Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Similar documents
Transcription:

Page 1 of 5 518102 EMERY SAPP & SONS INC SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020001 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) NON-PART 4 070580 FLAGGER (SET PRICE) 5 025600 FIELD OFFICE AND LABORATORY (TYPE A) Section Totals: Life Cycle Costs: 1.000 HOUR 1.000 EACH 535,064.00000 535,064.00 384,300.00000 384,300.00 1.00000 1.00 0.00000 0.00 4,000.00000 4,000.00 4,000.00000 4,000.00 25.00000 25.00 25.00000 25.00 9,461.00000 9,461.00 10,500.00000 10,500.00 $548,551.00 $398,825.00 Section Total with LCC: $548,551.00 $398,825.00

Page 2 of 5 518102 EMERY SAPP & SONS INC SECTION: 02 CONCRETE SURFACING ITEMS Cat Alt Set: Cat Alt Member: LCC: 6 012420 ROCK EXCAVATION 7 071265 CONCRETE PAVEMENT ( 8.5" UNIFORM) (AE) (NRDJ) 8 081050 PAVEMENT EDGE WEDGE (ROCK) 9 011478 WATER (EARTHWORK COMPACTION) (SET PRICE) 10 000012 CONCRETE PAVEMENT SMOOTHNESS Section Totals: Life Cycle Costs: 13,187.000 CUYD 57,478.000 SQYD 1,290.000 TON 1.000 MGAL 22.00000 290,114.00 29.00000 382,423.00 49.10000 2,822,169.80 51.00000 2,931,378.00 28.00000 36,120.00 50.00000 64,500.00 35.00000 35.00 35.00000 35.00 1.00000 1.00 1.00000 1.00 $3,148,439.80 $3,378,337.00 Section Total with LCC: $3,148,439.80 $3,378,337.00

Page 3 of 5 518102 EMERY SAPP & SONS INC SECTION: 03 TRAFFIC CONTROL ITEMS Cat Alt Set: Cat Alt Member: LCC: 11 072116 TRAFFIC CONTROL (INITIAL SETUP) 12 070916 PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I) 13 070917 PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II) 14 070912 PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) 15 013019 PAVEMENT MARKING REMOVAL 16 025331 WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 17 025332 WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 18 025376 WORK ZONE BARRICADES (TYPE 3-4 TO 12 LIN. FT.) 19 011492 CHANNELIZER (PORTABLE) 791.300 STAL 480.800 STAL 167.000 STAL 18,455.000 LNFT 3,855.000 3,345.000 1,350.000 22,890.000 28,500.00000 28,500.00 28,500.00000 28,500.00 83.00000 65,677.90 83.00000 65,677.90 25.00000 12,020.00 25.00000 12,020.00 50.00000 8,350.00 50.00000 8,350.00 0.40000 7,382.00 0.40000 7,382.00 0.10000 385.50 0.90000 3,469.50 0.15000 501.75 0.95000 3,177.75 0.45000 607.50 0.45000 607.50 0.05000 1,144.50 0.05000 1,144.50

Page 4 of 5 518102 EMERY SAPP & SONS INC SECTION: 03 TRAFFIC CONTROL ITEMS Cat Alt Set: Cat Alt Member: LCC: 20 025343 WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 21 070619 RIGID RAISED PAVEMENT MARKER (TYPE I) 22 025308 TRAFFIC SIGNAL INSTALLATION (TEMPORARY) Section Totals: Life Cycle Costs: 2,865.000 110.000 EACH 0.40000 1,146.00 0.40000 1,146.00 15.00000 1,650.00 15.00000 1,650.00 59,000.00000 59,000.00 40,000.00000 40,000.00 $186,365.15 $173,125.15 Section Total with LCC: $186,365.15 $173,125.15 Contract Item Totals Contract Time Totals $3,883,355.95 $3,950,287.15 Contract Life Cycle Costs Totals $0.00 $0.00 Contract Grand Totals ( ) indicates item is bid as Lump Sum $3,883,355.95 $3,950,287.15

Page 5 of 5 518102

Vendor Ranking 518102 Page 1 of 1 NHPP-A507(001) Rank Vendor ID/Name Total Bid Percent Of Low Bid 1 02189 EMERY SAPP & SONS INC $3,883,355.95 100.00% 2 00149 KOSS CONSTRUCTION CO $3,950,287.15 101.72%