LARGE INFRASTRUCTURE PROJECT CONFERENCE 2018 BUILD FOR LIFE HCMC - OCTOBER, 2018 PRESENTED BY: PHAM ANH TUAN DEPUTY GENERAL DIRECTOR PORTCOAST CONSULTANT CORPORATION

Contents 1.The existing of Vietnam Seaport system; 2.The Master plan of Vietnam Seaport system; 3.Some key projects. 6

Vietnam seaport system Group 1 Group 2 Group 3 Group 4 - Group 1: Port group in the North from Quang Ninh to Ninh Binh provinces; - Group 2: Port group in the North Central Coast from Thanh Hoa to Ha Tinh provinces; - Group 3: Port group in the Central Coast from Quang Binh to Quang Ngai provinces; - Group 4: Port group in the South Central Coast from Binh Dinh to Binh Thuan provinces; - Group 5: Port group in the southeast (including Con Dao and Soai Rap River in the administrative division of Long An Province); - Group 6: Port group in the Mekong Delta (including Phu Quoc Island and islands in the southwest); Group 5 Total cargo throughput the Vietnam seaport in 2017: 441.94 million tons; Of which container: 14.63 million TEUs. Group 6 8

51.60862 105.10935 72.93694 53.83968 107.95467 79.43008 49.56588 112.85344 91.06822 49.72899 136.47281 101.11334 52.07871 154.58231 118.39471 59.23343 185.90430 126.34834 64.09351 62.65200 202.06235 147.83447 213.58300 165.70100 Cargoes throughput Vietnam seaport 500 450 400 Total cargo throughput seaport system: + 1997: 45.7 mil. tons; + 2017: 441.9 mil. Tons. ~ 10 times. Average growth rate 2011-2017: - Liquid: 2.81% - Dry cargo: 10.66% - Container: 11.93% - Total: 9.8% 371.48606 Unit: Million tons 413.99033 441.93600 350 325.05573 300 287.31514 250 229.65492 241.22443 253.48754 200 150 100 050 000 2010 2011 2012 2013 2014 2015 2016 2017 Liquid Dry cargo Container Total Container cargo throughput in 2017: 165.70 million tons ~ 14.63 million TEUs. 9

Dry cargo (including container) forecast in 2020-2030 2017 Group 1: 36% Group 2+3+4: 17% Group 5: 43% Group 6: 4% 10

Container cargo forecast in 2020-2030 2017 Group 1: 33% Group 2+3+4: 04% Group 5: 62% Group 6: 01% 11

GMS Economic Corridors and Industrial maps 12

Road infrastructure system The main road connecting the port Group 1: Highway 5, Highway 10, Highway 18, Highway 39,... The main road connecting the port Group 2: Highway 7, Highway 8, Highway 24, Highway 46, Highway 47,... The main road connecting the port Group 3: Highway 9, Highway 12A, Highway 14B. The main road connecting the port Group 4: Highway 19, Highway 26, Highway 27, Highway 55. The main road connecting the port Group 5: Highway 51, North-South backbone (Ho Chi Minh City), the inter-port at CM-TV, Nhon Trach... The main road connecting the port Group 6: Highway 53, Highway 54, Highway 80. 13

Railway infrastructure system Total length of 3,143km: 2,531km mainline; 612km branch road; The network consists of seven main lines: North - South (Hanoi - HCMC) Hanoi - Hai Phong; Hanoi - Dong Dang; Hanoi - Lao Cai; Hanoi - Quan Trieu; Kep - Luu Xa; Kep - Ha Long. Some branch lines: Bac Hong - Van Dien; Cau Giat - Nghia Dan; Da Lat - Trai Mat. Currently, the railway network only connects to ports in Hai Phong and Quang Ninh such as Vinatrans, Viconship and Cua Ong. Dinh Vu - Hai Phong railway has not been invested. The Bien Hoa-Vung Tau railway project was delayed due to unclear sources of investment capital. 14

Development viewpoints, Objectives Development viewpoints: Group 1 Group 2 To make the fullest use of natural conditions for the comprehensive development of the seaport system; To focus on development of ports for vessels of larger than 100,000 DWT; To synchronously develop transport infrastructure for connecting seaports, ICD, Distribution Center,...; To make sure sustainable development; Group 3 Objectives Group 6 Group 5 Group 4 Throughput: 2020: 640-680 M tons/year; 2030: 1,040-1,160 M tons/year; Giving the priority in building international gateway ports for vessels of larger than l00,000 tons (8,000 TEUs) in Ba Ria - Vung Tau, Hai Phong and the Central Key Economic Region (if possible); specialized ports of large scale; Comprehensively developing the navigation channel system. 16

Port Group No.1 Area: Quảng Ninh Hải Phòng Thái Bình Nam Định Ninh Bình. Planned capacity of ports: + 2020: 153-164 mil tons; + 2030: 260-295 mil tons; Mayor ports in the area: + Hai Phong port, National general port; International gateway (grade IA). + Hon Gai Quang Ninh: National general port, regional hub (grade I). + Other; Vessels size : + General vessels :100.000 DWT; + Dedicated vessels : 70.000DWT. The main road connecting: Highway 5, Highway 10, Highway 18,.. etc. 17

Port Group No.2 18 Area : Thanh Hóa Hà Tĩnh. Planned capacity of ports: + 2020: 101-106 mil tons; + 2030: 171-182 mil tons; Mayor ports in the area: + Nghi Sơn Thanh Hóa: National general port, a regional hub (grade I). + Nghệ An: National general port, a regional hub (grade I). + Sơn Dương, Vũng Áng Hà Tĩnh: National general port, a regional hub (grade I). Vessel size: + General vessel : 30.000 50.000 DWT; + Dedicated vessel: 200.000 300.000 DWT. The main road connecting the port Group 2: Highway 7, 8, 45, 46, 47, 48,..etc.

Port Group No.3 19 Area: Quang Binh Quang Tri Thua Thien Hue Da Nang Quang Nam Quang Ngai. Planned capacity of ports : + 2020: 56.5-70 mil tons; + 2030: 97.4-115 mil tons; Mayor ports in the area : + Đà Nẵng, Dung Quất: National general port, a regional hub (grade I). + National general port, a regional hub (grade I). + Quảng Bình; Quảng Trị; Thừa Thiên Huế; Kỳ Hà: Local general ports (grade II). Vessel size: + General vessel : 10.000 50.000 DWT; + Dedicated vessel: up to 350.000 DWT. The main road connecting the port Group 3: Highway 9, Highway 12A, Highway 14B.

Port Group No.4 20 Area: Binh Định Phú Yên Khánh Hòa Ninh Thuận Bình Thuận. Planned capacity of ports: + 2020: 61 62.5 mil tons; + 2030: 85.4 91.3 mil tons; Mayor ports in the area : + Vân Phong Khánh Hòa: National general port, a international transshipment hub (grade IA). + Quy Nhơn; Nha Trang, Cam Ranh: National general port, a regional hub (grade I). + Vung Rô; Ca Na: Local general ports (grade II). + Vinh Tân: dedicated port Vessel size: + General vessel: 15.000 TEUs; + Dedicated vessel: up to 200.000 DWT. The main road connecting the port Group 4: Highway 19, 26, 27, 55

Port Group No.5 21 Area: Ho Chi Minh City Ba Ria Vung Tau Dong Nai Binh Duong Long An Planned capacity of ports: + 2020: 238 248 mil tons; + 2030: 358,5-411,5 mil tons; Mayor ports in the area : + Vung Tau: National general port, International gateway (grade IA), International transshipment hub. + Ho Chi Minh, Dong Nai: National general port, a regional hub (grade I). + Binh Duong: Local general ports (grade II). Vessel size: + Container vessel: 18.000-21.000 TEUs; + General vessel: 100.000 DWT; + Dedicated vessel: up to 100.000 DWT.

Port Group No.5 Sai Gon Area Cat Lai Area Nhon Trach Area Nha Be Area Hiep Phuoc Area Go Dau Area My Xuan Area Phuoc An Area Thi Vai Area Long An Area Tien Giang Area Cai Mep Area Vung Tau Area 22

Port Group No.6 Area: Mekong Delta. Planned capacity of ports : + 2020: 25 28 mil tons; + 2030: 66.5 71.5 mil tons; Vessel size: + General vessel: 20.000DWT; + Dedicated vessel: up to 23100.000DWT.

Port group No.6 Gateway port Major port Key economic region Economic zone Industry zone economic corridor Road Railway Inland waterway The main road connecting the port Group 6: Highway 53, Highway 54, Highway 80. 24

Cruises Terminal Starting Stage: - Berths No.1 & 2 - Total length: 750m - Area: 45ha Lach Huyen International Gateway Terminal Container Terminal - Stage: 2020 - Berth No.3 No.6 - Total length: 2.250m - Area: 219ha General Cargo Terminal - Stage: 2020 - No. of Berth: 03 berth - Total length: 750m - Area: 45ha Chanel - Length: 16,8km - B: 160m - Depth: -14,0m General Cargo Terminal - Stage: 2020-2030 - Vessels: Up to 10.000DWT - Total length: 1.100m - Area: 66ha General Cargo Terminal - Stage: 2020-2030 - No. of Berth: 07 berth - Total length: 1.000m - Area: 60ha Container Terminal - Stage: 2020-2030 - No. of Berth: 10 berth - Total length: 3.750m - Area: 312ha 26 Function: - International Gateway Terminal of Northern; - Container, General Cargo; - Vessels size: Up to 100.000 DWT; 6.000-8.000 TEU.

Lien Chieu International Terminal Function: - International Gateway Terminal of Central; - Container, General cargo; Bulk cargo. - Vessels size: Up to 100.000 DWT; 6.000-8.000 TEU. 27

Van Phong International Transhipment Terminal Function: - International Transhipment Terminal; - Container. - Vessels size: Up to 15.000 18.000 TEU. 28

Cai Mep Thi Vai International Gaterway Terminal 29 Function: - International Gateway Terminal of Southern; - Container, General cargo; Bulk cargo. - Vessels size: Up to 200.000 DWT; 21.000 TEU.

Cai Mep Ha Logistics Park Total Area: 1,148.7 ha: + Logistics Park: 868.7ha; 30 + Terminal: 280 ha.

31 CMIT Video

Thank you for your attention! CONSULTANT: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ CẢNG - KỸ THUẬT BIỂN PORTCOAST CONSULTANT CORPORATION Address: 92 Nam Ky Khoi Nghia, Dist. No.1, Ho Chi Minh City, Vietnam Tel: 8428 38211486, 62970345; Fax: 8428 62970344 Website: www.portcoast.com.vn E-mail: portcoast@portcoast.com.vn