BID TABULATION Page 1 of 10. CMES, Inc. (L) E. R. Snell Contractor, Inc. (L) Est. Bid Quantity

Similar documents
Transcription:

BID TABULATION Page 1 of 10 CMES, Inc. C. W. Matthews Contracting Co., Inc. E. R. Snell Contractor, Inc. Units Unit Price Total Price Unit Price Total Price Unit Price Total Price 001 Aerial Photograph Documentation 12 MO $75.00 $900.00 $250.00 $3,000.00 $98.07 $1,176.84 002 Traffic Control Project F-1059 1 LS $120,356.00 $120,356.00 $67,095.76 $67,095.76 $110,150.51 $110,150.51 003 Erosion Control Project F-1059 1 LS $32,650.00 $32,650.00 $22,450.00 $22,450.00 $22,731.65 $22,731.65 004 Construct, Maintain & Remove Check Dams 28 EA $80.00 $2,240.00 $678.13 $18,987.64 $102.40 $2,867.20 005 Construct, Maintain & Remove Inlet Sediment Trap 24 EA $95.00 $2,280.00 $195.00 $4,680.00 $131.40 $3,153.60 006 Construct, Maintain & Remove Rock Filter Dam 3 EA $200.00 $600.00 $1,293.21 $3,879.63 $712.28 $2,136.84 007 Construct, Maintain & Remove Stone Filter Ring 3 EA $450.00 $1,350.00 $393.12 $1,179.36 $994.62 $2,983.86 008 Temporary Silt Fence, Type A 5777 LF $1.25 $7,221.25 $2.55 $14,731.35 $3.84 $22,183.68 009 Temporary Silt Fence, Type C 9778 LF $2.50 $24,445.00 $3.55 $34,711.90 $4.99 $48,792.22 010 Found Bkfill Material, Type II 51 CY $55.00 $2,805.00 $106.04 $5,408.04 $60.31 $3,075.81 011 Grading Complete Project F-1059 1 LS $1,052,214.00 $1,052,214.00 $1,144,771.10 $1,144,771.10 $587,147.83 $587,147.83 012 Undercut Excavation (Per Specification 210.5c) Project F-1059 750 CY $7.50 $5,625.00 $7.50 $5,625.00 $7.50 $5,625.00 013 GR Aggr Base CRS, Incl Material 6047 TN $19.00 $114,893.00 $31.81 $192,355.07 $29.90 $180,805.30 014 Aggr Surf CRS 250 TN $19.00 $4,750.00 $22.33 $5,582.50 $29.90 $7,475.00 015 Recycled Asph Concrete Patching, Incl Bitum 46 TN $140.00 $6,440.00 $224.22 $10,314.12 $221.79 $10,202.34 016 Recycled Asph Concrete Leveling, Incl Bitum 200 TN $122.00 $24,400.00 $106.52 $21,304.00 $115.51 $23,102.00 017 Recycled Asph Concrete 25 mm Superpave, Gap 1 or 2, Incl Bitum 2726 TN $86.00 $234,436.00 $73.60 $200,633.60 $82.83 $225,794.58 018 Recycled Asph Concrete 12.5 mm Superpave, Gap 2 only, Incl Bitum 3039 TN $88.00 $267,432.00 $87.14 $264,818.46 $87.74 $266,641.86 019 Recycled Asph Concrete 19 mm Superpave, Gap 1 or 2, Incl Bitum 974 TN $97.00 $94,478.00 $82.65 $80,501.10 $84.48 $82,283.52 020 Tack Coat 2497 GL $4.25 $10,612.25 $1.80 $4,494.60 $5.58 $13,933.26 021 Mill Asph Concrete Pavement, Variable Depth 1814 SY $6.00 $10,884.00 $6.63 $12,026.82 $6.70 $12,153.80 022 Concrete Slope Drain 30 SY $40.00 $1,200.00 $72.60 $2,178.00 $115.38 $3,461.40 023 Concrete Sidewalk, 4 In 2286 SY $28.00 $64,008.00 $25.99 $59,413.14 $45.27 $103,487.22 024 Concrete Sidewalk, 8 In 607 SY $35.00 $21,245.00 $54.84 $33,287.88 $90.27 $54,793.89 025 Concrete Median, 7 1/2 In 183 SY $54.00 $9,882.00 $75.29 $13,778.07 $83.07 $15,201.81

BID TABULATION Page 2 of 10 CMES, Inc. C. W. Matthews Contracting Co., Inc. E. R. Snell Contractor, Inc. Units Unit Price Total Price Unit Price Total Price Unit Price Total Price 026 Concrete Valley Gutter, 6 In 80 SY $30.00 $2,400.00 $53.85 $4,308.00 $50.77 $4,061.60 027 Concrete Valley Gutter, 8 In 301 SY $35.00 $10,535.00 $62.93 $18,941.93 $60.00 $18,060.00 028 Concrete Curb & Gutter, 8 In X 30 In, Type 2 5696 LF $13.00 $74,048.00 $19.21 $109,420.16 $18.46 $105,148.16 029 Sawed Joints in Exist Pavements - PAC 178 LF $3.00 $534.00 $5.00 $890.00 $6.24 $1,110.72 030 Class B Concrete - Plug Pipe 1 CY $350.00 $350.00 $400.00 $400.00 $659.24 $659.24 031 Class B Concrete, Base Or Pavement Widening 42 CY $175.00 $7,350.00 $234.11 $9,832.62 $259.61 $10,903.62 032 Storm Drain Pipe, 18 In, H 1-10 1963 LF $35.00 $68,705.00 $63.45 $124,552.35 $47.52 $93,281.76 033 Storm Drain Pipe, 30 In, H 1-10 40 LF $65.00 $2,600.00 $143.26 $5,730.40 $72.19 $2,887.60 034 Storm Drain Pipe, 36 In, H 1-10 316 LF $75.00 $23,700.00 $102.62 $32,427.92 $82.63 $26,111.08 035 Storm Drain Pipe, 36 In, H 10-15 153 LF $90.00 $13,770.00 $163.96 $25,085.88 $93.95 $14,374.35 036 Storm Drain Pipe, 60 In, H 1-10 192 LF $230.00 $44,160.00 $245.36 $47,109.12 $203.29 $39,031.68 037 Side Drain Pipe, 18 In, H 1-10 109 LF $30.00 $3,270.00 $74.66 $8,137.94 $42.33 $4,613.97 038 Safety End Section 18 In, Storm Drain, 4:1 Slope 3 EA $950.00 $2,850.00 $500.99 $1,502.97 $603.13 $1,809.39 039 Safety End Section 18 In, Side Drain,4:1 Slope 6 EA $750.00 $4,500.00 $402.54 $2,415.24 $494.06 $2,964.36 040 Flared End Section, 18 In, Storm Drain 1 EA $625.00 $625.00 $562.54 $562.54 $660.64 $660.64 041 Flared End Section, 30 In, Storm Drain 1 EA $850.00 $850.00 $746.88 $746.88 $861.42 $861.42 042 Flared End Section, 36 In, Storm Drain 1 EA $1,100.00 $1,100.00 $1,161.31 $1,161.31 $1,396.49 $1,396.49 043 Underdrain Pipe Incl Drainage Aggr, 6 In 200 LF $4.00 $800.00 $44.03 $8,806.00 $25.43 $5,086.00 044 Stn Dumped Rip Rap, Type 3, 18 In 160 SY $40.00 $6,400.00 $36.58 $5,852.80 $35.53 $5,684.80 045 Plastic Filter Fabric 160 SY $4.00 $640.00 $7.39 $1,182.40 $4.78 $764.80 046 Rem Highway Sign, STD 1 EA $200.00 $200.00 $95.00 $95.00 $109.61 $109.61 047 Reconstr Catch Basin, Group 1 2 EA $1,550.00 $3,100.00 $2,391.00 $4,782.00 $2,779.59 $5,559.18 048 Reconstr Storm Sewer Manhole, Type 1 5 EA $1,250.00 $6,250.00 $1,485.00 $7,425.00 $1,726.34 $8,631.70 049 Reset Highway Sign 1 EA $200.00 $200.00 $180.00 $180.00 $207.68 $207.68 050 Adjust Manhole To Grade 2 EA $700.00 $1,400.00 $709.00 $1,418.00 $824.23 $1,648.46

BID TABULATION Page 3 of 10 CMES, Inc. C. W. Matthews Contracting Co., Inc. E. R. Snell Contractor, Inc. Units Unit Price Total Price Unit Price Total Price Unit Price Total Price 051 Right of Way Markers 46 EA $70.00 $3,220.00 $118.96 $5,472.16 $116.07 $5,339.22 052 Highway Signs, Type 1 Material, Refl Sheeting, Type 3 128 SF $18.00 $2,304.00 $16.85 $2,156.80 $19.44 $2,488.32 053 Highway Signs, Type 1 Material, Refl Sheeting, Type 11 146 SF $21.00 $3,066.00 $19.40 $2,832.40 $22.38 $3,267.48 054 Highway Signs, Type 2 Material, Refl Sheeting, Type 11 181 SF $23.00 $4,163.00 $21.00 $3,801.00 $24.23 $4,385.63 055 Galv Steel Posts, Type 7 519 LF $8.00 $4,152.00 $7.88 $4,089.72 $9.09 $4,717.71 056 Guardrail, Type W 250 LF $25.00 $6,250.00 $23.00 $5,750.00 $26.54 $6,635.00 057 Guardrail Anchorage, Type 1 1 EA $1,250.00 $1,250.00 $1,113.00 $1,113.00 $1,284.18 $1,284.18 058 Guardrail Anchorage, Type 12 1 EA $2,500.00 $2,500.00 $2,276.00 $2,276.00 $2,626.05 $2,626.05 059 Thermoplastic Pavement Marking, Arrow, Type 2 58 EA $82.00 $4,756.00 $75.00 $4,350.00 $86.54 $5,019.32 060 Thermoplastic Pavement Marking, Arrow, Type 3 4 EA $165.00 $660.00 $95.00 $380.00 $109.61 $438.44 061 Thermoplastic Pavement Marking, Word, Type 1 2 EA $165.00 $330.00 $125.00 $250.00 $144.23 $288.46 062 Thermoplastic Solid Traffic Stripe, 24 In, White 402 LF $8.00 $3,216.00 $7.50 $3,015.00 $8.65 $3,477.30 063 Thermoplastic Solid Traffic Stripe, 8 In, White 5750 LF $2.70 $15,525.00 $2.50 $14,375.00 $2.88 $16,560.00 064 Thermoplastic Traffic Striping, White 901 SY $5.50 $4,955.50 $4.00 $3,604.00 $4.62 $4,162.62 065 Thermoplastic Traffic Striping, Yellow 81 SY $5.25 $425.25 $4.00 $324.00 $4.62 $374.22 066 Wet Weather Thermoplastic Solid Traffic Stripe, 5 In, White 11747 LF $1.70 $19,969.90 $1.56 $18,325.32 $1.80 $21,144.60 067 Wet Weather Thermoplastic Solid Traffic Stripe, 5 In, Yellow 9509 LF $1.70 $16,165.30 $1.56 $14,834.04 $1.80 $17,116.20 068 Wet Weather Thermoplastic Skip Traffic Stripe, 5 In, White 6103 GLF $1.25 $7,628.75 $1.10 $6,713.30 $1.27 $7,750.81 069 Wet Weather Thermoplastic Skip Traffic Stripe, 5 In, Yellow 3642 GLF $1.25 $4,552.50 $1.10 $4,006.20 $1.27 $4,625.34 070 Raised Pavement Markers Type 1, Type 2 & Type 3 465 EA $5.40 $2,511.00 $4.00 $1,860.00 $4.62 $2,148.30 071 Raised Pavement Markers Type 10 6 EA $5.40 $32.40 $4.00 $24.00 $4.62 $27.72 072 Preformed Plastic Solid Pavement Mkg, 8 In, White, Type Pub 1332 LF $8.20 $10,922.40 $7.50 $9,990.00 $8.65 $11,521.80 073 Catch Basin, Gap 1 16 EA $2,200.00 $35,200.00 $2,632.00 $42,112.00 $3,059.75 $48,956.00 074 Catch Basin, Gap 1, Spcl Design 3 EA $2,000.00 $6,000.00 $2,632.00 $7,896.00 $3,059.75 $9,179.25

BID TABULATION Page 4 of 10 CMES, Inc. C. W. Matthews Contracting Co., Inc. E. R. Snell Contractor, Inc. Units Unit Price Total Price Unit Price Total Price Unit Price Total Price 075 Catch Basin, Gap 1, Addl Depth 3 LF $150.00 $450.00 $210.00 $630.00 $244.13 $732.39 076 Drop Inlet, Gap 1 7 EA $2,000.00 $14,000.00 $2,150.00 $15,050.00 $2,499.42 $17,495.94 077 Drop Inlet, Gap 1, Addl Depth 7 LF $150.00 $1,050.00 $157.00 $1,099.00 $182.52 $1,277.64 078 Storm Sewer Manhole, Type 1 10 EA $1,550.00 $15,500.00 $1,738.00 $17,380.00 $2,020.46 $20,204.60 079 Storm Sewer Manhole, Type 1, Addl Depth, Cl 2 17 LF $150.00 $2,550.00 $223.00 $3,791.00 $259.24 $4,407.08 080 Outlet Control Structure 1 EA $8,800.00 $8,800.00 $8,887.00 $8,887.00 $14,677.60 $14,677.60 081 Grassing Complete Project F-1059 1 LS $29,350.00 $29,350.00 $72,600.00 $72,600.00 $225,244.22 $225,244.22 Traffic Signal 082 Prestressed Concrete Strain Pole, Type IV 8 EA $10,000.00 $80,000.00 $7,012.08 $56,096.64 $8,151.68 $65,213.44 083 Traffic Signal Installation No. 1, Sir 324 At Jim Moore/Old Fountain Rd 1 LS $120,125.00 $120,125.00 $91,224.67 $91,224.67 $106,050.42 $106,050.42 084 Traffic Signal Installation No. 2, Sir 324 At Dacula Rd 1 LS $110,250.00 $110,250.00 $90,676.48 $90,676.48 $105,413.14 $105,413.14 085 Pull Box, PB-5 2 EA $1,650.00 $3,300.00 $1,245.59 $2,491.18 $1,448.03 $2,896.06 ATMS 086 Pull Box, PB-7 7 EA $1,900.00 $13,300.00 $1,967.79 $13,774.53 $2,287.59 $16,013.13 087 Conduit, Nonmetl, Type 3, 2 In 6440 LF $4.00 $25,760.00 $3.71 $23,892.40 $4.31 $27,756.40 088 Directional Bore, 5 In 3155 LF $15.00 $47,325.00 $13.84 $43,665.20 $16.09 $50,763.95 089 Outside Plant Fiber Optic Cable, Loose Tube, Single Mode, 72 Fiber 2455 LF $4.75 $11,661.25 $1.90 $4,664.50 $2.21 $5,425.55 090 Outside Plant Fiber Optic Cable, Drop, Single Mode, 12 Fiber 315 LF $6.00 $1,890.00 $2.39 $752.85 $2.78 $875.70 091 Fiber Optic Closure, Underground, 72 Fiber 3 EA $1,050.00 $3,150.00 $714.99 $2,144.97 $831.19 $2,493.57 092 Fiber Optic Closure, DC (Wall Mounted), 12 Fiber 2 EA $1,050.00 $2,100.00 $664.57 $1,329.14 $772.58 $1,545.16 093 Fiber Optic Splice, Fusion 160 EA $62.00 $9,920.00 $40.02 $6,403.20 $46.52 $7,443.20 094 Field Switch Type A 2 EA $5,000.00 $10,000.00 $2,028.61 $4,057.22 $2,358.30 $4,716.60

Water & Sewer BID TABULATION Page 5 of 10 CMES, Inc. C. W. Matthews Contracting Co., Inc. E. R. Snell Contractor, Inc. Units Unit Price Total Price Unit Price Total Price Unit Price Total Price 095 Adjust Manhole Frame And Cover To Grade - 1 Vertical Ft or Less - Pavement 7 EA $750.00 $5,250.00 $2,300.00 $16,100.00 $2,707.75 $18,954.25 096 Adjust Manhole Frame And Cover To Grade - 1 Vertical Ft or Less - Non- Pavement 5 EA $500.00 $2,500.00 $1,200.00 $6,000.00 $1,412.74 $7,063.70 097 Adjust Water Vault 5 VF $450.00 $2,250.00 $1,500.00 $7,500.00 $1,765.93 $8,829.65 098 Adjust Water Vault Top to Grade - 1 Vertical Ft or Less, Non-Pavement 1 EA $1,300.00 $1,300.00 $7,000.00 $7,000.00 $8,240.98 $8,240.98 099 Adjust Manhole Barrel 4 VF $450.00 $1,800.00 $500.00 $2,000.00 $588.65 $2,354.60 100 House Service Connection - 3/4 In - 1 In, Short Side Complete 17 EA $950.00 $16,150.00 $2,800.00 $47,600.00 $3,296.39 $56,038.63 101 House Service Connection - 3/4 In - 1 In, Long Side Complete 2 EA $1,350.00 $2,700.00 $4,500.00 $9,000.00 $5,297.78 $10,595.56 102 Relocation And/or Reconnection Of Existing Fire Hydrants 6 EA $2,200.00 $13,200.00 $3,200.00 $19,200.00 $3,767.31 $22,603.86 103 Adjust Fire Hydrants 1 VF $550.00 $550.00 $1,200.00 $1,200.00 $1,412.73 $1,412.73 104 Adjust Valve Box 14 EA $165.00 $2,310.00 $1,200.00 $16,800.00 $1,412.74 $19,778.36 TOTAL $3,115,929.75 $3,402,733.52 $3,187,041.41

BID TABULATION Page 6 of 10 G. P.'s Enterprises, Inc. Ohmshiv Construction, LLC. Strickland & Sons Pipeline, Inc. Units 001 Aerial Photograph Documentation 12 MO 002 Traffic Control Project F-1059 1 LS 003 Erosion Control Project F-1059 1 LS 004 Construct, Maintain & Remove Check Dams 28 EA 005 Construct, Maintain & Remove Inlet Sediment Trap 24 EA 006 Construct, Maintain & Remove Rock Filter Dam 3 EA 007 Construct, Maintain & Remove Stone Filter Ring 3 EA 008 Temporary Silt Fence, Type A 5777 LF 009 Temporary Silt Fence, Type C 9778 LF 010 Found Bkfill Material, Type II 51 CY 011 Grading Complete Project F-1059 1 LS 012 Undercut Excavation (Per Specification 210.5c) Project F-1059 750 CY 013 GR Aggr Base CRS, Incl Material 6047 TN 014 Aggr Surf CRS 250 TN 015 Recycled Asph Concrete Patching, Incl Bitum 46 TN 016 Recycled Asph Concrete Leveling, Incl Bitum 200 TN 017 Recycled Asph Concrete 25 mm Superpave, Gap 1 or 2, Incl Bitum 2726 TN 018 Recycled Asph Concrete 12.5 mm Superpave, Gap 2 only, Incl Bitum 3039 TN 019 Recycled Asph Concrete 19 mm Superpave, Gap 1 or 2, Incl Bitum 974 TN 020 Tack Coat 2497 GL 021 Mill Asph Concrete Pavement, Variable Depth 1814 SY 022 Concrete Slope Drain 30 SY 023 Concrete Sidewalk, 4 In 2286 SY 024 Concrete Sidewalk, 8 In 607 SY 025 Concrete Median, 7 1/2 In 183 SY Unit Price Total Price Unit Price Total Price Unit Price Total Price $249.75 $2,997.00 $750.00 $9,000.00 $165.00 $1,980.00 $64,711.22 $64,711.22 $81,500.00 $81,500.00 $185,051.90 $185,051.90 $30,798.50 $30,798.50 $27,500.00 $27,500.00 $30,925.00 $30,925.00 $549.75 $15,393.00 $55.00 $1,540.00 $375.63 $10,517.64 $654.50 $15,708.00 $75.00 $1,800.00 $181.20 $4,348.80 $1,237.97 $3,713.91 $150.00 $450.00 $857.46 $2,572.38 $1,512.66 $4,537.98 $100.00 $300.00 $1,714.92 $5,144.76 $1.69 $9,763.13 $1.50 $8,665.50 $3.82 $22,068.14 $1.76 $17,209.28 $2.75 $26,889.50 $4.61 $45,076.58 $25.20 $1,285.20 $45.00 $2,295.00 $67.59 $3,447.09 $632,821.10 $632,821.10 $840,250.00 $840,250.00 $1,182,204.25 $1,182,204.25 $7.50 $5,625.00 $7.50 $5,625.00 $7.50 $5,625.00 $26.45 $159,943.15 $18.00 $108,846.00 $24.27 $146,760.69 $26.45 $6,612.50 $19.00 $4,750.00 $25.34 $6,335.00 $287.49 $13,224.54 $205.00 $9,430.00 $209.10 $9,618.60 $130.01 $26,002.00 $91.00 $18,200.00 $112.20 $22,440.00 $87.26 $237,870.76 $78.00 $212,628.00 $75.48 $205,758.48 $100.01 $303,930.39 $91.00 $276,549.00 $84.66 $257,281.74 $105.74 $102,990.76 $86.00 $83,764.00 $79.56 $77,491.44 $3.89 $9,713.33 $3.50 $8,739.50 $3.32 $8,290.04 $9.97 $18,085.58 $6.50 $11,791.00 $2.55 $4,625.70 $96.43 $2,892.90 $32.00 $960.00 $69.96 $2,098.80 $38.26 $87,462.36 $25.00 $57,150.00 $35.77 $81,770.22 $59.82 $36,310.74 $41.50 $25,190.50 $51.77 $31,424.39 $74.18 $13,574.94 $45.00 $8,235.00 $70.70 $12,938.10

BID TABULATION Page 7 of 10 G. P.'s Enterprises, Inc. Ohmshiv Construction, LLC. Strickland & Sons Pipeline, Inc. Units Unit Price Total Price Unit Price Total Price Unit Price Total Price 026 Concrete Valley Gutter, 6 In 80 SY 027 Concrete Valley Gutter, 8 In 301 SY 028 Concrete Curb & Gutter, 8 In X 30 In, Type 2 5696 LF 029 Sawed Joints in Exist Pavements - PAC 178 LF 030 Class B Concrete - Plug Pipe 1 CY 031 Class B Concrete, Base Or Pavement Widening 42 CY 032 Storm Drain Pipe, 18 In, H 1-10 1963 LF 033 Storm Drain Pipe, 30 In, H 1-10 40 LF 034 Storm Drain Pipe, 36 In, H 1-10 316 LF 035 Storm Drain Pipe, 36 In, H 10-15 153 LF 036 Storm Drain Pipe, 60 In, H 1-10 192 LF 037 Side Drain Pipe, 18 In, H 1-10 109 LF 038 Safety End Section 18 In, Storm Drain, 4:1 Slope 3 EA 039 Safety End Section 18 In, Side Drain,4:1 Slope 6 EA 040 Flared End Section, 18 In, Storm Drain 1 EA 041 Flared End Section, 30 In, Storm Drain 1 EA 042 Flared End Section, 36 In, Storm Drain 1 EA 043 Underdrain Pipe Incl Drainage Aggr, 6 In 200 LF 044 Stn Dumped Rip Rap, Type 3, 18 In 160 SY 045 Plastic Filter Fabric 160 SY 046 Rem Highway Sign, STD 1 EA 047 Reconstr Catch Basin, Group 1 2 EA 048 Reconstr Storm Sewer Manhole, Type 1 5 EA 049 Reset Highway Sign 1 EA 050 Adjust Manhole To Grade 2 EA $67.60 $5,408.00 $32.00 $2,560.00 $53.07 $4,245.60 $79.36 $23,887.36 $40.00 $12,040.00 $55.63 $16,744.63 $19.65 $111,926.40 $15.00 $85,440.00 $18.84 $107,312.64 $7.21 $1,283.38 $3.00 $534.00 $4.20 $747.60 $1,912.50 $1,912.50 $110.00 $110.00 $1,112.35 $1,112.35 $382.06 $16,046.52 $120.00 $5,040.00 $262.35 $11,018.70 $53.49 $105,000.87 $32.00 $62,816.00 $37.86 $74,319.18 $99.90 $3,996.00 $62.00 $2,480.00 $71.71 $2,868.40 $102.68 $32,446.88 $80.00 $25,280.00 $83.53 $26,395.48 $113.02 $17,292.06 $88.00 $13,464.00 $96.53 $14,769.09 $295.21 $56,680.32 $205.00 $39,360.00 $194.37 $37,319.04 $45.03 $4,908.27 $30.00 $3,270.00 $33.86 $3,690.74 $851.82 $2,555.46 $650.00 $1,950.00 $1,455.90 $4,367.70 $827.18 $4,963.08 $650.00 $3,900.00 $779.75 $4,678.50 $830.10 $830.10 $750.00 $750.00 $854.46 $854.46 $1,128.11 $1,128.11 $1,200.00 $1,200.00 $1,238.50 $1,238.50 $1,682.90 $1,682.90 $1,500.00 $1,500.00 $1,807.65 $1,807.65 $18.21 $3,642.00 $10.00 $2,000.00 $31.31 $6,262.00 $74.21 $11,873.60 $40.00 $6,400.00 $60.50 $9,680.00 $14.91 $2,385.60 $4.00 $640.00 $5.21 $833.60 $253.75 $253.75 $65.00 $65.00 $150.00 $150.00 $5,217.48 $10,434.96 $1,650.00 $3,300.00 $1,802.50 $3,605.00 $3,727.80 $18,639.00 $1,500.00 $7,500.00 $1,467.00 $7,335.00 $276.00 $276.00 $65.00 $65.00 $150.00 $150.00 $2,474.60 $4,949.20 $1,500.00 $3,000.00 $1,000.00 $2,000.00

BID TABULATION Page 8 of 10 G. P.'s Enterprises, Inc. Ohmshiv Construction, LLC. Strickland & Sons Pipeline, Inc. Units Unit Price Total Price Unit Price Total Price Unit Price Total Price 051 Right of Way Markers 46 EA 052 Highway Signs, Type 1 Material, Refl Sheeting, Type 3 128 SF 053 Highway Signs, Type 1 Material, Refl Sheeting, Type 11 146 SF 054 Highway Signs, Type 2 Material, Refl Sheeting, Type 11 181 SF 055 Galv Steel Posts, Type 7 519 LF 056 Guardrail, Type W 250 LF 057 Guardrail Anchorage, Type 1 1 EA 058 Guardrail Anchorage, Type 12 1 EA 059 Thermoplastic Pavement Marking, Arrow, Type 2 58 EA 060 Thermoplastic Pavement Marking, Arrow, Type 3 4 EA 061 Thermoplastic Pavement Marking, Word, Type 1 2 EA 062 Thermoplastic Solid Traffic Stripe, 24 In, White 402 LF 063 Thermoplastic Solid Traffic Stripe, 8 In, White 5750 LF 064 Thermoplastic Traffic Striping, White 901 SY 065 Thermoplastic Traffic Striping, Yellow 81 SY 066 Wet Weather Thermoplastic Solid Traffic Stripe, 5 In, White 11747 LF 067 Wet Weather Thermoplastic Solid Traffic Stripe, 5 In, Yellow 9509 LF 068 Wet Weather Thermoplastic Skip Traffic Stripe, 5 In, White 6103 GLF 069 Wet Weather Thermoplastic Skip Traffic Stripe, 5 In, Yellow 3642 GLF 070 Raised Pavement Markers Type 1, Type 2 & Type 3 465 EA 071 Raised Pavement Markers Type 10 6 EA 072 Preformed Plastic Solid Pavement Mkg, 8 In, White, Type Pub 1332 LF 073 Catch Basin, Gap 1 16 EA 074 Catch Basin, Gap 1, Spcl Design 3 EA $223.00 $10,258.00 $95.00 $4,370.00 $72.10 $3,316.60 $17.76 $2,273.28 $17.00 $2,176.00 $24.48 $3,133.44 $19.73 $2,880.58 $20.00 $2,920.00 $26.52 $3,871.92 $44.39 $8,034.59 $50.00 $9,050.00 $51.47 $9,316.07 $9.89 $5,132.91 $8.00 $4,152.00 $10.20 $5,293.80 $30.96 $7,740.00 $23.50 $5,875.00 $25.30 $6,325.00 $1,711.08 $1,711.08 $1,175.00 $1,175.00 $1,224.30 $1,224.30 $2,872.07 $2,872.07 $2,350.00 $2,350.00 $2,503.60 $2,503.60 $113.31 $6,571.98 $80.00 $4,640.00 $82.50 $4,785.00 $196.63 $786.52 $160.00 $640.00 $165.00 $660.00 $196.63 $393.26 $160.00 $320.00 $165.00 $330.00 $9.33 $3,750.66 $7.00 $2,814.00 $8.25 $3,316.50 $6.94 $39,905.00 $2.60 $14,950.00 $2.75 $15,812.50 $7.89 $7,108.89 $5.50 $4,955.50 $5.10 $4,595.10 $13.89 $1,125.09 $5.50 $445.50 $5.50 $445.50 $2.32 $27,253.04 $1.60 $18,795.20 $1.72 $20,204.84 $2.22 $21,109.98 $1.60 $15,214.40 $1.72 $16,355.48 $1.68 $10,253.04 $1.15 $7,018.45 $1.21 $7,384.63 $1.38 $5,025.96 $1.15 $4,188.30 $1.21 $4,406.82 $6.89 $3,203.85 $5.50 $2,557.50 $5.50 $2,557.50 $14.89 $89.34 $5.50 $33.00 $5.50 $33.00 $9.33 $12,427.56 $7.15 $9,523.80 $8.25 $10,989.00 $3,819.49 $61,111.84 $2,500.00 $40,000.00 $3,082.69 $49,323.04 $4,309.75 $12,929.25 $2,500.00 $7,500.00 $3,975.19 $11,925.57

BID TABULATION Page 9 of 10 G. P.'s Enterprises, Inc. Ohmshiv Construction, LLC. Strickland & Sons Pipeline, Inc. Units Unit Price Total Price Unit Price Total Price Unit Price Total Price 075 Catch Basin, Gap 1, Addl Depth 3 LF 076 Drop Inlet, Gap 1 7 EA 077 Drop Inlet, Gap 1, Addl Depth 7 LF 078 Storm Sewer Manhole, Type 1 10 EA 079 Storm Sewer Manhole, Type 1, Addl Depth, Cl 2 17 LF 080 Outlet Control Structure 1 EA 081 Grassing Complete Project F-1059 1 LS $622.75 $1,868.25 $195.00 $585.00 $390.75 $1,172.25 $3,543.75 $24,806.25 $2,200.00 $15,400.00 $1,927.62 $13,493.34 $622.85 $4,359.95 $195.00 $1,365.00 $390.75 $2,735.25 $3,316.00 $33,160.00 $2,250.00 $22,500.00 $2,564.75 $25,647.50 $519.45 $8,830.65 $275.00 $4,675.00 $310.50 $5,278.50 $8,925.50 $8,925.50 $9,500.00 $9,500.00 $7,315.00 $7,315.00 $52,679.20 $52,679.20 $72,500.00 $72,500.00 $75,330.00 $75,330.00 Traffic Signal 082 Prestressed Concrete Strain Pole, Type IV 8 EA 083 Traffic Signal Installation No. 1, Sir 324 At Jim Moore/Old Fountain Rd 1 LS 084 Traffic Signal Installation No. 2, Sir 324 At Dacula Rd 1 LS 085 Pull Box, PB-5 2 EA $8,459.38 $67,675.04 $9,850.00 $78,800.00 $7,713.29 $61,706.32 $149,978.96 $149,978.96 $151,250.00 $151,250.00 $105,956.92 $105,956.92 $133,374.78 $133,374.78 $135,250.00 $135,250.00 $105,353.90 $105,353.90 $2,538.41 $5,076.82 $1,800.00 $3,600.00 $1,370.15 $2,740.30 ATMS 086 Pull Box, PB-7 7 EA 087 Conduit, Nonmetl, Type 3, 2 In 6440 LF 088 Directional Bore, 5 In 3155 LF 089 Outside Plant Fiber Optic Cable, Loose Tube, Single Mode, 72 Fiber 2455 LF 090 Outside Plant Fiber Optic Cable, Drop, Single Mode, 12 Fiber 315 LF 091 Fiber Optic Closure, Underground, 72 Fiber 3 EA 092 Fiber Optic Closure, DC (Wall Mounted), 12 Fiber 2 EA 093 Fiber Optic Splice, Fusion 160 EA 094 Field Switch Type A 2 EA $1,867.91 $13,075.37 $1,800.00 $12,600.00 $2,164.57 $15,151.99 $4.29 $27,627.60 $3.65 $23,506.00 $4.09 $26,339.60 $14.90 $47,009.50 $14.05 $44,327.75 $15.23 $48,050.65 $6.94 $17,037.70 $4.50 $11,047.50 $2.09 $5,130.95 $9.13 $2,875.95 $5.80 $1,827.00 $2.63 $828.45 $929.68 $2,789.04 $650.00 $1,950.00 $786.49 $2,359.47 $920.68 $1,841.36 $650.00 $1,300.00 $731.03 $1,462.06 $68.55 $10,968.00 $40.00 $6,400.00 $44.03 $7,044.80 $2,521.67 $5,043.34 $2,100.00 $4,200.00 $2,231.48 $4,462.96

BID TABULATION Page 10 of 10 G. P.'s Enterprises, Inc. Ohmshiv Construction, LLC. Strickland & Sons Pipeline, Inc. Water & Sewer Units 095 Adjust Manhole Frame And Cover To Grade - 1 Vertical Ft or Less - Pavement 7 EA 096 Adjust Manhole Frame And Cover To Grade - 1 Vertical Ft or Less - Non- Pavement 5 EA 097 Adjust Water Vault 5 VF 098 Adjust Water Vault Top to Grade - 1 Vertical Ft or Less, Non-Pavement 1 EA 099 Adjust Manhole Barrel 4 VF 100 House Service Connection - 3/4 In - 1 In, Short Side Complete 17 EA 101 House Service Connection - 3/4 In - 1 In, Long Side Complete 2 EA 102 Relocation And/or Reconnection Of Existing Fire Hydrants 6 EA 103 Adjust Fire Hydrants 1 VF 104 Adjust Valve Box 14 EA Unit Price Total Price Unit Price Total Price Unit Price Total Price $1,994.88 $13,964.16 $1,250.00 $8,750.00 $335.50 $2,348.50 $1,715.45 $8,577.25 $750.00 $3,750.00 $260.50 $1,302.50 $2,050.00 $10,250.00 $1,500.00 $7,500.00 $712.25 $3,561.25 $3,150.00 $3,150.00 $5,000.00 $5,000.00 $253.50 $253.50 $1,018.78 $4,075.12 $500.00 $2,000.00 $462.25 $1,849.00 $1,827.36 $31,065.12 $1,050.00 $17,850.00 $2,054.13 $34,920.21 $1,220.31 $2,440.62 $1,250.00 $2,500.00 $3,453.02 $6,906.04 $1,945.59 $11,673.54 $2,000.00 $12,000.00 $785.75 $4,714.50 $1,249.92 $1,249.92 $1,500.00 $1,500.00 $1,336.15 $1,336.15 $1,057.00 $14,798.00 $175.00 $2,450.00 $101.75 $1,424.50 TOTAL $3,241,774.35 $2,948,258.90 $3,473,586.17 Recommended Vendor: Ohmshiv Construction, LLC Attn: Naresh Bhanderi 1805 Herrington Road, Building #3, Suite E Lawrenceville, GA 30043 Phone: 404-987-0020 Fax: 404-410-4936 Email: naresh@ohmshiv.com