CODE MODIFICATION PROPOSAL No xxxx <Disposal of Dynevor Arms LNG Storage Facility> Version x.x Date: 04/11/2008. Non Urgent

Similar documents
UNC B5.2.2 stipulates that Users are permitted to propose a System Capacity Transfer at any point during a Day but no later than 04:00.

Draft Modification Report Revision of the Gas Balancing Alert (GBA) Trigger/Safety Monitor Modification Reference Number 0257 Version 1.

Joint Office of Gas Transporters 0212: Revision of the Rough Storage Connection Agreement

Users may then choose contract with xoserve directly for the provision of this report on a commercial basis. The Proposal

Joint Office of Gas Transporters

1 The Modification Proposal

UNC 0645S: Amending the oxygen content limit in the Network Entry Agreement at South Hook LNG. UNC Final Modification Report.

Modification Report Facilitating a Supply Point Enquiry Service for Non-Domestic Supply Points Modification Reference Number 0296 Version 5.

CODE MODIFICATION PROPOSAL No 0115A Correct Apportionment of NDM Error Version 1.0. Non Urgent

Operating Margins Report July 2016

1 The Modification Proposal

Procurement Guidelines Report Procurement Guidelines Report

NGG NTS considers that the proposal would improve the facilitation of relevant objectives (a), (e) and (f)1 as follows:

Distribution System ManagementConstraint Management Principles Statement

This proposal will outline a solution that will enable suppliers to be compliant with the EU three week switching directive.

Proposer s preferred route through modification procedures and if applicable, justification for Urgency

UNC 0621C: Amendments to Gas Transmission Charging Regime. UNC Modification. 01 Modification

Joint Office of Gas Transporters

LDZ Energy Loss Final Estimates Financial Year 2015/16

Agency Charging Statement. Applies from 9 May 17 February 2014

LDZ Energy Loss Initial Proposals. Financial Year 2018/19

Amendment to Gas Quality NTS Entry Specification at BP Teesside System Entry Point

CODE REVIEW PROPOSAL No 0251 Review of the Determination of Daily Calorific Values Version 1.0 Date: 06/04/2009

UNC 0671: UNC Modification

UNC 0671: UNC Modification

UNC 0621: Amendments to Gas Transmission Charging Regime. UNC Workgroup Report. 01 Modification. 02 Workgroup Report

The Proposer recommends that this Modification should be treated as urgent and should proceed as such under a timetable agreed with the Authority.

0404: Profiling payment of LDZ capacity transportation charges for Small Shipper Organisations. Stage 01: Proposal

System Management Principles Statement. UK Transmission. Effective from 1 April 2017

LDZ Shrinkage Quantity Initial Proposals. Formula Year 2016/17

To be confirmed by the Joint Office. Background to the modification proposal

Transco NTS Response to UNC Modification Proposal 0035 Revisions to Section Q to Facilitate the Revised NEC Safety Case

IGT103: Inclusion of reference within IGT UNC to UNC TPD Section G paragraph inclusive - Meter Point Portfolio Reconciliation

UNC 0630R: Review of the consequential changes required in UNC as a result of the Ofgem Switching Programme. UNC Request Workgroup Report

The Proposer recommends that this Modification should be treated as urgent and should proceed as such under a timetable agreed with the Authority.

0389S: Simplification of points of telemetry. Stage 04: Final Modification Report

The Proposer recommends that this Modification should be treated as urgent and should proceed as such under a timetable agreed with the Authority.

Representation - Draft Modification Report UNC 0621; 0621A; 0621B; 0621C; 0621D; 0621E; 0621F; 0621H; 0621J; 0621K*; 0621L

National Grid Grain LNG Ltd. Third Party Access Arrangements. Guide for prospective Secondary Capacity customers 2017/18

Individual Settlements For Pre- Payment & Smart Meters

Representation - Draft Modification Report UNC A 0636B 0636C 0636D Updating the parameters for the NTS Optional Commodity Charge

UNC 0678G: Amendments to Gas Transmission Charging Regime including a Cost based Optional Capacity Charge. UNC Modification

By 22 nd June 2018

UNC 0621A: Amendments to Gas Transmission Charging Regime. UNC Final Modification Report. 01 Modification. 02 Workgroup Report

The Generic Entry and Exit Revenue Driver Methodology Statement

UNC 0641S: Amendments to Modification Shipper/Transporter - Meter Point Portfolio Reconciliation rules and obligations. UNC Workgroup Report

LDZ Shrinkage Quantity Initial Proposals Formula Year 2019/20. December 2018

Stage 01: Modification Proposal. Grid Code. What stage is this document at? Purpose of Modification:

CDSP SERVICE DOCUMENT CDSP SERVICE DESCRIPTION

DISCUSSION DOCUMENT Modification Proposal to the Gas Transmission Transportation Charging Methodology & Associated UNC and Licence Issues

igt Agency Services The relevant extract from GT UNC TPD V6.5 is shown in appendix 1. Final version December 2013 igt Agency Services industry report

Joint Office of Gas Transporters. Re: Modification Proposals 0116V/116VD/0116A/0116BV/0116CV: Reform of the NTS Offtake Arrangements

Re: UNC Modication Proposal Removal of the Zero Auction Reserve Price for Within-day Daily NTS Entry Capacity (WDDSEC)

EU Gas Balancing Code - Daily Nominations at Interconnection Points (IP)

The Entry Capacity Transfer and Trade Methodology Statement

Use of Market Sector Flag to determine Customer Status

0584: Energy Theft Tip-Off Service (ETTOS) Release of Supplier identity. Stage 01: Modification

Gas Transportation Transmission Planning Code

UNC 0616: Capacity Conversion Mechanism for Interconnection Points. UNC Modification. 01 Modification. 02 Workgroup Report

Northern Gas Networks Limited Metering Charges Statement METERING CHARGES. Effective from: 1 May 2018

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

0389VS: Simplification of points of telemetry u. Stage 03: Draft Modification Report

LDZ Shrinkage Factors Initial Proposals Gas Year 2006/7

UNC 0658 (Urgent): CDSP to identify and develop improvements to LDZ settlement processes. UNC Modification

CM067: National Grid Legal Separation - consequential. into STC Section B and changes to STC Modification Panel membership to add NGESO as Member.

PROPOSED AMENDMENT REPORT

CMP281: Removal of BSUoS Charges From Energy Taken From the National Grid System by Storage Facilities. CUSC Modification Proposal Form

Re: Modification Proposals 0116V/0116VD/0116A/0116BV/0116CV: Reform of the NTS Offtake Arrangements

for it and announcing the start date. Review Phase shall end either: be issued in relation to the STC; or issued by the Authority; or Code Review

Initial Proposals of LDZ Shrinkage Quantity North East and Northern LDZ Formula Year 2017/18

UNC 0647: Opening Class 1 reads to Competition. UNC Modification

UNC 0661R: Reconciliation and Imbalance Cash Out Prices. UNC Request Workgroup Report. 01 Request. 02 Workgroup Report. Purpose of Request:

AMENDMENT REPORT. STC Proposed Amendment CA039 Amendment of outage planning timescales to enable more coordinated outage planning

COMMISSION DECISION. of on the application of Article 9(9) of Directive 2009/72/EC to Transmission System Operation in Scotland

The relevant Transporter is the party who needs and actively uses the ECI to manage load reduction and pressure management on their Networks.

Improving the information given to Shippers when there is a requested disconnection

All presentations given at this Modifications Panel meeting can be found in the Meeting documents area on the National Grid website 1.

Representation - Draft Modification Report UNC 0621; 0621A; 0621B; 0621C; 0621D; 0621E; 0621F; 0621H; 0621J; 0621K*; 0621L

Compliance Statement. National Grid Gas plc

Shipper and Supplier Theft of Gas Reporting Arrangements

Description of the Issue or Defect that the CUSC Modification Proposal seeks to address

NAPRANUM ABORIGINAL SHIRE COUNCIL. POLICY STATEMENT. Procurement Policy. Authority in respect of this Policy is hereby delegated to CEO

Representation - Draft Modification Report 0541A/B

CM061: Amendment to the OFTO STC Panel Representative election process

European Commission s proposal for a revised Electricity Directive

Business Principles. For. Invoicing. Xoserve Project Nexus

Gas transmission. Baseline capacities and access Options for RIIO2. Shankar Rajagopalan (Baseline capacity) Lea Slokar (Access arrangements) 08/11/18

IGT119: Opening Class 1 read services on IGT Meter Supply Points to Competition. modification

High Impact: All parties that pay NTS Transportation Charges and/or have a connection to the NTS, and National Grid NTS

DRAFT FOR COMMENT. Comments should be sent to by * September 2005 PROPOSED AMENDMENT REPORT

European Developments

GLOSSARY OF DEFINITIONS

The Statement for Gas Transmission Connection Charging

V April March NTSCMF / Sub Group Forecasting Contracted Capacity (FCC)

CMP282: The effect Negative Demand has on Zonal Locational Demand Tariffs

Representation. British Gas supports both modification proposals with a preference for 0442.

CENTRAL DATA SERVICES PROVIDER ANNUAL CHARGING STATEMENT. For the period 1 st APRIL st MARCH 2019

Transmission Planning Code April 2015 v4.1

CENTRAL DATA SERVICES PROVIDER ANNUAL CHARGING STATEMENT. For the period 1 st APRIL st MARCH 2019

Transcription:

CODE MODIFICATION PROPOSAL No xxxx <Disposal of Dynevor Arms LNG Storage Facility> Version x.x Date: 04/11/2008 Proposed Implementation Date: [1/2/2009] Urgency: Non Urgent 1 The Modification Proposal a) Nature and Purpose of this Proposal On 4 th November 2008 National Grid Gas (NGG) announced its intention to dispose of its liquefied natural gas (LNG) storage facility located at Dynevor Arms in South Wales. This Modification Proposal seeks to amend the UNC to facilitate the orderly disposal of the facility as a going concern and provide clarity to Users with regards to the amount of capacity that National Grid NTS acting as operator of the National Grid LNG Storage Facilities (National Grid LNG Storage) proposes to make available for sale at the Dynevor Arms facility for the 2009/10 Storage Year and beyond. Background The Dynevor Arms LNG storage facility currently provides operating margins services to National Grid NTS, in its role as the gas transmission system operator, and commercial storage services and tanker filling arrangements to gas shippers and other parties. Furthermore, the Dynevor Arms facility is currently identified as a Constrained Storage Facility within section R, paragraph 4.1.1 of the Transportation Principle Document (TPD), although National Grid NTS has only specified a minimum inventory level for the facility in one out of the last nine storage years (this was the 2003/04 Storage Year when a minimum inventory level of 4% was specified for the start of the winter period). Based on information set out in its Gas Operating Margins: October 2008 Statement published on 31 st October 2008, National Grid NTS has confirmed that it does not now forecast any future requirement for locational Operating Margins services to be provided by the Dynevor Arms facility. National Grid NTS has also confirmed to National Grid LNG Storage that it does not forecast any future need for a constrained storage service at the Dynevor Arms facility. In light of the confirmation from National Grid NTS that it does not require either an operating margins service or a constrained storage service from the Dynevor Arms facility, NGG is proposing to offer the facility for sale. The disposal of the Dynevor Arms facility will require the consent of the Gas and Electricity Markets Authority (GEMA) pursuant to Standard Special Condition A27 (Disposal of Assets) ( SSC A27 ) of NGG s gas transporter all rights reserved Page 1 Version x.x created on 04/11/2008

licence in respect of the NTS. Joint Office of Gas Transporters NGG intends to complete any disposal of the facility as quickly as possible with a view to enabling any purchaser to provide commercial storage services in the 2009/10 Storage Year. For the avoidance of doubt, National Grid LNG Storage does not intend to provide storage services from the Dynevor Arms facility with effect from the end of the current Storage Year (i.e. after 30 April 2009). Proposed Modification Part I National Grid LNG Storage is required to invite applications for Storage Capacity in each National Grid LNG Storage Facility for Storage Year Y by not later than 1 st March in the Storage Year Y-1. Among other things, National Grid LNG Storage s invitation (the Annual Storage Invitation ) must set out the Maximum Storage Capacity (as at the date of the Annual Storage Invitation) that is to be made available for sale at each National Grid LNG Storage Facility. The Maximum Storage Capacity is determined in accordance with section Z, paragraph 2.1.6 of the TPD. As previously stated, it is NGG s intention to seek to dispose of the Dynevor Arms facility as quickly as reasonably practicable. However, in order to avoid a situation in which National Grid LNG Storage is required to sell capacity at the Dynevor Arms facility for the 2009/10 Storage Year (while, potentially, the disposal process is ongoing), thereby preventing any potential purchaser from offering alternative, competing storage services for the same period, National Grid LNG Storage proposes that the UNC be amended to set the Maximum Storage Capacity in respect of the Dynevor Arms facility to zero for the 2009/10 Storage Year and each subsequent Storage Year. In light of the confirmation from National Grid NTS that it does not forecast a need for a constrained storage service from the Dynevor Arms facility, National Grid LNG Storage also proposes that the reference to Dynevor Arms as a Constrained Storage Facility within section R, paragraph 4.1.1 of the TPD be removed at the same time. Part II National Grid LNG Storage also proposes that the reference to the Dynevor Arms facility be removed from the definition of National Grid LNG Storage Facilities set out in section R, paragraph 1.7.1(b) of the TPD with effect from the date on which National Grid LNG Storage ceases to operate the facility on its own behalf following a transfer of ownership of the facility to a third party (which, as highlighted above, will be subject inter alia to NGG receiving consent from GEMA pursuant to SSC A27 of its gas transporter all rights reserved Page 2 Version x.x created on 04/11/2008

licence in respect of the NTS). This would allow National Grid LNG Storage to continue to undertake the physical operations it needs to carry out at the facility (e.g. manage boil-off gas) in the period between the end of the current Storage Year and the date of transfer of ownership. b) Justification for Urgency and recommendation on the procedure and timetable to be followed (if applicable) [Urgent procedures are not requested] c) Recommendation on whether this Proposal should proceed to the review procedures, the Development Phase, the Consultation Phase or be referred to a Workstream for discussion. [National Grid LNG Storage has discussed this issue at the Transmission Workstream and has looked to take industry views into account.] 2 Extent to which implementation of this Modification Proposal would better facilitate the achievement (for the purposes of each Transporter s Licence) of the Relevant Objectives National Grid LNG Storage considers that this Modification Proposal would, if implemented, better facilitate the following Relevant Objectives: In relation to Standard Special Condition A11.1(d)(i), the securing of effective competition between relevant shippers, the Modification Proposal would facilitate the disposal of the Dynevor Arms facility to a third party which, if successful, would increase the extent of competition in the GB gas storage market thereby facilitating competition between shippers. In relation to Standard Special Condition A11.1(a), the efficient and economic operation of the pipeline system, the Modification Proposal would facilitate market testing to determine the most economic outcome for the future of the Dynevor Arms facility. 3 The implications of implementing this Modification Proposal on security of supply, operation of the Total System and industry fragmentation If the Dynevor Arms facility is sold as a going concern, there would be no impact on security of supply. In light of the confirmation by National Grid NTS that it does not now forecast any requirement for locational Operating Margins services, or the need for a Constrained storage service, at the Dynevor Arms facility in the future, National Grid LNG Storage considers that this Modification Proposal, if implemented, would not have an impact on the operation of the Total System. In view of the fact that there are already a number of third-party storage operators, National Grid LNG Storage does not believe that the Modification Proposal, if all rights reserved Page 3 Version x.x created on 04/11/2008

implemented, would have a material impact on industry fragmentation. 4 The implications for Transporters and each Transporter of implementing this Modification Proposal, including: a) The implications for operation of the System: National Grid LNG Storage believes the operation of the System would not be adversely affected by this Modification Proposal. b) The development and capital cost and operating cost implications: Any development, capital or operating costs directly associated with the sale of the Dynevor Arms facility would be for the account of NGG and its shareholders. c) Whether it is appropriate to recover all or any of the costs and, if so, a proposal for the most appropriate way for these costs to be recovered: d) The consequence (if any) on the level of contractual risk of each Transporter under the Uniform Network Code of the Individual Network Codes proposed to be modified by this Modification Proposal No such consequence has been identified 5 The extent to which the implementation is required to enable each Transporter to facilitate compliance with a safety notice from the Health and Safety Executive pursuant to Standard Condition A11 (14) (Transporters Only) Not applicable 6 The development implications and other implications for the UK Link System of the Transporter, related computer systems of each Transporter and related computer systems of Users 7 The implications for Users of implementing the Modification Proposal, including: a) The administrative and operational implications (including impact upon manual processes and procedures) b) The development and capital cost and operating cost implications all rights reserved Page 4 Version x.x created on 04/11/2008

c) The consequence (if any) on the level of contractual risk of Users under the Uniform Network Code of the Individual Network Codes proposed to be modified by this Modification Proposal No consequences on the level of contractual risk have been identified. 8 The implications of the implementation for other relevant persons (including, but without limitation, Users, Connected System Operators, Consumers, Terminal Operators, Storage Operators, Suppliers and producers and, to the extent not so otherwise addressed, any Non-Code Party) The sale of the facility to a third party would improve competition in the gas storage market. 9 Consequences on the legislative and regulatory obligations and contractual relationships of the Transporters None identified. 10 Analysis of any advantages or disadvantages of implementation of the Modification Proposal not otherwise identified in paragraphs 2 to 9 above Advantages If implemented, the Modification Proposal would: facilitate the orderly disposal of the Dynevor Arms facility to a third party; and provide clarity to Users on the level of Storage capacity to be made available by National Grid LNG Storage at the Dynevor Arms facility ahead of the 2009/10 Storage Year. Disadvantages None identified 11 Summary of representations received as a result of consultation by the Proposer (to the extent that the import of those representations are not reflected elsewhere in this Proposal) 12 Detail of all other representations received and considered by the Proposer 13 Any other matter the Proposer considers needs to be addressed all rights reserved Page 5 Version x.x created on 04/11/2008

14 Recommendations on the time scale for the implementation of the whole or any part of this Modification Proposal Proposal discussed at Transmission Workstream 06/11/2008 Proposal submitted to Mod panel [20/11/2008] Proposal issued for consultation (subject to Panel approval) [21/11/2008] Closeout for representations (? Days) [9/1/2009] Modification Panel decide upon recommendation [22/01/2009] FMR submitted to Ofgem [23/01/2009] Proposed implementation date [01/02/2009] 15 Comments on Suggested Text 16 Suggested Text TPD Section R Amend paragraph 1.7.1(b) to read as follows: (b) "National Grid LNG Storage Facilities" means the LNG Facilities which are from time to time operated by National Grid NTS and are located at Glenmavis, Partington and Avonmouth. Amend paragraph 4.1.1 to read as follows: 4.1.1 The National Grid LNG Storage Facility at Avonmouth is a "Constrained Storage Facility" in relation to a Storage Year for the purposes of this paragraph 4. Transition Document Part IIC Amend paragraph 1.4.3 to read as follows: 1.4.3 TPD Section R1.7.1 For the duration of Storage Year 2004/5 relating to the National Grid LNG Isle of Grain Storage Facility, the National Grid LNG Isle of Grain Storage Facility shall be a 'National Grid LNG Storage Facility'. The LNG Facility at Dynevor Arms shall be a National Grid LNG Storage Facility until the date on which National Grid LNG Storage ceases to operate the facility on its own behalf. all rights reserved Page 6 Version x.x created on 04/11/2008

Add new paragraph 1.8 to read as follows: 1.8 TPD Section Z: National Grid LNG Storage Facilities 1.8.1 TPD Section Z2.1.6 For the purposes of TPD Section Z2.1.6, in respect of Storage Year 2009/10 and each subsequent Storage Year until the time at which the LNG Facility at Dynevor Arms ceases to be a National Grid LNG Storage Facility pursuant to paragraph 1.4.3, the Maximum Storage Space, Maximum Storage Deliverability and Maximum Storage Injectability for the National Grid LNG Storage Facility at Dynevor Arms shall each be zero. Code Concerned, sections and paragraphs Uniform Network Code Transportation Principal Document Section(s) R and Z Proposer's Representative Matt Golding (National Grid NTS acting as operator of the National Grid LNG Storage Facilities) Proposer National Grid NTS all rights reserved Page 7 Version x.x created on 04/11/2008