley Rainfall: Stage Relationship Dark Hole WC Hway 2 & Lakes Jct Bridge Tri-O-Path Bridge East Coast Bridge

Stage (m) Rainfall (mm) Portvale Lag time Analysis (14Nov 2004) 1.60 1.40 1.20 0 20 40 1.00 0.80 0.60 0.40 0.20 0.00 11:50 13:30 15:10 16:50 18:30 20:10 21:50 23:30 Time of Day 60 80 100 120 140 Portvale R'fall WC Stage Jamestown Stage Dr H

Cubic metres Monitoring Richmond Hill Check Dam Time W.L. Reduce Volume Time W.L. Reduce Volume Time W.L. Reduc Volum 235-254.8 Level 73,930 Level e Level e 320 1245 75,430 143.79 405 833 75,018 66.84 240 357.2 74,542 325 1233 75,418 141.14 410 767 74,952 57.01 245 590.5 74,776 330 1203 75,388 134.51 415 690 74,875 45.88 250 788.0 74,973 335 1162 75,347 125.45 420 609 74,794 34.16 255 953.0 75,138 340 1114 75,299 104.13 425 523 74,708 24.17 300 1072.0 75,257 345 1064 75,249 103.87 430 431 74,616 16.22 305 1155.0 75,340 350 1012 75,197 95.53 435 350 74,535 9.22 310 1212.0 75,397 355 957 75,142 86.71 440 273.8 74,459 5.28 315 1241.0 75,426 400 895 75,080 76.77 445 197.6 74,383 3.57 Infiltration at Richmond Hill Infiltration 160.000 140.000 120.000 100.000 80.000 60.000 40.000 20.000 0.000 320 325 330 335 340 345 350 355 400 405 410 415 420 425 430 435 440 445 Time overall rate of 101.49m 3 /hr or 1.69m 3 /min

Flood Observations Channel Flows Inudations Nuisance flooding

Flood Surveys Registering flood levels, Recording level damages, and Losses

Flood Hazard Map Production From 1996 Barbados Drainage Study Legend contours 5yrFldLine Updated Roads 20yrFldProofArea1996 20yrFldLine 100yrFldLine Nov2004FldLine / Created by Pernel Brewster C:\Drainage Unit -Server\GIS Files\Drainage Features\FloodPlainMapping

100-years Rainfall/Storm Surge events Source: Coastal Hazard Project 2007

Thank-you Questions? Appreciation: to Drainage Unit s staff who braved flood conditions to provide flood data