WE International, Inc.

Similar documents
HouseWrap Applications System R-Value: R-4.17 Horizontal Heat Flow Only

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

HI-PERFORMANCE REFLECTIVE INSULATION. The most versatile insulation CONTRACTOR INFORMATION AND INSTALLATION GUIDE

GAF EnergyGuard Polyiso Wall Sheathing

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

DuPont Tyvek Wall Underlay Install Guide

WeatherSmart Air Barrier Installation Guide

INSULATION BATT (1) (2) Code Reference: 2016 Title 24, Reference Appendices RA3.5. Pressure or Friction Fit

ESD5 GENERAL GUIDELINES ESD 5 INSTALLATION ESD 5 ROLLS HANDLING:

ESD5 GENERAL GUIDELINES ESD 5 INSTALLATION ESD 5 ROLLS HANDLING:

10 Steps to Save Energy in Your House

In addition to performing as an interior vapor retarder, MemBrain the Smart Vapor Retarder may be installed as a continuous, interior

NOVAWRAP ASPIRE Q & A

About Insulation & R Value - cmhc.ca

FREQUENTLY ASKED QUESTIONS

Feature Zone IECC 2009 IECC

ATTICS. Use: PRODEX TOTAL INSULATION Foil-Foam-Foil (FfmF), Foil-Bubble-Foil (FBF), Foil-Fiberglass-Vinyl (FfgV), Foil-Foil (FF)

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

1 Exam Prep Prov Module: Thermal and Moisture Protection Questions and Answers

INSULATION OWENS CORNING INSULATION PRODUCTS IN THIS SECTION:

The better way to build TM. Installation Manual NAILBASE PANELS

EPA Seal and Insulate with ENERGY STAR Insulation Product Certification Report: GAF EnergyGuard Polyiso Insulated Sheathing Board Insulation

Solutions. for the Contractor. Reflectix Insulation

INSTALLATION GUIDE GUIDE TO ASC ISO-WALL CONSTRUCTION SYSTEM APPLICATION ISO-WALL SYSTEM. ASC Iso-Wall System Includes: Materials Required:

Chapter 4: Insulation

FirstEnergy Program Overview

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

Pella 250 Series. Wood Frame Construction with Vinyl Siding... V250-ID-888 Wood Frame Construction with Brick Veneer...

Foil Back Gypsum Board

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

Chapter 13. Ceiling Sheetrock

Installation instructions Thin, flexible multi-foil insulation

TABLE OF CONTENTS HALO INSTALLATION GUIDE. THE ADVANCED RIGID INSULATION ENVELOPE PRINTED 2017

Knauf Makes It Easy to Insulate

DuPont Tyvek Air Barrier Installation Guidelines. Canadian Version. Version 2

RADON ABATEMENT FROM THE GROUND UP

10 EXTREME BASEMENT PANELS

GOWANDA, NEW YORK SEPTEMBER 18, 2008 ARCH PROJECT NO

ENCLOSURE: SIMPLE LAYERS

Water control Vapor control and drying Room for growth

E S P. LOW-E REFLECTIVE INSULATION Reduces your carbon footprint INSTALL GUIDE CLASS A PRODUCTS

Standard practice for installing cellulose building insulation

DuPont. Tyvek Sheathing Membrane Installation Guidelines. Version 2. Canadian Version

Thermasheath-XP. Insulation for Exposed Use

Crawl Space Moisture Control

White Paper. Central Catholic High School, Portland, OR

Introducing TJ Insulated Structural Framing Components

Chapter 14 - Air Sealing

Section 22A. Lead Paint Risk Factor NONE-HIGH FLOOR INSULATION FOR CONVENTIONAL HOMES TABLE OF CONTENTS

E S P LOW-E REFLECTIVE INSULATION INSTALL GUIDE LOW-E PRODUCTS

RAY-CORE Structural Insulated Roof and Wall Panels

Table Air Barrier and Insulation Inspection Component Criteria

Gold Bond BRAND Gypsum Sheathing

Where to Draw the Line with Thermal Boundaries

Metal Buildings and Condensation. Welcome to Metalcon Condensation Description. Program Objectives. Dew Point Temperatures

Encapsulated, Sealed & Closed Crawlspace Installation Manual

Envelope Highlights Mandatory Measures Prescriptive High Performance Walls 150.1

Concrete Soffit Direct Fix

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

Issue Date: April 2003 Release: I. Product Specifications

A Rater s perspective from the field. Thomas H. Marston, February 21, 2007

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction

The Inspection Process. Waxhaw N.C.

NORANDEX 1/4 EXTRUDED POLYSTYRENE FOAM INSULATION

G O G R E E N W I T H A F U L L L I N E OF ESP LOW-E INSULATION PRODUCTS

Low-cost Construction for High-energy Savings. Brian J. Wimmer Construction Manager Rochester Area Habitat for Humanity

Building Your Own Wine Room

7.0 - EXAMPLE DETAILS

Explaining the Thermal Bypass Checklist. Ed Minch, Energy Services Group Kelly Parker, GWS

Installation and Planning Guide

2006 INTERNATIONAL ENERGY CONSERVATION CODE

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 Section [ ].

MID-RISE DESIGN & CONSTRUCTION

9.36. Energy Efficiency

1.0 - PRODUCT DESCRIPTION

Technical Data Sheet

Moisture Considerations for Insulated Building Assemblies

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials

4 EXTREME FOUNDATION PANELS

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

Design & Construction Standards, Revised January

SES FOAM 0.5 LB SPRAY INSTALLATION INSTRUCTIONS

Radon Vent Pipe System. Labeling Performance Indicators

5.0 NUDURA PRODUCTS ON SITE STORAGE PACKAGING, UNIT ASSEMBLY, USAGE

The Transition to Energy Efficient Homes in Canada

Grey Matter: Platform Performance

R-Matte Plus-3: Insulation for the Building Envelope

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION

Carpentry/Carpenter CIP Task Grid

Chapter 13. Ceiling Sheetrock

NEXT GENERATION HIGH PERFORMANCE WALLS

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

Why Control Heat flow? How to Control Heat Flow? Thermal Performance. Modes of heat transfer: Thermal Control: Insulation & Thermal Bridges

Inspection of New One- and Two- Family Dwellings

Framing Methods Structural Components

Transcription:

M E E T Y O U R R O U N D T H E Steel Frame Building Roof Application - Drape Method Ideal insulation for steel frame building application Quick and easy to install Provides reflective insulation for radiant heat loss/gain Blocks up to 97% of radiant heat Excellent vapor barrier Greatly reduces condensation 1) Starting at an end of the building, apply two-sided tape on the first C or Z channel. 2) Roll out rfoil Reflective Insulation, allowing it to sag between the rafters, creating a 1 (approx). air space between the top of the foil and the bottom of the roof panel. 3) Seal all seams with 2 Reflective Foil Tape (All tape should be applied using a flat edge taping tool to ensure good adhesion.) 4) Attach metal roofing with usual method.

M E E T R O U N D Y O U R T H E Post Frame Buildings Wall & Ceiling Application, Method #2 Ideal insulation for post frame building application Quick and easy to install Provides reflective insulation for radiant heat loss/gain Blocks up to 97% of radiant heat Excellent vapor barrier Greatly reduces condensation For Ceilings: 1) Staple leading edge of rfoil to end truss and then again on the side of the truss as in illustration. 2) Wrap foil around the truss, stapling it to the edge to tack it into place. Continue around to the other side, as shown in the installation. 3) Continue to staple rfoil along the ceiling, ensuring that the Foil is recessed into the cavity to provide at least a 1 space on either side. 4) Seal all seams with 2 Reflective Foil Tape (All tape should be applied using a flat edge taping tool to ensure good adhesion). 5) Attach interior lining using usual method. For Walls: 1) Unroll rfoil Single Bubble Foil horizontally along the wall. 2) Staple edge to corner stud and then again on the side of the stud, as show in in the illustration above. 3) Wrap rfoil around the stud, stapling it to the edge to tack it into place. Continue around to the other side, as shown in the illustration. 4) Continue to staple rfoil along the wall, making sure that it is recessed into the wall cavity to provide at least a 1 space on either side. 5) Seal all seams with 2 Reflective Foil Tape (All tape should be applied using a flat edge taping tool to ensure good adhesion). 6) Attach interior lining using usual method.

M E E T Y O U R R O U N D T H E Post Frame Building Retroft With Single Bubble Foil or Single Bubble Poly Ideal insulation for post frame building application Quick and easy to install Provides reflective insulation for radiant heat loss/gain Blocks up to 97% of radiant heat Excellent vapor barrier Greatly reduces condensation White or Black Poly can be used. It is resistant to animal waste, and is ieasy to clean for agricultural use. With Single Bubble Foil 1) If trusses or wall posts are equal to or greater than 48 on center, add wood furring strips in the cross directions to posts and trusses at 24 on center. This will prevent rfoil from sagging after installation. 2) Unroll rfoil Single Bubble Foil perpendicular to trusses and wall posts. Staple to all posts/trusses and furring strips. 3) Seal all seams with 2 Reflective Foil Tape (All tape should be applied using a flat edge taping tool to ensure good adhesion.) With Single Bubble Poly 1) rfoil Single Bubble Poly may be used if a white or black interior is more desirable. 2) Install furring strips as described in Single Bubble Foil Step #1 Notes: 1) This installation method is also suitable for new post frame buildings in the northern part of the United States and Canada. 2) Unroll rfoil Single Bubble Poly perpendicular to trusses and wall posts. Staple to all posts/trusses and furring strips. 3) Seal all seams with 2 Vinyl Tape (All tape should be applied using a flat edge taping tool to ensure good adhesion.) 2) If you are going to install paneling or metal to the interior, please use Post Frame Building, Method #2 instead.

M E E T R O U N D Y O U R T H E Perimeter Insulation on Outside of Foundation With rfoil Concrete Barrier Quick, easy and safe to install Replaces 2 foam board insulation 100% vapor proof - creates a vapor barrier Greatly reduces basement dampness 1) Unroll rfoil Concrete Barrier horizontally on the outside of the foundation. 2) Secure to foundation using fasteners or adhesives. 3) Seal all seams with 2 or 3 vinyl tape (All tape should be applied using a flat edge taping tool to ensure good adhesion). 4) Backfill soil as usual.

M E E T Y O U R R O U N D T H E Under Carpet With rfoil Concrete Barrier/Single Bubble Poly/Double Bubble Poly Eliminates basement dampness Increases comfort Quick and easy to install Excellent vapor and radon barrier Keeps ffloor warm Thermal Value: - Equivalent to R-10 for the assembly - Tested with thermography method 1) Unroll rfoil over concrete floor. If using Single Bubble Poly or Double Bubble Poly, install white poly facing the ground and aluminum side up. 2) Seal the seams with regular foil tape (2 wide). (All tape should be applied using a flat edge taping tool to ensure good adhesion). 3) Install the carpet as usual.

M E E T R O U N D Y O U R T H E Basement Walls With Single Bubble Foil, Method #2 Quick, easy and safe to install Provides reflective insulation for radiant heat loss or gain Blocks up to 97% of radiant heat during the winter 100% vapor proof - creates a vapor barrier 1) Fasten 2x4 wall against concrete foundation using usual methods. 2) Attach rfoil Single Bubble Foil horizontally to 2x4 s, stapling it 1 back into the wall cavity, as shown. 3) Seal all seams with 2 Reflective Foil Tape (All tape should be applied using a flat edge taping tool to ensure good adhesion). 4) Attach drywall or paneling as usual.

M E E T R O U N D Y O U R T H E Basement Walls With Single Bubble Foil, Method #1 Quick, easy and safe to install Provides reflective insulation for radiant heat loss or gain Blocks up to 97% of radiant heat during the winter 100% vapor proof - creates a vapor barrier (It is important to remember that rfoil works best when there is a 1 airspace between rfoil and another material, like drywall or paneling. Since it is important to block heat leaving a building or house, the 1 airspace should be closest to the inside). 1) Attach 2x2 furring strips to basement/masonry wall with construction adhesive. Note: Regular 2x4s can be ripped on a table saw and used. 2) Tack rfoil horizontally to furring strips using staples. Pull it tight along the wall, but make sure the rfoil is not touching the basement wall. 3) Seal all seams with 2 Reflective Foil Tape (All tape should be applied using a flat edge taping tool to ensure good adhesion). 4) Fasten 2x2 furring strip over rfoil insulation using normal installation methods. 5) Attach drywall or paneling as usual.

WE WE MEET YOUR NEEDS AROUND THE WORLD PHONE: (574) 457-3066 FAX: (574) 457-8807 Crawlspaces With rfoil Double Bubble Foil Helps reduce heat loss and prevent cold floors Adds extra 14.8 R-Value (based on ASTM C236 test) No nesting support for insects and rodents Helps prevent ground moisture from causing dry rot Helps prevent condensation from causing mold and bacteria growth Excellent vapor and radon barrier if needed Installation Notes: Installing rfoil DBF can be done under floor joists or between floor joists. DBF can be used with regular mass insulation, or instead of it. We recommend replacing old insulation before installing rfoil. If you want to use additional insulation with rfoil DBF, we strongly recommend using rigid insulation, following the instructions below. Wear safety goggles and head protection. Also wear a dust mask when removing old fiberglass insulation. Since there is a high probability of mold and bacteria in the old fiberglass, a respiration mask is ideal. 1) Don t use any fibrous insulation between floor joists. Use rigid insulation, if necessary. 2) Staple Double Bubble Foil from the Ring Box joist to the bottom of the sill plate as in N/S elevation. Use 16 wide material if necessary. 3) Staple DBF under the floor joists. Be sure to seal it well around the perimeter (illustration #2). (All tape should be applied using a flat edge taping tool to ensure good adhesion). Builders Note: For higher R-Value 1) Install a wood strapping over the Double Bubble Foil perpendicular to the joists (skip this step if you have used 16 material, and installed it between the floor joists). 2) Nail rigid insulation following the manufacturer s instructions. Make sure the airspace between the DBF and rigid insulation is well sealed.

WE WE MEET YOUR NEEDS AROUND THE WORLD PHONE: (574) 457-3066 FAX: (574) 457-8807 Residential Housewrap With No-Tear Radiant Barrier PERF or SOLID Ideal housewrap for residential construction Quick and easy to install Provides reflective insulation for radiant heat loss/gain Serves as standard wind block already used on all new construction Solid No-Tear serves as a moisture & vapor barrier Blocks up to 97% of radiant heat 1) Unroll No-Tear Radiant Barrier horizontally around perimeter of house. Use same methods for installing regular housewrap. Staplein place every 12-18. 2) Cut out any holes for doors and windows. 3) If you are using No-Tear SOLID, seal all seams with 2 Reflective Foil Tape (All tape should be applied using a flat edge taping tool to ensure good adhesion). You should be using No-Tear SOLID, only if building codes require a vapor barrier on the exterior of the house (warm weather climates only). If you are using No-Tear PERF, reflective tape is not necessary. Use No-Tear PERF if a vapor barrier is required on the interior of the house. Using No-Tear SOLID in this type of application can result in vapor lock. 4. Attach siding or bricks using usual method. If possible, leave an airgap between the bricks and the No-Tear.

WE WE MEET YOUR NEEDS AROUND THE WORLD PHONE: (574) 457-3066 FAX: (574) 457-8807 Under Radiant Floor Heating Systems With rfoil Concrete Barrier Reduces heat loss by 77% Quick, easy and safe to install Helps to radiate the energy in the slab Reduces installation time and labor over alternative insulations 85 psi puncture resistance; 140 psi compression resistance (Highest in the industry) 100% vapor proof - creates a vapor, radon, and methane barrier Can be used with ice & snow metls 1) Unroll Concrete Barrier over the sand or gravel. Since there are bubbles on both sides, there is no right side up; either side will work. 2) Curl the seams 2 up the sidwall. This prevents horizontal heat loss. 3) Butt the edges together. 4) Seal the seams with 3 white poly tape (All tape should be applied using a flat edge taping tool to ensure good adhesion). 5) Install Radiant Heating and pour the concrete as usual. Builders Note: Adding 1 of sand over Concrete Barrier will facilitate water drainage, thus shortening actual curing time. WE International also offers concrete curing blankets for winter use.

WE WE MEET YOUR NEEDS AROUND THE WORLD PHONE: (574) 457-3066 FAX: (574) 457-8807 Residential Homes Wall Application Used by itself or in conjunction with mass insulation Quick, easy and safe to install Provides reflective insulation for radiant heat loss or gain Adds R-9.8 to wall system as determined by ASTM C236 Hot Box test 100% vapor proof - creates a vapor barrier 1) Unroll rfoil Reflective Insulation horizontally along the wall. Regular bulk insulation should already be in place. If you are using kraft-faced fiberglass, put 2 or 3-6 cuts into the kraft paper to prevent vapor lock. 2) Staple edge to corner stud and then again on the side of the stud, as showin in the illustration above. 3) Wrap rfoil around the stud, stapling it to the edge to tack it into place. Continue around to the other side, as shown in the illustration. 4) Continue to staple rfoil along the wall, making sure that it is recessed into the wall cavity to provide at least a 1 space on either side. 5) Seal all seams with 2 Reflective Foil Tape (All tape should be applied using a flat edge taping tool to ensure good adhesion). 6) Attach drywall or paneling using usual method.

M E E T Y O U R R O U N D T H E Residential Homes Ceiling Applications Used by itself or in conjunction with mass insulation Quick, easy and safe to install Provides reflective insulation for radiant heat loss or gain Reflects up to 97% of radiant heat Adds R-14.3 to ceiling system 100% vapor proof - creates a vapor barrier 1) Staple leading edge of rfoil to end truss/rafter and then again on the side of the truss/rafter as in illustration. 2) Wrap foil around the truss/rafter, stapling it to the edge to tack it into place. Continue around to the other side, as shown in the installation. 3) Continue to staple rfoil along the roofline, ensuring that the Foil is recessed into the cavity to provide at least a 1 space on either side. 4) Seal all seams with 2 Reflective Foil Tape (All tape should be applied using a flat edge taping tool to ensure good adhesion). 5) Attach drywall or paneling using usual method.