Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 1 09/08/20 101082 D01 UBI FY21 Use a consultant to perform underwater bridge inspections. Consultant to perform underwater bridge inspections for approximately twenty structures in rict 1. 01/04/21 105680 D01/D02 ENV FY21 Task Environmental task order agreement for rict 1 and rict 2. focused mainly on projects in ricts 1 and 2. The duration 05/03/21 102862 D01 GPR FY22 Hire a firm by way of Task Agreement to perform Ground Penetrating Radar inspection on various structures and pavements. 24 month agreement. Ground penetrating radar (GPR) services on various structures and pavements. The completion time will be 24 months from the date of authorization to proceed. The maximum prime compensation shall not exceed $200,000. 01/10/22 105682 D01/D02 ENV FY22 Task Environmental task order agreement for rict 1 and rict 2. focused mainly on projects in ricts 1 and 2. The duration 01/09/23 105685 D01/D02 ENV FY23 Task Environmental task order agreement for rict 1 and rict 2. focused mainly on projects in ricts 1 and 2. The duration 05/08/23 108000 D01 GPR FY24 Hire a firm by way of Task Agreement to perform Ground Penetrating Radar inspection on various structures and pavements. 24 month agreement. Ground penetrating radar (GPR) services on various structures and pavements. The completion time will be 24 months from the date of authorization to proceed. The maximum prime compensation shall not exceed $200,000. 01/08/24 107997 D01/D02 ENV FY24 Task Environmental task order agreement for rict 1 and rict 2. focused mainly on projects in ricts 1 and 2. The duration rict Subtotal: 7 3 05/04/20 05/03/21 108039 90765 102655 $950,000 $8,000,000 $2,700,000 LOR US 0020 24.97 RIC US 0030 17.50 LOR US 0006 06.86 Bridge ReplacementLOR US 0020 24.97 Bridge Replacement - Twin structures over Koogle Road Bridge Deck Replacement - LOR-6-6.86 (LOR-611D ove LOR-6)Bridge Replacement - LOR-611-0.31 (Martins Run) Bridge Repacement Bridge Replacement Bridge Replacement 10/01/23 10/01/23 102708 $5,000,000 LOR IR 0090 11.53 Bridge Deck ReplacementsLOR-90-11.53 L&R (over Murray Ridge Rd) Bridge Deck Replacement 10/01/22 10/01/22 Page 1 of 6

Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 3 05/08/23 90892 $9,000,000 RIC US 0030 14.08 Bridge Replacements RIC-030-14.08 L&R (US 30 over US 42) Bridge Replacement rict Subtotal: 5 4 09/08/20 109481 D04 Const. Insp/Admin FY2021 A 109482 FY2021 B 09/07/21 109483 FY2022 A 109484 FY2022 B 09/06/22 109485 FY2023 A 109486 FY2023 B 09/05/23 109487 FY2024 A 09/11/23 109488 FY2024 B 01/08/24 109489 FY2025 A 109490 FY2025 B One year Inspection Agreement to provide rict Subtotal: 10 6 05/04/20 107201 $44,480,000 FRA IR 71 0.00 Major rehabilitation of IR-71 and widening to 3 lanes in both directions entire length of project.replace and widen 2 pairs of mainline structures.design included with 93496 Page 2 of 6 Provide construction inspection services for duration of project 07/01/20 07/01/20

Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 6 09/07/21 88611 $2,000,000 FRA SR 104 9.690 Deck replacement of Groveport Road over SR-104Probable R/W. Columbus sidewalk coordination. Consultant to provide design services for environmental engineering thru on-going services, including right of way plans. 92063 D06 CON ENGR FY 22P Bridge painting inspection on construction projects in D6 for CY 2020 & 2021 Consultant to provide Paint Inspection Services on various projects as requested by rict 6. Contract duration 24 months. rict Subtotal: 3 7 05/04/20 107376 $16,889,749 MOT IR 75 14.74 Major rehabilitation of the Interstate 75 pavement by rebuilding the asphalt pavements. Consultant to deliver the following items associated with the design of this project: AER, Stage 1, Stage 2, Stage 3, Final Tracings. Consultant shall also be available or Pre-Bid Activities and On Going Services during construction. 01/01/23 01/01/23 01/10/22 101849 $4,219,000 MOT SR 4 17.79/18.03 MOT-4-1779 - Replace deteriorated bridge decks, investigate retrofit vs superstructure replacement, investigate semi-integral abutment conversion and other miscellaneous patching of substructure units.mot-4-1803 - Replace expansion joint seals, replace fa iled flexible scupper connectors, patch substructure Consultant will be required to complete the following: AER, Stage 1, 2, & 3 plans, Final Tracings, and assist in PreBid Activities, as well as provide On Going Services during rict Subtotal: 2 8 05/04/20 100822 HAM Mt. Adams Inspection FY21-23 Inspection, monitoring, and maintenance of the Mt. Adam Slope Stability System. Three year contract beginning July 1, 2020. Inspection and maintenance of the Mt. Adams slope stability system for a period of 3 years. Consultant may be required t complete maintenance construction contract plans to repair items identified 100903 D08 CE Paint Insp FY21/22 rict wide bridge painting inspection for FY21-FY22 rict wide general project and bridge painting inspection for FY2021/2022 (B) 101099 D08 TSINSP FY2021/FY2022 FY2021/FY2022 traffic signal inspection contract. FY2021/2022 construction traffic signal inspection contract 102726 $890,000 WAR IR 71 13.71 Rehabilitate WAR-71-13.71 bridge that carries Waynesville Rd over I-71. Rehab likely to include replacement of parapets, joints, bearings and painting of structure. Consultant will complete detailed construction and right of way plans as needed. 104668 $81,000,000 HAM IR 74 18.01 This is Phase 5B of the Hamilton MCE 75 corridor projects. This phase was split off of the work originally to be completed under 83723. Project addresses work on I-74 as part of the I-74/75 interchange reconstruction. In addition, will improve the I-75 ramps to I-74 WB. Inspection 07/01/21 08/01/21 Page 3 of 6

Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 8 09/08/20 100838 D08 BI 2021/2022 (A) D8 Consultant Bridge Inspection Contract for various truss bridges in the rict for calendar year 2021 and 2022. Annual Bridge inspection for various fracture critical steel pier caps for calendar years 2021 and 2022 100839 D08 BI 2021/2022 (B) D8 Consultant Bridge Inspection Contract for calendar year 2021 and 2022. Includes various fracture critical steel pier caps. Annual bridge inspection for various truss bridges in rict 8 for calendar years 2021 and 2022 101029 $500,000 HAM SIGNS FY 2022 Systematic Sign Replacement-general routes. Systematic sign upgrade and data collection of all signs on all routes in Hamilton County. 04/01/22 04/01/22 102842 D08/D07 GES Task FY 22/23 rict 7 and 8 Design Task for FY2022/FY2023 GES 102843 D07/D08 ES Task FY 22/23 rict 7 & 8 Environmetal Services Task for FY2022 & FY2023 Environmental services Task 105471 HAM Tunnel Insp/Tunnel FY20/21 Project to Inspect and maintain the Lytle Tunnel (Structur HAM-71-0134) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, draina ge systems and egress systems. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, drainage systems and egress systems. 107695 $650,000 BUT SR 4 14.88R Replace the boxbeam superstructure of bridge BUT-4-1488R Complete design services - Reservoir target sale date 10/01/23 01/04/21 84602 $691,000 BUT SR 122D 1.47 Replace bridge BUT-122D-0148, a 5 cell CMP pipe arch structure (87"x63") that carries SR 122 over the hydraulic canal in Middletown. Preparation of detailed construction plans and environmenta document. 102783 $476,000 BUT US 4 23.17 Rehabilitate Bridge BUT-4-23.17 over the Great Miami River by patching and strengthening piers with (Fiber Reinforced Polymer) FRP Consultant to prepare complete construction plans as well as environmental as needed. 09/07/21 102790 $3,982,000 HAM IR 71 1.81 Replace pedestrian bridge HAM-71-0181 over I-71 and Consultant to provide complete construction and right of way I-471 that spans from Mt Adams to US22. Rehabilitate the plans as well as some environmental work. pedestrian bridge HAM-22-0111 that spans over US22. Construct new ADA compliant ramp from Eggleston to junction of I-71/US22 pedestrian bridges. 102792 $570,000 GRE US 35/235 2.65/2.47 Rehabilitate bridges GRE-35-0265 that carries North Fairfield Rd over US 35 and and GRE-235-0247 that carries 235 over US 35 by strengthening the piers with Fiber Reinforced Polymer (FRP) and installing Vandal Protection Fences. Consultant to prepare complete construction plans. 105507 D08 CEINSP FY2023/FY2024 (A) rict wide general project and bridge painting inspection for FY2023/2024 (A) rict Wide general project and bridge painting inspection for FY2023/2024 105509 D08 CEINSP FY2023/FY2024 (B) rict wide general project and bridge painting inspection for FY2023/2024 (B) rict Wide general project and bridge painting inspection for FY2023/2024 105510 D08 CEINSP FY2023/FY2024 (C) rict wide general project and bridge painting inspection for FY2023/2024 Page 4 of 6 (C) rict Wide general project and bridge painting inspection for FY2023/2024

Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 8 09/07/21 105515 D08 TSINSP FY2023/FY2024 FY2023/FY2024 traffic signal inspection contract. FY2023/FY2024 traffic signal inspection 05/09/22 75630 $309,000 WAR SR 123 12.95 Rehabiltate Bridge No. WAR-123-1296, SFN: 8304351 over a tributary of Halls Creek by replacing the inlet wingwalls, patching and performing other minor rehabilitation items. Preparation of detailed construction plans and environmenta document. 102786 $1,542,000 PRE IR 70 8.72 Rehabilitate Bridge PRE-70-0872 which carries Monroe Central Road over I-70 by replacing the concrete deck. Consultant to prepare complete construction plans. 105475 D08 BI FY2023/2024 (A) D8 Consultant Bridge Inspection Contract for truss and complex bridges in rict 8 for calendar year 2023 and 2024. Consultant bridge inspection for truss and complex bridges in rict 8 for calendar year 2023 and 2024 105476 D08 BI FY2023/2024 (B) rict 8 consultant inspection contract of various fracture critical steel pier caps in the rict for calender year 2023 and 2024. Consultant inspection of various fracture critical steel pier caps for calendar year 2023 and 2024 09/06/22 77942 $2,121,000 GRE SR 72 18.76/18.83 For Bridge Nos. GRE-72 1876 and 1883, SFNs: 290207 and 2902109 respectively: replace the existing concrete slabs on existing substructure units and perform other minor rehabilitation. The bridges carry SR 72 over the Little Miami River (1876) and a ta il race to the Little Miam River (1883). Consultant to prepare detailed construction plans through final engineering phase and prepare environmental document. 105220 $1,039,000 HAM IR 71 5.05 Minor Rehabilitation of the bridge the HAM-71-0505 Bridge that carries Woodburn Ave over I-71. Preparation of detailed construction plans through Final Engineering. 105472 HAM Tunnel Insp/Tunnel FY22/23 Project to Inspect and maintain the Lytle Tunnel (Structur HAM-71-0134) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, draina ge systems and egress systems. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, drainage systems and egress systems. 01/08/24 105473 HAM Tunnel Insp/Tunnel FY24/25 Project to Inspect and maintain the Lytle Tunnel (Structur HAM-71-0134) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, draina ge systems and egress systems. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, drainage systems and egress systems. rict Subtotal: 28 9 05/04/20 102917 LAW Ironton Russ Brdg Insp FY22 FY22 in depth Bridge Inspection In depth Bridge Inspection rict Subtotal: 1 Page 5 of 6

Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 11 05/04/20 75089 $3,253,164 TUS US 250 14.12 Rehabilitation of twin steel beam bridges by replacing the bridge decks and converting the abutments to semi-integral. Consultant request for Consultant to develop detailed plans for Rehabilitation of two structures on US 250 in Tuscarawa County. 91607 $3,292,189 TUS US 250 22.890 Replace bridge deck and paint structural steel. To develop construction plans to replace deck and paint structural steel 01/04/21 100568 $2,883,934 BEL IR 70 26.180 Replace existing deck with new reinforced concrete deck. Convert abutments to semi-integral. To develop construction plans for deck replacement of BEL-70-26.18 (SFN 0702978) bridge. 102540 $4,206,898 TUS IR 77 23.600 Replace existing superstructures of the twin bridges with new Slab superstructures. Replace Approach Slabs. Repair abutments/substructure. To prepare construction plans for replacement of superstructure on two bridges 09/07/21 84015 $950,134 BEL SR 148 16.510 Replace superstructure on box beam bridge. Temp construction fill in Captina Creek. Prepare complete construction plans for the replacement of the exisitng boxbeam superstructure with a new superstructure type. 01/01/26 01/01/26 01/09/23 81708 $6,800,658 BEL IR 70 21.340 Replace deck and paint structural steel on two bridges Prepare detailed construction plans for the replacement of a deck and the painting of the structural steel on two bridges rict Subtotal: 6 12 09/08/20 21781 $4,200,000 CUY SR 002 05.97 Replace the deck of the Detroit Rd (SR-2/SR-254) bridge over IR-90 in Rocky River. Replace the deck of the Detroit Rd bridge over I-90 in Rocky River. 104102 $3,500,000 CUY IR 071 18.89 SW Deck Replace the deck of the ramp structure from SR-176NB t IR-90 WB over IR-490 in Cleveland. Work will include steel retrofits. Prepare construction contract plans to replace the deck of the structure from SR-176NB to IR-90 WB. rict Subtotal: 2 Total 64 Page 6 of 6