The Need for Flexibility in Power Plants with CCS

Similar documents
Transcription:

The Need for Flexibility in Power Plants with CCS John Davison IEA Greenhouse Gas R&D Programme Workshop on operating flexibility of power plants with CCS Imperial College, London, 11 th -12 th November 2009

Outline of the Presentation How flexible will CCS plants need to be? Variability in electricity demand By how much will CO 2 emissions need to be reduced Characteristics of the other generation technologies that will be used to reduce CO 2 emissions Can we avoid the need for CCS plant flexibility?

Electricity Demand 60 Electricity demand, GW 50 40 30 20 10 Winter maximum Summer minimum 0 0 4 8 12 16 20 24 28 32 36 40 44 48 Half-hour period UK, 2008-9

Electricity generation, GW 60 50 40 30 20 10 0 Electricity generation Intermediate/ peak load Base load (59% of total generation) Do we need to reduce emissions from intermediate and peak load? Intermediate/peak load 0 2000 4000 6000 8000 10000 Hours Data source: UK, 2008-9

The Need for Deep Reductions in Emissions G8 meeting, L Aquila, Italy 2009: The G8 countries have committed to reduce their greenhouse gas emissions by 80% or more by 2050 with reference to 1990 or more recent years. G8 countries committed to undertake significant comparable mid-term reductions, coherent with the long term objectives.

CO 2 Emissions Difficult to reduce emissions Residential and other sectors Transport Manufacturing and construction Public power and heat production Other energy industries Near-zero emissions needed IEA 2007 data, excludes land-use change

Techniques for Emission Reduction Energy efficiency improvements Land-use changes Changing to lower carbon fuels (coal to gas) Renewable energy Nuclear CCS

Impact of Renewable and Nuclear Energy Large increases in renewables are expected EU s Renewable Energy Directive commits to 20% of overall energy from renewable sources by 2020. For electricity a greater fraction may be required E.g. ~35% in the UK Wind, solar, tides etc have variable outputs Use of nuclear is expected to increase in some countries, decrease in others Nuclear plants are relatively inflexible

Impact of Renewable and Nuclear Energy Marginal operating cost merit order Wind / solar etc Nuclear Fossil fuels with CCS / Biomass Fossil fuels without CCS Low marginal cost, operate whenever available Higher marginal cost, operate at lower load factor

Fossil Fuel Power Generation 60 Electricity generation, GW 50 40 30 20 10 Electricity demand 35% wind 35% wind 22% nuclear 0 0 2000 4000 6000 8000 10000 Hours Data sources: UK power demand 2008-9 Wind energy scaled from current UK output

Load factor, % 100 90 80 70 60 50 40 30 20 10 0 Fossil Fuel Plant Load Factors 35% wind, 22% inflexible nuclear generation 0 10 20 30 40 50 60 70 80 90 100 % of annual fossil fuel generation Such low load factors would only be required for CCS plants in very low emission scenarios

Variability of Wind Generation Electricity generation Time HV grid connected wind in the UK, May 2009

Electricity Supply from Non-Wind Plant 50 Electricity, GW 40 30 20 10 0 0 200 400 600 800 1000 1200 1400 Half-hourly data points Electricity demand Demand minus wind generation Basis: UK, May 2009, wind scaled to 35% of total generation

Rate of Change of Load Impact of wind generation on fossil fuel power plants 6 GW change per half hour 5 4 3 2 1 System with 35% wind System with no wind 0 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 Half-hour periods Basis: UK power demand (maximum 59GW) 22% of generation from inflexible plants Wind output scaled from current system output

Economic Implications CCS plants are capital intensive Operation at low load factors increases costs This may not be a significant problem There is limited competition to CCS for intermediate load generation with low-co 2 emissions Hydro and biomass have major resource constraints Prices of intermediate load power will be higher in a carbon-constrained world

Can the Need for Flexibility be Avoided? Smart grids, load shifting etc to smooth demand Electricity storage Pumped hydro, compressed air storage, flow batteries etc Electrolysis to produce hydrogen an expensive option Include energy storage in CCS processes Solvent storage in post combustion capture (short term) Oxygen storage in IGCC and oxy-combustion (short term) Hydrogen storage in gasification combined cycles (short and long term)

Integrated Gasification Combined Cycle Coal Gasification and pre-combustion capture CO 2 compression CO 2 transport and storage Hydrogenrich gas Combined cycle power plant Power Air Flue gas

Gasification Combined Cycle with H 2 Storage Coal Gasification and pre-combustion capture CO 2 compression CO 2 transport and storage Hydrogenrich gas On-site power generation Flue gas Base load capture plant Flexible load power plant Hydrogen storage Air Combined cycle plant Flue gas Power

Gasification Combined Cycle with H 2 Storage Gasification, capture and storage can operate at base load no need for flexibility Only the combined cycle plant has to operate flexibly High utilisation of capital investment Underground hydrogen storage is proven technology, e.g. in salt caverns in Texas and UK Small cost and efficiency penalties for non-integrated base load plants Large cost advantage for intermediate load plants 99% CO 2 capture is possible

Conclusions CCS flexibility requirements depend on external factors: Variability of electricity demand The overall GHG abatement requirement The amount of wind and nuclear in the system Developments in electricity system load management Some CCS plants will be able to operate at base load if there is a modest CO 2 abatement requirement, little wind and nuclear or high load management Most CCS plants will probably have to operate flexibly Including energy storage in some CCS processes can be an effective way to reduce the need for flexible operation