Interoperability beyond traditional BIM Christian Rust Sales Development Manager AEC Emerging Countries Autodesk 2008 Autodesk
What does the Bermuda triangle and AEC industry have in common? Owner Planner Builder Typical challenges on projects Information flow between involved parties Time and cost pressure Buildings are getting more complex
Technologies & Processes available to the Industry Owner Constructor Building Information Model Architect CAD Computer Aided Drafting MEP Engineer BIM Building Information Modeling Structural Engineer IPD Integrated Project Delivery
The Building Information Model Defined Definition Building Information Modeling (BIM) The creation and use of coordinated, internally consistent, computable information about a building project in design and construction. OWNERS BUILDERS BUILDING INFORMATION MODELING ARCHITECTS Image Courtesy of DDB Architectural International Ltd. MEP SYSTEMS ENGINEERS STRUCTURAL ENGINEERS
The benefits of BIM for the AEC industry Visualization Clash detection Marketing Sustainable design Shop drawing coordination Cost estimation Record models Phasing and scheduling Construction monitoring 48% 39% 36% 33% 27% 27% 18% 61% 88% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% Design Intelligence Technology Survey May/June 2008 www.di.net
Case Study 1 ADSK office building Integrated Project Delivery 2006 Autodesk 6
BIM-enabled approach: Integrated Project Delivery (IPD) 1) Early substantive involvement of key participants 2) Joint sharing of risk and reward through a profit/incentive pool 3) Joint project management 4) Zero Litigation
BIM in practice: Design 2006 Autodesk 9
BIM Design Deliverables Lighting Design Collaboration Design/Electrical Model Coordination Model
BIM in practice: Digital Fabrication 2006 Autodesk 11
Millwork Design: Contractor s Visualization Millwork: Fabrication Model
QTO
Construction Process: Coordination
Sustainable Design: Lighting
Sustainable Design: Construction
Results 8 months from 0% design to Certificate of Occupancy 0% change orders 30% owner scope changes delivered in 6.7% less time (compared to baseline project schedule) No Claims No lost time accidents No back charges 7.4% added design quality
Case Study 2 Baltic Arena Poland Eurocup 2012 Structural Engineer: Autorska Pracownia Konstrukcyjna WOJDAK Using: Autodesk Robot Structural analysis & Revit Structure & Autocad Benefits: Leveraged architects Autocad plans Developed structural model in 2 days Able to test multiple design variations and optimize structural setup on the fly Easier communicateon with the client & architect enabled faster decission process
Case Study 4 CET Budapest Planer: ONL Using: Revit Architecture & 3DMax Challenges: Non Standard architecture with cost limits & embedding existing building Advantages: Visualize to understand concept Get collision free building Building to factory design
creating structural element listings [one-to-one relation]
Case Study 5 Tatweer Towers Planer: Burt Hill Using: Autodesk BIM approach Challenge: Very complex & big building 3.9 Mio SF 2 x119 Floors plus 4 (2) Basements Benefits: Saving time, money, Gaining understanding Following material all provided by:
DATA FEASIBILITY DESIGN
GIANT 6 GB FILE SIZE REQUIRES SERIOUS STRUCTURING COMMERCIAL TOWER ONLY SHOWN, RESIDENTIAL HAS SIMILAR STRUCTURE EACH USER WORKS ON A FILE OF MAXIMUM 250 MB
IT CAN T BE DONE IN REVIT
IT MUST BE DONE IN REVIT
AUTODESK SOLUTION ENABLES SEAMLESS EFFICIENT INTERRELATION BETWEEN DESIGNER AND BIM EXPERT MANAGER DATABASE DESIGN REVIT MODEL MAX MODEL
Dubailand Project, mixed use 4.6 M sf
Dubailand Project, mixed use 4.6 M sf
PARAMETRIC SURFACE SUBDIVISION
PARAMETRIC SURFACE SUBDIVISION
STRUCTURAL FRAME GENERATION
BEFORE 2 WEEKS 8 STAFF
AFTER 2 HOURS 2 STAFF
Cities = BIM + IM Project = BIM + IM
Big BIM Small BIM MEGABIM
Case Study 6 looks familiar, or? BIM consultants Omnix & Allcad Using: Revit Arch, Structure, MEP, 3D Max, Navisworks, MS Project, Excel, ACAD Benefits: BOQ with 2d referencing Fast delivery deadline 1st November Clash detection Easier communication with the client, architect & engineers enabled faster decision process and much more..
Case Study 6 YAS Hotel Omnix BIM Services 1. 3d Views And Section For Constructability Review 2. Clash Detection Reports 3. BOQ of all items in BIM model with 2D Drawing cross referencing 4. Rendered Views & Walk-through for interior and overall building Pre- Construction Analysis 5. Construction Progress Review Sheet 6. Construction Simulation 7. As-Built BIM Model AllCAD Services 1. 3d Views And Section For Constructability Review
3d Views And Section For Constructability Review
3d Views And Section For Constructability Review
3d Views And Section For Constructability Review
3d Views And Section For Constructability Review
3d Views And Section For Constructability Review
Clash Clash Detection Detection Reports Reports NWD MODEL HTML REPORT
CLASH REPORT OF TOWER-A (YAS ISLAND) Floors MEP to MEP SGN, AGN to MEP Basement 51 87 LGF 307 677 GF 377 1555 Mezzanine 78 349 Level 01 437 837 Level 02 364 573 Level 03 Level 04 Level 05 Level 06 Level 07 Level 08 - - Total 3142 7473
CLASH REPORT OF TOWER-B (YAS ISLAND) Floors MEP to MEP SGN, AGN to MEP Basement 510 1355 LGF 187 974 GF 533 317 Mezzanine 72 683 Level 01 51 367 Level 02 65 169 Level 03 Level 04 Level 05 26 194 Level 06 - - Level 07 - - Total 1574 4397
Rendered Views & Walk-through for interior and overall building Pre-Construction Analysis
Rendered Views & Walk-through for interior and overall building Pre-Construction Analysis
Rendered Views & Walk-through for interior and overall building Pre-Construction Analysis
(GYPSUM WALL) BOQ with 2D Drawing cross referencing
BOQ with 2D Drawing cross referencing
QUANTITY DELIVERABLES 1 Foundation 2 RCC Column Schedule 3 RCC Wall Schedule 4 RCC Slab Schedule 5 RCC Beam Schedule 6 Wall Schedule 7 Curtain Wall Schedule 8 Exterior Glazing Schedule 9 Door Schedule 10 Window Schedule 11 Flooring Schedule 12 Reflected Ceiling Schedule 13 Staircase Schedule 14 Balustrade Schedule FLOOR WISE QUANTITY LIST FOR FOLLOWING SERVICES. 1 Electrical Power, Light & Auxiliary 2 HVAC Works 3 Fire Protection Works 4 Water Supply & Drainage
Construction Progress Review Sheet SEGREGATED BROKEN MODEL STAIRCASE CURTAIN WALLS COREWALLS BLOCK WALLS SLAB & COLUMNS
As-Built BIM Model for preventive maintenance
As-Built BIM Model for corrective maintenance
As-Built BIM Model for Facility Management
Case Study 6 YAS hotel Thanks to: Omnix and AllCAD ALDAR and Al Futtaim Cedric Carr Rajinder Lall 7473+4397=11870 Clashes solved