Administrative Modification 22 FY FY 2021 Transportation Improvement Program October 25, Page 1

Similar documents
Transcription:

County KIPDA ID State ID Name Description KENTUCKY PROJECTS Jeffersontown Jefferson 2230 Miscellaneous Sidewalks and ADA Ramps Construct and replace various sidewalks and ADA ramps throughout the city. Move Oversight from FY 2018 to FY Jeffersontown Jefferson 2385 KYTC Jefferson 213 5-531.00 KY 1932 KYTC Jefferson 1451 5-8501.00 KY 2055 Patti Lane Sidewalk Safety Improvement Construct sidewalks along Patti Lane, a urban collector, to connect three area schools and a high density residential neighborhood to a major arterial roadway (Taylorsville Road) and the public transit system along with a commercial cluster of uses. The project also includes curb and gutter, drainage related improvements and access management of adjoining businesses to reduce conflict with pedestrians and motorist. Improve the safety and congestion of KY 1932 (Chenoweth Lane) from US 60 (Shelbyville Rd.) to US 42 (Brownsboro Rd.), approx 1.07 miles. From MP 5.523 to MP 6.590. Construction of a Roundabout at West Manslick Road/Mount Holly Road at the intersection of Fairdale Road/Mitchell Hill Road as well as pavement rehabilitation from MP 1.36 to 1.42 on KY 2055 Move Design from FY 2018 to FY KYTC Bullitt 1493 5-293.00 KY 1494 Widen travel lanes (no additional travel lanes) and relocate a section of KY 1494 from KY 61 to Cundiff Lane. In FY 2018 Construction, reduce $129,285 (Federal) and for $170,715 (Federal) $170,715 (Total Cost) *** KYTC Oldham 1508 5-449.00 KY 22/KY 329 Intersection improvement at KY 22 and KY 329 in Crestwood. $129,285 (Federal) $129,285 (Total Cost) *** Page 1

County KIPDA ID State ID Name Description KYTC Jefferson 1879 5-481.00 KY 864 Widen Beulah Church Road from 2 to 3 lanes from I-265 to Cedar Creek Road. KYTC Jefferson 2214 5-536.00 KY 1931 Widen KY 1931 (St. Andrews Church Road) from two to three lanes from US 31 W (Dixie Highway) to Doss High School. This project will include bicycle and pedestrian facilities. From MP 3.148 to MP 4.887. In FY 2018 Construction, reduce $26,542 (Federal) and for KYTC Jefferson 2216 5-535.00 Sidewalk Connections on US 60, KY 1747 & KY 22 Installation of sidewalks to fix gaps in pedestrian network on US 60 (Shelbyville Road), KY 1747 (Hurstbourne Lane), and KY 22 (Brownsboro Road). Includes: westbound US 60 from end of U of L trail to Eden Avenue MP 7.717 to MP7.734, westbound US 60 from Daventry Lane to Wildwood Lane MP 7.966 to MP 8.051, eastbound US 60 from Wildwood Lane to Cambridge Station Frontage Road MP 8.062 to MP 8.241, eastbound US 60 from Dorsey Lane to Country Squire Florist entrance MP 8.535 to MP 8.641, southbound KY 1747 from Hurstbourne Trace to Eden Avenue MP 13.635 to MP 13.869, and eastbound KY 22 from Paul's Fruit Market to Herr Lane MP 0.370 to MP 0.432. $63,458 (Federal) $63,458 (Total Cost) *** $26,542 (Federal) $26,542 (Total Cost) *** KYTC Bullitt 2237 5-544.00 KY 44 Sidewalks West of Shepherdsville Installation of new sidewalks and rehabilitation existing of sidewalks to fix gaps in the pedestrian network along KY 44 from Frank E. Simon Drive (City Park Drive) east to KY61 in Shepherdsville. MP 11.75 to 12.25. Add to TIP Open to Public date 2019 KYTC Jefferson NEW, Parent ID: 1643 5-10028.00 Various Interstate Bridge Maintenance Preventative maintenance on various structure along I-65 and at intersection of Preston Highway/I-264 in Jefferson County. (056B00342N, 056B00388N, 056B00391N, 056B00394N) IM $2,275,000 (Federal) $2,275,000 (Total Cost) Transportation Jefferson 223 5-404.01 Cooper Chapel Road Phase 3 Phase 3: Extend and construct 2 lane roadway with a continuous center-turn lane from KY 864 (Beulah Church Road) to US 31E (Bardstown Road) at Bardstown Falls Road. will include consideration of bicycle and pedestrian facilities. Page 2

County KIPDA ID State ID Name Description In FY 2018 Right of Way, reduce by $63,840 (Federal) and add $76,400 (Other) for $336,160 (Federal) $76,400 (Other) $412,560 (Total Cost) Program Design in FY 2019: Transportation Jefferson 384 5-479.00 Hubbards Lane Widen Hubbards Lane from 2 to 3 lanes (3rd lane will be a center turn lane) from US 60 (Shelbyville Road) to KY 1447 (Westport Road). Add bike lanes to Hubbards Lane from Kresge Way to KY 1447. length is 1.4 mi. $63,840 (Federal) $14,510 (Other) $78,350 (Total Cost) Transportation Jefferson 1109 5-505.00 Ohio River Levee Trail - Phase III Construct bicycle/pedestrian facilities along Campground Road from the end of the shared use path at the railroad crossing on Campground Road near I-264 to Lees Lane and the connection to Riverside Gardens Park at 2899 Lees Lane. Reduce $210,065 (Federal) and $39,183 (Other) for a new cost of this phase: $323,268 (Federal) $80,817 (Other) $404,085 (Total Cost) In FY 2021 Construction, add $210,065 (Federal) and $52,516 (Other) for Transportation Jefferson 2116 5-525.00 Northeast Louisville Loop - Design and construct a shared-use path system from Eastwood Cut Off Road to Section II Eastwood Recreation Center (16300 Eastwood Cut Off) $660,065 (Federal) $165,016 (Other) $825,081 (Total Cost) Page 3

County KIPDA ID State ID Name Description Transportation Jefferson 2540 River Rd Multi-Modal Improvements - 3rd to 7th Between 4th Street and 6th Street, we propose to reduce from two westbound lanes to a single westbound lane with a shoulder, allowing the [multimodal] path to increase to 14 feet in width. Middletown Jefferson 2267 5-3039.00 Kratz Lane Sidewalks Construct sidewalks along Kratz Lane for 0.35 miles between Shelbyville Road and Old Shelbyville Road/Main Street, including drainage improvements. Remove FY 2018 Design with $100,000 (Federal) and $25,000 (Other) for a Total Cost of $125,000. In FY 2019 Construction, add $100,000 (Federal) and for Oldham County Oldham 321 5-434.00 LaGrange Underpass West of LaGrange Construct a 4 lane uninterrupted rail underpass west of LaGrange. $10,100,000 (Federal) $10,000,000 (Total Cost) Remove FY 2018 Design with $25,000 (Federal) and $6,250 (Other) for a Total Cost of $31,250. In FY 2019 Construction, add $25,000 (Federal) and for a new cost of this phase: Oldham County Oldham 1606 5-494.00 Old Floydsburg Road Replace narrow one-lane culvert crossing; clear trees and vegetation out of right-of-way; add shoulder to the road, and add signage for safety. $950,000 (Federal) $950,000 (Total Cost) Page 4

County KIPDA ID State ID Name Description In FY 2018 Right of Way, reduce by $33,556 (Federal) and $8,389 (Other) for $680,944 (Federal) $170,236 (Other) $851,180 (Total Cost) In FY 2019 Utilities, add $33,556 (Federal) and $14,089 (Other) for a new cost of this phase: Oldham County Oldham 1808 5-754.00 Buckner Connector Construct new connection from Old LaGrange Road to KY 393. length is 0.8 miles. $261,556 (Federal) $65,389 (Other) $326,955 (Total Cost) University of Louisville Jefferson 2225 University of Louisville Pedestrian Improvements Install or retrofit 400 or more lighting fixtures throughout campus including the L Trail, Humanities Building and other campus sidewalk locations. *** The project sponsor submitted a Phase Shift Application or Cost Increase Application in compliance with KIPDA's Management Process. Move Oversight from FY 2018 to FY Page 5